Aurangabad District Swachhata Plan

Strategy and plan to make district ODF by December 2017

Aurangabad District Swachhata Plan 1

CONTENTS

1. Introduction ...... 2

2. Enabling Factors and Bottlenecks ...... 5

3. The Strategy ...... 6

4. Strategic actions and activity plan ...... 7

4.1 Demand Management ...... 7

4.2 Demand Response Mechanism ...... 15

4.3 Oversight and Monitoring ...... 21

4.4 Sustainability Plan ...... 22

Institutional arrangements for implementation of the strategy ...... 23

Non-negotiables for the strategy ...... 24

Activity Plan ...... 26

Financial Plan ...... 30

5. Annexure ...... 31

Annexure 1 List of Master Trainers and Motivators ...... 32

Annexure 2 GP wise status of Sanitation ...... 36

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 2

1. INTRODUCTION

1.0 State and District Vision The Government of (GoM) has recently announced its vision of making the state Open Defecation Free (ODF) by March 2018.1 In order to contribute to this vision of the GoM, Zilla Parishad, Aurangabad decided to make the district ODF by December 2018 and developed an appropriate strategy and detailed action plan, outlined in this document.

1.1 Current sanitation situation in the district

A snapshot of the sanitation situation, as of December 2016, with respect to baseline Survey 2012 (BLS-2012) is presented in Table-1 below.

Table-1: Sanitation coverage in Aurangabad district: Total Units 9 Blocks 854 3,76,037hhs Gram Panchayats (GPs) Sanitation coverage No block ODF 93(10.9%) 1, 63,511 hhs (43.5%) Target 9 761 (89.1%) 2, 12,526 hhs (56.5%)

1.2 The Targets

1.2.1 BLS 2012 Target

100% An analysis of block wise status of

80% sanitation reveals that out of the 9 blocks to be made ODF, one block has 60% above 70% coverage, 2 blocks have 40% coverage above 50% coverage, 3 20% blocks have coverage between 40% to 0% 50% and 3 blocks have coverage below 40%. Details are given in table-2, below. Achievement Target

1 Announcement by Hon Chief Minister of Maharashtra on 19/11/2016

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 3

Three blocks (, and Kannad) have a target above 30,000 units each and contribute half of the total target. Hence, these blocks need special attention. Table -2: IHHL coverage and targets Sr. Block Total Total HHs ODF GPs % of ODF IHHL Target in No. GPs GPs Coverage % numbers 1. Aurangabad 113 48789 32 28% 57.4% 20801 2. Gangapur 109 51236 6 6% 42.1% 29646 3. Kannad 137 57402 8 6% 38.3% 35424 4. Khultabad 38 16799 14 37% 72.8% 4562 5. Paithan 107 52965 10 9% 38.9% 32338 6. Phulambri 67 23179 7 10% 50.4% 11504 7. Sillod 103 57502 6 6% 32.8% 38616 8. Soygaon 46 20462 2 4% 44.6% 11335 9. Vaijapur 134 47703 8 6% 40.7% 28300 Grand Total 854 376037 93 11% 43.5% 212526 Source: SBM data as on December 2016, data received from the district

Following map presents the block wise targets of IHHL construction.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 4

1.2.2 Additional families and defunct toilets:

Two additional factors add to the target load. These are additional families and defunct toilets in the district.  Target of additional families and  There are 77,550 new households formed defunct toilets add to the target load in GPs after baseline survey which do not in the district. have a toilet.  The total target (BLS 2012+  19,721 toilets built so far are in some additional families without IHHLs + state of repair and are not in useable defunct toilets) in the district is condition or used for other purposes 3,09,797IHHLs (defunct toilets)  Three blocks (Sillod, Paithan and Kannad) contribute half of the total

target. These households, totalling about 3, 09,797 also need to be covered to achieve complete elimination of open defecation. Block wise status of additional families and defunct toilets in the district is presented in Table-3.

Table-3 additional families and defunct toilets in Aurangabad Defunct toilets Sr. No Block Total additional families Total % to total families with IHHLs 1. Aurangabad 8194 2962 16% 2. Gangapur 12280 1256 6% 3. Kannad 10910 1996 9% 4. Khultabad 5133 1412 12% 5. Paithan 6906 2434 14% 6. Phulambri 8072 2380 20% 7. Sillod 8489 1447 13% 8. Soygaon 1797 1379 15% 9. Vaijapur 15769 4455 7% Grand Total 77550 19721 12% Source: data received from the district

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 5

2. ENABLING FACTORS AND BOTTLENECKS

Aurangabad district has done well in moving towards achieving 100% ODF status. This achievement is due to a vibrant enabling environment, though bottlenecks exist in some aspects. The same are presented in the schematic below. In moving forward, this strategy aims to strengthen the enabling factors and address bottlenecks.

-Psychological barriers for -Utmost importnace by the usage of toilets CEO and HoDs- regular reviews, monitoring -High number of big GPs (39 GPs with more than 1000 -Social media based households) monitoring mechanism -Issues in baseline survey already functional data -Availability of manpower -Availability of funds and trained on ODEP (5 master their disbursement trainers and 8 motivators) -Involvement of political -ODEP process leaders

implemmented in almost all BOTTLENECKS target GPs -Less human power with technical knowledge of two High number of pre-cast pit toilets ENABLING ENVIRONMENT ENABLING superstructure manufacturers -Involvement from village level functionaries of other departments -Less effective convergence of government schemes -Availability of sand -Less time period available for achieving the target - Space constraints for toilet construction in big GPs

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 6

3. THE STRATEGY

This section presents the strategy and action plan adopted by Zilla Parishad, Aurangabad to achieve the goal of making the district ODF by December 2017. While the primary aim of the strategy is to cover the BLS-2012 target, the strategy also focuses on covering additional families without toilets and families with defunct toilets, in convergence with other programs. Another key focus area of the strategy is to ensure sustainability of the ODF status. The unit of planning in this strategy is a block and builds on three pillars; (i) Demand Management (ii) Demand Response Mechanism and (iii) Oversight and monitoring. Key elements of these pillars are explained in the schematic diagram presented below.

• Strategic planning and prioritization of IHHL construction • Rolling out ODEP process for generating demand at village level and its consolidation at higher levels Demand • Behaviour change communication for demand generation at Management hosuehold level • Involvement of elected representatives for higher visibility, enhanced outreach and oversight • Involvement of other stakeholders for positive behaviour change

• Monitoring quality of construction of toilets Demand • Effective convergence of government schemes Response • HR development and deployment to high burden areas Mechanism • Supply chain management • Effective fund flow mechanism

• Regular monitoring Oversight and • Oversight by sampark adhikaris and elected representatives Monitoring • Concurrent online and offline data entry • Third party monitoring

Next section of this document details the key strategic actions followed by the action plan.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 7

4. STRATEGIC ACTIONS AND ACTIVITY PLAN

The key strategic actions and a detailed action plan under the three strategic pillars are captured in this section. 4.1 Demand Management Demand response While there is a good awareness mechanism about need for adopting Oversight Demand sanitation behaviour, there are and Management some sections where the monitoring awareness is not yet translated into demand. Hence, generating District demand for building toilets Swachhata among these sections is Plan paramount. Second, creating demand for making the entire GP ODF is also equally important and hence demand creation is a non-negotiable in this strategy. The district would adopt three processes for this;  ODEP process- for generating demand for making the GP ODF.  Behaviour Change Communications (BCC) for generating demand for building toilets and using them.  Effective engagement of elected representatives and other key stakeholders for proving overall leadership and oversight to the drive. This section presents the strategic actions related to generation, articulation and consolidation of demand for sanitation.

Demand Management  Strategic planning and prioritization IHHLs construction - (for BLS-2012 families, additional families and defunct toilets)

 Rolling out ODEP process for generating demand for making GPs ODF.  Behaviour change communication for triggering household’s demand for building and using toilets.

 Engagement of elected representatives for effective leadership and overall oversight.  Involvement of other stakeholders, as required.

PriMove Pune UNICEF Mumbai 4.1.1: Strategic planning and prioritization IHHL construction All the 761 GPs will be targeted simultaneously but the achievement of ODF status is likely to spread in the next 13 months, based on the burden. While the GPs with very low burden are expected to become ODF earlier, focusing on high burden GPs is a non-negotiable. a. BLS-2012 families On the basis of GP wise data, planning for achieving ODF status of each GP was undertaken and plotted against monthly time frame. Based on this, the likely time frame for each block to become ODF was also estimated. These details are presented in Table-4. Table -4: Month wise planning for making GPs and Blocks ODF

Block Already Month wise no. of GPs to be made ODF To be Total Name ODF Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sept- Oct- Nov- Dec- Total made GPs GPs 16 17 17 17 17 17 17 17 17 17 17 17 17 ODF by Aurangabad 113 32 9 6 20 26 8 9 1 0 2 0 0 0 0 81 Aug-17 Gangapur 109 6 0 10 1 20 21 2 1 22 26 0 0 0 103 Sep-17 Kannad 137 8 0 4 6 6 6 10 8 13 6 20 10 15 25 129 Dec-17 Khultabad 38 14 0 12 12 0 0 0 0 0 0 0 0 0 0 24 Feb-17 Paithan 107 10 4 10 2 13 4 14 22 10 16 0 2 0 0 97 Oct-17 Phulambri 67 7 9 9 8 7 27 0 0 0 0 0 0 0 0 60 Apr-17 Sillod 103 6 0 4 3 8 11 1 8 13 7 0 0 21 21 97 Dec-17 Soygaon 46 2 4 8 7 6 8 10 1 0 0 0 0 0 0 44 Jun-17 Vaijapur 134 8 8 14 30 36 3 17 11 2 5 0 0 0 126 Sep-17 Total 854 93 34 77 89 122 67 82 42 48 55 51 12 36 46 761 Dec-17 Source: data received from the district

Monthwise number of target GPs 140 122 120 100 89 77 82 80 67 55 60 48 51 42 46 36 40 34 20 12 0

As per the Zilla Parishad goal, all the reaming 761 GPs from the 9 blocks are to be made ODF by December 2017. Following is the detailed planning- Khultabad block will be made ODF in February 2017, Phulambri block in April 2017, Soygaon block in June 2017, Aurangabad block in August 2017, Gangapur and Vaijapur blocks in September 2017, Paithan block in October 2017, Kannad and Sillod blocks in December 2017.

b. Additional families and defunct toilets: As discussed earlier, additional families and defunct toilets add to the open defecation burden in the district. These families would also be targeted under the strategy. This exact status under these categories will be clarified and confirmed during ODEP process and the action plan for addressing such families will be finalized during the process itself. The MREGS functionaries at village and block level will be involved in the process, and a realistic

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 10

plan will be developed. Additional families and defunct toilets will be targeted in the same time frame proposed in the above table for achieving ODF status. The process for addressing these families is elaborated further under the section on convergence. Apart from this, efforts will also be taken for updating/ refinement in the baseline survey data. 4.1.2 Rolling out ODEP Process Open Defecation Elimination Plan (ODEP) is an effective tool for mobilizing community, triggering action and generating implementable plan for eliminating open defecation in the GP. The actual targets in each GP will be revisited during the ODEP process and The district has decided that the ODEP realistic plans for target the GPs and Blocks process will be implemented based on the will be drafted. target HHs in the GPs. The momentum for rolling out ODEP has already begun in the district. Four master trainers and six motivators from Zilla Parishad, Aurangabad have already been trained. Following schematic presents the process of ODEP roll out in the district. The district has decided that the ODEP process will be implemented based on the target HHs in the GPs. The strategy is as follows-  In the 187 GPs where the target is above 350 HHs, the entire ODEP process will be conducted by KRCs.  In 47 GPs having target below 50 HHs, ODEP process will not be conducted, these GPs will be focused for direct action.  In remaining 527 target GPs, following process will be adopted-

A three day district level ODEP training will be organized in January 2017, where the DWSM team, ABDOs, EOPs, BRCs, will be trained and BDOs will join the training on the last day. The master trainers and motivators already trained on ODEP will be the facilitators of the training. Then, in February, the block level trainings will be facilitated by the district trainees in each block. These trainings will be for three days where all Gramsevaks from target GPs will be trained. The number of trainings may be based on the number of participants. The training will include one day classroom sessions and two days field work. During the field work, ODEP plans for 10 GPs will be done. A one day orientation will be organized for village functionaries like ASHA, AWWs, Jalsurakshaks, MPWs, Anganwadi supervisors, etc.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 11

A GP wise schedule of ODEP process will be finalized during the block level trainings. The process will be implemented in each GP as per the schedule. The trained functionaries along with BRCs, gramsevaks and motivators - champions will conduct ODEP process in their respective GPs. The district level consultants, EOPs and master trainers will monitor the process. The main roles and responsibilities of the ODEP team are listed below.

ROLES AND RESPONSIBILITIES OF ODEP TEAM (MASTER TRAINERS, MOTIVATORS, CHAMPIONS)

Rolling out ODEP process  Organization and facilitation of district and block level trainings and preparation of GP wise schedule for ODEP process  Facilitation of ODEP process in GPs  Preparation of ODEP report and its consolidation  Monitoring the action plan implementation process in GPs Behaviour Change Communications (BCC):

 Support in preparation of BCC plan  Planning and conducting Home visits  Identifying some of the good ODF GPs for knowledge sharing Involvement of elected representatives  Support in sharing copies of the District Swachhata Plan with political leaders  Compilation and sharing Gat wise data Ensuring Quality of Toilets Construction  Support during training of masons and village functionaries  Monitor toilet construction quality in each GP during and after construction

Effective Convergence  Support during interdepartmental meetings for convergence  Efforts and support for allocation and disbursal of funds from MREGS and other schemes Supply chain management  Efforts for involvement of masons groups  Communication with the functionaries and villagers  Support for the Helpline Fund flow  Cross verification of receipt of incentive amount by the beneficiary Oversight and Monitoring  Review of block wise/ gat wise progress Sustainability plan  Support implementation of the sustainability activities at GP level  Planning and monitoring of sustainability activities

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 12

The ODEP action plan will be prepared and displayed in public place in every GP. The ODEP plans will be consolidated at block and district levels. The BDOs, EoPs and Dy CEO (WATSAN) will closely monitor the ODEP process roll out.

The ZP will ensure smooth flow of funds and involvement of all village level functionaries, for the process. The ZP will also arrange appropriate transport facilities for the ODEP team for their travel to villages.

An ODEP kit will be prepared by the ZP which will contain material required for ODEP, mason and service provider lists, flex of technical information about two pit latrine design, and a pocket diary to be distributed to each household during IPC drives. These kits will be handed over to each targeted GP for further distribution to the households.

Summary of strategic actions for ODEP roll out  Adapting ODEP process based on GP wise targets  Conducting district and block level trainings & finalizing GP wise process schedule

 Implementation of the planning process in target GPs  Submission and consolidation of plans  Implementation of the plans  Monitoring of the process by the district and block level officials

 Distribution of ODEP Kits 4.1.3 Behaviour Change Communications (BCC): A district level training for planning BCC activities and effective use of BCC materials will be organized for the block and village level functionaries to prepare a detailed BCC plan of action. The proposed BCC activities are listed below.

IEC/ BCC activities  Development of Ads/ jingles  Calendars  Digital board  MREGS film  Technology flex  ODEP process  Pocket diary  Triggering with the help of master trainers  Kalapathaks and elocution competitions  Gramsabha  Street plays of college students  Adopting families for BCC  Wall posters  Home visits  Wall painting  Sanitation walk  Story telling competition  Toilet rekhankan  Stickers on vehicles, doors, glasses, etc. for  Ward meetings toilets O&M  Flex (implementation of police act article  Beneficiary list flex 115,117 & ODF date declaration)  Dinner diplomacy and tea diplomacy  Good morning squads  CD circulation  Night meetings  Bulk SMS  IEC van

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 13

 School rally  NSS camp  Cultural activities

The district has high number of big GPs. Specific IEC activities will be designed and implemented for big GPs through KRCs.

To better manage home visits for generating demand for construction and use of toilets, the district would prepare a detailed ‘home visit plan’. Efforts will be made for celebration of ‘Gram swachhata Din’ regularly in every GP.

Besides, the district would organize cross learning visits to GPs that have already achieved ODF status/ have adopted some good practice and are sustaining the same.

Summary of strategic actions for Behaviour change communication  Preparation of BCC plan, specific activities for big GPs  Preparation and distribution of communication tools/ material

 Planning and implementation of home visits  Identifying good ODF GPs/ good practices for knowledge sharing

4.1.4 Involvement of elected representatives for oversight and effective monitoring In all, there are about 194 elected representatives at various levels (excluding GP level) in Aurangabad district and could provide leadership Table 5: No. of elected representatives for the program. This draft strategic plan would be Designation Number discussed with them and finalized with their Vidhan sabha 1 inputs. The steps for enhanced ownership and Adhyaksha involvement of these leaders are; MPs 3 - Requesting them to discuss and review MLAs 8 progress on district swachhata plan during their MLCs 3 meetings like District Planning Committee (DPC) ZP members 60 meetings, Zilla Parishad meetings, Panchayat PS members 120 Samiti meetings. Total 194

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 14

- A workshop will be conducted at district level Involvement of political leaders is where all MPs, MLAs, MLCs, ZP and PS members crucial for awareness, demand will be invited. The status of sanitation in each generation as well as for oversight. gat/ gan will be discussed and appeal will be For this, a Gat level Task Force (GTF) made for their involvement. will be set up and gat wise status of sanitation will be discussed and -Regular progress reports would be prepared for monitored based on real time data. each ‘Gat’ and shared with the leaders for their update and actions. The gat wise status sheet will be updated and will be discussed on priority during every monthly meeting of ZP members.

- Decision may also be taken for recognition of good work/ approach by a Gat or functionary.

- A Gat level Task Force (GTF) of elected representatives and government officers from every Gat will also be formed for coordinating implementation of the strategy and its oversight as required. The GTF will be led by the ZP member and will include the PS members, Extension officers, BRCs, other line department officials, Gramsevaks, etc.

Summary of strategic actions for involvement of elected representatives  Involvement of MPs and MLAs  Gat (cluster) approach for involvement of ZP members, PS members and key district officials

 A workshop of all elelected representatives  Formation of Gat level Task Force (GTF)  Presentation for district and block officials

4.1.5 Involvement of Other Stakeholders - Apart from the political leaders, many other stakeholders play an important role in the society and could influence the sanitation behaviour of the people, to varying degrees. These stakeholders include social leaders, Deepshikhas, SHG members, CBOs, NGOs, religious leaders, social units of companies, Gramsevak organization, police patils, police department, KRC members, NSS students, Swadhyay Pariwar members, Ganesh Mandals, etc. Data regarding these stakeholders will be collected. Apart from one to one communication with these stakeholders, the District Swachhata Plan would also be shared with them, to elicit their interest and register their willingness to support the same.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 15

Interest/ commitment expressed by them would be recorded and the ZP would make all arrangement to enable their active and timely involvement.

4.2 Demand Response Mechanism Aurangabad district has a good demand response mechanism for sanitation and efforts would be made to build on this system. The key aspects that would be strengthened are; (i) Monitoring technical quality of construction, (ii) Strengthening/ Supplementing financial resource mobilization, (iii) Ensuring effective supply chain links, (iv) Effective convergence, and (v) Making available capable and optimal human resources. Following section presents the key strategic aspects of the response mechanism in the district.

Demand Response Mechanism  Monitoring quality of toilets construction.  Effective convergence of government schemes.  HR development and deployment to high burden areas.

 Supply chain management.  Effective fund flow mechanism.

4.2.1: Monitoring Quality of Toilets Construction Proper monitoring of the toilets during construction and quality assurance needs to be ensured for reducing the number of defunct toilets, in future. The following steps have been designed to ensure quality of toilets built;

 A one day training of village level functionaries regarding technical quality will be organized in Quality of toilets will be ensured each block. During the training, technically through technical trainings to masons appropriate construction of various types of and functionaries, quality monitoring during and after construction and IHHLs will be discussed, highlighting the key awareness generation through technical aspects to be checked and monitored development of sanitation parks. during and after construction.  Training of masons in every block will be organized to explain technicalities of various types of toilets. A check list/ information sheet regarding toilet technology designs and technical considerations will also be provided to the masons.  The motivators/ champions will monitor toilet construction quality in each GP during and after construction.  The master trainers and BRCs will randomly monitor IHHL quality. Inappropriate construction will be reported to the district level officials who in turn will take corrective measures.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 16

 Sanitation parks will also be developed where the households will get cost effective quality material, guidance for construction and reference to masons. These sanitation parks will work for spreading technical information and also timely availability of material and service providers.

Summary of strategic actions for ensuring quality of construction  Training of village level functionaries  Masons training  Quality monitoring

 Development of sanitation park

4.2.2 Effective Convergence of Government Schemes The Zillha Parishad proposes to develop an effective convergence between relevant government schemes and the same would be implemented, as shown below.

- The eligible families under SBM will be targeted under SBM. - Funds from other schemes like MREGS, IAY, Suvarn Jayanti Dalit Vasti Yojana, SSY, CSR funds would be mobilized for households with defunct toilets and additional households without toilets. - Remaining households which would not be eligible for any of the above funds would be Convergence of government motivated to use their own resources. schemes will mainly aim at providing benefits to For this, various activities will be implemented which additional families, non- include interdepartmental meetings for discussion of eligible families under SBM scheme wise targets and plan, aligning the and for repairs of defunct construction targets to the respective AIPs of the toilets. departments, documentation of MREGS fund disbursal process and its dissemination to concerned stakeholders, etc.

Efforts will be taken for coordination between Panchayat Department, Revenue Department and Police Department for activities regarding sanitation.

Summary of strategic actions for effective convergence  A meeting of officials of various departments  Aligning the AIPs of various departments  Construction of toilets for additional families  Repairing defunct toilets

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 17

4.2.3. HR development and deployment to high burden areas Adequate, capable and responsive human resources at all levels are necessary for a robust response mechanism. In Aurangabad, there are 13 positions of DWSM experts sanctioned, out of which are filled. As far as BRC members are concerned, 32 positions in the district are sanctioned, out of which 22 have been filled.

Considering the present availability of human resources in the district, following are the actions proposed under the strategy.

The block level human resources Table 7: Status of HR at block level Positions from ODF blocks will be temporarily No Block Recruited Sanctioned shifted to the high burden blocks, in 1. Aurangabad 4 4 view of the high burden shouldered 2. Gangapur 4 3 by the staff from non-ODF blocks. 3. Kannad 4 3 E.g. - In February 2017 when 4. Khultabad 3 3 Khultabad block becomes ODF, two 5. Paithan 4 3 out of three BRCs from Khultabad 6. Phulambri 3 2 can be shifted to the next block - say, 7. Sillod 4 1 Phulambri block. After Phulambri 8. Soygaon 2 1 block is made ODF in April 2017, one 9. Vaijapur 4 2 TOTAL 32 22 BRC from Phulambri and two BRCs Source: Data received from the district from Khultabad will be shifted to Soygaon, and so on. Also, considering that the available HR is inadequate in Sillod and Soygaon blocks, BRCs from other blocks may be shifted immediately to these blocks. One BRC will be retained in the block for regular work of the BRCs and remaining members will be shifted. Following schematic presents the HR transfer policy.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 18

Following are other activities to be implemented in the district for HR development and deployment-

- Efforts would be made to rope in officers from other The block level departments (MREGS, NRLM, ICDS, education, health human resources and revenue department etc.), Gat wise, as required and from ODF blocks will feasible. be temporarily - A refreshers training on ODEP to the master trainers and shifted to the high motivators is proposed, where the knowledge regarding burden blocks, in ODEP will be refreshed and the critical issues faced by view of the high the master trainers and motivators during burden shouldered implementation will also be addressed. Guidance will by the staff from also be provided on how to achieve the remaining non-ODF blocks. targets by December 2017. -A MREGS task force will be developed at the district level which will aim at streamlining and smooth functioning convergence with MREGS. A film or process guideline for receiving benefits for sanitation under the scheme may also be released. -Various capacity building events will be organized as follows- District Level Block level  Orientation for sarpanchas and  Workshop of elected representatives gramsevaks, village level government  Training on ODEP functionaries, religious leaders, SHGs,  Training on ODF+ and sustainability etc. on SBM (G) implementation  Technical training for masons, motivators, village functionaries  ODEP training  Training on ODF+ and sustainability  Training of communication champions

Summary of strategic actions for HR development and deployment

 Transfer of HR to high burden areas.  Refresher training to master trainers and motivators.  Involvement of NRLM and MREGS and health department staff.

 Development of MREGS task force.  Organization of capacity building events.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 19

4.2.4 Supply chain management Considering the IHHL construction targets, huge supply chain arrangements are required. Availability of trained masons, availability and information about material suppliers and service providers and their management is critical.

There are many masons in the district and also suppliers for materials like sand, cement, bricks, pipes, pans, etc. It is crucial to identify and list these agents and make efforts for their involvement for effective supply chain arrangements.

Following are the strategic actions proposed for supply chain management in Aurangabad district-

 First of all, every block will prepare a list of trained masons, suppliers/ service providers available in the block. These lists will be further consolidated at district level. This will clearly put forth the picture of adequacy and need of additional supply chain arrangements.  The list of masons and suppliers in each block will be published on the web for easy access by the functionaries and villagers. The lists will also be made available in every GP the Gramsevak will help the villagers in identifying a mason and supplier based on the list.  A block level workshop of service providers and suppliers, including the masons, groups will be organised immediately to inform them about the present need and their expected involvement and support. Efforts will be made for Critical aspects like timely availability of involvement and training of supplies, rate negotiations, transport masons and material suppliers for facilities, etc. may be discussed with them effective supply chain during the workshop. arrangements  Just like BRC staff, even the masons and suppliers can also be shifted from ODF blocks to the high burden blocks. Their willingness and availability for support in other blocks may be finalized in the block level workshop.  Apart from this, a supply chain helpline will also be initiated where the callers will be provided the information about available masons/ suppliers in their area.  Efforts will be taken for bulk purchase of material at cluster/ GP level.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 20

Summary of strategic actions for supply chain management

 Making a list of masons, suppliers/ service providers  Efforts for involvement and awareness of suppliers and mason’s groups  Shifting of masons to high burden blocks

 Communication with the functionaries and villagers  Initiating a Helpline  Efforts for rate negotiations and bulk purchase

4.2.5 Effective Fund Flow Mechanism The following steps would be adopted by the ZP to enhance fund flow speed and effectiveness;

- The 12,883 toilets in non-AIP GPs built so far, will need fund of approximately 15.46 crore Rs. Availability of these funds will be ensured. - Efforts will be taken for increasing co- ordination between Toilet construction DPC, ZP and DWSM quality for efficient fund Physical and transfers ODF Status financial progress - Once, a toilet is completed and

verified, the funds Time for Process - ODEP, will be transferred proposal What to convergence, verification and incentive to the beneficiary incentive monitor disbursal, CB, account within 15 disbursement etc. days - The ZP would dialogue with all the private companies situated in the district and try to raise CSR funds, to the extent possible. - Maharashtra state government recently formed a Swachh Maharashtra Kosh (Fund) on the lines of Swachh Bharat Kosh. The district would submit a proposal to avail the Kosh funds.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 21

Summary of strategic actions for efficient fund flow  Transfer of funds within 15 days from toilet construction  Increasing co-ordination between DPC, ZP and DWSM for efficient fund transfers  Meetings with companies for CSR  Demand from Swachhata Kosh

4.3 Oversight and Monitoring The SBM gives importance to monitoring both outputs (Toilet Construction) and of Outcomes (Toilet usage). The following steps would be taken to improve the speed and quality of monitoring.

 Regular monitoring- The district already has a fortnightly monitoring mechanism in place. The block level reviews are taken every 15 days and district level reviews once every month. Two HoDs are assigned one block for review and monitoring. These HoDs in turn report to the CEO. The district proposes to continue with this monitoring mechanism.  Oversight by sampark adhikaris and elected representatives – The Sampark Adhikaris assigned by the district will play a key role in monitoring the activities in field. Also, as discussed before, oversight of sanitation activities and progress in their respective Gats/constituencies by elected representatives would be institutionalized.

 Concurrent online and offline data- The district and block level functionaries will take special efforts for maintaining concurrent online and offline data, which will prove to be useful in reducing data gaps and enable faster uploading on the website.

 Third Party Monitoring- Apart from the official review, a third-party task force will be set up for reviewing the on-field status of program implementation to provide real and unbiased status (both quality and quantity) of progress and will also keep a check on the functionaries.

Summary of strategic actions for oversight and monitoring

 Regular monitoring  Oversight by sampark adhikaris and elected representatives  Concurrent online and offline data

 Development of a special third party task force for monitoring

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 22

4.4 Sustainability Plan

Sustaining ODF status is very crucial for realizing the intended benefits of SBM initiatives and the following activities are planned for the same;

 The ZP would develop special IEC and BCC activities focusing on use and maintenance of toilets and would implement the same to influence individual/ household and community behaviours.  Follow up and monitoring system will be set up in every GP. This system will comprise of Open Defecation Elimination Follow up Committee and a Toilet Use Monitoring Committee. These committees will take care of maintenance of sanitation structures and will monitor the ODF+ activities and ZP will train them adequately for the same.  The OD status within GPs that achieved ODF status would be monitored and analysed periodically.  The status reports, along with deviations and course correction measures, would be shared with all key stakeholders for their action.  To ensure continued improvement in environmental sanitation, the ODF+ activities will also be promoted in all ODF GPs. These include activities for effective SLWM, personal hygiene, MHM, institutional sanitation etc.  Village sanitation days will be planned and implemented and topics for discussion will be based on the context and specific need of the GP. Also, discussions regarding sanitation will be held during every gramsabha.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 23

Institutional arrangements for implementation of the strategy

Institutional arrangements Functions  Policy making at district level. D  Preparation of district level Plan including BCC and CB plan I  Staff deployment to high burden areas S  Efforts for involvement of political leaders, religious leaders, social leaders, etc. T  Organization of Capacity Building and Behaviour Change Communication activities R  Convergence of government schemes through inter departmental co-ordination I C  Disseminate all relevant information to all project stakeholders T  Monitoring physical and financial progress and process  Timely and efficient funds disbursal/ fund management  Reporting / accountability to WSSO  Organization of BCC and awareness, community mobilization and triggering activities Capacity building of GP members, VHNWSSC members, & other functionaries  Providing required support for village level implementation of NBA Transfer of funds to GPs and financial management under the project B  Disseminate all relevant information and instructions to all project stakeholders L  Efforts for involvement of political leaders O  Data management and submission of reports to the district in prescribed formats C  Technical support and Supply Chain Management K  Monitoring, support and consolidation of village level ODEP action plans  Review and monitoring of village level works through regular visits and meetings  Identifying some of the good ODF GPs for knowledge sharing  Uploading data online  Special attention on high burden GPs or clusters  Preparation and implementation of community led village level ODEP action plans  Awareness and behaviour change communication regarding sanitation through various campaigns, activities, rallies, home visits, meetings, IPC, swachhata din and sabha etc. G  Motivating villagers and ensure community participation in implementation P  Implementation of effective convergence

 Management of toilet construction  Creation and maintenance of sanitation facilities and monitoring  Village level data collection and management, social audit and participatory monitoring

Aurangabad District Swachhata Plan 24

NON-NEGOTIABLES FOR THE STRATEGY

State level

 Availability and timely transfer of funds required in each quarter.  The central and state fund for sanitation is presently routed through treasury, which is time consuming. Considering the program urgency, if these funds are routed through the state pool, the funds transfer process will be more efficient.  Effective monitoring of the fund transfer process. District level  Strategic push and priority at all levels.  Timely release of funds to blocks.  Deployment of HR from ODF blocks to other blocks / high burden GPs.  Convergence of government schemes, MREGS task force.  Involvement of elected reprsentives.  Effective monitoring mechanism - Physical and financial progress. (SBM, MREGS and other relevant schemes) Block level  Continued focus on high burden GPs (target above 350 IHHLs)  Cluster (Gat) approach  Special efforts for PRI involvement  Facilities to ODEP team  Effective monitoring mechanism - Physical and financial progress (SBM and MREGS), process (ODEP, convergence, CB, etc.), time for proposal verification and incentive disbursement, toilet construction quality, ODF Status

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 25

Key strategic actions 1. Demand Management 1.1: Strategic planning and prioritization for IHHL construction. 1.2: Rolling out ODEP process for generating demand at village level and its consolidation at higher levels.  Adapting ODEP process based on GP wise target.  Conducting district and block level trainings.  Implementation of the planning process in target GPs.  Implementation of the plans and its monitoring by the district officials and Master Trainers. 1.3 Behaviour change communication for triggering positive behaviour and prioritising sanitation.  Preparation of BCC plan.  Preparation and distribution of communication tools/ material.  Planning and implementation of Home visits.  Identifying good ODF GPs/ good practices for knowledge sharing. 1.4 Involvement of elected representatives for demand generation and effective monitoring.  Involvement of MPs and MLAs.  Gat (cluster) approach for involvement of ZP members, PS members and key district officials.  Formation of Gat level Task Force. (GTF) 1.5 Involvement of other stakeholders for positive behaviour change. 2. Response mechanism to demand 2.1 Monitoring quality of construction for effective waste management.  Training of village level functionaries and masons groups.  Quality monitoring.  Development of Sanitation Park. 2.2 Effective convergence of government schemes.  Meeting officials of various departments and aligning sanitation activities to their AIPs.  Construction of toilets for additional families and repairing defunct toilets. 2.3 HR development and deployment to high burden areas.  Transfer of HR to high burden areas.  Refresher training to master trainers and motivators.  Involvement of NRLM and MREGS and health department staff.  Development of MREGS task force.  Capacity building activities at block and district level. 2.4 Supply chain management.  Making list of masons/suppliers, sharing with functionaries/ villagers, efforts for involvement.  Efforts for involvement and awareness of suppliers and mason’s groups.  Shifting of masons to high burden blocks.  Initiating a Helpline. 2.5 Efficient fund flow mechanism.  Transfer funds within 15 days from construction.  Making funds available for CB/ IEC activities beforehand.  Meetings with companies for CSR, demand from Swachhata Kosh. 3. Oversight and Monitoring  Daily monitoring, Concurrent online and offline data.  Oversight by sampark adhikaris and elected representatives.

PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 26

Activity Plan

Activity 1 2 3 4 5 6 7 8 9 10 11 12 Implementation No. Monitoring responsibility Months- responsibility

A Demand Management A-1 Strategic planning & prioritization DWSM Dy. CEO WATSAN A-2 Rolling out ODEP process Planning and preparations for 1. DWSM Dy. CEO WATSAN trainings Conducting district level training on 2. DWSM Dy. CEO WATSAN ODEP Conducting block level trainings on Master Trainer, 3. BDO / Dy. CEO WATSAN ODEP Motivators, BRC & DWSM Implementation of the planning process 4. Motivators & BRC Master Trainer & DWSM in GPs Submission and consolidation of plans at 5. Motivators & BRC Master Trainer & DWSM block and district level Sarpanch & Gramsevak & Master Trainer, BRC & 6. Implementation of the plans GP level Functionaries DWSM Master Trainer, BRC & 7. Monitoring of the process Champion & Motivator DWSM A-3 Behaviour change communication 1. Finalization of BCC activities and plan DWSM Dy. CEO WATSAN Preparation of communication tools/ 2. DWSM Dy. CEO WATSAN material Distribution of communication tools/ Master Trainer, 3. BDO / Dy. CEO WATSAN material Motivators, BRC & DWSM

Aurangabad District Swachhata Plan 27

Activity 1 2 3 4 5 6 7 8 9 10 11 12 Implementation No. Monitoring responsibility Months- responsibility Champion, Motivator, 4. Home visits Sarpanch & Gramsevak & Master Trainer & BDO GP level Functionaries 5. Development of model villages BRC Master Trainer & BDO Sharing best practices/ knowledge Master Trainer, 6. BDO / Dy. CEO WATSAN products Motivators, BRC & DWSM A-4 Involvement of elected representatives

1. Involvement of ministers, MPs and MLAs Dy. CEO WATSAN CEO

Gat (cluster) approach for involvement 2. Dy. CEO WATSAN CEO of ZP members and key district officials Presentation for ZP members and key 3. DWSM Dy. CEO WATSAN district officials @ district level Presentation for PS members and 4. DWSM Dy. CEO WATSAN Sarpanch @ block level A-5 Involvement of other stakeholders DWSM Dy. CEO WATSAN Strengthening the Response B Mechanism B-1 Technical quality Master Trainer, 1. Training of village level functionaries BDO / Dy. CEO WATSAN Motivators, BRC & DWSM Master Trainer, 2. Masons training BDO / Dy. CEO WATSAN Motivators, BRC Champion, Motivator, 3. Technical monitoring Sarpanch & Gramsevak & Master Trainer & BDO GP level Functionaries 4. Development of sanitation park Master Trainer BDO / Dy. CEO WATSAN

Aurangabad District Swachhata Plan 28

Activity 1 2 3 4 5 6 7 8 9 10 11 12 Implementation No. Monitoring responsibility Months- responsibility B-2 Convergence District level inter-departmental 1. DWSM Dy. CEO WATSAN meeting 2. Aligning to their AIPs HoD Dy. CEO WATSAN /CEO Construction of toilets for additional 3. DWSM Dy. CEO WATSAN families 4. Repairing defunct toilets DWSM Dy. CEO WATSAN B-3 HR Development and deployment 1. Transfer of HR to high burden areas DWSM Dy. CEO WATSAN Refresher training to master trainers 2. DWSM Dy. CEO WATSAN and motivators Involvement of NRLM and MREGS and 3. DWSM & HoD Dy. CEO WATSAN / CEO health department staff 4. Development of MREGS task force DWSM & MREGS Cell Dy. CEO WATSAN / CEO Organization of capacity building 5. DWSM, BRCs, MTs Dy. CEO WATSAN/ BDO activities B-4 Supply chain management Making a list of masons, suppliers/ 1. BRC Master Trainer service providers Efforts for involvement and awareness Master Trainer, 2. of service providers and suppliers- BDO / Dy. CEO WATSAN Motivators, BRC & DWSM Creating enabling environment Shifting of masons to high burden GPs 3. BRC & Motivators Master Trainer after making a low burden GPs ODF Communication with the functionaries 4. and villagers regarding the availability of BRC & Motivators Master Trainer suppliers/ service providers

Aurangabad District Swachhata Plan 29

Activity 1 2 3 4 5 6 7 8 9 10 11 12 Implementation No. Monitoring responsibility Months- responsibility 5. Initiating a supply chain Helpline DWSM Dy. CEO WATSAN B-6 Fund flow Champion, Motivator, Transfer of funds within 15 days from 1. Sarpanch & Gramsevak & Master Trainer & BDO toilet construction GP level Functionaries 2. Dialogue with companies for CSR DWSM Dy. CEO WATSAN Demand from Swachh Maharashtra 3. Dy. CEO WATSAN CEO Kosh C Oversight and Monitoring

1. Daily monitoring based on Whatsapp Master Trainer BDO & Dy. CEO WATSAN

2. Monitoring by political leaders Master Trainer & DWSM BDO & Dy. CEO WATSAN 3. Concurrent online and offline data Master Trainer & DWSM BDO & Dy. CEO WATSAN Third party monitoring (KRCs, external 4. organizations, task force, flying squads, DWSM Dy. CEO WATSAN NSS students, etc.)

Aurangabad District Swachhata Plan 30

Financial Plan

Sr. Total funds Component Rate No. required (crore Rs.)

A. Swachh Bharat Mission

IHHL construction for eligible families 12,000 Rs. per IHHL 255.03 Total 2,12,526 IHHLs IEC + HRD (up to 5% ) 12.75 Revolving fund (up to 5%) 13.39

Administrative expenditure (up to 2%) 5.62 A. Sub -Total 286.79 B. MREGS IHHL construction for additional

families 12,000 Rs. per IHHL 93.06 Total 77,550 IHHLs B. Sub -Total 93.06 Other sources (CSR fund /Own C. Contribution ) Repairs of Defunct toilets Approx. 8000 Rs per 15.78 Total 19,721 IHHLs IHHL Relevant IEC/CB SBM funds C. Sub -Total 15.78 Total (A+B+C) 395.63

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 31

5. ANNEXURE

Annexure 1: List of master trainers and motivators in Aurangabad district Annexure 2: GP wise data on status of sanitation

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 32

Annexure 1 List of Master Trainers and Motivators Aurangabad District - Block wise list of Master Trainers Sr. No. Block Name of Master trainer Department Designation 1. A.bad Mr. Popalghar S. A. Panchayat Extension Officer (Health) 2. A.bad Mr.Ranjana Rathod Panchayat Extension officer (Pan.) 3. A.bad Mr. Kokre B R Panchayat Extension officer (Pan.) 4. Phulanbri Mr. Jaybhaye D A Panchayat Extension officer (Pan.) 5. Phulanbri Mr. Kamble J.G. Panchayat Extension officer (Pan.) 6. Phulanbri Mr. Prakash Jandhale Panchayat A.BDO 7. Phulanbri Mr. S.M. Shengule Panchayat Extension officer (MREGS) 8. Kannad Aabasaheb Ghule Sarpanch Ex Military Man 9. Kannad S.B.Bhosale Health MPW 10. Kannad V.F.Pardeshi Panchayat BDO 11. Kannad A.N.Gaike Panchayat A.BDO 12. Kannad S.D.Chavan Panchayat Extension officer (Pan.) 13. Kannad S.B.Bhosale Water Supply Block Coordinator 14. Khultabad Kahate S B Panchayat Extension officer (Pan.) 15. Khultabad J.P.Shrangane Water Supply Cluster Coordinator 16. Khultabad R.S.Dandeker Water Supply Taluka Coordinator 17. Khultabad Dr.Pandane Health THO 18. Khultabad Dr. R.S.Lahoti Panchayat BDO 19. Khultabad Bagul Panchayat Extension officer (Pan.) 20. Paithan Wagh N M Panchayat Extension officer (Pan.) 21. Paithan B.T.Salve Panchayat Extension officer (Pan.) 22. Paithan G.S.Pawar Panchayat Extension officer (Pan.) 23. Paithan Santosh Darkunde Panchayat Extension officer (IRJV.) 24. Paithan Shailesh Choudhari Panchayat Extension officer (Sta.) 25. Paithan Vikash Chondhe Panchayat Extension officer (Agri.) 26. Paithan Shevrao Chandane Panchayat Agriculture Officer 27. Paithan Sandeep Khirsath Panchayat Agriculture Officer 28. Paithan Ashok Khedkar Panchayat Agriculture Officer 29. Paithan R.F.Patil Panchayat Extension officer (Agri.) 30. Paithan Balkhande Panchayat Sectional Engg. 31. Paithan Durawade Panchayat Sectional Engg. 32. Paithan Aswale Panchayat Sectional Engg. 33. Paithan Ingole Panchayat Jr.Engg. 34. Paithan D.B.Kharat Panchayat VDO 35. Shillod D.B.Nikam Panchayat Gramsevak 36. Shillod K.S.Bulbule Water Supply BRC 37. Shillod S.M.Anbhore Panchayat VDO

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 33

Aurangabad District – Block wise list of Motivators Sr.No Block Contact Motivator Name Department Designation Name No. 1. A.Bad Mr. P B Maind Panchayat Gramsevak 2. A.Bad Mr. S P Taide Panchayat Gramsevak 3. A.Bad Mr. Shital Umap Panchayat Gramsevak 4. A.Bad Mr. Phulchand Sonawne Panchayat Gramsevak 5. A.Bad Mr. Sanjay Nanasaheb Sarpanch Dandge 6. A.Bad Mr.Ganesh Khandu palaskar Dy Sarpanch 7. A.Bad Mr. Kachru patil Social Worker 8. A.Bad Mr. Machandra mhaske Social Worker 9. A.Bad Mr. P P Bhuigal Water Supply BRC 10. A.Bad Village Account Mr. K L Dandait Panchayat Coordi 11. Phulanbri Smt. Smita Sanjay Khandale NRHM Aasha Worker 12. Phulanbri Smt. Minabai Anil Mahalkar ICDS Aanganwadi Warker 13. Phulanbri Mr.Ranjana Shrikhande NRHM Asha worker 14. Phulanbri Mr. Suresh Manikrao Panchayat Gramsevak Choudhari 15. Phulanbri Mr. Samadhan Nawle Panchayat Gp Helper 16. Phulanbri Smt. Anita Bilge NRHM Asha worker 17. Phulanbri Mr. Rajesh Chavan Water Supply Block coordinator 18. Phulanbri Mr. Suresh Choudhari Panchayat Gramsevak 19. Phulanbri Mr. Ramesh Mule Panchayat Gramsevak 20. Phulanbri Mr. Vilash Dhenge Panchayat Gramsevak 21. Phulanbri Mr. R.v. Kathare Panchayat Gramsevak 22. Phulanbri Mr. A.P. Jangle Panchayat Gramsevak 23. Phulanbri Smt.M.A.Mahalkar ICDS Anganwadi Sevika 24. Phulanbri Smt.Sarala Ingale Panchayat Gramsevak 25. Gangapur Mr. K L Dandait Panchayat Village Account Coordi 26. Gangapur Mr. Shafiq Shaha Panchayat GP Helper 27. Gangapur Smt. Savita Suresh Bhalerao NRHM Asha worker 28. Gangapur Mr. Iruna Abdul Rashid NRHM Asha worker 29. Gangapur Mr.Sarif Shaha Panchayat G.P. Worker 30. Gangapur Smt. Eruna Abdul Rashid NRHM ASHA Worker 31. Gangapur Smt. Jyoti B. Bhosale NRHM ASHA Worker 32. Gangapur Smt. Karuna N. Manovar NRHM ASHA Worker 33. Kannad Mr. Manohar Nil Sarpanch 34. Kannad Aabasaheb Ghule Ex Military Man 35. Kannad Dilip Bhingare Health Health helper 36. Kannad Smt. Wanita Pundlik Dandge SHG Member 37. Kannad Smt. Jyoti Prakash Rokde SHG Member 38. Kannad Mr. Pravin Nalawade Panchayat Gramsevak 39. Kannad Smt. Padma Babasaheb Zalte NRHM Aasha Worker 40. Kannad Smt. Ushatai Gawande ICDS Aanganwadi Warker 41. Kannad Mr. Aabasaheb kale Panchayat Gramsevak

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 34

42. Kannad Mr. Ghule Panchayat Gramsevak 43. Kannad Mr. S.B.Sonawane Water Supply BRCs 44. Kannad Mr. S.D.Chavan Water Supply BRCs 45. Kannad Mr. N.D.Kratkar Water Supply BRCs 46. Kannad Mr. Nalawade Panchayat Gramsevak 47. Kannad Mr. G.D.Chavan Panchayat Gramsevak 48. Khultabad Smt. Shrungare Jyoti P. Water Supply BRCs 49. Khultabad Mr. Jadhav Ramchandra S. Serpancha 50. Khultabad Mr. D.D.Thone Panchayat Gramsevak 51. Khultabad Mr. G.A.Takalkar Panchayat Gramsevak 52. Khultabad Mr. C.R.Pawar Panchayat Gramsevak 53. Khultabad Mr. B.R.Meshram Panchayat Gramsevak 54. Paithan Smt. Sushma Dnyaneshwar NRHM Asha worker Satale 55. Paithan Smt. Shaikh Mumtaj Abdul NRHM Asha worker 56. Paithan Mr. Suresh Madke Panchayat GP Helper 57. Viajapur Mr. Nikam P. R. Motivator 58. Viajapur Mr. J K Kale Panchayat Gramsevak 59. Viajapur Mr. E A Dhamne Panchayat Gramsevak 60. Viajapur Mr. Sandeep Shinde Panchayat Gramsevak 61. Viajapur Mr. Ashok Kachre Panchayat Gramsevak 62. Viajapur Smt. Radha Sandeep Giri Social Worker 63. Viajapur Mr. Nikan pralhad Rajendra Prabhodhankar 64. Shillod Smt. Mina Kisanrao Kale ICDS Aanganwadi Worker 65. Shillod Smt. Mina narayan Wagh ICDS Aanganwadi Worker 66. Shillod Smt. Shashikala Lathe ICDS Aanganwadi Worker 67. Shillod Mr. Ravindra Kale Sarpanch 68. Shillod Mr. Samadhan Sirsath Dy Sarpanch 69. Shillod Mr. Datta Pundlik Nikam Panchayat Gramsevak 70. Shillod Mr. Vishnu Pandit Social Worker 71. Shillod Mr. S M Ambhore Panchayat Gram vikas Adhikari 72. Shillod Smt. Chaya nikam SHG Member 73. Shillod Smt. Jyoti Weldode SHG Member 74. Shillod Mr. Harun Tadvi Panchayat Gramsevak 75. Shillod Mr. K.Y.Zond Panchayat VDO 76. Shillod Mr. Popat Janjal Panchayat Gramsevak 77. Shillod Mr. M.S.Pawar Panchayat VDO 78. Shillod Mr. G.N.Jivrag Panchayat Gramsevak 79. Shillod Smt. V.D.Kawal ICDS CDPO 80. Shillod Smt. Kotkar ICDS CDPO 81. Shillod Extension Officer Mr. Naresh Donkalwar Panchayat (ICDS) 82. Shillod Smt.L.D.Palhal ICDS Supervisor 83. Shillod Smt.U.P.Sonawane ICDS Supervisor 84. Shillod Smt. C.L.Raut ICDS Supervisor 85. Shillod Smt.M.V. Gajbhiye ICDS Supervisor

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 35

86. Shillod Smt.A.C.Achale ICDS Supervisor 87. Soyegaon Smt. Jyoti Bhausaheb Bhosle Motivator 88. Soyegaon Smt. Karuna Naresh Manowar Motivator 89. Soyegaon Smt. Anita Gajanan Sharma Motivator 90. Soyegaon Mr. Aurn Wagh Motivator 91. Soyegaon Mr. Sitaram Jadhav Motivator 92. Soyegaon Mr. Uttam Chavan Motivator 93. Soyegaon Mr. Dhamraj Jaising Chavan Motivator 94. Soyegaon Mr. Sunil Wagh Motivator 95. Soyegaon Smt. Shobha Dhakre Motivator 96. Soyegaon Smt. Pramila Anand More Motivator 97. Soyegaon Smt. Ratna Satish Jaiswal Motivator 98. Soyegaon Smt. Anita Pokhaji Sardar Motivator 99. Soyegaon Mr. Rajendra Sawant pardeshi Motivator 100. Soyegaon Mr. Anil Govind Sonawne Motivator

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai

Aurangabad District Swachhata Plan 36

Annexure 2 GP wise status of Sanitation

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Aurangabad Bangaon 230 0 132 10 ODF Aurangabad Abdimandi 529 0 45 57 ODF Aurangabad Apatgaon 355 0 58 12 ODF Aurangabad Balapur 211 0 20 18 ODF Aurangabad Bhambarda 128 0 81 23 ODF Aurangabad Chowka 351 0 671 16 ODF Aurangabad Darakwadi 158 0 150 19 ODF Aurangabad Dudhad 553 0 70 5 ODF Aurangabad Ekod 235 0 131 15 ODF Aurangabad Gadhejalgaon 732 0 223 9 ODF Aurangabad Gandhli 505 0 65 22 ODF Aurangabad Garkheda 328 0 40 49 ODF Aurangabad Golwadi 165 0 0 35 ODF Aurangabad Gopalpur 239 0 27 9 ODF Aurangabad Hatmali 325 0 139 30 ODF Aurangabad Jadgaon 531 0 65 9 ODF Aurangabad Kadrabad 332 0 80 42 ODF Aurangabad Karodi 546 0 0 22 ODF Aurangabad Kodgaon Ambad 326 0 30 13 ODF Aurangabad Kumbephal 749 0 97 20 ODF Aurangabad Ladgaon 282 0 117 15 ODF Aurangabad Mandki 367 0 151 39 ODF

Aurangabad District Swachhata Plan 37

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Aurangabad Patoda 509 0 68 101 ODF Aurangabad Pirwadi 100 0 64 18 ODF Aurangabad Pisadivi 783 0 0 35 ODF Aurangabad Pokhri 212 0 0 15 ODF Aurangabad Shendra Kamangal 436 0 77 11 ODF Aurangabad Sultanpur 106 0 0 5 ODF Aurangabad Valadgaon 405 0 12 42 ODF Aurangabad Wahegaon 349 0 21 12 ODF Aurangabad Wanjarwadi 193 0 0 12 ODF Aurangabad Zalta 587 0 56 17 ODF Aurangabad Bhalgoan 270 102 78 8 48 54 Aurangabad Georai Kuber 302 56 50 23 22 34 Aurangabad Gharegaon Pimpri 191 64 26 7 25 39 Aurangabad Kaudgaon Jalna 187 61 644 34 23 38 Aurangabad Lingdari 160 91 69 8 31 60 Aurangabad Shindon 118 43 58 21 18 25 Aurangabad Adgaon Mohaloli 325 263 6 9 23 140 100 Aurangabad Angandoh 303 80 12 7 20 35 25 Aurangabad Bhindon 123 78 0 12 15 25 38 Aurangabad Chitegaon 320 163 45 6 30 58 75 Aurangabad Daultabad 958 163 36 15 30 77 56 Aurangabad Demni 207 120 71 74 25 49 46 Aurangabad Jaipur 205 128 42 52 20 56 52 Aurangabad Jodwadi 242 83 287 26 13 30 40 Aurangabad Karajgaon 356 152 44 23 40 58 54

Aurangabad District Swachhata Plan 38

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Aurangabad Karmad 975 176 108 13 20 80 76 Aurangabad Khamkheda 238 108 33 5 22 50 36 Aurangabad Khodegaon 500 346 122 9 26 146 174 Aurangabad Mangrul 209 62 75 13 14 25 23 Aurangabad Nipani 382 91 22 53 21 40 30 Aurangabad Palshi 613 247 17 39 20 127 100 Aurangabad Sanjkheda 430 203 100 15 40 88 75 Aurangabad Sawangi 553 193 39 231 30 76 87 Aurangabad Shivgadtanda 99 87 41 22 17 32 38 Aurangabad Warud 566 174 73 17 30 78 66 Aurangabad Adgaon Kh. 311 154 0 5 15 48 69 22 Aurangabad Chartha 231 166 2 13 20 57 49 40 Aurangabad Chincholi (Pardari ) 273 257 0 17 17 80 76 84 Aurangabad Dawlapuri 254 147 9 9 10 52 45 40 Aurangabad Donwada 351 198 37 12 10 60 79 49 Aurangabad Jatwada 248 194 287 5 45 84 65 Aurangabad Karol 233 180 256 41 45 78 57 Aurangabad Kesapuri 622 155 30 31 25 30 69 31 Aurangabad Kolghar 301 159 97 25 59 52 48 Aurangabad Konewadi 388 155 16 19 10 56 62 27 Aurangabad Laigaon 280 215 339 20 20 47 70 78 Aurangabad Lamkhna 279 152 165 16 10 52 56 34 Aurangabad Mahalpimpri 279 275 1 16 15 89 98 73 Aurangabad Maliwada 475 217 10 43 15 55 68 79 Aurangabad Morhira 194 150 24 10 12 49 47 42

Aurangabad District Swachhata Plan 39

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Aurangabad Naigvaon 338 272 135 7 30 69 85 88 Pandghri Aurangabad 157 2 19 10 43 58 46 Pimpalgaon 246 Aurangabad Pardari 255 208 115 7 10 56 44 98 Aurangabad Pimpalgaon Chite 313 207 0 61 30 48 52 77 Aurangabad Pimpalgaon Pandhri 234 142 83 11 15 47 48 32 Aurangabad Pimpalkhta 423 231 0 11 22 73 57 79 Aurangabad Satala Bu 355 284 82 15 84 100 100 Aurangabad Sharnapur 312 138 10 37 12 42 44 40 Aurangabad Shelud 239 166 48 11 20 56 60 30 Aurangabad Taklimali 395 284 0 12 10 88 91 95 Aurangabad Varzadi 438 271 0 12 22 80 70 99 Aurangabad Wadkha 325 218 0 382 30 48 52 88 Aurangabad Adgaon Bk. 417 318 9 21 35 46 54 94 89 Aurangabad Gadiwat 411 300 110 42 22 78 65 69 66 Aurangabad Jalgaonferan 429 346 100 11 30 86 91 88 51 Aurangabad Murumkheda 473 343 35 16 15 98 89 85 56 Aurangabad Naigaon 561 350 82 19 25 87 91 98 49 Aurangabad Saiyadpur 361 310 13 18 25 75 56 78 76 Aurangabad Shekta 429 310 56 9 40 52 51 89 78 Aurangabad Shevga 447 326 72 68 20 85 87 82 52 Aurangabad Adgaon Sarak 556 498 153 7 10 125 110 103 100 50 Aurangabad Georai Bu. 913 738 50 22 38 189 178 155 98 80 Aurangabad Ghardone 500 426 50 19 10 89 90 86 76 75 Aurangabad Girnera 438 402 0 28 20 80 52 80 82 88

Aurangabad District Swachhata Plan 40

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Aurangabad Golatgaon 871 637 0 21 50 134 128 115 110 100 Aurangabad Kachner 735 500 29 12 20 109 128 103 89 51 Aurangabad Ladsawangi 1299 683 23 27 10 153 150 135 125 110 Aurangabad Rahalpatitanda 728 473 60 12 20 101 99 92 98 63 Aurangabad Tisgaon 1015 741 132 16 188 183 171 101 98 Aurangabad Pimpri Kh 1613 1022 17 31 50 189 186 184 185 120 108 Aurangabad Pandharpur 1832 1352 14 32 190 185 179 176 148 145 169 160 Aurangabad Wadgaon Kolhati 3244 1751 70 5 298 270 256 251 198 190 175 113 Aurangabad Bakapur 405 61 16 21 61 Aurangabad Daigavan 275 12 81 36 12 Aurangabad Gharegaon Ektuni 183 14 25 13 14 Aurangabad Krishnapurwadi 299 54 44 10 54 Aurangabad Ohar 341 53 200 34 53 Aurangabad Pachod 193 36 105 13 36 Aurangabad Satana 158 17 0 21 17 Aurangabad Shendraban 191 11 71 7 11 Aurangabad Tongaon 191 31 41 5 31 Gangapur Bhendala 476 0 24 15 ODF Gangapur Fatiyabad 269 0 78 8 ODF Gangapur Gavalishivara 444 0 52 6 ODF Gangapur Pachpirwadi 185 0 11 5 ODF Gangapur Shindhi Shirasgaon 192 0 212 4 ODF Gangapur Warzadi 188 0 1474 10 ODF Gangapur Amalner 392 37 131 10 37 Gangapur Bhivdhanora 368 3 137 0 3

Aurangabad District Swachhata Plan 41

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Gangapur Buttewadgaon 246 47 43 6 47 Gangapur Ganeshwadi 153 6 0 21 6 Gangapur Maliwadgaon 497 8 196 5 8 Gangapur Manjri 504 2 33 5 2 Gangapur Pimpalgaondivshi 146 89 68 1 89 Ranjangaon Gangapur 604 47 23 Shenpunji 4733 23 Gangapur Siresaigaon 369 52 0 7 52 Gangapur Zodegaon 125 5 192 4 5 Gangapur Shivrai 202 147 0 0 30 117 Gangapur Agarkanadgaon 282 108 174 0 20 42 46 Gangapur Agarwadgaon 284 115 15 8 20 45 50 Gangapur Babargaon 196 102 174 9 60 20 22 Gangapur Bolegaon 132 82 58 6 35 20 27 Gangapur Dhamori Bu 265 146 56 5 16 45 85 Gangapur Dhamori Kh 145 81 118 17 11 30 40 Gangapur Dhoregaon 164 72 0 5 10 22 40 Gangapur Gavalidhanora 187 126 66 21 40 40 46 Gangapur Kaigaon 291 134 0 5 10 40 84 Gangapur Khadaknarala 145 68 0 9 20 18 30 Gangapur Lakhamapur 274 140 229 5 40 50 50 Gangapur Nawabpur 181 58 0 6 20 38 Gangapur Pendapur 208 119 35 10 19 40 60 Gangapur Phulshivra 251 130 1 11 15 55 60 Gangapur Pimpalwadi 105 75 28 5 30 20 25

Aurangabad District Swachhata Plan 42

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Gangapur Pimparkheda 244 123 284 0 23 40 60 Gangapur Shahapur Banjar 145 73 68 20 23 30 20 Gangapur Sultanabad 137 109 49 5 30 39 40 Gangapur Takli 330 100 83 5 80 10 10 Gangapur Wadgaon 127 95 88 4 20 40 35 Gangapur Babhulgaon 297 215 394 9 15 30 50 50 70 Gangapur Bagadi 290 212 9 12 12 25 30 55 90 Gangapur Dinwada 371 171 101 5 20 20 31 40 60 Gangapur Ghanegaon 347 161 154 12 20 11 45 40 45 Gangapur Haibatpur 206 195 8 6 5 30 35 50 75 Gangapur Kodapur 158 154 0 12 10 20 20 50 54 Gangapur Limbejalgaon 511 157 0 5 15 22 20 45 55 Gangapur Mahebubkheda 210 178 0 12 25 23 30 40 60 Gangapur Malkapur 287 173 102 5 20 23 35 44 51 Gangapur Pakhora 265 217 0 0 10 27 45 55 80 Gangapur Pandarohal 312 198 276 1 10 38 40 50 60 Gangapur Pratap Purwadi 235 193 421 0 10 13 20 70 80 Gangapur Puri 321 237 28 16 10 27 40 70 90 Gangapur Ranjangaon (Pol) 334 220 213 0 10 30 50 65 65 Gangapur Shankarpur 314 213 51 5 10 23 40 70 70 Gangapur Sirasgaon 347 238 401 0 5 23 45 70 95 Gangapur Siregaon 283 171 14 11 20 21 30 60 40 Gangapur Solegaon 208 154 124 3 10 20 24 50 50 Gangapur Tembhapuri 283 188 30 57 40 30 38 35 45 Gangapur Wajanapur 245 200 0 15 10 20 35 45 90

Aurangabad District Swachhata Plan 43

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Gangapur Washusaigaon 282 220 35 0 25 30 45 55 65 Gangapur Kinhal 265 240 177 12 10 20 40 50 60 60 Gangapur Wadali 410 249 769 0 10 25 44 50 50 70 Gangapur Talpimpri 469 348 86 6 50 50 48 50 50 50 50 Gangapur Akoliwadgaon 331 310 0 7 10 25 35 40 40 45 50 65 Gangapur Ambegaon 426 287 0 28 5 25 20 35 45 55 50 52 Gangapur Bhagathan 367 309 10 13 10 25 30 35 45 40 64 60 Gangapur Bhalgaon 407 273 9 0 30 33 35 40 45 35 25 30 Gangapur Bhoyegaon 351 313 0 0 15 23 30 35 45 50 50 65 Gangapur Dahegaon 520 476 139 5 20 30 35 40 55 90 100 106 Gangapur Deoli 341 266 0 25 5 15 20 25 35 46 50 70 Gangapur Gajgaon 778 489 51 7 20 35 40 45 60 89 100 100 Gangapur Jikthan 283 256 0 16 10 20 25 25 30 40 50 56 Gangapur Kasoda 360 300 54 18 10 25 35 40 45 55 40 50 Gangapur Katepimpalgaon 602 522 0 7 30 40 50 70 80 80 84 88 Gangapur Lanzi 341 266 0 5 5 20 15 35 25 45 51 70 Gangapur Mandwa 384 303 35 6 10 25 35 45 45 50 50 43 Gangapur Mudeshwadgaon 650 256 205 2 30 27 25 35 40 45 20 34 Gangapur Nadrabad 434 317 0 6 10 27 30 35 40 50 50 75 Gangapur Narayanpur Bu 363 274 30 1 5 20 25 30 35 40 50 69 Gangapur Raipur 503 336 40 26 30 35 45 60 60 30 30 46 Gangapur Sawkheda 438 295 554 5 20 25 30 35 45 50 55 35 Gangapur Shingi 364 321 111 8 10 21 25 45 45 45 55 75 Gangapur Sillegaon 365 336 0 0 30 36 35 35 55 55 50 40 Gangapur Warkhed 532 337 0 2 10 30 40 45 55 40 57 60

Aurangabad District Swachhata Plan 44

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Gangapur Yeshgaon 337 275 54 4 5 20 25 35 40 45 50 55 Gangapur Ambelohal 788 739 47 9 30 50 70 80 80 90 110 110 119 Gangapur Asegaon 1047 750 103 25 30 50 70 80 90 95 120 100 115 Gangapur Dighi 445 384 35 24 10 30 30 33 45 47 50 55 84 Gangapur Domegaon 641 532 0 31 30 50 50 60 70 80 92 10 90 Gangapur Dongaon 420 373 0 0 8 25 25 35 45 47 50 55 83 Gangapur Eklahera 499 405 0 15 10 30 40 40 45 50 55 45 90 Gangapur Galnimb 473 364 0 15 10 30 35 35 40 45 50 50 69 Gangapur Ghodegaon 1072 614 941 7 40 50 55 60 65 75 80 89 100 Gangapur Gurudhanora 465 358 0 0 60 30 25 25 35 40 45 45 53 Gangapur Jambhala 582 390 0 0 10 30 30 30 45 50 55 40 100 Gangapur Jamgaon 764 369 546 6 10 30 30 40 45 50 54 50 60 Gangapur Jogeshwari 2979 1229 0 20 50 100 100 100 150 200 200 150 179 Gangapur Kankori 552 506 0 3 30 40 40 45 60 91 50 50 100 Gangapur Maholi 387 370 0 4 5 25 35 40 45 50 40 50 80 Gangapur Malunja Kh 573 526 98 5 30 40 50 60 80 90 76 10 90 Gangapur Mangegaon 651 603 70 13 40 55 65 75 85 90 90 10 93 Gangapur Nevargaon 603 449 0 0 10 30 40 45 50 55 50 55 114 Gangapur Ranjangaon (N) 473 416 130 205 16 30 40 45 50 55 60 40 80 Gangapur Sawangi 833 569 30 5 40 50 60 70 80 90 79 10 90 Gangapur Shahapur 952 877 90 0 30 65 80 80 85 114 140 150 133 Gangapur Shendurwada 567 396 95 20 5 40 30 32 45 50 55 59 80 Gangapur Shidhanathwadgaon 462 383 165 5 8 30 30 35 45 47 50 55 83 Gangapur Tandulwadi 493 392 0 14 10 30 30 32 45 50 55 40 100 Gangapur Turkabad 1122 856 30 0 30 60 75 85 95 95 110 150 156

Aurangabad District Swachhata Plan 45

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Gangapur Wahegaon 835 653 230 2 30 40 55 60 75 70 100 100 123 Gangapur Waluj 2249 1649 204 123 50 150 100 250 250 280 200 169 200 Kannad Adgaon Jh. 180 0 10 7 ODF Kannad Ambala 186 0 35 7 ODF Kannad Amdabad 394 0 70 14 ODF Kannad Bramni 249 0 0 0 ODF Kannad Chinchkheda Kh. 359 0 324 94 ODF Kannad Hasta 401 0 5 43 ODF Kannad Jalgaonghat 444 0 73 9 ODF Kannad Kanadgaon Kn. 182 0 17 9 ODF Kannad Athegaon 414 28 125 45 28 Kannad Bibkheda 326 97 13 9 40 57 Kannad Deopudi 326 39 25 2 39 Kannad Jaitapur 145 27 44 10 27 Kannad Waki Jh. 248 131 30 26 131 Kannad Barkatpur 161 90 80 5 50 40 Kannad Bhokangaon 140 83 51 6 40 43 Kannad Khamgaon 227 144 11 10 61 83 Kannad Kolwadi 352 142 29 2 71 71 Kannad Ramnagar 504 73 37 11 20 53 Kannad Takli Bk. 113 65 35 18 25 40 Kannad Alapur 132 44 46 28 14 20 10 Kannad Devpul 740 137 66 30 50 50 37 Kannad Kheda 412 79 20 10 30 30 19 Kannad Langadatanda 383 66 66 8 20 20 26

Aurangabad District Swachhata Plan 46

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Kannad Nevpur Jh. 419 141 40 10 50 50 41 Kannad Tapovan 716 150 37 0 50 50 50 Kannad Hasankheda 173 160 25 9 40 30 30 60 Kannad Jamdighat 105 120 26 8 35 35 30 20 Kannad Kolmbi Mj. 397 105 66 13 20 30 30 25 Kannad Adgaon Pishor 428 240 30 23 50 50 50 50 40 Kannad Aurali 238 164 22 3 25 25 25 25 20 20 24 Kannad Deolana 212 142 183 15 25 25 25 25 42 Kannad Dhabhadi 141 137 18 9 25 25 25 25 37 Kannad Dhamni Kh. 290 167 28 9 23 23 23 25 18 30 25 Kannad Digaon 538 462 65 4 15 25 28 32 35 41 45 46 48 52 54 41 Kannad Dongaon 144 147 25 0 50 50 47 Kannad Gaurpimpri 204 155 12 34 40 22 18 20 30 25 Kannad Javali Kh. 571 117 40 11 20 30 25 22 20 Kannad Mategaon 457 121 145 15 32 37 31 11 10 Kannad Mehegaon 813 160 58 4 25 25 25 25 60 Kannad Telwadi 260 117 29 4 20 30 25 22 20 Kannad Umberkheda Tanda 139 150 40 0 30 30 30 30 30 Kannad Chambharwadi 154 128 24 7 5 5 35 35 30 18 Kannad Dongergaon 163 154 51 26 20 25 18 22 15 54 Kannad Jamdi Jh 378 186 20 17 20 20 20 16 25 40 45 Kannad Javkheda Kh. 247 143 35 2 20 20 20 20 20 43 Kannad Lamangaon 413 154 68 5 15 20 25 18 22 54 Kannad Sasegaon 1296 118 27 4 20 15 25 15 25 18 Kannad Banshendra 154 171 67 11 21 21 21 21 21 30 36

Aurangabad District Swachhata Plan 47

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Kannad Chinchkheda Bk. 163 166 20 8 23 23 23 24 22 23 28 Kannad Ghusur 198 130 42 4 5 15 25 20 20 25 20 Kannad Kalanki 792 155 95 6 5 5 24 26 30 25 40 Kannad Mundwaditanda 395 153 30 12 20 30 15 15 10 10 53 Kannad Nagapur 465 128 118 92 10 18 10 20 20 20 30 Kannad Pimperkheda 507 260 77 27 35 35 30 40 30 30 60 Kannad Tapargaon 367 185 9 4 20 20 20 15 25 40 45 Kannad Upla 185 166 70 24 23 23 23 24 20 25 28 Kannad Dahigaon 279 278 33 9 30 40 45 45 35 40 30 13 Kannad Javkheda Bk. 276 157 59 44 20 10 5 30 25 25 25 17 Kannad Nimdongri 479 165 159 2 20 20 15 15 30 25 25 15 Kannad Satkund 1054 285 50 0 35 35 42 35 37 16 40 45 Kannad Shirodi 3555 184 172 4 15 25 20 20 15 25 30 34 Kannad Wadgaon J. 423 177 33 10 22 22 22 22 22 22 20 25 Kannad Wadod 157 159 51 7 30 25 30 25 10 15 14 10 Kannad Amba 266 232 102 12 22 25 32 30 35 25 30 18 15 Kannad Bharamba 187 190 69 2 21 21 21 21 21 21 21 21 22 Kannad Bharamba Tanda 214 289 111 2 20 40 35 35 32 28 35 40 24 Kannad Borsar Bk. 287 178 111 14 19 19 19 19 19 19 19 20 25 Kannad Borsar Kh. 246 252 109 0 28 28 30 25 32 35 30 24 20 Kannad Chimnapur 264 195 35 26 21 18 22 30 24 20 18 22 20 Kannad Gavali 481 241 84 0 20 30 35 32 37 25 28 27 7 Kannad Hiverkheda Na. 245 254 68 16 30 35 40 35 28 37 35 7 7 Kannad Jaitkheda 229 224 172 7 21 21 21 21 20 22 19 38 41 Kannad Jaitkheda Tanda 187 193 64 9 20 18 22 33 20 20 20 20 20

Aurangabad District Swachhata Plan 48

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Kannad Mundwadi 831 198 56 9 20 28 20 20 20 20 30 25 15 Kannad Palaskheda 552 225 10 14 26 26 26 24 24 24 30 30 15 Kannad Palshi Kh. 513 228 28 1 30 26 26 24 24 25 30 32 11 Kannad Rohila Kh. 803 190 37 1 21 21 21 21 20 22 19 23 22 Kannad Sonwadi 297 240 50 2 20 30 35 40 25 20 25 15 30 Kannad Tandulwadi 200 191 95 6 21 20 22 22 19 20 23 24 20 Kannad Wadali 323 194 65 23 20 18 22 34 20 20 20 20 20 Kannad Wasdi 229 258 205 22 25 35 40 35 32 37 18 28 8 Kannad Andhaner 291 351 105 16 10 30 38 32 35 45 38 42 45 36 Kannad Aurala 469 289 144 53 15 25 32 38 40 35 35 35 17 17 Kannad Debhegaon 315 302 83 80 15 25 20 35 45 50 35 35 32 10 Kannad Nevpur Kh. 594 208 58 16 20 28 20 20 20 20 20 20 20 20 Kannad Sarola 1155 220 276 11 20 20 20 20 20 20 20 20 30 30 Kannad Savargaon 1480 301 52 21 10 35 40 38 40 35 32 25 25 21 Kannad Takli L. 184 204 49 8 20 20 20 20 20 20 20 20 20 24 Kannad Talner 271 208 40 0 20 20 20 20 28 20 20 20 20 20 Kannad Umberkheda 326 64 394 11 20 20 14 10 Kannad Vita 311 200 94 18 20 20 20 20 20 20 20 20 20 20 Kannad Bhildari Pi. 300 351 25 0 15 25 35 30 28 32 38 38 38 40 32 Kannad Chapaner 254 348 243 16 10 35 30 25 35 38 35 35 45 42 18 Kannad Ghatshendra 235 363 25 0 15 20 35 38 40 45 35 42 41 38 14 Kannad Haraswadi 214 354 11 12 12 25 30 35 35 38 42 45 42 25 25 Kannad Hatnur 322 329 99 9 10 35 20 35 35 40 38 40 35 35 6 Kannad Hiverkheda Gu. 288 356 252 14 10 20 22 30 35 38 40 38 45 42 36 Kannad Lohagaon 378 318 16 12 15 25 30 32 35 38 45 42 35 21

Aurangabad District Swachhata Plan 49

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Kannad Makhranpur 362 341 50 11 15 25 30 20 40 35 38 45 45 35 13 Kannad Malegaon Th. 1009 226 77 1 24 30 26 24 24 25 30 30 13 Kannad Mohara 376 326 42 5 10 25 35 35 35 38 45 38 35 15 15 Kannad Naderpur 455 94 141 8 24 35 35 Kannad Navadi 624 213 30 0 20 20 20 25 20 20 20 20 20 20 8 Kannad Palshi Bk. 927 307 87 6 10 25 35 30 35 25 32 35 30 25 25 Kannad Rampurwadi 584 316 93 11 25 15 35 30 32 35 35 38 35 25 11 Kannad Rithi 600 328 129 18 15 25 30 20 35 35 35 40 25 35 33 Kannad Shivrai 254 308 156 7 10 15 35 35 40 35 35 32 35 30 6 Kannad Sitanaiktanda 269 361 105 4 10 18 35 32 35 38 38 42 45 42 26 Kannad Vitkheda 239 317 92 17 10 15 25 35 38 32 40 35 40 20 27 Kannad Ambatanda 288 406 119 8 12 15 20 25 32 35 38 35 38 45 42 40 29 Kannad Bahirgaon 294 378 74 37 15 20 25 32 35 33 34 38 42 45 47 12 Kannad Belkheda 385 558 80 3 25 32 35 37 42 45 47 51 54 57 55 78 Kannad Bhamberwadi 399 367 67 7 12 20 25 32 35 30 35 30 45 42 30 31 Kannad Chikalthan 329 787 80 15 35 42 48 46 61 65 67 62 84 89 84 104 Kannad Chincholi Li. 355 828 160 5 38 47 53 55 68 74 87 97 90 92 97 30 Kannad Deogaon R. 336 655 398 25 30 36 42 45 47 52 54 57 63 71 74 84 Kannad Ganeshpur 232 392 66 0 10 15 20 35 38 32 35 35 38 42 45 20 27 Kannad Garada 243 484 27 3 20 28 30 28 37 42 47 52 51 48 56 45 Kannad Jehur 498 432 251 19 20 35 20 25 32 35 38 48 45 46 47 41 Kannad Karanjkheda Jh. 493 955 219 50 51 63 67 72 74 81 83 87 93 97 91 96 Kannad Khatkheda 344 360 7 12 10 15 30 28 32 35 35 40 42 40 25 28 Kannad Kunjkheda 353 607 17 9 35 38 40 45 52 54 56 57 60 63 67 40 Kannad Nachanwel 464 153 0 8 30 40 30 30 23

Aurangabad District Swachhata Plan 50

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Kannad Nagad 466 970 41 50 50 57 62 74 79 87 89 93 96 98 99 86 Kannad Nagadtanda 374 450 6 4 12 17 22 30 32 38 38 41 38 48 53 81 Kannad Nimbhora 500 413 189 22 10 20 15 20 25 32 35 32 35 38 42 45 64 Kannad Nipani 506 240 0 10 15 35 30 35 35 25 35 15 15 Kannad Pishor 461 1882 115 180 127 129 137 240 155 147 132 142 149 145 247 132 Kannad Rail 546 441 305 9 15 20 28 32 38 35 37 42 44 45 52 53 Kannad Ruikheda 854 60 108 4 10 20 20 10 Kannad Saigavan 1452 915 233 2 48 62 67 77 83 87 92 97 87 97 92 26 Kannad Shelgaon Kh. 1314 362 33 11 10 15 25 32 35 40 38 35 43 30 30 29 Kannad Sirajgaon 343 436 162 4 25 31 25 28 28 32 33 45 52 54 51 32 Kannad Tadpimpalgaon 454 652 64 14 32 35 38 45 47 51 55 59 62 67 71 90 Kannad Takli An. 294 420 45 9 10 25 35 35 32 35 32 32 35 30 42 45 32 Kannad Wadner 294 589 34 15 35 42 45 51 54 56 54 56 57 52 40 47 Kannad Wakad 287 355 160 11 11 28 25 35 32 40 42 45 25 25 27 20 Khultabad Bodkha 428 0 0 30 ODF Khultabad Chincholi 388 0 39 60 ODF Khultabad Gadana 548 0 45 35 ODF Khultabad Galle Borgaon 852 0 10 70 ODF Khultabad Ghodegaon 299 0 114 39 ODF Khultabad Golegaon 381 0 73 43 ODF Khultabad Kagjipura 202 0 37 58 ODF Khultabad Khirdi 352 0 83 33 ODF Khultabad Padli 550 0 140 104 ODF Khultabad Sarai 280 0 55 29 ODF Khultabad Sonkheda 245 0 73 36 ODF

Aurangabad District Swachhata Plan 51

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Khultabad Sulibhanjan 506 0 101 69 ODF Khultabad Tajnapur 476 0 28 35 ODF Khultabad Zari 152 0 144 13 ODF Khultabad Bhatji 352 82 59 47 82 Khultabad Devlana Bk. 320 88 208 25 88 Khultabad Kanadgaon 215 122 106 18 122 Khultabad Kasabkheda 1041 159 48 17 159 Khultabad Loni 530 149 66 48 149 Khultabad Mavsala 228 83 83 2 83 Khultabad Mhaismal 345 134 18 43 134 Khultabad Nirgudi Bk. 334 114 216 52 114 Khultabad Rasoolpura 148 73 183 15 73 Khultabad Sultanpur 443 168 118 12 168 Khultabad Tisgaon 349 196 94 18 196 Khultabad Verul 988 147 30 4 147 Khultabad Bazarsavangi 677 256 218 23 150 106 Khultabad Daregaon 697 323 381 59 203 120 Khultabad Dhamangaon 531 167 134 32 100 67 Khultabad Kankashil 355 224 248 19 180 44 Khultabad Khandipimpalgaon 428 225 317 126 150 75 Khultabad Palasgaon 361 252 264 32 190 62 Khultabad Palaswadi 500 245 72 3 200 45 Khultabad Pimpri 324 199 196 15 100 99 Khultabad Takli Ra. Ra. 754 429 544 67 300 129 Khultabad Viramgaon 383 218 200 66 160 58

Aurangabad District Swachhata Plan 52

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Khultabad Wadod Bk. 366 206 143 11 150 56 Khultabad Yesgaon 471 303 245 4 200 103 Paithan Babhulgaon 154 39 13 2 ODF Paithan Dinnapur 269 50 36 23 ODF Paithan Kaudgaon 299 31 9 1 ODF Paithan Tanda Bk. 211 37 138 4 ODF Paithan Harshi Bk. 200 29 19 33 ODF Paithan Harshi Kh. 185 15 74 0 ODF Paithan Kaosan 165 19 8 0 ODF Paithan Lakhegaon 184 9 13 2 ODF Paithan Akhatwad 397 0 42 73 ODF Paithan Krishnapur 230 0 85 10 ODF Paithan Muddalwadi 980 0 72 8 ODF Paithan Pharola 385 0 0 26 ODF Paithan Rajapur 215 0 15 22 ODF Paithan Shevta 143 0 6 5 ODF Paithan Sonwadi Bk. 185 0 40 31 ODF Paithan Takli Paithan 176 0 35 13 ODF Paithan Tandulwadi 198 0 0 28 ODF Paithan Wadji 264 0 52 4 ODF Paithan Dhangaon 360 109 0 0 42 67 Paithan Dhupkheda 247 70 0 18 35 35 Paithan Gharegaon 232 70 32 12 15 55 Paithan Kapuswadi 215 53 20 27 53 Paithan Parundi Tanda 141 102 0 0 42 60

Aurangabad District Swachhata Plan 53

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Paithan Taru Pimpalwadi 227 61 14 52 38 23 Paithan Brahmagaon 181 78 17 5 15 28 35 Paithan Indegaon 184 86 22 8 7 35 44 Paithan Adgaon Javle 288 111 71 12 4 20 25 62 Paithan Bokudjalgaon 577 200 140 45 10 30 80 80 Paithan Dadegaon Bk. 183 117 12 27 39 29 49 Paithan Deogaon 433 138 47 32 7 40 40 51 Paithan Gadhegaon Paithan 163 94 285 20 26 38 30 Paithan Imampur 393 220 11 11 20 60 60 80 Paithan Issarwadi 855 158 36 42 8 50 50 50 Paithan Mulaniwadgaon 472 225 95 35 45 60 60 60 Paithan Murma 247 117 20 14 40 40 37 Paithan Nandalgaon 281 127 178 27 50 50 27 Paithan Pachod Kh. 216 152 420 112 25 40 40 47 Paithan Pangra 458 205 0 10 35 60 70 40 Paithan Tondoli 406 214 39 2 35 80 80 19 Paithan Apegaon 373 244 42 48 4 70 70 70 30 Paithan Hirapur 204 155 0 8 50 50 50 5 Paithan Mharola 301 158 29 23 50 50 50 8 Paithan Padli 259 194 50 5 50 50 50 44 Paithan Adool Kh. 247 214 149 40 50 50 50 50 14 Paithan Anandpur 341 185 8 11 40 40 40 40 25 Paithan Brahmangaon 243 183 25 28 37 37 37 37 35 Paithan Chanakwadi 384 215 0 18 50 50 50 50 15 Paithan Chitegaon 34 24 50 50 50 50 47 1071 247

Aurangabad District Swachhata Plan 54

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Paithan Georai Basi 303 242 3 18 60 60 60 60 2 Paithan Kadethan Kh. 270 240 9 0 60 60 60 50 10 Paithan Khadgaon 362 219 27 3 50 50 50 50 19 Paithan Mavasgavhan 305 229 103 0 60 60 60 40 9 Paithan Narayangaon 314 210 51 14 50 50 50 50 10 Paithan Pachalgaon 332 230 106 2 60 60 60 40 10 Paithan Ranjangaon Dandga 399 244 0 20 60 60 60 60 4 Paithan Salwadgaon 266 229 178 3 60 60 60 40 9 Paithan Warudi Bk. 365 167 14 17 40 40 40 40 7 Paithan Aliyabad 419 342 0 0 70 70 70 70 60 2 Paithan Antarwali Khandi 32 11 75 75 75 60 15 6 415 306 Paithan Awdeunchegaon 379 304 8 48 70 70 70 70 20 4 Paithan Changatpuri 604 254 136 10 45 45 45 45 52 22 Chauryahattar Paithan 37 5 80 80 70 70 20 18 Jalgaon 528 338 Paithan Dabhrul 375 325 80 9 70 70 50 50 35 50 Paithan Katpur 512 253 140 54 45 45 45 45 53 20 Paithan Kaundar 309 259 36 9 50 50 50 50 34 25 Paithan Koli Bodkha 410 337 21 2 80 80 70 60 40 7 Paithan Limgaon 321 258 0 10 50 45 50 45 34 34 Paithan Nandar 520 330 65 21 80 70 60 70 30 20 Paithan Pachod Bk. 902 426 5 9 80 80 80 90 70 26 Paithan Parundi 382 368 47 62 80 80 80 70 40 18 Paithan Pategaon 437 308 0 3 80 80 80 40 20 8 Paithan Porgaon 355 269 0 0 50 60 60 50 30 19

Aurangabad District Swachhata Plan 55

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Paithan Rahatgaon 426 316 148 21 20 70 60 50 50 46 20 Paithan Ranjangaon Khuri 394 299 304 52 60 60 60 60 30 29 Paithan Shekta 487 351 57 10 80 80 70 70 40 11 Paithan Solnapur 367 303 88 6 70 70 70 70 20 3 Paithan Sompuri 342 316 20 3 60 70 60 70 40 16 Paithan Thergaon 363 326 72 0 70 70 70 70 26 20 Paithan Warawandi Kh. 401 298 40 20 70 70 70 30 30 28 Paithan Chinchala 452 388 481 120 20 90 80 70 60 40 20 8 Paithan Daregaon 550 466 63 10 90 80 90 80 90 30 6 Paithan Dhakephal 530 421 11 0 70 80 70 80 70 30 21 Paithan Hiradpuri 684 504 46 32 100 80 90 80 70 60 24 Paithan Karkin 521 402 17 15 80 70 80 70 60 40 2 Paithan Kekatjalgaon 518 438 0 16 90 80 70 80 60 30 28 Paithan Kherda 572 379 9 14 80 70 80 70 40 20 19 Paithan Lohgaon Bk. 743 496 61 14 80 80 80 80 80 80 16 Paithan Nilajgaon 585 471 0 52 100 90 80 80 60 60 1 Paithan Wadwali 530 466 0 12 80 90 100 90 80 20 6 Paithan Adool Bk. 1097 808 26 41 150 130 100 80 80 80 60 60 68 Paithan Balanagar 911 806 330 0 150 130 100 80 80 80 60 60 66 Paithan Dadegaon Jahangir 784 746 0 2 150 130 130 100 90 60 60 20 6 Paithan Dawarwadi 915 760 81 23 150 130 120 90 90 60 60 30 30 Paithan Dhorkin 808 678 49 1 100 90 90 90 100 70 70 68 Paithan Dongaon 589 537 48 0 100 100 90 90 70 60 20 7 Paithan Ektuni 628 553 32 33 100 90 90 90 80 80 20 3 Paithan Georai Bk. 610 539 0 0 100 90 80 90 80 60 30 9

Aurangabad District Swachhata Plan 56

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Paithan Jambhali 595 508 279 8 100 90 90 80 80 30 30 8 Paithan Kadethan Bk. 723 661 0 33 100 90 90 80 70 80 90 61 Paithan Naigaon 610 533 0 12 100 90 80 100 80 40 40 3 Paithan Navgaon 995 748 60 26 150 130 130 100 90 60 60 20 8 Paithan Paithankheda 592 507 33 11 80 80 80 70 70 60 60 7 Paithan Pimpalwadi Pirachi 1496 1051 115 47 200 200 150 100 100 80 80 100 41 Paithan Takli Ambad 798 637 73 26 100 90 90 80 60 70 80 67 Paithan Wahegaon 848 720 97 50 150 110 100 80 80 70 90 20 20 Paithan 4600 1824 643 252 200 200 200 150 150 150 200 200 175 175 24 Paithan Vihamandwa 2095 1664 72 141 200 200 150 150 100 100 150 150 150 150 164 Phulambri Chincholi Bk. 207 0 70 50 ODF Phulambri Dhanora 0 0 171 162 ODF Phulambri Pendgaon 107 0 88 0 ODF Phulambri Ridhora Dewi 0 0 50 34 ODF Phulambri Sanjul 129 0 94 77 ODF Phulambri Satala Bk. 173 0 50 11 ODF Phulambri Wahegaon 235 0 136 28 ODF Phulambri Adgaon Bk. 278 109 132 24 59 50 Phulambri Daregaon Dari 183 84 8 139 20 64 Phulambri Dongargaon Kawad 190 87 102 0 7 80 Phulambri Girsavli 288 79 89 36 20 59 Phulambri Jalgaon Mete 194 68 27 29 8 60 Phulambri Leha Jahangir 332 74 140 89 14 60 Phulambri Sonari Bk. 201 142 34 0 72 70 Phulambri Waghalgaon 235 101 59 231 20 81

Aurangabad District Swachhata Plan 57

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Phulambri Waghola 324 132 201 11 32 100 Phulambri Bodhegaon Bk. 483 182 70 19 2 90 90 Phulambri Jategaon 478 180 38 111 40 90 50 Phulambri Lahanyachiwadi 235 95 95 0 5 40 50 Phulambri Nimkheda 255 181 230 28 8 90 83 Phulambri Shirodi Bk. 321 156 36 4 56 50 50 Phulambri Sultanwadi 181 118 164 15 18 50 50 Phulambri Wakod 390 284 31 50 100 100 84 Phulambri Chincholi Nakib 519 144 19 0 4 44 50 46 Phulambri Kanhori 526 294 26 0 4 90 100 100 Phulambri Kingaon 595 171 96 0 11 60 50 50 Phulambri Lalwan 141 135 12 0 5 30 50 50 Phulambri Ranjangaon 279 138 153 0 8 50 50 30 Phulambri Shelgaon 262 171 183 24 11 60 50 50 Phulambri Shevta Kh. 252 154 65 0 5 49 50 50 Phulambri Wawna 203 164 101 8 4 60 50 50 Phulambri Adgaon Kh. 231 191 7 86 1 40 50 50 50 Phulambri Babhulgaon Kh. 292 205 104 26 15 40 50 50 50 Phulambri Babra 699 421 199 40 21 100 100 100 100 Phulambri Bilda 415 235 61 231 10 75 50 50 50 Phulambri Dhamangaon 343 247 162 49 17 40 70 70 50 Phulambri Dongargaon Shev. 490 249 969 43 9 48 70 72 50 Phulambri Georai Gungi 427 353 88 8 3 100 100 100 50 Phulambri Georai Paiga 416 329 123 15 29 100 50 100 50 Phulambri Jatwa 286 266 214 28 6 70 70 70 50

Aurangabad District Swachhata Plan 58

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Phulambri Khamgaon 630 224 250 19 24 50 50 50 50 Phulambri Lohgad Nandra 285 216 55 0 16 50 50 50 50 Phulambri Mahalkinhola 391 174 13 84 4 50 50 50 20 Phulambri Murshidabadwadi 269 183 26 148 3 40 40 50 50 Phulambri Naigaon 282 274 0 5 4 70 70 80 50 Phulambri Nidhona 510 325 87 0 25 100 100 50 50 Phulambri Pal 611 406 192 29 6 100 100 100 100 Phulambri Pathri 376 184 79 1 4 40 40 50 50 Pimpalgaon Phulambri 221 43 6 40 40 50 50 Gangdev 259 186 Phulambri Pimpalgaon Walan 579 485 98 0 5 120 120 120 120 Phulambri Pirbawda 431 341 227 21 41 100 100 50 50 Phulambri Satalapimpri 447 289 19 24 9 80 100 80 20 Phulambri Shirodi Kh. 281 198 22 0 8 40 50 50 50 Phulambri Takli Kolte 340 267 102 4 7 70 70 70 50 Phulambri Umarawati 536 383 101 15 3 100 100 150 30 Phulambri Wadodbazar 995 330 225 0 30 100 100 50 50 Phulambri Wanegaon Bk. 477 355 250 28 5 100 100 100 50 Phulambri Waregaon 652 253 26 106 13 50 60 80 50 Phulambri Aland 637 99 562 0 99 Phulambri Bodhegaon Kh. 330 15 199 28 15 Phulambri Borgaon Arj 474 75 268 19 75 Phulambri Ganori 476 126 66 15 126 Phulambri Mamnabad 103 3 24 0 3 Phulambri Marsavli 315 77 58 0 77

Aurangabad District Swachhata Plan 59

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Phulambri Narala 332 67 44 53 67 Phulambri Shelgaon Kh. 249 18 29 32 18 Phulambri Viramgaon 117 12 132 0 12 Sillod Bhodwad 168 0 37 3 ODF Sillod Digras 343 0 6 16 ODF Sillod Kediliha 254 0 78 0 ODF Sillod Perola 231 0 0 11 ODF Sillod Sarati 110 0 30 10 ODF Sillod Wangi Bu. 344 0 14 2 ODF Sillod Ban Kinhola 294 6 0 22 6 Sillod Borgaon Kasari 403 17 43 10 17 Sillod Deedgaon 162 18 46 7 18 Sillod Dhahigaon 209 22 17 3 22 Sillod Chinch Keda 228 92 167 0 80 12 Sillod Mukhpath 165 70 72 4 30 40 Sillod Pangri 370 27 46 0 12 15 Sillod Bhahuli 192 104 101 0 32 32 40 Sillod Chinchpur 302 78 89 0 10 15 53 Sillod Dharla 178 80 56 0 20 20 40 Sillod Khotnandra 563 96 0 0 30 30 36 Sillod Takli Givrag 220 82 179 1 20 30 32 Sillod Takli Khu. 219 93 0 0 30 30 33 Sillod Talni 395 89 53 4 29 20 40 Sillod Warkedi 186 88 18 25 20 35 33 Sillod Anad 220 147 0 30 37 40 45 25

Aurangabad District Swachhata Plan 60

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Sillod Babhulgaon 210 105 0 7 25 35 25 20 Sillod Chandapur 258 133 12 1 40 35 40 18 Sillod Gavvali 360 156 65 1 40 45 50 21 Sillod Lonwadi 558 129 38 8 38 40 35 16 Sillod Mandgaon 193 118 40 0 25 37 35 21 Sillod Mhasla Bu. 170 147 94 5 30 35 40 42 Sillod Pendgaon Aa 361 125 147 31 25 33 41 26 Sillod Pimpry 274 147 51 21 28 35 40 44 Sillod Sasurwada 232 161 31 9 39 42 30 50 Sillod Talwada 217 160 16 19 42 48 46 24 Sillod Gevrai Shemi 517 170 0 1 35 38 32 30 35 Sillod Anwi 632 191 128 11 30 32 38 33 30 28 Sillod Khandala 262 188 51 4 30 30 33 36 40 19 Sillod Khatkeda 214 178 27 0 28 30 35 40 30 15 Sillod Mhasla Khu. 207 177 0 38 30 35 37 30 30 15 Sillod Panwadod Khu. 387 187 18 81 30 33 44 43 30 7 Sillod Pimpalgaon Ghat 305 246 0 9 35 35 35 35 50 56 Sillod Seersala 290 244 103 1 30 35 35 38 57 49 Sillod Tanda Seersala 264 241 32 0 30 50 40 40 40 41 Sillod Balapur 305 290 57 3 50 60 60 55 45 10 10 Sillod Borgaon Bazzar 594 279 129 0 45 55 60 55 40 10 14 Sillod Golegaon Khu 356 274 11 0 40 50 55 60 40 15 14 Sillod Jalki Ghat 364 259 44 0 45 50 55 55 30 20 4 Sillod Jalki Wasai 328 304 0 18 50 55 60 60 50 10 19 Sillod Kasod 454 310 67 13 50 60 60 55 50 15 20

Aurangabad District Swachhata Plan 61

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Sillod Khupta 442 293 0 0 50 60 60 55 45 10 13 Sillod Lihakedi 544 295 85 3 60 60 60 55 45 10 5 Sillod Rahimabad 496 299 142 4 60 60 60 50 40 15 14 Sillod Sisarkeda 324 269 58 5 40 45 50 50 40 30 14 Sillod Upli 409 304 87 0 50 55 55 65 45 15 19 Sillod Wadod Chatha 410 291 398 4 50 59 61 55 45 11 10 Sillod Warud Khu. 337 293 53 0 50 60 60 55 45 10 13 Sillod Bharadi 1154 318 0 0 40 45 50 55 55 30 20 23 Sillod Bhawan 703 330 79 65 50 45 55 60 45 35 15 25 Sillod Dhotra 355 316 0 0 40 45 55 60 50 20 20 26 Sillod Jambhai 379 324 0 14 40 45 50 55 55 30 20 29 Sillod Modha Bu. 473 343 243 44 45 48 54 35 45 50 30 36 Sillod Shindephal 416 334 19 159 50 55 60 40 35 35 19 40 Sillod Wadala 388 323 8 2 40 45 50 55 55 30 20 28 Sillod Aamsari 450 397 41 0 35 40 45 50 40 30 35 30 35 20 37 Sillod Amthana 741 500 86 29 45 50 50 55 40 40 45 40 45 45 45 Sillod Asadi 656 488 0 9 40 45 55 60 45 35 40 35 40 35 58 Sillod Dhanora 737 407 0 1 40 45 50 55 40 45 35 30 35 15 17 Sillod Dhawda 485 459 99 1 40 45 50 55 50 35 30 45 40 30 39 Sillod Gavvali Tanda 567 422 0 29 40 45 40 50 45 40 30 45 20 30 37 Sillod Ghatambri 459 416 96 1 40 40 40 55 40 40 35 40 30 30 26 Sillod Golegaon Bu. 549 423 14 23 40 45 40 50 40 45 35 40 30 20 38 Sillod Jalki Bazzar 404 387 0 8 30 35 40 45 45 30 40 45 30 20 27 Sillod Kaigaon 611 406 8 0 40 45 45 50 45 40 30 35 40 15 21 Sillod Khulood 698 411 44 7 40 40 45 50 35 40 40 35 30 21 35

Aurangabad District Swachhata Plan 62

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Sillod Mandna 440 351 6 4 30 35 30 30 35 25 35 30 35 30 36 Sillod Modha Khu. 620 364 79 6 35 40 35 40 30 35 40 35 35 25 14 Sillod Panwadod Bu. 780 442 0 49 40 45 50 55 45 30 35 40 30 35 37 Sillod Pimpalgaon Peth 475 400 14 0 40 45 50 55 40 30 40 35 40 10 15 Sillod Relgaon 562 461 49 8 40 45 50 55 50 30 35 40 45 35 36 Sillod Sarola 601 394 0 65 30 35 40 40 35 35 30 40 35 30 44 Sillod Savkheda Bu. 485 374 80 3 35 40 45 35 40 30 35 30 35 20 29 Sillod Waghera 450 410 17 2 40 40 45 50 35 40 40 35 30 20 35 Sillod Wangi Ku. 532 385 11 12 40 45 50 55 50 35 35 40 15 10 10 Sillod Wasai Jalki 482 360 0 24 35 30 40 35 30 35 35 35 30 30 25 Sillod Ajantha 2874 2227 52 0 200 210 215 220 225 30 35 35 250 260 275 272 Sillod Ambhai 981 658 138 14 65 60 65 60 60 30 35 30 65 65 60 63 Sillod Andhari 1595 1122 210 0 110 110 115 115 115 35 30 35 110 115 110 122 Sillod Borgaon Sarwani 815 572 35 5 60 55 50 55 55 35 30 30 55 45 45 57 Sillod Charner 717 667 564 0 65 60 65 60 60 30 35 30 65 65 70 62 Sillod Deulgaon Bazzar 792 644 132 58 60 65 60 60 60 35 35 30 60 60 60 59 Sillod Dongargaon 1287 1073 0 13 100 110 115 115 115 30 35 30 115 110 100 98 Sillod Ghatnandra 1584 1024 913 169 100 110 115 115 115 35 35 30 100 110 90 69 Sillod Halda 995 829 225 6 65 80 65 80 80 35 35 30 80 85 100 94 Sillod Hatti 796 698 517 9 65 60 65 60 60 35 30 35 65 65 75 83 Sillod Kalgaon 974 856 105 8 90 90 90 95 95 30 35 35 90 90 80 36 Sillod Kerala 1520 1333 21 5 120 120 125 120 125 35 30 45 125 125 185 178 Sillod Madni 935 536 133 1 50 45 50 45 50 45 40 45 50 55 30 31 Sillod Mangrul 757 612 221 6 60 55 60 60 50 30 35 35 60 50 40 77 Sillod Nanegaon 658 636 74 3 70 60 60 60 60 35 30 30 60 60 50 61

Aurangabad District Swachhata Plan 63

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Sillod Nillod 635 539 93 10 55 50 55 50 50 30 35 35 50 40 40 49 Sillod Palod 988 832 195 9 85 85 80 85 85 30 35 30 85 90 80 62 Sillod Palshi 1040 949 20 0 95 90 95 95 95 35 30 30 90 95 90 109 Sillod Pimpaldari 612 513 0 6 45 40 45 50 45 40 35 40 40 40 40 53 Sillod Shivna 2389 1779 185 7 175 170 160 150 160 35 30 35 170 170 262 262 Sillod Undangaon 1876 1500 627 108 150 140 150 140 150 30 35 30 160 160 160 195 Soygaon Ghosla 345 0 0 80 ODF Soygaon Warkhedi Bk 436 0 0 8 ODF Soygaon Jamthi 357 141 64 10 41 100 Soygaon Kankrala 213 89 19 15 47 42 Soygaon Kinhi 181 122 13 21 45 77 Soygaon Mohlai/Pim/Ant 299 120 18 3 46 74 Soygaon Mukhed/Titur 263 106 4 14 60 46 Soygaon Palashi 578 130 0 36 48 82 Soygaon Pohari Bk 143 56 0 17 23 33 Soygaon Wangaon/Ghorkund 262 149 63 42 48 101 Soygaon Dastapur 370 135 57 242 35 64 36 Soygaon Malegaon Pi 128 86 0 3 14 26 46 Soygaon Nimbhora 239 179 253 23 79 45 55 Soygaon Palaskheda 177 130 0 44 46 84 Soygaon Sawarkheda 234 157 60 2 25 39 93 Soygaon Wadgaon Ti 271 158 0 12 39 26 93 Soygaon Warkhedi Kh 343 180 0 159 33 58 89 Soygaon Bormal Tanda 314 285 0 6 57 65 78 85 Soygaon Galwada 546 285 1 11 85 57 78 65

Aurangabad District Swachhata Plan 64

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Soygaon Molkheda/Hivri 323 219 94 51 30 49 78 62 Soygaon Sawaladbara 349 254 65 15 78 125 51 Soygaon Tidka 193 101 1 87 18 23 60 Soygaon Titvi/Palaskheda 369 268 0 11 30 78 47 113 Soygaon Bahulkheda 604 451 36 16 60 92 117 141 41 Soygaon Banoti 869 431 61 47 80 140 151 29 31 Soygaon Ghanegaon Tanda 562 369 48 0 69 77 89 91 43 Soygaon Janglatanda 394 293 0 2 40 85 78 47 43 Soygaon Jarandi 778 377 10 54 43 89 90 77 78 Soygaon Pimpalwadi/Mahl 428 295 221 11 43 47 60 67 78 Soygaon Rawla/Jawla 516 416 85 3 66 80 92 98 80 Soygaon Shindol 400 307 30 2 45 62 56 66 78 Soygaon Amkheda 864 451 125 44 41 85 121 151 28 25 Soygaon Fardapur 1749 646 87 33 30 98 156 181 103 78 Soygaon Gondegaon 1014 600 0 34 15 60 71 98 156 200 Soygaon Hanumantkheda 548 450 100 4 85 92 130 117 26 Soygaon Nandgaon 769 503 117 62 52 78 95 122 77 79 Soygaon Nimbayati 596 378 88 17 42 68 82 101 41 44 Soygaon Nimkhedi 699 359 8 24 45 59 58 75 78 44 Soygaon Uppalkheda/Dhap 423 343 55 9 58 68 58 78 81 Soygaon Wadi Sutanda 421 387 0 3 60 82 89 91 48 17 Soygaon Warthan 517 411 0 35 40 70 78 110 89 24 Soygaon Kauli 490 313 0 23 33 78 59 48 68 27 Soygaon Dabha 184 22 0 22 22 Soygaon Devhari 213 124 0 3 124

Aurangabad District Swachhata Plan 65

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Soygaon Nanda Tanda 334 14 0 16 14 Soygaon Wakdi 157 45 14 3 45 Vaijapur Amanatpurwadi 148 0 147 27 ODF Vaijapur Awwalgaon 439 0 58 46 ODF Vaijapur Balhegaon 82 0 132 40 ODF Vaijapur Bhalgaon 123 0 101 48 ODF Vaijapur Deogaonshani 172 0 0 80 ODF Vaijapur Fakirabadwadi 184 0 27 10 ODF Vaijapur Raghunathpurwadi 164 0 52 19 ODF Vaijapur Ballalisagaj 152 83 108 10 23 60 Vaijapur Bhatana 271 78 70 13 15 63 Vaijapur Chendufal 213 76 5 57 34 42 Vaijapur Dongaon 289 53 77 17 25 28 Vaijapur Ekodisagaj 216 83 121 34 30 53 Vaijapur Jategaon 274 88 313 9 45 43 Vaijapur Kangoni 169 77 116 26 48 29 Vaijapur Khirdi 118 79 62 4 20 59 Vaijapur Lakhni 195 102 97 56 51 51 Vaijapur Naigavan 112 84 138 23 35 49 Vaijapur Panvi Bk. 281 96 159 78 35 61 Vaijapur Parsoda 254 95 601 19 18 77 Vaijapur Pendephal 162 72 56 52 28 44 Vaijapur Tembhi 187 84 211 9 40 44 Vaijapur Anchalgaon 207 107 22 20 7 45 55 Vaijapur Babhultel 241 132 23 88 15 50 67

Aurangabad District Swachhata Plan 66

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Vaijapur Babtara 248 117 80 35 87 30 Vaijapur Babulgaon Kh. 418 142 133 44 24 50 68 Vaijapur Bajathan 289 121 27 11 65 56 Vaijapur Bendewadi 217 144 204 19 15 64 65 Vaijapur Bhaur 199 120 45 25 12 50 58 Vaijapur Biloni 396 151 25 55 30 56 65 Vaijapur Chandegaon 151 107 0 15 7 50 50 Vaijapur Dahegaon 203 108 278 17 5 55 48 Vaijapur Dakpimpalgaon 251 111 74 13 8 55 48 Vaijapur Goiagaon 256 127 45 49 15 45 67 Vaijapur Golwadi 248 132 201 25 15 50 67 Vaijapur Hingoni 215 106 35 14 13 46 47 Vaijapur Jalgaon 202 133 274 27 24 50 59 Vaijapur Khambala 252 120 374 213 55 65 Vaijapur Kharaj 224 144 60 13 60 84 Vaijapur Ladgaon 594 154 352 49 54 50 50 Vaijapur Lakhganga 346 144 91 28 75 69 Vaijapur Mandki 244 146 0 11 16 60 70 Vaijapur Pangavan 315 126 155 9 62 64 Vaijapur Panvi Kh. 164 131 94 47 15 50 66 Vaijapur Saffiyabadwadi 394 127 293 17 60 67 Vaijapur Sakegaon 326 113 119 65 13 55 45 Vaijapur Savkhedkhandala 218 106 218 18 10 50 46 Vaijapur Sawkhedganga 309 143 50 38 43 50 50 Vaijapur Shahajatpur 166 106 52 38 16 44 46

Aurangabad District Swachhata Plan 67

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Vaijapur Sudamwadi 163 118 0 27 65 53 Vaijapur Tunki 264 144 122 16 60 84 Vaijapur Zollegaon 151 120 181 19 62 58 Vaijapur Agarsaigaon 277 187 41 117 52 78 57 Vaijapur Aghur 687 203 44 53 65 75 63 Vaijapur Babulgaon Bk. 187 174 22 21 15 50 60 49 Vaijapur Babulkheda 299 196 300 7 60 39 97 Vaijapur Bhaggaon 258 191 0 37 75 50 66 Vaijapur Bhaigaonganga 201 168 56 26 56 56 56 Vaijapur Bhingi 204 170 35 34 60 70 40 Vaijapur Chandgaon 528 169 0 37 50 40 39 40 Vaijapur Garaj 310 159 27 59 46 65 48 Vaijapur Hadaspimpalgaon 327 241 165 36 60 80 101 Vaijapur Hajipurwadi 282 187 149 35 67 60 60 Vaijapur Hanumantgaon 335 245 22 24 70 80 95 Vaijapur Jiri 273 252 0 19 80 70 102 Vaijapur Karanjgaon 318 174 76 17 74 50 25 25 Vaijapur Kawitkheda 242 178 0 27 60 50 68 Vaijapur Lasurgaon 471 177 43 19 60 40 77 Vaijapur Mahalgaon 582 216 13 31 60 70 86 Vaijapur Malegaon K. 323 218 55 16 50 70 98 Vaijapur Maligogargaon 300 229 70 5 60 80 89 Vaijapur Malisagaj 276 238 290 22 50 70 118 Vaijapur Manegaon 316 229 42 99 60 80 89 Vaijapur Manoor 550 204 22 71 70 80 54

Aurangabad District Swachhata Plan 68

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Vaijapur Mhaski 381 185 129 6 50 60 75 Vaijapur Nadi 217 193 88 17 50 70 73 Vaijapur Nandgaon 393 245 0 23 65 75 105 Vaijapur Nandurdhoke 381 185 13 10 11 58 58 58 Vaijapur Narala 217 173 84 16 57 63 53 Vaijapur Nimgaon 297 208 514 38 50 60 98 Vaijapur Panvikhandala 388 189 142 8 63 60 66 Vaijapur Purangaon 257 159 101 39 30 29 50 50 Vaijapur Rotegaon 370 189 63 38 15 65 74 35 Vaijapur Shivgaon 248 156 196 22 10 50 50 46 Vaijapur Surala 365 249 21 31 70 85 94 Vaijapur Vaijapur Gramin 300 182 57 20 40 42 50 50 Vaijapur Wadgi 224 170 25 23 40 60 70 Vaijapur Wanjargaon 303 204 12 20 50 70 84 Vaijapur Nagamthan 321 252 105 61 60 70 80 42 Vaijapur Naginapimpalgaon 411 312 55 20 25 50 75 80 82 Vaijapur Rahegaon 373 264 95 17 50 70 85 59 Vaijapur Alapurwadi 373 330 23 14 50 60 80 70 70 Vaijapur Belgaon 380 335 69 8 60 70 85 90 30 Vaijapur Bhokargaon 485 335 12 74 50 60 80 75 70 Vaijapur Chikatgaon 458 291 45 22 40 50 70 80 51 Vaijapur Dhondalgaon 548 297 705 40 45 65 70 80 37 Vaijapur Gadhepimpalgaon 401 340 335 68 80 70 90 50 50 Vaijapur Kanaksagaj 408 353 206 8 60 60 80 80 73 Vaijapur Kolhi 333 296 2 77 40 60 75 85 36

Aurangabad District Swachhata Plan 69

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Vaijapur Loni Bk. 487 341 24 57 50 70 95 52 74 Vaijapur Loni Kh. 461 286 108 37 50 60 80 60 36 Vaijapur Nalegaon 403 328 568 60 15 50 80 85 40 58 Vaijapur Parala 376 320 0 47 50 60 80 70 60 Vaijapur Satana 342 280 24 18 50 70 80 40 40 Vaijapur Tidi 369 315 56 7 15 40 60 75 75 50 Vaijapur Virgaon 565 335 67 32 15 60 80 90 45 45 Vaijapur Waghla 348 307 26 22 40 50 60 60 97 Vaijapur Bhadli 421 378 46 25 30 40 50 60 60 38 100 Vaijapur Bhagur 471 390 0 17 30 60 80 70 50 50 50 Vaijapur Bhaigaon Vaijapur 560 423 40 28 40 50 55 70 85 90 33 Vaijapur Chorwagalgaon 518 419 0 24 15 35 45 55 65 135 50 19 Vaijapur Hilalpur 457 429 19 31 45 55 65 90 75 50 49 Vaijapur Jambargaon 429 365 62 20 40 45 55 65 75 40 45 Vaijapur Kapuswadgaon 544 402 116 10 30 60 70 85 75 40 42 Vaijapur Khandala 1259 491 1010 62 50 70 90 80 65 95 41 Vaijapur Palkhed 814 475 480 60 50 40 80 85 90 65 65 Vaijapur Pokhari 543 478 0 30 50 60 85 90 70 85 38 Vaijapur Sanjarpurwadi 481 372 136 37 10 30 60 70 80 22 50 50 Vaijapur Shivrai 864 431 123 39 50 50 80 60 30 50 111 Vaijapur Jarrul 673 521 18 56 40 60 60 70 90 95 90 16 Vaijapur Sirasgaon 646 516 28 115 40 50 90 95 75 95 40 31 Vaijapur Janephal 631 606 0 25 50 65 60 60 75 85 50 50 111 Vaijapur Sawandgaon 722 656 22 32 50 45 60 85 90 85 85 90 66 Vaijapur Shivoor 2218 1529 360 24 170 169 169 169 169 169 169 172 173

Aurangabad District Swachhata Plan 70

Total

Additional No. od IHHL

17

17

17

17

16 17

17

17 17

17

17

17

-

-

17

-

-

- -

-

Grampanchayat HHs Defunct Online - -

-

-

- Block Name HHs Target - Name (Online without HHs Status

Jul

Jan

Jun

Oct

Feb Apr Sep

Dec Dec

Aug

Nov

Mar BLS May Dec 16) Toilets 2012 Vaijapur Talwada 575 522 14 10 40 55 65 75 70 50 50 50 67 Vaijapur Wakla 1019 774 81 57 50 65 70 73 80 85 95 128 128 Vaijapur Bhivgaon 334 13 145 28 13 Vaijapur Borsar 247 2 749 12 2 Vaijapur Chinchadgaon 399 13 0 18 13 Vaijapur Dawala 242 18 0 23 18 Vaijapur Ghaigaon 298 36 196 53 36 Vaijapur Hingane K. 153 35 25 6 35 Vaijapur Pimpalgaonkhandala 222 12 136 16 12 Vaijapur Takalisagaj 158 35 191 30 35 Vaijapur Vaijapur Rural 2 1 1 52 13 1 8210 38158 35762 31823 23828 19171 12820 11253 9336 8899 4931 4637 3470

Aurangabad District Swachhata Plan 71

PriMove Pune UNICEF Mumbai PriMove Pune UNICEF Mumbai