Public Disclosure Copy The World Bank Implementation Status & Results Report & Telangana Road Sector Project (P096021)

Andhra Pradesh & Telangana Road Sector Project (P096021)

SOUTH ASIA | India | Transport & ICT Global Practice | IBRD/IDA | Specific Investment Loan | FY 2010 | Seq No: 17 | ARCHIVED on 17-Jun-2016 | ISR24140 | Public Disclosure Authorized

Implementing Agencies: APRDC

Key Dates

Key Project Dates

Bank Approval Date:15-Oct-2009 Effectiveness Date:23-Mar-2010 Planned Mid Term Review Date:31-Dec-2012 Actual Mid-Term Review Date:08-Oct-2012 Original Closing Date:30-Jun-2015 Revised Closing Date:31-May-2017 Public Disclosure Authorized Project Development Objectives

Project Development Objective (from Project Appraisal Document) The development objective of the project is to provide better quality, capacity and safe roads to users in a sustainable manner through enhanced institutional capacity of the Andhra Pradesh government in the road sector.

Has the Project Development Objective been changed since Board Approval of the Project Objective? No

PHRPDODEL

Public Disclosure Authorized Components

Name Road Improvement:(Cost $526.20 M) PPP Facilitation:(Cost $1.20 M) Institutional Strengthening:(Cost $9.60 M) Road Safety:(Cost $12.00 M)

Overall Ratings

Name Previous Rating Current Rating

Progress towards achievement of PDO  Moderately Unsatisfactory  Moderately Unsatisfactory Public Disclosure Authorized Overall Implementation Progress (IP)  Moderately Unsatisfactory  Unsatisfactory Overall Risk Rating  Substantial  Substantial

6/17/2016 Page 1 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

Implementation Status and Key Decisions

Project Development Objective (PDO) is to provide better quality, capacity and safe roads to users in a sustainable manner, through enhanced institutional capacity of the Andhra Pradesh (and Telenagana) government in the road sector. Although, the project is being implemented within a reasonable threshold of the original cost estimates, the current pace of implementation of various major project activities, especially the six slow-moving upgradation packages (detailed below), indicates that the project is likely to fall moderately short of achieving its objective by the current closing date of the project, mainly w.r.t. the number of km envisaged to be upgraded. Implementation Progress: All components of the project are progressing satisfactorily except for the slow progress of six upgradation packages - of which five are in Andhra Pradesh (Kakinada-Rajahmundry, Pedana--Vissannapet (PNV-08 and PNV-09) and Mydukuru-Jammalamadugu (MJ-03 and MJ-04) and one in Telangana (Kandi-Shadnagar). The slow progress across all these packages is mainly attributable to the lackadaisical performance on the part of the contractors and is further accentuated in PNV-08 because of the slow progress in LA and RR and delays in shifting of utilities. In view of the above, the ratings for the Implementation Progress has been downgraded to unsatisfactory and for the achievement of the Development Objective has been retained at moderately unsatisfactory.

Risks

Systematic Operations Risk-rating Tool

Risk Category Rating at Approval Previous Rating Current Rating

Political and Governance  --  Moderate  Moderate Macroeconomic  --  Moderate  Moderate Sector Strategies and Policies  --  Moderate  Moderate Technical Design of Project or Program  --  Moderate  Moderate Institutional Capacity for Implementation and -- Substantial Substantial Sustainability    Fiduciary  --  Moderate  Moderate Environment and Social  --  Substantial  Substantial Stakeholders  --  Low  Low Other  --  --  -- Overall  --  Substantial  Substantial

6/17/2016 Page 2 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

Results

Project Development Objective Indicators

PHINDPDOTBL

 Full Operationalization of the RDC with adequate financial and human resources to manage the CRN (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N N Y

Date 14-Sep-2009 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Andhra Pradesh: Consultants Recommendations are awaiting high-level review and decision making by the government. Telangana: Formation of RDC is under consideration at Government level.

PHINDPDOTBL

 Vehicle Operating Costs decline relative to the without project scenario in upgrading roads (Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 5.41 -- -- 4.76

Date 14-Sep-2009 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Works are in Implementation stage. This can be assessed after completion of all works.

PHINDPDOTBL

 Travel time for bus passengers declines relative to without project situation in upgraded roads (Hours, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 10.60 -- -- 7.80

Date 14-Sep-2009 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Works are in Implementation stage. This can be assessed after completion of all works.

6/17/2016 Page 3 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

PHINDPDOTBL

 Number of road accident fatalities per vehicle km travelled reduced on demonstration corridors (Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.47 ------

Date 30-Jun-2010 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Works are in Implementation stage. This can be assessed after completion of all works.

PHINDPDOTBL

 Roads in good and fair condition as a share of total classified roads (Percentage, Core)

Baseline Actual (Previous) Actual (Current) End Target

Value 40.00 65.00 73.70 80.00

Date 14-Sep-2009 05-Aug-2014 02-Jun-2016 31-May-2017

Comments Andhra Pradesh: 70% of 6800 Km Telangana: 80% of 4020

PHINDPDOTBL

 Size of the total classified network (Kilometers, Core Supplement)

Baseline Actual (Previous) Actual (Current) End Target

Value 10820.00 10820.00 10820.00 10820.00

PHINDPDOTBL

 Share of total classified network - Andhra Pradesh (Kilometers, Custom Breakdown)

Baseline Actual (Previous) Actual (Current) End Target

Value -- 6800.00 6800.00 6800.00

Date -- 31-Aug-2014 02-Jun-2016 31-May-2017

6/17/2016 Page 4 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

PHINDPDOTBL

 Share of total classified network - Telangana (Kilometers, Custom Breakdown)

Baseline Actual (Previous) Actual (Current) End Target

Value -- 4020.00 4020.00 4020.00

Date -- 31-Aug-2014 02-Jun-2016 31-May-2017

Overall Comments

Intermediate Results Indicators

PHINDIRITBL

 427 km upgraded efficiently and environmental and socially sustainable way (Kilometers, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 208.00 239.00 427.00

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Andhra Pradesh: 157 km of Bituminous layers Telangana: 82 km of bituminous layers

PHINDIRITBL

 6018 km of roads under Long-term performance based maintenance contract (Kilometers, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 5702.00 6180.00 6018.00

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Note: Many of the OPRC roads in both Andhra Pradesh and Telangana are being reclassified at NH. Andhra Pradesh: Telangana:

6/17/2016 Page 5 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

PHINDIRITBL

 GoAP and GoT able to concession three of roads selected for PPP transactions (Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 2.00 2.00 3.00

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Andhra Pradesh: One road (NAM Road) has been developed under PPP mode. The work was completed and the facility is in operation stage. The other two State Highway stretch envisaged for development as PPP are now being upgraded to NH and are likely to be subsequently taken up for development as PPP concessions. Telangana: HKR road has been taken up under PPP. Work was completed and is in Operation stage.

PHINDIRITBL

 ISAP milestones met (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N N Y

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments In Progress/Partially met. The detailed Andhra Pradesh: Telangana: status as follows: IT-MIS, HR and Training plans fully Development of MIS has been entrusted to It is proposed to develop MIS separately by operational M/s. Backend Systems. Installation and initial Administrative Wing of R&B Dept with the training completed. Data is being updated. State funds. Complete Preparation of State Network Network master plan for combined State has Consultant for ISAP will be in place shortly. Master Plan been prepared and same is being revised for State Network Master plan expected to be residual State of A.P. prepared in 6-8 months.

PHINDIRITBL

 GAAP milestones met (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N Y Y

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Milestones in GAAP met Andhra Pradesh: Telangana: Disclosure & complaints handling mechanism Yes. It is in operation. Disclosure and complaint handling mechanism operational will be developed under the MIS and linked to the R&B website.

6/17/2016 Page 6 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

PHINDIRITBL

 Annual maintenance plans developed through RMS system (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N N Y

Date -- 19-Mar-2015 02-Jun-2016 31-May-2017

Comments Indicator Status Andhra Pradesh: Telangana: Annual maintenance plans developed Required Software has been procured. The GoT is actively considering through the RMS system Procurement for collection of Road data has been consultant proposals for developing a completed for 9 districts. Bids for collection of road Road Asset Management System. The data are received for balance 4 districts and same EoI is expected to be issued in June are under finalization. Data collection was 2016. completed for 4 districts (Guntur, Prakasam, Srikakulam and Vizianagaram ).

PHINDIRITBL

 Demonstration project carried out in at least two road corridors (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N N Y

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Indicator Status Andhra Pradesh: Telangana: Complete implementation Demo Corridor with Implementation of Demo Project is under Implementation of Demo Project is in multi-sector coordination and evaluate results progress. Civil works are completed. progress. Procurement of Civil works Procurement of goods is in progress. completed and works are in progress. Procurement of goods is under process.

PHINDIRITBL

 Comprehensive road safety functions, capacity and action plan(s) put in place (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N N Y

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Indicator Status Andhra Pradesh: Telangana:

6/17/2016 Page 7 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

Establish Road Safety lead Agency and Multi- Transport Department was designated as Transport Dept. is acting as Nodal sector team for road safety coordination (Dec lead agency and Road Safety Cell with the agency. Road Safety Cell is in place. 2015) experts from all stake holder department is Technical experts for RSC are to be in place. engaged. New Safety Policy approved; institutional Consultant for evaluation of Demo Project Consultants have been engaged and are arrangement put in place, and Action Plan Results and Preparation of safety policy monitoring with the stakeholder Implementation drawn and action plan has been appointed. departments for formulation of the policy.

PHINDIRITBL

 Black spot improvement of CRN (Yes/No, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value N N Y Y

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments Indicator Status Andhra Pradesh: Telangana: Complete implementation of improvement of 36 blackspots: Works are completed for improving 2 no. of Works identified for improvement under blackspots. Balance black spots are under Black Spot are completed. identification.

PHINDIRITBL

 Roads rehabilitated, Non-rural (Kilometers, Core)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 208.00 239.00 427.00

Date 14-Sep-2009 05-Dec-2015 02-Jun-2016 31-May-2017

PHINDIRITBL

 Land Acquisition (Percentage, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value -- 88.40 89.00 100.00

Date -- 05-Dec-2015 02-Jun-2016 31-May-2017

Comments LA to be completed Andhra Telangana Total Target (Acres) 376.21 99.76 475.97

6/17/2016 Page 8 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

% 100% 100% 100% Actual (Acres) 324 99.76 423.76 % 86% 100% 89%

PHINDIRITBL

 R and R (Percentage, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value -- 53.00 89.50 100.00

Date -- 05-Dec-2015 02-Jun-2016 31-May-2018

Comments R&R to be completed Andhra Telangana Total Target (Nos.) 2922 308 3230 % 100% 100% 100% Actual (Nos) 2640 252 2892 % 90% 82% 89.5

Overall Comments

Data on Financial Performance

Disbursements (by loan)

Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed

P096021 IBRD-77920 Effective USD 320.00 264.00 56.00 149.27 114.73 57%

Key Dates (by loan)

Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date

P096021 IBRD-77920 Effective 15-Oct-2009 22-Jan-2010 23-Mar-2010 30-Jun-2015 31-May-2017

Cumulative Disbursements

6/17/2016 Page 9 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Andhra Pradesh & Telangana Road Sector Project (P096021)

Restructuring History

Level 2 Approved on 03-Mar-2014 ,Level 2 Approved on 26-Feb-2015

Related Project(s)

There are no related projects.

6/17/2016 Page 10 of 10 Public Disclosure Copy