OUR CITY IS CELEBRATING ENERHODAR years The 2020 Investment Passport

This document has been developed in order to be submitted to prospective national and foreign investors intending to invest into the economic and social sectors of Enerhodar WELCOMING REMARKS Table of contents

This year our city is celebrating 50 years. The city is the young one where active, industrious CITY’S COMPETITIVE ADVANTAGES 4 and creative people striving for professional development and improvement live in. LOCATION AND TRANSPORTATION 6 Today, much efforts are made in order to ensure the economic development, growth in prosperity, GENERAL INFORMATION ON ENERHODAR 8 competitive recovery of the economy, improved quality of life for the citizens and implementation BRAND OF THE CITY OF ENERHODAR 10 of their interests. We strive to make the city of Enerhodar the center of investments, the territory of developed and investment-attractive business POPULATION AND HUMAN RESOURCES 11 in the foreseeable future. We invite the representatives of small, medium ECONOMIC PROFILE 12 and big businesses, who are ready to invest their intellectual property, efforts and material assets CITY’S DEVELOPMENT STRATEGY 16 in the development of our city.

The 2020 The 2020 Passport Investment The city of Enerhodar is open for partnership and LIVING CONDITIONS, SOCIAL AND CULTURAL ATMOSPHERE AND INFRASTRUCTURE 17 ready to attract investors. We welcome anyone, who wishes to expand and increase the city’s 23 prosperity. The citizens of Enerhodar have always BUDGET PROFILE been hospitable and today they are happy to welcome everyone who come to us with good and BUSINESS CLIMATE, INTERNATIONAL COOPERATION AND SUCCESSFUL INVESTMENT PROJECTS 25 friendly intentions. We offer you the insights into the city of Enerhodar! INVESTMENT PROPOSALS (ANNEXES) 30 2 LEADING POSITIONS ACCORDING AVAILABLE LAND TO THE SOCIAL AND ECONOMIC DEVELOPMENT AND MANUFACTURING AND CONDITIONS OF LOCAL FINANCES AREAS The city of Enerhodar takes the 1st place in region according to the budget More than 50 propositions of different revenues and key figures of the social and economic development per capita that is categories. CITY’S supported by stable operation of two powerful energy enterprises — Zaporizhzhia Heat Power Plant and Zaporizhzhia Nuclear Power Plant. https://www.en.gov.ua/ nvesticyna-dyalynsty/ COMPETITIVE vlyn-zemelyn-dlyanki- HIGH PURCHASING POWER ta-primschennya OF THE POPULATION ADVANTAGES The level of employment and salary are higher than the average ones in the country and create proper conditions for the development of tourism, consumer services and related branches. HIGH RATINGS RECREATIONAL The ratings assigned by the Credit-Rating AND TOURISTIC POTENTIAL National Rating Agency: 2142,3 ha — land reserves, 1231,7 ha — water reserve lands. The available recreation a credit rating assigned to the city areas and a high level of available water reserve lands create proper conditions for the A high level of investment of Enerhodar — , a stable outlook development of the city’s touristic potential. uaАА attractiveness of Enerhodar The 2020 The 2020 Passport Investment is supported by its strategic The level of the city’s investment meaning, high manufacturing attractiveness — uaINV4 (high level). and labor potential, the availability FAVORABLE BUSINESS CLIMATE of important infrastructure AND TRANSPARENT ADMINISTRATION for business development as well The city has available transparent administrative procedures. The Joint Office, Administration http://www.credit-rating.ua/ as favorable business environment Service Centre of Enerhodar City Council, provides more than 130 types of administrative ua/rate_history/21/134/ and a good condition of the local services. The city’s authorities is open for cooperation with foreign and national investors as finances well as provides support for business activities and implementation of the citizens’ initiatives. 4 LOCATION AND TERRITORY 6 350,1 ГА 53,1% 28,1% 3,6% including: land reserves and industrial, transport, residential water reserve lands communication, and public TRANSPORTATION energy sector lands, etc. constructions

About 106 departures per day are made HIGHWAYS from Enerhodar’s bus station, SERVICES including 46 inter-city departures. ENERHODAR

There is a railway station in the city. RAILWAY Railroad passenger services are performed in the direction “Enerhodar-Zaporizhzhia 1” twice a day. The 2020 The 2020 Passport Investment SERVICES

The closest airport is located in the north-east part of the city of Zaporizhzhia – the Zaporizhzhia International Airport that provides services to all types of aircrafts. Direct flights are performed to Minsk, Antalya, Istanbul, Warsaw, Sham AIR El-Sheikh, Dalaman, Batumi, Burgas, and Tel Aviv. The to the regional center (the city of Zaporizhzhia) — 124 km; located in the south of , Zaporizhzhia International Airport sends daily flights to Kiev, DISTANCES to the highway Kamianka-Dniprovska — Berdiansk — 7 km; LOCATION on a left bank of the Kakhovka Reservoir SERVICES from where flights to many countries are operated. to the airport in the city of Zaporizhzhia — 132 km (in the Lower region) 6 DATE OF ESTABLISHMENT June 12, 1970 GENERAL AREA 63,5 square kilometers, the city’s density index is low – 0,84L people per 1 square kilometer POPULATION DENSITY 53,3K people (as at 01.01.2020) INFORMATION AVERAGE MONTHLY SALARY IN 2019 UAH 20 638,5 ECONOMIC STRUCTURE mono-functional economy, the key branch is energy sector

CITY’S BUDGET Enerhodar takes the first place in Zaporizhzhia region and among the majority ON ENERHODAR of cities in the country according to the local budget revenues per capita INTERNATIONAL COOPERATION German Development Cooperation Agency (GIZ) International Organization for Migration (МОМ) Polish-Ukrainian Cooperation Foundation (ПАУСІ) Eastern Europe Fund U-LEAD with Europe Program

PARTICIPATION IN PROJECTS the project of the Federation of Canadian Municipalities OF INTERNATIONAL TECHNICAL ASSISTANCE “Partnership for urban development” (the PROMIS project) EU project “The Mayors for Economic Growth” (M4EG) The Agreement of Mayors — an initiative of the European Unions concerning the climate and energy sector.

OFFICIAL WEBPAGE ENERHODAR is the energy capital of Ukraine as there are two powerful OF ENERHODAR The 2020 The 2020 Passport Investment energy enterprises in its territory – a nuclear power plant and a heat power CITY COUNCIL plant, which produce 25% electric energy of Ukraine.

ENERHODAR is a young Ukrainian city with a high level of social and economic development and a significant investment potential. Enerhodar is the city of active people, open for modern business models https://www.en.gov.ua/ and technologies. In 2020 the city is celebrating 50 years. 8 ENERHODAR is a young city and BRAND OF THE CITY OF ENERHODAR a share of the able-bodied citizens POPULATION AND is higher than the national average and is 70% when the national figure is 67,6%. HUMAN RESOURCES THE CITY’S BRAND WAS DEVELOPED AND APPROVED IN 2018 (A DECISION OF THE CITY’S COUNCIL # 10 OF 21.12.2018). The available labor resources of the city together with a high level GENDER https://www.en.gov.ua/brend-msta of education and intellectual potential create conditions for operation STRUCTURE of the enterprises with high POPULATION THE ELEMENTS OF THE CITY’S innovating features. STRUCTURE BRANDS ARE USED: 53,3K 53,6K as elements of festive decoration people people of the city during national and local LABOR MARKET available resident holidays (fests, competitions, populations population exhibitions, etc.); employed at the on diplomas, greeting cards; enterprises of the 17 764 people principal circle of on souvenirs; statistical reporting (Q4 2019) The 2020 The 2020 Passport Investment on printed products, presentation materials; 34777 21384 13393 employed at the people people people for advertising purposes: on posters, social 35,4% population key enterprises Human 40-64 21-39 advertising; resources years years for production of web pages 343 persons the unemployed and mobile apps in the Internet; 8277 7713 2604 people people people when manufacturing the small per one vacancy 47% 53% 6 persons 0-14 65 years old 15-20 architectural forms. male female years and older years 10 Industrial products sold Average monthly in 2019 per 1 citizen, salary in 2019, ECONOMIC UAH UAH ENERHODAR is a leader according to the volumes of sold ENERHODAR PROFILE industrial products per capita among other cities of Zaporizhzhia is a leader according to the UKRAINE UKRAINE region and nationwide. volumes of income of the city’s citizens that creates ZAPORIZHZHIA REGION ZAPORIZHZHIA REGION A positive dynamics of the largest local employers (Zaporizhzhia additional advantages for ENERHODAR takes the first place Nuclear Power Plant and Zaporizhzhia Heat Power Plant) ensures business development, in in Zaporizhzhia region according the stable demand for labor resources and a high level of official particular for financial sector, ENERHODAR ЕНЕРГОДАР to the key figures of social and employment of population. Besides, an average monthly salary is consumer services, trading economic development higher than the figures of Zaporizhzhia region and the national average. and related branches. 100 000 200 000 300 000 400 000 500 000 600 000 700 000 5 000 10 000 15 000 20 000 25 000

A share of of registered fulltime Retail turnover in January- employees compared to the number Seprtember 2019 per of the present population in 2019, % 1 citizen, UAH

UKRAINE UKRAINE The 2020 The 2020 Passport Investment

ZAPORIZHZHIA REGION ZAPORIZHZHIA REGION

ENERHODAR ЕНЕРГОДАР

5 10 15 20 25 30 35 5 000 10 000 15 000 20 000 25 000 12 ZAPORIZHZHIA NUCLEAR POWER ATOMENERHOMASH MANUFACTURER TEPLOVODOKANAL, PUBLIC INDUSTRY PLANT NPP OF ENERGOATOM NNEGC OF ENERHOATOM NNEGC UTILITY COMPANY Principal activity – electric energy production. Zaporizhzhia nuclear power Principal activity – the production of elements of the pipelines and Principal activity – the provision of services plant is the largest producer of electric energy among the Ukrainian nonstandard equipment for nuclear and heat power plants, production for centralized water supply and disposal, ENERHODAR is the city with mono-functional nuclear plants and the most powerful nuclear station in Europe. of construction metal constructions, metal doors and windows, metal supply of heat energy, transportation of economy – the dynamics of social and economic Employment size – 11 168 persons (63,2% of the total number of fulltime containers, reservoirs; repair and technical maintenance of vehicles heat energy through main and local heat development and a level of the budget revenues employees of the city in 2019). and industrial machinery. supply networks depend on stable operation of two energy The payments, made by Zaporizhzhia nuclear power plant, amount to 2/3 Employment size – 783 persons. Employment size – 437 persons. enterprises – Zaporizhzhia Nuclear Power Plant of revenues of the general fund of the city’s budget, excluding transfers. and Zaporizhzhia Heat Power Plant. The key type of products produced and sold by the largest employers is electric energy. The operation of energy complex of Enerhodar is an important conditions of energy stability not Contact details: Contact details: only of the region but on a nationwide scale. https://www.npp.zp.ua/uk https://aem.zp.ua/ Contact details: https://www.en.gov.ua/vikonavchi- organi-misyko-radi/komunalyne- pdprimstvo-teplovodokanal A share of the enterprises ZAPORIZHZHIA HEAT POWER 15,8% of Enerhodar in the total products sales in Zaporizhzhia region PLANT OF DNIPROENERGO PJSC ENHOL PRIVATE ENTERPRISE VELYCH LLC Industrial products sold Principal activity – electric energy production. UAH 30,8b by the enterprises in 2019 Employment size – 1 026 persons. Principal activity – the repair and maintenance of vehicles and Principal activity – bakery products and Zaporizhzhia heat power plant forms 5% of revenues to the general fund industrial machinery. Designing the systems and equipment for confectionery; production of fancy baked Energy production Key branch nuclear stations, installation, adjustment, repair and technical The 2020 The 2020 Passport Investment of the city’s budget and, considering the negative impact of the production goods, nondurables cakes and desserts on the environment, it pays an environmental tax to the municipal budget maintenance Employment size – 25 persons 43,5 billion Electric energy produced by the (74,6% of revenues of the budget’s special fund). Employment size – 163 persons of kW/h city’s energy enterprises in 2019

A share of the enterprises of Enerhodar in the total volume 28,8% of electric energy produced Contact details: in Ukraine in 2019 http://dniproenergo.com.ua/separate-units/ Contact details: Contact details: dtek-zaporizka-tpp/ http://enhol.com.ua/ +38 061 394 10 56 14 Key strategic directions and targets stipulated CITY’S by the Strategy of development LIVING CONDITIONS, SOCIAL DEVELOPMENT of the city of Enerhodar until 2027 AND CULTURAL ATMOSPHERE STRATEGIC STRATEGIC AND INFRASTRUCTURE STRATEGY DIRECTIONS TARGETS

The leading city in THE SOCIAL INFRASTRUCTURE OF ENERHODAR THE STRATEGIC PLAN OF DEVELOPMENT OF ENERHODAR the national energy is sufficiently developed – a wide network of elementary and industry UNTIL 2027 (APPROVED BY THE DECISION OF THE The city open Development of secondary education establishments, medical establishments, cultural ENERHODAR CITY COUNCIL OF 27.01.2017, NO.4) for investment small and medium establishments and physical culture establishments, as well as a retail and business businesses store network. The citizens consider their city comfortable for living, and https://www.en.gov.ua/strategya-rozvitku-msta-energodara_Vq development Investment raising the visitors notice that it is quiet, clean and atmospheric

Preservation and development of water THE MOST SUCCESSFUL IMPLEMENTS THE GENERAL PLAN OF THE CITY, WAS resources Reducing the man-caused PROJECTS OF THE STRATEGIC PLAN APPROVED ACCORDING TO THE DECISION OF Environment- load on the environment friendly city Increasing the OF DEVELOPMENT OF ENERHODAR THE ENERHODAR CITY COUNCIL OF 03.07.2015, environmental liability of the business and citizens The 2020 The 2020 Passport Investment ARE THE FOLLOWING: NO.94 AND IT PROVIDES FOR THE FOLLOWING:

introduction of an efficient marketing system in the city; establishment of new neighborhood units with relevant modern urban streets; infrastructures; Attractive, modern and safe urban environment development of the green industry; construction of logistics, shopping, sports and recreation centers; Resource efficient introduction of the energy-saving technologies; construction of a waste recycling plant; The city and modern urban inclusive education; construction of a road-and-railway bridge across the Kahovka comfortable environmental support the university of the third century; Reservoir; for living system public budget of Enerhodar construction of hotels and dining facilities. Qualitative social services 16 HEALTH CARE EDUCATION

The level of medical services and the access to health care in the city of Enerhodar is one of the factors creating a positive investment environment.

In the healthcare, the primary Healthcare medical assistance and the quality (communal) of medical services are being establishments constantly improved: Specialized industrial hospital, Communal Noncommercial Enterprise The haemodialysis center considered the best in Ukraine A wide network of elementary and secondary was established in 2018 Education institutions 382 education establishments, located in the territory of In 2020, due to the private Number of medical the city, ensure the provision of educational services The Enerhodar Institute of Public and Municipal 420 students training for management, investors; support, a compute- staff, people in close proximity to the place of living. Considering Administration named after R.H. Khenokha software engineering, economics, rized tomograph was purcha- a good conditions of the local finances, the city’s “Classic Private University” (the highest education accounting and audit, and social work The 2020 The 2020 Passport Investment authorities annually allocate funds for purchasing institution of the 3rd level of accreditation) sed and, at the expense of Municipal Center the budget fund, 5 artificial of Primary Medical required technical equipment for educational process 8 general educational institutions 5 775 pupils respiration units, digitalized Assistance, Communal purposes. Noncommercial Enterprise stationary and portable X-ray 11 out-of-school education facilities 2 202 children units were purchased as well The Enerhodar city branch of Zaporizhzhia region as the major repair of the employment center made a multilateral agreement 2 complexes “Pre-school institution – 149 pre-school children general educational institution” and 431 pupils premises of the in-patient 100 with Education department of the city council with facility and dental department Number of medical regards to complex professional orientation and Preschool facilities 8 pre-school facilities and many were initiated. staff, people employment of the youth. different afterschool programs 18 CULTURAL ESTABLISHMENTS 12K CITIZENS RETAIL, PUBLIC CATERING OF THE CITY Cultural center Municipal cultural center “Suchasnyk” of Enerhodar city council visit different specialized AND SERVICES Culture Cultural and business center Zaporizhzhia nuclear power sports groups. The most and business center plant of Energoatom NNEGC popular are swimming, Cinemas The Premier cinema network martial arts, boxing and The levels of employment and salary that are above Exhibitions Art exhibition hall football. the national average ensure the increase in a consumer and galleries ART BLOK Gallery demand of the population. It is expedient to develop Museums Zaporizhzhia heat power plant and Zaporizhzhia nuclear power plant retail trade, consumer services and related branches. Centralized library system of Enerhodar city council consisting This field of concern makes a stable cash flow, Libraries of 5 libraries, including 1 children’s library 250 SPORTING AND and the payback period of projects is from 5 to 7 years. Municipal Park of Culture and Rest Leisure and Pobedy Park MASS PARTICIPATION recreational Quay Garden square at Kurchatova Street facilities Soniachnyi Beach EVENTS are held every year 126 food stores, Stores 210 non-food stores, and where more than 10K 6 wholesale warehouses people participate in. SPORT Markets 2 units 3 restaurants SPORTS INSTITUTIONS 20 cafeterias INFRASTRUCTURE Public catering 4 pizzerias 9 bars/clubs The 2020 The 2020 Passport Investment OF THE CITY: facilities 21 canteens and eateries (the most of them The developed sports infrastructure enable every citizen to choose his own way of located within the territory of Zaporizhzhia 7 sports institutions sporting activities. Every year the city hosts both local and national competitions. nuclear power plant and the city’s schools) Municipal stadium, which We are proud that our sportsmen come in top places. For example, among the citizens seats 4 000 Hotels 5 units of Enerhodar there are bronze medalist of the 2000 Olympic Games, Para-Powerlifting 12 sports halls located at world champion, medalists of the canoeing world championship, boxing champions of Hair and 39 units Ukraine and Europe, medalists of the swimming championship and the freestyle wrestling general education schools beauty salons championship of Ukraine. 7 fitness centers 20 INFORMATION COMMUNAL ROAD URBAN BUDGET ON THE BUDGET: https://www.en.gov.ua/ INFRASTRUCTURE INFRASTRUCTURE BEAUTIFICATION byudghet-msta

Today there are 8 public utility PROFILE companies in the city that 2019: provide the following services: 36,71km a new square was established, the city’s budget revenues significantly low susceptibility of the water supply and disposal total length about 300 trees and more than exceeds the relevant averages of other revenue item of the city’s of the urban road, ROAD 2000 ornamental bush were local budgets per capita budget to economic risks centralized heat supply of which: RECONSTRUCTION plunged, removal of domestic waste WITHIN THE LIMITS UAH 6.5m was spent for high dependence on operation of the Enerhodar is a donor city and refuse OF THE RESIDENTIAL development of the green largest employers of the city: Zaporizhzhia as it annually transfers a maintenance and operation 19,4km AREA, KM infrastructure. heat power plant and Zaporizhzhia reverse grant to the state of a solid domestic waste within the limits nuclear power plant budget landfill of the residential beautification development. other specialized services. ІH2020: 2019: 646 trees (of which 200 Oriental Budget revenues, excluding grants, INFORMATION ON WORKING HOURS 11,69 km 7,71 km cherries), more than 4200 roses UAH UAH UAH UAH +15,8% per 1 citizen, UAH and 760 bushes have been OF THE COMPANIES, APPLICABLE reconstruction others 970,9m 1 122,6m 94m 45m TARIFFS AND NETWORK CONNECTION plunged The reconstruction of the revenues expenses transferred loanable funds growth of the revenues POSSIBILITY IS POSTED ON: 8,41 km 1,76 km 1,53 km of the of the of the to the State raised for of the municipal budget UKRAINE (local budgets) reapirs carried expected to be expected to be existing irrigation system and municipal municipal budget as a reconstruction (excluding transfers) ut in 2018-2019 repaired in 2020 repaired in 2021 The 2020 The 2020 Passport Investment https://www.en.gov.ua/msyk-slughbi the construction of the new one budget budget reverse grant of the road compared to the relevant infrastructure amount in 2018 have been initiated ZAPORIZHZHIA REGION Starting from the year 2018, the city has been imple- UAH 4.1m has been spent for theses purposes. menting a large-scale project of reconstruction of the A good condition of local finance is a competitive advantage of the city as it defines road infrastructure – almost 44% of the road has been It is expected to construct 6km of the quality of the environment, where investors operate. A high level of the fiscal ENERHODAR reconstructed within the city’s limits. The sources of capacity enable to finance both current expenses of the budgetary institutions (in financing are the following: a new irrigation pipeline and to reconstruct 38km of the existing full) and investment projects of development of the municipal infrastructure using municipal budget funds loanable funds one before the end of the year. the funds of the municipal budget. 2 000 4 000 6 000 8 000 10 000 12 000 14 000 16 000 22 The number of small and medium businesses REVENUE STRUCTURE EXPENSE STRUCTURE BUSINESS in Enerhodar, people Individual Revenues of Enerhodar’s budget in 2017-2019, UAH millions Expenditures of Enerhodar’s budget in 2017-2019, UAH millions 2017 entrepreneurs

2018 Legal 2017 2017 entities CLIMATE 2019 2018 2018 500 1000 1500 2000 2019 2019 The number of small and medium businesses 200 400 600 800 1000 1200 200 400 600 800 1000 1200 per 10000 people of the present population own income transfers current expenses capital expenditures

600 Individual The tax receipts have the largest share in the budget of Enerhodar Using the funds of the budget, the city successfully implements 500 entrepreneurs that is evidence of a high level of its sufficiency and a good condition municipal development programs and, respectively, a share of capital The development 400 of the local finances. expenditures of the budget annually increases. Small and 300 medium of small and medium enterprises businesses is one 200 of the top priority 100 OWN REVENUES THE 2019 ENERHODAR development fields Enerhodar Tokmak Berdiansk Melitipol Zaporizhzhia OF ENERHODAR’S BUDGET BUDGET EXPENDITURES of the city. (EXCLUDING GRANTS) FOR 2019 (WITHOUT GRANTS) Small Business Regardless of the 2019 1 752 private The 2020 The 2020 Passport Investment growth of the number of Number of small entrepreneurs private entrepreneurs, and medium businesses as at 01.01.2020 177 small and the city of Enerhodar medium enterprises falls behind other cities Total return to the budget UAH 41.6m (in 2019) – 6% of all receipts to the general fund of Zaporizhzhia region from small and medium 66,4% 14,9% 8,3% 5,0% 2,6% 2,6% 0,3% of the city’s budget Local Payments Social Resources Housing Education according to the small businesses (without transfers) Individual Land Environ- Non-tax Single Excise Other government to the state and cultural conservation and utilities income tax tax mental tax revenues tax tax revenues bodies budget sector infrastructure and medium enterprises UAH 20.1m (in 2019) – by 14,9% Single tax paid more compared to the year 2018 growth index. 24 BUSINESS SUPPORT SUCCESSFUL AND DEVELOPMENT INVESTMENT PROJECTS

From the beginning of participation in the project (from 2015) the following THE PROJECT OF have been done: PUBLIC BUDGET The Strategic plan of development of Enerhodar until 2027 and the INTERNATIONAL program of development of small and medium businesses developed; THE PROGRAM OF SUPPORT OF SMALL TECHNICAL ASSISTANCE Express analysis of the local business climate performed; AND MEDIUM BUSINESSES IN THE CITY Projects implemented: OF ENERHODAR FOR 2018-2022 WAS DEVELOPED “PARTNERSHIP FOR - “The improvement of the level of competence of active and prospective Due to the cooperation with the Polish- business entities for business diversification in Enerhodar”; Ukrainian Cooperation Foundation (PAUC), URBAN DEVELOPMENT” - “Creation of Enerhodar’s positive image as an investment-attractive city”. the city introduced the Public Budget. THE JOINT OFFICE, ADMINISTRATION SERVICE CENTRE In 2H2020 the implementation of two new projects “Youth business Due to the implementation of the projects, is established (THE PROMIS PROJECT) consulting center” and “The workshop of talents” dealing with business 2 murals appeared in the city, sports development and diversification of the city’s economy are expected to be grounds were constructed and energy- «THE AGENCY OF LOCAL DEVELOPMENT OF ENERHODAR implemented. efficient street lighting was established. PUBLIC ORGANIZATION AND THE ACADEMIC BUSINESS Before the end of the year, it is expected INCUBATOR were established as a part of the Enerhodar In 2010, the city and DTEK LLC signed a declaration of social partnership. to construct new modern sports and art Institute of Public and Municipal Administration named after “THE COMMUNITY According to the cooperation, the equipment for the hospital, computer places, to take energy saving measures R.H. Khenokha “Classic Private University” equipment and furniture for the school have been purchased as well as the fin the buildings, as well as to introduce a WITH ITS OWN HANDS” measures for urban beautification and energy preservation have been taken. system of underground waste collection, It is expected to establish a BUSINESS CENTER and SPONSORED DTEK LLC In 2013, a tradition of holding a competition of mini-projects “The community classification and storage. The 2020 The 2020 Passport Investment AN INDUSTRIAL PARK for the expansion of production with its own hands” was established. During that time, 68 projects for and comprehensive business support in the city improvement of the quality of education, urban beautification and energy preservation have been implemented.

In 2019, the Joint Office, Administration Service Centre of Enerhodar City https://www.en.gov.ua/pidpriemcyam/ U-LEAD WITH EUROPE Council was chosen for participation in the program “U-LEAD with Europe”. msyka-programa-pdtrimki-ta-rozvitku- According to the program, it is expected to get institutional and methodological malogo-serednyogo-pdprimnictva-v- support, furniture, computer equipment and for the issuance of passport. The https://www.en.gov.ua/ menergodar project is expected to be implemented in 2H2020. gromadsykiy-byudghet 26 CURRENT NEW CONSTRUCTION Our city is being constantly developed. INVESTMENT PROJECTS New recreation places are being constructed: OF THE LARGEST SHOPPING MALL OUTDOOR POOL Description: Description: 2 pools: a 3-storey shopping for adults (25*10, mall with an area of depth 1,4 – 1,6m) EMPLOYERS 6200 m2 and a wading pool Commencement of Commencement of construction works: construction works: 2018 рік 2019 рік Scheduled final Final completion: completion: 2020 рік 2021 рік Project owner: Project owner: «Мале Виробничо- Obriy LLC ESTABLISHMENT OF SCIENCE PARKS – SUSTAINABLE CONSTRUCTION комерційне підприємство» PROCESSING CENTERS (DATA CENTERS) WITHIN THE OF A SOLAR ELECTRIC PLANT TERRITORY SURROUNDING THE NUCLEAR POWER PLANT, “SONECHKO-1”. RESIDENTIAL COMPLEX ‘PRESTIGE” The 2020 The 2020 Passport Investment Description: a 10-storey residential complex consisting that enable to raise private investments, to create new jobs and to increase the According to the project, it is expected to install 5K solar of 3 sections with commercial premises on the 1st floor. revenues of the state and local budgets. The city will receive an impetus for panels in the territory of 37ha. The expected power capacity development and introduction of new technologies of the most powerful processing is 13.2MWth; the expected volume of energy production is Commencement of construction works: complexes. At the moment the project is at the stage of planning (economic and 16 705 MWth. In 2019 the pre-construction activities were 2019 рік technological feasibility). initiated and the expected start-up date is December 2021. Scheduled final completion: І section – 2020; ІІ section –2021; ІІІ section – 2022.

Investor: service company: Housing maintenance and construction company “Enerhodar 1”, Solomon-Bud LLC 28 INVESTMENT PROPOSALS (ANNEXES)

ANNEX 1. A list and description of existing investment projects RECONSTRUCTION OF THE STADIUM OF ENERHODAR AT 23A BUDIVELNYKIV STREET RECONSTRUCTION OF DECORATIVE WATER INSTALLATIONS AND DECORATIVE MONUMENTAL

Project owner Enerhodar City Council AND DECORATIVE APPEARANCE OF THE CITY OF ENERHODAR Start date 2021 Project owner Enerhodar City Council Duration 2 months Start date 2021 Project’s purpose Creation of proper conditions for health improvement and outside activities of the citizens, Duration 13 months for running training sessions, holding local and regional sports competitions Project’s purpose Improvement of conditions for recreations of the city’s citizens as well as any other public events Expected benefits The existing water reservoir of 0.45ha cleaned and its banks fortified with stones, Expected benefits Reconstructed stadium with total area of 21 038 sq.m. for 400 visitors Pedestrian fountain (15 х 15 м) constructed, and the surrounding territories landscaped project cost, UAH (000) UAH 31 569,41 project cost, UAH (000) UAH 45 908,37 Sources of financing Municipal budget Sources of financing Municipal budget Implementation phase Design estimates developed and a positive expert report received Implementation phase Design estimates developed and a positive expert report received RECONSTRUCTION OF A MUNICIPAL PARK OF CULTURE AND REST RECONSTRUCTION OF A 5-STOREY DORMITORY LOCATED AT 5 BUDIVELNYKIV STREET, AS A SOCIAL HOUSING ESTATE FOR SERVICEMEN Project owner Enerhodar City Council Start date 2021

The 2020 The 2020 Passport Investment Project owner Enerhodar City Council Duration 13 months Start date 2021 Project’s purpose Creation of proper conditions for relaxation of the city’s citizens at a modern park Duration 33 months Expected benefits The park’s territory is fenced around the perimeter, grass lawns, sidewalks and road renewed and redesigned. 2 playgrounds and a sports grounds established for people with limited mobility. The sprinkler system and illumination system renewed Project’s purpose Provision of housing to the population in need of improved housing conditions Expected benefits Construction of 101 apartments, 17 of which for people with limited mobility project cost, UAH (000) UAH 35 569,409 project cost, UAH (000) UAH 46 683,62 Sources of financing Municipal budget Sources of financing Municipal budget Implementation phase In 2018 design estimates was developed and a positive expert report was issued. At present, the design estimated Implementation phase Design estimates developed and a positive expert report received are being agreed and adjusted 30 Information on premises/sites held on the balance sheet of ANNEX 2. Information on available (communal) land plots ANNEX 5. Zaporizhzhia Nuclear Power Plant, Production Enterprise of Enerhoatom JSC Area, Available utility systems (public ownership) Location Object’s name square Intended use For sale/rent (gas, water, electricity meters or distances to them) Area, Available utility systems Location Object’s name square Intended use For sale/rent (gas, water, electricity Construction and maintenance Mains system nearby, Kurchatova Lan plot (cadastral No. meters or distances to them) 9620,0 of a multi-story residential For sale/rent heat supply, water supply Street 2312500000:02:008:0023 building and disposal Heat supply system; electric power 157 Promyslova A building of the industrial site’s office 489,5 Amenity and office premises For sale/rent supply, water supply, sewer system; Street telecommunication 129 Promyslova Mechanical unit of cable piece cutting 464,0 Production premises, garages For sale/rent supply system; electric power supply ANNEX 3. Information on available private manufacturing sites Street Area, Available utility systems Heat supply system; electric power Production premises, warehouses, Location Object’s name square Intended use For sale/rent (gas, water, electricity A shop of ventilation units 4291,8 For rent supply, water supply, sewer system; garages meters or distances to them) telecommunication

A building of the transformer substation 90,0 Transformer substation For rent Electric power supply Production facility consisting of Heat supply, sewer 127 Promyslova 7 Komunalna administration building, garage box, 14800 Production facility For sale system, water supply, Street Heat supply system; electric power Street covered storehouse, fence and electricity supply Administrative and amenity building 789,9 Amenity and office premises For rent supply, water supply, sewer system; telecommunication Heat supply system; electric power Warehouse of supporting materials 473,0 Warehousing For sale supply Heat supply system; electric power Information on available premises/sites held on the balance sheet of Zaporizhzhia Production premises (production of Sanitaryware premise 110,8 For sale/rent supply, water supply connected to the Heat Power Plant, Production Enterprise of Dniproenerho, JSC (private ownership) varnish-and-paint mixtures) ANNEX 4. building Area, Available utility systems Premises of the central materials Centralized Heat supply system, electric 135,2 Amenity premises For rent power supply, water supply, sewer Location Object’s name square Intended use For sale/rent (gas, water, electricity 126 Promyslova warehouse system meters or distances to them) Street Concrete sites 1566,4 Unsheltered warehouse or car parking For rent No utility networks A part of the Olesya store’s building Electrical power supply, water 4a Yunosti Avenue 703,3 Commercial activities For sale/rent Cold warehouse – a shed for millworks 472,6 Warehousing For rent Electric power supply (a basement and a part of the 1st floor) supply, sewer system Plant of forming-and-reinforcing systems Heat supply system; electric power 96 Promyslova Street Warehouse of heat-insulation materials No.1 592,4 Warehousing For sale No utility networks 1866,3 Carpentry shop For sale The 2020 The 2020 Passport Investment with power-saw bench supply, sewer system 97 Promyslova Street Warehouse of heat-insulation materials No.2 567,4 Warehousing For sale/rent No utility networks 117 Promyslova Cold storage material warehouse 98,5 Warehousing For rent Temporary electric power supply 3-г Prydniprovska Electrical power supply, Street Administration and amenity building 279,3 Amenity and office premises For rent Street water supply, sewer system Centralized heat supply system, electric The building is unsuitable Service and amenity building 1477,8 Amenity and office premises For rent power supply, water supply, sewer for continued operations. 48 Promyslova Street A building of the oxygen station 190,3 For rent No utility networks system The supporting structures 116 Promyslova partially dismantled Street Semi knocked down assembly area 4815,1 Unsheltered warehouse or car parking For rent No utility networks To be used as a hotel or office Electrical power supply, water Heat supply system, electric power 25 Budivelnykiv Street Enerhodar hotel 6672,2 For sale/rent Repair shops 907,4 Maintenance of equipment and vehicles For sale premises supply, heat supply, sewer system supply, water supply, sewer system 32 Area, Available utility systems Area, Available utility systems Location Object’s name square Intended use For sale/rent (gas, water, electricity Location Object’s name square Intended use For sale/rent (gas, water, electricity meters or distances to them) meters or distances to them) Heat supply system, electric A buildings of the pre-installation works Turning shop, production of metal Concrete warehouse 221,9 Concrete warehousing For sale Power distribution system 2513,8 For sale power supply, water supply, shop constructions 136 Promyslova 116 Promyslova sewer system Street For premises of the gas Electric power supply, and some Gas compressor station 622,9 For sale No utility networks Street Steam supply line warehouse 537,5 Warehousing For sale compressor station premises have heating system Heat supply, electrical power Shops, sheltered warehouse or car Cold storage warehouse-shelter 188,8 Warehousing For sale No utility networks Administrative and amenity building 570,4 For rent supply, water supply, sewer system, parking Heat supply system, electric illumination Laboratory and amenity building 761,8 Amenity and office premises For rent power supply, water supply, A shop of heat insulation works with sewer system 115 Promyslova Shops, sheltered warehouse Centralized heating, electrical power 68 Promyslova a warehouse of thermal insulating 1450,0 For rent Reinforced concrete products steam Street or car parking supply Street Steam cleaning chambers 96,6 For sale No utility networks materials cleaning warehouse space for reinforced concrete For coating the metal and other 22200,0 Unsheltered warehouse For rent No utility networks Products Gumming shop 430,5 construction and spare parts For sale No utility networks with rubber Centralized heat supply system, social and amenity objects, Feeder base. Building No.1 23,3 Office premises For rent No utility networks Daryusha store building 119,3 For rent electric power supply, water 36 Promyslova Street stores, trading sites Building No. 2 236,4 Warehousing 133 Promyslova supply, sewer system Office and amenity premises, Street Engineering Laboratory Building 1467,0 For sale No utility networks Centralized heat supply system, laboratory social and amenity objects, Store building №26 98,3 For rent electric power supply, water supply, stores, trading sites Amenity premises 103,5 Amenity and service premises For sale No utility networks sewer system Centralized heat supply system, Materials warehouse of ПТЕМ 1001,0 Warehousing For sale Heat supply, electrical power supply Concrete plant. Administrative and 298,8 Amenity and office premises For sale electric power supply, water Warehouse of складу inflammable amenity building Highly inflammable materials warehouse 1553,5 For sale No utility networks supply, sewer system 91 Promyslova materials Street Concrete plant. Guard desk 6,8 Amenity premises For sale No utility networks Heat supply, electrical power supply, Service and amenity building 1540,0 Amenity and service premises For sale water supply, sewer system Unsheltered warehouse or car Concrete plant. Concrete sites and roads 5100,0 For sale No utility networks parking Sheltered parking for special purpose 969,0 Сar parking For sale No utility networks Concrete plant. Shop of brick hydro- vehicles The 2020 The 2020 Passport Investment 136 Promyslova 310,2 Sheltered warehouses For sale No utility networks pressing Warehousing of large reinforced Street Pre-Assembly Site 25099,0 For sale No utility networks Managing the technological Heat supply, electric power and metal constructions Concrete plant. Central control room 33,0 For sale operations of the concrete plant supply A building of the central control room has Producing the concrete and Water supply and electric power 134 Promyslova Gas station with a warehouse of fuel and Gas station and a warehouse of fuel and Concrete plant 377,4 For sale 2332,0 For sale heat supply and water supply systems. concrete mixture supply Street lubricant materials lubricant materials And the building has an electrical wiring A ground car ramp and an Warehousing of inert materials used underground gallery have a Inert material warehouse 1560,8 for technological operations of the For sale Workshop 517,2 Amenity and office premises For rent No utility networks temporary power supply line. No 12 Promyslova concrete plant other utility networks Street A covered shed and a car ramp 761,6 Loading-unloading operations For rent No utility networks 34 ENERHODAR The 2020 Investment Passport

Developed by the city’s authorities in collaboration with Сredit-Rating, nationally authorized rating agency.

The opinions and views have been expressed considering the situation as at the document’s date. The document is for information purposes.

Credit-Rating, LLC 1 Mezhyhirska Street, Kyiv 04070 phone.: +38 (044) 490 25 50 e-mail: [email protected] www.credit-rating.com.ua

Enerhodar City Council 11 Kurchatova Street, Enerhodar, 71502, Zaporizhzhia Region phone.: +38 (06139) 3 24 14 e-mail: [email protected] www.en.gov.ua