Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Machine Resurfacing – Contact Officer Mr Byron Lovell

Road Name Parish Extent of Works Current Status

From the junction with Royal Tunbridge nd Camden Road Calverley Road to the Programmed 2 Wells junction with Albion Road. October 2017

Royal Tunbridge th A26 London Road Junction with Church Road Programmed 24 Wells October 2017

Footway Improvement - Contact Officer Mr Neil Tree

Road Name Parish Extent of Works Current Status

From Outside number 32 Programmed for Sychem Place Capel for the remaining length. November 2017. (Footway Protection). From the junction with Maidstone Road to the Badsell Road layby adjacent to Completed. The Goldings. (Footway Protection). Entire length Programmed for Allan Close (Footway Protection) November 2017.

Surface Treatments – Contact Officer Mr Jonathan Dean

Micro Surfacing

Road Name Parish Extent of Works Current Status

A262 Cranbrook / Hammerhill Farm to Neave Completed Biddenden Road

Babbs Lane to South Cranbrook Road Completed Lodge Constitutional Hill Road to the junction with A26 Southborough Pennington Road. (St Completed London Road Andrews to Harland Way) A26 Vale Road to the junction Tunbridge Wells Completed London Road with Mount Ephraim. A26 Harland Way to Southborough Completed London Road Ridge (linked to Ops P1) Top of "S" bends. Extend micro either side of bends B2160 and micro top bend. Extend Completed Gedges Hill to join with Chantlers Hill (Extra 350Lm) Barn Store to previous B2086 micro joint (outside Cranbrook Completed Benenden Road Swattenden Cottages) near Tilsden Lane B2079 Peasley Lane to Goudhurst Completed Bedgebury Road crossroads

B2086 Tilsden Lane through dip Cranbrook Completed Cranbrook Road up to Binan Cottage

Hollybank to Crook Road Brenchley Completed Road

B2160 Coppers Lane to Chestnut Matfield Completed Maidstone Road Lane

Hartleys Farm Shop to Swattenden Lane Cranbrook Completed A229

B2084 End of SD "UPPER LAWN" Goudhurst Completed Chequers Road to B2079 North Road

A264 Ashurst "s" bends From Stone Ness Completed Ashurst Road Stone Ness to Stone Cross

Programmed for 18th Coach Road Rusthall Whole Road October 2017 for 2 days From junction with Rusthall Programmed for 19th Lower Green Road Rusthall Road to Junction with October 2017 for 2 Cranwell Road days

Surface Dressing

Road Name Parish Extent of Works Current Status

Slip Mill Road A268 to Lightfoot Green Completed