CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 1 TIVOLI SHOWROOM & OFFICE BUILDING TIVOLI FURNITURE LUQTA 11/9/2008 2/28/2011

2 AL REFAA RESIDENTIAL TOWER [2B+G+M+32 FLOORS] ISLAMIC BANK 11/1/2007 1/31/2011

3 AL RAYYAN RESIDENTIAL TOWER [2B+G+33 FLOORS] QATAR ISLAMIC BANK DOHA 10/9/2007 1/1/2011 PUBLIC WORKS AUTHORITY – AL RAYYAN & AL 4 ROAD IMPROVEMENT WORKS IN ZONE 51 & 52 8/2/2009 8/1/2010 ROAD AFFAIRS GHARRAFA ERC 0638 CIA – CONSTRUCTION OF QATAR PRIMARY ROUTES, NORTH PUBLIC WORKS AUTHORITY – 5 DOHA 6/1/2005 11/30/2008 ROAD PROJECT – PACKAGE 1 ROAD AFFAIRS SH. HAMAD BIN JASSIM BIN FAISAL 6 LAFFAN TOWER DOHA 3/1/2005 9/14/2009 AL THANI 7 CONSTRUCTION OF 10 NO KINDERGARTENS IN DOHA AND VILLAGES PUBLIC WORKS AUTHORITY DOHA 10.06.2007 28.02.2009 CONSTRUCTION OF SCIENCE AND TECHNOLOGY PARK INFORMATION 8 TRANSFER TECHNOLOGY CENTRE AND INCUBATION CENTRE BUILDINGS QATAR FOUNDATION DOHA 15.12.2005 31.03.2008 FOR PHASE 1 STAGE 1 AND 2, QATAR FOUNDATION – EDUCATION CITY

9 CONSTRUCTION OF PRIVATE BEACH VILLA COMPLEX QATAR FOUNDATION DOHA 01.12.2004 6/25/2008 CONSTRUCTION OF EDUCATION HOUSING DEVELOPMENT [HOUSING LOT 10 QATAR FOUNDATION DOHA 11/1/2004 5/31/2007 1] QATAR FOUNDATION – EDUCATION CITY SH. HAMAD BIN JASSIM BIN 11 HAYA RESIDENTIAL AND OFFICE COMPOUND AT FARIQ BIN OMRAN DOHA 5/12/2004 9/30/2006 FAISAL AL THANI 12 ROADS AND PARKING LOTS FOR MILITARY CAMPS [RW-527-01] QATAR ARMED FORCE DOHA 13.11.2005 26.04.2006 UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT-MARKING OF EAST 13 QATAR AIRWAYS DOHA 20.08.2005 09.12.2005 APRON RECONSTRUCTION OF ACCESS ROADS AT VARIOUS LOCATIONS WITHIN 14 QATAR PETROLEUM 15.02.2005 21.02.2006 MESAIEED OPERATIONS AREAS EPIC OF RENOVATION WORKS FOR MD’S OFFICE FACILITIES AT 8TH FLOOR 15 AT QP HEADQUARTER AT – VARIATION TO CONTRACT NO. 1 QATAR PETROLEUM RAS LAFFAN 22.11.2004 12.06.2005 EPIC OF TEMPORARY TRAINING FACILITY AT RAS LAFFAN 16 MEZZANINE FLOOR FOR NEWS ROOM AT AL JAZEERA CHANNEL AL JAZEERA CHANNEL DOHA 01.01.2005 31.07.2005 AL DARWISH UNITED REAL ESTATE & 17 UNITED TOWER DOHA 10.03.2004 24.07.2005 INVESTMENT

CompletedProjects.xls 1 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE DFA 0216 – WEST BAY SEWERAGE REHABILITATION OF SEWERAGE – 18 MMA&A – DRAINAGE DEPT. DOHA 22.02.2004 27.06.2005 PHASE 1 CIVIL PROJECT NO. 643 CONSTRUCTION OF VILLAS FOR MR. NASSER MOHD. AL-OTHMAN AND HIS MR. NASSER MOHD. AL- 19 DOHA 15.01.2004 14.10.2005 SON OTHMAN UPGRADING OF EXTERNAL SERVICES AT DOHA NAVAL BASE – PHASE II [D- QATAR ARMED FORCES - 20 DOHA 10.12.2002 31.10.2005 630-03] AFWEU PACKAGE NO. BP#IC-1 – QATAR FOUNDATION – EDUCATION CITY- 21 CONSTRUCTION OF ROADS, UNDERGROUND PARKING, UTILITY TUNNELS QATAR FOUNDATION DOHA 23.07.2002 30.09.2005 AND UTILITIES EAC 0037/C1 – RUNWAY MARKING AND MINOR WORKS AT DOHA 22 M.M.A.&A DOHA 20.02.2002 23.02.2005 INTERNATIONAL AIRPORT EPIC OF RENOVATION WORKS FOR MD’S OFFICE FACILITIES AT 8TH FLOOR AT QP 23 QATAR PETROLEUM DOHA 29.04.2004 29.12.2004 HEADQUARTER AT WEST BAY CONTRACT NO. BP#1C1 – QATAR FOUNDATION – EDUCATION CITY – CONSTRUCTION OF ROADS, UNDERGROUND PARKING, UTILITY TUNNELS AND 24 QATAR FOUNDATION DOHA 25.03.2004 24.12.2004 UTILITIES [VARIATION NO.02] – AL JAZEERA CHILDREN’S TV CHANNEL BUILDING PROJECT RESIDENTIAL BUILDING [GF+5 FLOORS] IN BIN MAHMOUD AREA FOR SHEIKH SH. KHALED BIN JASEM BIN 25 DOHA 01.05.2003 29.07.2004 KHALED BIN JASSIM BIN ABDUL AZIZ AL THANI ABDUAL AZIZ AL THANI 26 UNACCOMPANIED PERSONEL HOUSING – FY03 MCA, DACA 78-03-C-0010 CONTRACK INT’L INC SAYLIYAH 21.01.2003 19.08.2004

27 NEW STUDIO FOR AL JAZEERA SATELLITE CHANNEL AL JAZEERA CHANNEL DOHA 25.09.2003 24.06.2004 DFA 0208C1 DOHA AND RAYYAN SEWERAGE REHABILITATION OF SEWER 28 M.M.A.&A. DOHA 26.11.2001 19.05.2003 NETWORK – CP 628 WEILL CORNELL MEDICAL COLLEGE-QATAR FOUNDATION EDUCATION CITY - 29 QATAR FOUNDATION DOHA 21.04.2002 30.08.2003 QATAR FOUNDATION CONTRACT #BP2A 30 ERC 0387/C3 – RIW DOHA M.M.A.&A. DOHA 22.09.2001 14.03.2002

31 ERC 0473/C1 – RIW, ZONES 44 & 45 M.M.A.&A. DOHA 15.09.2001 26.04.2003

32 EBA 0106/C1 AL MUNTAZAH SIGNAL CONTROL M.M.A.&A. DOHA 29.12.2001 27.08.2002

33 EIC 0539/C1 - SOUTH PERIMETER ROAD M.M.A.&A. DOHA 01.08.2001 27.10.2002

34 ERC 0550/C1 RIW, DHAKIRA AREA ROADS 4, 5, 6, 7, 8 & 9 M.M.A.&A. DHAKIRA 01.08.2001 13.03.2003

CompletedProjects.xls 2 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 35 GULF TOWER (B+G+19) FOR SH. HAMAD BIN JASSIM AL THANI AT WEST BAY SH. HAMAD BIN JASSIM AL THANI DOHA 01.08.2001 31.01.2003 36 EMC 0029/C1 - DOHA CORNICHE SEA WALL REHABILITATION M.M.A.&A. DOHA 21.07.2001 16.01.2003 37 GENERAL TRAFFIC WORKS - ROAD MARKINGS DOHA M.M.A.& A DOHA 20.05.2001 19.11.2002

DEVELOPMENT OF SMALL AND MEDIUM SCALE IN DOHA CITY - DID - MINISTRY OF ENERGY, 38 DOHA 01.05.2001 21.12.2002 CONSTRUCTION OF ROADS AND ALLIED WORKS PHASE-I OF STAGE-I PART-IV. INDUSTRY, ELECTRICITY & WATER

39 RAS ABU FONTAS - B1 STATION - CIVIL WORKS ALSTOM POWER ITALY DOHA 01.04.2001 30.11.2002 NEW HEADQUARTER BUILDING FOR QATAR INDUSTRIAL DEVELOPMENT BANK AT 40 QIDB DOHA 01.02.2001 14.10.2002 GRAND HAMAD AVENUE RAS LAFFAN – POWER AND DESALINATION PROJECT 41 ENELPOWER - ITALY RAS LAFFAN 05.01.2002 15.07.2002 SS C02A EARTH WORKS 42 OFFICE DEVELOPMENT AT WEST BAY DOHA FOR MR. KHALIFA ALI ALKUBAISI MR. KHALIFA ALI- ALKHUBAISI DOHA 01.09.2000 09.06.2002 RAS LAFFAN LIQUEFIED NATURAL GAS COMPANY LTD. 43 DEVELOPMENT PROJECT – PROCUREMENT AND RASGAS AL KHOR 18.09.2000 18.12.2001 CONSTRUCTION OF THE MEDICAL CENTER. ERC 0388 C6 ROAD IMPROVEMENT WORKS CENTRAL DOHA 44 M.M.A.&A. DOHA 03.01.2001 31.10.2001 C99/C1999/35 45 DOHA BANK NEW BRANCH AT ‘C’ RING ROAD DOHA BANK DOHA 01.09.2000 31.08.2001 NEW OFFICE BUILDING FOR Q. N. N. T. C AT ‘C’ RING ROAD G + 6 + 2 QATAR NATIONAL NAVIGATION 46 DOHA 01.02.2000 31.07.2001 BASEMENT & TRANSPORT CO. QATAR INTERNATIONAL ISLAMIC BANK HEAD QUARTER BUILDING AT 47 QATAR INT’L ISLAMIC BANK DOHA 01.09.1999 31.05.2001 GRAND HAMAD AVENUE. MAINTENANCE OF ROADS, PARKING AND SERVICES AT TRAINING QATAR ARMED 48 DUHAILIYAT 10.09.2000 24.05.2001 INSTITUTE AT DUHAILIYAT [RW-517-01] FORCES 49 ROADS AND PARKING IN SAILIYAH ARMY CAMPS [RW-514-01] QATAR ARMED FORCES SAILIYAH 10.09.2000 16.05.2001 50 ERM 1013 C12 ROAD MAINTENANCE 1999/2000 - CONTRACT 12 M.M.A. & A. DOHA 01.07.2000 28.02.2001 51 STREET EAST M.M.A. & A. DOHA 15.11.1999 13.02.2001 52 QATAR ELDERLY PEOPLE BUILDING PHASE-1 QATAR RED CRESCENT DOHA 09.01.1999 28.02.2001 RUNWAY MARKING & MINOR WORKS AT DOHA INTERNATIONAL 53 C.E.D. - M.M.A.A. DOHA 01.01.1998 04.01.2001 AIRPORT. 54 UPGRADING TO RUNWAY & TAXIWAYS AT DOHA INT’L AIRPORT C.E.D. - M.M.A.A DOHA 25.02.1998 04.10.2000

CompletedProjects.xls 3 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE RASGAS HOUSING PROJECT PACKAGE-2 INFRASTRUCTURE WORKS – QATAR REAL ESTATE & 55 RAS LAFFAN 20.12.1998 20.08.2000 MISCELLANEOUS STRUCTURES INVESTMENT CO. 56 ROAD MAINTENANCE 1998/99 CONTRACT - 1 M. M. A & A MESAIEED 01.06.1999 31.03.2000 57 AL DARWISH ENGINEERING HEADQUARTER BUILDING, ‘D’ RING ROAD. AL DARWISH ENGG. DOHA 15.05.1998 15.11.1999 58 PROPOSED TOILETS AND BANQUET STORES AT AL DANA CLUB AL DANA CLUB DOHA 08.05.1999 08.01.2000 59 ROADS & PARKING FOR QATAR EMIRI SIGNAL CORP AT RAYYAN QATAR EMIRI RAYYAN 10.04.1999 16.10.1999 60 RAF ‘B’ DISTILLATE MAINS UMM SAID CHAMBERS MABANI UMM SAID 01.09.1998 30.01.1999

61 FY98 MCA PROJECT US ARMY SALIYAH 19.07.1998 28.02.2000

62 U.A.E. EMBASSY & AMBASSADOR’S BUILDING AT DOHA UAE GOVT. WEST BAY 01.09.1997 23.02.1999 63 REPLACEMENT OF WATER MAINS AT DOHA CORNICHE MINISTRY OF ELEC. & WATER DOHA 11.09.1996 30.07.2000 64 OFFICE BLOCK AT WEST BAY FOR MR. MOHD. AJJAJ AL KUBAISI AJJAJ AL KUBAISI WEST BAY 29.06.1996 21.09.1997 65 REPAIR & MAINTENANCE WORK FOR WHARVES AT UMM SAID MIN. OF ENERGY & IND. UMM SAID 01.11.1995 23.02.1999 66 FY 96 MCA PROJECT QATAR US ARMY SAYLIYAH 16.07.1996 31.01.1999 67 DOHA & RAYYAN SEWERAGE PS14/2 NORTH AREA SEWERAGE CP392 MMA&A DAFANA 25.02.1996 31.01.1999 68 PACKAGE ‘B’ INFRASTRUCTURE WORKS PHASE I B.E.D. WEST BAY 11.01.1995 31.07.1998 69 NEW UMM BAB CEMENT PLANT QNCC UMM BAB 20.05.1995 30.06.1997

70 NEW AMERICAN INTERNATIONAL SCHOOL AMERICAN SCHOOL DOHA 15.11.1996 07.02.1998

71 HEAD OFFICE BUILDING FOR QATARGAS QATARGAS RAS LAFFAN 19.08.1995 19.04.1997 72 VILLA COMPLEX FOR DR. NAJEEB AL NAUIMI AT WADI SAIL DR. NAJEEB WADI SAIL 20.02.1995 31.12.1996 EJC0013C1 SIGNALISATION OF AL MATAR STREET / AHMED BIN MOHD. 73 M.M.A.A. DOHA 04.05.1996 27.02.1997 THANI INTERSECTION DSC0015 SURFACE WATER SCHEME SW PUMPING STATION CIVIL PROJECT 74 M.M.A.A. DOHA 15.05.1993 01.01.1995 381 75 DFC0230 SAYLIYAH SEWERAGE PUMPING STATION 50 – CP 500 M.M.A.A. SAYLIYAH 14.04.1993 30.04.1995 76 DFC194 NDOD WEST BAY SEWERAGE PUMPING STATION 35 – CP 399 M.M.A.A. WEST BAY 10.03.1993 30.09.1995 77 CONSTRUCTION OF OFF-SITE BUILDING QAPCO – PHASE II QAPCO UMM SAID 31.11.1994 31.12.1995

CompletedProjects.xls 4 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 78 G + 1 VILLA FOR MR. ADEL AL MALKI MR. ADEL AL MALKI DOHA 01.08.1994 30.07.1995 ERM 0036 RECONSTRUCTION OF AL MATAR AL QADEEM & PART OF JABIR 79 M.M.A.A. DOHA 16.03.1994 18.09.1995 BIN HAYYAN STREET (R/1495) QATAR CENTRAL BANK ALTERATION AND REFURBISHMENT 80 GOVT. OF QATAR DOHA 01.03.1994 31.08.1994 ACCOMMODATION 81 CONSTRUCTION OF VIP BUILDING QAPCO MESAIEED 15.09.1995 15.03.1996 82 MCDONALDS RESTAURANT ALMANA RESTAURANT FARIJ AL NASR 15.07.1995 17.11.1995 83 AL GHUWAIRIYAH MILITARY ROAD ARMED FORCES GHUWAIRIYAH 20.12.1994 18.04.1995 84 NDOD BLOCK 1200 (1+2) INFRASTRUCTURE PROJECTS M.M.A.A. DOHA 01.09.1992 27.03.1995

85 NEW TOYOTA SHOWROOM ABDULLA ABDULGHANI DOHA 15.06.1992 15.12.1994 86 CONSTRUCTION OF GULF AIR SIMULATOR BUILDING AT DOHA GULF AIR DOHA 02.04.1994 02.12.1994 87 DAIRY QUEEN RESTAURANT MR. A.M. AL MAJID DOHA 01.02.1994 31.07.1994 ERC 0208 ALI BIN ABDULLAH STREET (AL ASMAK STREET TO GRAND 88 M.M.A.A. DOHA 10.03.1994 14.09.1994 HAMAD) RAS ABU FONTAS ‘B’ POWER & DESALINATION STATION SITE FORMATION QATAR ELECTRICITY & WATER RAS ABU 89 04.08.1993 30.01.1994 CONTRACT NO. 1 COMPANY FONTAS 90 ERC 0224 AL UTURIYAH TO SUNAY SALIM ROUTE IMPROVEMENT M.M.A.A. SHAHANIYAH 04.04.1993 04.10.1993 91 AL GHAZAL PHASE III QATAR ARMED FORCES SHAHANIYAH 01.02.1992 01.09.1993 92 CONSTRUCTION OF B767 & AIRBUS SIMULATOR BUILDING DOHA GULF AIR DOHA 15.10.1991 15.02.1993 93 ROADS & SERVICES AT GHQ PHASE II QATAR ARMED FORCES SHAHANIYAH 15.05.1992 15.10.1992 DOHA INTERNATIONAL TENNIS TOURNAMENT CENTRE EXTERNAL WORKS 94 M.M.A.A. DOHA 18.08.1992 10.12.1992 PACKAGE “G” 95 ACCESS ROAD TO FALCON 77 & 78 QATAR ARMED FORCES SHAHANIYAH 20.10.1991 12.05.1992 96 UNIVERSITY LINK ROAD PHASE II (R/1396) M.O.I.P.W. GHARRAFAH 23.05.1991 15.03.1992 97 ADDITIONAL SHELTERS A & B FALCON 78 QATAR ARMED FORCES SHAHANIYAH 20.11.1990 24.03.1992 98 HEADQUARTER BUILDING FOR QATAR ISLAMIC BANK QATAR ISLAMIC BANK DOHA 28.11.1989 15.03.1992

99 DISTANT NAVIGATION BEACONS (R/1403) M.O.I.P.W. DOHA 30.11.1991 16.10.1992 CONSTRUCTION OF TWO EXCHANGE BUILDINGS AT RAYYAN & OLD RAYYAN & O. 100 Q-TEL 08.10.1991 08.06.1992 AIRPORT AIRP

CompletedProjects.xls 5 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE RAA POWER STATION & DESALINATION PLANT REMEDIAL WORKS TO 101 ” ” DOHA 14.01.1991 14.05.1991 BREAKWATER & COOLING WATER INLET CHANNEL DOHA SURFACE WATER SCHEME OLD RAYYAN TO AL SAAD PHASE II CIVIL 102 ” ” DOHA 24.03.1990 30.06.1991 PROJECT 365 103 UNIVERSITY LINK ROAD PHASE I ” ” GHARRAFAH 01.11.1989 16.10.1990

104 GHARRAFAH INTERCHANGE ” ” GHARRAFAH 01.09.1988 22.02.1990

105 MAINTENANCE OF ROADS ” ” DOHA 01.01.1990 31.12.1990

106 ROAD IMPROVEMENT WORKS ” ” DOHA 01.01.1990 31.12.1990

107 SOUTH RELIEF ROAD PHASE II M.O.I.P.W. DOHA 16.01.1988 16.04.1990 108 CAMEL RACE TRACK RUNNING RAIL (RW-511-2) QATAR ARMED FORCES SHAHANIYAH 10.06.1989 10.09.1989 109 PAVING TO FOOTPATHS – PHASE I MIN. OF PUBLIC WORK WEST BAY 09.04.1988 09.04.1989 RECREATIONAL & SPORTS FACILITIES AT SHAHANIYAH CAMEL RACE 110 QATAR ARMED FORCES SHAHANIYAH 01.10.1988 15.01.1989 TRACK 111 ARTILLERY CAMP PHASE 1A QATAR ARMED FORCES DUHAIL CAMP 12.03.1989 06.03.1991 112 ROAD WORKS AT AIRWING BASE MIN. OF PUBLIC WORK DOHA 13.02.1988 05.09.1988 113 DOHA PALACE PROJECT – SITE SAFETY & ATTENDANCE AMIRI TECH. OFFICE DOHA 01.02.1987 30.11.1987 114 DOHA PALACE PROJECT – SITE ACCESS & ASSOCIATED WORKS AMIRI TECH. OFFICE DOHA 15.09.1987 31.03.1988 115 AL GHAZAL PH. II BUNKERS CONTRACT II MINISTRY OF DEFENCE SHAHANIYAH 10.12.1986 06.03.1988

116 DOHA PALACE – HARD LANDSCAPING AMIRI TECH. OFFICE DOHA 21.03.1985 11.02.1987

117 NEW MOSQUE NO. 151 AT FARIQ ABDUL AZIZ AWQAF DOHA 15.01.1987 14.09.1987 FARM AT UMM QARN FOR H.E. SH. ABDULLA BIN KHALIFA AL THANI 118 HEIR APPARENTS UMM QARAN 08.02.1987 15.05.1987 ANCILLARY BUILDINGS 119 SECURITY WORKS AMIRI TECH. OFFICE DOHA 31.01.1986 31.01.1988 UMM 120 ROADS & SPORTS GROUNDS TO FARM VILLA AT UMM GHARAIBAH MIN. OF FINANCE 11.05.1985 15.11.1985 GHARAIBAH 121 PENINSULAR ROAD PROJECT JUNCTION B8 TO C21 MIN. OF PUBLIC WORK DOHA 18.01.1986 06.11.1986

CompletedProjects.xls 6 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 122 QATAR RED CRESCENT SOCIETY H.Q. BUILDING QATAR RED CRESCENT SOCIETY DOHA 03.08.1985 31.10.1987

123 BAHARANA HOUSING INFRASTRUCTURE CIVIL ENGG. DEPT. DOHA 31.08.1985 07.11.1986

124 BEACH CLUB – OASIS HOTEL DARWISH DOHA 16.03.1985 15.09.1986 ROAD WORKS – EAST COAST PENINSULAR ROAD & ‘C’ RING ROAD 125 ” ” WEST BAY. 03.07.1984 30.09.1984 EXTENSION WEST BAY INTERMEDIATE STAFF HOUSING PROJECT SITE ‘F’ COMBINED 126 GOVT. OF QATAR WEST BAY 08.07.1984 22.04.1985 INFRASTRUCTURE CONTRACT WB22 127 RENOVATION OF VOLKSWAGON BUILDING DARWISH DOHA 17.12.1983 16.12.1984

128 ALTERATION TO SHERATON HOTEL AMIR’S TECH. OFFICE WEST BAY 14.05.1983 06.08.1983

129 CORNICHE LANDSCAPING AND DEVELOPMENT ” ” DOHA 20.05.1983 21.02.1984

130 EDUCATIONAL HEALTH CENTRE AT AL HITMI ” ” DOHA 16.10.1982 20.12.1984

131 SEA ARM BASE DOCKYARD EXTENSION GOVT. OF QATAR DOHA 03.06.1982 23.10.1983 132 CONSTRUCTION OF VILLA FOR MR. KHATTAB AL DAFA AL KULAIB KHATTAB AL DAFA DOHA 16.06.1982 01.10.1983 133 KASSEM DARWISH APARTMENT BUILDING BLOCK 1 KASSEM DARWISH DOHA 12.02.1982 Sep-83 ‘D’ RING ROAD CONSTRUCTION, SALWA ROAD TO UMM SAID AND 134 GOVT. OF QATAR SALWA 15.11.1981 23.08.1984 WATER MAIN CONSTRUCTION 135 SH. ALI LIBRARY & APARTMENT BLOCK LATE SH. ALI DOHA 27.05.1981 Aug-82 136 CONSTRUCTION OF ESTATE ROADS INTERMEDIATE STAFF HOUSING SITE A ” ” DOHA 05.05.1981 09.03.1982

137 ADDITIONAL WORKS AT AIR BASE TAXI WAY EXTENSION GOVT. OF QATAR DOHA 05.04.1981 07.04.1984

138 VILLA FOR ABDULLAH DARWISH ABDULLAH DARWISH DOHA 01.07.1980 31.03.1986 CO-ORDINATED INFRASTRUCTURE FOR 500 SENIOR STAFF HOUSES WEST 139 ” ” WEST BAY 22.09.1979 30.06.1982 BAY 140 ROAD CONSTRUCTION AT UMM SAID USR 26 ” ” UMM SAID 19.04.1980 20.11.1980

CompletedProjects.xls 7 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 141 PRODUCTION OF T.V. STUDIO FACILITIES GOVT. OF QATAR DOHA 10.01.1979 29.08.1980 KASSEM ABDULLA S/O 142 OASIS HOTEL RENOVATION DOHA 12.10.1978 12.10.1980 DARWISH FAKHROO 143 NGL PLANT ROADS CHIYODA UMM SAID 07.08.1979 07.01.1980

144 WHOLESALE MARKET & SLAUGHTER HOUSE/ROADS ” ” SALWA 16.07.1979 13.11.1979

145 SCHOOLS ROADS AT KHALIFA TOWN ” ” KHALIFA TOWN 28.04.1979 30.01.1980

146 ROADS AT UMM SAID SUR 12 ” ” UMM SAID 28.10.1978 15.07.1979

147 JUMAILIYAH TOWN ROAD ” ” DOHA 15.03.1976 09.11.1976

148 SINNAH AT JUMAILIAH AND GOVT. QUARRY ROADS ” ” DOHA 15.03.1974 10.09.1976

149 DUKHAN ROAD ” ” DOHA 05.04.1973 27.02.1977

150 ROADS FROM UMM SAID ROAD TO R.A.A. ROAD ” ” DOHA 18.07.1972 18.02.1973 151 ROAD CONSTRUCTION FROM SUNNAH TO UMM AL-QEHAB GOVT. OF QATAR DOHA 07.06.1972 07.08.1973 152 NEW ENGLISH SPEAKING SCHOOL DOHA 13.08.1977 07.04.1979

153 UMM SAID PORT DEVELOPMENT GOVT. OF QATAR UMM SAID 05.01.1977 07.10.1979

154 V.I.P. LOUNGE & APRON EXTENSION GOVT. OF QATAR DOHA 01.10.1976 20.01.1978

155 TURBINE HALL EXTENSION FIAT R.A.A. 15.07.1976 15.08.1977

156 CIVIL WORKS AT DISTILLATION PLANTS I & II SIDEM R.A.A. 1976 -

157 MOOSA DARWISH MOSQUE DARWISH FAMILY DOHA 21.07.1976 20.02.1977

158 Q.G.P.C. HEADQUARTERS ” ” ” 22.02.1975 15.08.1978

159 GULF UNIVERSITY INFRASTRUCTURE GOVT. OF QATAR WEST BAY 03.12.1975 02.02.1978

CompletedProjects.xls 8 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE KASSEM & ABDULLA S/O DARWISH 160 EXTENSION TO OASIS HOTEL (ADD. OF 8 STOREY BUILDING) DOHA 07.10.1975 15.03.1976 FAKHROO 161 SEA ARM BASE PHASE 1 ” ” DOHA 19.12.1974 01.04.1977

162 SEWERAGE TREATMENT WORKS PHASE II ” ” DOHA 06.08.1974 05.02.19976

163 AIRPORT SERVICE RESERVOIR ” ” DOHA 26.03.1973 -

164 BOILER HOUSE (CIVIL & MECHANICAL) ” ” R.A.A. 1970

165 DOHA SEWERAGE SCHEME (GRAVITY MAINS) ” ” DOHA 10.09.1972 05.03.1974 166 SEA WATER INTAKE WORKS PH. (4) (CIVIL & MECHANICAL) GOVT. OF QATAR R.A.A. 02.04.1972 05.10.1973 167 QATAR FLOUR MILL PROJECT & GRAIN SILOS QATAR FLOUR MILLS UMM SAID 03.11.1970 03.02.1972

168 SEWERAGE TREATMENT WORKS GOVT. OF QATAR DOHA 25.07.1968 15.03.1970 CONSTRUCTION OF 4 PUMPING STATIONS AND LAYING OF WATER 169 PIPELINE 35 MILES LONG 8” TO 18” DIA. FROM NORTH OF QATAR TO ” ” - 31.03.1968 15.12.1969 DOHA. 170 SEA WATER INTAKE WORKS (CIVIL & MECHANICAL) ” ” R.A.A. 27.02.1965 -

171 DOHA GRAND MOSQUE ” ” - 12.03.1962 15.09.1964

172 DOHA AIRPORT DEVELOPMENT (RUNWAY) ” ” DOHA 17.08.1961 15.08.1963 GAS PIPELINE FROM DUKHAN TO DOHA & WATER PIPELINE TO 173 ” ” - 31.08.1960 15.03.1962 RESERVOIR 174 R.A.A. POWER STATION ” ” R.A.A. 07.07.1960 -

175 GUEST PALACE GOVT. OF QATAR - 06.08.1959 Aug-61 H.H. LATE SH. AHMAD BIN ALI 176 BUILDINGS AND PALACES - - - AL THANI INSTALLATION OF PUMPING STATION AND PIPELINE AT KHORAIB, 177 SHAHAINIYAH UMM QEHAD, MAZROUH, RAWDAT RASHID, PIPELINES OF ” ” - - - DIFFERENT SIZES FROM ALL THESE WELL FIELD TO DOHA.

CompletedProjects.xls 9 of 10 CONTRACTS EXECUTED BY THE COMPANY

COMMENCE- COMPLETION S.N. NAME OF PROJECT CLIENT LOCATION MENT DATE DATE 178 WATER DISTRIBUTION SYSTEM IN DOHA ” ” DOHA

179 MATERNITY HOSPITAL ” ” DOHA 29.12.1956 15.06.1958

180 STATE HOSPITAL GOVT. OF QATAR DOHA May-54 May-56 RUMAILLA & 181 BUILDINGS AND SERVICES FOR SHELL COMPANY SHELL COMPANY Jun-53 Dec-53 RAA 182 POLICE & ARMY HEADQUARTERS AT RUMAILLAH/ASSOCIATED BUILDINGS GOVT. OF QATAR DOHA 18.04.1953 18.04.1955

CompletedProjects.xls 10 of 10