Madhya Pradesh Size

Total Page:16

File Type:pdf, Size:1020Kb

Madhya Pradesh Size Pradhan Mantri Awas Yojana (PMAY-U) 1 Meeting of CSMC Proposal for Approval of 75 HFAPoA Submission of Annual Implementation Plan and Submission of Annual Capacity Building Plan Utilization Certificate of Hoshangabad BLC Project 24th July, 2017 Urban Development & Housing Department Government of Madhya Pradesh 2 Progress of PMAY (U) 2 Indicators Current Status (No.) . Cities Approved 379 . Demand Survey Completed 379 . Total Demand 11.52 Lakh . Demand received through Common Service 3.93 Lakh Centre and Online Application . Cases accepted/rejected 1.60 Lakh . Whether HFAPoA Submitted Yes, For 133 Towns . Whether AIP Submitted AIP approved by SLSMC and submitted to GoI . Whether HFAPoA & AIP entered in MIS 7,63,784 Surveyed Data Entries have been entered in PMAY MIS . SLTC/CLTC staffs approved vs. placed SLTC:14 / CLTC: 204 . Target of DUs in 2017-18 Sanctioning- 3.00 Lakhs DUs Completion- 1.30 lakhs DUs . State Budgetary Provision for PMAY (U) in As per provision of GoI matching budgetary 2017-18 provisions is ensured in state budget 3 Status of Mandatory Conditions 3 Current Status (Special Circumstances/Alternative institutional Mandatory conditions Mechanism, if any) .Dispensing the need for separate .Achieved, No permission is required as per provision under Non Agricultural (NA) Permission Section 172 of Madhya Pradesh Land Revenue Code, 1959. .Achieved, Affordable Housing can be proposed at any location .Prepare/amend their Master Plans except land reserved for catchment, recreation and roads. earmarking land for Affordable .15% of dwelling units are reserved for EWS / LIG category in Housing all residential colonies. .Achieved, Single Window Time Bound Clearance System is in place. .Single-window, time bound .Single window and time bound clearance of building permissions clearance for layout approval and and layout approvals have been included under Public Service building permissions Guarantee Act. .ABPAS under implementation in all ULBs of the State. 4 Status of Mandatory Conditions 4 Current Status (Special Circumstances/Alternative Mandatory conditions institutional Mechanism, if any) .Adopt the approach of deemed building .Achieved, Pre-approved building permission has been permission and layout approval on the adopted for plot sizes up to 300 square meters, as per basis of pre-approved lay outs and amendment issued in Madhya Pradesh Bhumi Vikas building plans. Niyam. 2012 on 27th November 2015 .The provision of Rent Control Act of Madhya Pradesh .Amend or legislate existing rent laws on is in lines of the Model Tenancy Act circulated by the lines of the Model Tenancy Act. MoHUPA, Gol and is being reviewed by the State. .Additional Floor Area Ratio (FAR)/Floor .Achieved, An additional FAR of up to 0.50 is allowed Space Index (FSI)/ Transferable in addition to the permissible FAR for redevelopment of Development Rights (TDR) and relaxed slum as per provision under Clause No. 61 of Madhya density norms. Pradesh Bhumi Vikas Niyam, 2012. 5 Interface with MIS 5 Indicators Current Status (No.) .Survey entry made (%) 76% .Projects approved: 360 .Projects entered (7A/B/C/D) 342 .DUs approved under BLC 1,61,091 .Beneficiaries attached 29,930 .Houses geo-tagged 14,417 6 Progress of Projects 6 Work Grounded/In Progress Houses Verticals Tendered order Plinth / Completed Approved Ground Roof Total Issued Foundation .ISSR 2,172 960 - - - - - - .AHP 1,12,106 45,385 66,721 53,821 8,492 4,288 66,601 120 .BLC (N)* 1,61,091 - - 63,435 3,701 2,885 70,021 103 .BLC (E) - - - - - - - - .Total 2,75,369 46,345 66,721 77,256 12,193 7,173 96,622 223 Data of 1,20,886 potential beneficiaries entered in 2,858 .CLSS - PMAY MIS as well as details shared with SLBC and both (As on 22nd July, 2017) CNAs. Under BLC Vertical : For 70,386 DUs approved in 21st and 22nd CSMC, 1st installment is yet to be released and For 60,734 DUs approved in 19th and 20th CSMC, 1st installment released on 26th April, 2017. 7 No. of EWS DU - 1131 8 9 10 Allotted DUs in Chhindwara Jabalpur 3D Model 11 12 13 Betul Anuppur Hoshangabad Datia Jabalpur 14 Utilization Certificate of Hoshangabad (BLC) 15 Amount of %age of Source of Date of Total Released Amount Released Fund Release Release Amount Utilized Installments (as per UC submitted) Utilized GoI 27/06/2016 507.00 507.00 507.00 100.00% State 27/06/2016 338.00 338.00 314.00 92.90% Beneficiary (As Labour and - 456.30 456.30 456.30 100.00% Beneficiary Funds for Construction of DU) Total:- 1,301.30 1,301.30 1,277.30 98.16% Rs. 16.05 Crore utilized as on 22nd July, 2017. Roof No of Approved DUs Plinth/ Foundation Completed Level 845 109 721 15 16 17 No. of EWS DU - 845 18 No. of EWS DU - 845 19 Approval of 75 HFAPoA Housing Need as per HFAPoA SLSMC Date / Total Total Total Slum Total Slum % of Slum Population Households Population Households Households Number of Non- % of (As per Census (As per Census (As per Census (As per Census (As per Census Slum Total Cities 2011) 2011) 2011) 2011) 2011) Slum Household 9th Feb, 17 / 21 10,30,692 2,05,561 4,03,949 79,393 38.62% 36,271 16,171 52,442 25.51% 20th Mar, 17 / 20 6,18,210 1,25,443 2,51,080 49,398 39.38% 20,866 15,635 36,501 29.10% 22nd Apr, 17 / 16 3,77,580 73,189 1,12,725 21,667 29.60% 6,786 11,019 17,805 24.33% 27th May, 17 / 18 3,60,221 73,176 98,586 20,370 27.84% 4,689 7,914 12,603 17.22% 75 23,86,703 4,77,369 8,66,340 1,70,828 35.79% 68,612 50,739 1,19,351 25.00% 20 Total Total Total Slum Total Slum % of Slum Housing Need as per HFAPoA S. Population Households Population HouseholdsHouseholds Name of City Non- % of No. (As per Census (As per Census (As per Census (As per Census (As per Census Slum Total 2011) 2011) 2011) 2011) 2011) Slum Household 1 Dewas 2,89,550 57,397 97,690 18,237 31.77% 12,054 919 12,973 22.60% 2 Neemuch 1,28,561 25,650 59,970 11,682 45.54% 2,873 4,975 7,848 30.60% 3 Nagda 1,00,039 20,177 13,715 2,719 13.48% 2,534 3,474 6,008 29.78% 4 Dhar 93,917 18,531 35,155 6,606 35.65% 5,120 680 5,800 31.30% 5 Itarsi 99,330 20,638 39,688 8,197 39.72% 4,990 - 4,990 24.18% 6 Raghogarh 62,163 12,409 14,454 2,802 22.58% 2,628 1,382 4,010 32.32% 7 Jaora-Ratlam 74,907 13,485 58,147 10,303 76.40% 2,590 1,113 3,703 27.46% 8 Gadarwara 47,604 9,995 6,468 1,294 12.95% 2,001 1,422 3,423 34.25% 9 Mandla 55,133 12,146 35,128 7,770 63.97% 2,702 659 3,361 27.67% 10 Barwani 55,504 10,917 25,187 4,956 45.40% 2,075 923 2,998 27.46% 11 Dhanpuri 45,156 9,293 1,456 328 3.53% 653 2,266 2,919 31.41% 12 Biaora 47,663 9,497 36,537 7,350 77.39% 653 2,197 2,850 30.01% 13 Pandurna 45,479 10,243 31,469 7,034 68.67% 721 1,290 2,011 19.63% 14 Sarangpur 37,435 6,405 17,576 3,059 47.76% 804 1,162 1,966 30.69% 15 Rehli 30,329 5,930 13,626 2,686 45.30% 1,387 534 1,921 32.39% 21 Total Total Total Slum Total Slum % of Slum Housing Need as per HFAPoA S. Name of City Population Households Population HouseholdsHouseholds Non- % of No. (As per Census (As per Census (As per Census (As per Census (As per Census Slum Total 2011) 2011) 2011) 2011) 2011) Slum Household 16 Seoni-Malwa 30,100 6,042 14,701 2,924 48.39% 1,081 830 1,911 31.63% 17 Narsinghgarh 32,329 6,404 13,170 2,658 41.51% 900 1,007 1,907 29.78% 18 Agar 37,917 7,349 20,479 4,074 55.44% 1,066 792 1,858 25.28% 19 Maheshwar 24,411 4,932 4,932 974 19.75% 1,309 538 1,847 37.45% 20 Ashta 53,184 10,006 35,218 6,578 65.74% 1,102 602 1,704 17.03% 21 Garhakota 32,726 6,369 7,759 1,509 23.69% 1,057 518 1,575 24.73% 22 Chanderi 33,081 6,669 12,053 2,425 36.36% 1,223 316 1,539 23.08% 23 Pipariya 48,826 10,225 29,668 6,280 61.42% 613 865 1,478 14.45% 24 Sohagpur 25,040 5,291 8,277 1,690 31.94% 620 817 1,437 27.16% Mhowgaon- 25 30,012 6,373 7,140 1,366 21.43% 413 1,016 1,429 22.42% Indore 26 Chitrakoot 23,316 4,752 10,234 1,960 41.25% 899 517 1,416 29.80% 27 Alirajpur 28,498 5,403 8,094 1,550 28.69% 1,212 148 1,360 25.17% 28 Sihora 44,048 9,551 19,074 4,251 44.51% 162 1,197 1,359 14.23% 29 Raisen 44,162 8,637 38,701 7,665 88.75% 974 369 1,343 15.55% 30 Unchehra 18,442 3,738 4,203 910 24.34% 1,200 - 1,200 32.10% 22 Total Total Total Slum Total Slum % of Slum Housing Need as per HFAPoA S.
Recommended publications
  • State of Environment (Soe)
    STATE OF ENVIRONMENT (SOE) REPORT – TIKAMGARH Executive Summary Welcome to the Tikamgarh State of Environment Report. The State of Environment Report provides a summary of the environmental attributes and condition of the district and the human impacts on the environment. It also provides a public record of district authority, industry and community activities and achievements in responding to pressures on the environment. State of the Environment Reports can therefore be considered as a mechanism for reporting on progress towards Environmentally Sustainable Development (ESD). State of the Environment (SoE) Reporting will be an annual requirement of district authority, coinciding with Annual Plan and prepared for each financial year. It involves looking at: the various pressures on the environment; the state or condition of the environment at the time of reporting; and any responses that has been or will be made to better manage environmental pressures or impacts to improve environmental conditions. So the main objective of the SoE Report of Tikamgarh is to bring out an overview of the environmental scenario of the district to serve as a baseline document and assist in logical and information based decision making. It is recognized that to achieve ESD within district the activities of annual plan require a shift in priorities, which involves the integration of environmental considerations into the development of community goals/targets, strategies, economic policies, and decision-making in every sphere of activity. The SoE Report provides a mechanism for identifying sustainability issues and trends, and therefore provides a mechanism for assisting the prioritization of district plan in achieving ESD The State of the Environment Report prepared for Tikamgarh covers the state and trends of the environmental issues like Agriculture, Forest, Land degradation, Water quantity, and Water quality.
    [Show full text]
  • 33Kv & 11Kv Tripping Information.Xlsx
    33KV FEEDERS HAVING MORE THAN 5 TRIPPINGS IN LAST 3 MONTHS IN WEST DISCOM No. of 33KV Feeders No. of 33KV Feeders No. of 33KV Feeders Total No. Of 33KV S.No. Circle having more than 5 having more than 5 having more than 5 Feeders Trippings in Apr-2019 Trippings in May-2019 Trippings in June-2019 1 Indore City 75 0 2 9 2 Indore O&M 122 0 0 11 3 Khandwa 46 0 0 3 4 Burhanpur 21 0 0 0 5 Khargone 71 1 0 7 6 Barwani 33 2 0 0 7 Dhar 65 1 0 7 8 Jhabua 30 0 0 4 Indore Region 463 4 2 41 9 Ujjain 110 0 0 3 10 Dewas 102 1 2 11 11 Shajapur 59 6 0 2 12 Agar 44 0 0 2 13 Ratlam 55 0 0 8 14 Mandsaur 52 1 0 4 15 Neemuch 28 0 0 2 Ujjain Region 450 8 2 32 West Discom 913 12 4 73 11KV FEEDERS HAVING MORE THAN 8 TRIPPINGS IN LAST 3 MONTHS IN WEST DISCOM No. of 11KV Feeders having No. of 11KV Feeders having No. of 11KV Feeders having Total No. Of 11KV more than 8 Trippings in more than 8 Trippings in more than 8 Trippings in June- Feeders S.No. Circle Apr-2019 May-2019 2019 Non- Non- Non- Non- Irrigation Irrigation Irrigation Irrigation Irrigation Irrigation Total Irrigation Total Irrigation Total Feeders Feeders Feeders Feeders Feeders Feeders Feeders Feeders 1 Indore City 451 2 4 0 4 2 0 2 31 0 31 2 Indore O&M 303 304 0 0 0 0 0 0 35 12 47 3 Khandwa 168 184 2 4 6 0 2 2 25 22 47 4 Burhanpur 73 102 1 2 3 0 0 0 2 4 6 5 Khargone 218 284 0 0 0 0 0 0 2 4 6 6 Barwani 137 142 13 3 16 0 0 0 30 14 44 7 Dhar 196 347 0 2 2 1 1 2 63 37 100 8 Jhabua 182 9 0 1 1 1 0 1 45 0 45 Indore Region 1728 1374 20 12 32 4 3 7 233 93 326 9 Ujjain 314 465 3 0 3 2 0 2 28 1 29 10 Dewas 240 334 33 9 42 2 0 2 49 53 102 11 Shajapur 129 215 18 6 24 3 1 4 25 23 48 12 Agar 63 98 7 1 8 5 1 6 15 3 18 13 Ratlam 198 291 15 2 17 2 2 4 46 24 70 14 Mandsaur 226 325 21 6 27 8 3 11 61 43 104 15 Neemuch 138 196 28 14 42 10 0 10 46 46 92 Ujjain Region 1308 1924 125 38 163 32 7 39 270 193 463 West Discom 3036 3298 145 50 195 36 10 46 503 286 789 33KV Feeder wise Trippings Of MPWZ in June-2019 Total Outage Total No.
    [Show full text]
  • FULL SECTOR ASSESSMENT: WATER and OTHER URBAN INFRASTRUCTURE and SERVICES A. India Urban Scenario 1. About 377 Million (31%)1 Of
    Madhya Pradesh Urban Sector Investment Program (RRP IND 42486) FULL SECTOR ASSESSMENT: WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES A. India Urban Scenario 1. About 377 million (31%)1 of India’s population lives in 7,935 urban areas and contributes 63% of gross domestic product (GDP). About 70% of the urban population resides in 4682 rapidly growing urban agglomerations and cities with a population of over 100,000, including 53 cities with a population of more than a million. Growth in the remaining small towns was nominal. The contribution to GDP from the urban areas is expected to increase to about 75% as the proportion of urban population reaches 40% of the total population by 2030. 2. Urban water supply in India is characterized by intermittent water supply (often for a couple of hours in a week) and low coverage, high nonrevenue water, and poor cost recovery. No city in India can claim for universal coverage with continuous pressurized water supply. The service levels are even lower in small towns, which have been upgraded from village character to a town. These small towns mostly depend on local groundwater sources with no treatment and no planned hydraulic networks. The small town local bodies have been struggling with limited financial resources further aggravated by a lack of competent and skilled human resources capable of delivering services expected from a fully functional water utility. 3. The investment in urban infrastructure3 up to the year 2031 was estimated at $53.5 billion for water supply and $40.5 billion for sewerage services at 2009–10 prices.
    [Show full text]
  • O.I.H. Government of India Ministry of Housing & Urban Affairs Lok Sabha Unstarred Question No. 2803 to Be Answered on March
    O.I.H. GOVERNMENT OF INDIA MINISTRY OF HOUSING & URBAN AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2803 TO BE ANSWERED ON MARCH 13, 2018 DEVELOPMENT OF CITIES No.2803 SHRI LAXMI NARAYAN YADAV: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) the proposals for the development of cities forwarded by the State Government of Madhya Pradesh to the Union Government during the last three years; (b) the names of the cities and the nature of work to which the said schemes are related to; and (c) the action taken so far by the Union Government on the said proposals along with the final outcome thereof? ANSWER THE MINISTER OF STATE ((INDEPENDENT CHARGE) OF THE MINISTRY OF HOUSING & URBAN AFFAIRS (SHRI HARDEEP SINGH PURI) (a) to (c) Urban Development is a State subject. The Ministry of Housing and Urban Affairs facilitates and assists States/Union Territories (UTs), including Madhya Pradesh, in this endeavour through its various Missions- Swachh Bharat Mission (SBM), Atal Mission for Rejuvenation and Urban Transformation (AMRUT), Smart Cities Mission (SCM), Pradhan Mantri Awas Yogana(Urban)(PMAY-U) and through Metro Rail Projects to improve urban infrastructure to improve the quality of life in cities and towns covered under these Mission. List of such cities/towns in the State of Madhya Pradesh along with details of funds released are in Annexure. Under the Missions the Central Government approves the State Plans and provides the Central Assistance to the States. The projects are designed, approved and executed by the States/UTs and the Cities. Annexure Annexure referred to in reply to part (a) to (c) of Lok Sabha Unstarred Question No 2803 regarding ‘Development of Cities’ for answer on 13 March,2018 Atal Mission for Rejuvenation and Urban Transformation(AMRUT) Cities covered under AMRUT Sl.No.
    [Show full text]
  • Madhya Pradesh Administrative Divisions 2011
    MADHYA PRADESH ADMINISTRATIVE DIVISIONS 2011 U T KILOMETRES 40 0 40 80 120 T N Porsa ! ! ! Ater Ambah Gormi Morena ! P Bhind P A ! BHIND MORENA ! Mehgaon! A ! Ron Gohad ! Kailaras Joura Mihona Sabalgarh ! ! P ! ! Gwalior H ! Dabra Seondha ! GWALIOR ! Lahar R Beerpur Vijaypur ! ! Chinour Indergarh Bhitarwar DATIA Bhander ! T SHEOPUR Datia ! Sheopur Pohri P P P ! ! Narwar R Karahal Shivpuri A ! Karera Badoda P SHIVPURI ! S ! N!iwari D D ! ! Pichhore Orchh!a Gaurihar ! D Nowgong E ! Prithvipur Laundi Kolaras ! Chandla Jawa ! D TIKAMGARHPalera ! ! ! ! Teonthar A ! ! Jatara ! ! Maharajpur Khaniyadhana ! Sirmour Bad!arwas Mohangarh P ! Ajaigarh ! Naigarhi S ! ! Majhgawan ! REWA ! ! ! Chhatarpur Rajnagar ! Semaria ! ! Khargapur Birsinghpur Mangawan Hanumana Singoli Bamori Isagarh Chanderi ! CHHATARPUR (Raghurajnagar) ! Guna ! P Baldeogarh P Kotar (Huzur) Maugan!j Shadhora Panna P ! Raipur-Karchuliyan ! Chitrangi ! ASHOKNAGAR Tikamgarh Bijawar ! Rampur P ! J Jawad P ! ! DevendranagarNago!d !Gurh Sihawal ! ! P Baghelan ! Churhat GUNA Bada Malhera ! ! P H NEEMUCH Bhanpura Ashoknagar ! !Gunnor (Gopadbanas) ! I Raghogarh N Ghuwara D ! SATNA I ! ! A P ! Manasa ! Mungaoli PANNA Unchahara !Amarpatan Rampur Naikin Neemuch ! ! ! Amanganj SINGRAULI ! Aron ! Shahgarh Buxwaha ! Pawai SIDHI ! Kumbhraj Bina ! ! Ram!nagar !Majhauli Deosar Jiran Malhargarh Garoth Hatta ! ! Kurwai ! Shahnagar Maihar P ! ! Maksoodanga!rh Malthon Batiyagarh ! MANDSAUR ! ! ! Beohari Singrauli Mandsaur Shamgarh Jirapur ! Chachaura Lateri Sironj Khurai Raipura ! ! ! A ! P ! ! ! !
    [Show full text]
  • List of Eklavya Model Residential Schools in India (As on 20.11.2020)
    List of Eklavya Model Residential Schools in India (as on 20.11.2020) Sl. Year of State District Block/ Taluka Village/ Habitation Name of the School Status No. sanction 1 Andhra Pradesh East Godavari Y. Ramavaram P. Yerragonda EMRS Y Ramavaram 1998-99 Functional 2 Andhra Pradesh SPS Nellore Kodavalur Kodavalur EMRS Kodavalur 2003-04 Functional 3 Andhra Pradesh Prakasam Dornala Dornala EMRS Dornala 2010-11 Functional 4 Andhra Pradesh Visakhapatanam Gudem Kotha Veedhi Gudem Kotha Veedhi EMRS GK Veedhi 2010-11 Functional 5 Andhra Pradesh Chittoor Buchinaidu Kandriga Kanamanambedu EMRS Kandriga 2014-15 Functional 6 Andhra Pradesh East Godavari Maredumilli Maredumilli EMRS Maredumilli 2014-15 Functional 7 Andhra Pradesh SPS Nellore Ozili Ojili EMRS Ozili 2014-15 Functional 8 Andhra Pradesh Srikakulam Meliaputti Meliaputti EMRS Meliaputti 2014-15 Functional 9 Andhra Pradesh Srikakulam Bhamini Bhamini EMRS Bhamini 2014-15 Functional 10 Andhra Pradesh Visakhapatanam Munchingi Puttu Munchingiputtu EMRS Munchigaput 2014-15 Functional 11 Andhra Pradesh Visakhapatanam Dumbriguda Dumbriguda EMRS Dumbriguda 2014-15 Functional 12 Andhra Pradesh Vizianagaram Makkuva Panasabhadra EMRS Anasabhadra 2014-15 Functional 13 Andhra Pradesh Vizianagaram Kurupam Kurupam EMRS Kurupam 2014-15 Functional 14 Andhra Pradesh Vizianagaram Pachipenta Guruvinaidupeta EMRS Kotikapenta 2014-15 Functional 15 Andhra Pradesh West Godavari Buttayagudem Buttayagudem EMRS Buttayagudem 2018-19 Functional 16 Andhra Pradesh East Godavari Chintur Kunduru EMRS Chintoor 2018-19 Functional
    [Show full text]
  • Answered On:15.12.2004 B.S.N.L
    GOVERNMENT OF INDIA COMMUNICATIONS AND INFORMATION TECHNOLOGY LOK SABHA UNSTARRED QUESTION NO:2483 ANSWERED ON:15.12.2004 B.S.N.L. TENDERS Paswan Shri Sukdeo Will the Minister of COMMUNICATIONS AND INFORMATION TECHNOLOGY be pleased to state: (a) the number of telephone exchanges alongwith the number of tenders invited by the civil wing of B.S.N.L. i n different circles in Madhya Pradesh since 2001 till date; (b) the number of tenders disposed off alongwith the names of contractors/firms to which these tenders have been awarded; (c) whether the Government has received any complaints regarding these tenders; and (d) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF COMMUNICATIONS AND INFORMATION TECHNOLOGY (DR. SHAKEEL AHMAD) (a) There are 2788 Telephone Exchanges in Madhya Pradesh and 149 numbers of tenders were invited under various Civil Circles of Madhya Pradesh relating to construction of telephone exchanges since 2001 till date. (b) Out of these 149 tenders, 142 number were disposed off and the details of contractors/firms to whom these tenders were awarded are given in Annexure-I. (c) Yes, Sir. (d) Three complaints have been received. Details are given in Annexure-II. Annexure-I DETAILS OF CONTRACTORS/FIRMS TO WHOM TENDERS WERE AWARDED SL.NO NAME OF WORK NAME OF AGENCY & ADDRESS (A) (B) (C) 1 Construction of Q-Rex at Shri J.K. Badkul, Gorjhamar (Dsistt. Sagar) Nanak ward Khurai, Distt Sagar. 2 Construction of SBM T.E. Multai M/S Karolia Constructions. E-2/242 Arera Colony Bhopal. 3 Construction of T.E.
    [Show full text]
  • List of Functional School in 2011-12 Madhya Pradesh S No. District
    List of Functional School in 2011-12 Madhya Pradesh S No. District Block 1 Ashok Nagar Mungaoli 2 Ashok Nagar Eshagarh 3 Bhopal Berasia 4 Burhanpur Khaknar 5 Burhanpur Burhanpur 6 Chhatarpur Gaurihar 7 Chhatarpur Bijawar 8 Chhatarpur Buxwaha 9 Chhindwara Tamia 10 Chhindwara Amarwada 11 Chhindwara Parasia 12 Chhindwara Jamai 13 Gwalior Bhitarwar 14 Gwalior Ghatigaon 15 Harda Khirkiya 16 Hoshangabad Sohagpur 17 Hoshangabad Babai 18 Hoshangabad Bankhedi 19 Jabalpur Shahpura 20 Khandwa Harsud 21 Khandwa Pamdhana 22 Khandwa Baladi (Killod) 23 Panna Panna 24 Panna Pawai 25 Sagar Banda 26 Sagar Bina 27 Sagar Khurai 28 Sagar Malthon 29 Sagar Shahgarh 30 Vidisha Basoda 31 Vidisha Nataran 32 Vidisha Sirong 33 Vidisha Latari Alirajpur ( Jhabua Dist in 34 Alirajpur MDM List ) Bhabra(Jhabua Dist in MDM 35 Alirajpur List ) Jobat(Jhabua Dist in MDM 36 Alirajpur List ) Katthiwada(Jhabua Dist in 37 Alirajpur MDM List ) Sondwa (Jhabua Dist in MDM 38 Alirajpur List ) Udaigarh(Jhabua Dist in MDM 39 Alirajpur List ) Anuppur (SHAHDOL is in 40 Anuppur MDM list ) Jaithahri((SHAHDOL is in 41 Anuppur MDM list ) Kotma(SHAHDOL is in MDM 42 Anuppur list ) Pushaprajgarh(SHAHDOL is 43 Anuppur in MDM list ) 44 Balaghat Baihar 45 Balaghat Birsa 46 Barwani Barwani 47 Barwani Niwali 48 Barwani Pansemal 49 Barwani Pati 50 Barwani Rajpur 51 Barwani Sendhwa 52 Betul Bhimpur 53 Betul Ghoradongari 54 Betul Shahpur 55 Chhindwara Harrai 56 Damoh Tendukheda 57 Dewas Kannod 58 Dewas Khategaon 59 Dhar Badnawar 60 Dhar Bagh 61 Dhar Dahi 62 Dhar Dhar 63 Dhar Dharampuri 64 Dhar Gandhwani
    [Show full text]
  • LIST of MINING PROJECTS - MPSEAC PENDING S.No
    LIST OF MINING PROJECTS - MPSEAC PENDING S.No. Case No Category Name of Project Proponent Activity 1 59/2008 1(a) Agrawal Mineral process, Manganese ore mine 5.00 ha. Gwari-wadhana, 1(a) NagpurRoad , Chhindwara M.P. Teh-Sausar, Distt-Chhindwara M.P. 2 70/20081 1(a) M/s Ismail & Sons MissionChowk, Lime stone mine 10-748 ha. Village Bhatgaon (a) Katni M.P. Sunehra Teh-Murwada Katni M.P. 3 99/2008 1(a) M/s Nirmala Minerals Dubiyara Iron Ore Mine 32.375 ha. at 1(a) PathalewardKatni M.P. DubiyaraTalluka-Sihora Jabalpur M.P. 4 104/2008 1(a) Anand mining corporation Dubiyara-Tikaria Iron ore mine 26.00 ha at Village 1(a) Pathakward, Katni- M.P. Dubiyara Tikaria Jabalpur 5 411/2009 1(a) Shri Kishore Kumar Station Road , Limestone & Dolomite mine 5.605 ha. 6200 TPA 1(a) Katni-M.P. at Village- Chandan Teh- Murwara, Distt-Katni- M.P. 6 412/2009 1(a) M/s Kamal lime Industries Station Lime stone & Dolomite mine 7.205 11500 TPA at 1(a) Road Katni-M.P. Village ChandanTeh-Murwara Katni-M.P. 7 434/2009 1(a) Smt. Rekha Sharma 192, Second Laterite, clay and Red ochre deposit mine 6.83 ha. 1(a) Floor, Rachna Nagar Bhopal-M.P. at village Salebhar Teh- Bahoriband, Distt-Katni- M.P. 8 472/2009 1(a) N.M. Dubash Stone & Lime Co. Pvt Lime stone & Dolomite mine 7.42 ha. production 1(a) Ltd Station Raod, Maihar Satna capacity 1.6 lakhs TPA at village Kachhgawan, –M.P.
    [Show full text]
  • Final Population Totals, Series-24
    Census of India 2001 Series 24 : Madhya Pradesh FINAL POPULATION TOTALS (State, District, Tehsil and Town) Prabhal(ar Bansod Of the Indian Administrative Service Director of Census Operations, Madhya Pradesh Bhopal Websltl:: http://www.censlJsmdia.net/ © All rights reserved wIth Government of India Data Product Number 23-006-Cen-Book Preface The final population data presented in this publication IS based on the processing and tabulation of actual data captured from each and every 202 million household schedules. In the past censuses the final population totals and their basIc characteristics at the lowest geographical levels popularly known as the Village/town Primary Census Abstract was compiled manually. The generation of Primary Census Abstract for the Census 2001 is a fully computerized exercise starting from the automatic capture of data from the Household Schedule through scanning to the compilation of Primary Census Abstract. ThiS publication titled "Final Population Totals" is only a prelude to the Primary Census Abstract. The publication, which has only one table, presents data on the total population, the Scheduled Castes population and the Scheduled Tribes population by sex at the state, district, tehsll and town levels. The vitlage-wise data IS being made available In electronic format It is expected to be a useful ready reference document for data users who are only Interested to know the basic population totals. ThiS publrcatlon IS brought out by Office of the Registrar General, India (ORGI) centrally, I am happy to acknowledge the dedicated efforts of Mr Prabhakar Bansod, Director of Census Operations, Madhya Pradesh and his team and my colleagues in the ORG! in bringing out thiS publication.
    [Show full text]
  • Population Figures, Tikamgarh
    OFFICE OF THE CHIEF ELECTORAL OFFICER. MADHYA PRADESH POPULATION FIGURES (INCLUDING SCHEDULED CASTES AND SCHEDULED TRIBES) TIKAMGARH DISTRICT 1971 CENSUS BHOPAL GOVERNMENT CENTRAL PRESS 1972 ,[Price Re. 1.90 DISTRICT TIKAMGARH INDEX Name of Tahsil Name of Revenue Patwari Circl~ Page Inspector Circle! Town (1) (2) (3) (4) 1. TlKAMGARH ·. 1. Tikamgarh 1 to 18 1--4 Tikamgarh Town 8 and 17 1- 2. Samarra 19 to 37 4--7 3. Badagaon 38 to 55 7-9 4. Baldeogarh .. 56 to 75 9--12 5. Khargapur .:- 76 to 93 \ 12-14 6. Kudola 94 to 110. 14--17 2. JATARA ·. 1. Mohangarh .. 1 to 19 17--20 2. Digaucla 20 to 37 .20--22 3. Lidhora 38 to 57 22~25 4. Jatara 58 to 81 25~29 5. Palaira 82 to 101 29-32 3. NIWARI · . 1. Orchha 1 to 19 32-35 2. Tarichalkala .. 20 to 37 35--38 3. Niwari 38 to 59 38-41 4. Prithwipur 60 to 84 41--44 NOTE This booklet contains the population figures of 1971 Census according to administrative units for purposes of delimitation of Constituer.ci(s. The figures hlve been compiled from the records of the Director of Census Operatior s of Madhya Pradesh. It may be noted that the Census authorities do not compile census figures Patwari circle-wise. Also, in their method of compilation) non-municipal urban areas have been tagged on with the Illuniciral areas, of wJ.ich they form out-growths. As non-municipal urban areas are not legally within the municipal limits, in this booklet they have been tagged on to the relevan t patwari circles.
    [Show full text]
  • Madhya Pradesh Size:( 5.5
    37th Meeting of the Central Sanctioning cum Monitoring Committee(CSMC) under Pradhan Mantri Awas Yojana - Housing For All rd Urban Development & Housing Department 23 August, 2018 Government of Madhya Pradesh Indicators Current Status (No.) . Cities Approved 378 . Demand Survey Completed 378 . Total Demand 11.52 Lakh . Demand received through Common Service Centre 4,44,606 and Online Application . Cases accepted/rejected 2,07,397 . Whether HFAPoA Submitted Yes, For all 378 Towns . Whether AIP Submitted Yes 10,49,665 Surveyed Data Entries have been entered in PMAY . Whether HFAPoA & AIP entered in MIS MIS . SLTC/CLTC staffs approved vs. placed SLTC:10 vs 10 / CLTC: 454 vs 521 Sanctioning: 2.47 Lakh DUs (Excluding CLSS) . Target of DUs in 2018-19 Completion: 5.00 Lakh DUs As per provision of GoI matching budgetary provisions is . State Budgetary Provision for PMAY (U) in 2018-19 ensured in state budget 2 Indicators Current Status (No.) .Survey entry made (%) 87.60% .Projects approved: 887 .Projects entered (7A/B/C/D) 851 .DUs approved under BLC 3,47,242 (Excluding 35,475 Surrendered DUs) .Beneficiaries attached 3,04,186 .Geo-tagged Points 6,77,539 (No. of Unique Houses Geo-Tagged: 2,56,075) 3 Grounded for Construction / In-Progress EWS Work Verticals Houses Tendered Order Completed Approved Issued Foundation Lintel Roof Total AHP 1,49,645 48,499 1,01,146 58,816 18,643 5,748 83,207 17,939 (Including RAY) BLC (N) 3,47,242 - - 1,24,110 26,775 18,767 1,69,652 97,313 ISSR 2,172 960 - - - - - - CLSS 11,616 - - - - - - 11,616 (Including LIG/MIG)
    [Show full text]