Involuntary Resettlement Assessment and Measures

Resettlement Plan for AEP 7: 27A and 27B (Shelavadi–Gadag–Mundaragi) Document Stage: Draft for Consultation Project Number: 42513 August 2010

IND: State Highway Improvement Project

Prepared by Public Works Department, Government of Karnataka.

The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

i

TABLE OF CONTENTS ABBREVIATIONS ……………………………………..1 EXECUTIVE SUMMARY ……………………………...... 3 1. PROJECT DESCRIPTION ...... 16 1.1. BACKGROUND ...... 16 1.2. OBJECTIVES...... 16 1.3. PHYSICAL CHARACTERISTICS OF THE PROJECT AREA...... 18 1.4. PROJECT COMPONENTS ...... 18 1.5. ROAD CONFIGURATION:...... 18 1.6. REALIGNMENT / BYPASSES: ...... 18 1.7. BRIDGES AND OTHER CROSS DRAINAGE STRUCTURES:...... 18 1.8. ROAD SIDE DRAINAGE:...... 18 1.9. RAILWAY OVER BRIDGES (ROB’S): ...... 19 1.10. JUNCTIONS / INTERSECTION IMPROVEMENTS: ...... 19 1.11. SERVICE ROADS AND UNDERPASSES:...... 19 1.12. WAY SIDE AMENITIES / TOLL PLAZA / TRUCK PARKING, ETC.: ...... 19 1.13. MAGNITUDE OF IMPACTS...... 19 1.14. MINIMIZING IMPACTS...... 20 1.14.1 MITIGATION THROUGH REALIGNMENTS/BYPASSES AND DESIGN ALTERATION...... 20 1.14.2 DESIGN CROSS- SECTIONS ...... 20 1.14.3 MITIGATION THROUGH DESIGN CROSS SECTION ...... 21 1.15. ROAD SAFETY AND TRAFFIC MANAGEMENT MEASURES ...... 21 1.16. MAGNITUDE OF IMPACTS CULTURAL PROPERTIES AND CPRS ...... 21 1.17. IMPACT OF THE PROJECT ...... 22 1.18. RIGHT OF WAY AND CORRIDOR OF IMPACT...... 23 2. METHODOLOGY FOR IMPACT ASSESSMENT ...... 24 SOCIAL IMPACT ASSESSMENT ...... 24 APPROACH TO RESETTLEMENT PLANNING ...... 24 CENSUS SOCIO-ECONOMIC SURVEY ...... 24 METHODOLOGY AND DATABASE ...... 25 SOURCES OF DATA ...... 25 3. SOCIOECONOMIC INFORMATION AND PROFILE...... 26 SOCIOECONOMIC PROFILE OF THE PROJECT AREA ...... 26 SOCIOECONOMIC PROFILE OF DISPLACED POPULATION...... 26 VULNERABLE GROUPS ...... 29 GENDER ISSUES ...... 29 INDIGENOUS PEOPLE ...... 30 4. SCOPE OF LAND ACQUISITION AND RESETTLEMENT...... 31 PROPOSED LAND ACQUISITION...... 31 ESTIMATED TIME FOR LA...... 32 MANAGING LAND ACQUISITION ...... 32 STAFFING FOR LAND ACQUISITION WORK ...... 32 NEGOTIATIONS COMMITTEE FOR LAND PRICE FIXATION AND DETERMINATION OF REPLACEMENT COST ...... 32 NEGOTIATION COMMITTEE ...... 33 METHOD OF PRICE FIXATION ...... 33 FAILURE OF KHA AND APPELLATE COMMITTEE ...... 34 VALUATION OF ASSETS ...... 34 CUT-OFF DATE...... 34 ESTIMATION OF LAND REQUIREMENT AND PREPARATION OF LAND ACQUISITION PLANS ...... 34 COMPENSATION PAYMENT PROCESS...... 35 ADMINISTERING THE PAYMENT OF R & R ASSISTANCE...... 35 5. STAKEHOLDERS CONSULTATION, PARTICIPATION AND DISCLOSURE ...... 36 CONSULTATION AND COMMUNITY PARTICIPATION ...... 36

ii

METHODOLOGY ...... 36 KEY FINDINGS OF THE CONSULTATIONS...... 36 LEVELS OF CONSULTATION ...... 39 CONSULTATIONS DURING IMPLEMENTATION ...... 39 DISCLOSURE...... 39 6. LEGAL FRAMEWORK ...... 42 THE NATIONAL POLICY ON RESETTLEMENT AND REHABILITATION FOR PROJECT AFFECTED HOUSEHOLDS, 2007 ...... 42 THE LAND ACQUISITION (LA) ACT OF 1894...... 42 ASIAN DEVELOPMENT BANK’S SAFEGUARD POLICY...... 43 INDIGENOUS PEOPLES ...... 45 KARNATAKA HIGHWAY ACT 1964...... 45 COMPARISON OF NATIONAL AND STATE POLICIES WITH ASIAN DEVELOPMENT BANKS SPS - 2009 45 7. ENTITLEMENTS, ASSISTANCE AND BENEFITS ...... 47 KSHIP POLICY ...... 47 IMPACTS AND ENTITLEMENTS ...... 47 CORRIDOR OF IMPACT...... 47 TARGETED SUPPORT TO VULNERABLE GROUPS ...... 48 OPTION AND CHOICES...... 48 PRINCIPLES ...... 48 DEFINITIONS ...... 48 ENTITLEMENTS ...... 50 ENTITLEMENT MATRIX...... 54 8. RELOCATION OF HOUSING AND SETTLEMENTS ...... 60 BASIC PROVISION FOR RELOCATION...... 60 NEED FOR RELOCATION ...... 60 DEVELOPMENT OF VENDOR MARKETS...... 60 ENVIRONMENTAL ASPECTS ...... 60 SOCIAL ASPECTS...... 60 RECONSTRUCTION OF AFFECTED COMMUNITY STRUCTURES...... 61 9. INCOME RESTORATION AND REHABILITATION...... 62 INCOME RESTORATION MEASURES...... 62 IMPACT CATEGORIES AND IR SCHEMES ...... 62 IR ACTIVITIES ...... 62 10. RESETTLEMENT BUDGET AND FINANCING...... 64 BUDGET AND COSTS ...... 64 11. GRIEVANCE REDRESSAL MECHANISM...... 67 GRIEVANCE REDRESSAL COMMITTEE ...... 67 12. FIGURE 11-1: GRIEVANCE REDRESSAL ...... 68 13. INSTITUTIONAL MECHANISMS...... 69 INSTITUTIONAL ARRANGEMENTS...... 69 SOCIAL DEVELOPMENT AND RESETTLEMENT CELL (SDRC) ...... 69 SDRC AND STAFF DEPLOYMENT...... 69 PROTECTION OF ROW ...... 72 VALUATION OF OTHER STRUCTURES/ASSETS ...... 72 ROLES AND RESPONSIBILITIES OF OFFICIALS FOR RP IMPLEMENTATION ...... 72 COMPETENT AUTHORITY FOR VARIOUS APPROVAL...... 76 IMPLEMENTATION SUPPORT BY NGOS ...... 77 DATABASE MANAGEMENT ...... 78 14. IMPLEMENTATION SCHEDULE ...... 79 COORDINATION WITH CIVIL WORKS AND CERTIFICATION...... 79 IMPLEMENTATION SCHEDULE AND TIMING OF RESETTLEMENT ...... 79 CAPACITY BUILDING AND TRAINING ...... 80 15. MONITORING AND REPORTING ...... 82 iii

MONITORING ...... 82 INTERNAL MONITORING ...... 82 EXTERNAL MONITORING ...... 82 16. TYPE OF GATE ...... 93 17. PART-III...... 100 18. FOR TENANTS ...... 101 19. EXTENT OF LOSS...... 105 COMMUNITY ASSET SCHEDULE ...... 107 III. CONDITION OF SERVICES ...... 143 3. Data, Services and Facilities to be provided by the Client ...... 144 6. TEAM FOR THE ASSIGNMENT ...... 145

LIST OF TABLES Table 1-1: Summary Tables on Impacts ...... 19 Table 2-1: Distribution of DHs...... 25 Table 3-1: Social Stratification ...... 26 Table 3-2: Religion...... 26 Table 3-3: Occupation Distribution...... 27 Table 3-4: Income Distribution ...... 27 Table 3-5: Age Classification ...... 28 Table 3-6: Literacy ...... 28 Table 3-7: Type of Structure ...... 28 Table 3-8: Affected Households by Gender...... 29 Table 4-1: Land Acquisition Details ...... 33 Table 5-1: Key Issues: 27 A...... 37 Table 5-2: Key Issues: 27 B...... 38 Table 6-1: Comparison of gaps in various Acts and Policies with ADBs SPS ...... 45 Table 7-1: Entitlement Matrix ...... 54 Table 9-1: Categories for Income restoration ...... 62 Table 10-1: Budget ...... 64 Table 10-2: Unit Costs for R & R ...... 65 Table 10-3: R & R Unit Costs...... 65 Table 12-1: Administrative and Financial Responsibilities of officials and Agencies for RP Implementation ...... 72 Table 12-2: Competent Authority for Approvals...... 76 Table 13-1: R & R Implementation Schedule...... 80 Table 13-2: In house Training programme...... 81 Table 14-1: Monitoring Indicators for Physical Progress ...... 83 Table 14-2: Financial Indicators for Progress ...... 83 Table 14-3: Monitoring Of GRC ...... 84

LIST OF FIGURES Figure 1-1: KSHIP Roads ...... 17

ANNEXURE ANNEX 1: Typical Road Cross Section ANNEX 2: Details of Community Assets ANNEX 3: Census and Community Asset Survey Schedules ANNEX 4: Details of Land Acquisition ANNEX 5: Structure Details ANNEX 6: List of Participants For Meeting and Photographs ANNEX 7: NGO ToR ANNEX 8: Monitoring and Evaluation Consultants ToR

1

ACRONYMS ADB Asian Development Bank AC Assistant Commissioner ADSW Assistant Director Social Welfare APL Above Poverty Line BP Bank Policy BPL Below Poverty Line CAO Chief Administrative Officer CPO Chief Project Officer CPR Common Property Resources COI Corridor of Impact DC Deputy Commissioner DH Displaced household DP Displaced Persons DPR Detail Project Report EWS Economically Weaker Section FGD Focus Group Discussion GOI Government of GOK Government of Karnataka GRC Grievance Redressal Cell HPCFRRI High Power Committee for Redressal of Regional Imbalances HDM Highway Design Module ID Identity Card IPDP Indigenous People Development Plan IR Income Restoration ITI Industrial Training Institute KHA Karnataka Highways Act KSHIP Karnataka State Highways Improvement Project LAA Land Acquisition Act LAO Land Acquisition Officer LAP Land Acquisition Plan MRR Manager Rehabilitation andResettlement NH National Highway NGO Non-Governmental Organization NPRRP National Policy on Resettlement and Rehabilitation Policy PSA Poverty and Social Assessment PA Project Authority PIU Project Implementation Unit PGB Project Governing Body PHC Primary Health Center PWD Public Works Department PU Pre University PGB Project Governing Body RTC Record of Rights R & R Rehabilitation and Resettlement RP Resettlement Plan ROW Right of Way SIA Social Impact Assessment SDO Social Development Officer SDRC Social Development Resettlement Cell SWI Social Welfare Inspector SC Scheduled Caste SR Schedule of Rates 2

ST Scheduled Tribes ToR Terms of Reference UR Upgrading ZP Zilla Panchayat

3

E. EXECUTIVE SUMMARY E1. Project Description 1. The Public Works Department, Government of Karnataka is implementing Karnataka State Highways Improvement Project (KSHIP). Under this Project, 615.03 km of State Highways roads have been identified for project assistance under Asian Development Bank. The 615.03 km of roads have been divided into nine packages. The aim of the project is to improve the performance of the State’s road transport network by improving road conditions and capacity, and to improve the State’s capacity to plan, develop and maintain the Karnataka roads network. This project is Package AEP 7 comprising of two links: 27A (Shelvadi to Gadag) is 30.54 km in Dharwad and and 27 B (Gadag to ) is 32.90 km in Gadag district. 2. The scope of work involves upgrading works of existing single-lane and intermediate lane roads to 12 m roadway with standard two lane seven meter carriageway and alignment improvements to relevant IRC standards and other associated road and bridge works including improvement of major and minor bridges, culverts, road intersections, drains, road geometrics and road furniture 3. The proposed project can be viewed as boosting economic growth and poverty reduction which will bring substantial social and economic development in the region. The social benefits arising due to the project will be triggered off due to improved accessibility to various services such as easy access to markets, health facilities, schools, workplace which in turn increases the income of the region, and ultimately elevating their standard of living. Although various positive project impacts and benefits are expected from the proposed project as mentioned above, there will be some negative impacts on the people living in the immediate project area. 4. The aim of this Resettlement Plan (RP) is to mitigate negative impacts caused due to the project and resettle the displaced persons (DPs) and restore their livelihoods. This Resettlement Plan has been prepared on the basis of census survey findings and consultation with various stakeholders. The plan complies with ADB Safeguard Policy Statement-2009. E2. Socioeconomic Information and Profile 5. Scheduled Caste households account for 1.10% of the population and Scheduled tribe households each account for 6.91% of the total population; the remaining are from the general category. Among religious groups, Hindus dominate with 90.03%, the remaining account for Muslims. Distribution of DPs by occupation reveals that agriculture accounts for 68.45 %, trade/commerce accounts for 10.27%, agriculture labour accounts for 9.99%, and population employed in the service sector accounts 3.97%. In spite of the difficulties in getting reliable data on household income, efforts were made to persuade the respondents to report as accurate data as possible. 35.48% of the population has income less than Rs.26,000. Scheduled Tribes (ST) households earning less than Rs.26,000 also account for 35.48% of the ST population. The income information has been segregated for ST, SC and general category. Age classification shows 69.96% of the total DPs fall in the age group of 18-59. Since this happens to be the working age- group the mitigation measures as given in the entitlement matrix need to be carefully implemented with reference to 18-59 age groups. Literacy pattern shows illiterate population accounts for 18.34% of the surveyed population. Just literate population accounts for 9.02% of the total population, while primary accounts for 15.10% of the total population; those with Middle school education account for 14.42% of the total population; those with education up to secondary level accounts for 22.43% of the total population. Graduates account for 6.58%. Of the residential structures getting affected

4

60.42% are pucca. Amongst commercial structures getting affected only 1.28% of the structures are pucca. Majority (29) of the commercial structures are pan/cigarette shops followed by tea shops (14), tyre repairing (three), etc. Of the total residential structures getting affected 91.66% have electricity, while 31.81% have access to piped water. Among household assets 12.42% of the households have television; 2.08% own two/four wheelers; 1.23% having cooking gas; 1.92% have telephones and only 0.64% have refrigerators. Amongst agricultural equipment 1.87% own tractors; 3.09% own bullock carts. Less than 1% own sprayers. 6. The vulnerable group includes persons such as physically challenged, widows, or persons above sixty years of age, who are not provided or cannot immediately be provided with alternative livelihood and who are not otherwise covered as part of a household. These persons are entitled to assistance to include in government pension schemes if not included, if eligible as per Government criteria (OR) lump-sum amount of Rs. 25,000. There are some DPs that are in more than one vulnerable category. These DPs will be paid only once. There are 83 widows, 13 physically challenged persons and 218 persons over 60 years. There are 59 women-headed household identified. E3. Scope of Land Acquisition and Resettlement 7. Census socioeconomic surveys were conducted for a Corridor of Impact between 16 m and 22 m keeping in view the design requirements. Land acquisition for the project is estimated at 10.52 acres of private land which needs to be acquired. No government land is getting affected. According to the census survey, there are 522 Displaced households (DHs) and 1876 DPs. The project will impact 49 community structures. There is no impact on archaeological sites. All community structures will be relocated by the project authorities before demolition. According to the Census survey, 132 DHs are losing structure and 387 owners are losing agricultural land. There are 8 physically displaced (relocation, loss of residential land, or loss of shelter) households; economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) are 390 households. There are 76 households who are getting economically and physically displaced as they are losing their commercial structures. 8. The summary project impacts are presented below. Table E-1: Summary of Project Impacts Impacts No. 1 Land Acquisition 10.52 Acres 2 Total no. of owners losing land 387 households 3 Total no. of private structure affected 132 4 Total No. of CPRs 49 5 Total no. of DPs 1876 6 Total no of physically and economically displaced (those 76 households losing commercial structures totally) 7 Total no of economically displaced ( those whose incomes 390 households are affected but not physically displaced) 8 Total no. economically displaced persons ( employees) 0 households 9 Total no. physically displaced ( those losing their 9 households residential structures) Source: Census Survey, KSHIP Project, 2009-10

5

E4. Stakeholders Consultation, Participation and Disclosure 9. Consultations with various stakeholders were carried out during various phases of project preparation. There is a lake nearby – if the road is widenend and construction work takes place the lake will get polluted, it’s a source of drinking water for the villages so villagers will get affected. They asked the PA to make the road away from the lake; wanted to know if a temple was on private land how compensation will be given; wanted to know how compensation will be given for houses and land; said Government valuation for land in the neighboring village is less – this should be valued more. So that the people will get more compensation or else they will get affected; it was mentioned earlier land was taken for the road, and no compensation was paid; people are still paying tax for land taken in the RTC this land has not been transferred. Again land is being acquired under this project. , want compensation for the earlier acquisition also; people said compensation should be given directly to the people and without harassment; people want market rate for land; wanted know whether compensation will be paid before the start of work or after the work has started; people do not want to be harassed. In response it was explained that the lake will be protected under the environmental management plan of the project. For issues reagarding non paymentof earlier compensation it was explained that the issue needs to discussed with the DC. Further the entitlement matrix was explained. 10. To keep transparency in planning and for further active involvement of stakeholders the project information will be disseminated through disclosure of resettlement planning documents. The project authority (PA) will submit the RP to ADB for disclosure on ADB’s website. 11. The PA will provide relevant resettlement information, in a timely manner, in an accessible place in to affected persons and other stakeholders. A Resettlement and Land Acquisition information leaflet containing information on compensation, entitlement and resettlement management adopted for the project will be made available in Kannada and distributed to DPs. E5. Legal Framework 12. The Government of Karnataka (GoK) will adopt a Resettlement and Rehabilitation (R & R) Policy for KSHIP to address the adverse impacts arising out of this project in the line with the National Resettlement and Rehabilitation Policy 2007. The policy adopted for the project is consistent with the Asian Development Banks Safeguard Policy Statement. This RP is prepared in accordance with the stipulations and guidelines provided in Public Works Departmental Code Government of Karnataka, and the project specific Resettlement and Rehabilitation: - Principles and Policy Framework for the Karnataka State Highways Improvement Project, The National Resettlement and Rehabilitation Policy 2007 and The Asian Development Bank’s Safeguard Policy Statement SPS -2009. In addition to the above measures, realizing the need of infrastructure development like roads in timely manner, the PWD GoK has decided to acquire the land through the legislation called “The Karnataka Highways Act 1964”(KHA,1964). The KHA, 1964 provides the opportunity to acquire the land through consent award. It is expected that land acquisition under this Act will help the DPs to receive the market price/replacement cost of land as compensation. The GoK has already initiated the process of establishing the Negotiation Committee. The role of the committee will be to negotiate the price of land with the beneficiary. The guidance value of the land will be considered for negotiation. Minimum negotiated price for the Districts of Bangalore Urban, Bangalore Rural, Chikkaballapur, , Ramnagaram, , Davangere, and Dakshin Kannada will be one and half times the Guidance Value. For all the other districts, other than those mentioned, the minimum price will be twice the guidance value.

6

E6. Entitlements, Assistance and Benefits 13. The Project Entitlement policy addresses the direct and indirect impacts of project construction and operation on displaced persons, households and communities. The most direct and immediate impacts are those associated with project construction, mainly land acquisition. Other losses include loss of shelter, and other assets within the project’s corridor of impact; as well as roadside structure, business establishments, and public facilities. Mitigation is provided through compensation and assistance to project displaced persons, households, and groups. These social units are entitled to compensation and assistance on the basis of this policy framework adopted by the project. The policy provides mitigation for: • loss of assets, including land and house or work place; • loss of livelihood or income opportunities; and • Collective impacts on groups, such as loss of community assets, common property resources, and others. 14. Compensation eligibility is limited by a cut-off date. The cut-off date for non- title-holders, is the date of the start of the census survey on a particular link. The cut-off date for the Link 27A is 1 August 2010 and Link 27B is 4 August 2010. The project Entitlement Matrix (Table E-2) identifies and lists various types of losses resulting out of the project and specific compensation and resettlement packages for each category. Table E-2 Entitlement Matrix

No. Impact Entitlements Remarks Category I. Title Holders (a) Loss of land 1. Compensation as per the • Stamp duty and registration principle of replacement cost charges are applicable to through direct negotiation as those who accept negotiation provided for in the Karnataka price. State Highway Act, 1964 + stamp duty and registration charges; • Minimum negotiated price for 2. Compensation offered is cash the Districts of Bangalore for land; Urban, Bangalore Rural,

Chikkaballapur, Ramnagaram, and Corporation / Municipal limits of other district HQs will be 1.5 times the Guidance Value. For all other areas

other than those mentioned

above, the minimum

3 As per the NRRP-2007 the acquiring body has to provide rehabilitation grant equivalent to 750 days minimum agricultural wages. At present the minimum agricultural wages is Rs. 100/day. The NGO will ascertain the actual needs of the displaced persons and assist in creating assets. 4 Bagar Hukum lands are government lands which are unauthorizedly cultivated by persons without legal documents. Applications for regularization that are pending before the regularization committee. 7

No. Impact Entitlements Remarks Category negotiated price will be 2 times the Guidance Value.1 OR average sales statistics, 2 whichever is higher.

3. In case of severance of land an

additional 25% compensation

will be paid to the land loser if

he retains the remaining plot

OR if the remaining land is not

viable and the land owner opts

to surrender the entire plot to

the project, compensation as

given in No. 1 will be

applicable;

4. Loss of perennial crops and

non-perennial crops will be

compensated in accordance

with Horticulture department

valuation process, which is the

replacement cost;

5. A grant of Rs. 15,000 for

replacement of Cattle shed;

6. Water yielding bores will be

replaced in the location

identified by the affected

person in the remaining land

holding subject to availability of

water. In case water is not

available replacement cost of

the borewell at current PWD

SR rates without depreciation

charges and 30% solatium will

be given; • Marginal farmer is defined as

those left with 1 hectare of 7. In case of land owners who non-irrigated or 0.50 hectare become landless or marginal of irrigation or combination of farmers, the following both. additional entitlements will be

offered: (a) subsistence

allowance of Rs. 30,000 for

land less and marginal; and,

(b) assistance for creating

income generating asset

valued up to Rs.75,0003; • Narrow stretch of land is

1 Revised Guidance Value of the properties in Bangalore Urban, Bangalore Rural, Chikkaballpur, Ramanagaram and Corporation/Municipal limits is 2-3 times higher than the earlier Guidance Value. Hence 1.5 times the Guidance Value is proposed as minimum negotiated price. In other areas ratio of revision is reasonably low, hence 2 times the Guidance Value is proposed as minimum price. 2 The average Sales Statistics is in line with LA Amendment Bill. In the LA Amendment Bill there are different modalities in determining and assessing the market value, any one among them would be adopted wherein the land loser gets the maximum market value.

8

No. Impact Entitlements Remarks Category 8. Additional amount of Rs. defined as persons losing an 20,000 will be restricted to area that is up to 5 guntas of those who lose narrow stretch land. of land as ex gratia compensation in lieu of all other benefits; • The NGO engaged for the 9. For those becoming landless RP implementation will and all marginal farmers ensure linkages of the training assistance will be trained persons to ongoing provided for income generating programs, to facilitate vocational training and skills employment and marketing upgrade options as per opportunities. affected the displaced persons' choice; • Any Government land which is unauthorizedly occupied 10. Employment opportunity for by a person and such person affected the displaced persons has applied for regularization as per his/her skills and the of the same under the availability of suitable work in Karnataka Land Revenue road construction work; Rules under 108 C(1) is called Bagar Hukum land. 11. In case of Bagar Hukum lands4 Under Rule 108C section - 50% of compensation and 94A, of the Karnataka Land other benefits as available for Revenue Act,1966, the land owners which is Tahsildar is the custodian of equivalent to replacement the records and he will issue value for this category.. the certification whether the application is pending before the Committee or not. Tahsildar is the Secretary of the Committee for regularization of unauthorized occupation of government land.

(b) Loss of 1. Compensation at current PWD • In case more than 25% of a Residential scheduled rates without house is affected and structures depreciation and 30% solatium unviable for retaining, full at replacement cost; compensation will be paid. 2. Alternative houses in • Resettlement colonies will be resettlement colony or developed if more than 20 developed plot and households are displaced in construction cost of Rs. 40,000 2 km continuous stretch. linked to construction progress; • Plot size will be equivalent to 3. Additional 25% of current PWD size lost subject to a SR rates without depreciation + maximum of 369 sq m/1200 30% solatium for the affected sq ft in rural areas and 184 portion as compensation for sq m /600 sq ft in urban partially affected structures areas. towards reconstruction; • Displaced persons have a 4. Shifting assistance of Rs. right to salvage the affected 10,000; materials. 5. Subsistence allowance of Rs. 30,000.

9

No. Impact Entitlements Remarks Category (c) Loss of 1. Compensation at current PWD • Shopping units with 100-150 commercial scheduled rates without sq ft will be constructed if structures depreciation and 30% solatium more than 20 shops are at replacement cost; affected in a continuous 2. Alternative shop or assistance stretch of 2 km and the for income generating asset owners opt for a shop. valuated up to Rs. 75,000; • Displaced persons have a 3. Additional 25% compensation right to salvage the affected for partially affected structures; materials. 4. Shifting assistance of Rs. • Training for self-employment 10,000; will be provided to one adult 5. Subsistence allowance of Rs. per household as needed. 30,000. • Displaced persons have a right to salvage the affected materials.

(d) Loss of 1. Compensation at current PWD • In case more than 25% of residential scheduled rates without house is affected and cum depreciation and 30% solatium unviable for retaining, full commercial at replacement cost; compensation will be paid. structures 2. Alternative shop or assistance • Resettlement colonies will be for income generating asset developed if more than 20 valuated up to Rs. 75,000 households are displaced in 3. Additional 25% compensation 2 km continuous stretch. for partially affected structures; • Plot size will be equivalent to 4. Shifting assistance of Rs. size lost subject to a 10,000; maximum of 369 sq m /1200 5. Subsistence allowance of Rs. sq ft in rural areas and 184 30,000; sq m /600 sq ft in urban 6. Additional amount of Rs. areas. 25,000 as grant. • Shopping units with 100-150 sq ft will be constructed if more than 20 shops are affected in a continuous stretch of 2 km and the owners opt for a shop. • Displaced persons have a right to salvage the affected materials. • Training for self employment will be provided to one adult per household as needed. II. Tenants (a) Residential 1. Rental allowance for 6 months at Rs. 500 per month in rural areas and Rs. 1000 in urban areas; 2. Shifting assistance of Rs. 10,000. (b) Commercial 1. Rental allowance for 6 months at Rs. 1,000 per month in rural areas and Rs. 1,500 in urban areas; 2. Shifting assistance of Rs. 10,000; 3. Assistance for income generating asset up to Rs. 75,000.

10

No. Impact Entitlements Remarks Category (c) Loss of 1. Rental allowance for 6 months residential at Rs. 1,000 per month in rural cum areas and Rs. 1,500 in urban commercial areas; structures 2. Shifting assistance of Rs. 10,000; 3. Assistance for income generating asset up to Rs. 75,000. III. Non-Title holders (a) Residential 1. House in resettlement colony 1. House plot size in Squatters or developed plot and resettlement colony to be construction cost of Rs. 40,000 minimum of 25 sq m/270 sq linked to construction progress; ft. Resettlement colony will 2. Subsistence allowance of be constructed if more than Rs.15,000; 20 residential squatters are 3. Shifting Allowance of Rs.5000. getting affected in a continuous stretch of 2 km and opted for same. As per NRRP 2007. 2. Developed plot size will be allotted of 25 sq m/ 270 sq ft in urban areas and 33 sq m /350 sq ft in rural areas as per NRRP 2007.

(b) Commercial 1. Alternative shop of 100 sq ft or 3. Shopping units will be Squatters assistance for income constructed if more than 20 generating asset valuated up shops are affected in a to Rs. 30,000; continuous stretch of 2 km 2. Subsistence allowance of and opted for shop. Rs.15,000; 3. Shifting Allowance of Rs.5000. (c) Encroachers 1. Replacement cost of affected structure calculated at current PWD scheduled rates without depreciation; 2. Compensation of crop loss or advance notice for harvesting crops. IV. Loss of livelihood (a) Loss of 1. Subsistence allowance of Rs. • Training for self-employment primary 15,000; will be provided to one adult source of 2. Training assistance will be per household as needed. income provided for income generating vocational training and skills upgrade options as per the displaced persons' choice; 3. Employment opportunity for the displaced persons as per his/her skills and availability of suitable work in the road construction. V. Vulnerable People (a) Widows 1. Assistance to include in • This will be restricted to Physically government pension schemes if those who have no or challenged not included, if eligible as per cannot be provided with and those Government criteria; (OR) alterative livelihood aged above 2. Lump-sum amount of Rs. sources. 11

No. Impact Entitlements Remarks Category 60 years 25,000; • Training for those above 3.Training assistance will be 60 years is not provided for income generating mandatory and will be vocational training and skills provided for if the upgrade options as per the person opts for it and displaced persons' choice. after the need is assessed. VI. Community Assets (a) Community 1. Reconstruction of affected Assets assets; 2. Transfer to Local authorities for maintenance. VII. Unidentified Impacts (a) Unidentified 1. Unforeseen impacts shall be Impacts documented and mitigated based on the principles provided in this policy. Note: All amounts in this entitlement matrix are fixed as of April 01, 2010. These will increased 10% annually on first day of April every year. The same will hold good for guidance value also if not revised by the GoK.

E7. Relocation of Housing and Settlements 15. Wherever there is a loss of residential structure the PA will provide for alternative house. The alternative house will be provided in consultation with the displaced person. The Project Authority will provide compensation for the affected structure without depreciation, adequate compensation for partially damaged structures, and relocation assistance, according to the Entitlement Matrix. The entitlements to the non-titleholders will be given only if they occupied the land or structures in the project area prior to the cut-off date. There are 9 houses and 76 commercial structures that need to be relocated. There are also 36 houses that are partially affected. Whether these need to be relocated will be decided on verification by the NGO. 16. During the surveys and consultations it was seen that there are no stretches which are of two km in length and having 20 displaced persons losing their commercial/residential structure. Thus there is no need for a separate Resettlement Center or a Vendor market in this package. People prefer resettlement within the village to avoid disruption of community life and problem with host community. E8. Income Restoration and Rehabilitation 17. The DPs losing their livelihoods includes titleholders losing land, DPs having commercial structures and employees of the affected structures. In the case of economically displaced persons, the PA will compensate for the loss of income or livelihood sources. The PA will also provide assistance such as, training, and employment opportunities so that they can improve, or at least restore, their income-earning capacity, production levels, and standards of living to pre-displacement levels. 18. The entitlement proposed for the project has adequate provisions for restoration of livelihood of the affected communities. The focus of restoration of livelihoods is to ensure that the DPs are able to at least regain their previous living standards. To restore and enhance the economic conditions of the DPs, certain income generation and income restoration programs are incorporated in the RP. To begin with providing employment to the local people during the construction phase will enable them

12 to benefit from the project and keep more of the resources spent on the project in the local economy. It will also give the local communities a greater stake and sense of ownership in the project. The implementing NGO will carry out need assessment and micro plan with training or linking to ongoing income generation training programs and assist in rehabilitation of DPs. E9. Resettlement Budget and Financing Plan 19. The costs used for the budget estimates are based on information collected during the census socioeconomic surveys of DPs. The estimated total budget for the implementation of RP is Rs. 48.83 million. The resettlement cost estimate for this project includes eligible compensation and resettlement assistance. It does not include Operating Costs, NGO and Monitoring Consultant Costs as these costs are for the overall project (this has been estimated Rs. 20 million for the total project). The unit cost for land and other assets in this budget has been derived through consultation with SDRC/PIU. Contingency provisions have also been made to take into account variations from this estimate. A summary R & R cost is given in Table E-3. Table E-3 R & R Budget Item (in Rs) 1 Compensation for land 10,520,000.00 2 Alternative site cost 2,590,000.00 3 Compensation for private structure 11,260,689.00 4 R & R Assistance 20,024,500.00 5 Contingency (10%) 4,439,519.00 6 Total 48,834,708.00

E10. Grievance Redress Mechanisms 20. The project will establish a Grievance Redressal process, with district-level committees. Each District Grievance Redressal Committee (GRC) will have representation from the local affected population and the NGOs involved in RP implementation. These committees will hear complaints and facilitate solutions; and the process, as a whole, will promote dispute settlement through mediation to reduce unnecessary litigation. The Deputy Commissioner will be the Chairman of the Grievance Redressal Committe; an Academician (To be selected by DC) will be Member; (iii) A representative of DP (to be selected by DC) will be Member and (iv) Executive Engineer of the concerned Division will be Convener. The GRC will be established at the district level with the primary objective of providing a mechanism to mediate conflict and cut down on lengthy litigation. It will also provide people, who might have objections or concerns about their assistance, a public forum to raise their objections and through conflict resolution, address these issues adequately. The GRCs will continue to function, for the benefit of the displaced persons, during the entire life of the project including the defects liability periods. 21. The Grievance Committees will meet regularly during implementation of the RP, at least once a month. The committees will suggest corrective measures at the field level itself and fix responsibilities for the implementation of its decisions. However, the NGOs will form the first level of intervention in resolving DP-related grievances and attempt to motivate the DP to facilitate implementation of the R & R program. The option of contacting the project authorities is available to DPs at any time. The Deputy Commissioner will be the Appellate Authority. At the first level intervention, the NGO will attempt to resolve the grievance; Next, the CAO will attempt to address land-related grievance and the ADSW will address the non-land related grievances; the next option will be to approach the Grievance Redressal Committee; followed by the Regional Commissioner 13

who is the Appellate Authority; If all the above fails, the DPs can approach the court. It is the responsibility of the SDRC/NGO to inform the affected persons of the GRC, to make it effective. Taking grievances to Judiciary will be avoided as far possible and the NGO will make utmost on efforts at reconciliation at the level of GRC. E11. Institutional Arrangements 22. KSHIP has a dedicated unit called the Social Development and Resettlement Cell (SDRC) within the Project Implementation Unit for the implementation of the RP. All aspects of resettlement and rehabilitation and the delivery of entitlements are managed by Social Development/Resettlement Cell (SDRC). The SDRC facilitates land acquisition and compensation, relocation and resettlement, distribution of assistance for the DPs. The SDRC is responsible for monitoring the implementation of all resettlement and rehabilitation activities, including land acquisition. The RP will be implemented by the () division of PIU; Staffing is complete for the proposed institutional set-up. The key SDRC officials are: 23. Special DC Land Acquisition - Special Deputy Commissioner will be the one in charge of the overall land acquisition. He will be assisted by two Assistant Commissioners for Land Acquisition who are responsible for all activities related to land acquisition. One Assistant Commissioner will be stationed at the zonal office of North Karnataka (Hospet) and the other one will be stationed at the PIU Office (South Zonal Office) in Bangalore. 24. Chief Administrative Officer –The CAO will be responsible for all resettlement and rehabilitation activities. The CAO will also be assisted by the Assistant Director Social Welfare (ADSW) who will be responsible for Rand R work. On the land acquisition side, the CAO and the Assistant Commissioners will be responsible for fixing the negotiated price of the land along with the affected persons according to the Karnataka Highways Act, 1964, and for disbursing the compensation. 25. The Assistant Director Social Welfare is responsible for shifting of project affected persons, coordination of disbursement of assistance such as shifting allowance disbursement of funds for income generating programmes, relief assistance, etc. 26. The Resettlement and Rehabilitation Manager will assist the ADSW and coordinate all the rehabilitation work of the Social Development Officer (SDO). 27. The ADSW and the Resettlement and Rehabilitation Manager will be assisted by the SDO.The SDOs will be assisted by the Social Welfare Inspectors (SWI). The SWI’s are supporting staff to SDOs to carry out the functions as per the directions of SDOs. 28. The SDRC will have a Data Management Specialist. The responsibility of this person will be to monitor and update the data of all the project affected persons; to highlight any discrepancy in compensation paid and disbursed; and coordinate the inputs of information from the North and South Divisions to the Central databased at the PIU in Bangalore. The PIU has already appointed the Consultants for database management. Information is ready to be transferred to the PIU for use in implementation. 29. Involuntary resettlement is a sensitive issue and strong experience in R & R matters along with community-related skills will be required by the PIU in order to build a good rapport with the affected community and facilitate satisfactory R & R of the DPs. To overcome this deficiency, two experienced and well-qualified NGO in this field will be engaged to assist the PIUs in the implementation of the RP. The NGO would play the role of a facilitator and will work as a link

14 between the PIU and the affected community. NGO will assist DP in income restoration by preparing micro plan and guiding to access into various ongoing government development schemes and agencies providing financial assistance and loan. Taking into account the significant role of the NGO in RP implementation, it is important to select NGO that are capable, genuine and committed to the tasks assigned in order to ensure the success of the Plan. E12. Implementation Schedule 30. Implementation of RP mainly consists of compensation to be paid for affected structures and rehabilitation and resettlement activities. The time for implementation of resettlement plan will be scheduled as per the overall project implementation. All activities related to the land acquisition and resettlement must be planned to ensure that compensation is paid prior to displacement and commencement of civil works. Public consultation, internal monitoring and grievance redress will be undertaken intermittently throughout the project duration. However, the schedule is subject to modification depending on the progress of the project activities. The civil works contract for each project will only be awarded after all compensation and relocation has been completed for project and rehabilitation measures are in place. The RP preparation and implementation schedule is presented below. Table E-4: R & R Implementation Schedule

Activity Progress (Year/Quarter) 2009 2010 2011 Q4 Q1 | Q2 | Q3 | Q4 Q1 | Q2 | Q3 | Q4 Project Preparation Stage Screen project impact ------Public Consultation on alignment ------Prepare Land Acquisition Plan ------Carry out Census Survey ------Prepare Resettlement Plan (RP) ------RP Implementation Stage Hiring of NGOs for RP Implementation ------Obtaining approval of RP from ADB ------Disclosure of RP ------Public consultation ------Preparation LAP ------Declaration of cut-off date (KHA Notification) ------Payment of compensation ------Taking possession of acquired land ------Handing over the acquired land to contractor ------Rehabilitation of DPs ------Monitoring and Reporting Period Internal monitoring and reporting ------External monitoring and reporting ------

E13. Monitoring and Reporting 31. Monitoring involves periodic checking to ascertain whether activities are going according to the plan. It provides the feedback necessary for project management to keep the programmes on schedule. Monitoring provides both working system for project managers and a channel for the resettles to make known their needs and their reactions to resettlement execution. Monitoring exercise will be undertaken both internally and externally. 15

32. While SDRC/PIU on monthly basis will carry out the project’s internal monitoring and external agency will be appointed for third party monitoring. Monitoring is essentially an exercise in strategic learning that can and should be used for enhancing the quality of RP implementation. There are two types of monitoring being undertaken namely (a) Internal, which is normally carried out by the project authority itself and (b) external or independent monitoring by an external agency. 33. The internal monitoring is a conventional monitoring of government related to physical factors such as, number of households affected, resettled, assistance extended infrastructure facilities provided, etc. and other financial aspects, such as compensation paid, grant extended, etc. The internal monitoring must be simultaneous with the implementation of the Rehabilitation Plan.The objectives of the internal monitoring are: (i) Daily Operations Planning; (ii) Management and Implementation; and (iii) Operational Troubleshooting and Feedback. The frequency of internal monitoring could be daily or weekly depending on the issues and level. 34. An external monitoring agency will be appointed to monitor R & R programmes on semi- annual basis. It should also bring the difficulties faced by the DPs to the notice of PIU so as to help in formulating corrective measures. As a feedback to the PIU and other concerned, the external agency should submit semi-annual report on progress made relating to different aspect of R & R. The report will be disclosed on ADBs website.The agency will also certify the completion of LA and R & R activities for issuing bid documents and award from LA and R & R point of view.

16

1. PROJECT DESCRIPTION

1.1. Background 1. This package has been selected, for upgradation with a 7 m carriage way. Upgrading will have direct /indirect impact on the population along the project corridor. Common property resources, residential structures, commercial structures are likely to be affected. Non-titleholders within the ROW are likely to be displaced. This RP includes the baseline socioeconomic survey characteristics of the displaced persons, the R & R Policy provisions and entitlements and outcome of the consultation held with displaced persons and communities. 2. This project is Package AEP 7 comprising of two links: 27A ( Shelvadi to Gadag) is 30.54 km in Dharwad and Gadag districts and crosses two Taluks Navalgund and Gadag and 27 B (Gadag to Mundargi) is 32.90 km in Gadag district and crosses the taluks of Gadag and Mundargi. According to the categorization of taluks given in the High Power Committee for Redressal of Regional Imbalances Report of 2002, package covers (i) one more backward taluk3 (Mundargi) ;(ii) one backward taluk (Navalgund); and (iii) and one relatively developed taluk (Gadag) . The location Map of the Project is given in Map 1.

1.2. Objectives 3. This Resettlement Plan (RP) is project specific, which outlines the extent of impacts due to road improvements on communities and the mitigation of the potential impacts. It details necessary implementation procedures for resettlement and rehabilitation. This RP is prepared in accordance with the stipulations and guidelines provided in Public Works Departmental Code Government of Karnataka,4, and the project specific Resettlement and Rehabilitation: - Principles and Policy Framework for the Karnataka State Highways Improvement Project, The National Resettlement and Resettlement Policy 2007 and ADB’s Safeguard Policy Statement 2009. Within this given background, the objective of RP is: i. To Identify adverse impacts and determine how they could be overcome or substantially mitigated with the implementation of Karnataka State Highways Improvement Project; ii. To present the entitlements for the affected persons for payment of compensation and assistance for establishing the livelihoods; and iii. To present an action plan for the delivery of compensation and assistance in accordance with the policy adopted for the project. iv. To prepare an action plan for the project affected people for improving or at least retaining the living standards in the post resettlement period.

3 The HPCFRRI report classified taluks in four categories on the basis of the Composite Development Index namely: i) Most backward taluka; ii) More backward taluka; iii) Backward Taluka; and iv) Relatively Developed Taluk A total of 35 relevant indicators covering 5 sectors viz., agriculture and allied; industry, trade and finance; infrastructure (economic); infrastructure (social) and population characteristics were considered for analysis in the report. This indicator was used to compute a Comprehensive Composite Development Index (CCDI) for each taluk. The Committee also attempted a study of imbalances from the deprivation end in respect of six important basic minimum needs to gain a qualitative understanding of the problem. Those six basic minimum needs are: 1. Income deprivation - Percentage of households (rural) below poverty line.2.Unsafe deliveries - Percentage of deliveries not attended by trained health personnel. 3. Unsafe Drinking water - Percentage of habitations not fully covered by safe drinking water facility.4. Malnourished Children below age group 5 - Percentage of moderately and severely malnourished children. 5. Children out of school in the age group of 6-14 years- Percentage of children out of school in the age group of 6-14 years. 6. Gender Gaps in literacy- Literacy rate (Male-female)

4 PWD Departmental Code is in the process of being finalized. 17

Figure 1-1: KSHIP Roads

18

1.3. Physical Characteristics of the project area 4. This link passes through the Central Karnataka Plateau. The Central Karnataka Plateau covers the districts of Bellary, Chikkamagalur, , Davanagere, Dharwad, Gadag, , , and . The region represents the transitional surface between the Northern Karnataka Plateau with relatively higher surface. By and large, this region represents the area of Tungabhadra basin. The general elevation varies between 450 and 700 meters. However, this transitional ground is broken by several sets of parallel ridges mainly made up of Dharwar system of rocks. The height of such residual hills is about 900 meters above mean sea level. The general slope of this region is towards the east. The major crops growing in these places are Sunflower, Paddy, Maize, Groundnut, Cotton, Flowers, Wheat, Ragi, Bajra, Chillies, Coconut and Arecanut.

1.4. Project Components 5. As the existing ROW is not uniform, the additional requirement varies for a minimum of 12 m up to 30 m COI. Key activities for road improvement involves (i) widening/strengthening of the road up to two-lane divided carriageway configuration, (ii) improving road geometry, (iii) laying of embankment, (iv) rehabilitation and construction of new bridges and other cross drainage structures, (v) construction of side drains, (vi) construction of ROBs, (vii) junctions/intersections improvement, (viii) provision of service roads, underpasses and way side amenities, etc. The project activities are described below.

1.5. Road Configuration: 6. Link 27A is designed at three million standard axle (msa) and nine msa for Bitiminous and Granular respectively. Rural Cross Section with Paved Shoulders (RCSPS) is proposed for 19.05 km, Rural Cross Section with Earthern Shoulders for 17.41 km and Urban Cross Section 1 for 2.74 km length. 7. Link 27B is designed at 11 million standard axle (msa) and 33 msa for Bitiminous and Granular, respectively. Rural Cross Section with Paved Shoulders is proposed for 1.08 km, Rural Cross Section with Earthern Shoulders for 30.48 Km and Urban Cross Section 1 for 1.34 km length.

1.6. Realignment / Bypasses: 8. Link 27 A: Bypass (process of been finalized) for Gadag Town is proposed at the end of project link. 9. Link 27 B: There are no major realignments / bypasses proposed.

1.7. Bridges and other Cross Drainage structures: 10. Link 27 A: Nine minor bridges and 44 culverts are proposed for reconstruction. 11. Link 27 B: One major bridge, eight minor bridges and 43 culverts are proposed for reconstruction

1.8. Road Side Drainage: 12. Link 27 A: Unlined drain is proposed in rural section and both covered / uncovered drains are provided in town and village sections. 19

13. Link 27 B: Unlined drain is proposed in rural section and both covered / uncovered drains are provided in town and village sections.

1.9. Railway over Bridges (ROB’s): 14. Link 27A: One ROB is proposed in lieu existing railway crossing (Chainage 24+750 to 25+950 -1200m on existing general alignment drawing). 15. Link 27B: There are no ROB’s proposed

1.10. Junctions / Intersection improvements: 16. Link 27A: There are five major and 13 minor junctions proposed for improvement. 17. Link 27B: There are three major and 16 minor junctions proposed for improvement.

1.11. Service roads and underpasses: 18. Link 27 A: There are no service roads and underpasses proposed. 19. Link 27 B: There are no service roads and underpasses proposed.

1.12. Way side amenities / Toll plaza / Truck parking, etc.: 20. Link 42A: There are 14 bus bays with passenger shelter proposed.

21. Link 42B: There are eight bus bays with passenger shelter proposed.

1.13. Magnitude of impacts 22. The project will impact 1876 DPs and 522 DHs. The total private land acquisition for the project is 10.52 Acres. (The survey of bypass, approximately eight km in length and an additional length of two km is yet to be done, as these have just been finalized by the PIU.) Table 1-1: Summary Tables on Impacts Land Land Acquisiti Displaced Communi Transfer Displaced Link List of villages on- househol ty Assets – Govt ( Persons Private( ds (Nos) Ac) Ac) 27A Gadag, H S 5.03 0.00 282 1124 37 Venkatapura, Hombala, Shelavadi, Tangada, Tuppada Kurahatti 27B Adavi Somapura, 5.49 0.00 240 752 12 Baradura, Dambala, Doni, Kadampura, Mevundi, Mundaragi, TOTAL 10.52 0.00 522 1876 49

20

Table 1-2: Categories of DHs and losses

Sl. Extent of Loss Titleholders Tenant Squatter Encroacher No. 1 Losing Total House 90 0 0 2 Losing Total Com. Struc. 2 0 74 0 3 Losing Total House and Com. Struc. 00 0 0 4 Tenants Losing Total Livelihood 03 0 0 5 Losing Total Land 00 0 0 6 Losing only Part of House 36 0 2 0 7 Losing Part of Com. Struc. 00 0 0 Losing Part of House and Com. 8 00 0 0 Struc. 9 Patrial Plot 00 0 0 10 Total Boundary Wall 20 1 0 11 Partial Boundary Wall 00 1 0 12 Cattleshed 20 1 0 13 Losing Partial Land 387 0 0 0 14 Others 10 1 0 Total (Impacts) 439 3 80 0 Source: Census Survey, KSHIP Project, 2009-10

1.14. Minimizing impacts

1.14.1 Mitigation through realignments/bypasses and Design Alteration 23. Besides minor realignments this package has the Gadag bypass which is 6 km in length bypassing Gadag town.

1.14.2 Design Cross- Sections 24. There are 11 types of typical road cross sections proposed for upgrading roads. Distinct design approaches have been followed to minimize negative impacts on the people. The Typical road cross section for upgrading roads is given in Annex 1. In this package 7 cross sections were used to minimize impacts. These were : (i) UR 1 A Rural Cross section: This has a 7.0 mts paved carriage way, with 1.5 mts paved shoulder and 1.0 mts unpaved shoulder on either side. (ii) UR 1 B Rural Cross section: This has a 7.0 mts paved carriage way, with 2.5 mts unpaved shoulder on either side. (iii) UR 2 Rural Cross section (through village): This has a 7.0 mts paved carriage way, with minimum 2.5 mts to a maximum of 4.5 mts paved shoulder and 1.0 mts uncovered drains on each side. (iv) UR 3 Urban Cross section in Built up area (with covered drain): This has a 7.0 mts paved carriage way, with minimum 2.5 mts to a maximum of 4.5 mts paved shoulder and 2.0 mts footpath on either side, with the drains below the foot path. (v) UR 7 Rural Cross section in Cutting: This has a 7.0 mts paved carriage way, with 1.5 mts paved shoulder and 1.0 mts paver block shoulder on each side, beyond which there is 0.8mt concrete drain and 0.5 mts benching. 21

(vi) UR 19: for ROB section: This has a 7.0 mts paved carriage way, with 2.0 mts paved shoulder and 0.5 mts crash barriers each side.

1.14.3 Mitigation through Design Cross Section 25. The changes that have been considered in the project through good designs to mitigate social impacts include: i. Avoiding unnecessary displacement by modifying project alignments, reducing the width of the corridor of impact, or modifying design based on rural and urban cross sections. At built-up/ village sections where the road width is insufficient for expansion, design alternatives include reduction of COI. ii. Smoothening of curves and bends for better geometric design. In case where it affects settlements, alignment changes were done; iii. Minimal impact on residential and commercial structures thus minimizing resettlement and loss of livelihood; iv. Paved shoulders to be maintained as far as possible to facilitate movement of non- motorized traffic; v. Reducing design speed in built-up areas; vi. Reducing impacts on existing shrines and worship places; vii. Providing suitable safety measures, such as speed reductions near schools and hospitals; viii. Minimizing the raising of roads in urban areas to prevent water seepage to the houses adjoining the roads; and ix. Providing access to businesses and residential units that would be otherwise impacted by construction; and minimizing losses of public and private property, such as tube wells, tree plantations and other common property resources within the ROW, by minimizing the width to be cleared.

1.15. Road safety and Traffic Management measures 26. During the consultations, safety of the roadside communities has been found to be a major concern. A number of measures have been proposed to reduce the risk of traffic accidents. Traffic safety measures include: Conducting “Road Safety Audits” which has become a key responsibility as part of the Highway Designs. Various road safety appurtenances, which should be adopted as a part of improving the safety in the road design, are adopted in the project road designs: 27. Road Furniture details include: Road Markings; Cautionary, Mandatory and Informatory signs; KM stones and 200m stones; Delineators and Object Markers; Guard Posts and Crash Barriers; Road Humps and Rumble Strips; Reflective Pavement Markers (RPM) and Chevron signs and Median and Footpath Barriers. In addition, bus bays, parking bays, truck lay byes with rest areas and detailed improvements to major and minor intersections on the project road coupled with identification of black spots are being dealt with.

1.16. Magnitude of Impacts Cultural properties and CPRs 28. There are no sites of archaeological importance or sacred groves within the COI for this link. The project authorities would relocate cultural properties in alternative site such as places of worship

22 which are getting totally affected. The identification of alternative site will be done by the NGO/ support agency in consultation with the local user population of that particular cultural property. The alternative site for construction will be provided by the GOK. In case government land is not available, the project authorities will have to buy land to replace the cultural property. If the cultural properties are partially affected the project authorities will compensate only the affected portion. 29. The project will impact 49 community structures. There are: 12 temples, 1 aralikatte, 8 bus shelters, 10 hand pumps, 1 Mini Water Supply tanks, 3 bore holes, 1 well, 2 water tanks etc. There are some structures which are getting partially affected. The details of community assest are given in Annex 6. 30. All community assets getting affected need to be relocated before commencement of civil works. The broad timetable for relocation of community assets is given in the Implementation Schedule. The relocation of the community assets needs to be undertaken concurrently in all the contract packages. The project authority will be responsible for the construction of the affected community assets. The relocated community assets would be handed over to the local community/trust for maintenance. 31. All hand pumps getting affected will be located depending on availability and depth of water table. Water points, public taps and wells getting affected will also be similarly relocated. All affected aralikattes, will be built by the project authorities, and in sites identified by the project-affected groups and the co-ordinating NGO/ support agency for implementation. The project authorities will relocate all the bus shelters getting affected by widening of the road. The location of the bus shelter were decided on the basis of the frequency of usage arrived through the consultative process of the users and design requirements.

1.17. Impact of the project 32. The proposed project can be viewed as boosting economic growth and poverty reduction which will bring substantial social and economic development in the region. The social benefits arising due to the project will be triggered off due to improved accessibility to various services such as easy access to markets, health facilities, schools, workplace which in turn increases the income of the locals, and ultimately elevating their standard of living. The outcome of the project will include: i. The project will serve villages with better access and enhanced mobility. Improved backward taluk connectivity will facilitate travel to taluk head quarters and other local government/development agencies. In places where the connectivity is poor, the project will provide better access to amenities such as health, education, town/market, and improved social networking. ii. The project will improve the accessibility of the population along the project corridor to education, health, employment, trading opportunities and in the long run help towards poverty alleviation. iii. The project will help increase new economic and employment opportunities by providing improved linkages to markets, production centers and other areas of economic opportunities. Better and quicker transportation would help the rural population to transport their produce faster and get more profit margins instead of depending solely on local ‘markets’ and middlemen. 23

iv. Women will benefit, as their mobility will be facilitated both in terms of access to social services, as well as access to higher levels of schooling. Women’s access to higher levels of health care outside the village will also improve considerably. v. Targeted assistance will be provided to vulnerable groups including below poverty line households, women-headed households, and handicapped persons, through the Resettlement Policy. 33. The likely adverse impacts of the project are: Potential adverse impacts associated with the project is (i) land acquisition; and (ii) loss of livelihood and overall the proposed project will bring in economic and social changes, which in turn would bring economic prosperity and would lead to poverty alleviation.

1.18. Right of Way and Corridor of Impact 34. The Right of Way is the lawfully acquired corridor of public land owned by the State Government and administered by the PWD for the transit of the existing road. Using available records with the PWD and the Revenue Department, the social team verified the boundaries of private properties within and in the vicinity of likely corridor of impact. The preparation of the Land Acquisition Plan is being facilitated through the verification of land records, updated records for the ownership of land. 35. For this project, preparation of RP associated with displacement is limited to the corridor of impact. The corridor of impact is the width required for the actual construction of the road, including carriageway, shoulder, embankments and longitudinal drainage. Within this corridor there should be no structures or hindrances. The objective of social input to project design is to ensure that the corridor of impact is reduced, within acceptable design principles and standards, to minimize displacement and other project impacts. Those affected between the Corridor of Impact and Right of Way during the lifetime of the project will be assisted in line with this project Entitlement Policy, if they are required to be affected for any additional work required for this project.

24

2. METHODOLOGY FOR IMPACT ASSESSMENT

Social Impact Assessment 36. Poverty and Social Assessment (PSA) was carried out for the project road. The PSA study looked into the likely impacts of road improvement on the communities, and the likely mitigation aspects of the impacts. It also looked into the impact of the project especially on the backward taluks through which the project road passes, and how the road project is likely to affect the impacted population. The study was based on extensive public consultations and stakeholders view. 37. The negative social impact identified by community members was the potential for loss of land to project interventions. However, according to a majority of stakeholders consulted, the benefits of the project outweigh impacts from minor losses of land. There was broad consensus in all these communities that dry land acquired by the project would not be a problem, people were reluctant to part with irrigated or garden lands. To overcome any resistance it was informed that according to the entitlement policy land losers will be given market value of land after negotiation under the KHA.1964. Recommendations for impact mitigation and enhancement entitlements were given by the stakeholders. The suggestions as feasible have been incorporated into the design.

Approach to Resettlement Planning 38. During the census survey it was seen that road widening and improvement will have some impact on residences, businesses, shrines, places of worship, agricultural land, community assets. Most of the infrastructure work planned for the project as far as possible will take place within the established ROW. In most cases, the land required for the project is immediately adjacent to the current carriageway. The additional land required by the project falls under several classifications: (i) Public land owned by the State Government and administered by other Departments such as Revenue; (ii) Public land owned by villages or other local governments; and (iii) Private land. 39. The RP is prepared to ensure that: a. The displaced persons are: (i) informed about their options and rights pertaining to resettlement; (ii) consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; and (iii) provided prompt and effective compensation at full replacement cost for losses of assets attributable directly to the project; b. Displaced persons are: (i) provided assistance (such as shifting allowance, transition allowance, economic rehabilitation grant etc.) during relocation; and (ii) provided with residential housing, or housing sites, or as required, compensated for agricultural sites; c. To ensure that displaced persons are : i) offered support after displacement, for a transition period, to restore their livelihood and standards of living; (ii) provide with development assistance in addition to compensation measures, such as credit facilities, training, or job opportunities; and (iii) at least improving or retaining the living standards in the post resettlement period.

Census Socio-Economic Survey 40. As a part of the project, a census survey of Displaced households\Persons (DHs and DPs) was carried out. The findings of the census survey provided the magnitude of social impacts on the DHs and DPs. In this section, the survey outcomes are analyzed. The census information helped to generate necessary data/input for the preparation of this Resettlement Plan. The Census Survey 25

Schedule is given in Annex 3. The surveys provide a baseline measurement of potential impacts on displaced households/persons that form the eligibility criteria for entitlement as given in the R & R Policy of KSHIP. The objectives of the census verification were: (i) Provide information regarding project impacts in order to facilitate designing of various components of the RP, especially R & R entitlement; (ii) Minimize the influx of outsiders to the affected area; (iii) Identification of DPs by effect categories; and (iv) Enumeration of DPs assets and land holdings; 41. The project will impact the following persons: Table 2-1: Distribution of DHs Link Titleholder Tenant Squatter Encroacher 27A 253 3 26 0 27B 186 0 54 0 TOTAL 439 3 80 0 Source: Census Socio-Economic Survey 2009 -2010.

Methodology and Database 42. Census covers 100% of the potentially affected population within the likely COI. It provides a demographic overview of the population served by the RP and profiles household assets and main sources of livelihood. During census survey, legal boundaries of affected properties were verified. The census registered all household members and individuals within the potential COI their assets and income, and demographic and social information to determine whether project affected persons were to be categorized as vulnerable groups with special entitlements under the project. Private land owners, tenants, squatters and encroachers within the COI were covered. Structures, trees, and other assets were also recorded. 43. Data was collected at the following levels: (i) Household level interviews with each affected household were undertaken. Each of the households surveyed and the structure/agricultural land likely to be affected by the project has been numbered, documented and photographed ; and (ii) Village level public consultations were conducted. 44. A database has been created for the census information. The information has been stored and analyzed using Visual Basic and MS-Access. This program is easily convertible to Oracle platform. The superimposition of the survey data on the final engineering designs will provide the actual number of DPs. Only these DPs within the final COI will be considered eligible for support under the project.

Sources of Data 45. Data was collected was collected from the following secondary sources: (i) Revenue records at local/village level - with regard to land particulars for acquisition of properties; (ii) Census records for demographic information; (iii) PWD for ROW/COI, estimates of the cost of infrastructure development etc.; (iv) Development agencies to get information on various developmental programs for specific sections of population like landless, marginal and small farmers etc. tribal, SCs etc.; and (v) Local organizations’ including NGO’s in order to involve them and integrate their activities in the economic development programs of the displaced population.

26

3. SOCIOECONOMIC INFORMATION AND PROFILE

Socioeconomic profile of the project Area 46. This project comprises of two links: 27 A (Shelvadi to Gadag) is 39.20 km in Dharwad and Gadag districts and crosses two Taluks Navalgund and Gadag and 27 B (Gadag to Mundargi) is 32.90 km in Gadag district and crosses the taluks of Gadag and Mundargi. The Schedule Caste population varies from 7.91% in Link 27 A to 14% in Link 27 B.The overall Scheduled tribe population is 5% in Links 27 A and B. The literacy rate is 56% in both the links. The female literacy rate is 45% in both the links. The work force participation rate varies from 54.73% in Link 27 A to 46.08% in Link 27 B. The total female work force rate varies from 47.41% in Link 27 A to 36.08% in Link 27 D. This area has dry agricultural cropping. Crops grown are mostly jowar and groundnut. Overall accessibility to amenities is poor in this corridor. Access to basic health facilities is average with nine villages having access to maternity and child welfare centers within five km and six villages having access to primary health centers within five km. The nearest towns in Link 27 A are Navalgund, and Gadag; in Link 27 B the towns are Mulgund and Mundargi.

Socioeconomic profile of Displaced Population 47. The key socioeconomic characteristics of the displaced population are discussed below. 48. Social Stratification: Scheduled Caste households account for 1.10 % of the population and Scheduled tribe households each account for 6.91% of the total population; the remaining are from the general category. Table 3-1: Social Stratification Link SC ST General Total No. No. % No. % No. % No. 27A 1 0.46 12 5.48 206 94.06 219 27B 3 2.10 13 9.09 127 88.81 143 Total 4 1.10 25 6.91 333 91.99 362 49. Religious Group: Among religious groups, Hindus dominate with 90.03%, the remaining account for Muslims. Table 3-2: Religion Link Hindu Muslim Christian Jain Total No. No. % No. % No. % No. % No. 27A 202 92.66 16 7.34 0 0.00 0 0.00 218 27B 123 86.01 20 13.99 0 0.00 0 0.00 143 Total 325 90.03 36 9.97 0 0.00 0 0.00 361 50. Occupation: Distribution of DPs by occupation reveals that agriculture accounts for 68.45%; trade/commerce accounts for 10.27%; agriculture labour accounts for 9.99%; population employed in the service sector accounts 3.97%. 27

Table 3-3: Occupation Distribution Agricult Allied HH Agricult Link No. % ure % Agri. % Service % Indust % ure Labour Activities ries 27A 283 76.28 29 7.82 2 0.54 24 6.47 0 0.00 27B 177 58.80 53 17.61 1 0.33 10 3.32 0 0.00 Total 460 68.45 82 12.20 3 0.871 34 5.06 0 0.00 Cont.. Comm Link Profes Skilled Artisa Othe erce/ % % % % % Total No. sional Labour ns rs Trade 27A 22 5.93 0 0.00 4 1.08 0 0.00 7 1.89 371 27B 47 15.61 0 0.00 0 0.00 0 0.00 13 4.32 301 Total 69 10.27 0 0.00 4 0.60 0 0.00 20 2.98 672 51. Income level: In spite of the difficulties in getting reliable data on household income, efforts were made to persuade the respondents to report as accurately as possible. 35.48% of the general population has income less than Rs.26,000. ST households earning less than Rs.26,000 also account for 35.48 % of the ST population. The income information has been segregated for ST, SC and general category. Table 3-4: Income Distribution Schedule Caste

Link 5000 - 11501 - 16001 - 26001 - 40001 - 75001 - Above Total No. % % % % % % % 11500 16000 26000 40000 75000 100000 100000 SC

27A 0 0.00 0 0.00 0 0.00 0 0.00 1 100.00 0 0.00 0 0.00 1 27B 0 0.00 1 25.00 1 25.00 2 50.00 0 0.00 0 0.00 0 0.00 4 Total 0 0.00 1 20.00 1 20.00 2 40.00 1 20.00 0 0.00 0 0 5

Cont… Schedule Tribe 5000 1150 Abov Link 16001 26001 - 1 - 40001 - 75001 - e Tot_ No. % % - % - % % % % 1150 1600 75000 100000 1000 ST 26000 40000 0 0 00 27A 4 25.00 1 6.25 4 25.00 5 31.25 1 6.25 0 0.00 1 6.25 16 13.3 27B 0 0.00 0 0.00 2 13.33 4 26.67 6 40.00 2 1 6.67 15 3 Total 4 12.90 1 3.22 6 19.35 9 29.03 7 22.58 2 6.45 2 6.45 31

Cont… General

Abov Link 11501 16001 26001 40001 5000 - 75001 - e Tot_ No. % - % - % - % - % % % 11500 100000 1000 O 16000 26000 40000 75000 00

27A 26 10.12 12 4.67 29 11.28 70 27.24 62 24.12 21 8.17 37 14.40 257 27B 29 13.94 19 9.13 50 24.04 47 22.60 39 18.75 9 4.33 15 7.21 208 Total 55 11.83 31 6.67 79 16.98 117 25.16 101 21.72 30 6.45 52 11.18 465 52. Age Classification: 69.96 per cent of the total DPs fall in the age group of 18-59. Since this happens to be the working age-group the mitigation measures as given in the entitlement matrix need to be carefully implemented with reference to 18-59 age groups.

28

Table 3-5: Age Classification Link Below 18 18-60 Above 60 Total No. No. % No. % No. % No. 27A 226 20.11 764 67.97 134 11.92 1124 27B 118 15.80 545 72.96 84 11.24 747 Total 344 18.39 1309 69.96 218 11.65 1871 53. Literacy: Illiterate population accounts for 18.34% of the surveyed population. Just literate population accounts for 9.02% of the total population, while primary accounts for 15.10% of the total population. Those with middle school education account for 14.42% of the total population; those with education up to secondary level account for 22.43% of the total population. The detail education table with gender wise break up is given below. Graduates account for 6.58%. Table 3-6: Literacy Illiterate Just Literate Primary Middle Link Tot Tot Tot Tot No. M % F % M % F % M % F % M % F % _Ill _JL _P _M 13 74. 40. 60.0 51. 48. 50.0 27A 47 25.68 183 34 51 85 82 76 158 72 72 50.00 144 6 32 00 0 90 10 0 70. 48. 51.3 53. 46. 70.9 27B 41 29.29 99 140 36 38 74 58 50 108 78 32 29.09 110 71 65 5 70 30 1 Tota 23 72. 44. 55.9 14 52. 47. 15 59.0 88 27.24 323 70 89 159 126 266 104 40.94 254 l 5 76 03 7 0 63 37 0 6 Cont… Secondary Intermediate Graduate Post Graduate Lin k To Tot_ Tot Tot_ No. M % F % M % F % M % F % M % F % t_ S _IM G PG 58.3 41.6 68.9 31.0 67. 2 32.4 27A 140 100 240 89 40 129 50 74 13 65.00 7 35 20 3 7 9 1 57 4 3 65.8 34.1 76.1 23.8 76. 1 23.8 100.0 27B 102 53 155 48 15 63 32 42 4 0 0.00 4 1 9 9 1 19 0 1 0 Tot 61.2 38.7 71.3 28.6 70. 3 29.3 29.1 242 153 395 137 55 192 82 116 17 70.83 7 24 al 7 3 5 5 69 4 1 7 Cont… Link ITI/Diploma Engineer/Doctor Others Total No. M % F % Tot_I/D M % F % Tot_E/D M % F % Tot_O M % F % Tot 27A 18 0.00 0 0 18 6 85.71 1 14.29 7 0 0 0 0 0 551 52.08 507 47.92 1058 27B 7 100.00 0 0 7 0 0 0 0 0 0 0 0 0 0 406 57.75 297 42.25 703 Total 25 100.00 0 0 25 6 85.71 1 14.29 7 0 0 0 0 0 957 54.34 804 45.66 1761 54. Structure Type: Of the residential structures getting affected 60.42% are pucca. Amongst commercial structures getting affected only 1.28% of the structures are pucca. Table 3-7: Type of Structure Residential Link Semi No. Pucca % % Kutcha % Tot_Residential Pucca 27A 29 61.70 18 38.30 0 0.00 47 27B 0 0.00 1 100.00 0 0.00 1 Total 29 60.42 19 39.58 0 0.00 48

Cont… Link Commercial 29

No. Semi Pucca % % Kutcha % Tot_Commercial Pucca 27A 0 0.00 5 18.52 22 81.48 27 27B 1 1.96 2 3.92 48 94.12 51 Total 1 1.28 7 8.97 70 89.74 78 55. Loss of Commercial structures: Majority (29) of the commercial structures are pan/cigarette shops followed by tea shops (14); tire repairing (3) etc. 56. Access to utilities: Of the total residential structures getting affected 91.66% have electricity; while 31.81% have access to piped water. 57. Household Assets: Among household assets 12.42% of the households have television; 2.08% own two/4 wheelers; 1.23% having cooking gas; 1.92% have telephones and only 0.64% have refrigerators. Amongst agricultural equipment, 1.87% own tractors; 3.09% own bullock carts. Less than 1% have own sprayers.

Vulnerable Groups 58. Those falling within this category include persons such as physically challenged, widows, or persons above sixty years of age, who are not provided or cannot immediately be provided with alternative livelihood and who are not otherwise covered as part of a household. These persons are entitled to Assistance to include in government pension schemes if not included, if eligible as per Government criteria (OR) Lump-sum amount of Rs. 25,000. There are some DPs that are in more than one vulnerable category. These DPs will be paid only once. There are 83 widows, 13 physically challenged persons, and 218 DPs over 60 years. Households by Gender are given below: Table 3-8: Affected Households by Gender Link Male Female Total Category No. No. % No. % No. Head of HH 180 82.57 38 17.43 218 27A DPs 903 80.34 221 19.66 1124 Head of HH 121 85.21 21 14.79 142 27B DPs 657 87.37 95 12.63 752

Gender Issues 59. There are 59 women-headed households. The proposed upgrading of roads under KSHIP is expected to open up new economic opportunities for women to upgrade their skills and also better accessibility to educational and health facilities. The improved road was perceived to help reduce travel time, as an immediate benefit. Women as a segregated class are not involved in any economic activity, which demands attention for their special needs. However, in the village level consultations, the women said improved roads were a danger especially in the built-up area. Increased speed of traffic makes it difficult for women and children to cross the roads. It also leads to increased accidents as children in villages areas tend to play near the roads. In some links the improved road will lead to the movement of heavy vehicles carrying ore and goods; this was not welcome in the village limits. To ensure that women are secure in receiving payments all benefits will be provided in joint account where the woman will be the first beneficiary accounts. Wherever title is provided, it should be provided with joint title with women as the first beneficiary.

30

Indigenous People 60. In Karnataka, Schedule Tribes (ST) account for 6.55% (3.46 million) of the total State population. Bellary district has the highest concentration of STs in Karnataka. There are 50 major tribes with 109 sub-tribes in the State (as of March 2005), according to the notified Schedule under Article 342 of the Constitution of India. In Karnataka, there are 4 Districts which fall under the Integrated Tribal Development Project. These are Mysore, Kodagu, Dakshin Kannada and Chikmagalur. Integrated Tribal Development Projects (ITDPs) are contiguous large areas of the size of one or more Development Block in which the ST population is 50% or more of the total population. Primitive Tribal Groups are found in Chamarajnagar District. The Government of Karnataka has identified: (i) Jenu Kuruba; and (ii) Koraga tribes as primitive groups (PTGs). Primitive Tribal Groups (PTGs) are identified isolated communities among the STs characterized by a low rate of population, a pre-agricultural level of technology and extremely low levels of literacy. 61. Jenu Kuruba tribes are originally from Mysore, Chamarajanagar, and Kodagu districts and Koraba tribes are from and Dakshin Kannada districts. In Chamarajanagar district, only Kollegala Taluk has PTG areas. PTGs constitute the most vulnerable among the all notified tribes. 62. None of the ITDP districts or the PTG district fall within this project road. The Director of Tribal Welfare GoK, has indicated through a letter No: DSTW : TSP:OSCR 12/2010-11 dated 26.04.2010, that no village in the State of Karnataka has been designated as tribal village; and that the project roads are not passing through any ITDP areas. Tribal are living in the villages along the project roads along with other communities. Based on the information provided by the Tribal Department and the Census surveys IPDP will not be required. 63. There are 25 Scheduled Tribe households getting affected in this package. The Tribal households found in the project area no longer maintain any of the distinctive characteristic mentioned above. During the consultations held there were no specific issues raised by tribal persons/groups. According to the detailed socio economic survey carried out for the poverty and social assessment and the census survey carried out for the preparation of the RPs, the STs identified in the links do not exhibit any of the following characteristics (i) self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; (ii) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; (iii) customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and (iv) a distinct language, often different from the official language of the country or region. Besides all the STs are predominantly maintaining the similar standards of living which is comparable to the other sections of the community. 31

4. SCOPE OF LAND ACQUISITION AND RESETTLEMENT

Proposed Land Acquisition 64. Land acquisition will be done under the Karnataka Highways Act (KHA), 1964. Under KHA land acquisition will be entrusted to a designated “Highway Authority” with delegated powers, so that the entire acquisition proceedings will be carried out under centralized agency i.e. “Highway Authority” with dedicated officials for the purpose of land acquisition, instead of involving many officials of the revenue department. Acquisition under consent award as given under Section 27 of KHA, 1964 will be applicable. This will help in arriving at a mutually agreed rate of compensation with the land owners, which will eliminate resentment from the land owners regarding rate of compensation thus reduce the scope for approaching the civil courts for higher compensation. Section 27 read with Section 26 provides payment of compensation to individuals who are losing land. No other section in the Act deals with payment of compensation determined by way of agreement. Under the KHA in this project the Negotiation Committee after negotiation with the land losers in clusters arrive at a price agreeable to the land losers. Once the price is agreed for individual survey numbers accordingly an agreement will be executed with the land losers. Subsequently the land will be taken possession of. In this process no award is passed. Generally this process is termed consent award. 65. The summary and main features on comparison between LAA and KHA are: 1. Time taken under ideal situation for land acquisition under KHA,1964 is 63 weeks as against 94 weeks for LA Act 1894; 2. The Project Director is designated as “Highway Authority” and in charge of LA. However, the land acquisition under LA Act, 1894 needs to pass through a set of departmental procedure and officials who are often busy with their primary departmental duties; 3. The proposal of land acquisitions under LAA 1894 needs to pass through six offices, i.e. the acquiring body, the Tahlisdar, the Assistant Commissioner, the Deputy Commissioner, the survey department and finally, the Government which is not only time consuming but also a tedious process. It is also relevant to mention here that even for small clarifications the file has to go through all these offices which cause unavoidable delay in file processing. Under KHA, 1964 the Project will have dedicated officers designated solely for this task, as a result of which the LA process will be faster and better streamlined. The land acquisition under KHA, 1964 would involve two agencies namely the “Highway Authority” and “Government”. 66. The process of Land Acquisition under KHA, 1964 is as follows: 1. On the recommendations of the “Highway Authority”, the “State Government” will issue a notification for acquisition of the required land, which will be published in the Gazette (Section 15). 2. After publication of notification Under Section 15 of KHA, 1964, the Highway Authority will cause the land to be measured (Section 16). 3. Under Section 17 of KHA, 1964, public notice will be issued to all the interested persons to file their claim for compensation within 15 days from the date of receipt of notice. 4. At any time after the publication of notification under section 15(on receiving report from the Highway Authority), the State Government. may direct that the lands specified in the notification shall be taken possession of, from such date as may be specified in the

32

direction. From such date, the said land vest absolutely in the State Government. free from all encumbrances (Section 19). This process would take place only after completion of awards in every case. 5. Consequent to notification under section 15 and after obtaining documents from the land losers the “Highway Authority” will proceed to pass award on consent basis if there is consensus for a mutually agreed rate for consent award (section 27). 6. In default of consensus the “Highway Authority” will proceed to fix the compensation on general award basis (Section 28). 7. There is also provision for making reference against the award of the “Highway Authority” before the court of law (Section35).

Estimated time for LA 67. From the issue of Section 15 the time taken to complete the land acquisition process is 6 months. Anticipated time to be taken for each stage of acquisition proceedings under KHA 1964 is as follows: 1. Section 15: After issue of section 15 notification, 45 days is given for filing claims. 2. Section 17: public notice and notice to individual land losers to file his claims within a specific date mentioned therein the notice. 3. Framing of award: Framing of award under section 27, 28 and taking possession of land -12 weeks 4. Section 19: From section 15 notification to issue of direction under section 19 for taking possession of the land – 24 weeks

Managing Land Acquisition 68. The GOK has designated the Project Director (PD) as Highway Authority under Section 6 of KHA, as per GO Order No.PWD 49 EAP 2008 dated 02 December 2008. 69. The Special DC Land Acquisition and the Project Director are the award approving authority. Sp DC LA can approve award up to Rs.50 Lakhs. Above Rs.50 Lakhs and upto Rs.1 Crore the authority rests with the Project Director.

Staffing for Land Acquisition Work 70. The Special DC Land Acquisition will be in charge of Land Acquisition. To execute the LA work efficiently the GoK has issued orders for the appointment of supporting staff for LA. 71. The Sp DC LA will be assisted by two Assistant Commissioners.

Negotiations Committee for Land Price Fixation and determination of Replacement Cost 72. Under the KHA, 1964 the negotiation of compensation is the most important task. The determination of replacement cost is the foundation for the purpose of compensation by agreement or consent award. Replacement Cost of land for consent award will be determined through negotiations between the land losers and the Negotiation Committee. The price of land has generally been seen more than the market value derived adopting the procedure land down in the LA Act 1894. Since land acquisition proceedings are quasi judicial proceedings offering a minimum 33

price before the award can be passed will not be a fair act for the proceedings. The composition of the committee is given below.

Negotiation Committee 1. Assistant Commissioner of the concerned Sub Division Chairman 2. Assistant Commissioner of KSHIP Secretary 3. Jurisdictional Executive Engineer Member 4. Zilla Panchayat Member of the concerned jurisdiction Member 73. The Guidance Value as per the Department of Stamps and Registration for the different categories of land, for the villages along the project road will be obtained from concerned District Registrars. This guidance value will be referred to by the Negotiation Committee. 74. The Zilla Panchayat member of the area is the member of the Committee. Proceedings of the Committee are documented by the AC (LA) of PIU KSHIP who is the member secretary. The public representative, that is the Zilla Panchayat, member on the Committee will be considered as an independent external party for the negotiation and settlement purpose. If needed proceedings can be videographed. 75. At this stage, it is not possible to identify the exact owner of the land getting affected. This will be known after Section 19 Notification under KHA is complete. The details of those losing land are given in Annex4. Table 4-1: Land Acquisition Details Private land Govt Land Total Land Link Details (Acres) (Acres) (Acres) 27A Shelvadi - Gadag 5.03 0.00 5.03 27B Gadag- Mundargi 5.49 0.00 5.49 TOTAL 10.52 0.00 10.52

Method of Price fixation 1. The concerned Land Acquisition officer who is the member secretary of the Negotiation Committee will call for a meeting; 2. Dates for price negotiation will be given village wise. Negotiation will be conducted village wise calling all the land losers together for negotiation. This is to ensure transparency; 3. The PIU will provide information on the guidance value of the land to land losers before negotiations; 4. For the Districts of Bangalore Urban, Bangalore Rural, Chikkaballapur, Kolar, Ramnagaram, Mysore, Davangere, Belgaum and Dakshin Kannada the minimum negotiation price will be one and a half times the Guidance Value. For all the other districts other than those mentioned the minimum price will be twice the guidance value; 5. The Negotiation Committee will negotiate the price with the landlord; 6. Based on the decision of the Negotiation Committee the Special Land Acquisition Officer will give the compensation;

34

7. Compensation will be given within 30 days of taking possession and receiving all the necessary documents5 by the Special LA officer. In case of delay, a 9% interest will be given to the beneficiary up to a period of one year after which will be increased to15% thereafter. (This is as per the provisions of the LA Act). 8. On approval of the award by the Special DC or PD, the Special Land Acquisition Officers will make the payments accordingly. 9. Possession of Land will be taken vide Section 19, which will be only after the payment of compensation.

Failure of KHA and Appellate Committee 76. In the event the land lord does not agree with the rate negotiated by the Negotiation Committee, the award will be passed in the traditional general LA method and the amount will be deposited with the court. The provisions of the Amendment Bill will be followed as necessary.

Valuation of Assets 77. The valuation of structures and other assets will be carried out by Government approved valuators appointed by the PIU. Valuation will be done on the basis of current PWD Schedule of Rates, without depreciation at replacement cost. Based on the valuation another 30% will be given . Trees will be valued by the Horticulture/Forest Department.

Cut-Off Date 78. The cut-off date for those who have legal title is the date of Notification under Section 15 of Karnataka Highway Act 1964. The date of census is the cut-off date for those who do not have legal standing for eligibility of assistance under the project. People moving into the COI after this cut-off date will not be entitled to support. It is the responsibility of the PWD to ensure that the COI is maintained free of squatters and encroachers. 79. It is recognized that there will be a margin of error in the census, and any person who was not enumerated but can show documentation or evidence that he/she is rightfully an entitled person will also be included. The Project Implementation Unit is responsible for such verification. A cut-off date slip was issued to the non-title people surveyed. The cut-off date for non- titleholders, is the date of the start of the census survey on a particular link. The cut-off date for link 27A is 1 August 2010 and for 27B is 4 August 2010. The details of displaced persons whose structure/assets are getting as on the cut-off date is given in Annex 5.

Estimation of land requirement and Preparation of Land Acquisition Plans 80. The Land Acquisition Plan (LAP) for the link road is under preparation. Coordination with revenue department is in progress. The likely time table for procurement for land acquisition is placed in the implementation schedule. 81. The preparation process of LAP includes: 1. From the Land Record office Village map, tippany, hissa tippany, akar band is collected; 2. RTC records is collected from the Taluk Office; 3. Based on the above documents and spot inspection sketches for LA are made;

5 Documents to be furnished include Phani (RTC), Mutation Extract, Vamsha Ruksha (Geneological Tree) and if the interest of land holder is subject to a court decree, a certified copy of such a decree. 35

4. Calculation of land acquisition requirement in a particular survey number is arrived based on the Akarband; 5. Field verification of RoW is done from PWD notifications; 6. Identify and Stakeout on ground of the areas beyond RoW where private land needs to be acquired as per approved proposed alignment designs; 7. Measurement of land proposed to be acquired to be done along with the Revenue Department. This is done in coordination with Project Consultants, PIU staff and revenue officials; 8. After field verification land particulars are transferred to each survey sketch; and 9. The LA plans have to be finally signed by the Surveyor, Supervisor, Tahsildar and; KSHIP AE, KSHIP AEE and Project Consultants.

Compensation Payment Process 82. The compensation payment process includes: 1. Compensation to be finalized by the Negotiation Committee with the consent of beneficiary; 2. The award will be approved by the Special DC LA or Project Director depending on the award amount; and 3. Cheque payment will be done. The SDRC will assist beneficiaries to open a Bank account in case they do not have and existing account. 4. Consent will be in written form

Administering the payment of R & R Assistance 1. All Entitlements to be provided will be verified against losses incurred by the NGO; 2. Information will be updated in the database; 3. Bank accounts are to be opened for all beneficiaries; 4. The CAO will authorize payment of R & R assistance; 5. All payments will be made through Cheque, directly to the DP; and 6. DPs who are in more than one vulnerable category will be paid only once.

36

5. STAKEHOLDERS CONSULTATION, PARTICIPATION AND DISCLOSURE

Consultation and Community Participation 83. Public consultations were held in Hombala in 27A and in 27B, focusing on areas of impact due to widening, at places congestion with impacts on buildings and where major common property resources are getting affected- such as any religious structures etc. The outcome of the consultations were used for analysis of alternatives and minimising negative impact of the project.

Methodology 84. The methodology followed for public consultations was: i. Group meetings and one to one consultations were held with the displaced persons. ii. Informing all the likely affected persons regarding the meeting including DPs and at village level. Panchayat leaders, gram sabha members, officers from PWD sub divisions and any local NGOs were also informed about the meetings. iii. The minutes of the meetings have been recorded, list of participants for each of the meeting along with the signature have been obtained and the photographs of consultations have also been taken. The list of participants and photographs has been provided in Annex 6. 85. During the consultation the people were informed about: (i) KSHIP, including a background on KSHIP Phase A project; (ii) The rural and urban design cross sections of the roads; (iii) The people were informed about KSHIP Resettlement policy and the compensation and assistance provided therein and asked suggestion for improvement so that their suggestions can be incorporated by the project authority for KSHIP; (iv) Proposed safety measures for the road; and (v)The likely impacts of the road, both positive and negative. The Consultations elicited from the people: (i) Their views on the project especially the likely adverse impacts; (ii) Possible mitigation measures in case of adverse impacts; (iii) Means of better delivery of compensation and assistance; (iv)The assurance from the project authority not to marginalize people by depriving them from their livelihood; and (v) Provision of infrastructure such as drinking water and toilets. 86. As a part of the public empowerment through public consultations the stakeholders have written to the Project authority regarding their views on the impact of the project, and the anticipated adverse impacts. These issues have been addressed and responses have been provided. 87. As meaningful consultations in the project is a regular and continuous process, more in-depth consultations will be organized by the implementation NGOs throughout the project cycle.

Key Findings of the Consultations 88. The consultations have helped in not only achieving the social assessment objectives, but also assisted in gathering suggestions for mitigation of adverse impacts, improvement in designs and facilitating inputs for the resettlement plan preparation and implementation. The consultations for the links were held at Hombala for link 27 A and at Meundi for 27 B on 4 July 2010. There were 42 participants for link 27 A meeting and 48 participants for link 27 B meeting. 89. The issues discussed and the outcome has been given below:

37

Table 5-1: Key Issues: 27 A Name Sex Profession Issues discussed Response Veerappa M Farmer He said there is a lake nearby It was informed that there Soodi – if the road is widenend and was a separate construction work takes place Environmental Management the lake will get polluted, it’s a Plan, and protection of the source of drinking water for lake will be ensured. The the villages so villagers will feasibility of alignment get affected. So he asked the change will have to be PA to make the road away looked into. from the lake. If the temple is affected on If we temple in our own land - private land, compensation how will you give for the structure and land will compensation? be provided according to the Entitlement Matrix of the project. Sashidhar M Farmer He wanted to know how land It was explained that Khanchch will be valuated? compensation for land will be Ombal Based on negotiation as per the KHA. A Negotiation committee will be set up. One and a half times to twice the guidance value will be taken as minimum price for negotiation.

Shashi M Farmer He said Government It was explained valuation of Shankar valuation for land in the land was a Revenue Dept Budihala neighbouring village is less – matter. However for this this should be valued more. project if any land is required So that the people will get it will be compensated as per more compensation or else the KHA, based on they will get affected. negotiations. Nandish M Farmer How will the affected houses Compensation for affected Somanna be compensated? structure will be based on valuation as per the current SR rates without depreciation. For those losing houses, alternate house will be provided acroding to the Entitlement Matrix provisions. Prakash M Driver He said according to the The design of roads is done Pujary Hombal current design you are in such a manner that affecting about 30 -40 adverse impacts are minimal. houses. Why don’t you build However, if required, a the road on the gove land realignment of the road will nearby and save all the be examined. houses? Bhaskar Bhat M Farmer He had land in Tuppada For compensation for the Shelvadi kurati where he has land on earlier road the matter has to either side of the road. be taken up with the Earlier land was taken for the DC/PWD. Under this project, road, and no compensation compensation will be paid

38

Name Sex Profession Issues discussed Response was paid. Again land is being based on negotiation as per acquired under this project. the KHA. A Negotiation He wants compensation for committee will be set up. the earlier acquisition also. Veeranna M Farmer Compensation should be Bank accounts of the given directly to the people beneficiary will be created, Hombal and without harassment. and all payments will be made directly to the Bank. Dr. Mulugunda M Doctor We want a similar meeting in The design of the road will be Shelavadi Shelavadi, as a lot of houses looked into. Another meeting will get affected. In Shelavadi can be conducted by the the road is at a higher level NGO during implementation. than the road. During rains Safety issues raised will be water gets into the house and incorporated in the design. causes lot of problem. He wants the road to be built away from the houses, outside the village. Another problem is having a road in the village cause problem for children crossing and playing.

Table 5-2: Key Issues: 27 B

Name Sex Profession Issues discussed Response Sharnappa Farmer The road is already on his The matter needs to be Bassappa land. He is still paying tax for discussed with the Hooghar it. In the RTC this land has not RevenueDept / DC been transfered. Siddappa Farmer He wants compensation for The matter needs to be Rachhapa the land acquired and for land discussed with the which was acquired earlier. He RevenueDept / DC said the road is already on his land and he is still paying tax for it. In the RTC this land has not been transfered. He said giving land for the road and still paying tax for it is a loss.

Andappa Farmer According to Government. It was explained that Avaragere valuation the value of his his compensation for land will Meundi land is Rs.20,000, but be based on negotiation as according to market rate it is 3 per the KHA. A Negotiation lakhs. He wants the market committee will be set up. rate. One and half times to twice times the guidance value will be taken as minimum price for negotiation depending on the District.

Durgappa Farmer He wants to know whether It was explained that all Meundi compensation will be paid compensation and before the start of work or will assistance has to be paid it be paid after the work has before start of civil works. started after harraing the affected people by making them come and go many times 39

Name Sex Profession Issues discussed Response for the compensation? Maruti Meundi Labour He said compensation should It was explained that all be paid first and then work compensation and should start. assistance has to be paid before start of civil works. Sidddappa Farmer He said there are so many It was told that in this project Basappa shops next to the road which assiatance/compensation Balnuru are affected. He said even if was given based on the type Meundi they have APL card, they do of loss and not based on not have alternative land. So APL or BPL card. he asked to consider them also for compensation. Andappa Farmer If the land is in the fathers It was told that Avaragere name and the son is doing compensation is given per Meundi business elsewhere – he said household. For land it will be even the son should get verified on whose name the compensation. land is and compensation will be paid to the owner only. On land bundhs which are built This matter will be looked to stop water if affected should into in a case to case basis. be compensated by the project. If during project implementation PIU KSHIP or implementation NGO come across any case where affected persons have not been timely paid during previous land acquisition (for the same road) such cases will be dealt on the case to case basis and PIU KSHIP will facilitate the acquiring body to make payment to the affected persons through GRC and this will be documented.

Levels of Consultation 90. The consultation program is tiered and conducted at several levels that included, among others: (i) Heads of households/members likely to be impacted; (ii) Villagers and Village Panchayats; and (iii) and Implementing Agency and line Departments.

Consultations during implementation 91. Several additional DP consultations will be conducted during RP implementation. As a follow- up of the local-level DP consultations held during project preparation, further consultations will be conducted by the NGO during implementation. In the first round of consultations information on RP and Entitlement policy and options will be disseminated. This will involve explaining the Entitlement Framework and resettlement options to the DPs and soliciting their support and co-operation. This will help finalize agreement on the various entitlements provided in the entitlement framework. Next round of consultation involves agreements on compensation and assistance options and entitlements with DPs and completion of DP identity card indicating the accepted entitlement package. The next round of DP consultations will occur when compensation and assistance are provided and actual resettlement begins and the NGO has to facilitate relocation.

Disclosure In order to make the RP implementation process transparent, a series of FGDs/ meetings etc will be held with all stakeholders for dissemination of information regarding rehabilitation process and entitlement framework. The RP and entitlements will be disclosed in public meeting. The salient features of RP and the R & R policy will be translated in Kannada and disclosed through public consultations to be held in taluka head quarter of each districts through which the particular link pass

40 through. It will also be disclosed through the PWD, Government of Karnataka website. In addition brochure of the Land Acquisition and the R & R Policy will also be provided. All copies will be kept in: (i) State Government Library at Bangalore; (ii) District libraries of the Project; and (iii) in the Panchayat offices along the project roads. The RP document will also be disclosed on ADBs website as per the disclosure requirements. A Public Consultation and Disclosure Plan will be prepared by PIU/NGO for each of the project roads as per the format below: Table 5-3: Public Consultation and Disclosure Plan Timing Agencies Activity Task (Date/ Remarks

Period) Stakeholder Mapping of the identification project area Project information Distribution of dissemination information leaflets to dispalced persons (DPs) Consultative Discuss potential meetings with APs impacts of the during scoping project phase Public Notification Publish list of affected lands/sites in a local newspaper; establish eligibility cut-off date Socio-economic Collect socioeconomic survey information on DP’s perception on the project Consultative Discuss meetings on entitlements, resettlement compensation mitigation rates, grievance measures redress mechanisms Publicize the Distribute leaflets resettlement plan or booklets in local (RP) language

Full disclosure of Distribute RP in the RP to APs local language to DPs Internet disclosure of RP posted on ADB the RP and/or EA website

Consultative Face to face meetings during meetings with DPs detailed measurement survey(DMS) Disclosure after Disclose updated DMS RP to DPs

Internet disclosure of Updated RP 41

the updated RP posted on ADB and/or EA website

42

6. LEGAL FRAMEWORK 92. This chapter provides an overview of the applicable policy and Acts for the Project.

The National Policy on Resettlement and Rehabilitation for Project Affected Households, 2007 93. Till recent time, in India, there were no safeguard policy to deal with resettlement and rehabilitation of displaced persons. There was no uniform approach adopted by states towards the displaced persons. In the absence of central policies, ad hoc administrative instructions, in conformity with the land acquisition act was in practice. In 2007 the GOI developed a National social safe guard policy. This was developed taking into the consideration the safeguard policies of international development bodies like the World Bank, Asian Development Bank etc. The National Policy on Resettlement and Rehabilitation for Project Affected Households, 2007 (NRRP) came into effect in October 2007. The salient feature and the statements of the NRRP policy are as followings: i. SIA shall be mandatory for all projects involving displacement of four hundred or more households en masses in plain areas, or two hundred or more households en masses in tribal or hilly areas etc. Coordination with EIA in the context of the public hearing done in the project affected area for EIA shall also cover issues related to SIA; ii. Consultations with affected people and disclosure of relevant information to them at various stages of resettlement planning; iii. Affected people without legal rights also need to be assisted (affected people categorized landless agricultural workers, forest dwellers, tenants and artisans who are critically dependent on the acquired assets for their subsistence/ livelihoods); iv. Prepare resettlement plans that are disclosed to the affected people in draft form, and reviewed and approved by competent authorities; v. Collection of socioeconomic baseline for project affected households; vi. Project displaced persons (whose entire land is taken) will receive land in lieu of his loss. In addition to their loss cash assistance will be paid for regaining livelihood; vii. Vulnerable project affected people will get extra cash/kind assistance; viii. Purchase of land from any project affected persons would be through consent award (negotiation of rate between land owner and project authority); ix. The Grievance Redressal Cell shall have representatives of women, Schedule Castes Schedule tribes residing in the affected zone. The Cell shall have the power to consider and dispose of all complaints relating to resettlement and rehabilitation against the decision of the Administrator/R & R Committee at Project level; x. A monitoring cell should be constituted under the project; xi. Each project affected household comprising of rural artisan/small trader and self-employed person shall get one-time financial assistance for construction of working shed/shop for livelihood support.

The Land Acquisition (LA) Act of 1894 94. The Land Acquisition (LA) Act of 1984 is commonly used for acquisition of land for any public purpose. It is used at the State level with State amendments made to suit local requirements. Expropriation of and compensation for land, houses and other immovable assets are carried out under the Land Acquisition (Amendment) Act, 1984. The Act deals with compulsory acquisition of 43

private land for public purpose. The procedures set out include: (i) Preliminary notification (Section 4); (ii) Declaration of Notification (Section 6); (iii) Notice to persons interested (Section 9); (iv) Enquiry and award (Section 11); and (v) Possession (Section 16). 95. The 1984 amendments to the LA Act addressed the matter of compensation and delays in payment. As regards to the level of compensation, the rate of solatium was increased from 15 per cent to 30 per cent. For delays, the amendment requires that: i. A time of one year was fixed for completing all formalities between the issuance of Section 4 and Section 6; and ii. The compensation award must be determined within two years of the issuing of section 6 notification. Interest is payable at a rate of 12% per year from the date of preliminary notification to the date of dispossession. These changes apply to cases before the Civil Courts even for awards made before the enactment of the amendments.

Asian Development Bank’s Safeguard Policy 96. The ADB’s Safeguard Policy Statement 2009, recognizes and addresses the R & R impacts of all the affected persons, irrespective of their titles, and requires the preparation of RP in every instance where involuntary resettlement occurs. The ADB policy requirements are: (a) avoid involuntary resettlement wherever possible; (b) to minimize involuntary resettlement by exploring project and design alternatives; (c) to enhance, or at least restore, the livelihoods of all displaced persons6 in real terms relative to pre-project levels; (d) improve the standards of living of the displaced poor and other vulnerable groups.

97. The main policy principles of the SPS are : • Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks. • Carry out meaningful consultations with affected persons, host communities, and concerned non-governmental organizations. Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and reporting of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples, and those without legal land title, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons’ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks

6 In the context of involuntary resettlement, displaced persons are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas.

44

are highly complex and sensitive, compensation and resettlement decisions should be preceded by a social preparation phase. • Improve, or at least restore, the livelihoods of all displaced persons through (i) land- based resettlement strategies when affected livelihoods are land based where possible or cash compensation at replacement value for land when the loss of land does not undermine livelihoods, (ii) prompt replacement of assets with access to assets of equal or higher value, (iii) prompt compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through benefit sharing schemes where possible. • Provide physically and economically displaced persons with needed assistance, including the following: (i) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of resettled persons economically and socially into their host communities, and extension of project benefits to host communities; (ii) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (iii) civic infrastructure and community services, as required. • Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas, provide them with legal and affordable access to land and resources, and in urban areas provide them with appropriate income sources and legal and affordable access to adequate housing. • Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status. • Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets. • Prepare a resettlement plan elaborating on displaced persons’ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. • Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. • Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of project’s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. • Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation. 45

• Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

Indigenous Peoples 98. Indigenous Peoples (IP) are defined by ADB’S Indigenous Peoples Policy are those having distinct social, cultural, economic, and political traditions and institutions compared with the mainstream or dominant society. IP generally share the following characteristics: (i) descent from a population living in an area before current national territories were defined; (ii) maintenance of cultural and social identities separate from those of dominant societies; (iii) self-identification and identification by others as being part of a distinct cultural group; (iv) linguistic identity different from that of dominant society; (v) political traditions and institutions distinct from dominant culture; (vi) economic systems oriented more toward traditional production systems; and (vii) unique ties and attachments to traditional habitats and ancestral territories.

Karnataka Highway Act 1964 99. In addition to the above measures, realizing the need of infrastructure development like roads in timely manner, the PWD GOK has decided to acquire the land in KSHIP through the “The Karnataka Highways Act 1964”(KHA,1964) instead of using the Land Acquisition Act of 1894.

Comparison of National and State Policies with Asian Development Banks SPS -2009 100. The National Resettlement and Rehabilitation Policy of 2007 (NRRP-2007) , represents a significant milestone in the development of a systematic approach to address resettlement issues in India and closes significantly the gap between Indian national policies and those of ADBs. The Land Acquisition Act (LAA) of 1894 (as amended in 1984) gives directives for the acquisition of land in the public interest and provides benefits only to titleholders. The LAA also does not provide replacement cost for the loss of land and assets. By contrast, the NRRP recognizes non-titleholders, although the basic requirement is for the non-titleholder to have been in the project-affected area at least 3 years prior to the declaration of the area as an affected area. In Karnataka, there are various project level R & R Policies. The KSHIP policy tries to address any gaps in the existing policies which are relevant for the project. Table 6-1: Comparison of gaps in various Acts and Policies with ADBs SPS LA NRRP-2007 ADB KSHIP Policy Cut-off Date 3 years prior to Date of survey will Date of survey will be for Assistance date of survey for be considered as considered as cut off for Non titleholders cut off for Non Non titleholders and the and the date of titleholders and the date of section 15 section 15 date of section 15 notification for titleholder. notification for notification for titleholders. titleholder. Social Impact Mandates SIA Requires a Poverty A Poverty and Social Assessment survey for 400 or and Social Assessment study has more getting Assessment study been done for this project. displaced en no minimum masse in plain threshold area or more than prescribed. 200 households in hilly areas.

46

LA NRRP-2007 ADB KSHIP Policy Replacement No Provides for Provides for Provides for replacement Cost of land replaceme alternative lands; replacement cost cost (compensation)of nt cost of where not possible of land land through negotiations land monetary as per KHA. compensation. Assistance to No direct mention This is covered. Provides assistance to tenants losing of assistance to tenants losing commercial commercial tenants losing and residential structures. and residential commercial and structures residential structures. 47

7. ENTITLEMENTS, ASSISTANCE AND BENEFITS

KSHIP Policy 101. The National, State and Departmental Code provides for the framework for resettlement and rehabilitation activities. However, within the context of the above mentioned policy frameworks, a project specific Resettlement Policy has been prepared. The project policy has been evolved through a number of discussions by PIU. Good practices of the other States have also been taken into consideration in addition to considering the relevant policy provisions and entitlements under each category of loss mentioned in National Policy for Resettlement and Rehabilitation of 2007.

Impacts and Entitlements 102. This policy addresses the direct and indirect impacts of project construction and operation on displaced persons, households and communities. The most direct and immediate impacts are those associated with project construction, mainly land acquisition. Other losses include loss of shelter, and other assets within the project’s corridor of impact; as well as roadside structure, business establishments and public facilities. Mitigation is provided through compensation and assistance to project-displaced persons, households, and groups. These social units are entitled to compensation and assistance on the basis of this policy framework adopted by the project. All assiatnace will be paid as one time grant. The policy provides mitigation for: • loss of assets, including land and house or work place; • loss of livelihood or income opportunities; and • Collective impacts on groups, such as loss of community assets, common property resources, and others. 103. Loss of assets and livelihood are impact categories that represent direct project impacts on an identified population. The people likely to be affected will be surveyed and registered, and project monitoring and evaluation will compare long-term impact against baseline socioeconomic data. Collective impacts on groups represent direct and indirect impacts, where group members need not be individually registered. Group-oriented gains and losses in this category are less quantifiable in terms of impacts on the individual. Mitigation and support mechanisms are collectively oriented, and the monitoring of these efforts will examine the impact and benefits for the groups involved. The GoK from time to time will make amendments in this policy as and when required.

Corridor of Impact 104. Right of Way is the lawfully acquired corridor of public land owned by the State Government and administered by the PWD for the transit of the existing road. Using available records with the PWD and the Revenue Department, the project will verify the boundaries of the legal right of way as well as boundaries of private properties within and in the vicinity of the likely Corridor of Impact. Displacement under the project will be limited to the corridor required for the road and its safety zone. This corridor is referred to as the Corridor of Impact. Within this corridor, there should be no structures or other hindrances. The advantage of this approach is that such a corridor is easier to maintain free of encumbrances than the full Right of Way. Where the COI is beyond the RoW land acquisition will be required.

48

Targeted support to vulnerable groups 105. The project will develop target assistance for groups such as women-headed households, physically challenged, widow and persons above the age of 60 years. Attention will be given on a case by case basis, with regard to their rehabilitation, livelihood, educational opportunities, vocational training, etc.

Option and Choices 106. The project will provide options and choices among different entitlements to the affected population. As part of the project consultation and participation mechanisms, people will be informed and consulted about the project and its impacts, and their entitlements and options. The affected population will be counselled so that they are able to make informed choices among the options provided.

Principles 107. This policy is based on the principle that the population affected by the project will be assisted to improve their former living standards. The policy emphasizes that involuntary resettlement will be avoided or minimized where possible by exploring other alternative project designs. Where displacement is unavoidable, people losing assets, livelihood or other resources shall be assisted in improving their former living standards. The policy document describes the details of entitlements and type of assistance to be extended to the affected persons, which will become the basis for preparing a detailed and time-bound Resettlement Plan (RP). The RP will contain the implementation details on how to ensure that principles and provisions of this policy can be implemented. The Resettlement Plan will describe the approach to be followed in minimizing and mitigating negative social and economic impacts caused by the project, including displacement. 108. This policy identifies categories of expected project impacts, including loss of property and assets, loss of livelihood, and other social and economic impacts on groups and roadside communities. All people, households and groups adversely affected by the project would be registered and support will be given in accordance with these policy provisions.

Definitions a. “Agricultural land”: means lands being used for the purpose of :(i) agriculture or horticulture; (ii) raising of crops, grass or garden produce; and (iii) land used by an agriculturist for the grazing of cattle, but does not include land used for cutting of wood only; b. Assistance; refers to the support provided to displaced persons in the form of ex-gratia payments, loans, asset services, etc. in order to improve the standard of living and reduce the negative impacts of the project. c. Bagar Hukum land is any government land which is unauthorizedly occupied by a person and such person has applied for regularization of the same under the Karnataka Land Revenue Rules under 108 C(1) is called Bagar Hukum land.. d. Below poverty line or BPL Household”; means below poverty line households as defined by the Planning Commission of India, from time to time, and those included in the State BPL list in force. 49

e. Compensation: refers to the amount paid under The Karnataka Highways Act, 1964 and The Karnataka Highways Rules, 1965, for private property, structures and other assets acquired for the project. It refers to the amount as given in the Entitlement Matrix for the project. f. Cutoff Date: the date of Notification under Section 15 of Karnataka Highways Act, 1964 will be the cutoff date where the land acquisition will be required. For Non titleholders the date of socioeconomic survey will be considered as the cut-off date. g. Displaced households (DHs): means- (i) a household whose primary place of residence or other property or source of livelihood is adversely affected by the acquisition of land for a project or involuntary displacement due to any other reason; (ii) any tenure holder, tenant, lessee or owner of other property, who on account of acquisition of land (including bagar Hukum or other property) in the affected area of otherwise, has been involuntary displaced from such land or other property; (iii) any agricultural or non-agricultural labourer, landless person (not having homestead land or agricultural land) rural artisan, small trader or self-employed person; who has been residing or has engaged in any trade, business, occupation or vocation in the affected area, and who has been deprived of earning his livelihood or alienated wholly or substantially from the main source of his trade, business, occupation or vocation because of the acquisition of land in the affected area or being involuntarily displaced for any other reason; h. Displaced Persons (DPs):, any person who has economic interests or residence within the project impact corridor and who may be adversely affected directly by the project. Project displaced persons include those displaced, those losing commercial or residential structures in whole or part, those losing agricultural land or homesteads in whole or part, and those losing income sources as a result of project action. i. Encroachers: are those persons who have extended their building, business premises or work places into government lands. Assistance will be provided to these persons, based on their loss. j. “Household”: includes a person, his or her spouse, minor sons, unmarried daughters, minor brothers, unmarried sisters, father, mother and other relatives residing with him or her and dependent on him or her for their livelihood; and includes “nuclear household” consisting of a person, his or her spouse and minor children. k. “Government”: refers to the Government of Karnataka. l. “Land acquisition” or “”acquisition land”: means acquisition of land under the Karnataka Highways Act, 1964. m. “Marginal farmer”: means a cultivator with an unirrigated land holding up to one hectare or irrigated land holding up to half hectare. n. Minimum Wages: The minimum wage of a person for his/her services/labour is Rs. 100 per day as per Government Notification NoLD96 LMW 2005 dated 30 July 2007. o. Non-Perennial Crop: Any plant species, either grown naturally or through cultivation that lives for a season and perishes with harvesting of its yields has been considered as a non-perennial crop in the project. For example, paddy, sugarcane, groundnut, etc. p. Notification means a notification published in the Gazette of India, or as the case may be, the Gazette of State.

50

q. Perennial Crop: Any plant species that live for years and yields its products after a certain age of maturity is a perennial crop. Generally trees, either grown naturally or by horticultural and yield fruits or timber have been considered as perennial crop in the project. For example, tamarind, coconut, mango, teak, neem etc. are perennial crops. r. Replacement Cost of the acquired assets and property is the amount required for the affected house hold to replace/reconstruct the lost assets through purchase in the open market. Replacement cost will be calculated at PWDs current Schedule of Rates without depreciation. Replacement cost will be in line with the provisions of the Entitlement Matrix of the project. s. Severance of Land can be defined of a landholding divided into two or more pieces due to acquisition of land mainly for laying new project alignment, such as a bypass or a realignment. t. Small farmer means a cultivator with an unirrigated land holding up to two hectares or with an irrigated land holding up to one hectare, but more than the holding of a marginal farmer. u. Squatter means those persons who have illegally occupied government lands for residential, business and or other purposes. v. Tenants are those persons having bonafide tenancy agreements, written or unwritten, with a private property owner with clear property titles, to occupy a structure or land for residence, business or other purposes. w. Vulnerable groups: persons such as physically challenged, widows, or persons above sixty years of age. x. Women-headed Household: A household that is headed by a woman and does not have a male earning member is a Woman Headed Household. This woman may be a widowed, separated or deserted person.

Entitlements 109. The DPs will be provided with the benefits described in the succeeding paragraphs. 110. Loss of Land: This includes all those who have legal title to land. They will be provided with Compensation as per Replacement Cost through direct negotiation as per Karnataka State Highway Act, 1964 + stamp duty and registration charges. Stamp duty and registration charges are applicable for those who accept negotiation price. Minimum negotiated price for the Districts of Bangalore Urban, Bangalore Rural, Chikkaballapur, Ramnagaram, and Corporation / Municipal limits of other district HQs will be one and half times the Guidance Value. For all other areas other than those mentioned above the minimum negotiated price will be twice the Guidance Value.7 OR average sales statistics, whichever is higher8. In case of severance of land an additional 25% compensation will be paid to the land loser if he retains the remaining plot OR if the remaining land is not viable and the land owner opts to surrender the entire plot to the project, compensation as given earlier

7 Revised Guidance Value of the properties in Bangalore Urban, Bangalore Rural, Chikkaballpur, Ramanagaram and Corporation/Municipal limits is 2-3 times higher than the earlier Guidance Value. Hence 1.5 times the Guidance Value is proposed as minimum negotiated price. In other areas ratio of revision is reasonably low, hence twice the Guidance Value is proposed as minimum price. 8 The average Sales Statistics is in line with LA Amendment Bill. In the LA Amendment Bill there are different modalities in determining and assessing the market value, any one among them would be adopted wherein the land loser gets the maximum market value. 51

will be applicable; Loss of perennial crops and non-perennial crops will be compensated in accordance with Horticulture department valuation process; A grant of Rs. 15,000 for replacement of Cattle shed; Water-yielding bores will be replaced in the location identified by the affected person in the remaining land holding subject to availability of water. In case water is not available, replacement cost of the borewell at current PWD SR rates without depreciation and 30% solatium will be given. In case of land owners who become landless or marginal farmers, the following additional entitlements will be offered: (a) subsistence allowance of Rs.30,000 for land less and marginal; and (b) assistance for creating income generating asset valued up to Rs.75,000; Additional amount of Rs.20,000 will be restricted to those who lose narrow stretch of land as additional compensation in lieu of all other benefits (narrow stretch of land is defined as persons losing up to five guntas of land). For those becoming landless and all marginal farmers, training assistance will be provided for income generating vocational training and skill upgrading options as per affected persons choice. The NGO will ensure linkages of the trained persons to ongoing programmes, to facilitate employment and marketing opportunities; Employment opportunity for affected persons as per his skills and availability of suitable work in road construction work; In case of Bagar Hukum lands - 50% of compensation and other benefits as available for land owners. 111. Loss of residential structures: These persons with legal titles losing their residential structures. They will get compensation at current PWD scheduled rates without depreciation and 30% solatium at replacement cost; Alternative houses in resettlement colony or developed plot and construction cost of Rs. 40,000 linked to construction progress; Additional 25% compensation for partially affected structures towards reconstruction; shifting assistance of Rs. 10,000; Subsistence allowance of Rs. 30,000. In case more than 25% of house is affected and unviable for retaining, full compensation will be paid; Resettlement colonies will be developed if more than 20 households are displaced in two km continuous stretch; Plot size will be equivalent to size lost subject to a maximum of 369 sq m/1200 sq ft in rural area and 184 sq m /600 sq ft in urban areas. People have right to salvage the affected materials. 112. Loss of commercial structures: These are persons with legal titles who will lose their commercial structures. They will get compensation at current PWD scheduled rates without depreciation and 30% solatium at replacement cost; Alternative shop or assistance for income generation asset valuated upto Rs. 75,000; Additional 2 % compensation for partially affected structures; Shifting assistance of Rs. 10,000; Subsistence allowance of Rs. 30,000; Shopping units with 100-150 sq ft will be constructed if more than 20 shops are affected in a continuous stretch of two km and opt for shop. People have right to salvage the affected materials; Training for self employment will be provided to one adult per household as needed. 113. Loss of residential cum commercial structures: These are persons who lose their commercial cum residential structures. They will get the following entitlements: Compensation at current PWD scheduled rates without depreciation and 30% solatium at replacement cost; Alternative shop or assistance for income generation asset valuated up to Rs. 75,000 or Alternative houses in resettlement colony or developed plot and construction cost of Rs. 40,000 linked to construction progress; Additional 25% compensation for partially affected structures; Shifting assistance of Rs. 10,000; Subsistence allowance of Rs. 30,000; Additional amount of Rs. 25,000 as grant. In case more than 25% of house is affected and unviable for retaining, full compensation will be paid; Resettlement colonies will be developed if more than 20 households are displaced in two Km continuous stretch; Plot size will be equivalent to size lost subject to a maximum of 369 sq m/1200 sq ft in rural areas and 184 sq m /600 sq ft in urban areas; Shopping units with 100-150 sq ft

52 will be constructed if more than 20 shops are affected in a continuous stretch of two km and opt for shop; People have right to salvage the affected materials; Training for self employment will be provided to one adult per household as needed. 114. Tenants losing residential structure: These are persons who are residing as tenants. They will be eligible for rental allowance for 6 months at Rs. 500 per month in rural and Rs. 1000 in urban areas ; Shifting assistance of Rs. 10,000. 115. Tenants losing commercial structure: These are persons who are carrying out commercial activities as tenats. They will be eligible for Rental allowance for 6 months at Rs. 1000 per month in rural and Rs. 1500 in urban areas; Shifting assistance of Rs. 10,000; Assistance for income generation asset upto Rs. 75,000. 116. Tenants losing residential cum commercial structure: These are temnts who reside and carry out commercial activity in the same structure. These persons will be entitled to rental allowance for 6 months at Rs. 1000 per month in rural areas and Rs. 1500 in urban areas; Shifting assistance of Rs. 10,000; Assistance for income generating asset up to Rs. 75,000. 117. Non titleholders – residential squatters: These are persons without legal title who are residing on government property. These persons will be assisted with house in resettlement colony or developed plot and construction cost of Rs. 40,000 linked to construction progress; Subsistence allowance of Rs.15,000; Shifting Allowance of Rs.5000. House size in resettlement colony to be minimum of 25 sq m/270 sq ft. Resettlement colony will be constructed if more than 20 residential squatters are getting affected in a continuous stretch of 2 km and opted for same; Developed plot size will be allotted of 25 sq m/ 270 sq ft in urban area and 33 sq m/350 sq ft in rural areas. 118. Non titleholders – commercial squatters: These are persons without legal title who are carrying out commercial activity on government property. These persons will be given assistance. 119. Alternative shop of 100 sq ft or assistance for income generating asset valuated up to Rs. 30,000; Subsistence allowance of Rs.15,000; Shifting Allowance of Rs.5000. Shopping units will be constructed if more than 20 shops are affected in a continuous stretch of 2 km and opted for shop. 120. Encroachers: These are persons whose structures have encroached on government land. These persons will be provided Replacement cost of affected structure calculated at current PWD scheduled rates without depreciation and compensation of Crop loss or advance notice for harvesting crops 121. Loss of primary source of income: Those persons who are working as employees or agricultural labors who depend upon an existing activity getting affected. These persons will be entitled to Subsistence allowance of Rs. 15,000. Training assistance will be provided for income generating vocational training and skill upgrading options as per affected persons choice; Employment opportunity for affected persons as per his skills and availability of suitable work in road construction work will be provided. Training for self employment will be provided to one adult per household as needed 122. Vulnerable groups – Widows, physically challenged, and those aged above 60 years: These persons will be entitled to Assistance to include in government pension schemes if not included, if eligible as per Government criteria (OR) lump-sum amount of Rs. 25,000. Training assistance will be provided for income generating vocational training and skill upgrading options as per choice. This will be restricted to those who have no or cannot be provided with alterative livelihood sources. 53

123. Community Assets getting affected will be reconstructed and be transferred to Local authorities for maintenance. 124. Unidentified Impacts : Unforeseen impacts shall be documented and mitigated based on the principles provided in this policy. 125. All amounts in this entitlement matrix are fixed as of April 01, 2010. These will increased 10% annually on first day of April every year. The same will hold good for guidance value also if not revised by the GoK.

54

Entitlement Matrix 126. The entitlement matrix will guide to offer compensation and assistance to those persons affected by the project. The detailed entitlement matrix for the project is given in Table 7-1. Table 7-1: Entitlement Matrix No. Impact Entitlements Remarks Category I. Title Holders (a) Loss of land 1. Compensation as per the • Stamp duty and principle of replacement cost registration charges are through direct negotiation as applicable for those who provided for in the Karnataka accept negotiation price. State Highway Act, 1964 + stamp duty and registration charges; • Minimum negotiated price 2. Compensation offered is cash for the Districts of for land; Bangalore Urban,

Bangalore Rural, Chikkaballapur, Ramnagaram, and Corporation / Municipal limits of other district HQs will be 1.5 times the

Guidance Value. For all

other areas other than those mentioned above, the minimum negotiated price will be 2 times the Guidance Value.1 OR average sales statistics,

which ever is higher.2 3. In case of severance of land an additional 25%

compensation will be paid to

the land loser if he retains the

remaining plot OR if the

remaining land is not viable

and the land owner opts to

surrender the entire plot to the

project, compensation as

3 As per the NRRP-2007 the acquiring body has to provide rehabilitation grant equivalent to 750 days minimum agricultural wages. At present the minimum agricultural wages is Rs. 100/day. The NGO will ascertain the actual needs of the displaced persons and assist in creating assets. 4 Bagar Hukum lands are government lands which are unauthorizedly cultivated by persons without legal documents. Applications for regularization that are pending before the regularization committee. 1 Revised Guidance Value of the properties in Bangalore Urban, Bangalore Rural, Chikkaballpur, Ramanagaram and Corporation/Municipal limits is 2-3 times higher than the earlier Guidance Value. Hence 1.5 times the Guidance Value is proposed as minimum negotiated price. In other areas ratio of revision is reasonably low, hence 2 times the Guidance Value is proposed as minimum price. 2 The average Sales Statistics is in line with LA Amendment Bill. In the LA Amendment Bill there are different modalities in determining and assessing the market value, any one among them would be adopted wherein the land loser gets the maximum market value. 55

No. Impact Entitlements Remarks Category given in No. 1 will be applicable;

4. Loss of perennial crops and non-perennial crops will be compensated in accordance with Horticulture department valuation process, which is the replacement cost;

5. A grant of Rs. 15,000 for replacement of Cattle shed;

6. Water yielding bores will be replaced in the location identified by the affected person in the remaining land holding subject to availability of water. In case water is not available replacement cost of the borewell at current PWD SR rates without depreciation charges and 30% solatium will be given; • Marginal farmer is defined as those left with 7. In case of land owners who 1 hectare of non-irrigated become landless or marginal or 0.50 hectare of farmers, the following irrigation or combination additional entitlements will be of both offered: (a) subsistence allowance of Rs. 30,000 for land less and marginal; and, (b) assistance for creating Income generation asset valued up to Rs.75,0003; • Narrow stretch of land is defined as persons losing 8. Additional amount of Rs. an area that is up to 5 20,000 will be restricted to guntas of land. those who lose narrow stretch of land as ex gratia compensation in lieu of all other benefits; • The NGO engaged for the RP implementation 9. For those becoming landless will ensure linkages of the and all marginal farmers trained persons to training assistance will be ongoing programs, to provided for income facilitate employment and generating vocational training marketing opportunities. and skills;upgrade options as per displaced persons' choice;

10. Employment opportunity for affected the displaced persons as per his/her skills and the availability of suitable work in road construction work; • Any Government land which is unauthorizedly 11. In case of Bagar Hukum occupied by a person and

56

No. Impact Entitlements Remarks Category lands4 - 50% of compensation such person has applied and other benefits as available for regularization of the for land owners which is same under the equivalent to replacement Karnataka Land Revenue value for this category. Rules under 108 C(1) is called Bagar Hukum land. Under Rule 108C section 94A, of the Karnataka Land Revenue Act,1966, the Tahsildar is the custodian of the records and he will issue the certification whether the application is pending before the Committee or not. Tahsildar is the Secretary of the Committee for regularization of unauthorized occupation of government land. (b) Loss of 1. Compensation at current • In case more than 25% of Residential PWD scheduled rates without a house is affected and structures depreciation and 30% solatium unviable for retaining, full at repalcemnt cost; compensation will be 2. Alternative houses in paid. resettlement colony or • Resettlement colonies developed plot and will be developed if more construction cost of Rs. than 20 households are 40,000 linked to construction displaced in 2 km progress; continuous stretch. 3. Additional 25% of current • Plot size will be PWD SR rates without equivalent to size lost depreciation + 30% solatium subject to a maximum of for the affected portion as 369 sq m/1200 sq ft in compensation for partially rural areas and 184 sq m affected structures towards /600 sq ft in urban areas. reconstruction; • Displaced persons have 4. Shifting assistance of Rs. a right to salvage the 10,000; affected materials. 5. Subsistence allowance of Rs. 30,000.

(c) Loss of 1. Compensation at current • Shopping units with 100- commercial PWD scheduled rates without 150 sq ft will be structures depreciation and 30% solatium constructed if more than at replacement cost; 20 shops are affected in 2. Alternative shop or assistance a continuous stretch of 2 for income generation asset km and the owners opt valuated upto Rs. 75,000; for a shop. 3. Additional 25% compensation • Displaced persons have for partially affected structures; a right to salvage the 4. Shifting assistance of Rs. affected materials. 10,000; • Training for self 5. Subsistence allowance of Rs. employment will be 30,000. provided to one adult per household as needed .

57

No. Impact Entitlements Remarks Category (d) Loss of 1. Compensation at current • In case more than 25% of residential PWD scheduled rates without the house is affected and cum depreciation and 30% solatium unviable for retaining, full commercial at replacement cost; compensation will be paid structures 2. Alternative shop or assistance • Resettlement colonies for income generation asset will be developed if more valuated up to Rs. 75,000; than 20 households are 3. Additional 25% compensation displaced in 2 km for partially affected structures; continuous stretch. 4. Shifting assistance of Rs. • Plot size will be 10,000; equivalent to size lost 5. Subsistence allowance of Rs. subject to a maximum of 30,000; 369 sq m/1200sq ft in 6. Additional amount of Rs. rural areas and 184 sq m 25,000 as grant. /600 sq ft in urban areas. • Shopping units with 100- 150 sq ft will be constructed if more than 20 shops are affected in a continuous stretch of 2 km and the owners opt for a shop. • Displaced persons have a right to salvage the affected materials. • Training for self employment will be provided to one adult per household as needed. II. Tenants (a) Residential 1. Rental allowance for 6 months at Rs. 500 per month in rural areas and Rs. 1000 in urban areas; 2. Shifting assistance of Rs. 10,000. (b) Commercial 1. Rental allowance for 6 months at Rs. 1,000 per month in rural areas and Rs. 1,500 in urban areas; 2. Shifting assistance of Rs. 10,000; 3. Assistance for income generation asset up to Rs. 75,000. (c) Loss of 1. Rental allowance for 6 months residential at Rs. 1,000 per month in rural cum areas and Rs. 1,500 in urban commercial areas; structures 2. Shifting assistance of Rs. 10,000; 3. Assistance for income generation asset up to Rs. 75,000. III. Non-Title holders

58

No. Impact Entitlements Remarks Category (a) Residential 1. House in resettlement colony • House plot size in Squatters or developed plot and resettlement colony to be construction cost of Rs. minimum of 25 sq m../270 40,000 linked to construction sq ft. Resettlement progress; colony will be constructed 2. Subsistence allowance of if more than 20 Rs.15,000; residential squatters are 3. Shifting Allowance of Rs.5000. getting affected in a continuous stretch of 2 km and opted for same. As per NRRP 2007. 4. Developed plot size will be allotted of 25 sq m/ 270 sq ft in urban areas and 33 sq m /350 sq ft in rural areas as per NRRP 2007.

(b) Commercial 1. Alternative shop of 100 sq. ft. 5. Shopping units will be Squatters or assistance for income constructed if more than generating asset valuated up 20 shops are affected in to Rs. 30,000; a continuous stretch of 2 2. Subsistence allowance of km and opted for shop. Rs.15,000; 3. Shifting Allowance of Rs.5000. (c) Encroachers 1. Replacement cost of affected structure calculated at current PWD scheduled rates without depreciation; 2. Compensation of crop loss or advance notice for harvesting crops. IV. Loss of livelihood (a) Loss of 1. Subsistence allowance of Rs. • Training for self primary 15,000; employment will be source of 2. Training assistance will be provided to one adult per income provided for income generating household as needed. vocational training and skills upgrade options as per the displaced person’s choice; 3. Employment opportunity for the displaced persons as per his/her skills and availability of suitable work in the road construction. V. Vulnerable People (a) Widows 1. Assistance to include in • This will be restricted to Physically government pension schemes if those who have no or challenged not included, if eligible as per cannot be provided with and those Government criteria; (OR) alternative livelihood aged above 2. Lump-sum amount of Rs. sources. 60 years 25,000; • Training for those above 3. Training assistance will be 60 years is not provided for income generating mandatory and will be vocational training and skills provided for if the person upgrade options as per the opts for it and after the displaced person’s choice. need is assessed.

VI. Community Assets 59

No. Impact Entitlements Remarks Category (a) Community 1. Reconstruction of affected Assets assets; 2. Transfer to local authorities for maintenance. VII. Unidentified Impacts (a) Unidentified 1. Unforeseen impacts shall be Impacts documented and mitigated based on the principles provided in this policy. Note: All amounts in this entitlement matrix are fixed as of April 01, 2010. These will increased 10% annually on first day of April every year. The same will hold good for guidance value also if not revised by the GoK.

60

8. RELOCATION OF HOUSING AND SETTLEMENTS

Basic Provision for Relocation 127. The PA will provide adequate and appropriate replacement land and structures or cash compensation for lost land and structures, adequate compensation for partially damaged structures, and relocation assistance, according to the Entitlement Matrix. The PA will compensate to the non- titleholders for the loss of assets other than land, such as dwellings, and also for other improvements to the land. The entitlements to the non-titleholders will be given only if they occupied the land or structures in the project area prior to the cut-off date.

Need for Relocation 128. Efforts have been made to minimize the resettlement. There are nine houses (titleholders) that are totally affected. There are 36 titleholder houses that are getting partially getting. Majority of the commercial structures (74) getting affected are non-titleholder commercial structures. All efforts are made through various provisions in this RP to mitigate negative social impacts on displaced persons and communities by supporting relocation of affected households and by restoration of pre- project levels of income.

Development of Vendor markets 129. Shopping units with 100-150 sq ft will be constructed if more than 20 shops are affected in a continuous stretch of two km and opt for shop. In this package there is no requirement for vendor markets.

Environmental Aspects 130. Some of the criteria to be considered are: (i) Lands notified, as bodies of water should be avoided; (ii) Irrigated agriculture lands should be avoided; (iii) Lands notified, as forest should be avoided including forests coming under Panchayat; (iv) Resettlement sites nearer to the water bodies (including ponds and canals) are to be avoided to prevent water borne diseases; (v) Lands under plantation are to be avoided; and (vi) the resettlement sites should be at least 10 km away from ecologically sensitive areas.

Social Aspects 131. (i) Lands owned by the vulnerable communities should be avoided for resettlement sites. This includes SC/ST, women-headed households and households below poverty line, lands owned by small and marginal farmers should not be acquired for resettlement sites; and (ii) DPs and host community should be consulted for mutual acceptance of the presence of each other. 132. Preference will be given to land-based resettlement strategies for displaced persons whose livelihoods are land-based. These strategies may include resettlement on public land, or on private land acquired or purchased for resettlement. Whenever replacement land is offered, displaced persons are provided with land for which a combination of productive potential, locational advantages, and other factors is at least equivalent to the advantages of the land taken. If land is not the preferred option of the displaced persons, or sufficient land is not available at a reasonable price, 61

non land-based options built around opportunities for employment or self-employment should be provided in addition to cash compensation for land and other assets lost.

Reconstruction of affected community structures 133. The project authorities will replace and reconstruct all community assets before demolition. For shifting of community assets the NGO will; (i) consult with the community along with the SDO and identify alternative land- the land identified has to be government land wherever possible, or given as donation in some cases; (ii) owner consent letter has to be signed by the donor /owner in the prescribed format prepared by the NGO (name, place, survey nos., site measurement); (iii) the reconstruction will be carried out by the local contractors; (iv) the KSHIP Assistant Executive Engineer of the division will be responsible for monitoring the work; and (v) the cost for the relocation and reconstruction will be paid by the project.

62

9. INCOME RESTORATION AND REHABILITATION

Income restoration measures 134. The basic objective of income restoration activities is that no project-affected person shall be worse off than before the project. Restoration of pre-project levels of income is an important part of rehabilitating individuals, households, and socio-economic and cultural systems in affected communities. Income restoration schemes will be designed in consultation with affected persons so as to benefit them. Based on the information collected on IR activities from the census socio- economic surveys, the implementing NGO will identify suitable IR programme for the affected persons.

Impact Categories and IR Schemes 135. Project-induced displacement may lead to loss or diminished income for Displaced Person (DPs). The main categories of impacts expected as a result of project land and property acquisition include: (a) Loss of agriculture land in part or full; (b) Loss of commercial establishments: (c) Loss of livelihood as employees and (v) tenants losing their livelihood. 136. Table 9-1: Categories for Income restoration Loss No. DPs/ DHs 1 Partial loss of agriculture 387 2 Loss of commercial structures 76 3 Loss of livelihood as employees 0 4 Tenants losing livelihood 3 137. The economic rehabilitation assistance money will be deposited in bank accounts to be released only for the purchase of income generating assets. Women-headed households will be assisted in identifying alternative space in adjacent areas for continuing their trade or vocations. These households will have to be given preference in disbursement of assistance. The SDRC will use its good offices with local authorities to facilitate early rehabilitation of these women-headed households. DPs losing their livelihood as employees will be provided only relief assistance.

IR Activities 138. There are two types of IR activities, i.e. short term and long term. Short-term IR activities mean restoring DPs’ income during periods immediately before and after relocation. For this, the support NGO shall ensure that: compensation and R & R assistance as provided in the entitlement matrix is provided. Other works include work in the project construction activities and other allied activities such as work on resettlement sites etc. Long term IR activities include provision of shops for those losing their total livelihood, to re-establish their commercial activities. Shopping units with 100-150 sq.ft will be constructed if more than 20 shops are affected in a continuous stretch of two km and opt for shop. It also includes purchase of income generating assets upto Rs. 75,000. In case the amount used is less than this, the beneficiary will get the remaining amount after one year of successful completion of the activity, which will be monitored by the NGO. 139. The steps to be followed for income restoration include: 140. Step 1: Identification of Target Groups – NGOs need to identify the affected persons; 63

141. Step 2: Identification of IR Activities - Prepare a list of possible and feasible income restoration options. While identifying IR options, the following factors shall also be considered: (i) Education level of DPs; (ii) Skill possession; (iii) Likely economic activities in the post displacement period; (iv) Extent of land left; (v) Suitability of economic activity to supplement the income; and (vi) Market potential and marketing facilities. Based on socioeconomic characteristics and options preferred by DPs, the NGO may have to re-assign trades to DPs. Options include (i) petty trade, and (ii) skill related schemes and loans for pumps, bore wells, bullock carts etc to increase productivity. The NGO will assist DPs in identifying appropriate alternative economic rehabilitation schemes through counseling and consultation. 142. Step 3: Training: Option for training for skill enhancement for those losing their livelihood has been provided in the Entitlement Matrix for owners losing commercial structure and employees losing their livelihood. 143. Step 4: Identification of Trainers / Training Institutes: Based on trades selected, NGO shall have to identify master trainer and/or training institute for different trades / activities who can provide on the job training. 144. Step 5: Training Arrangement: NGO shall make different groups of DPs as per trades selected and make all the arrangements such as fixing the venue etc. 145. Step 6: Monitoring of DPs: After training the NGO shall monitor the DPs in order to take midterm correction measures, if required.

64

10. RESETTLEMENT BUDGET AND FINANCING

Budget and Costs 146. The costs used for the budget estimates are based on information collected during the census socioeconomic surveys of DPs. The estimated total budget for the implementation of RP is Rs. 48.83 million. This does not include Operating Costs, NGO and Monitoring Consultant Costs as these costs are for the overall project, which is estimated at Rs. 20 million. The unit costs and detailed budget are given below: Table 10-1: Budget Sl. Cost per Category Total Unit Total cost No. Unit LAND ACQUISITION 1 Agriculture land 10.52 1000000 10520000 Sub Total 10520000 ALTERNATIVE SITE COST 2 Residential site (owner) 9 30000 270000 3 Commercial site (owner) 2 50000 100000 4 Commercial site (squatter) 74 30000 2220000 5 Residential site (squatter) 0 50000 0 Sub Total 2590000 STRUCTURE COST 6 RCC - Pucca housing (Sq ft.) 7447.93 800 5958344 7 Dry stone masonary (Sq ft.) 6350.76 600 3810456 8 Mud mortar (Sq ft.) 4262.54 350 1491889 Sub total 11260689 R & R ASSISTANCE 9 EWS House construction(Non Titleholder) 0 40000 0 10 House construction (owners) 9 40000 360000

11 Shifting Allowance(Non titleholders) 74 10000 740000

12 Subsistence Allowance (Non titleholders) 74 15000 1110000

13 Subsistence Allowance (Owners) 11 30000 330000 14 Additional assistance for land losers 287 20000 5740000 15 Shifting Allowance(Titleholders) 11 10000 110000

17 Economic generating asset(owner/tenant) 5 75000 375000 18 Economic generating asset (squatter) 74 30000 2220000 19 Rental Value Commercial 3 9000 27000 20 Rental Value Residential 1 6000 6000 21 Relief Assistance 0 15000 0 22 Training for DP 2 15000 30000 23 Vulnerable groups 314 25000 7850000 24 Cattle shed 3 15000 45000 65

Sl. Cost per Category Total Unit Total cost No. Unit 25 Group Entitlement 72.10 15000 1081500 Sub Total 20024500 Total 44395189 10% Contingency 4439519 OVERALL TOTAL 48,834,708.00 Table 10-2: Unit Costs for R & R Sl. Category Estimates (in Rs) No. 1 Agricultural Land per ha Rs.2470000 2 Non Agricultural Land per ha Rs.3705000 3 Pucca house 800 per sq. ft 4 Semi pucca house 600 per sq. ft 5 Kutcha house 350 per sq ft. 6 Construction cost for house in Resettlement site 40,000 per structure 7 EWS Housing 40,000 per unit Training for DP for income generation schemes and 15,000 (Rs.5000 per month for 3 8 vocational training months) 9 NGO assistance for implementation 85,00,000 10 Evaluation Consultants 30,00,000 11 SDRC and associated staff training 15,00,000 lump sum 12 Group entitlements 15,000 per km Office equipment (including Rs. 5,00,000 each for 20,00,000 lump sum 13 setting up office of LAO in North and South Karnataka 14 Vehicle cost ( Rs.8,00,000 per vehicle) 8 vehicles 56,00,000 147. In accordance with the policy provisions, all grants and benefits shall be indexed annually at 10% on the first of April. These include subsistence allowance, shifting allowance, relief assistance, amounts for income generating asset, cost for the provision of sites to squatters and rental allowance. Table 10-3: R & R Unit Costs Sl. Category Proposed Amount No. 1 Purchase Commercial site for Rs.30,000 (10’x10’) Urban Rs 15000 Rural area squatters 2 Purchase Commercial site for Rs.50,000 (10’x15’) Urban Rs 25000 Rural area Titleholders 3 Purchase Residential site for Rs. 30000 Urban Rs 20000 Rural area squatter 4 Purchase Residential site for Rs. 70000 Urban Rs 30000 Rural area Titleholders 5 Shifting allowance for Titleholders Rs.10,000 as one time payment 6 Subsistence allowance for Rs. 30000 Titleholders 7 Subsistence allowance for squatters Rs.15000 as one time payment 8 Shifting assistance for squatters Rs.5000 as one time payment 9 construction cost for Residential Rs.40000 squatters 10 IGA assistance to commercial Rs.30,000 for income generating asset squatter 11 Shifting allowance for Bagar Hukum Rs.5000 as onetime Payment House holders 12 Subsistence allowance for those Rs.15000 as onetime payment

66

Sl. Category Proposed Amount No. who are losing Bagar Hukum Lands 13 Additional assistance for those Rs.20,000 as onetime payment. losing land 14 Income generating Grant for Title Rs.75,000 as onetime payment holder who loose entire land /Business 15 Rental allowance for commercial Rs. 1500 for urban and Rs. 1000 for rural per Tenant month for 6 months. 16 Rental allowance for residential Rs.1000 for urban and Rs. 500 for rural per Tenant month for 6 months 17 Relief assistance for loss of Rs.15000 lump sum payment employment of agriculture and Non agriculture. 18 Assistance to Vulnerable groups Rs. 25,000 lump sum payment In the R & R budget, allocation has not been made for replacement of affected community structures. Any community assets that are getting impacted and which need to be replaced or relocated, is being undertaken separately by PIU KSHIP field division offices. 67

11. GRIEVANCE REDRESSAL MECHANISM

Grievance Redressal Committee 148. The project will establish a Grievance Redressal process, with district-level committees. Each District Grievance Redressal Committee will have representation from the local affected population and the NGOs involved in RP implementation. These committees will hear complaints and facilitate solutions; and the process, as a whole, will promote dispute settlement through mediation to reduce unnecessary litigation. 149. The following persons will constitute the District Level Grievance Redressal Cell: 1. Deputy Commissioner Chairman 2. Academician (To be selected by DC) Member 3. Representative of DP (To be selected by DC) Member 4. Executive Engineer of Concerned Division Convener 150. The main functions of the GRC will be: i. to provide support to DPs on problems arising out of eligibility for RP-provided entitlements and assistance provided; ii. to record the grievances of the DPs, and categorize, prioritize, and solve them within one month; iii. to inform PIU of serious cases within one week; and iv. to report to the aggrieved parties about the developments regarding their grievance and decisions of the PIU, within one month. 151. The Grievance Committees will meet regularly during implementation of the RP, at least once a month. The committees will suggest corrective measures at the field level itself and fix responsibilities for implementation of its decisions. However, the NGOs will form the first level of intervention in resolving DP-related grievances and attempt to motivate the DP to facilitate implementation of the R & R program. The option of contacting the project authorities is available to DPs at any time. The Deputy Commissioner will be the Appellate Authority. The steps in the GRC are: 1. At the first level intervention the NGO will attempt to resolve the grievance; 2. Next the CAO will attempt to address land related grievance and the ADSW will address the non-land related grievances; 3. The third step will be to approach the Grievance Redressal Committee; 4. Next they can Approach the Regional Commissioner who is the Appellate Authority; 5. If all the above fails, the DPs can approach the court. 152. It is the responsibility of the SDRC/NGO to inform the affected persons of the GRC, to make it effective. The NGO shall make DPs aware of the grievance mechanism set out in the RP and shall assist PDPs who have grievances to pursue a suitable remedy. The NGO shall help the DPs to file a grievance application. 153. The NGO shall record the grievance and bring the same to the notice of the Grievance Redressal Committees (GRC) within 7 days of receipt of the grievance from the DPs. It shall submit

68 a draft resolution with respect to the particular grievance of the DP, suggesting solutions, if possible, and deliberate on the same in the GRC meeting through the NGO representative in the GRC. 154. The NGO shall assist in the GRC process whenever necessary. Figure 11-1: Grievance Redressal

69

12. INSTITUTIONAL MECHANISMS

Institutional Arrangements 155. KSHIP has a dedicated unit called the Social Development and Resettlement Cell (SDRC) within the Project Implementation Unit for the implementation of the RP. All aspects of resettlement and rehabilitation and the delivery of entitlements are managed by Social Development/Resettlement Cell (SDRC).

Social Development and Resettlement Cell (SDRC) 156. The SDRC facilitates land acquisition and compensation, relocation and resettlement, distribution of assistance for the DPs. The SDRC is responsible for monitoring the implementation of all resettlement and rehabilitation activities, including land acquisition. The responsibilities of SDRC include: i. responsible for all land acquisition activities; ii. liaison with State and District levels Departments to facilitate DP access and take advantage of services and programs already in place; iii. evolve mechanisms for coordinating the delivery of the compensation and assistance to entitled persons; iv. review and provide social development perspectives and inputs to on-going project design and implementation by working closely with project planners, contractors, and construction supervision consultants; v. link the project with state government agencies, provide liaison with PWD field units and impacted communities, coordinate with district-level committees regarding social development and resettlement operations in the field, mobilize assisting NGO partners, and support the organisation of local community representing DPs; and vi. engage required training services, oversee a grievance redressal process, actively monitor RP implementation, and cooperate with planned project evaluations.

SDRC and Staff Deployment 157. The RP will be implemented by the North Karnataka (Hospet) division of PIU; Staffing is complete for the proposed institutional set up. The institutional setup is given in Figure12.1. The key SDRC officials are: 158. Special DC Land Acquisition - Special Deputy Commissioner in the cadre of KAS will be the in charge of the overall land acquisition. He will be assisted by two Assistant Commissioners for Land Acquisition who is responsible for all activities related to land acquisition. One Assistant Commissioner will be stationed in the zonal office of North Karnataka(Hospet) and the other one would be stationed at PIU Office (South Zonal Office) in Bangalore. 159. Chief Administrative Officer –The CAO in the cadre of KAS will be responsible for all resettlement and rehabilitation activities. The CAO will also be assisted by The Assistant Director Social Welfare (ADSW) who will be responsible for R & R work. On the land acquisition side, the CAO and the Assistant Commissioners will be responsible for fixing the negotiated price of the land along with the affected persons according to the Karnataka Highways Act, 1964, and disbursing the compensation.

70

160. The Assistant Director Social Welfare is responsible for shifting of project affected persons, coordination of disbursement of assistance such as shifting allowance etc., disbursement of funds for income generating programmes, relief assistance, etc. The ADSW needs to have relevant experience of at least five years in resettlement projects, with a minimum educational qualification of Masters in Social Science. 161. The Resettlement and Rehabilitation Manager will assist the ADSW and coordinate all the rehabilitation work of the SDO’s. The R & R Manager has to have experience in resettlement projects with minimum experience of three years, with a minimum educational qualification of Masters Degree in Social Sciences. 162. The ADSW and the Resettlement and Rehabilitation Manager will be assisted by the Social Development Officer (SDO). It is suggested that four SDOs be stationed in the Assistant Commissioners Office to be located on North zone and PIU –South in Bangalore (already appointed). The responsibility of SDO includes: support to resettlement and rehabilitation related work pertaining to RP implementation, like issue and the verification of ID cards, identification of local income generation potential, monitoring rehabilitation works, providing assistance to vulnerable groups, co-ordinating with NGOs etc. The SDO has to have a Masters degree in Social Sciences. 163. The SDOs will be assisted by the Social Welfare Inspectors (SWI). The SWI’s are supporting staff to SDOs to carry out the functions as per the directions of SDOs. 164. The SDRC will have a Data Management Specialist. The responsibility of this person will be to monitor and update the data of all the project affected persons; to highlight any discrepancy in compensation and paid disbursed; and coordinate the inputs of information from the North and South Divisions to the Central database at PIU at Bangalore. The Data Management Specialist is to be supported by additional staff. The PIU has already appointed the Consultants for database management. Information is ready to be transferred to the PIU for use in implementation. 71

Figure 12.1: Institutional Set up

CHIEF PROJECT OFFICER

PROJECT CAO (SPECIAL DC) SPECIAL DIRECTOR AT PIU HQsc DC(LA)

AC-LAO-GRP I NORTH

KARNATAKA ASSISTANT DIRECTOR (Office at Dharwad - AC-LAO-GRP I SOUTH (SOCIAL WELFARE) tentatively KARNATAKA AT HQ s

DEPUTY TAHSILDAR R &R MANAGER DEPUTY TAHSILDAR

FIRST DIV REVENUE COMPUTER SOCIAL DEVELOPMENT SDO - NORTH KARNATAKA SDO - SOUTH SURVEYOR (4) FIRST DIV REVENUE COMPUTER ASSISTANT INSPECTOR (4) OPERATOR/STENO 1 SURVEYOR (4) OFFICER (1) PIU (2) KARNATAKA (2) ASSISTANT (2) INSPECTOR (4) OPERATOR/STENO 2

GROUP D (4) GROUP D (4) SOCIAL WELFARE INSPECTOR (1) SOCIAL WELFARE INSPECTOR (6) SOCIAL W ELFARE VEHICLE 1 INSPECTOR (6) DRIVER1 VEHICLE 1 DRIVER 1

COMPUTER OPERATOR 1; STENO 1

VEHICLE 4, DRIVER 4 MONITORING DBMS NGO NORTH NGO SOUTH CONSULTANTS SPECIALIST GROUP D (2) 72

Protection of RoW 165. Section 5 of the KHA mentions that the Highway Authority will exercise power and discharge duties in accordance with provisions of the KHA for restriction of ribbon development along the highways and for prevention and removal of encroachments. The Highway Authority under Section 7 has power to fix boundary of building and control lines of highways. Section 21 mentions prevention of unauthorized occupation of highway. Thus the onus of protecting the COI/RoW lies with the Project Authority. Once the COI/Row has been identified and frozen, the COI/RoW has to be clearly marked with boundary stones. Any new encroachment into the area will be monitored the Division PWD, this has to be done through bi-monthly site inspection by the Divisional Engineer in charge. Those Non-titleholders already identified by the project will be provided by Identity Cards issued by the PIU. The bi-monthly site inspection will help to prevent further encroachments.

Valuation of other structures/assets 166. The valuation of structures and other assets, which have not been covered by the LAPs will be carried out by Government approved valuators appointed by the PIU. Valuation will be done on the basis of current PWD Schedule of Rates, without depreciation at replacement cost. Based on the valuation another 30% will be given. However, this will be approved and verified by the concerned Executive Engineer. It will be forwarded to the PD for approval. Trees will be valued by the Horticulture/Forest Department.

Roles and responsibilities of officials for RP implementation 167. The Administrative roles and responsibilities and financial powers - existing and to be delegated of the SDRC officials are given below. Delegations of financial powers have to done through a Government Order. Table 12-1: Administrative and Financial Responsibilities of officials and Agencies for RP Implementation Personnel/ Administrative Roles and Financial Powers Agency Responsibilities PIU Chief Project • In charge of the overall project • Will be authorized Officer activities. to make any • To decide on all policy matters additional changes regarding LA and R & R. without having to • Participate as a member secretary refer to the in the State level Committees to Steering facilitate land acquisition, pre- committee, construction activities, and provided the implementation of R & R activities. amount is within the budget • Authorized to take decision in financial matters within the provided budget.

73

Personnel/ Administrative Roles and Financial Powers Agency Responsibilities Project Director • Overall in charge of day to day • To approve awards activities of LA and R & R. above Rs.50 lakhs • Participate in State and District level to Rs. One Crore. meetings to facilitate LA and R & R • To approve of R & activities. R assistance above • Responsible for contracting NGOs One Lakh. and Monitoring consultants. • Periodic appraisal of progress and reporting to the Asian Development Bank and the Government on monthly basis. SDRC Chief • Responsible for all R & R activities. • To approve Administrative • Coordinate the implementation of R payments for R & R Officer & R activities with PIU, field staff, assistance upto Rs. engineering and revenue officials. One Lakh per • Approve of micro plans prepared by individual. the NGOs for implementing RP. • Monitor the progress of R & R activities and LA carried out by the NGO and Monitoring Consultants. • Hold periodic meetings on R & R implementation and report to the PD and CPO. • Provide advisory support to PIU for monitoring of RP implementation. Assistant • Assist CAO in the implementation of • No financial Director Social R & R activities. powers Welfare • Coordinate training for PIU and NGOs for capacity building to implement R & R. • Facilitate development of resettlement sites and agriculture land. • Participate in the allotment of residential and commercial plots to the DPs. • Liaison with district administration and line departments for dovetailing government schemes for income generating activities to DPs. • Participate in the meetings of Grievance Redressal Committee. Manager R & R • Coordinate implementation of R & R • No financial activities with PIU and field staff. powers • Facilitate the appointment of external agency for monitoring activities to be taken up by the implementing NGO. • Assist CAO to perform R & R activities.

• Review the work in finalization of

resettlement site development.

• Prepare monthly progress report for the SDRC and Land Acquisition. • Monitor the R & R report and submit to CAO and PD.

74

Personnel/ Administrative Roles and Financial Powers Agency Responsibilities LAND Special DC • Coordinate Land acquisition • To approve awards ACQUISITIO Land process with Tahsildar at field. upto Rs.50 lakhs, N Acquisition • Prepare guidelines and procedures to be adopted for land acquisition. • Interact with District officials and other stakeholders to speed up the land acquisition process. • Monitor land acquisition and report progress to CPO and PD. Assistant • Assist CAO and Sp. DC LA to • No financial powers Commissioner- perform R & R and Land Acquisition LAO activities. • Make budgetary provisions Tahsildar • Overall responsible for land • No financial powers acquisition as land acquisition officer. • Coordinate the preparation of Land Plan Schedules with Consultants and monitor the same. • Facilitate the preparation and submission of Section 15 notification under KHA for land acquisition. • Prepare progress report on physical and financial monitoring of LA and submit to DC LA. FIELD UNIT Executive • Participate in District level meetings. • No financial powers Engineer • Oversee the process of implementation of RP in the field. • Ensure the preconstruction work is done before handing over site to contractor. • Oversee the process of land acquisition, shifting of CPRs and other assets in the field. • Scrutinize and certify the structures valuation report submitted by the valuators. • Coordinate selection of resettlement site. • Conduct periodic review with staff • Submit monthly progress reports to PD on R & R activities. Assistant • Responsible for pre construction • No financial powers Executive work in his jurisdiction. Engineer • Finalization and demarcation of COI. • Coordinate with NGO/Monitoring consultants and SDO to carry out R & R activities.

• Coordinate with valuers for preparations of estimates. • Support SDO/NGO for selection of resettlement site. 75

Personnel/ Administrative Roles and Financial Powers Agency Responsibilities Social • Overall responsible for R & R No financial powers Development activities in the field Officer • Liaison with District administration and line departments for dovetailing government schemes. • Make budget provision for R & R activities • Participate in allotment of sites to DPs. • Coordinate with NGO/Monitoring consultants for implementation of R & R. • Facilitate opening of Joint Accounts for DPs for transfer of R & R assistance through cheque. • Coordinate to disseminate the R & R policy in local language. • Facilitate public consultation on R & R Policy with NGO/ Revenue/ PWD officials. • Organize meetings with NGOs to review progress at district level and submit to R & R Manager and CAO at PIU. Social Welfare • Responsible for maintaining the R & • No financial Inspectors R work at division wise. powers • Assist NGO for selection of resettlement site. • Assist Monitoring Consultants /NGO to conduct training for DP on IGA • Coordinate with SDO/EE at field level for disbursement of R & R assistance. • Ensure all eligible DPs are awarded compensation. • Attend monthly meeting at district level and submit monthly progress report to R & R Manager and ADSW. DATABASE Data • Responsible for maintaining the • No financial Management database of the DPs. powers Specialist • Responsible for maintaining the database of overall physical and financial progress. • Coordination of the database for SDRC. • The implementation of R & R activities by NGOs to be maintained. • Provide necessary formats for collection of field information. • Coordinate with SDRC to prepare and maintain the progress report. • Maintain the records of grievance redressal committee.

76

Personnel/ Administrative Roles and Financial Powers Agency Responsibilities • Coordinate the inputs of data from North and South Divisions. • Identify discrepancies in disbursement. EXTERNAL NGO (2) • Responsible for providing PIU • No financial AGENCIES support for implementation of RP. powers • Verification of DPs. • Distribution of ID cards. • Preparation of micro plans. • Dissemination of information. • Assist to DPs to avail R & R assistance and compensation. • Identify site for relocation for CPRs. • Identify resettlement /vendor market sites. • Identify training needs and provide the same. • Facilitate in opening joint accounts. • Enable DPs to identify alternate sites for house/shop • Assist DPs to relocate. • Provide monthly progress reports on implementation Monitoring • Conduct monitoring of RP • No financial Consultants implementation activities. powers • Conduct internal, external and concurrent monitoring. • Provide early alert to PIU to redress any potential problems. • Monitor target achievements and slippages. • Certification of readiness from LA and R & R view at the time of issuing bid documents and award of contract. Grievance • Support DPs in resolving issues • No financial Redressal related to R & R and LA. powers Committee. • Record grievance and resolve them within stipulated time. • Inform PIU about any serious cases. • Report to the aggrieved parties about the decisions of the PIU. Negotiation • Negotiate the consent price of land. • No financial Committee. powers

Competent Authority for various Approval 168. The table below identifies the competent Authority for various approvals during implementation: Table 12-2: Competent Authority for Approvals Approvals Required Competent Authority Approval for LA awards Special DC LA and PD, PIU; Notification by Government 77

Approvals Required Competent Authority Approval for Roles and Responsibilities for SDRC Steering Committee officials and staff R & R Policy/ Entitlements and amendments to Government Policy RP and Budget Steering Committee Changes in R & R Policy/RP implementation and Government entitlements Consultants/NGOs output CAO Fixing compensation rate Price Negotiation Committee – District level Approval for issue of ID cards CAO PIU jointly by Engineers/ Revenue /NGO. Approval of disbursement of Assistance CAO; PD Approval for structure valuation with land Preparation By Divisional EE/ valuators and approval by PD and Special DC LA Approval for structure valuation without land Preparation By Divisional EE/ valuators and approval PD Approval for shifting and relocation of community Estimate preparation by Divisional EE and assets approval by PD Approval for requirement of Resettlement site , CAO, PD vendor market for AFs Approval for any grievance related to R & R Grievance Redressal Committee

Implementation support by NGOs 169. The work of the NGO will include consultations and counseling of DPs, encouraging DPs for productive utilization of compensation and rehabilitation grants, facilitating DP access to income generating assets, increasing the social acceptability, ensuring effectiveness of training programs organized for DPs electing participation in self employment schemes etc., The SDRC has to ensure that the NGO has sufficient experience in implementation of resettlement project, especially in Karnataka and it has to have adequate manpower. Two NGOs will be hired, one for North Karnataka and one for South Karnataka. 170. The NGO will work as a link between the PIU - SDR Cell and the affected community. They will educate the DPs on the need to implement the Project, on aspects relating to LA and R & R measures and ensures proper utilization of various compensations extended to the DPs under the R & R entitlement package. The tasks of the NGO will be to facilitate the resettlement process. Its broad objectives will be: 1. Identification, verification and updating of DP Census, Includes verification of properties of DPs and estimation of their type and level of losses for the preparation micro plans and ID Cards; 2. Develop micro plans in consultation with the DPs and PIU staff; 3. Educate DPs on their rights, entitlements, and obligations under the RP; Assist the DPs to identify suitable alternate land for resettlement purposes; 4. Preparation and Distribution of Entitlement cum Identity Card. All eligible project displaced households will be issued Identity Cards, giving details of the type of losses and type of entitlements. 5. Ensure that DPs receive their full entitlements; Where options are available, the NGO will provide advice to DPs on benefits of each option; Assist the DPs in getting benefits from various government development programs;

78

6. Rehabilitation of Affected Households and restoration of Income and Livelihood. The NGO will help the communities derive maximum benefits out of the project without loosing their livelihoods and the least impact on socio-cultural aspects of their lives; 7. Assist DPs on grievance redressal through the established system; and 8. Will relocate DPs. Assist PIU in making arrangements for the smooth relocation of the DPs; No Physical relocation from agriculture land, residential units, commercial establishments or other immovable properties will begin before alternate arrangements are made; and 9. Any other responsibility that may be assigned by the PIU for the welfare of the affected communities. 171. In order to carry out the above tasks, NGO staff will be stationed in the site offices. Besides contacting the DPs on an individual basis to regularly update the baseline information, group meetings and village-level meetings will be conducted by the support agency on a regular basis. The frequencies of such meetings will depend on the requirements of the DPs but should occur at least once a month. The support agency will have to encourage participation of individual DPs in such meeting by discussing their problems regarding LA, R & R and other aspects relating to their socio- economic lives. Such participation will make it easier to find a solution acceptable to all involved. The ToR for the NGO is given in Annex 7.

Database Management 172. A census database has been created by the consultants. This database will be transferred to the SDRC, for upgrading and further use. The main purpose of the database and use will be to: (i) track progress of R & R implementation (ii) for determining the entitlements to be paid; (iii) track pending entitlements and amounts; (iv) organizing outputs for periodical reports and other project requirements; and (v) establishing input formats. The database consultants will be responsible for: (i) modifying the input/output formats to the project requirements; (ii) training of SDRC staffs and other field level staffs; (iii) aid the NGO in finalizing the entitlements of each DPs and DHs; (iv) provide for decision making at the PIU; (v) monitor and regulate the land acquisition, distribution of compensation and assistance, grievance redressal and financial progress. In which the SDRC will hire database management consultants for the management, monitoring and updating of the data. The database consultants will need to depute data entry operators in the offices of the Assistant Commissioner. The data in the HQ will be updated based on the information sent by the division office. The database will be developed to suit the requirements of implementation and monitoring payments. The database information will be made web enabled (based on consultation with SDRC). 79

13. IMPLEMENTATION SCHEDULE

Coordination with civil works and certification 173. The resettlement program will be co-coordinated with the timing of civil works. The required coordination has contractual implications, and will be considered in procurement and bidding schedules, award of contracts, and release of cleared COI sections to project contractors. The project will provide adequate notification, counseling and assistance to affected people so that they are able to move or give up their assets without undue hardship before commencement of civil works and after receiving the compensation. The implementation schedule provides the key benchmarks of implementing the RP. All other activities related to implementation and land acquisition will be undertaken simultaneously. 174. Actions to be completed before prior to bid and award of contract include: (i) Resettlement Plan should have been approved by the GoK and Bank for respective roads; (ii) the RP should have been disclosed in the web site and other public places accessible to the local people; (iii) the first notification for private land acquisition should have been issued; and (iv) the issue of identity cards to eligible project affected households should have been completed. The actions to be completed prior to handing over of the first milestone stretches to the contractor includes: (i) The private land acquisition should have been completed and compensation offered to the land owners for Section 1; (ii) The Government land should have been transferred or no objection should have been obtained from the land owning agency for Section I; (iii) The community assets should have been replaced in Section 1; and (iv) the remaining land acquisition, R & R assistance and relocation of community assets for second milestone should be completed within 6 months of award of contract and prior to handing of the site to the contractor. 175. It is the responsibility of the PIU to ensure that the RP is successfully implemented in a timely manner. The implementation schedule needs to be updated periodically and monitored judiciously. The completion of R & R activities will be certified by the MandE consultants. Resettlement and Rehabilitation is complete only when the following criteria are met: a. All legal compensation both for land and structure must be paid; b. 100% must have received compensation; c. All eligible DPs must have alternative house and economic rehabilitation must be complete; d. At least 80% of all eligible DPs must have started their new economic activity; e. All project affected common property resources must be replaced and re-established. f. Implementation of the remedial measures arising out of impact evaluations must be complete.

Implementation Schedule and Timing of Resettlement 176. During project implementation, the resettlement program will be co-coordinated with the timing of civil works. The required coordination has contractual implications, and will be considered in procurement and bidding schedules, award of contracts, and release of cleared COI sections to project contractors. The project will provide adequate notification, counseling and assistance to affected people so that they are able to move or give up their assets without undue hardship before commencement of civil works and after receiving the compensation. This provides the key benchmarks of implementing the RP. All other activities related to implementation and land

80 acquisition will be undertaken simultaneously. After signing of contract the contractor will start his works in Section I, followed by Section II. 177. The proposed consideration of time to be taken for Land Acquisition under the KHA, after the issue of Section 15 notification, is 6 months. 178. The time taken for the implementation for the RP will be two years. Resettlement planning and updating of studies will be a continuous process throughout the project. The PIU will coordinate these efforts to assure that RP implementation and phasing is appropriately sequenced with designs and civil works. 179. The resettlement process must be completed before the start of civil works. PIU has clear the COI and resettle DPs located within the COI, before the civil work starts on any section of the project road. DPs will be given at least three months notice to vacate their property before civil works starts. The civil works schedule needs to be dovetailed into the land acquisition and resettlement implementation schedule. The LA and R & R implementation schedule is given below: Table 13-1: R & R Implementation Schedule

Activity Progress (Year/Quarter) 2009 2010 2011 Q4 Q1 | Q2 | Q3 | Q4 Q1 | Q2 | Q3 | Q4 Project Preparation Stage Screen project impact ------Public Consultation on alignment ------Prepare Land Acquisition Plan ------Carry out Census Survey ------Prepare Resettlement Plan (RP) ------RP Implementation Stage Hiring of NGOs for RP Implementation ------Obtaining approval of RP from ADB ------Disclosure of RP ------Public consultation ------Preparation LAP ------Declaration of cut-off date (KHA Notification) ------Payment of compensation ------Taking possession of acquired land ------Handing over the acquired land to contractor ------Rehabilitation of DPs ------Monitoring and Reporting Period Internal monitoring and reporting ------External monitoring and reporting ------

Capacity Building and Training 180. The capacity building and training of the PIU/SDRC is important for successful and timely implementation of RP. To enhance capabilities, the SDRC staff will be given in house training periodically (once in six months at least). All SDRC officers and staff have to attend training programmes. Training will cover techniques in conducting participatory rural appraisal for micro- planning, conducting census socioeconomic surveys, dissemination of information, community consultation and progress monitoring and evaluation. In-house training will be carried out by professional identified by the PIU. Local institutes such as the Indian Institute of Management, Institute for Social and Economic Change and private consultants can be identified for training. 81

Table 13-2: In house Training programme Staff Training Module PIU CAO; DC LA; ADSW; R & R Policy, National State, Asian Development Banks; R & R Manager; SDO; Socio Economic and Census Survey; Checklist for R & SWI R; Implementation Schedule; Training Needs Assessment; Monitoring indicators; Dissemination of information; Preparation of RP, LAP, Disbursement method, disclosure of documents; Best practices of other R & R projects. FIELD EE; AEE; Revenue Measurement of structures; Valuation procedures; Resettlement site selection; Minimizing resettlement; preparation of LAPs, Disbursement method.; Shifting of CPRs. EXTERNAL NGOs; Monitoring Government schemes; Disbursement methods; public Consultants consultation; income generating activities.

82

14. MONITORING AND REPORTING

Monitoring 181. Monitoring involves periodic checking to ascertain whether activities are going according to the plan. It provides the feedback necessary for project management to keep the programmes on schedule. Monitoring provides both working system for project managers and a channel for the resettles to make known their needs and their reactions to resettlement execution. Monitoring exercise will be undertaken both internally and externally. 182. While SDRC/PIU on monthly basis will carry out the project’s internal monitoring and external agency will be appointed for third party monitoring. Indicators, which will be monitored during the project, may be divided into two categories. • Process and output indicators or internal monitoring • Outcome/impact indicators or external monitoring 183. Monitoring is essentially an exercise in strategic learning that can and should be used for enhancing the quality of RP implementation. There are two types of monitoring being undertaken namely (a) Internal, which is normally carried out by the project authority itself and (b) external or independent monitoring by an external agency.

Internal monitoring 184. The internal monitoring is a conventional monitoring of government related to physical factors such as, number of households affected, resettled, assistance extended infrastructure facilities provided, etc. and other financial aspects, such as compensation paid, grant extended, etc. the internal monitoring must be simultaneous with the implementation of the Rehabilitation Plan (RP). 185. The objectives of the internal monitoring are: (i) Daily Operations Planning; (ii) Management and Implementation and (iii) Operational Trouble shooting and Feedback. The periodicity of internal monitoring could be daily or weekly depending on the issues and level.

External monitoring 186. An external monitoring agency will be appointed to monitor R & R programmes on semi- annual basis. It should also bring the difficulties faced by the DPs to the notice of PIU so as to help in formulating corrective measures. As a feedback to the PIU and other concerned, the external agency should submit semi-annual report on progress made relating to different aspect of R & R. The reports will be disclosed on ADBs website The agency will also certify the completion of LA and R & R activities for issuing bid documents and award from LA and R & R point of view. 187. The objectives of the external monitoring are: • To track resettled and host population over time in order to document the restoration of incomes and standard of living; • Determine remedial action if required; • If income and standard of living of the DPs has at least been restored and has not declined; • In case of host population, whether income and standard of living of host population have not declined due to influence of resettlers; • Whether resettlers and host population has re-integrated with each other. 83

Table 14-1: Monitoring Indicators for Physical Progress % Revised against Implementati Implem Progres Cumulati Sl. Monitoring Indicators for Revised on Target entatio s This ve No. Physical Progress Impleme (Nos) n Month Progress ntation Target Target 1 Land Acquired- private 10.52 Land transferred – 2 0.00 Government Compensation for loss of 3 Commercial structure to title 2 holder. Shifting assistance to Title 4 2 holder for commercial Subsistence allowance for 5 commercial structures for 2 titleholder. Alternative shop/or IGA for 6 commercial structure 2 (owner) Commercial tenants to be 8 3 paid rental allowance Shifting assistance for 9 4 tenants Income generating Assets 10 3 for Commercial tenants. Commercial Structure for 11 74 squatters Shifting allowance for 12 74 commercial squatters Commercial squatter for 13 74 shop or IGA Subsistence allowance for 14 74 commercial squatters 15 Vulnerable groups 314 16 Cattle Shed 3 Table 14-2: Financial Indicators for Progress Progress Sl. Monitoring Indicators for Implementation Total Cost Unit Cost This No. Physical Progress Target (in Rs.) Month Rs. 2470000.00 1 Land Acquired- private 10.52 per ha. Land transferred – 2 0.00 Government Allowance for those losing 3 387 20000.00 land 4 Commercial site (owner) 2 50000 Pucca housing (Area in Sq 5 7447.93 800 ft.) 6 Semi Pucca (Area in Sq ft.) 6350.76 600 7 Kutcha (Area in Sq ft.) 4262.54 350 8 Commercial site (squatter) 74 30000 EWS House 9 0 40000 construction(Non Titleholder)

84

Progress Sl. Monitoring Indicators for Implementation Total Cost Unit Cost This No. Physical Progress Target (in Rs.) Month 10 House construction (owners) 9 40000 Shifting Allowance(Non 11 74 10000 titleholders) Subsistence Allowance (Non 12 74 11000 titleholders) Subsistence Allowance 13 11 30000 (Owners) Shifting 14 11 10000 Allowance(Titleholders) Economic generating 15 5 75000 asset(owner/tenant) Economic generating asset 16 74 30000 (squatter) Rental Value for Commercial 17 3 9000 tenant Rental Value for Residential 18 1 6000 tenant. Training for DP(commercial 19 2 15000 owner tenant, employee) 20 Vulnerable groups 314 25000 21 Group Entitlement (km) 72.10 15000 Table 14-3: Monitoring Of GRC Sl. 1st 2nd 3rd 4th Particulars No. Quarter Quarter Quarter Quarter 1 No. of cases referred to GRC 2 No. of cases settled by GRC 3 No. of cases pending with GRC 4 Average time taken for settlement of cases 5 No. of GRC meetings 6 Number of DPs moved to court 7 No. of pending cases with the court 8 No. of cases settled by the court 9 No. of GRC meetings

85

Annex 1: Typical Road Cross Section

86 87

88

Annex 2: Details of Community Assest

Community Asset Details of link 27A (Shelavadi-Gadag)

Total Affected Sl. Typeof Other Owner Chainage Side Village Structure Structure No. Asset Asset Type (Sq.m) (Sq.m) 1 0.317 RHS Shelavadi Temple Community 36.00 4.00 2 0.540 LHS Shelavadi Temple Community 40.00 10.00 0.630 RHS Compound 560.00 40.00 3 Shelavadi Others Panchayat Wall 1.300 LHS Hand 6.00 2.25 4 Shelavadi Panchayat Pump 5 3.450 RHS Shelavadi Temple Community 27.00 9.00 6.160 LHS Tuppada 30.00 9.00 6 Temple Community Kurahatti 6.180 LHS Tuppada Bus 35.00 28.00 7 Panchayat Kurahatti Stand 6.260 LHS Tuppada 56.00 52.00 8 Temple Community Kurahatti 6.370 LHS Tuppada Hand 12.00 1.50 9 Panchayat Kurahatti Pump 6.480 LHS Tuppada Bus 36.00 32.00 10 Panchayat Kurahatti Stand 6.560 RHS Tuppada Hand 13.50 2.25 11 Panchayat Kurahatti Pump 6.955 RHS Tuppada Hand 14.25 2.25 12 Panchayat Kurahatti Pump 7.300 RHS Tuppada Hand 12.00 1.50 13 Panchayat Kurahatti Pump 8.710 LHS Hand 13.50 2.25 14 Venkatapura Panchayat Pump 8.713 LHS Mini 12.75 2.25 Water 15 Venkatapura Panchayat Supply Tank 16 8.760 RHS Venkatapura Others Bore Hole Panchayat 15.00 2.25 17 8.840 RHS Venkatapura Others Bore Hole Panchayat 15.00 2.25 18 9.540 RHS Venkatapura Temple Community 27.00 3.00 19 9.560 LHS Venkatapura Temple Community 30.00 14.00 9.622 RHS Bus 33.00 6.00 20 Venkatapura Panchayat Stand 10.200 RHS Hand 10.50 2.25 21 Venkatapura Panchayat Pump 22 12.380 LHS Hombal Temple Community 20.00 17.50 13.140 LHS Compound 1650.00 75.00 23 Hombal Others Community Wall 24 13.280 RHS Hombal Aralikatte Community 16.00 16.00 13.67 RHS Grama 48.00 8.00 25 Hombal Others Panchayat Panchyath 13.700 RHS Compound 90.00 7.50 26 Hombal Others Community Wall 27 13.910 RHS Hombal Well Panchayat 24.00 6.00 28 14.160 LHS Hombal Temple Community 296.00 185.00 14.830 LHS Compound 575.00 25.00 29 Hombal Others Community Wall 17.770 RHS Pump 13.50 2.25 30 Hombal Others House & Panchayat Bore Hole

89

18.140 RHS Pump 9.00 2.25 31 Tagada Others House & Panchayat Bore Hole 18.440 RHS Pump 7.50 2.25 32 Tagada Others House & Panchayat Bore Hole 18.920 RHS Hand 12.00 2.25 33 Tagada Panchayat Pump 20.230 RHS Hand 10.50 2.25 34 Tagada Panchayat Pump 20.340 RHS Bus 30.00 20.00 35 Gadag Panchayat Stand 20.950 RHS Hand 12.00 2.25 36 Gadag Panchayat Pump 37 RHS Tuppadakurahatti Others Graveyard Government 0.00 0.00

Community Asset Details of link 27B (Gadag-Mundaragi)

Total Affected Sl. Typeof Other Owner Chainage Side Village Structure Structure No. Asset Asset Type (Sq.m) (Sq.m) 1 0.160 LHS Adavi Somapura Temple Community 24.00 9.00 7.980 RHS Bus 44.00 16.00 2 Kadampur Panchayat Stand 10.960 LHS Bus 46.50 7.50 3 Kadampur Panchayat Stand 13.815 LHS Water 50.00 5.00 4 Others Panchayat Tank 13.820 LHS Compound 150.00 7.50 5 Dambal Others Panchayat Wall 6 23.750 RHS Mevundi Temple Community 40.00 10.00 23.760 LHS Water 121.00 4.00 7 Mevundi Others Panchayat Tank 23.990 RHS Bus 80.00 40.00 8 Mevundi Panchayat Stand 28.690 RHS Bus 28.00 16.00 9 Bardur Panchayat Stand 10 29.118 RHS Bardur Temple Community 32.00 12.00 11 31.900 LHS Mundaragi Others Arch Panchayat 72.00 27.00 12 32.230 RHS Mundaragi Others Bore Hole Panchayat 18.00 2.25

90

Annex 3: Census and Community Asset Survey Schedules

Census Survey Schedules

PART 1

ASSET INFORMATION

Q.No. ______

Name of the Investigator: ______Date: ______

1.0 GENERAL IDENTIFICATION

1.1 Corridor Name 1.2 Corridor No

1.3 Link Name

1.4 Link No

1.5 Chainage

1.6 Side (LHS/RHS)

1.7 i) District

ii) Taluk

iii) Village/Town

1.8 Name of the owner

1.9 Name of the Respondent

1.10 Type of likely loss

1. Residential 2. Commercial 3. Residential cum Commercial

4. Office 5. Cattle Shed 6. Agricultural land 7. Farm House 8. Boundary Walls 9. Water bodies 10. Institutions 11. Livelihood / Income 12. Others (sp.)

Location: 1.Rural 2.Semi Urban 3.Town 4.City 5. Industrial

91

2.0 STRUCTURE IDENTIFICATION

2.1 Sl.No. of the Structure : ______

2.2 Address of the Structure : ______

2.3 Status of Occupier (Tick in the appropriate box)

Owner Legal Non-title holders Vacant Tenant Squatte Encroacher r

2.4 Ownership (Tick under appropriate type and enter the no. of households under the same)

Governmen Communit Private Trust t y

Type of ownership

2.5 Do you have legal document of

Structure 1. Yes 2. No RTC No. Sub No.

Agricultural land 1. Yes 2. No RTC No. Sub No.

(to be asked only to the owner) (If yes, ask for the legal document and check it with the Village Accountant)

3.0 PROOF OF RESIDENCE

3.1 Do you own a ration card? 1. Yes 2. No

Green Red Yellow (Please verify the category of card: APL/BPL/ Others ______) 3.2 If yes, Card No. ______

3.3 If Yes, since how long (only year) ______

92

4.0 TYPE OF CONSTRUCTION

4.1 MEASUREMENT OF THE STRUCTURE

(In Sq.m)

OFFSET FROM EXISTING OFFSET FROM EDGE OF ASSET UP

CENTRAL LINE TO AREA GETTING AFFECTED

LAND STRUCTURE LAND STRUCTURE Starting Metre Ending Metre Width Total Area (in sq. m)

4.2 STRUCTURE DETAILS Plinth Area Total Area being Sl.No Type of structure Length Width affected (in Sq.m)

1 Type A (With RCC roof/ Stone/Brick work in Cement Mortar and plastered with cement mortar, Class II woodwork with fixtures, Mosaic/Polished slab flooring with water supply, sanitary and electrical works. 2 Type B (With RCC roof, Stone/Brick work in Cement Mortar and plastered with cement mortar/ Class II wood work with fixtures, cement concrete flooring with water supply, sanitary and electrical works. 3 Type C with tile roof, Stone/Country Brick work in Cement Mortar and plastered with cement mortar, ordinary woodwork fixtures. Flooring …………..(specify) with water supply sanitary and electrical work. 4 Type D with AC/GI sheet roof, Stone/Country Brick work in Mud Mortar and plastered with Cement Mortar, ordinary wood work fixtures flooring……………….(specify) with water supply sanitary and electrical work. Type E with Stone/Country Brick/Mud 5 walls ordinary slab flooring with ordinary wood work doors, roofing with slab/sheets 6 Type F with stone slab/GI sheet for walls with Mud flooring, Thatched roof 7 Type G with Tatti walls with thatched 93

Plinth Area Total Area being Sl.No Type of structure Length Width affected (in Sq.m)

roof mud flooring 8 Type I Wooden Box 9 Type J only Basement 10 Type K Upto lintel level

4.3 SITE MEASUREMENT

Sl. Width Total Area Area Length No. (in Sq. m) 1 Built up area 2 Open Space 3 Total Area

4.4 BOUNDARY WALL DETAILS

Sl. Boundary/Compound wall Width Total Area No. Length (in Sq. m) 1 Barbed wire fencing 2 Stone Masonry 3 Brick/Stone Masonry 4 Mud Wall 5 Others (Specify)

4.5 GATE DETAILS

Sl. Length (in m) Height (in m) No. 15. Type of Gate 1 M.S 2 Wooden 3 Others

4.6 Diagram of the Structure (Rough diagram with dimension – Not to Scale)

4.7 No. of Floors

Ground Ground+1 Others Total Floor Area (all floors) (Sq. m)

4.8 DETAILS OF STRUCTURE IN ROW Give the following details

Sl.No. TYPE OF STRUCTURES IN ROW*

94

* 1. Pucca 2. Semi-Pucca 3. Kutcha

5.0 WATER SOURCES GETTING AFFECTED

Sources (in No.) User (use code)* Units to be acquired Dug Wells Tube Wells LI Points *[1. Domestic 2. Agriculture 3. Industrial 4. Others (to be specified)]

6.0 TREES COMING WITHIN LAND AREA TO BE ACQUIRED

Trees to be acquired Species - Type (In nos.) Fruit bearing Fodder Fuel wood

(PHOTOGRAPH TO BE ATTACHED – STRUCTURE ALONG WITH HEAD OF HOUSEHOLD/ RESPONDENT)

95

PART – II

HOUSEHOLD SCHEDULE (FOR OWNERS, SQUATTERS, ENCROACHERS)

1.0 HOUSEHOLD IDENTIFICATION

1.1 Name of the head of the HH: ______1.2 Name of the Respondent: ______

2.0 SOCIAL GROUP PARTICULARS

2.1 Religious Group

1. Hindu 2. Muslim 3. Sikh

4. Christian 5. Jain 6.Others (specify)______

2.2 Social Stratification:

1.SC 2.ST 3.Others (General)

2.3 Caste ______

3.0 Indebtedness Please indicate your borrowings during last one year

Source Reason for Amount Borrowed Borrowing (in Rs.) Bank Private Money Lender

Friends/Relatives

Others (Specify)

4.0 DETAILS OF HOUSEHOLD ASSETS OWNED Do you own any of the following?

1. Colour TV 1.Yes 2. No.

2. Refrigerator 1.Yes 2. No.

3. 2-Wheeler/4-Wheeler 1.Yes 2. No.

4. Cooking gas (LPG) 1.Yes 2. No.

5.Telephone 1.Yes 2. No.

96

5.0 DETAILS OF AGRICULTURAL EQUIPMENTS OWNED

Do you own any of the following?

1. Tractor 1.Yes 2. No.

2. Bullock carts 1.Yes 2. No.

3. Harversters 1.Yes 2. No.

4. Sprayer 1.Yes 2. No.

5. Others (Specify) 1.Yes 2. No.

6.0 DETAILS OF HOUSEHOLD MEMBER(S) WITH DISABILITY

Name of the household Sl.No. Sex Age Nature of Disability member

97

7.0 HOUSEHOLD PARTICULARS

7.1 Kindly provide the following details.

Sex Relation Total Income (Rs.) Income (Rs.) Sl. Name of the household (Male/ Marital Educatio Occupation with Head of Age No. members Femal Status n Subsidiar Subsidiar Within Outside HH Main Main e) y y COI* COI* 1 2 3 4 5 6 7 8 9 10 11 12 * Corridor of Impact (COI) (Please ensure that the respondent is above 18 yrs

98

Code for Relation with Head of Household

1. Self 2. Son 3. Brother 4. Son-in-law 5. Brother-in-law 6. Cousin 7. Daughter 8. Wife 9. Daughter-in-law 10. Sister 11. Sister-in-law 12. Mother 13. Mother-in-law 14. Grand Son 15. Grand Daughter 16. Grand Daughter-in-law 17. Grand Son-in-law 18. Niece

19. Nephew 20. Father 21. Others

Code for Marital Status

1. Married 2. Unmarried 3. Divorced 4. Separated 5. Widow 6. Widower 7. Deserted

Code for Education

1. Illiterate 2. Just literate 3. Primary (upto 4th) 4. Middle (5th, 6th, 7th) 5. Secondary (8th, 9th, 10th 6. Intermediate (12th pass) pass) 7. Graduate 8. Post Graduate 9. ITI/ Diploma

10. Engineer 11. Doctor 12. Others (specify)

Code for Occupation

1. Agriculture 2. Agriculture labour Allied agriculture activities (e.g. dairy, poultry, goatery, piggery, sheep rearing etc.) Service HH industries (specify) Commerce/Trade Professional (doctor, engineer, etc.) Skilled labor (welders, fitters, turner, plumber, electrician, mechanic, mason, etc.) Artisans (cobbler, etc.) Others (Specify)

8.0 LAND UTILISATION

8.1 Kindly give the details of landholding (applicable in case of acquisition of land) Kindly check up the ownership of land with the land records available with the respondents.

99

(Unit in Sq. m) Wet Type Dry Land Garden Land Total Land 1. Total land owned

2. Land Proposed to be acquired

3. Remaining land

8.2 AFFECTED CATEGORY (Tick the appropriate category)

1 Title Land 2 Tenancy Land 3 Encroached Land 4 Bagar Hukum

8.3 LAND UTILISATION FOR AGRICULTURAL ENCROACHERS

Total area of encroached land

Type of crop grown

8.4 MARKET VALUE

Please provide the current market value of the land likely to be affected.

8.5 CROPPING PATTERN (Only in Case of Bypasses and Realignments) Kindly give the following details Area Cultivated Income from Yield Crop Rate (in land which Season Sl.No. Irrigate (Qtls/Acr Name Dry Rs./Qtls) is likely to d e) be acquired Kharif 1

2

3 Rabi 1

2

3 Summer 1

2

3

100

16. PART-III

FOR OWNERS and SQUATTERS (Only in case of the total loss of the structure)

1.0 STRUCTURE

RESIDENTIAL

1.1 Is your house electrified 1. Yes 2. No

1.2 Do you have piped water connection? 1. Yes 2. No

1.3 If no, what is your source of drinking water?

a) Open Well b) Bore Well c) Piped Water d) Others (Specify) ______

COMMERCIAL

1.4 What type of business you are doing?

1. Tea Stall 2. Grocery 3. Garments 4. Cloth Shop 5. Medical Store 6. Auto repair 7. Auto spare parts 8. Sweet Stall 9. Eatery (Dhaba) 10. Fruits and 11. Only fruits 12. Only vegetable Vegetable 13. Snacks 14. Pan/Cigarette 15. Bicycle repair 16. Tyre repairing 17. Tailoring 18. General Merchant 19. Clinic 20. School/College 21.Motel/Hotel 22. Electrical goods 23. Barber 24. Bakery 25. Others (specify)

1.5 Do you have any assistants/employees to help in the business? 1. Yes 2. No

1.6 If yes, how many? (in nos.) ______

1.7 What is your net income/year ? Rs. ______

101

PART IV

17. FOR TENANTS

1.0 RESIDENTIAL

1.1 Name and Address of the Owner ______

1.2 Name and Address of the Tenant ______

1.3 How long are you residing in this place (in years)? ______

1.4 How much rent you pay (in Rs.)? ______

1.5 Do you have a Rental Agreement ? 1. Yes 2. No

COMMERCIAL

1.6 Name and Address of the Owner ______

1.7 Name and Address of the Tenant ______

1.8 From how long you are running business in this structure (in years)? ______

1.9 How much rent do you pay/month? Rs. ______

1.10 Do you have a Rental Agreement ? 1. Yes 2. No

1.11 Do you have any helping hand? 1. Yes 2. No

1.12 If yes, how many (in Nos.)? ______

102

1.13 What type of business you are doing? ______

1. Tea Stall 2. Grocery 3. Garments 4. Cloth Shop 5. Medical Store 6. Auto repair 7. Auto spare parts 8. Sweat Stall 9. Eatery (Dhaba) 10. Fruits and 11. Only fruits 12. Only vegetable Vegetable 13. Snacks 14. Pan/Cigarette 15. Bicycle repair 16. Tyre repairing 17. Tailoring 18. General Merchant 19. Clinic 20. School/College 21.Motel/Hotel 22. Electrical goods 23. Barber 24. Bakery 25. Others (specify)

1.14 Usage of structure? 1.Shop 2.Godown 3.Workshop 4.Office

1.15 Turnover per month? Rs. ______

103

PART – V EMPLOYEES IN COMMERCIAL ESTABLISHMENTS Employee No.1 1. Name ______

2. Address ______

3. Age (years) ______

4. Sex M F

5. Working Full time Part-time

6. Education ______

7. Income (Rs.) ______

8. Any other source (specify) ______

9. Any other income generating skill known ______

Employee No.2 1. Name ______

2. Address ______

3. Age (years) ______

4. Sex M F

5. Working Full time Part-time

6. Education ______

104

7. Income (Rs.) ______

8. Any other source (specify) ______

9. Any other income generating skill known ______

Employee No.3 1. Name ______

2. Address ______

3. Age (years) ______

4. Sex M F

5. Working Full time Part-time

6. Education ______

7. Income (Rs.) ______

8. Any other source (specify) ______

9. Any other income generating skill known ______

105

PART VI

18. EXTENT OF LOSS

(NOT TO BE ASKED BUT TO BE ASSESSED BY THE INVESTIGATOR)

1. Losing Total House 2. Losing Partial House 3. Losing Total House and part of Plot (Aangan or Courtyard) 4. Losing Total Plot and Total House 5. Losing Total Plot and Partial House 6. Losing Partial Plot 7. Losing Total Commercial Structure 8. Losing Partial Commercial Structure 9. Losing Total Commercial Structure and Partial Plot 10. Losing Total Commercial Structure and Total Plot 11. Losing Partial Commercial Structure and Total Plot 12. Losing Total House and Total Commercial Structure 13. Losing Total House, Total Commercial Structure and Total Plot 14. Losing Total House, Total Commercial Structure and Part of Plot 15. Losing Total House, Partial Commercial Structure and Part of Plot 16. Losing Partial House, Partial Commercial Structure and Part of Plot 17. Losing Total House and Partial Commercial Structure 18. Losing Total Commercial Structure and Part of House 19. Losing Total Boundary Wall 20. Losing Partial Boundary Wall 21. Losing Total Agricultural Land 22. Losing Partial Agricultural Land 23. Losing Total Cattle Shed 24. Losing Part of Cattle Shed 25. Losing Water bodies 26. Losing Total Livelihood for Commercial Tenant 27. Others (Specify)

106

In case the tenancy/ownership is under dispute (legal or otherwise) please make a short note below

Field Supervisor:______Date: ______

Endorsed by:

Revenue Officer:______Date: ______

PWD Officer: ______Date: ______

107

Community Asset Schedule

Q.No.: ______

Name of Investigator: ______Date : ______

1.0 GENERAL IDENTIFICATION

1.1 Corridor Name

1.5 Corridor No

1.6 Link Name

1.7 Link No

1.9 Chainage

1.10 Side ((LHS/RHS)

1.11 i) District

ii) Taluk

iii) Village/Town

1.12 Name of the owner

1.9 Name of the Respondent

2.0 STRUCTURE IDENTIFICATION

2.1 Sl. No. of the structure :______

2.2 Address of the structure: ______

2.3 Tick the relevant community asset affected:

Primary High school Anganavadi Samadhi College (C ) Mosque (M) school (PS) (HS) (A) (S) Temple (T) Shrine (SH) Primary Health Community Aralikatte Hospital (H) Center Hall/Club (CH) (AK) (PHC/PHU) Bus stand Grazing land Well (W) Handpump (HP) Irrigation (IP) Pond (P) (BS) (GL) Points Mini Water Others Supply tank including (MWS) cultural

108

properties (SPECIFY)

2.4 Type of Ownership Tick the relevant box

Private Government Panchayat Pvt. Trust Public Trust Community

2.5 Measurement of the structure

OFFSET FROM EXISTING OFFSET FROM EDGE OF ASSET CENTRAL LINE (in Sq.m) UP TO AREA GETTING AFFECTED (in Sq.m)

LAND STRUCTURE LAND STRUCTURE

Starting Metre Ending Metre Width Total Area (in sq. m)

2.6 What is the approximate location of the community asset?

1. In the beginning 2. Central part 3. Towards End

2.7 Diagram of the structure

2.8 Please attach a photograph of the structure with the assigning number. 109

Annex 4: Details of Land Acquisition

Land Acquisition Owner Details 27 A Area in Acre-Gunta

Sl. Affected % of Affected Village Survey No. OwnerName Total Area No. Area Area

Amathye Lingaraja S/o 1 Gadag 505/2B 0.03 11.01 0.27 Hanumanthappa Hullannavara Hanumanthappa 2 " 505/3A S/o Chandappa Kamathara Rachappa S/o 3 " 505/5 Ningappa Pinjara uruf Bagalkot Davalsab 4 " 691/2 0.02 4.00 0.50 S/o Rajesab Goolannavara Ningappa S/o 5 " 712/2 0.02 0.18 11.11 Sakrappa

715/1A+2A+3 Navalagunda Sankappa S/o 6 " 0.02 19.24 0.10 A+2B+2B/6 Nagappa

715/1A+2A+3 Halappa S/o 7 " A+2B+2B/6 Bandeppa 715/1A+2A+3 Police Patila Beeranagowda 8 " A+2B+2B/6 S/o Linganagowda 715/1A+2A+3 9 " Mariyappa S/o Pakkirappa A+2B+2B/6 Palleda Shivappa S/o 10 " 795/2B 0.03 5.16 0.58 Shankrappa Pattanashetty Parvathavva 11 " 705 28.07 0.00 W/o Eshwarappa Pattanashetty Girijavva W/o 12 " 705 Gurubasappa Palleda Kanthappa S/o 13 " 795/2A 0.04 5.16 0.78 Thotappa Hullura Shivagangavva W/o 14 " 691/1 0.02 10.00 0.20 Hanumanthagowda Bingi Gowravva (Neelavva) 15 " 690/1+2/C 0.03 15.18 0.20 W/o Pakkirappa Shivappa S/o 16 " 690/1+2/B Virupakshappa Neelagunda Prakasha S/o 17 " 688/1+2/A 0.3 14.25 2.11 Basappa Beladhadi Prema W/o 18 " 688/1+2/B Basavaraja Divatara Mallappa S/o 19 " 685/1+2/A Channabasappa Itaai Sharadha W/o 20 " 685/1+2/B 0.02 14.18 0.14 Shankrappa 21 " 685/1+2/D Divatara Sripada S/o Basappa Kamathara Pakirappa S/o 22 " 682/1B 0.02 6.20 0.32 Karabasappa Kotambri Veerabhadrappa S/o 23 " 682/2B Pakkirappa H S Gowdru Basanagowda 24 90/2 0.02 14.32 0.14 Venkatapu Chanaveeranagowda

110

ra

Gowdra Sanganagowda S/o 25 " 90/3 Veeranagowda Gowdra Shivanagowda S/o 26 " 90/4A Fakiragowda Gowdra Chandragowda S/o 27 " 90/4B Veerabhadragowda Cheppadi uruf Doddamani 28 " 91/4 0.02 2.38 0.84 Paddavva W/o Veerappa Ganigera Shankrappa S/o 29 " 87 0.31 13.30 2.33 Ningappa Ganigera Sangappa S/o 30 " 87 Ningappa Badigera Manappa S/o 31 " 86 0.03 3.10 0.97 Gurappa Parasappa Hanumappa 32 " 113A/2 0.07 1.22 5.74 Malasamudra Malasamudra Shankarappa 33 " 113A/2 S/o Basappa Shethasanadi Yamanavva W/o 34 " 2/2+3/A 0.08 20.06 0.40 Fakirappa 2/2+3/B, on Behalf of Governer of 35 " 13/1,89 Karnataka - Tahasildhar 36 " 6/1 Jadara Sangappa Shankrappa 0.02 20.24 0.10 Naregalla Mahalingappa S/o 37 " 6/2A Shiddappa Naregalla Amruthappa S/o 38 " 6/2B Havappa Naregalla Andappa S/o 39 " 6/2C Shanmukhappa Sangamada Channappa - 40 " 73/1 0.04 18.14 0.22 Gaviyappa Sangama Parvathavva W/o 41 " 73/2 Kedarappa 42 " 89 Veeraiah Madivala 0.06 25.18 0.24 43 " 89/1A Shivaiah Rachaiah Lakkundi Kallavva W/o 44 " 89/1B Veeraiah Lakkundi Shanmukhaiah S/o 45 " 89/1B Shiddaiah Munenavara Paravva W/o 46 " 89/2A/2B/1 Veerappa Halli Kurthakote Lalitha W/o 47 " 88/1+2+3A 0.11 5.07 2.17 Virupakshappa

48 " 88/1+2+3A E.E, Taluk Panchayath, Gadag

Gowdra Guravva W/o 49 " 85/1 0.05 1.16 4.31 Veerabhadragowda Gowdra Goolanagowda S/o 50 " 85/2 Basanagowda Virakthamata Veeraiah S/o 51 " 13/2 0.06 1.24 4.84 Andanaiah Channappa S/o 52 " 12/1A 0.04 10.00 0.40 Basavanthappa Naregal Kasthuravva W/o 53 " 12/1B Hutthanagowda 111

54 " 8/1 Angadi Kallappa Rachappa 0 19.08 0.00 Malasamudra Basavva W/o 55 " 8/2A Appaji Malasamudra Narasimhappa 56 " 8/2B S/o Shivarayappa Hiremata Veeresha S/o 57 " 8/2C Gurulingaiah Handigola Godavaribai - Bru. 58 Hombala 21/2 0.08 8.20 0.98 Shivaji Patila Bammanagowda Uruf 59 " 22 Ranganagowda S/o 0.19 17.15 1.11 Shanakaragowda 60 " 44/1+2+3/D/2 Karabasappa S/o Bylappa 0 3.00 0.00

Narayanapura Hasansab S/o 61 " 307/B 0.04 0.16 25.00 Husainsab Mylara Shakunthala W/o 62 " 764 0.01 0.37 2.70 Chanabasappa Sajjanara Vijaya Kumara 63 " 764/Kapla29 Mudakappa Mylara Shakunthala W/o 64 " 764/Kapla30 Chanabasappa Pawara Shanthabai W/o 65 " 764/Kapla31 Srikantha Mylara Shakunthala W/o 66 " 764/Kapla52 Chanabasappa Mylara Shakunthala W/o 67 " 764/Kapla66 Chanabasappa Mylara Shakunthala W/o 68 " 764/Kapla65 Chanabasappa Mylara Shakunthala W/o 69 " 764/Kapla67 Chanabasappa

70 " 764/Kapla68 Razaksab Imamsab

Tirakannavara Ningappa S/o 71 " 764/1 Neelappa

72 " 763/1 Mylara Yellappa S/o Lingappa 0.05 8.38 0.60

Rajura Ashoka S/o 73 " 763/3 Neelakantappa Ramaji Channabasappa S/o 74 " 761/3 0.02 9.24 0.22 Yallappa Ramaji Shankarappa S/o 75 " 761/2 Yallappa Devaravara Shankrappa 76 " 734/2 0 8.14 0.00 Hucchappa 791/1A+1B+2 Mudakavi Jagadisha S/o 77 " 0.04 11.28 0.35 /B Nagappa 791/1A+1B+2 Basappa S/o 78 " /E Dyamappa 791/1A+1B+2 79 " Soori Veerappa S/o Kallappa /D Katti Shekharappa S/o 80 " 804/2 0.15 22.26 0.67 Hanumanthappa

81 " 804/2 Renavva W/o Mylarappa

Hennura Mallavva W/o 82 " 804/2 Mutthanna

112

Katti Shekharappa S/o 83 " 804/2 Hanumanthappa Purthageri Basavannavva W/o 84 " 804/1A+1B Shivappa Mylara Renuka S/o 85 " 802/2 0.14 12.24 1.14 Shankarappa Mylara Malathesha S/o 86 " 822/3A 0.02 3.20 0.63 Ningappa Magalada Ningappa S/o 87 " 823/3A+2+3B 0.02 5.30 0.38 Kariyappa

88 " 20/1 Hoogara Mallappa Channappa 0.04 42.18 0.09

89 " 20/2 Savakka W/o Bhimappa

90 " 20/3 Gurappa S/o Ningappa 91 " 20/4 Channappa S/o Bhimappa 92 " 20/4 Gurappa S/o Ningappa 93 " 20/4 Mallappa S/o Channappa Nadaf Mohammadsab S/o 94 " 17/2A/1 0 14.10 0.00 Nabisab Dayammanavara Babusab S/o 95 " 17/2A/2 Subhasasab Dayammanavara Noor Ahmad 96 " 17/2B S/o Babusab Bachalapura Ningappa S/o 97 " 13 0 10.22 0.00 Veerappa Bachalapura Basavaraja S/o 98 " 13 Veerappa Yalamali Shanthaveerappa S/o 99 " 12/1A 0.28 5.00 5.60 Gurushanthappa Shelavadi Chanabasappa S/o 100 " 8 0.01 21.30 0.05 Adiveppa 101 " 1/2/1+2/E Giriyappa S/o Chandappa 0.02 17.16 0.12 Kulakarni Manjunatha Shankar 102 " 1/2/1+2/C 0 Rao Kulakarni Mohana S/o 103 " 1/Kapla1 0 Shankar Rao Kulakarni Madhukara S/o 104 " 1/2/1+2/D 0 Shankar Rao

105 " 765/1C Governer - Govt. of Karnataka 0.05 6.24 0.80

Kalebai Jeevansab S/o 106 " 765/1C Gaffarsab 774/1+2+3+4/ Yakshasapura Andanappa - 107 " 0.03 8.06 0.37 A Gudneppa Rajuru Shankarappa 108 " 795/1,795/2 0.05 18.18 0.28 Neelakantappa 109 " 795/3 Yallappa S/o Siddappa Kuri Mullanavara Khadarsab S/o 110 " 824/2A 0.04 6.38 0.63 Vammalasab Mullanavara Rehmansab S/o 111 " 824/2A Jeevansab Mullanavara Hasansab S/o 112 " 824/2B Husainsab Naganura Yallappa S/o 113 Shelavadi 208 0.02 28.05 0.07 Mudakappa 113

Naganura Siddlingappa S/o 114 " 208 Devappa Ganigera Kadappa S/o 115 " 205 0.02 15.20 0.13 Basappa Agasara Rudravva W/o 116 " 206/2 0.04 16.10 0.25 Mallappa

Karyadarshi Krushi Uthpanna 117 " 206/1 Marukatte Samithi, Annigeri

118 " 363/1 Vaggara Devappa Yallappa 0.22 16.22 1.36 119 " 207/2C Govt. Kere 0.06 26.15 0.23 120 " 207/2B Gramapanchyath, Shelavadi 207/1B,207/2 121 " Gramapanchyath, Shelavadi A,2B Salmani Basavannevva W/o 122 " 363/2 0 4.00 0.00 Chandragowda Hanumareddy Mallareddy S/o 123 " 362/1 0.05 8.22 0.61 Shiddappa Ibrahimpura Devareddy - 124 " 362 Giraddi Ibrahimpura Krishnaareddy - 125 " 362/2 Devareddy 126 " 376 Governer - Mysore Govt. 0.02 3.36 0.60 127 " 377B/1 Governer - Mysore Govt. 0.03 2.14 1.40 128 " 377 Governer - Mysore Govt. 129 " 364/3B Ganigera Basappa - Parappa 0.05 6.34 0.79 Tuppada Kariyannavara Basavva W/o 130 22/1 0.06 15.10 0.40 Kurahatti Bhimappa Chikkannavara Bhimappa S/o 131 " 22/2B Basappa Hosamani Shivareddy S/o 132 " 21/2 0.06 28.08 0.21 Hanumareddy Hosamani Lakshmavva W/o 133 " 21/2 Ramareddy Javalakere Shivaji S/o 134 " 21/1 Siddappa Hosamani Lingareddy S/o 135 " 21/2 Hanumareddy Negali Hanumareddy S/o 136 " 19/1+2/A+B 0.12 19.30 0.62 Basavareddy Keerasura Hanumareddy 137 " 18/1 Basavareddy - Asadara 0.12 4.22 2.84 Balavva Keeresura Govindareddy S/o 138 " 15/1 0.21 11.00 1.91 Ningareddy Keeresura Tungavva W/o 139 " 15/2 Basavareddy Keeresura Gurunathareddy 140 " 15/3 0 5.34 0.00 S/o Govindareddy Sasvi Bhimareddy S/o 141 " 33/1+2A/1 0 8.00 0.00 Basavareddy Badekhanavara Mahaboobsab 142 " 34/1 0.01 16.14 0.06 S/o Sabesab Sasvihalli Thimmareddy S/o 143 " 34/3 Fakkireddy

114

Sasvihalli Basavareddy S/o 144 " 34/2A Venkareddy Sasvihalli Govindareddy S/o 145 " 34/2B Venkareddy Sasvihalli Krishnareddy S/o 146 " 35/2C 0 2.32 0.00 Venkareddy Ganigere Gangavva W/o 147 " 42/1 0 17.00 0.00 Virupakshappa Ganigere Basappa S/o 148 " 42/2A Ningappa Ganigere Shivalingappa S/o 149 " 42/3A Kallappa Ganigere Basappa S/o 150 " 42/3B Verappa Savakka W/o 151 " 43/1 0.03 5.02 0.60 Basavanthappa Hallikeri Basavanthappa S/o 152 " 44/1 0.08 0.21 38.10 Sakrappa Hallikeri Fakkirappa S/o 153 " 45/2,44/2 0.31 20.36 1.52 Hucchappa Hallikeri Jakkappa S/o 154 " 45/B/1A+1B Konthappa 155 " 45C/1A+1B Kuribasavva W/o Shivappa 0 7.20 0.00

Patil Guranagowda S/o 156 " 3 0.03 8.08 0.37 Gurupadagowda

Hallikeri Husainavva W/o 157 " 3 Nabisab Mee Asst. Education Officer, 158 " 267/B/2 0.02 8.00 0.25 Navalagunda 159 " 267/B/1A Sarkari Turamandi - for KHA 160 " 267/B/1B Mee A J D M - Dharwad Oora Janaru Kudiyuva - 161 " 1 0.09 12.04 0.75 Sarakari Kere Patila Channappagowda - 162 " 238/4 0 13.30 0.00 Linganagowda Patila Parvathagowda - 163 " 238/2 Chandrashekharagowda Patila Shankragowda S/o 164 " 238/1 Chandrashekharagowda Satareddy Venkareddy S/o 165 " 237/2 0.02 9.18 0.22 Bhimareddy Satareddy Bhimareddy S/o 166 " 237/1B Hanumareddy Negala Krishnareddy S/o 167 " 236/1 0.06 12.12 0.50 Rangareddy Negala Rangareddy - 168 " 236/2 Basavareddy Jakkanagowdru 169 " 235/2 Yallappagowda - 0.07 9.00 0.78 Goolanagowda Jakkanagowdra Tippavva W/o 170 " 235/3 Yallappagowda Badekhanavara Mahaboobsab 171 " 235/1 S/o Sabesab Kenchanagowdra 234/1,3/1,3/4 172 " Shivanagowdra - 0.03 10.28 0.29 C,3/4A Linganagowdra 115

Kenchanagowdra 173 " 234/2 Basanagowda - Linganagowda Bharamagowdra 174 " 233 Niinganagowda S/o 0.02 12.26 0.16 Hanumanthagowda Kulakarni Vilasa S/o Madhava 175 " 229/2 0.03 7.40 0.41 Rao Sasvihalli Sharana 176 " 14/1 Basavareddy - 0.08 28.36 0.28 Ramachandrappa Sasvihalli Prakasha 177 " 14/1 Ramachandra Sasvihalli Manjunatha 178 " 14/1 Ramachandra Sasvihalli Pakkirappa S/o 179 " 14/2 Ramareddy Negali Shivareddy - 180 " 13/1 0.14 24.08 0.58 Yankareddy Negalli Shekharreddy - 181 " 13/2 Rangareddy Negali Maheshareddy - 182 " 13/2 Rangareddy Badekhanavara Rehmanbee 183 " 10/1 0 16.32 0.00 W/o Diwansab

184 " 10/2 Ganigera Kallppa - Pakkirappa

Navalagunda Veeranna - 185 " 10/3 Basavanneppa Patila Ninganagowda - 2 186 " 4 0.05 46.22 0.11 Basanagowda Jangamata Veeraiah - 187 " 4 Andanaiah Malaprabha Baladande Kaluve 188 " 266 0.02 14.26 0.14 Nirmana 189 " 266 Angadi Shanthaiah - Veeraiah 190 " 266 Angadi Basaiah - Chandraiah Angadi Chennavva W/o 191 " 266 Channabasappa Jakkanagowdra Basangowda - 192 " 240/3 0.02 9.32 0.21 Marthandagowda Patila Maheshwaragowda - 193 " 241/3,238/3 0.08 27.20 0.29 Shanmukhagowda Patila Lakshmibai W/o 194 " 241/2 Shankaragowda Patila Channanagowda - 195 " 241/3 Linganagowda Patila Parvathavva W/o 196 " 241/4 Kallanagowda Patila Shivanagowda - 197 " 241/5 Basanagowda Patila Basanagowda - 198 " 241/6 Neelakantagowda Bharamagowdra 199 " 232/1 Shekharagowda S/o 0 12.20 0.00 Linganagowda Sankadala Subhash 200 " 228/3+4 Chandragowda - 0 3.16 0.00 Basanagowda

116

Bellada Somashekharappa - 201 " 230/1 0.02 8.32 0.24 Channaveerappa

Bellada Chennaveerapa - 202 " 230/2 Veerabasappa Ajja Shiddappa

Land Acquisition Owner Details 27B Area in Acre-Gunta

Sl. Affected % of Affected Village Survey No. OwnerName Total Area No. Area Area

Adavi 1 67/1A Sangvi Movers Ltd Pune 0.01 14.36 0.07 Somapura Gunjala Sathyanarayana S/o 2 " 67/1B Veerappa 3 " 66/3A Veerappa S/o Ramappa 0.02 6.28 0.32 Madivalappa S/o 4 " 66/1 Basavannappa Chikkannavara

Hallikere Devappa S/o 5 " 64/2A/2 0.06 13.32 0.45 Mallappa Itagi Rajashekharappa S/o 6 " 64/1B Veerappa 7 " 64/2A/1 Itagi Umesha S/o Eshwarappa Meti Sanganabasappa S/o 8 " 64/2B Kudleppa Makandara Mahaboobi W/o 9 " 74/1/2 0.02 2.30 0.87 Allasab

10 " 77/1+2/B Mallappa S/o Mahadevappa 0.02 13.11 0.15 Doddamani Mohammad Issak 11 " 77/1+2/B Ali

Doddamani Mohammad 12 " 77/1+2/B Haneef

13 " 7/1+2/A Rajasab S/o Gausmudinasab 14 " 80/1+2/A Kalli Parappa S/o Pakkirappa 0.03 16.28 0.18 Soratoora Shashikala W/o 15 " 80/1+2/B Shivappa Jaina Jetamalla urus 16 Baradura 46/1 0.00 7.28 0.00 Shivarama S/o Shivaji

Gudadappa S/o Ningappa 17 " 46/4+5 Totappanavara

18 " 78/2 AEO Mundaragi 0.04 1.12 3.57 Sajjanara Shivappa S/o 19 " 78/1B1 Channappa Mulagunda Kenchappa S/o 20 " 78/1B2 Koteppa

Sajjanara Malleshappa S/o 21 " 257/4 0.05 10.00 0.50 Tippanna 117

22 " 257/1 Mahesha S/o Somappa Sajjanara Basappa S/o 23 " 257/6 Tippanna Laddi Karabasappa S/o 24 " 258/2+3 0.00 6.00 0.00 Ramappa Ramenahalli Annadanesha S/o 25 " 42/1 0.00 21.00 0.00 Devendrappa

Ramenahalli Duragappa S/o 26 " 42/2 Parasappa

Ramenahalli Devendrappa S/o 27 " 42/3 Parashuramappa

Ramenahalli Mariyappa S/o 28 " 42/4 Devendrappa

Shirur Srikantha S/o 29 " 105 0.02 19.00 0.11 Andanappa

Gadag Aravinda S/o 30 " 97/1A 1.06 4.00 26.50 Devendrappa

31 " 110 Eshwarappa S/o Shivappa 0.00 2.28 0.00

Tamboti Modinsab S/o 32 Dambala 437/2 0.00 6.24 0.00 Mohammad Alisab

Kotambri Suresha S/o 33 " 437/4 Channappa

Ugalata Drakshayanavva W/o 34 " 462/1 0.00 10.00 0.00 Basavanneppa

Akki Muktumsab S/o 35 " 462/2 Mehaboobsab

Gowdra Mallappa S/o 36 " 439/2 0.00 15.24 0.00 Hanumappa

37 " 439/5 Shah Archana W/o Suresh

Ramanakoppa Kumar 38 " 439/3 S/o Channabasappa

439/4, Patil Balavantha S/o 39 " 439/1B Venkatesh

Pyati Shivappa S/o 40 " 439/7 Channabasappa

Soratoora Vasudeva S/o 41 " 458/2 0.05 11.26 0.44 Hanamanthappa

Talavara Satyappa S/o 42 " 584/2+3A/1 0.07 10.38 0.67 Mannayakappa

Talavara Rangappa S/o 43 " 584/2+3A/2 Mannayakappa

Talavara Shidlingappa S/o 44 " 584/1,584/6 Shivappa

118

Talavara Renavva W/o 45 " 584/4 Ningappa

46 " 682/3D Pyati Shiddappa S/o Totappa 0.02 4.00 0.50

460/PlanNo8 47 " Matada Mallappa Gaviyappa 0.00 0.04 0.00 4

48 " 460/Plot65 Soratura Ramappa Gurappa 0.00 0.04 0.00

Aparanji Rameshgowda 49 " 460/Plot55 0.00 0.20 0.00 Govindagowda

460/PlanNo8 Gadagi Hanumanthappa S/o 50 " 2,89,81 Bharamappa

Talavara Dharmappa S/o 51 " 455 0.07 0.40 17.50 Rangappa

454/10,11,1, Hombala Riazahmad S/o 52 " 0.06 30.08 0.20 5 Rajesab

Hombala Imamsab S/o 53 " 454/2 Rajesab

54 " 454/3 EE, Gadag

Mangoji Giriyappa S/o 55 " 454/4 Yallappa

Yaligara Virupakshappa S/o 56 " 454/6 Erappa

Varakara Chi Vidyadhara S/o 57 " 454/8 Dhananjanadasa

Mangoji Shivappa S/o 58 " 454/9 Kariyappa

Hulabanni Ashoka S/o 59 " 685/1+2C/4 0.00 1.00 0.00 Shivalingappa

Mallesabanavara Modinsab 60 " 881/1 0.16 2.18 7.34 Khadirsab

Tamboti Mohammd Gaussab 61 " 881/2A+2B/1 0.00 3.38 0.00 S/o Buransab

Tamboti Kuthubsab, Abdul 62 " 881/2A+2B/3 0.00 3.22 0.00 Gaffarsab S/o Hydersab

Srimaan Niranjana Jagadguru, 63 " 884/2 0.07 13.30 0.53 Dambala

64 " 884/1 Governer 0.07 5.32 1.32

Sankannavara Shivappa 65 Doni 436/3 0.00 4.04 0.00 Basappa

Kannari Maruthappa S/o 66 " 42/1B 0.02 5.10 0.39 Yallappa

Bannikoppa Ramappa S/o 67 " 43 0.02 0.08 25.00 Ningappa 119

Guddada Devappa S/o 68 " 44 0.02 1.06 1.89 Ningappa

Kadappagola Kallappa S/o 69 " 43A/1A 0.02 5.16 0.39 Kadappa

Alavandi Ningappa S/o 70 " 434/1B 0.00 14.14 0.00 Shivappa

Bellada Veerappa S/o 71 " 434/2B Girijavva

72 " 434/2A Sri B C Channi Reciver

Nagavi Kallanagowda S/o 73 " 445/1+2+3 0.12 5.38 2.23 Basavagowda

Channappa S/o 74 " 40/1 0.11 21.26 0.52 Shivamurthappa

Guddada Ningappa S/o 75 " 40/3A Basappa

Nayaka Parashuramappa S/o 76 " 40/3B Sakaramappa

Harthi Shekhappa S/o 77 " 40/2B+2A Ayyappa

Kadampur Golappanavara Shanthavva 78 91/5 0.00 2.00 0.00 a W/o Shivaputrappa

Ganigera Susheelavva W/o 79 " 91/6 Sharanappa

Kategara Shivappa S/o 80 " 88/2 0.07 10.08 0.69 Shirurappa

81 " 88/3 Ritti Shankrappa S/o Ramappa

82 " 23/3 Forest 0.07 72.19 0.10

Hiremata Veeraiah S/o 83 " 98/2A,98/1 0.10 25.38 0.39 Charamurthaiah

Hiremata Jagadisha S/o 84 " 98/2B Thotaiah

85 " 98/2C Hirematada Shivalingaiah

Hiremata Shanthaiah S/o 86 " 98/2D Veerabhadraiah

Shah Nirmala Kumar S/o 87 " 98/2D Champalal

Jaina Vinod Kumar S/o 88 " 98/2D Ghevarachand

Mundaragi Shiddaiah S/o 89 " 98/2D Veerabhadraiah

120

Sankannavara Shivappa 90 " 3/4A 0.10 32.10 0.31 Basappa

Sankannavara Lakshmappa 91 " 3/3B+C S/o Parappa

Sankannavara Lakshmappa 92 " 3/4B S/o Parappa

Sankannavara Basamma W/o 93 " 3/4/C Kenchappa Bharamappa

Revanasiddappa S/o 94 " 3/4/D Malleshappa Sankannavara

Annigeri Shekharappa S/o 95 " 3/2E Vadakappa

Sankannavara Rayappa S/o 96 " 3/2F Basappa

Sankannavara 97 " 3/1+2A Veerabhadrappa S/o Basappa

98 " 3/1+2B Karapudi Prabhu Shankrappa

Sankannavara Sankappa S/o 99 " 3/1+2D Malleshappa

Sankannavara Mallappa S/o 100 " 3/3A+2Ga Goolappa

Badami Kanakappa S/o 101 " 38/4+3+5/A 0.00 3.14 0.00 Mallappa

Badami Hanumappa S/o 102 " 38/4+3+5/A Mallappa

Badami Shankrappa S/o 103 " 38/4+3+5/A Mallappa

Sankannavara Bharamappa 104 " 3/1+2C 0.00 0.38 0.00 S/o Basappa

Mahalingappa Angadi S/o 105 " 29 0.02 23.12 0.09 Andanashetty

Sankannavara Lakshmappa 106 " 95/1 0.03 2.04 1.47 S/o Parappa

Nokapura Venkappa S/o 107 " 89/1+2/A 0.02 8.24 0.24 Ramanna

Mundaragi Rustumsab S/o 108 " 89/1+2/B Nabisab

109 " 82/2A Badami Vittal S/o Ningappa 0.02 22.36 0.09

Badami Shanmukhappa S/o 110 " 82/2B+3 Kanakappa

Salimata Channabasavaiah 111 " 82/1A/1 S/o Virupakshaiah 121

Salimata Lingaiah S/o 112 " 82/1A/2 Virupakshaiah

Kakkur Udachapa S/o 113 " 75/1 0.00 9.08 0.00 Basappa

114 " 75/2 DPI, Dharwad

Mallappa Gullappa 115 " 45 0.02 0.20 10.00 Sankannanavara

Yavagal Yallappa S/o 116 " 44/2B 0.02 7.22 0.28 Avvanneppa

117 " 31/1 Badami Yallappa Kanakappa 0.00 21.36 0.00

Badami Shankrappa 118 " 31/2 Kanakappa

Badami Shanmukhappa S/o 119 " 31/3 Kanakappa

120 " 38/3+2/B Erappa Basappa Doni 0.05 5.46 0.92 121 " 38/6 Salimatada Shivaputraiah

Praveena S/o Suresha 122 " 43/1 0.06 3.16 1.90 Sankannavara

Sankannavara Prakasha S/o 123 " 43/1 Suresha

Mylavva W/o Madara 124 " 42/2 0.07 11.08 0.63 Mariyappa Yamanappa

Badigera Basavanthappa S/o 125 " 42/1 Pakkirappa

126 " 42/3A Rudrappa S/o Durgappa

Sankannavara Shrishailappa 127 " 41/2 0.38 26.36 1.44 S/o Kenchappa

Sankannavara Basavanneppa 128 " 41/3 S/o Kenchappa

Lakshmana Parappa S/o 129 " 41/4 Sankannavara

Shingatarayakeri Satyappa S/o 130 " 41/1C/1 Basappa

Sankannavara Shrishailappa 131 " 41/1C/1 S/o Kenchappa

132 " 41/1B, 41/1A Ningappa Kenchappa Eragara

Ningappa S/o Erappa 133 " 41/1C/2 Shingatarayanakeri

Jummannavara Ningappa S/o 134 Mevundi 104/1A,104/2 0.02 16.17 0.12 Hanumappa

122

Kodaganuru Yallappa S/o 135 " 104/1B Hanumappa

Harogeri Devappa S/o Sanna 136 " 109/1A 0.02 5.38 0.37 Hanumappa

Bennehalli Shivappa S/o 137 " 2A/1P1 0.23 3.54 6.50 Adiveppa

Korlahalli Kotrabasappa S/o 138 " 2A/1 Kotrappa

Harogeri Giddappa uruf 139 " 2A Hanumappa S/o Hanumappa

140 " 1 Bhopath Gayarana 0.05 2.06 2.43

Patil Sureshgowda S/o 141 " 429/1A 0.00 13.04 0.00 Mahadevagowda

Police Patila Basavanagowda 142 " 429/2 S/o Kotregowda

Baligara Pakkirappa S/o 143 " 109/3B 0.02 10.08 0.20 Rachappa

Alavundi Shanthabai D/o 144 " 20/1 Datthathreya

Patila Shankaragowda S/o 145 " 20/2 Krishnagowda

Annigeri Abdul Rehmansab 146 " 22/1 0.03 1.26 2.38 S/o Abdulsab

147 " 3/4 Education Officer, Mundaragi 0.02 5.18 0.39 148 " 3/98/1 Barki Mariyappa S/o Basappa

3/10/2,9B/2,9 149 " EE, Hospet /A/2

Kalappanavara Durgappa S/o 150 " 3/10/1 Bhimappa

151 " 288/1 Assistant EE, 0.05 24.00 0.21

Harogeri Vasappa S/o 152 " 288/3A,3B Shivappa

Gadugina Basappa S/o 153 " 42/3B 0.02 4.16 0.48 Ningappa

Doni Mallikarjuna S/o 154 Papanashi 92/2 0.00 10.34 0.00 Hemareddy

Mulluru Narayana S/o 155 " 92/1A Veerappa

Bhandi Hanumappa S/o 156 " 91/2 0.00 8.38 0.00 Ramappa

Itagi Basavaraja S/o 157 " 85/1A 0.03 14.32 0.21 Sharanappa 123

Hallikeri Virupakshappa S/o 158 " 85/1B Shankrappa

Shirola Eshwaraiah S/o 159 " 85/2B Goolaiah

Hadapad Chennavva W/o 160 " 87/1A+1B/1 0.02 36.26 0.06 Chennappa

Kulakarni Prabhaiah S/o 161 " 87/1A+1B/2 Rachaiah

Eligere Eshwarappa S/o 162 " 87/2C Devappa

Eligere Mallappa S/o 163 " 87/2D Virupakshappa

Kambala Ningappa S/o Dodda 164 " 20 1.16 14.38 8.07 Neelappa

Malligavada Ramappa S/o 165 " 20 Adiveppa

Harogeri Veerappa S/o 166 " 20 Bhimappa

Kambali Shivanavva W/o 167 " 20 Mallappa

Hadapada Gurappa S/o 168 " 86/1 0.04 10.24 0.39 Anandanappa

Kattimani J Sharanabasappa 169 " 86/1 S/o Gangadharappa

Bhandi Rammappa S/o 170 " 86/2A+B/2 Hanumappa

171 " 84 PHENO Officer Water Supply 0.03 23.24 0.13

172 " 84 Kuradagi Sachin S/o Vasappa

Kulakarni Jagadishwaraiah S/o 173 " 66/1A 0.04 13.04 0.31 Shantha Veeraiah

Kulakarni Chandrashekharaiah 174 " 66/2A Eshwarappa

Kulakarni Channaveeraiah S/o 175 " 66/2B Kallaiah

Umachagi Yallappa S/o 176 " 65/5 0.04 0.02 200.00 Kallappa

Umachagi Suvarna S/o 177 " 65/2B 0.04 0.02 200.00 Manjunatha

Madegowda Chandragada S/o 178 " 65/6 0.00 3.22 0.00 Verangowda

124

179 " 65/7 Govt. Land

Sankannavara Yallavva S/o 180 " 65/2A Danappa

Kuradagi Hanmanthappa S/o 181 " 65/17 Vasappa

Patila Basanagowda - 182 " 64/1+3+2/2 0.15 3.18 4.72 Rayanagowda

Havalada Srinivasa Rao S/o 183 " 25/1 0.24 21.14 1.14 Hanumantha Rao

Shirola Mahalingaiah S/o 184 " 25/2A Basaiah

Matada Eshwaraiah S/o 185 " 25/2B Shiddaiah

125

Annex 5: Structure Details Details of Structure losers – 27A % of Str. Total Str. Affecte Str. Sl. Chai Occu. Loss Structu Gettin Side Village Name d Area Area No nage Status Type re Type g (in (in Affect Sq.m) Sq.m) ed Chandrashekha Legal Residenti 1 0.285 RHS Shelavadi Pucca 9.00 108.00 8.33 r S/o Fakirappa Tenant al Virupakshappa S/o Residenti 2 0.335 LHS Shelavadi Owner Pucca 14.88 102.00 14.58 Channabasapp al a Korahatti Basavaraj S/o Residenti 3 0.344 LHS Shelavadi Shivappa Owner Pucca 14.00 120.00 11.67 al Korahatti Basavaraj S/o Residenti 4 0.362 LHS Shelavadi Veerappa Owner Pucca 22.80 144.00 15.83 al Hosakere Shankarappa Residenti 5 0.378 LHS Shelavadi S/o Shivappa Owner Pucca 19.25 132.00 14.58 al Yaragunte Raju S/o Residenti 6 0.396 RHS Shelavadi Owner Pucca 24.00 180.00 13.33 Shekhappa al Rudrappa S/o Residenti 7 0.417 RHS Shelavadi Owner Pucca 11.60 87.00 13.33 Nagappa al Guruppa S/o Residenti 8 0.438 RHS Shelavadi Veerappa Owner Pucca 12.50 65.00 19.23 al Molagunda Andappa S/o Residenti 9 0.443 RHS Shelavadi Veerappa Owner Pucca 15.00 78.00 19.23 al Molagunda Chennappa S/o Residenti 10 0.452 RHS Shelavadi Adevappa Owner Pucca 12.00 60.00 20.00 al Lagali Channabasaiah Residenti 11 0.455 LHS Shelavadi S/o Siddaiah Owner Pucca 13.20 35.20 37.50 al Hosamata Shivagangavva W/o Late Residenti 12 0.458 RHS Shelavadi Owner Pucca 8.00 32.00 25.00 Channabasapp al a Neelavva W/o Residenti Semi 13 0.462 RHS Shelavadi Owner 10.00 45.00 22.22 Erappa al Pucca Basavannevva W/o Residenti 14 0.465 LHS Shelavadi Owner Pucca 8.25 22.00 37.50 Basalingaiah al Hiremata Veeresha S/o Residenti 15 0.474 LHS Shelavadi Dundappa Owner Pucca 15.00 204.00 7.35 al Subarad Basalingaiah S/o Budaiah Residenti 16 0.490 LHS Shelavadi Owner Pucca 16.00 272.00 5.88 Gangadhara al Mata Eranna S/o Residenti 17 0.515 RHS Shelavadi Parameshwara Owner Pucca 18.00 90.00 20.00 al ppa Kuduri

Basavaraj S/o Residenti 18 0.524 RHS Shelavadi Parameshwara Owner Pucca 18.00 90.00 20.00 al ppa Kuduri

126

Totaiah S/o Residenti Semi 19 0.540 RHS Shelavadi Guraiah Owner 4.00 28.00 14.29 al Pucca Hombalimata Somaiah S/o Residenti Semi 20 0.544 RHS Shelavadi Shivaiah Owner 4.00 48.00 8.33 al Pucca Hombalimata Cattle Devendrappa Shed,Bo Semi 21 0.660 LHS Shelavadi S/o Fakirappa Owner 80.50 105.00 76.67 undary Pucca Ronad Wall Mutthappa S/o Yallappa Residenti Semi 22 0.682 LHS Shelavadi Owner 100.00 100.00 100.00 Hucchanayakar al Pucca a Gullanagowda Tuppada S/o Residenti 23 5.935 LHS Owner Pucca 40.00 64.00 62.50 Kurahatti Basavanagowd al a Yallappa Tuppada Gowda S/o Residenti 24 5.950 LHS Owner Pucca 12.00 120.00 10.00 Kurahatti Basavanagowd al a Tuppada Ganesha S/o Commer Semi 25 5.960 RHS Squatter 8.00 12.00 66.67 Kurahatti Maharudrappa cial Pucca

Tuppada Poorvachari Residenti Semi 26 5.980 LHS Owner 5.00 30.00 16.67 Kurahatti al Pucca

Tuppada Lakshmavva Commer 27 6.090 RHS Squatter Kutcha 3.00 4.00 75.00 Kurahatti W/o Shivappa cial

Tuppada Hasansab S/o Residenti Semi 28 6.115 LHS Squatter 5.00 60.00 8.33 Kurahatti Rajasab al Pucca Nethaji S/o Tuppada Semi 29 6.140 RHS Siddaramappa Owner (O) Toilet 2.00 6.00 33.33 Kurahatti Pucca Jadav Tuppada Konthappa Commer 30 6.145 LHS Squatter Kutcha 4.00 4.00 100.00 Kurahatti Haligi cial Tuppada Balesab S/o Commer 31 6.147 LHS Squatter Kutcha 3.00 4.00 75.00 Kurahatti Peersab Nadaf cial

Tuppada Chandsab S/o Commer 32 6.152 LHS Squatter Kutcha 3.00 4.00 75.00 Kurahatti Fakrusab cial Tuppada Rajasab S/o Commer 33 6.154 LHS Squatter Kutcha 3.00 4.00 75.00 Kurahatti Allasab cial Mallappa S/o Tuppada Commer 34 6.202 LHS Yallappa Squatter Kutcha 3.00 4.00 75.00 Kurahatti cial Hadapad Narayana Tuppada Reddy S/o Commer Semi 35 6.320 RHS Owner 9.00 9.00 100.00 Kurahatti Fakira Reddy cial Pucca Sasavehalli Veerabasappa Tuppada Residenti 36 6.380 RHS S/o Siddappa Owner Pucca 25.20 56.00 45.00 Kurahatti al Bellada Giriyappa S/o Tuppada Cattle Semi 37 6.386 RHS Bhimappa Owner 22.50 30.00 75.00 Kurahatti Shed Pucca Handi Govindareddy Tuppada S/o Residenti 38 6.400 LHS Owner Pucca 27.00 144.00 18.75 Kurahatti Basavareddy al Sattareddy Tuppada Kottarappa S/o Residenti Semi 39 6.410 RHS Owner 42.00 63.00 66.67 Kurahatti Ramappa al Pucca 127

Rajasab S/o Tuppada Commer 40 6.490 LHS Hasansab Squatter Kutcha 4.00 4.00 100.00 Kurahatti cial Ibrahimpura Tuppada Residenti 41 6.500 RHS Kenchareddy Owner Pucca 24.75 77.00 32.14 Kurahatti al Mallikarjuna Tuppada Residenti 42 6.510 LHS S/o Owner Pucca 30.00 120.00 25.00 Kurahatti al Shankarappa Tuppada Lakshmana S/o Commer 43 7.385 LHS Squatter Kutcha 4.00 4.00 100.00 Kurahatti Kanakappa cial Basappa S/o Commer 44 9.600 RHS Bhimappa Squatter Kutcha 4.00 4.00 100.00 a cial Harthi Basavanagowd Venkatapur Legal Commer 45 9.615 RHS a S/o Kutcha 4.00 4.00 100.00 a Tenant cial Fakiragowda Kanakappa S/o Venkatapur Commer 46 9.620 RHS Kenchappa Squatter Kutcha 4.00 4.00 100.00 a cial Talavara Mukhajappa Venkatapur S/o Commer 47 9.630 RHS Squatter Kutcha 4.00 4.00 100.00 a Veerabhadrapp cial a Veeragallu Sharanaiah S/o Venkatapur Residenti Semi 48 9.640 RHS Rudraiah Owner 24.75 54.00 45.83 a al Pucca Hosamata Venkatapur Karibasappa Semi 49 9.840 RHS Squatter (O) Toilet 2.25 2.25 100.00 a Nirakal Pucca

13.66 Bandusab S/o Commer 50 LHS Hombal Squatter Kutcha 4.00 4.00 100.00 0 Suleman cial

13.66 Basavaraj S/o Commer 51 RHS Hombal Squatter Kutcha 4.00 4.00 100.00 5 Bhimappa cial Gurupadappa 13.67 Commer Semi 52 RHS Hombal S/o Basappa Squatter 4.50 48.00 9.38 0 cial Pucca Mallapura 13.70 Praveen S/o Commer 53 RHS Hombal Squatter Kutcha 4.00 4.00 100.00 0 Shivaputrappa cial

13.72 Nagappa S/o Legal Commer Semi 54 RHS Hombal 7.50 9.00 83.33 0 Balappa Tenant cial Pucca

13.74 Eranna S/o Commer Semi 55 LHS Hombal Owner 32.50 100.00 32.50 5 Basappa cial Pucca

13.76 Dharmanna Commer 56 LHS Hombal Squatter Kutcha 4.00 4.00 100.00 0 Hosakote cial 13.76 Commer 57 LHS Hombal Abdulsab Squatter Kutcha 4.00 4.00 100.00 2 cial 13.76 Commer 58 LHS Hombal Savajiyavaru Squatter Kutcha 4.00 4.00 100.00 5 cial Tippanna S/o 13.76 Commer 59 LHS Hombal Adevappa Squatter Kutcha 4.00 4.00 100.00 7 cial Hosahalli Yallappa S/o 13.78 Bhimappa Residenti Semi 60 RHS Hombal Owner 4.50 31.50 14.29 0 Somannanavar al Pucca u 13.78 Ramanna S/o Residenti Semi 61 RHS Hombal Owner 5.00 40.00 12.50 5 Fakirappa al Pucca

13.80 Hanumanthapp Residenti Semi 62 RHS Hombal Owner 1.50 21.00 7.14 0 a S/o Somappa al Pucca

128

Prakasha S/o 13.82 Residenti Semi 63 RHS Hombal Jambuvantha Owner 12.00 48.00 25.00 0 al Pucca Pujara 13.83 Mallamma W/o Residenti Semi 64 RHS Hombal Owner 4.00 32.00 12.50 0 Ningappa al Pucca

13.83 Rudrappa S/o Residenti Semi 65 RHS Hombal Owner 7.50 48.00 15.63 5 Basappa al Pucca

Mallappa S/o 14.02 Residenti Semi 66 LHS Hombal Channappa Owner 32.00 120.00 26.67 5 al Pucca Edagidachi Ashok S/o 14.04 Residenti 67 RHS Hombal Neelakantappa Owner Pucca 25.00 150.00 16.67 0 al Rajra Lakshmikantha 14.06 Residenti 68 LHS Hombal S/o Ganapath Owner Pucca 44.00 80.00 55.00 5 al Kabadi 14.08 Uma W/o Residenti 69 RHS Hombal Owner Pucca 36.00 120.00 30.00 0 Kenchappa al

14.12 Ramanna S/o Residenti Semi 70 LHS Hombal Owner 45.00 100.00 45.00 0 Devendrappa al Pucca

14.12 Abdulsab S/o Commer 71 RHS Hombal Squatter Kutcha 4.00 4.00 100.00 5 Dasthagirisab cial Chennabasapp 14.13 Commer 72 RHS Hombal a S/o Squatter Kutcha 4.00 4.00 100.00 0 cial Murugeppa Vali Basavaraj S/o 14.18 Residenti Semi 73 RHS Hombal Gurusiddappa Owner 54.00 108.00 50.00 0 al Pucca Dodduru

14.24 Imamsab S/o Residenti 74 LHS Hombal Owner Pucca 75.00 150.00 50.00 0 Fakirsab al

Abdulsab S/o 14.32 Commer 75 RHS Hombal Malliksab Squatter Kutcha 4.00 4.00 100.00 0 cial Ummachigi Mohana S/o 14.38 Residenti 76 LHS Hombal Parappa Dodda Owner Pucca 42.50 100.00 42.50 0 al Ganigera Fakirasab S/o 14.45 Residenti 77 LHS Hombal Rehmansab Owner Pucca 45.00 100.00 45.00 0 al Agasibagil Siddappa S/o 18.73 Residenti Semi 78 RHS Tangada Venkappa Owner 12.00 48.00 25.00 5 al Pucca Navalli

Details of Structure losers – 27B % of Str. Total Str. Sl. Affecte Str. Chain Villag Occu. Loss Structu Gettin No Side Name d Area Area age e Status Type re Type g . (in (in Affect Sq.m) Sq.m) ed Adavi Channappa S/o Commer 1 0.085 LHS Soma Squatter Kutcha 4.00 4.00 100.00 Devappa cial pura Adavi Rajasab S/o Commer 2 0.100 RHS Soma Squatter Kutcha 4.00 4.00 100.00 Abdulsab cial pura 129

Adavi Ningappa S/o Commer 3 0.165 RHS Soma Squatter Kutcha 4.00 4.00 100.00 Mallappa cial pura Adavi Husainbee W/o Commer Semi 4 0.180 RHS Soma Squatter 24.00 24.00 100.00 Husainsab cial Pucca pura Eshwaraiah S/o Papan Commer Semi 5 3.530 RHS Puttaiah Squatter 10.00 24.00 41.67 ashi cial Pucca Malavada Pandappa S/o Papan Commer 6 3.540 LHS Guddadappa Squatter Kutcha 4.00 4.00 100.00 ashi cial Shilavadagi

Kada Mahanthesha Commer 7 7.870 RHS Squatter Kutcha 4.00 4.00 100.00 mpura Kadampura cial

Kada Mahadevaiah S/o Commer 8 7.970 RHS Squatter Kutcha 6.00 12.00 50.00 mpura Prachaiah cial

Kada Nagesha S/o Commer 9 7.974 RHS Squatter Kutcha 4.00 4.00 100.00 mpura Chandrashekhar cial Kada Commer 10 7.985 RHS Subhash Itagi Squatter Kutcha 3.00 4.00 75.00 mpura cial Hanumanthappa Kada Commer 11 8.060 RHS S/o Shivappa Squatter Pucca 14.00 49.00 28.57 mpura cial Badami Kada Commer 12 8.120 LHS Tippanna Pujara Squatter Kutcha 4.00 4.00 100.00 mpura cial Damb Pushpa W/o Commer 13 13.585 RHS Squatter Kutcha 4.00 4.00 100.00 al Hemareddy cial Damb Commer 14 13.585 LHS Imambee Squatter Kutcha 4.00 4.00 100.00 al cial Damb Rathna W/o Commer 15 13.610 RHS Squatter Kutcha 4.00 4.00 100.00 al Halappa cial Damb Commer 16 13.640 LHS Manju Dambal Squatter Kutcha 4.00 4.00 100.00 al cial Damb Eraiah S/o Commer 17 13.650 LHS Squatter Kutcha 4.00 4.00 100.00 al Parameshwaraiah cial

Damb Paramma W/o Commer 18 13.680 LHS Squatter Kutcha 4.00 4.00 100.00 al Basamma cial Shamshad Damb Commer 19 13.730 LHS Begum W/o Squatter Kutcha 4.00 4.00 100.00 al cial Jahangir Basha Damb Commer 20 13.760 LHS Kadarabee Squatter Kutcha 4.00 4.00 100.00 al cial Mruthuja S/o Damb Commer 21 13.770 LHS Dasthagirisab Squatter Kutcha 4.00 4.00 100.00 al cial Dambal

Damb Totappa S/o Residenti Semi 22 15.950 RHS Squatter 15.00 42.00 35.71 al Fakirappa Ganiga al Pucca

Damb Khajasab S/o Cattle 23 16.170 RHS Squatter Kutcha 28.00 28.00 100.00 al Chandkhan Shed Halappa S/o Mevun Commer 24 23.780 LHS Mallappa Squatter Kutcha 4.00 4.00 100.00 di cial Talavara Mevun Sharabee W/o Commer 25 23.785 LHS Squatter Kutcha 4.00 4.00 100.00 di Babusab cial

Mevun Kasimsab S/o Commer 26 23.800 LHS Squatter Kutcha 12.00 12.00 100.00 di Yamanursab cial Mevun Erappa S/o Commer 27 23.810 LHS Squatter Kutcha 12.00 12.00 100.00 di Kallaiah cial

130

Mevun Jayathumbi W/o Cattle 28 23.840 RHS Owner Kutcha 16.00 16.00 100.00 di Yamanursab Shed

Mevun Hanumavva W/o Commer 29 23.880 RHS Squatter Kutcha 4.00 4.00 100.00 di Yallappa cial

Mevun Balappa S/o Commer 30 23.925 RHS Squatter Kutcha 14.00 16.00 87.50 di Hanumappa cial

Mevun Gundappa S/o Commer 31 23.980 RHS Squatter Kutcha 4.00 4.00 100.00 di Erappa cial Mevun Shivappa S/o Commer 32 23.980 LHS Squatter Kutcha 4.00 4.00 100.00 di Erappa cial Mahesha S/o Mevun Commer 33 23.984 RHS Parasappa Squatter Kutcha 16.00 16.00 100.00 di cial Hadapad Mevun Basavaraj S/o Commer 34 23.985 LHS Squatter Kutcha 4.00 4.00 100.00 di Balappa cial

Yankappa S/o Mevun Commer 35 23.986 RHS Hanumappa Squatter Kutcha 4.00 4.00 100.00 di cial Kattimani Basavaraj S/o Mevun Commer 36 23.992 LHS Gangappa Squatter Kutcha 32.00 40.00 80.00 di cial Lakkundi Mevun Neelappa S/o Commer 37 24.000 RHS Squatter Kutcha 4.00 4.00 100.00 di Ningappa cial

Mevun Ameenbee W/o Commer 38 24.010 RHS Squatter Kutcha 4.00 4.00 100.00 di Kasimsab cial

Mevun Mohammad S/o Commer 39 24.015 RHS Squatter Kutcha 4.00 4.00 100.00 di Kasimsab cial

Mevun Shabuddin S/o Commer 40 24.020 RHS Squatter Kutcha 4.00 4.00 100.00 di Fakirsab cial

Bhimanna S/o Mevun Commer 41 24.026 RHS Hanumappa Squatter Kutcha 16.00 16.00 100.00 di cial Kattimani

Mevun Kotrappa S/o Commer 42 24.040 RHS Squatter Kutcha 4.00 4.00 100.00 di Shivappa Bele cial

Maulasab S/o Commer 43 28.630 LHS Bardur Squatter Kutcha 4.00 4.00 100.00 Rehmansab cial Gavisiddappa S/o Commer 44 28.635 LHS Bardur Hucchappa Squatter Kutcha 4.00 4.00 100.00 cial Hadapad Drakshanamma W/o Late Commer 45 28.662 LHS Bardur Squatter Kutcha 4.00 4.00 100.00 Ningappa cial Lakumapura Rudraiah S/o Commer 46 28.690 LHS Bardur Squatter Kutcha 4.00 4.00 100.00 Eraiah Eligar cial Munda Commer 47 32.640 LHS Raju Mundaragi Squatter Kutcha 4.00 4.00 100.00 ragi cial Munda Kotrappa S/o Commer 48 32.675 LHS Squatter Kutcha 4.00 4.00 100.00 ragi Hucchappa cial Shivananda S/o Mevun Commer 49 32.720 RHS Ramanna Squatter Kutcha 4.00 4.00 100.00 di cial Ullagaddi Sannaveerappa Munda Commer 50 32.870 RHS S/o Squatter Kutcha 3.00 4.00 75.00 ragi cial Veerabhadrappa 131

Munda Basavaraj S/o Commer 51 32.875 RHS Squatter Kutcha 4.00 4.00 100.00 ragi Shivappa cial

Tirukappa S/o Munda Commer 52 32.881 RHS Venkappa Squatter Kutcha 3.00 4.00 75.00 ragi cial Ramenahalli Munda Ningappa Commer 53 32.890 LHS Squatter Kutcha 4.00 4.00 100.00 ragi Hallikere cial Munda Commer 54 32.892 LHS Manjanna Desai Squatter Kutcha 4.00 4.00 100.00 ragi cial

132

Annex 6 :List of Participants for Meeting – 27A

133

134

135

Annex 6 :List of Participants for Meeting – 27B

136

137

138

Consultation Meetings

Meeting at Hombal village on 04.07.2010 – Meeting at Hombal village on 04.07.2010 – Link 27A Link 27A

Meeting at Mevundi village on 04.07.2010 – Meeting at Mevundi village on 04.07.2010 – Link 27B Link 27B

139

Annex 7 TERMS OF REFERENCE FOR NGO CONSULTANCY FOR IMPLEMENTATION OF RESETTLEMENT PLAN I. BACKGROUND OF THE PROJECT 1. The aim of the project is to improve the performance of the State's road transport sector. The KSHIP Stage I roads have been selected based on the Feasibility Study of State Roads for proposed KSHIP. The PWD has carried out a Poverty and Social Assessment study for 615.03 km of roads and prepared a Resettlement Plan . Keeping in view the impact to the people due to the implementation of the project, the PIU will require to appropriately resettle and rehabilitate the DPs in accordance with the RP proposed for the purpose. For the implementation of the RP, the PIU will require to appoint local NGO which not only have the experience in carrying out such activities, but also have a better access with the people at the grassroots for effective implementation. II. TASKS 2. The NGO shall play a role of secondary stakeholder in implementation of the RP and in mitigating the adverse effects of the project. The NGO shall remain responsible for the development of a comprehensive livelihood system to facilitate the project affected persons DPs to take advantages of the options available as per the RP. The NGO shall assist PWD in ensuring social responsibilities of the KSHIP such as compliance with labor laws, prohibition of child labour, HIV/AIDS and gender issues. The main tasks of the NGO thus appointed will be: 1. Verification 3. All Verification has to be conducted jointly with local SDRC offices: 4. The NGO shall undertake joint verification of the project affected persons and shall update the database on the eligible DPs and Displaced households (DHs). The NGO shall verify the information already contained in the RP and the individual losses of the DPs and validate the same and make suitable changes if required. 5. During the identification and verification of the eligible DPs/DHs, the NGO shall ensure that each of the DPs are contacted and consulted. The NGO shall ensure consultation with the women from the DP households especially women-headed households. 6. Verification exercise shall include actual measurement of the extent of total property loss/damage, and valuation of the loss/damage/affect along with the SDO. The NGO shall display the list of eligible DPs in prominent public places like Panchayat Offices, Taluk and District Headquarters. 7. The NGO has to identify any DP, DH or community asset coming within the Right of Way after the cut-off date, and notify the same to the local SDRC office. The NGO shall through consultation remove the DP, DH or community structure from the ROW, and inform them that any project benefits do not apply to them.

140

2. Distribution of Identity Cards 8. After verification the NGO shall distribute Identity Cards to all Project affected persons. The identity card should include a photograph of the DP, the extent of loss suffered due to the project, and the choice of the DP with regard to the mode of compensation and assistance, with necessary household details. The Identity Cards are to be signed by the local Social Development office counter signed by the Assistant Director Social Welfare at PIU. 3. Consultation 9. The NGO shall educate the DPs on their rights, entitlements and obligations under the RP. It shall disseminate information to the DPs on the possible consequences of the project on the communities' livelihood systems and the options available, so that they do not remain ignorant. It shall explain to the DPs the need for land acquisition, the provisions of the policy and the entitlements under the RP. This shall include communication to the roadside squatters and encroachers about the need for their eviction, the timeframe for their removal and their entitlements as per the RP. 4. Prepare Micro Plan 10. The NGO shall prepare Micro plans indicating category of entitlement; alternate livelihood options; land identification; skills upgrading and institutions responsible for training. A separate plan has to be prepared for shifting of community assets. 5. Training and Support for income restoration 11. In addition to providing assistance given in the entitlement package, the NGO shall be responsible for training and assisting the DPs to establish linkages with government programmes. 12. The NGO shall train DPs losing their livelihood, in suitable income restoration programmes, depending on the skills and interest of the DPs. The NGO shall prepare individual Income Restoration Plan, as a part of the Micro Plan for all DPs whose livelihoods are getting affected. The NGO shall explore the potential of employment opportunities with the local contractors, and wherever possible ensure suitable employment with the contractors. This will include providing the list of people wiling to work under contractors and to facilitate these types of jobs to PDPs and local people; 13. NGO shall assist the DP to establish linkage with Financial institutions for facilitating access to credit. 14. Assist the DP to establish linkages with Government departments, district administration, etc., to ensure that the DPs are included in the development schemes, as applicable especially with reference to vulnerable groups such as pension schemes for Senior citizens, schemes for women for women-headed household households, widow pensions, schemes for physically challenged persons etc. 15. Link up DPs to Training institutes for imparting skill and management training for enterprise creation and development. For those DPs who are interested in skill upgrading or training for economic generation programmes. 141

6. Disbursement of Assistance and delivery of entitlements 16. The NGO shall ensure that DPs obtain their full entitlements under the RP; to ensure benefits due to the DPs under the R & R policy and RP are provided to the DPs. Where options are available, the NGO shall provide advice to DPs on the relative benefits of each option. 17. The NGO shall assist the project authorities in ensuring a smooth transition helping the DPs to take salvaged materials and shift with proper notices. In close consultation with the DPs, the NGO shall inform the SDRC about the shifting dates agreed with the DPs in writing and the arrangements desired by the DPs with respect to their entitlements. 18. The NGO shall assist the DPs in opening bank accounts explaining the implications, the rules and the obligations of a joint account and how the person can access the resources s/he is entitled to. 19. Ensure proper utilization by the DPs of various grants available under the R & R package. The NGO will be responsible for advising the DPs on how best to use any cash that may be provided under the RP. Emphasis should be placed on using such funds in a sustainable way e.g. purchasing replacement land for that acquired 20. The NGO shall ensure proper utilization of the R & R budget available for each of the packages. It shall identify means and advise the SDO to disburse the entitlements to the eligible persons/households in a transparent manner and shall report to the SDRC/PIU on the level of transparency achieved in the project. 7. Grievance Redressal 21. The NGO shall make DPs aware of the grievance mechanism set out in the RP and shall assist PDPs who have grievances to pursue a suitable remedy. The NGO shall help the DPs to file a grievance application. 22. The NGO shall record the grievance and bring the same to the notice of the Grievance Redressal Committees (GRC) within 7 (seven) days of receipt of the grievance from the DPs. It shall submit a draft resolution with respect to the particular grievance of the DP, suggesting solutions, if possible, and deliberate on the same in the GRC meeting through the NGO representative in the GRC. 23. The NGO shall assist in the GRC process when ever necessary. 8. Identification of sites 24. As part of the RP, eligible AFs will receive alternative sites for residential and commercial structures getting affected. The NGO will identify with PIU and the Revenue Department suitable government land and assist in negotiating its transfer to the DP. Where suitable government land is not available, the NGO will assist the DP to locate a land owner willing to sell his land and will assist in the negotiation of the purchase price. 25. The NGO has to identify the need for Resettlement Centres in consultation with the project affected persons, according to the R & R Policy. In case the need arises, the NGO shall identify suitable site for the same. The NGO will have to develop Self-Help Groups and impact skill training to the affected persons.

142

9. Coordination between DPs and the SDRC 26. The NGO shall develop rapport between the DPs and the SDRC. This will be achieved through regular monthly meeting with both the SDRC representatives and the DPs. All meetings and decisions taken are to be documented. 10. Conduct Public information campaign 27. The NGO shall assist the SDRC to undertake public information campaign at the commencement of the project to inform the affected communities of the project RP, the R & R policy and the entitlement package. 11. Conduct Gram Sabhas 28. The NGO shall ensure that gram sabhas (village level meetings) are held in every village. Besides contacting DPs on an individual basis to regularly update the baseline information, Gram Sabhas will be conducted by the NGO on a regular basis. The frequency of such meetings will depend on the requirements of the DPs, to allow the PDPs to remain up to date on project developments. NGO will encourage participation of individual PDPs in such meetings by discussing their problems regarding LA, R & R and other aspects relating to their socioeconomic lives. Such participation will make it easier to find a solution acceptable to all involved. 12. Report the Status of PDPs after shifting 29. The NGO shall submit a status report of the PDPs after shifting to the SDRC. 30. 13. Road Safety Awareness 31. The NGO shall conduct Road Safety Awareness to the children of schools and community at large in the villages located along the Project Roads by way of training, distribution of pamphlets and fixing of posters 14. Assist the PWD in Actions to HIV/AIDS Awareness/Prevention Campaigns / Gender/Child Labour 32. Information campaign/advertisement in collaboration with line agencies (such as National AIDS Control Organisation, State AIDS Control Organisation etc.) including provision of signage/hoardings at suitable locations, distribution of vechicle stickers and provision of condom vending machines at suitable locations (rest areas, truck parking lay-byes etc. The Ngo shall assist the PWD to implement these measures including collaborating with line agencies. 33. The NGO shall ensure in collaboration with Engineer that Medical facilities and health checkups which may include detecting STD/AIDS for the workers are provided at the construction camps. 34. The NGO shall assist PWD to ensure that the Contractors comply with applicable labour laws (including prohibition of child labour) and gender issues. 143

III. CONDITION OF SERVICES 35. Two NGOs will be selected for implementation. One for North Karnataka and one for South Karnataka. No NGO should submit for more than one package. 36. The roads for RP implementation will provided to the NGO in a staggered manner. The time line for each of the links for RP implementation will be provided by the PIU. However, the ultimate end date remains the same, i.e two years from the start of signing of the contract. 37. The NGO shall ensure that the RP is implemented in an effective and proper manner. The prime responsibility of the NGO shall be to ensure that each and every eligible PDPs receive appropriate and due entitlement (within the Entitlement Framework). Additionally the NGO shall help the SDRC/PIU in all other matters deemed to be required to implement the RP in its spirit and entirety including activities involving some financial implications. 38. All documents created, generated or collected during the period of contract, in carrying out the services under this assignment will be the property of the SDRC/PIU. No information gathered or generated during and in carrying out this assignment shall be disclosed by the NGO without explicit permission of the SDRC/PIU. 1. Location of NGO 39. In order to carry out the above tasks, employees of NGO are to be stationed in each division as identified by the PIU. Each division office shall have one key person along with support staff. 2. Reporting 40. Reports will have to be submitted, as well as photographs, videotapes etc., taken during the assignment shall be submitted in support of the reports, along with an electronic copy of the documents. All reports should be in English language only. The following documentation have to be submitted. (i) Inception Report 41. The NGO shall submit to the PIU/SDRC an inception report-detailing plan of action, manpower deployment, time schedule, and detailed methodology within 21 days of the commencement of the assignment. (ii) Monthly progress Reports 42. The NGO should also submit monthly progress reports on the activities carried out during that month and proposed activities for the coming month. The monthly progress reports will include data on input and output indicators as required by the SDRC, with work charts as against the scheduled timeframe of RP implementation. All progress reports shall include data on input and output indicators as required by the SDRC. 43. The NGO shall document in full details, the consultation/counselling processes, the process of identification of the resettlement sites, and a full description of the training imparted (or facilitated) as part of the assignment. The progress achieved in land acquisition as per

144

entitlements have to be documented. This documentation shall be submitted to the SDRC as a part of the monthly progress report. 44. Copies of the monthly report have to be submitted to (i) Assistant Commissioner; (ii) Local SDRC and (iii) PIU/SDRC. (iii) Final Report 45. Submit a completion report at the end of the contract period summarizing the actions taken during the project, the methods and personnel used to carry out the assignment, and a summary of supports/assistance given to the DPs. (iv) Records of Meetings 46. All minutes of the meetings for GRC, gram sabhas, between SDRC and DPs etc have to be recorded and submitted to (i) Assistant Commissioner; (ii) Local SDRC and (iii) PIU/SDRC. (v) Record of Grievances 47. All grievances have to recorded and the process of redressal documented and submitted to (i) Assistant Commissioner; (ii) Local SDRC; and (iii) PIU/SDRC on a monthly basis. (vi) Submission of Micro Plans 48. All micro plans have to be submitted, with the status of disbursement and payment of compensation, on a monthly basis. Where changes occur during the project requiring changes to the micro level plans, the NGO will update the relevant plans and resubmit them to the (i) Assistant Commissioner; (ii) Local SDRC; and (iii) PIU/SDRC.

3. Data, Services and Facilities to be provided by the Client 49. The SDRC/PIU will provide to the NGO copies of the RP, Social Assessment Report , DP database, land acquisition details, and any other relevant reports/data prepared by the Project Preparation Consultants. All facilities required in the performance of the assignment, including office space, office stationery, transportation and accommodation for staff of the NGO etc., shall be arranged by the NGO. 4. Time Schedule 50. It is estimated that the NGO services will be required initially for two years for participating in the implementation of RP. The NGO shall carry out all assigned tasks based on the milestones as set out by the SDRC. 5. Payment 51. 47. All payments will be linked to the completion of tasks as per milestones. As the implementation will be done in a staggered manner, payment will be linked to the completion of links/contract packages, based on the timeline provided by PIU. 52. The payment schedule will be made against outputs as given below. Output Payment Schedule 1. After unequivocal acceptance of Letter of 10% Total Contract value. At the Award, submission of inception report should end of 1st month form be completed within 1st Month. commencement of the services. 145

With Bank Guarantee of 10% of Contract value. 2. a) Joint verification of Assets within Corridor 15% Total Contract Value. of Impact of all Packages information, dissemination and distribution of R & R Policy b) Issue of Identity card for eligible DPs should be completed within 6th Month 3. a) Submission of Micro plan for Title Holders/ 20% Total Contract Value. Non Title Holder approval b) Disbursements for 50% of total PAHs. c) Final Data Analysis Report containing additional and or missing Census details. d) Identification of Relocation sites for shifting of DHs/CPRS. Should be completed within 12th Month 4. a) Submission of Micro plan for Title Holders/ 25% Total Contract Value. Non Title Holder approval b) Disbursement of entitlements for 50% of total DHs. Should be completed within 16th Month 5. c) Training and need assessment for income 15% Total Contract Value. restoration. d) submission of monitoring and evaluation schedule of DPs on the implementation of RP Should be completed within 20th Month 6. a) on approval of final report summarizing 15% Total Contract Value. the action taken and other resettlement works to be fulfilled by NGO b) Should be completed within 24th Month 53. Bank Guarantee of 10% Contract Value shall be valid up to time period specified in C 1.2.3 of Special Conditions of contract.

6. Team for the Assignment 54. 48. The NGO shall depute a team of professionals to the site. The constitution of the team and the qualification for the team members is given below: Sl. No. Of No Position Position Qualification . s 1. Team Leader 1 The Team Leader should be a post-graduate, preferably in social sciences. S/he should have about 10 years experience in implementation of R & R and rural development works. S/he should have held responsible position in the previous assignments should possess participatory management skills. Knowledge of local language is a necessary qualification. The team leader must have been with the NGO for at least 2 years. In case of Joint Ventures the Team Leader must be from

146

Sl. No. Of No Position Position Qualification . s the lead partner 2. Key 5 Should be a post-graduate in social sciences. S/he Professionals should have about 5 years of working experience of which about 2 years in R & R or rural development projects. Should have sound understanding of the land acquisition process and experience in participatory management. Knowledge of local language is a necessary qualification. One key professional has to have a minimum qualification of Diploma in Civil Engineering. One key professional has to be a woman. One key professional should have about 10 years experience of working in community development and community awareness projects. Should have about 5 years experience in the field of HIV/AIDS. 3. Sub 1 for Should be graduate or equivalent in social sciences with professionals every at least two (2) years field experience. Knowledge of 100 local language and experience of working in the region major desired, One – third must be women. impacte d househ olds 4. Other support One support staff to be provided to each key Personnel professional

147

Annex 8

TERMS OF REFERENCE FOR MONITORING & EVALUATION CONSULTANTS FOR THE IMPLEMENTATION OF THE RESETTLEMENT PLAN

I. BACKGROUND

1.1. The aim of the project is to improve the performance of the State’s road transport sector. The KSHIP Stage II roads have been selected based on the Feasibility Study of State Roads for proposed KSHIP. The Asian Development Bank Assisted programme covers 650 kms of roads covering 20 links of 9 contract packages spread over in 15 districts. The up gradation and bypasses of roads will have direct /indirect impact on the population along the project corridor. Common property resources, residential structures, commercial structures are likely to be affected. Non-Titleholders within the ROW are likely to be displaced.

1.2. The proposed road improvement involves land acquisition, appropriation of structures and resettlement of squatters. The affected persons on account of the road improvements are covered under the Resettlement Plan (RP). All possible steps have been taken to minimize land acquisition and demolition of structures so as to reduce adverse affect on people settled along the road. Among others, the RP stipulates involvement of a consulting agency for monitoring and evaluation (M&E) of implementation of the RP, and compliance with the targets given in the RP.

1.3. It is in the background that the PIU/KSHIP intends to hire the services of a qualified and experienced external consultant to monitor and evaluate implementation of the RP being carried out by the PIU with the support of the NGO/s deployed.

II. OBJECTIVES OF THE ASSIGNMENT a. The objectives of the M&E consultancy services are (a) to assess the implementation of the RP; (b) to monitor the schedules and the achievement of targets; (c) to evaluate whether the outcomes of social development objectives of the project are being achieved.

III. SCOPE OF SERVICES

3.1. The CA will undertake to do the following assignments:

3.2 Undertake the supervision of RP implementation to ensure the delivery of entitlements to Project Displaced Persons/ Project Affected Persons in accordance with the provisions and procedures provided for in the Resettlement Plans.

3.3 Advise and guide the NGOs to implement the RP in accordance with their Terms of Reference; 3.4 To monitor the effectiveness and efficiency of PIU and NGO in the RP implementation.

3.5 To assess whether resettlement objectives, particularly livelihoods and

148

living standards of the Displaced Persons ( DPs) have been restored or enhanced.

3.6 To assess the efforts of the PIU and NGO in ensuring 'Community Participation' with particulatr attention on participation of vulnerable groups namely a) those who are below the poverty line ( BPL);b) those who belong to scheduled castes ( SC), scheduled tribes ( ST); c) female headed households (FHH); d) elderly and e) disabled persons.

3.7 To assess resettlement efficiency, effectiveness, impact and sustainability, drawing both on policies and practices and to suggest any corrective measures if necessary.

3.8 To review the project impacts on Indigenous People and groups if any and assess the effectiveness of the mitigation measures adopted.

3.9 Assist the PIU and field units to oversee the implementation of RP;

3.10 Participate in periodical meetings held between PIU and NGOs/district administration to assist the PIU for successful outcomes of the meetings;

3.11 Undertake reviews on behalf of PIU of all documents and reports related to land acquisition and resettlement received from the NGOs and consultants and advise the PIU for taking appropriate decisions on such reports;

3.12 Assist the PIU to respond to the ADB on any matters related to the implementation of RP and related matters;

3.13 Provide certification prior to invitation of bid and at the time of handing over of the milestone stretches to the contracts confirming the completion of land acquisition, payment of compensation, mitigation of resettlement impacts and reconstruction of community properties in the respective stretches;

3.14 Ensure synchronization of R&R implementation with civil works time table to avoid time and cost over runs. This should be done in close co- ordination with the construction supervision consultants;

3.15 Assist PIU in reviewing any additional reports submitted by the consultants or NGOs during the implementation;

3.16 Prepare annual reports on the implementation of RP including land acquisition and payment of compensation;

3.17 Organization of periodical training in the implementation of RP and delivering of entitlements, consultations etc. to PIU staff and NGOs as necessary.

3.18 The consultant will carry out limited impact assessment twice during the 149

contract period, one at the end of 15 months of the contract period and another at the end of 21 months of the contract period. Each evaluation will cover all Project Displaced Persons/ Project Affected Persons who have spent more than 6 months after receiving compensation or assistance or both.

3.19 For concurrent Impact Evaluation, the M& E Consultant shall:

Develop specific monitoring indicators for undertaking monitoring implementation of Resettlement Plans.

3.20 Review results of internal monitoring and verify through random checking at the field level to assess whether the objectives of resettlements have been realized, particularly the changes in the in the living standards;

3.21 Identify the strengths and weaknesses of the resettlement objectives and approaches and implementation strategies.

3.22 Review and verify the progress in resettlement implementation on the sample basis and prepare quarterly reports for the EA/ PIU and ADB.

3.23 Evaluate and assess the adequacy of compensation/ assistances given to the DPs/ PAPs and the livelihood opportunities and incomes as well as the quality of life of DPs/ PAPs after the project induced changes.

3.24 To evaluate and assess the adequacy and effectiveness of the consultative process with the affected DPs/ PAPs, particularly those vulnerable including the adequacy and effectiveness f grievance procedures and legal redress available to the affected parties, and dissemination of information about these.

150

3.25 Impact assessment is to be compared with the baseline values for key socioeconomic as given in the RP. If such information is not available information based on the same time of survey, has to be collected on recall basis;

3.26 to assess whether the compensation is adequate to replace the lost assets;

3.27 to assess how the compensation has been utilized;

3.28 assess the perceived benefits and losses of resettlement;

3.29 Assess the level of satisfaction of the various assets provided as part of R&R implementation;

3.30 Based on the impact assessment, suitable remedial measure are to be proposed for any shortcomings and;

3.31 Remedial measure if Project Displaced Persons/ Project Affected Persons are not able to improve their living standards.

IV REPORTING

The qualified and experienced external monitoring consultant will be responsible for monitoring of the R&R activities carried out by the EA/PIU and will submit quarterly review directly to ADB and determine whether resettlement goals have been achieved more importantly whether livelihoods and living standards have been restored/ enhanced and suggest suitable recommendations for improvement.

4.1 The CA shall submit the following reports: Inception Report with mobilisation details Quarterly Monitoring Reports Evaluation Reports (2)

Annual progress Reports Final Completion Report (containing implementation, experience and lessons learned).

All reports should be submitted in hard copy and soft copy in MS Word for easy transmission.

V METHODOLOGY

5.1 As a part of the proposal, the consultants will propose the methodology to carry out the assignment.

VI TIME LINE 151

6.1 The CA shall be hired for the period of project implementation that is 2 years.

VII BUDGET AND LOGISTICS

The proposal both technical and financial should be submitted and budget should include all costs and any other logistics details necessary for resettlement monitoring. Additional expense claims whatsoever outside the budget will not be entertained.

VIII QUALIFICATIONS

The qualified and experienced external monitoring consultants should have significant experience in resettlement policy analysis and RP implementation.

Proposals shold be submitted with relevant information concerning previous experience on monitoring of resettlement implementation and preparation of reports. In case of experts detailed CVs should be submitted providing the detils of the previous experience in monitoing and resettlement related activities.

IX TEAM FOR ASSIGNMENT

9.1 The CA shall deploy a team of which the positions and minimum qualification are stated in the following, with least one woman professional:

9.2 Team Leader: S/he should be a post-graduate in social sciences with at least 10 years of experience in the field of social development and projects requiring land acquisition. (Experience in land Acquisition is mandatory) S/he should have monitoring and evaluation experience of more than 5 projects, and should have held responsible positions in the previous assignments including as team leader. S/he should have adequate managerial skill and should be conversant with the region and the regional language.

9.3 Sub-Professional I: S/he should be a graduate in social sciences with at least 7 years of experience in the field of social development and participating rural appraisal. S/he should

152

adequate knowledge of computers and should be conversant with the region and the regional language.

9.4 Sub-Professional S/he should be a graduate in statistics with II: good knowledge of computerized database development and management and should be conversant with the region and the regional language.

9.5 Sub-Professional S/he should be a graduate in civil III: engineering with at least 7 years of experience in construction/maintenance of National/State Highways. S/he should good knowledge of land measurement and should be conversant with the region and the regional language.

9.6 Support Staff: There should be an adequate number of support staff. They should be able to perform as asked be the members of the team. There should be a good mix of women and men.

9.7 Location of office The CA is required to have an office in Bangalore and in the field.

X. PAYMENT SCHEDULE

10.1 The payment schedule will be made against outputs as given below:

Sl. Output Payment No. Schedule 1. Inception Report : 20%

2. After submission of 2nd : 20% quarterly Report

3. After submission of 2nd : 30% Evaluation Report after 15 months

4. After submission and : 30% approval of Final Completion Report

153

Note1: In the Road Development Projects taken up by the KSHIP, Project Affected Households/ Persons will be more when compared to Project Displaced Persons as the affected people will be mainly Title Holders, Squatters, Encroachers, Tenants & workers & that the affected structures & lands will also be partial. Hence PAPs (Project Affected Persons) are included along with PDPs (Project Displaced Persons).

2. Serial numbers have been changed taking into consideration of the suggestions made.