Alpiika (, region) 1. Name of the Project Alpiika

2. Web page of the Project https://zv.ua/uk/proekt/kotedzhne-mistechko-alpijka/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) ZV Development, ZV Architect

4. Link to the promo video https://www.youtube.com/watch?v=iBVNEMznyVM

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://zv.ua/uk/alpijka-uk/zalcburg-41-ua/ https://zv.ua/uk/alpijka-uk/karvarra-uk/ https://zv.ua/uk/alpijka-uk/semering-uk/ https://zv.ua/uk/proekt/kotedzhne-mistechko-alpijka/

6. Typical layouts of apartments (in pictures) https://zv.ua/uk/proekt/kotedzhne-mistechko- alpijka/

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) «Alpiyka», Pidhirtsy, Kyiv region, Ukraine. Planeair hill is just net to the location. There is a lake in the middle of the complex

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Garage for the 2 cars in the yard. Playground, tennis court, field for mini-football, lake in the complex Manufactura outlet - 5 minutes Kindergartens and schools for 20-25 minutes Hospitals, clinics – 10-15 km, pharmacy – 500 m. Shopping centers, restaurants, fitness center, sport clubs, cinema, children entertainment center – 1-5 km

9. Date of start and completion of the project (it's phase) 1997-2015

10. Project Class Business Class

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). 3 houses on the market left. House's area 365-415, plots area 25-32

12. Management company and services (security, concierge services, etc.) ZV service, ZV security

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Garage, artesian water, fiber-optic cable internet

14. Construction materials/technologies used in the project Brick

15. Occupancy rate (% of sold apartments) 95% are sold

16. Noteworthy information you consider might be relevant for the jury members The complex is situated on the shore of the picturesque lake. Houses are built in a fachwerk style.

Club Village Riviera Villas 1. Name of the Project Club Village Riviera Villas

2. Web page of the Project http://r-v.com.ua

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Managing company is Dragon Capital http://www.dragon-capital.com/ru/chastnym/nedvizhimost.html The club has its own service company and architectural bureau.

4. Link to the promo video https://www.youtube.com/watch?v=2CmL2Hk52Ic, channel on youtube - https://www.youtube.com/channel/UCr40bt7n_VmvpTF2XStg3Qg/videos?sort=dd&shelf_id=0&view=0

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://drive.google.com/open?id=0B8TyG1DTzZ71d0c1VTA4OVhBdk0 either on the project site http://r-v.com.ua/en/#!/page/gallery/

6. Typical layouts of apartments (in pictures) https://docs.google.com/a/ureclub.com/document/d/1HX42teidTg71lJ- bFRXQClL0KJLMubjMvI34AjO9sm8/edit?usp=sharing

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev region, Vyshgorod district, 11 km along the Kiev Sea in the direction of Lebedevka village. Public transport: a route taxi (ST M. HEROEV DNEPRA - S. LEBEDEVKA, PN-VS, from 6:30 to 20:22, interval 75 minutes). The path from the River Station to Podol will take 25 minutes on the car, the motor boat trip on the water is 15 minutes.

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Club Village Riviera Villas is located 20 km from Kiev on the banks of the Dnieper Canal in a natural oasis that is famous for its clean air, coniferous forests and a unique microclimate. The own service company carries out both maintenance of public territories, so specialized services of each residence. The infrastructure of the village includes: 2 equipped beach, tennis court, mini football field, 2 equipped volleyball courts, eco-school-garden Clever Kids, playgrounds, water-restaurant terrace, 3 berths for boats, aqua zone (2 seasonal pool, summer bar, boat station, children attractions, billiards), a tent for celebratory events of residents, arbors for rest and a park area. Eco-parking is available for the convenience of residents and guests throughout the village. Also, the construction of a bridge through the Dnieper channel for internal communication has been completed.

9. Date of start and completion of the project (it's phase) Beginning of the project - 2010 Completed phases Phase 1. French Rivera, street 1 - 2010-2012 Phase 2. Infrastructure, line 1: equipped beach 1, terrace at the water, pier, children's and sports grounds, arboretums for rest - 2010-2011 Phase 3. Italian Riviera, street 1 - 2013 - August 2016 Phase 4. Infrastructure, line 2: equipped beach 2, aqua zone with pools, summer bar, 2 berths, children's and sports grounds - November 2016 - August 2017 Stages during construction Phase 5. French Rivera, street 2 - 2015-2019 Phase 6. Italian Riviera, street 2 - 2018 - 2022 Phase 7. Italy skaya Riviera, Street 3 - 2019 - 2024 Phase 8. Riviera Park Lane: 21 domovladenye. 2016 - 2020 Phase 9. Riviera Water Front: 35 households - 2011 -019 Phase 10. Riviera Water Side: 44 homeownership. 2017 -2025 * At each of phases 1-9, the construction of pavement and engineering networks in full has already been completed.

10. Project Class Premium

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). The number of phases is 10. The total number of houses is 174. Phase 1. French River, street 1 - 18 houses, one administrative building (school-garden). Phase 2. Infrastructure, line 1 - equipped beach 1, restaurant, pier, children's and sports grounds, arbors for rest. Phase 3. Italian Riviera, street 1 - 7 houses Phase 4. Infrastructure, line 2 - equipped beach 2, aqua zone with swimming pools, summer bar, 2 berths, children's and sports grounds. Phase 5. French Rivera, street 2 - 18 households. Phase 6. Italian Riviera, street 2 - 9 households. Phase 7. Italian Riviera, line 3 - 21 homeownership. Phase 8. Riviera Park Lane: 21 homeownership Phase 9. Riviera Water Front: 35 homeowners Phase 10. Riviera Water Side: 44 homeownership

12. Management company and it's services (security, concierge services, etc.) The service company Riviera Villas provides the following services: • 24-hour security of the territory; • Specialized beach area service; • Maintenance of common territories and infrastructure; • Service of centralized engineering networks; • Cleaning and repair of roads and sidewalks; • Call center services; • Delivery organization. And also the organization of such services as: maid, nanny, gardener, driver, car hire, delivery of food with the help of its own catering service.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) The area of the houses is from 252 sq.m. up to 669 sq.m. The area of the plots is from 12 acres. Floors of houses - one-storey, two-storeyed, two-storey with a basement floor. Ceiling height - from 3 to 5 meters. Exterior and internal capital walls are brick. Every household has all the necessary communications, the accomplishment of the territory of the country (including the system of irrigation) has been completed. The Riviera Villas Clubhouse has a centralized water, electricity and gas supply system. There is a multi-level security system. An automated management system for the service company and the security service is also implemented.

14. Construction materials/technologies used in the project For the construction of houses in the classical style, materials such as red clay brick are used, clinker tiles are used for decoration of facades, for roof - bitumen, ceramic and basalt tile. Modern one-level houses are also made of red bricks, facings are used for covering the facades with natural materials - larch and stone. All works are carried out using modern construction technologies and energy saving.

15. Occupancy rate (% of sold apartments) Sold 91 houses, of which 62 houses were built.

16. Noteworthy information you consider might be relevant for the jury members As a result of the development of the settlement, new formats and architectural solutions are emerging, which are the consequence of the development of the market of suburban real estate and increased demand for new forms using innovative technologies (solar panels, energy saving materials, etc.). So now work is underway to create 2 more streets with projects in the modern style with an exit to the already created artificial lake. The implementation of the new queue is scheduled to begin in the second quarter of 2018. It is also planned to create a third line of infrastructure taking into account the needs, interests, interests and lifestyles of existing and future residents. Probable infrastructure: school, spa, professional football field. Good Life Park

1.Name of the Project Good Life Park 2.Web page of the Project goodlifepark.ua 3.Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) "Good Life Park" www.goodlifepark.ua Architectural bureau "TSEKH" https://tseh.com.ua 4.Link to the promo video http://goodlifepark.com.ua/gallery/

5.Visual materials (link to pictures of exterior and interior design, parking and nearby environment) http://goodlifepark.com.ua/gallery/

6.Typical layouts of apartments (in pictures) http://goodlifepark.com.ua/cms/proekty-domov.html

7.Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev region, s.Lebedevka

8.Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) In the cottage "Good Life Park" there is a full infrastructure: public center, kindergarten, sports hall, massage room, karaoke club, restaurant, mini hotel, heated pool, tennis courts, football field, climbing wall, yacht club, hangar for storing boats, hangar for helicopter storage, helipad, sky park, beach, car wash, laundry, spa complex (hammam, Russian wood-burning bath, massage rooms, hay room, fireplace rooms, procedural), shop 9.Date of start and completion of the project (it's phase) Start August 2013, Completion - December 2017

10. Project Class Premium Class

11.Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components) 4 phases 1 phase – 8 houses 2 phase – 12 houses 3 phase – 10 houses 4 phase – 10 houses

12. Management company and it's services (security, concierge services, etc.) OKA "ST" "Goodlife Service" (security, cleaning department, technical department, concierge service, landscape department, construction department

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) height of ceilings from 3,5 to 7,5 meters, central air conditioning Daikin, central ventilation systemair, boiler Buderus, multiroom, geothermal heat pump + reserve gas, central water supply, central sewerage, fiber optic Internet, industrial diesel generator, on-site autoplay.

14. Construction materials/technologies used in the project foundation - monolithic slab, walls - red brick, overlapping - monolith, roof 1 type - Waterproofing membrane PVC Sika, windows -Aluminium -Alumil, multi-glass - Titan (triple-glazed).

15. Occupancy rate (% of sold apartments) 70%

16. Noteworthy information you consider might be relevant for the jury members GoodLife Park is recognized as the best cottage town in 2016 (http://goodlifepark.com.ua/news/news/goodlife-park-priznan-luchshim-kotte-1-nym-gorodkom-2016- goda.html) April 14 in Kiev, the official ceremony of awarding the winners of the National Award "National recognition in the field of construction - 2015", where the cottage town Goodlife Park won the category "Best Project of the Year". http://goodlifepark.com.ua/news/news/narodnoe-priznanie.html Green Hills

1. Name of the Project Green Hills

2. Web page of the Project http://green-hills.ua

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer and investor: British investment fund Dragon-Ukrainian Properties & Development (DUPD), whose shares are quoted on the Stock Exchange. The fund was created by the investment company Dragon Capital with the aim of investing in the Ukrainian real estate market. The management company is Dragon Capital http://www.dragon- capital.com/chastnym/nedvizhimost.html Own architectural bureau Capital Construction. In the cottage town operates its own service company "Grand Development".

4. Link to the promo video https://drive.google.com/drive/folders/0B8TyG1DTzZ71WGxWWlZCOHZSRXc

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) Gallery on the project site http://green-hills.ua/en/gallery Best photo Green Hills http://green-hills.ua/en/gallery/best-views

6. Typical layouts of apartments (in pictures) The full version of projects with planning solutions can be found at http://green-hills.ua/ru/houses- projects

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) The cottage town is located 10 km from Kiev along the highway, near the village of Vita- Pochtovaya (ST Novita, Kyiv-svyatoshinsky district, Kiev region, Ukraine). Public transport Minibus taxi from: • Art. m. Friendship of Peoples No. 801, No. 812; • Art. m. Vokzalnaya (railway station) № 368; • Art. m. Svyatoshin No. 369, No. 778; • Art. m. Akademgorodok № 742; • Art. m. Lybidskaya (as well as the Vladimir market, Gorky Street) № 813; • Art. m. Palace of Ukraine (as well as Moscow and Odessa Square) № 825; • from circus and shopping center Ukraine №720.

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) The cottage town of Green Hills is located in an ecologically clean area near the village of Vita- Pochtovaya, 10 km from Kiev, surrounded by a beautiful forest and three lakes. In 10 minutes drive from the town in with. Gatnaya hosted the new Sport Life sports club and the Mega Market shopping and entertainment complex with a rollerdrome, a children's room, a Butterfly Cinema, a beauty bar, cafes and shops. In direction from the city to Kiev are: construction and economic hypermarket "New Line", restaurant Chabany with a mini-zoo and an open area for children's recreation, a shopping center "Magellan" with a cinema "Line Kino", supermarket "Auchan", 2 children's rooms, restaurants and shops. The nearest branches of Novaya Pochta are: №2 p. Tarasovka, No. 1 p.t. Shepherds, № 109, Kiev. Petrol stations: Socar, WOG, OKKO, KLO and others. The infrastructure of the town itself (ie located in the closed territory of Green Hills) includes: the private school of Britannica School (grades 1- 11) and 2 private kindergartens, a delicacy mini market and a cozy Green Hills Deli & Cafeteria cafe, a traditional American BBQ zone , 4 modern sports grounds - 2 multifunctional (for playing tennis, volleyball, mini-football and basketball), beach volleyball court and sports simulators, family doctor services and 24-hour services of a service company and security. On the territory of the town, the construction of a fitness center with a spa zone and a covered 25-meter pool for 4 lanes and a separate children's pool with a total area of about 1400 m2

9. Date of start and completion of the project (it's phase) Completed phases: Phase 1. The first phase of households and basic infrastructure facilities (including the School, kindergarten, shop, 2 sports fields and BBQ zone) - completed at the end of 2015. Phase 2 The second phase of households, including another kindergarten, is still one playground, two more sports grounds, an artificial lake and recreation areas - completed in the spring of 2017. Phase in the process of construction: The third phase (roads are being built and engineering communications are being built), the construction of the fitness center and the second building of the Brita school is being completed.

10. Project Class Business plus

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). 1 turn - 90 households, 2 turn - 44 households, 3 turn - 75 households, 4 turn - 17 households.

12. Management company and it's services (security, concierge services, etc.) Professional service company Green Hills - "Grand Development" provides the following services: • Maintenance, capital and current repairs, sanitary and technical works, provision of fire safety of engineering and social infrastructure facilities.• Maintenance and maintenance of public areas (lighting, heating, air conditioning, cleaning, sanitation, etc.).• Sanitary maintenance of wells, drinking water filters and sanitation of storage tanks for treated water.• Protection by professional security company of local infrastructure and common areas, control of pass to the town, patrolling the territory of the town.• Collection and removal of domestic garbage from public areas and from garbage tanks of residents (at the front of the house) at least three times a week.• Cleaning of snow and ice from public areas in winter.• Landscaping of local infrastructure and public areas, as well as caring for it (cutting and watering the grass).• Caring for lawns of facade parts of households (haircut and watering).• Maintenance of the automatic irrigation system for the façade parts of households and public use areas (cleaning of injectors and replacement of the nozzles purchased by the resident on the front part of the household, winter conservation and spring start of the irrigation system).• Providing the city with a navigation system (signs, road markings, etc.).• Coordination of work on the territory of the town of service structures, which ensure the functioning of the town. • Dispatcher services. • Presence of primary fire extinguishing means and access to them. • Sanitary maintenance of water supply, drainage and drainage networks.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) The total area of houses - from 103 square meters. m to 395 square meters. m. The area of sites - from 6 to 30 hectare. The floors of the houses are two-storeyed, the ceiling height is from 3 m to 5 m. External and internal capital walls - brick, aerated concrete or wood-frame construction, depending on the technology chosen by the customer. Every household has all the necessary communications. Each household has all the necessary communications, and after the purchase, the improvement of the house territory (including irrigation system) is carried out. The cottage community is fully provided with modern engineering systems: automatic irrigation of a common area, centralized systems of household and storm sewerage, water treatment and water supply, modern gas supply system, a separate water pipe with hydrants installed along the roads for fire safety. Closed cottage town. The territory is guarded by a professional security company. Own service company.

14. Construction materials/technologies used in the project Construction of houses takes place according to 15 standard projects of three types of building materials: red clay brick, aerocrete Aeroc, wooden frame house. For the finishing of the facades, clinker tiles and facade plaster are used, for the roof - bitumen, ceramic and basalt tiles. For the design of facades and entrance groups, the cladding is used with natural materials. 15. Occupancy rate (% of sold apartments) Sold - 138 households, built - 111 houses, of which 64 houses are inhabited.

16. Noteworthy information you consider might be relevant for the jury members Green Hills is a populated town with a fully functioning infrastructure. High rates of construction, including the development of the infrastructure of the town. Stably high level of sales of households in the last 3 years. Chicago Central House

1. Name of the Project Chicago Central House

2. Web page of the Project https://chicago.kiev.ua/

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine, the central business district of Kiev, st. Antonovich, 44

4. Date of start and completion of the project October 2016 - ІІ quarter of 2018

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) The developer of the project: Riverside Development (http://riverside.net.ua/) Engineering company: KDD Engineering (http://kdd.ua/) Architect: "BORODKIN architects" (http://www.borodkin.org/)

6. Project Type Residential

7. Description and major characteristics of the project (technical and functional specifications) CHICAGO Central House embodies a new concept for Ukraine - the house as a work of art. People who are used to always be in the forefront of life - it is for them that we build this living space. This ambitious concept combines bright Chicago architecture, world-class comfort, quality and all the advantages of living in the center of the capital. This is truly a unique space for life, intended for those who want special. For those who want to always be in the center - in the center of the city, in the center of business and cultural life. One of the important features of CHICAGO Central House will be interactive media sculpture, which you will not find analogues in Ukraine. This work of art and technology, successfully integrated into the facade of the building, should become one of the symbols of modern Kiev. The complex is located in the epicenter of city life, in close proximity to the most important Kiev places of power, within walking distance from the city and the old town. Located in the heart of the city and has a rich infrastructure. In the zone of 10 minutes walking distance there are a lot of shopping and entertainment centers, business centers, sports clubs, medical institutions of kindergartens and school institutions. Number of storeys: 8-24 floors Total area of the building: 31444.73 square meters. Functional components: Restaurants: 1100 sq. M. Honey. infrastructure: 780 square meters. Trade, services, offices: 2573 sq.m. Number of apartments: 240 apartments Availability: 2 minutes walk to metro station. Olympic 10 min to metro station Leo Tolstoy 1 minute of trolleybuses: №1, №12, №91H Distance to attractions: On foot: Park Taras Shevchenko - 7 minutes, Botanical Garden. Fomina - 10 minutes, Khreshchatyk - 15 minutes By car: Postal area - 15 minutes, Kontraktova Square - 17 minutes, Andreevsky Descent - 30 minutes The existing infrastructure in the neighborhood: - Location - https://chicago.kiev.ua/#place - educational infrastructure - https://chicago.kiev.ua/news/chicago_schools/ - restaurants, cafes, bars, coworkers - https://chicago.kiev.ua/news/vivid_life_in_center/ Parking: In the residential complex will be equipped with an underground guarded parking with a system of park- sharing, which allows the owner of the parking lot to rent it for use during his absence, and the money earned for using the parking lot will go to the personal account of the tenant. This system will allow to have a large stock of parking spaces at an affordable price and will provide control over violators of parking rules. The parking will be provided with everything you need: from places for storing bicycles to charging stations for electric cars. The cost of protection will depend on many factors (cleaning, equipment, cameras, fire automatics, electricity) Parking for 74 cars

8. Visual materials (link to pictures of exterior and interior design, layouts) Visualizations (interiors, exteriors): https://www.dropbox.com/sh/bnea5texvc32uum/AAD51IyeZcn9m2BwruxYEv8_a?dl=0 Layout of apartments: https://chicago.kiev.ua/choice/ Layouts of commercial premises: https://chicago.kiev.ua/torgovie-pomescheniya/

9. Noteworthy information you consider might be relevant for the jury members Art-object: "Modern technologies allow us to see what we normally perceive with other senses.We will supplement the reality with digital space and become the first in Ukraine who in the form of digital sculpture will show on the screen the invisible pace of the city The sculpture is created from the material of the XXI century - digital content, although from afar it will seem that it is a stone, plastic, glass or concrete. Sculptures on media screens will exhibit unusual plasticity for these materials and amaze with forms not characteristic of their physical nature. And only close to the viewer will see that in fact this is a screen projection. Screens of digital sculpture reproduce all time different, as a city, visualization of data sets. The content will not have a single pattern and will not be repeated, so viewers will not be able to assume that the screen will show further. Illumination of the facade of Chicago Central House will exist in a symbiosis with a sculpture and adjust to the image on the screen. The art object will be placed inside the glass cube, which has a length of 14.5 meters on the sides and a height of 11.6 meters. We will open the cube already in December this year, and in 2018 it will be replaced by a digital sculpture. Accomplishment: An integral feature of a truly high-quality housing is a well-equipped house with a pedestrian courtyard, a recreation area, a children's playground, and parking spaces. The project for the improvement of the streets and courtyard adjacent to CHICAGO Central House takes into account the needs of pedestrians, cyclists and drivers, as well as provides landscaping and equipment for children's recreational areas. Street At the house on the corner of Zhilyanskaya and Antonovich streets we will equip a green pedestrian zone with benches. Along the sidewalk, trees will grow, in particular the catalpa, under which we will put comfortable benches, and a little further - tables under umbrellas. All paving will be laid on one level, and before the pedestrian crossing the sidewalk will gradually decrease for the convenience of low- mobility people, parents with baby carriages and bicyclists. Yard A cozy courtyard will be located away from the busy street. From the surrounding space he will be separated by a hedge of grapes, the holes in which will repeat the rhythm of the facade windows. We will put in the yard benches of the original closed form. In the space formed inside these two benches, juniper bushes will grow, the center of the third bench will be the platform, and the fourth - the sandpit. Also for the kids we will install a swing, slide and a climbing machine. In order for children to be safer, we will make a rubber covering around the gaming equipment. Movement of transport and parking Removable bollards separate the pedestrian zone from the carriageway and at the same time leave room for access to the courtyard for fire trucks. Arrival for them and for garbage trucks to the territory of CHICAGO Central House will be arranged from the side of Zhylianska Street. Residents of the house will be able to use a two-level guarded underground parking lot around the clock, which can be reached by an elevator. Along the streets near the house will be arranged a small guest parking, and next to it - parking for bicycles.

Smart House: 1. Providing residents with a Wi-Fi access point (a hall on the ground floor, a courtyard - if necessary) 2. Management of street lighting 3. Automation of lighting in the porches 4. Video surveillance • supervision of children's playgrounds and parking; • observation inside the apartment building (apartment corridors, elevator halls); 5. Unified monitoring system for the complex for the managing organization 6. IP doorphone 7. Access Control System 8. Data collection from energy meters 9. Automation and control of individual heat point 10. Control of air temperature in the building entrances 11. Smart elevator 12. Mobile application "Smart home"

Smart apartment: All clients, all objects will receive a gift set "Smart Apartment" which contains: 3 Motion sensor 2 Sensor leakage 4 Temperature sensor 4 reed switches (window / door position sensor) Power Supply Fayna Town 1. Name of the Project Fayna Town

2. Web page of the Project http://faynatown.com.ua/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer - KAN Development General contractor - KAN BUD Architect - TAM Archmatics Brand - Banda

4. Link to the promo video https://www.youtube.com/watch?v=NQluQEogIFo

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://www.dropbox.com/sh/25v9cszhepyx2nq/AAAfQIq1AHjZiTuHzK6jPmjga?dl=0 http://faynatown.com.ua/gallery

6. Typical layouts of apartments (in pictures) http://faynatown.com.ua/layouts

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev, Shevchenkovskiy district, st. Salyutnaya, 2B The whole territory of the complex, as well as the existing streets adjacent to the project will be adapted for people with disabilities. Nearest metro station - Nivki http://faynatown.com.ua/location/transport - public transport http://faynatown.com.ua/location/education - educational institutions http://faynatown.com.ua/location/parks - the nearest parks http://faynatown.com.ua/location/restaurant - catering establishments http://faynatown.com.ua/location/shopping - stores http://faynatown.com.ua/location/sport - sports institutions http://faynatown.com.ua/location/medicine - medical institutions 8. Project Class Comfort

9. Noteworthy information you consider might be relevant for the jury members Before the construction of the project, meetings were held with residents of each house adjacent to the project area. The negotiation process helped to find common ground with the local community as a result of which the residents of Nivok received exhaustive information about the future construction and benefits of the project for its neighbors, and the developer - support for the residents of neighboring houses. "Comfort-Town"provides the following services for maintenance and maintenance of houses and adjacent areas of residential complexes:

Cleaning of the house territory. Cleaning of staircases. Cleaning of the basement, technical floors and roofing. Watering yards, flower beds and lawns. Maintenance of in-house systems: hot and cold water supply, water disposal, central heating, stormwater drain. Maintenance of elevators. Maintenance and routine maintenance of power supply and electrical equipment, fire and smoke control systems, and other in-house engineering systems, if any. Maintenance of dispatching systems. Maintenance of smoke and ventilation ducts. Removal of domestic waste (collection, storage, processing, disposal, disposal and disposal). Cleaning and removal of snow, sprinkling part of the adjacent territory, intended for passage and travel, with anti-icing agents. Current repair of structural elements, in-house systems of hot and cold water supply, water disposal, centralized heating and storm sewerage and technical devices of houses and elements of external improvement located on a fixed territory in the established order (including sports and children's and other playgrounds). Operation of license plates on houses. Illumination of common areas and basements and pumping of water. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height - 2,6 m Closed territory and navigation system throughout the complex. Thermosensation and renovation of the facades of the adjacent houses. Reconstruction of the street. Salyutnoy, extension st. Ak. Tupolev Reconstruction of the park "Veselka" Elevators KONE Construction materials/technologies used in the project Walls - gas block Frame monolithic Own boiler-house for all houses (gas supply) Heating water - boiler, installed in each apartment Occupancy rate (% of sold apartments) 65% (first stage) Jack House

1. Name of the Project JACK HOUSE

2. Web page of the Project http://jackhouse.com.ua/en/

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) A modern apartment building in the historical center of Kiev is located in the business center and the cultural heart of the capital. All the best restaurants, boutiques, clubs and wellness centers are located within a walking distance from Lesi Ukrainki boulevard, while JACK HOUSE itself is located in the quiet and comfortable Leonid Pervomaisky street. You can see all the beau@ful landmarks from your windows: St. Michael's Cathedral, St. Sofia‘s Cathedral, the Motherland Monument, the center of old Kyiv, the Stadium ―Olimpiyskiy‖, simply choose your favorite view to suit your morning cup of coffee.

4. Date of start and completion of the project 02.2014-03.2017

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) * The buyer always chooses a company with a good reputation and high construction quality. All development projects of TARYAN Group are the most progressive, innovative and ambitious on the Ukrainian real estate market. Investors in our real estate projects at early stages of construction benefit from an up to 30% annual growth of their investment value. web-site: http://taryangroup.com/en/main/ TARYAN Group‘s subsidiary and general contractor is POZNYAKYZHILBUD, one of the largest Ukrainian construction companies. It specializes in construction of elite residential developments with social infrastructure facilities and business centers. > 1000 000 m2 BUILT 45 OBJECTS COMMISSIONED 21-YEAR HISTORY Web-site: http://pjs.com.ua/en/main

6. Project Type Residential

7. Description and major characteristics of the project (technical and functional specifications) Start with an exceptional design and architectural solutions togetherwith the building location in Pechersk, right in the centre of social life. The construction of JACK HOUSE, a residential development began in the central district of the Ukrainian capital in Kiev – Pechersk. The district is considered to be the leader in the quantity of premium and business class residential constructions. Today 36 developments are being built in this part of Kiev. TARYAN GROUP had a goal to stand out in the market and create a modern and innovative residential developments. We have created a lively, high-tech, democratic and luxurious house. A lounge, five-star service, cutting-edge architecture, functional design, unique infrastructure and absolute comfort. By choosing apartments in JACK HOUSE, customers get new quality of life. Unique 31-floors premium residential building, located in the epicenter of social life of Kiev. The best restaurants, boutiques, clubs and wellness centers are within walking distance. On the roof of JACK HOUSE we have created Jack Club brought by our life style development TSARSKY. It offers everything needed for a quality lifestyle: spectacular lounge-zone, restaurant, a modern fitness club, SPA and all year-round thermal pool. MODERN APARTMENTS You can decide how your apartment will look by having absolute freedom in the layout choice, you can separate areas inside the apartment in a way which is convenient for you. In addition, Our TARYAN Interiors design studio made trendy and modern solutions: exclusive design projects of apartments in different styles with complex turnkey refurbishment. We use only the best materials, and we are confident in their quality. All design solutions are tested by technical expertise and accompanied by supervision until all works are complete. LUXURY LOBBY Jack House apartments' owners receive: their own lobby, helpful staff at the reception and concierge service/ COMFORT Apartment owners shouldn‘t choose between an active social life and a comfortable home-like atmosphere – they can get everything at once. JACK HOUSE entrance is situated in a convenient Pechersk yard which is protected from the noise of Lesia Ukrainka boulevard. We have made a modern playground for children and a park for walks and recreation – all of that for the comfort of our residents. A convenient bicycle parking and the opportunity to charge your electric car without going to the underground parking can also be found in the park. APARTMENT BUILDING AREA 41 681.5 м² NON-RESIDENTIAL PREMISES 1433.3 м² FLOOR HEIGHT 3.3 м RESIDENTIAL FLOORS NUMBER 31-6 APARTMENTS NUMBER 256 PARKING Three-level parking in the substructure with a separate elevator 238 parking lots for cars +74 parking lots for any other motor vehicles + chargers for electric cars

8. Visual materials (link to pictures of exterior and interior design, layouts) * Gallery: http://jackhouse.com.ua/en/#gallery Layouts: http://jackhouse.com.ua/en/#layouts Jack House video: http://jackhouse.com.ua/en/

Narration: Sometimes it's so important to stop and look around. Perfection is nearby. Perfection of lines, forms and style is an essential part of your life. Its quintessence. Feel how easy it is to be free, feel the weightless. Listen to yourself, moving only forward. These are your rules and this is your space, filled with lightness - your lightness. Following your desires, you choose only the best. New house from Taryan. Jack House - better than Jack Pot. View-360: https://goo.gl/ETKcVD VR-room (video): https://goo.gl/6WbuPi Show-room (video): https://goo.gl/g5Y9J3 We created a new TARYAN Group sales department, which takes up the entire floor. The buyer can experience the way of life that we create for him in TARYAN projects already here. In the new sales department we have created a spacious lounge area with soft sofas where you can discuss with the sales manager your choice. There is a model of the JACK House and other houses of the group. We built a virtual reality room where you can walk around your future apartment in JACK HOUSE with a completed interior design, see the view from the window during the day and night. In the sales department there is a lovely terrace where you can drink coffee or another favorite drink that the barman will make.

9. Noteworthy information you consider might be relevant for the jury members An innovative approach to creating a fashionable house, modern trends in the choice of materials and decor, the newest comfort and safety technologies, the exclusivity of every detail and attention to the guests – every little detail here creates a unique engineering and design solution of JACK HOUSE. From a ventilated facade and panoramic windows and to an artist-built lamp in the bar - everything is made to ensure that you feel at the center of the universe. Choosing an apartment in JACK HOUSE, you do not simply buy square meters but a certain standard of living. Jack House is a certain standard of living. Do you dream of a pleasant candlelight dinner on the roof of a skyscraper? That‘s so easy! We have created a cozy lounge-bar on the roof of JACK Club especially for those moments. ROOF THERMAL POOL ROOF FITNESS ROOF SPA ROOF REUSTARANT An innovative approach to creating a fashionable house, modern trends in the choice of materials and decoration, the newest comfort and safety technologies, the exclusiveness of each detail and aTen@on to the guests – every litle detail here creates a unique engineering and design solution.  24/7-monitoring of all life support systems of the building due to the automated monitoring and building management system.  Secured area, 24/7 video surveillance, security posts,  Personal electronic pass system, card access to elevators  2 heavy-load elevators and 1 passenger elevator. Manufacturer: Mizui. Travel speed: 3 meters per second  LIGHTING  ENERGY EFFICIENCY  WARM HOUSE TECHNOLOGY  ENERGY-SAVING WINDOWS.  RECYCLING  THE DRIVEWAY OF THE FIRE-FIGHTING EQUIPMENT IS PROVIDED AND AGREED The ability of  DURING THE CONSTRUCTION NON-COMBUSTIBLE MATERIALS WERE USED During the AUTOMATIC FIRE EXTINGUISHING SYSTEM IS INSTALLED  FIRE ALARM SYSTEM INSTALLED  AUTOMATIC FIRE EXTINGUISHING SYSTEM IS INSTALLED SMOKE REMOVAL SYSTEM IS ALSO AUTOMATIC  THE FIRE ALERT AND EVACUATION MANAGEMENT SYSTEM IS INSTALLED All JACK HOUSE Blockbuster Mall

1. Name of the Project Blockbuster Mall 2. Web page of the Project 3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Kyiv, Stepana Bandery, 34V 4. Date of start and completion of the project Completion - November 2018 5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) Investor - Mandarin Plaza Exclusive broker - NAI Ukraine / naiukraine.com Urban Experts - urbanexperts.co 6. Project Type (Shopping mall) 7. Description and major characteristics of the project (technical and functional specifications) GBA 350 000 sq.m. GLA 175 000 sq.m. Parking 60 000 sq.m., 3 000 cars Anchors: Entertainment area (45 000 m2), hypermarket (10,079 m2) Number of floors 2 Retail Gallery - over 500 stores Restaurants - over 40. Entertainment area 45 000 m2. - The shopping mall is located near Petrivka subway station. The average people flow - 53,300 people a day. There is also a train station close to Blockbuster Mall - average flow 7000 people a day. The mall is located on S. Bandera av. - daily average flow 136 662 people a day. - Blockbuster Mall will become one of the largest shopping malls in Eastern Europe and the largest SEC in Kyiv. - shoppertainment concept with an immense entertainment area - 45 000 m2

8. Visual materials (link to pictures of exterior and interior design, layouts) https://drive.google.com/drive/folders/0BwxFr3pmKRyTdEMwNHE2S3pRMm8

9. Noteworthy information you consider might be relevant for the jury members Park Pochaina will be located behind Blockbuster and Blockbuster Mall, along the Pochaina River. Thanks to Pochaina Park malls' visitors will have an alternative route to the shopping and entertainment centers Blockbuster and Blockbuster Mall. They won't need to walk along the noisy avenue with lots of cars, and they will be able to reach the shopping malls after a lovely walk in the park. The main part of the park will be located close to Blockbuster Mall - there will be an access to water, fast food area and sports area. -The first 4DX and IMAX cinema in Ukraine. -The highest mall's GBA and GLA in Ukraine. -The first cinema-restaurant RE'LUX in Ukraine. -The largest mall's entertainment area in Ukraine - over 45 000 sq m. -Shoppertainment concept. -LED panels navigation. -Synergy of Blockbusterand Blockbuster Mall. -Connection to the future park Pochaina. -Unique tenant mix. - Blockbuster Mall will become a part of the network of super-regional shopping with a total area of over 2 million square meters. 7 superregional megamalls will create an unprecedented synergy in the capital's real estate market, and will become leaders in the segment. Ocean Mall

1. Name of the Project Ocean Mall

2. Web page of the Project

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Kyiv, Lybidska Square

4. Date of start and completion of the project completion date for the Ocean Mall set for October 2018, and opening ceremony in November 2018

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) Investor - Mandarin Plaza. Exclusive broker - NAI Ukraine, naiukraine.com

6. Project Type Retail (Shopping mall)

7. Description and major characteristics of the project (technical and functional specifications) - Ocean Mall embodies shoppertainment concept - the provision of entertainment or leisure facilities within or alongside retail stores, as part of a marketing strategy designed to attract customers. Ocean Mall will be the first major Ukrainian mall created according to British architectural standards. Moreover, the shopping center will have the only Imax and 4dx cinema in the central part of Kiev and the first digital entertainment park. Total area of entertainment facilities will exceed 30 000 sq.m. - LED panels navigation. - Unique entrance group designed upon individual order by British architects.

8. Visual materials (link to pictures of exterior and interior design, layouts) https://drive.google.com/drive/folders/0BwxFr3pmKRyTRERPSm85Njd3T0E

9. Noteworthy information you consider might be relevant for the jury members Ocean Mall, one of the most anticipated projects in Ukraine‘s commercial real estate market, completes its foundation work and proceeds to building erection. The three largest companies — Altis, Eurointerbud and Osnova — are building this ambitious project, with a completion date for the Ocean Mall set for October 2018, and opening ceremony in November 2018.

―All the main areas in Ocean Mall have been already leased. The new shopping centre will include 500 stores, with a total area of 100,000 square meters, a cinema with an IMAX and 4DX halls, and a giant digital entertainment park with an area of 30,000 square meters. Thanks to the world‘s largest fashion retailers opening their stores at Ocean Mall, and the current retailers at Ocean Plaza, the project will become the main SEC for the central part of Kiev,‖ – said the founder of Mandarin Plaza, Vagif Aliyev. - cinema with an IMAX and 4DX halls, and a giant digital entertainment park with an area of 30,000 square meters -An entirely new traffic junction will be built next to Ocean Mall, eliminating congestion on the Lybidska Square and provide parking for 2,000 spaces without traffic problems. - Underground passage will connect Ocean Mall with Ocean Plaza, so two shopping malls create synergy in terms of tenant mix and entertainment offer. SEC Rive Gauche

1. Name of the Project SEC Rive Gauche

2. Web page of the Project www.rivegauche.ua

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine, Kyiv, Left bank, Darnitskiy district, 4A, Poznyaki microdistrict, 15A, Zdolbunovskaya str. Description of location (amenities, infrastructure, transport accessibility, etc) Video location https://youtu.be/pr79Jo20Y8E The SEC is located in the densely populated district Poznyaki, where new modern residential complexes with commercial housing were constructed an are under construction. Residential complexes have already been put into operation and populated. Approximately 80,000 people live in 2- minutses of walking distance to SEC. The total catchment area of the shopping and entertainment centre is 800 000 inhabitants. Further construction of modern residential complexes in the catchment area is planned. For comfortable living, residents of the district need a new modern offer for retail, services, entertainment, edutainment, recreation and leisure.Near the shopping center will be built a kindergarten. The stop of public transport will be placed near the entrance of the SEC. The free shuttle buses will be provided from subway station Poznyaki, Osokorki, Kharkovskaya. 4. Date of start and completion of the project (its phase):  Phase 1: September 2016 – Q4 2017;  Phase 2: Q4 2017 – Q3 2019 5. Participants of the Project (specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc): Development Company: Immochan http://www.immochan.com/en Immochan Ukraine http://www.immochan.ua/en Immochan Ukraine, LLC (Auchan Holding), an international company with strong development, one of the global leaders in commercial real estate, managing approximately 400 shopping centres in its portfolio in 13 countries. Architects: Exterior - FABER International LLC http://faberco.eu/ Interior – Urban Experts & Leslie Jones Architecture http://www.lesliejones.co.uk/ Property and construction consultancy: Gleeds Ukraine LLC - https://www.gleeds.com/ Вrokerage company: Immochan Ukraine and NAI Ukraine https://naiukraine.com/

6. Format of the project Retail

7. Project structure description (gallery, supermarket, food court, entertainment zone etc): Phase 1 GBA: 55 900 кв.м. GLA: 20 200 кв.м. (15 000 sq.m HM Auchan + 5 200 sq.m Shopping gallery) Phase 2 GBA: 150 000 кв.м. GLA: 72 000 кв.м. General information Shopping mall RIVE GAUCHE is a unique project that will become a vitrine of 40 years of experience of Immochan Company and a flagman project of the new development strategy – VISION 2030. Immochan engages creating a sustainable, smart and lively place to brighten up everyday life, meeting people's needs and animating the catchment area of the SEC ―RIVE GAUCHE‖. Technical and engineering specifications The project will be certified according to the international certification system BREEAM as the first ―Very Good‖ New Construction retail project. Parking (number of parking slots, type of parking, innovative solutions for parking)  Parking places – 2500  Two-level parking  Innovative solutions for parking: сarsharing; car chargers; bus stops; zoning for different type clients.   Tenants (anchor tenants, mini-anchor tenants, other gallery tenants):  Anchor tenants Phase 1 - Auchan, Eldorado, LC Waikiki, KFC, Divoland.  Other gallery tenants Phase 1: Brocard, Zarina, Zolotoy Vek, Sribniy Vik, Lush, Ives Rocher, Idea shop, Orner store, Master Zoo, Samsung, Xiaomi, Kyivstar, Vodafon, Jasmine, Krisstel, Giulia, Тvoya Pressa, Nasha Apteka, Novaya Pochta, Coffeelat.  Anchor tenants Phase 2 – Decathlon, Leroy Merlin, Multiplex, LPP, etc..

Occupancy rate phase 1 – more than 80%, phase 2 – leasing is on process.

8. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment): Rive Gauche https://www.dropbox.com/s/6rmbz7vohzt1yac/SEC%20RiveGauche_leaflet_EN.pdf?dl=0 Immochan https://www.dropbox.com/s/6rmbz7vohzt1yac/SEC%20RiveGauche_leaflet_EN.pdf?dl=0

9. Noteworthy information you consider might be relevant for the jury members Shopping mall RIVE GAUCHE is a unique project that will become a vitrine of 40 years of experience of Immochan Company and a flagman project of the new development strategy – VISION 2030. Immochan engages creating a sustainable, smart and lively place to brighten up everyday life, meeting people's needs and animating the catchment area of the SEC ―RIVE GAUCHE‖. Shopping mall ―RIVE GAUCHE‖ proposes an offer compliant with the expectations and power purchase of the catchment area of the project equal to 800 000 people. Immochan thoroughly analysed our future clients to respond to their needs. The infrastructure of the shopping mall provides for the implementation of complex social projects necessary for comfortable living of residents. It is known that according to the agreement of the parties and on the recommendation of the city administration and the mayor of Kiev Vitali Klitschko, near the shopping and entertainment center in a specially designated for this land plot, a pre-school institution (kindergarten) will be built. The construction of a kindergarten and a SEC will be carried out simultaneously, by the same developer. The tenant-mix is aimed to generate minimum 13 mln people per year with a help of powerful anchors and main ―GROUP BRANDS‖ such as Auchan, Leroy Merlin, Decathlon, etc. Due to its strong location, commercial program and experience of international developer ―RIVE GAUCHE‖ will become a place to welcome new brands for the market. As an integrated operator, we believe that real estate is not the end in itself. Every project, whatever it is, is above all a response to urban uses and issues. The positioning of ―RIVE GAUCHE‖ can be transmitted by means of slogan ―Be our guest‖. It will be realized by organization of comfortable rest areas, services and social spaces according to the corporate label AUSHOPPING. AUSHOPPING is the ambitious quality label to transform Immochan's shopping centre network. The aim is to expand and brighten up the shopping experience. The shopping and entertainment center ―RIVE GAUCHE‖ is the best opportunity to open a shop / enter new brand on the Ukrainian market, which is included in the rating of 30 biggest European markets. Expo 2017 Kazakhstan Pavilion - Nur Alem

1. Name of the Project Expo 2017 Kazakhstan Pavilion - Nur Alem

2. Web page of the Project https://expo2017astana.com/en/

3. Link to the promo video Euronews https://www.youtube.com/watch?v=mKApoRKDywI https://www.youtube.com/watch?v=mMlKKHrt728 https://www.youtube.com/watch?v=sIrbPpbmqcg https://expo2017astana.com/ru/page_id=22

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Photos https://goo.gl/wqcspi Layouts https://goo.gl/bZxDJQ

5. Location of the Project (country and city; location characteristics: CBD/historiс area of the city, suburban area etc) Kazakhstan, Astana, 55 Mangylik El street. EXPO 2017 Pavilion in Astana is located between main streets of Astana: Kabanbai batyr avenue, Orynbor street, Hussein bin Talal and Turar Ryskulov streets. Expo 2017 site is located on the south of city center of Astana. And the most important architectural object of Expo, Pavilion Nur Alem stands on the center of the Expo site. It is surrounded by International, Corporate and Thematic Pavilions, Art Center, Energy Hall, Best Practices Area and Amphitheater. There are also several important cultural, public, educational and residential areas around the Expo site such as, Hilton Hotel, Expo Congress Center, Mega Silk Way Shopping Mall Entertainment Center, Nazarbayev University and Astana Ballet Theatre. Regarding transportation, the area is easy accessible by motorway with private cars and public buses. People can use many public bus routes numbered as 10, 12, 18, 37, 40, 51, 53, 200 (night), 301, 302, 303, 308, 309 and 506. Also, The Astana Metro which is planned as light rail rapid transit system will come into use very soon. With a minimum number of stops it can take around 30 minutes to get to the exhibition from the city center the pavilion is about 3 km from Baiterek City Center, 11 km from the central railway station, 8 km from Astana International airport Astana.

6. Date of start and completion of the project (phase) 05/09/2014 – 30.04.2017

7. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) General Contractor: Sembol Construction http://www.sembolinsaat.com.tr/ Controller: Hill International https://www.hillintl.com Architectural Design: Adrian Smith + Gordon Gill Architecture (AS+GG) http://smithgill.com/ Structural Design: Werner Sobek Stuttgart Gmbh www.wernersobek.de Mechanical Projects: Positive Energy Practice Electrical Projects: Lighting Design Partnership International Ltd http://www.ldp.net/ Landscape: The Planning Partnership Limited (TPP) http://planpart.ca/ Interior Design: KCA International Designers http://www.kca-int.com/ Interior Lighting Design: Light Touch PLD http://lighttouchpld.com/ Acoustic Consultancy: AJ ACOUSTICS http://www.adrianjamesacoustics.co.uk/ AV Consultancy: Hewshott http://www.hewshott.com/ Daylight analysis: Lighting Lab1 http://www.lightinglab1.com/ Visitor flow analysis: Aecom http://www.aecom.com Content Design Consultancy: Raid Sabbah Local Content Design and Consultancy: Texspire LLP http://texspire.com/ Media Production Consultancy: Filmdeney http://www.filmdeney.com/ Photographer: Emre Dorter http://emredorter.com/

8. Property characteristics (GBA, GLA, room count, functional/infrastructure components as applicable) The defining symbol and the central venue of the EXPO-2017 site is Nur Alem - the spherical Main Pavilion in the centre of the Expo City. It is a glass ball of 80 meters in diameter – the largest of its kind – with two wind generators and 13.132 solar cells on the exterior upper part. While it‘s floors cover a total area of 41.633 m2, the 8 exhibition levels contain almost 70 independent exhibitions. There are 3 big atriums which are important impressive spaces through the sphere. One of them is located on the center, surrounded by 8 panoramic elevators and the rest 2 are on the north and south sides of the building. This iconic building is devoted to Future Energy and therefore looks to our global energy future. Accordingly, each floor has its own theme to focus on. Level 1 – National Pavilion Level 2 – Water Energy Level 3 – Kinetic Energy Level 4 – Biomass Energy Level 5 – Wind Energy Level 6 – Solar Energy Level 7 – Space Energy Level 8 – Future Astana Future Energy contemplates raising awareness regarding energy as an inherent asset of humanity that should be used responsibly and efficiently. Visitors will be able to see the future energy technologies and concepts related to floor themes as well as the perspective to Kazakhstan starting from its history to the future with digital, multimedia and interactive tools.

9. Tenants / operators (for commercial property) or end customer Joint-stock company ―National company ―Astana EXPO-2017‖ which was established by the enactment of Government of the Republic of Kazakhstan.

10. Occupancy rate (%) During EXPO period, the building worked with full 100 % occupancy.

11. Ribbon-cutting ceremony (description and links to the press releases, comments in mass media, footage etc) Euronews https://www.youtube.com/watch?v=mKApoRKDywI https://www.youtube.com/watch?v=mMlKKHrt728 https://www.youtube.com/watch?v=sIrbPpbmqcg Full live opening ceremony https://www.youtube.com/watch?v=K6iEfgoQa_k Press releases, mass media http://www.bie-paris.org/site/en/2017-astana http://www.euronews.com/2017/06/09/astana-expo-2017-opening-ceremony https://www.prnewswire.com/news-releases/expo-2017-opening-ceremony-to-surprise-guests-with-a- large-scale-multimedia-show-624283833.html https://www.expo2017.com/en/p/ceremoniya-otkrytiya-vystavki-expo-2017-sostoitsya-v-novom- kongress-holle-astany https://primeminister.kz/en/news/all/uchastie-v-tseremonii-otkritiya-mezhdunarodnoi-spetsializirovannoi- vistavki-ekspo-2017-14746 http://www.akorda.kz/en/events/astana_kazakhstan/participation_in_events/participation-in-the-opening- ceremony-of-expo-2017-international-specialized-exhibition http://www.washingtontimes.com/news/2017/jun/22/kazakhstan-leads-changes-in-central-asia-away- from/

12. Noteworthy information you consider might be relevant for the jury members The opening of Expo 2017 consisted of multimedia show in the Congress Center, a concert in the Amphitheater, a light and laser show on Nur Alem, and finally, there was incredible fireworks over all EXPO 2017 site.

Over 100 companies, including Zaha Hadid Architects, UNStudio, Snøhetta, HOK, and Coop Himmelblau, participated in a competition to design the grounds of Expo 2017. Chicago firm Adrian Smith + Gordon Gill Architecture (AS+GG) won the competition for the design idea. The main project, according to the design was realised by Swiss company IT-Engineering. Several national and international construction companies were awarded contracts to build the grounds. The main contractor Mabetex Group, and Sembol, CC Bazis-A LLC, ABK Kurylys-1 LLC, Turquaz-YDA Stroy LLC, Sredazenergostry LLC have completed the construction part. The financing of project is done by the Kazakhstan Government and some private investor like Plast Invest Production LLP, Sonik Company LLP, PolimerMetal-T LLP and Alyugal LLP. • Nur Alem became the most visited in Expo 2017 Astana • One of the best places of public is the glass cantilever skywalk on level 8. • Libraries on each floor`s balcony sides are open to public. • Kinetic Energy and Tokamak shows became most exciting and interesting activities for the public • Mobile Application Nur Alem which is developed for better communication with public The International Recognised Exhibition EXPO 2017 held in Astana is one of Kazakhstan's key national projects. The initiative for organising such a grand event in our capital city was launched by the President of the Republic of Kazakhstan, Nursultan Nazarbayev. Construction of the Astana EXPO 2017 venues is proceeding according to the plan. A growing number of states have confirmed their participation. These include Germany, France, Russia, Turkey, India, China, Japan and many others. Moreover, holding exhibitions also has a positive impact on both the city and the country where they take place. They promote investments and facilitate the development of construction and industry. New unique facilities are built that attract tourists from different countries. Therefore, our main task now is the adequate preparation of Kazakhstan for a large-scale international event: Astana EXPO 2017. The logo of Astana EXPO 2017, ―Wind Energy‖, symbolizes interaction of natural elements and is framed by the most recognizable symbol of alternative energy – the wind generator. Fountain Boulevard

1. Name of the Project Fountain Boulevard

2. Web page of the Project https://bfontanov.com

3. Link to the promo video https://www.youtube.com/watch?v=INpt595oi28 https://www.youtube.com/watch?v=4bPrpZCTlBg

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://drive.google.com/open?id=0B-cF7zptWLv-cTJGQ3hhRnlaYXM

5. Location of the Project (country and city; location characteristics: CBD/historiс area of the city, suburban area etc) Ukraine, Kiev. The central business district is Pechersk.

6. Date of start and completion of the project (phase) Turn 1 (1 house): the beginning of construction - II quarter of 2011, the completion of construction - II quarter of 2014, the second stage of construction (3 houses, 2 houses put into operation: house 1 - II quarter of 2016, house 3 - II quarter ): the beginning of construction - I quarter of 2013, the completion of construction - II quarter of 2019.

7. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Developer: City One Development - https://city1development.com.ua Customer: UDP - http://www.udp.ua General Contractor: Devenstroy General Designer: BIP-PM - http://www.bippm.com

8. Property characteristics (GBA, GLA, room count, functional/infrastructure components as applicable) Residential and commercial property; the total area of the site is 4.06 ha, the total area of the buildings is 178390.0 m2, the total area of the apartments is 83660.0, the number of apartments is 811, the number of parking spaces is 1016, the number of storeys is 8-24 floors; Infrastructure: on the first floors there are commercial areas, a 2-level roof terrace with a barbecue area, a public library for residents, a kindergarten, a fitness center.

9. Tenants / operators (for commercial property) or end customer - FORMA beauty salon - Center for Development of KinderWill - Coffee house BlackBerry - clothing store Marque Space - design and interior design studio Ambassador - Freedom Design and Interior Design Studio

10. Occupancy rate (%) 71%

11. Ribbon-cutting ceremony (description and links to the press releases, comments in mass media, footage etc) https://drive.google.com/file/d/0B-cF7zptWLv-R2RSTnJuNlcxSW8/view?usp=sharing

The opening of the fountain alley and the house 3 of the II turn https://docs.google.com/document/d/1LWfreO599cBzQ4vXUrI9fXX9GHhhcVeCT2BFu6Ow3YA/edit?us p=sharing

12. Noteworthy information you consider might be relevant for the jury members None TALAN TOWERS

1. Name of the Project TALAN TOWERS

2. Web page of the Project http://talantowers.com

3. Link to the promo video https://vimeo.com/236046721 - Video presentation of the project (Rus) https://vimeo.com/156371865 Video “Idea” (Eng)

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Exterior https://goo.gl/hkkWBJ City view https://goo.gl/Pj4Ho2 Talan Towers Offices https://goo.gl/Y5hvJK The Ritz Carlton Astana Hotel https://goo.gl/AyG9mM The Ritz-Carlton Residences Astana Residences https://goo.gl/rPehXJ Parking https://goo.gl/roYA47 Emporium https://goo.gl/koJG9c Restaurant Selfie Astana https://goo.gl/pdwaA1 Starbucks bar https://goo.gl/Tokb7d Astana Property Management Office https://goo.gl/5cr1qx

5. Location of the Project (country and city; location characteristics: CBD/historiс area of the city, suburban area etc) 010016, 16 Dostyk Street, Esil District Astana, Kazakhstan The project sits on a privileged location at the heart of the new city. Astana, being the youngest capital in the World, is considered as one of the most rapidly growing ambitious and bold teenager among the family of global capitals. Being just 17 years old, Astana hosted important international events as Congress of World Religions, various international summits, Asiada – 2011 and Expo-2017. The building completes the southeast corner of the Bayterek Tower plaza defined by the corner of Dostyk and Turkishtan Streets. The project’s prominent location allows the project to be a new landmark and a popular destination in Astana, offering direct views towards the Bayterek Tower and a unique visitor experience. This dialogue between the new structure and the Bayterek monument establishes the basis for the design. The new building inspires to reflect order, permanence and prosperity, complementing the Bayterek monument with a timeless design. Talan towers 360 view: http://talantowers.com/talan-towers-360-view/

6. Date of start and completion of the project (phase) Start 2013 Completion 2017 (Talan Towers Offices, The Ritz-Carlton, Astana; The Ritz-Carlton Residences, Astana) Luxury fashion gallery EMPORIUM - 2018 LEED Certificate – 2018

7. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Investor – Verny Capital https://vernycapital.com/ Developer – Astana Property Management Construction management - Turner International http://www.turnerconstruction.com/ Structural / MEP Contractor – Renaissance Construction http://rencons.com Architecture - SOM (Skidmore, Owings & Merrill LLP) http://www.som.com/ Interior design (Retail) – Callison https://www.callisonrtkl.com/ Interior design (Office) - Pringle Brandon Perkins+Will www.perkinswill.com Interior design (Hotel) – Richmond Branding Landor LEED Consultancy – Jain Sustainable Engineering Solutions (Amman, Jordan) LEED commissioning services consultancy - Salimus (Dubai, UAE) http://salimus.com/ Facility and Property Management – JLL http://www.jll.ru/ Engineering - Dizayn Group http://www.dizayngrup.com/en/ Lighting Design & Consulting - Paul Nulty (London, UK) Traffic consulting - Walker (New York, USA) http://walkerconsultants.com/ Hotel Pool & Spa consulting - Promet http://promet.com.tr/en/index.html Facade Design & Consulting – AFC http://www.afc1.com/ Facade works - Metal Yapi http://www.metalyapi.com/ Fit-out works - Kukbo (Seoul, South Korea) Elevators, turnegates, escalators - KONE http://www.kone.com/en/ Landscape design - AGS Pro Engineering http://www.ags-eng.kz/ Kitchen & Laundry consulting - Makpa http://www.makpa.com/ Wind engineering consulting - Wacker Ingenieure http://www.wacker-ingenieure.de Acoustics consulting - Mezzo Studyo (Ankara, Turkey) Audio visual consulting - Asimetrik http://asimetrik.com Design adaptation - Lighthouse http://lhk.kz Signage consulting - Baltic Signs http://balticsigns.com/ru/ Artwork consultancy - VISTO Images http://www.vistoimages.com/ F&B consulting - Blacksheep http://www.blacksheep.uk.com/

8. Property characteristics (GBA, GLA, room count, functional/infrastructure components as applicable) Talan Towers is the first high-end mixed-use development in Astana to create a new level of lifestyle and luxury experience in the capital. The project became the excluding brand, the pre-eminent destination point in Astana and emblematic of the city and its growing power and prominence. Talan Towers consists of three major components: - Hotel tower with the first luxury hotel in Astana “The Ritz- Carlton, Astana” and luxury apartments “The Ritz-Carlton Residences, Astana”; - Business Centre Talan Towers Offices – the first office complex of international standard in the capital; - EMPORIUM – a luxury fashion gallery. Office Tower: Talan Towers Offices • A class • 30 floors • GLA: about 30 000 sqm; • Opened in September 2016 The Ritz-Carlton, Astana • Number of rooms: 157 • Restaurants, sky bar, club lounge, ballroom (about 1000 sqm), spa, fitness center, pool, conference center etc. • Opened in June 2017 The Ritz-Carlton Residences, Astana • 27 residences • Top 7 floors of Hotel Tower • Opened in October 2017 Luxury Fashion Gallery: • GLA: about 8000 sqm • Opening: 2018 2 level underground parking GBA Talan Towers – 120 000 sqm. Amount of capital invested - $430 000 000. 9. Tenants / operators (for commercial property) or end customer Talan Towers Offices hosts the offices of major international and local companies, including VERNY CAPITAL group of companies (the investor of the project): BTA Bank Astana International Financial Center Representative Office Kazzinc Holding Astana Property Management White & Case LLP KaR-Tel (Beeline) Jones Lang LaSalle (JLL). 10. Occupancy rate (%) Talan Towers Offices - 33% The Ritz-Carlton Residences, Astana – 30%. 11. Ribbon-cutting ceremony (description and links to the press releases, comments in mass media, footage etc) Talan Towers organized grand opening of the three major components: June 5, 2017 - The Ritz-Carlton, Astana (hotel) September 28, 2017 – TALAN TOWERS OFFICES (business center) October 20, 2017 - The Ritz-Carlton Residences, Astana (residences) The buero Hirzberger organized the grand opening of the “The Ritz-Carlton, Astana” with performances by Jamiroquai, Milla Jovovich, Patricia Kaas and many more. The president of Kazakhstan mr. Nursultan Abishuly Nazarbayev visited the official opening. büro Hirzberger:

International Online Publications  http://wp.hirzbergerevents.com/portfolio/theritzcarltonastana/ Satprnews.com • Prnewswire.com • Crossroadstoday.com • Finance.yahoo.com • 4-traders.com • Luxury-hospitality-daily.com • Tatler Russia http://www.tatler.ru/ • Vogue Russia http://www.vogue.ru/ • GQ Russia http://www.gq.ru/ Other publications https://forbes.kz/process/property/skolko_gruppa_vernyiy_kapital_investirovala_v_talan_towers_v_astane - 9478 views https://qostanay.tv/obshchestvo/nazarbaev-otkryl-otel-ritc-karlton-v-astane https://www.kt.kz/rus/state/prezident_kazahstana_prinjal_uchastie_v_ceremonii_otkritija_gostinici_ritckarlton _v_astane_1153640508.html - 9030 views http://news.1.kz/news/nazarbaev-otkryl-otel-ritcz-karlton-v-astane-43958.html - 1407 views https://www.interfax.kz/ http://tengrinews.kz/kazakhstan_news/nazarbaev-otkryil-otel-ritts-karlton-v-astane-319498/ - 29994 views ETC. September 28, 2017 – TALAN TOWERS OFFICES an A-class business center built as part of the multifunctional Talan Towers complex, was presented Sept. 28 in the capital. It is a pioneer in green technology construction among the city’s business centers, as it was built in accordance with Leadership in Energy and Environmental Design (LEED®) international standards. The media event introducing the building was organized by Yerlan Ospanov, general director of Verny Capital, Ammar Nahya, general director of Jain Engineering Consultants International, Lukasz Skowronski, managing director of Global Development LLP and Leonid Volokh, regional director of JLL Russia & CIS (Commonwealth of Independent States). Short video of the event “Official presentation of the Talan Towers Offices” The final report on media coverage: https://goo.gl/Re2xAq October 20, 2017 The Ritz-Carlton Residences, Astana officially presented luxury apartments in the restaurant “Selfie Astana”, which is located on the 18th floor of the hotel “The Ritz-Carlton Residences, Astana”. It was private event (there is not any information in media coverage). 27 luxury residences located on the upper 7 floors of the hotel tower -The Ritz-Carlton, Astana. The target market for these residences are mostly UHNWIs from Kazakhstan’s Forbes list. In order to enhance the privacy and exclusiveness, there is a separate entrance as well as three passenger elevators for the owners and inhabitants of the residences. Without leaving the building, the owners of residences have access to restaurants, bars, fitness center, swimming pool, spa, beauty salon, conference rooms, and high-end shopping. Moreover, the location of Talan Towers provides breathtaking views of Astana’s main attractions, especially Baiterek. It is not only about the residence itself, but the entire complex that offers a true feeling of luxury. All blocks of the residential complex have full thermal and sound isolation, ensuring economy of resources and peaceful living conditions.

12. Noteworthy information you consider might be relevant for the jury members TALAN TOWERS noted in the international property contest, Asia Pacific Property Awards 2017. This prestigious international competition, held in Asia and which for more than 20 years has been determining the best representatives in the field of real estate, has proved that Kazakhstani companies are able to build to the highest international standards. The awards ceremony for the winners of the Asia Pacific Property Awards 2017 was held at the Marriott Marquis Queen's Park in Bangkok, Thailand. Astana Property Management won awards in the Development and Architecture sections with the Talan Towers project, winning for Mixed-use Architecture and Mixed-use Development. These awards open up new prospects for the winning companies. For more information, please go: https://forbes.kz/process/property/kazahstan_zavoeval_9_nagrad_na_konkurse_nedvijimosti_v_tailande/ The Ritz-Carlton, Astana - the first luxury hotel in the center of Astana was opened in the Talan Towers multifunctional complex, situated near the well-known Baiterek monument. The Ritz-Carlton, Astana, has 157 spacious rooms (including 32 suites with panoramic views), a spa, a ballroom with an area of 1000 square meters, a business center and a shopping gallery - all that is needed for the perfect business trip. If one wants to hold a business meeting or a conference at short notice, the hotel is ready to offer special rooms and offices. As for the restaurants, there are three of them: Lobby Lounge Өzen, which specializes in organic natural products, Mökki with an open kitchen and the Selfie Astana (White Rabbit Family). Testimonials Pablo De Miguel, Chief Project Architect SOM (USA) Talan Towers is the result of a very rigorous design approach and a very fruitful collaboration with our clients. This enabled the creation of an architecture that is distinctive, functional, sustainable and meaningful. At a time when much of architecture has been reduced to superficial imagery, Talan Towers rises as an elegant and timeless design that inspires to reflect order, permanence and prosperity. The project sits on a privileged location at the heart of the new city. Conceived as an extension of the Bayterek Plaza, Talan Towers creates a year round destination. Offering a unique and diverse visitor experience, with an exclusive mix of luxury retail, restaurants, hotel, residences and offices. Its architecture is derived and characterized by its context. The dialogue between the project and the Bayterek monument establishes the basis for the design. The distinct elements comprising the project are defined by their simplicity of forms and a strong underlying order of elements, rich materials and elegant proportions. This connection between function, context and a clear design solution allows the project to stand out as a new landmark for the city, and at the same time create spaces that, we believe, will enhance the lives of the people who inhabit them. John LeBron, Chief Design Manager Turner International (USA) TURNER has been managing projects Internationally for some 50 years, and constructing buildings for over a Century, and in that time, we have been fortunate to participate on a selection of high-profile development teams. To Project Manage an undertaking which can be seen as a Watermark for the host city however, is a more Rarified opportunity. Young Cities such as Astana are defined by their Buildings, Public Spaces, and the contributions of those Buildings to the Vision of the City. Talan Towers simultaneously introduces Retail, Residential, Hotel & Office Space to Astana at a quality-level which sets it apart, within the New Capital. For Turner International, this is an opportunity which challenges us to work with Consultants across 3 Continents, Contractor and Suppliers sourced from across the Globe, and to work in some of the most challenging climatic conditions - (well documented in the case of Astana) - and represents the kind of challenge on which our Company thrives. As Talan Towers rises into the skies over Astana, we are aware that the hardest work - and the most challenging aspects of delivering a Benchmark Project - lies ahead, in the coming weeks and months, and will consume the very best of our experience, and our abilities. Park Inn by Radisson Kyiv Troyitska

1. Name of the Project Park Inn by Radisson Kyiv Troyitska

2. Web page of the Project www.parkinn.com/hotel-kyiv

3. Link to the promo video

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) parkinn.com/hotel-kyiv/gallery

5. Location of the Project (country and city; location characteristics: CBD/historiс area of the city, suburban area etc) Ukraine, Kiev; city center

6. Date of start and completion of the project (phase) Start - January 2017, commissioning September 2017, opening - September 26, 2017

7. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) The developer of Smart Holding Group, www.smart-holding.com/en, the legal name of Prodhimindustria Ltd., the operator of Carlson Rezidor

8. Property characteristics (GBA, GLA, room count, functional/infrastructure components as applicable) The hotel, 12 826.4 square meters. m., the number of rooms - 5 058.7 square meters. m., lobby bar, conference area, restaurant, fitness center, business center 9. Tenants / operators (for commercial property) or end customer

10. Occupancy rate (%) The hotel has just opened

11. Ribbon-cutting ceremony (description and links to the press releases, comments in mass media, footage etc) http://biz.nv.ua/consmarket/mesto-gde-zhivet-schaste-park-inn-by-radisson-1935184.html http://eba.com.ua/uk/press-and-media/news-from-members/item/37524-2017-10-2-1155 http://destinations.com.ua/travel/park-inn-by-radisson-kyiv-troyitska https://www.kyivpost.com/business-wire/place-happiness-lives-park-inn-radisson.html http://www.abcnews.com.ua/en/markets/otiel-park-inn-by-radisson-troyitska-v-kiievie-nachal-rabotu

12. Noteworthy information you consider might be relevant for the jury members The hotel is equipped with a heat recovery system and ultraviolet water disinfection system. DoubleTree by Hilton Minsk

1. Name of the project DoubleTree by Hilton Minsk

2. Project web page minsk.doubletree.com

3. Link to the promo video

4. Date of beginning and end of the project 2012-2016

5. Participants in the project - indicate the names and activities of companies, as well as their web pages (management company, architect, engineering company, consulting company, law firm, brokerage company, etc.) Developer - Gallery Concept LLC, operator - Hilton Worldwide

6. Number of rooms 193

7. Operator Hilton Worldwide

8. Visual materials (link to photos from the exterior and interior, lay-out, parking and the surrounding environment) https://www.dropbox.com/sh/urh81h8dnkgkyhe/AAA3VCG9ZEdGC2QY42X-oJW1a?dl=0

9. Type of project Business hotel

10. Location of the project (country and city, central business district / historical district of the city, etc.) Belarus, Minsk, city center

11. Description of location (convenience, infrastructure, transport access, etc.) In the very center of Minsk, within walking distance from the atmospheric Old Town, numerous sights, business and exhibition centers of the capital, there is a modern first class DoubleTree by Hilton Minsk hotel, ideally suited for conferences, meetings and other events. Just a few minutes walk are public transport stops, metro station "Nemiga" and "Frunzenskaya". You can leave your personal car in the parking lot at the hotel or in the shopping center "Gallery". The hotel is located 40 minutes drive (45 kilometers) from the National Airport.

12. Hotel infrastructure and services (spa, gym, restaurants, conference services, parking, laundry, etc.) 193 rooms, including 15 suites and three suites (Diplomat, Ambassador, President) are decorated in an art deco style and equipped with everything necessary for comfortable rest and productive work: beds with unique branded mattresses Sweet Dreams by DoubleTree, ergonomic work area and free Wi- Fi. Free tea, coffee, water and a mini-bar are served, and there are also coffee machines in the higher categories. From the panoramic windows you can see a breathtaking view of the center of Minsk. High- class comfort includes a 24-hour gym, delivery of food and drinks to the room, business center, laundry, and concierge services. Guests have access to over-ground parking. DoubleTree by Hilton Minsk is also a central international conference venue. A large ballroom of flexible configuration with modern audiovisual equipment and a capacity of more than 350 guests, meeting rooms, a lobby for coffee breaks and cocktails, a business center, a restaurant and a large summer terrace are comfortably located on one level. It is an ideal place for conferences, presentations, business meetings, banquets and weddings. On the ground floor of the hotel is located the city cafe Beans & Leaves, open from early morning until late in the evening for hotel guests, visitors to the shopping center and nearby business centers. Large selection of tea and coffee, fresh sandwiches and a variety of pastries, salads, cereals and soups. Here you can quickly grab a snack or take food and drinks with you. The restaurant and bar Ember, created according to the Wine & Dine concept, offer international cuisine, including a grill menu, pizza in a stone oven, dishes of European and Belarusian cuisine. From the height of 21 floors in the Sky Lounge BarDotXX1 offers a magnificent panoramic view of the historic center of Minsk. The international team of chefs embodies the tastes of oriental cuisine in amazing forms of authentic dishes. The first bar of champagne in Minsk with classic and author's cocktails from famous bartenders. In summer, guests can relax on the terrace with a magnificent panoramic view of the center of Minsk. A cozy lounge area, a special menu, refreshing cocktails make Ember VII Heaven an ideal place for summer holidays.

13. Technical and engineering characteristics (ceiling height, standard room area and total area of rooms, common areas, parking, information infrastructure, security systems, elevators, electricity, air ventilation system) The ceiling height in the rooms is 2.7-3 m, in public areas and conference areas 4.5 - 4.7 m. The standard area of the rooms is 20 m2, the total area is 4 260 m2. The area of public areas is more than 3 000 m2. Parking for hotel guests is foul, uncovered, behind the barrier. The hotel has an anti-fire system Siemens, a smoke exhaust system. In the event of a fire, 1 fire elevator operates. The hotel is equipped with a diesel generator, capable of supporting the hotel at least during the day. The degree of air filtration G5, ventilation system chiller-fancoil. The hotel is equipped with access control and video surveillance.

14. Building materials and technologies All construction materials have been certified by the customs union and have received the Declaration of Conformity 15. Environmental certification (LEED, BREEAM, DGNB) sustainable on-site practice Not certified

16. Occupancy rate (%) The average occupancy rate since December 2016 is 60%

17. Cooperation with online booking systems (Booking.com, etc.) Booking.com, Expedia, HRS, Academservice, TripAdvisor and others.

18. Other important information that may be relevant to the jury members The hotel, which combines international service, comfortable living conditions and a lot of opportunities for recreation, is under the direct management of Hilton Worldwide and is part of the shopping and entertainment complex. Guests can feel at home, plunged into an atmosphere of warmth and genuine comfort; visit cafes and restaurants with a variety of cuisine and take advantage of all the comforts of stylish rooms of various categories. DoubleTree by Hilton Minsk presents the international loyalty program Hilton Hhonors. It is based on a system of points that are assigned to the guests for accommodation, events and stay in the hotels. The resulting points can later be converted into aviation miles. There are seasonal sales and travel auctions within the Hilton Hhonors. Members of Hilton Hhonors receive additional discounts if they book rooms on Hilton.com. Hotel de Paris Odessa MGallery by Sofitel

1. Name of the Project Hôtel de Paris Odessa MGallery by Sofitel

2. Web page of the Project www.accorhotels.com/9944, www.sofitel.com, www.hoteldeparisodessa.com

3. Link to the promo video

4. Date of start and completion of the project 2014-2017 5. Participants of the project (developer, management company, operator, etc.) City Group Development, JSC Magnificient Group, Accor Hotels

6. Room count 51 7. Operator JSC Magnificient Group/Franchise Agreement with Accor Hotels

8. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.dropbox.com/sh/76z21tovzvh0hdz/AACith3FwP_O84g_bqF4x4Yoa?dl=0

10. Project Type Hotel of the International chain

11. Location of the Project (country and city; CBD/historiс area of the city, suburban area, sea shore, etc.) Located on the northwestern shore of the Black Sea, Odessa, founded by Catherine the Great in 1794, and is home to the French inspired Riviera and the exclusive Hôtel De Paris. Magical historical building passionately designed by French architect and interior designer Ana Moussinet creating boutique hotel with luxurious accommodation options and upscale facilities at the very heart of the city. Inviting home away from home boasts more than the usual to the discerning cliental, it provides an ideal escape from reality and ensures the refinement of French savoir-faire in the form of extravagant and personalized service. 5* luxury boutique hotel has 51 lavish guestrooms, Café de Paris with international cuisine and Le Bar with regular live music. Guests can unwind in the cozy health club.

12. Description of location (amenities, infrastructure, transport accessibility, etc.) Absolute central location - the famous Potemkin Stairs, Primorsky Boulevard, Deribasovskaya Street, Opera and Ballet Theatre, Marine Fleet museum, Literature museum and Archaeological museum, Passenger Ship terminal and other attractive tourist places are situated within minutes of walking distance from the Hotel. 13. Hotel infrastructure and services provided (Spa, fitness, restaurants, conference service, parking, laundry, etc.) • 51 Guestrooms and Suites • 6 Classic Rooms • 42 Deluxe Rooms including 2 Disabled • 1 Ekaterina Suite • 1 Vorontsov Suite • 1 Morandi Suite • 24hr Lobby Lounge • 30 seats Restaurant – 40 seats with separated entrance • Health Club (fitness, sauna, Jacuzzi, treatment rooms) Secured parking Concierge & Battler services Limousine services Laundry & Dry Cleaning Guerlain Imperial Amenities Personal Shopper Services Personal Minder Services

14. Technical and engineering specifications (ceiling height, standard room area and total rooms area, common areas, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Ceiling height - 3,5 m - 4 m, Guestrooms from 20 sq.m - 76 sq.m, total room area - 1200 sq.m, common areas - 700 sq.m , security systems - CCTV, fire prevention systems, Otis elevators, electricity supply 380 & Carrier, air vent system, 25 parking places

15. Construction materials and technologies Reinforce steel, reinforce bricks

16. Environmental - Certification (LEED, BREEAM) or sustainable practices in place NA - historical building

17. Occupancy rate 46%

18. Cooperation with online booking systems booking.com, expedia.com, accorhotels/sofitel booking engine OTA

19. Noteworthy information you consider might be relevant for the jury members Hotel operator opened hotel within 2,5 months, first month - 58% occupancy/ADR 150 Euro Kokhta-Mitarbi Resort

1. Name of the Project Kokhta-Mitarbi Resort 2. Web page of the Project www.kokhta-mitarbi.ge

3. Link to the promo video https://www.dropbox.com/s/g1mxh7l5ectu5vl/Resort%20Kokhta-Mitarbi.mp4?dl=0

4. Date of start and completion of the project Start: September 2016, Completion: December 2017

5. Participants of the project (developer, management company, operator, etc.) Georgian Government - rehabilitation and development of tourist infrastructure of Bakuriani and Mitarbi - www.gov.ge Architects.ge - architectural part Adjara Group - hotel operator (Rooms Hotel) - www.roomshotel.ge Anagi - construction part - www.anagi.ge Development Company - Mountain Resorts Brokerage services - GREM 6. Room count There are up to 120 rooms in the hotel part, plus up to 100 rooms are added from the apart-hotel part. 7. Operator Rooms Hotel (Adjara Group) 8. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.dropbox.com/sh/4otiprlyre2uzzo/AABR5Z7RRGG7FVDspuafRcSSa?dl=0

10. Project Type Hotel and apart-hotel

11. Location of the Project (country and city; CBD/historiс area of the city, suburban area, sea shore, etc.) Located at 1,700 m in the Borjomi region of Georgia, Bakuriani is nestled in the shadows of the breathtaking Caucasus Mountains, only a three-hour drive from Tbilisi. Home to dozens of alpine slopes and cross-country trails, it offers some of the most spectacular skiing and snowboarding in Europe. Originally developed as an Olympic training facility, unsurprisingly, Bakuriani is one of Georgia‘s most popular winter sports and recreation destination. Enjoy the downhill ski runs, cross-country trails, horseback tours, sledding or simply take long walks through beautiful snowy forests.

12. Description of location (amenities, infrastructure, transport accessibility, etc.) Two main spots in Bakuriani are: Kokhta (2255 m)- It is a 4 km ski run with difficult and medium difficulty slopes. The upper part of the slope is rather difficult – the slope gradient is 52 percent and as for an intermediate piste, its trail runs through the fabulous fir wood plunged in the snow.

Mitarbi (1500 m) welcomed its first visitors in December 2016, after 30 years of a break. Winter sport fans can try 3 new ski lifts, 9 km ski pistes suitable for intermediate, expert and advance skiers and snowboarders, joining ski piste to Kokhta and Mitarbi, modern infrastructure and new experiences.

Bakuriani is one of the most important four season resorts in Georgia. People come throughout the year to enjoy the amazing views of the Caucasus Gorge; to wander through serene coniferous forests; to bask in the summer breeze; to ski, snowboard and hike; to go horseback riding and biking; and just to have an unforgettable time with family and friends. The resort is an ideal destination not only for recreational purposes but also for sport and nature lovers. 13. Hotel infrastructure and services provided (Spa, fitness, restaurants, conference service, parking, laundry, etc.) Hotel will provide the following services for hotel guests and apart-hotel tenants: - Concierge - 24 hour security service - Laundry - Conference - Spa/Swimming pool - Restaurants/cafes - Children's zone - Shopping area - Other entertainment 14. Technical and engineering specifications (ceiling height, standard room area and total rooms area, common areas, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Ceiling Height: 2.7 meters Total rooms area (hotel): 3075.9 sq. meters Total rooms area (apart-hotel): 3770.1 sq. meters Underground parking area: 1509.3 sq. meters Common area: 7561 sq. meters Security systems: CCTV Elevators: Kone Electricity supply: Mainly city electricity supply, plus backup generator Air ventilation system: AHU for cafe/restaurants and swimming pool area

15. Construction materials and technologies State of the art insulation and isolation, Rockwool double wall insulation, complete water and hydro insulation, primer application on the roof and thermal wood on the facade, aluminum facade windows and doors; excellent tiles and wooden fixed furniture. Two side insulation, aluminum doors and windows 1,36 coefficient, total foundation insulation, 4 layer primer on the roof. Excellent German grade thermal insulation, schuco facade windows and doors, external wall total water proofing; 16. Environmental certification (LEED, BREEAM) or sustainable practices in place None 17. Occupancy rate 100% of apart hotel part is sold.

18. Cooperation with online booking systems Sabre Hospitality Solutions

19. Noteworthy information you consider might be relevant for the jury members The first stage of the project will end by 2018, while the next stages will be developed for Mitarbi direction. In the nearest future, Kokhta-Mitarbi Resort will become attractive direction for family-vacationers, young families, sports people, tourists, as well as those who wish to enjoy untouched natural beauty, unique and healing trees and the amazing palette of their colors, healthy air and relax. Park Inn by Radisson Kyiv Troyitska

1. Name of the Project Park Inn by Radisson Kyiv Troyitska

2. Web page of the Project www.parkinn.com/hotel-kyiv

3. Link to the promo video None

4. Date of start and completion of the project Start - Jan 2017, Completion - Sept 2017 Opening - 26th of Sept 2017

5. Participants of the project (developer, management company, operator, etc.) Developer Smart Holding Group, Operator Carlson Rezidor hotel group

6. Room count 196 rooms (154 standard, 35 superior, 7 junior suites)

7. Operator Carlson Rezidor hotel group

8. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) parkinn.com/hotel-kyiv/gallery

9. Project Type Hotel of the International chain

10. Location of the Project (country and city; CBD/historiс area of the city, suburban area, sea shore, etc.) Ukraine, Kyiv, central business district, minutes from Olympiyskiy Stadium and metro station

11. Description of location (amenities, infrastructure, transport accessibility, etc.) Lobby bar, business center, conference rooms, restaurant, drive-thru line, medical facility in the same building

12. Hotel infrastructure and services provided (Spa, fitness, restaurants, conference service, parking, laundry, etc.) 6 Boardrooms (6 to 12 capacity), laundry services, restaurant on the 3rd floor, off-site underground parking, disabled access and rooms, fitness center on the 4th floor

13. Technical and engineering specifications (ceiling height, standard room area and total rooms area, common areas, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Ceiling height (avg) - 3m, total area - 12 826,4 sq. m., rooms located on 6-17 floors (5 058,7 sq. m.), video surveillance in all public areas, 5 guests elevators, electricity supply from 2 centers, automated air ventilation system - managed by BMS

14. Construction materials and technologies Reinforced frame with hinged façade

15. Environmental certification (LEED, BREEAM) or sustainable practices in place Green Key certificate

16. Occupancy rate Just opened hotel

17. Cooperation with online booking systems All major booking systems including, but not limited to Expedia, HRS, Booking.com

18. Noteworthy information you consider might be relevant for the jury members Hotel is equipped with heat recovery and UV water disinfection systems. Successfully passed Green Key Audit. Minskaya - "McDonald's Ukraine Ltd"

1. Name of the Project "Minskaya" - "McDonald's Ukraine Ltd"

2. Web page of the Project https://www.dropbox.com/s/mr32k6djvzrsy5t/MCD_MINSKAYA_2017%20%282%29.pptx?dl=0

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine Kiyv city Obolonsky district Obolonsky Avenue 26, A

4. Date of start and completion of the project start - of June 2016 end - of September 2017

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) "Bureau of investment projects" - Chief Engineer of the project (General designer) - Evdokimova Natalia "Format Project" - Chief Engineer of the project - Biabyak Bogdan "JI TI ENGINEERING" - Development Director - Varenytsya Evgeny "BR4 KMB1" - Director (General contractor) - Lyadecky Konstantin "Capital constraction Ltd" - Chief Architect of the project - Shadyrya Oleksiy, Architect - Korol Yurii, Architect - Khuder Samir "McDonald's Ukraine Ltd" - Senior Architect - Pastushenko Andrey

6. Project Type Restaurant

7. Description and major characteristics of the project (technical and functional specifications) Land area - 2324m2 Building area - 753,1m2 Ground floor - 387,7m2 Basement floor - 365,4m2 Lobby area - 159,83m2 Seats in lobby - 102 Seats on terrace - 128 McDrive - Yes Express window - Yes

8. Visual materials (link to pictures of exterior and interior design, layouts)

9. Innovative solutions implemented in the project (describe why it is innovative on the market?) Innovative solutions: a. Cross recuperator. This solution is not used in our market segment, due to the difficulties of cleaning the air in the hood systems. b. Purification of technological air by ultraviolet. Unique for Ukraine system (Jimco patent), which uses a combination of exposure to ultraviolet and ozone. Complete absence of fat and odor. As a consequence, no costs for cleaning the channels and recuperator, as well as lack of odor. c. Use of the catalyst (filter unit of 30 cartridges of 3 kg with special activated charcoal), which completely neutralizes odors and excess ozone (during hours of reduced demand). d. Adjusting the performance of the HVAC system at night to reduce the noise of the condenser units in accordance with the standards. e. Heat pump system with heat pump Vaillant

10. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) Cost of innovative solutions: a. Cross recuperator - 19273,00EUR b. Air cleaning Jimco - 17.200EUR c. Catalyst Jimco - 2.632EUR d. The system of hot water with a heat pump Vaillant - 10.000USD Resource Saving: a. Cross-flow recuperator - 275,4 thousand kW * hour / year (heating season 5 months) or 236.8 Gcal b. The system of hot water with a heat pump Vaillant - approx. 3500 kWh / hour

11. Noteworthy information you consider might be relevant for the jury members ASTARTA Organic Business Center

1. Name of the Project ASTARTA Organic Business Center

2. Web page of the Project http://abc-kyiv.com/opisanie-bc-astarta/

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) ASTARTA business-center is located in the business district of Kyiv's historical center in Podil. A fabulous view of River, St. Andrew's Church and St. Michael's Cathedral opens from the business-center. BC ASTARTA is located at the address: 58 Yaroslavska Street, Kyiv 04071 Ukraine. The main facades of the office building are facing to Nyzhnij Val, Yaroslavska, and Naberezhno- Khreschatytska streets, in fact creating a city in the city, shielding the cozy courtyard from the noise of the adjacent streets. Windows and terraces of the BC open spectacular view on the Dnipro slopes and the river itself, Andriivska church and Mykhailivskyi Cathedral.

4. Date of start and completion of the project The BC ASTARTA consists of 3 stages. The first stage was put into service in June 2016, and the second stage in the second quarter of 2018. The 1-st and 2-nd Stage of the ASTARTA Organic Business Center was opened on 25th of October 2017.The 1-st and 2-nd Stage of the ASTARTA Organic Business Center was opened on the 25th of October 2017.

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) The architectural concept and design have been developed by a leading consulting company in the field of commercial real estate - SCG INTERNATIONAL (UK), http://www.scg.international/ The concept has been adapted by a Ukrainian design bureau Kramall Studio http://kramall.com.ua/ General Contractor – Corporation DBK Zhytlobud. http://www.zhytlobud.com/ru/ ―TEC Energoinvest‖ is the developer company that performs the building of BC ASTARTA. http://abc- kyiv.com/ Ivan Pugolovkin, project manager of BC ASTARTA, Project Management Deputy Director of TEK Energoinvest. Julia Schastlivaja, Deputy Director on lease issues of TEC Energoinvest.

6. Project Type Office

7. Description and major characteristics of the project (technical and functional specifications) BC ASTARTA is the first building in Ukraine, constructed in accordance with ―green‖ building technologies. Its first stage is certified in accordance with international standard BREEAM Interim 2013 (August 2016). For building and further use of the BC, environmental-friendly materials, energy-saving technologies, modern engineering, and intellectual control systems are applied. For example, orientation of the building in relation to compass points, natural light of the premises, ventilation with efficient recuperation, use of modern materials, contemporary LED illumination and automatic management of the building‘s engineering networks. The concept of BC ASTARTA includes looking after environment, renters, who spend the majority of time here, as well as after reasonable and well- minded use of the building. High-tech technologies applied for BC ASTARTA allow reasonable decrease of a renter‘s exploitation expenses. Intellectual management systems are designed to ensure that renters of offices in BC ASTARTA feel easy and comfortable, to minimize standard exploitation risks and to eliminate any possible routine household inconveniences. Thanks to motion sensors and solenoid valves of water supply, in case of broken or running tap in absence of motion the system shall block water supply and eliminate the possibility of flood. Balanced magnetic switch shuts off conditioning system, if a window is crack-opened. 100% of office spaces have access to sunlight, and illumination system is equipped with the most up-to-date LED- decisions (energy performance now in 15% exceeds the requirements of ASHRAE standard). Each floor is equipped with premises for smoking with individual system of conditioning and ventilation. Thuswise, tobacco smoke shall never bother the non-smoking employees; the smokers will have comfortable smoking place, and a company – efficient use of employees‘ working day.

The project stipulates the use of alternative transport means at the account of bike parking and plugs for electric vehicles. Developing the project, we applied complex access to creation of environment with public transport, facilities for bikers and pedestrians, created transport plan, aimed at improving transport access to the building.

For energy effective and environmental secure ventilation system, BC ASTARTA used 24 plants of different efficiency. These supply and exhaust systems not only preserve fresh air and comfort temperature all year round, but also to decrease is several times the use of power resources (maximum value of saving – 87%). The BC is also equipped with high quality and hi-tech lifts by the world leading manufacturer of lift equipment, escalators and mechanical doors. The lifts being installed are produced in Italy and boast good technical characteristics: speed 1.7m/sec., cargo capacity – 1000 kg.

Conditioning system of BC ASTARTA also involved a range of innovation technologies. Conditioning systems use nature-friendly Freon R410A, and technologies of VRV-systems allow adjustment of individual climate zones on 60 square meters in office premises. Thanks to such technology each employee could have comfortable temperature regime and light. Furthermore, for example, each installation is equipped with rotor recuperative heat exchangers, special parts returning heat energy and humidity (eliminating the need in additional moisturizers). Such technology of recuperation is the key element of environment protection against the negative influence of human.

Hi-tech features of BC ASTARTA ensure its renter‘s reasonable decrease in exploitation expenses. For example, considering utility tariffs valid in September 2016, annual saving of a renter per 1 square meter of an office makes: power consumption – 2.4 USD, gas supply – 1.43 USD, water supply – 3.83 USD. Thuswise, sum total of single year‘s savings for an office space of 2000 square meters makes 7660 USD and almost 40 000 in 5 year perspective. Bearing in mind the growth of tariffs during the last year, the figures of money savings could possibly become even more reasonable.

Also BC ASTARTA is the only one office building in Ukraine, having a courtyard with recreation zone for the BC‘s renters and guests of the quarter: stylish small park, green lawn for walking, fountain with lighting, cozy benches and beautiful small structures, summer terrace. The quarter possessed by the building is packed with services and facilities required by contemporary metropolis dwellers. BC‘s infrastructure is a ―city in the city‖ and includes: zone of domestic services, bank branch, post office, notary office, restaurants, cafés, eating house, sports club, supermarket, drugstore, dry-cleaner‘s, beauty salon. One could drink a cup of coffee in several cafes of the business-center and have a lunch or dinner in a stylish premium-segment restaurant, city café or cozy eating house with democratic process and tasty home cuisine.

8. Visual materials (link to pictures of exterior and interior design, layouts) http://abc-kyiv.com/gallery/

9. Innovative solutions implemented in the project (describe why it is innovative on the market?) BC ASTARTA is the only one office building in Ukraine, having a courtyard with recreation zone for the BC‘s renters and guests of the quarter: stylish small park, green lawn for walking, fountain with lighting, cozy benches and beautiful small structures, summer terrace. The quarter possessed by the building is packed with services and facilities required by contemporary metropolis dwellers. BC‘s infrastructure is a ―city in the city‖ and includes: zone of domestic services, bank branch, post office, notary office, travel agency, restaurants, cafés, eating house, sports club, supermarket, drugstore, dry-cleaner‘s, beauty salon. One could drink a cup of coffee in several cafes of the business-center and have a lunch or dinner in a stylish premium-segment restaurant, city café or cozy eating house with democratic process and tasty home cuisine. In August 2016 BC ASTARTA became the first building in Ukraine that successfully passed the international audit according to ―green‖ standard BREEAM Interim2013 and received the respective certificate. The decision to certify the building according to BREEAM standard reflects the developer‘s desire to create commercial property, corresponding to the most up-to-date world requirements, including ―green‖ building.

10. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.)

BC ASTARTA‘s motto is ―SPACE FOR GROWTH‖. The similar is the concept of BC ASTARTA, unique and exclusive. It includes its own green ―oasis‖ – the green zone in its courtyard. There is a small park with attractive landscape design, fountain, and big green lawn for barefoot walking, summer terraces of cafes. All of this is the BC ASTARTA‘s zone for rest. Here BC‘s ―inhabitants‖ could spend their lunch time or negotiate or have informal meeting. The garden shall be opened not only for the BC‘s employees, but for all Kyivans and guests of the city. Tradition of such ecologic spaces is strong in Canada, the USA and Europe. As for Ukraine – BC ASTARTA is the first and still only one business center with its own green zone. For some minutes of rest and relax are also intended landscape terraces and usable roof with one of the most beautiful Kyiv sunsets.

Thanks to the unique concept and use of the most modern technologies, BC ASTARTA is not just a business center, it is one of buildings that make Kyiv a modern European capital city, and that is a city‘s decoration and landmark.

Our task is not only to create modern and beautiful business center, we would like the ASTARTA QUARTER to become the impulse for the start of positive changes and transformation of business Podil and Kyiv as a whole.

The concept of BC ASTARTA includes looking after environment, renters, who spend the majority of time here, as well as after reasonable and well-minded use of the building. High-tech technologies applied for BC ASTARTA allow reasonable decrease of a renter‘s exploitation expenses. Intellectual management systems are designed to ensure that renters of offices in BC ASTARTA feel easy and comfortable, to minimize standard exploitation risks and to eliminate any possible routine household inconveniences. Thanks to motion sensors and solenoid valves of water supply, in case of broken or running tap in absence of motion the system shall block water supply and eliminate the possibility of flood.

Balanced magnetic switch shuts off conditioning system, if a window is crack-opened. 100% of office spaces have access to sunlight, and illumination system is equipped with the most up-to-date LED- decisions (energy performance now in 15% exceeds the requirements of ASHRAE standard).

Each floor is equipped with premises for smoking with individual system of conditioning and ventilation. Thuswise, tobacco smoke shall never bother the non-smoking employees; the smokers will have comfortable smoking place, and a company – efficient use of employees‘ working day.

The project stipulates the use of alternative transport means at the account of bike parking and plugs for electric vehicles. Developing the project, we applied complex access to creation of environment with public transport, facilities for bikers and pedestrians, created transport plan, aimed at improving transport access to the building. For energy effective and environmental secure ventilation system, BC ASTARTA used 24 plants of different efficiency. These supply and exhaust systems not only preserve fresh air and comfort temperature all year round, but also to decrease is several times the use of power resources (maximum value of saving – 87%). The BC is also equipped with high quality and hi-tech lifts by the world leading manufacturer of lift equipment, escalators and mechanical doors – Finnish company ―KONE‖. The lifts being installed are produced in Italy and boast good technical characteristics: speed 1.7m/sec., cargo capacity – 1000 kg. The business center shall be equipped with 19 such lifts. Conditioning system of BC ASTARTA also involved a range of innovation technologies. Conditioning systems use nature-friendly Freon R410A, and technologies of VRV-systems allow adjustment of individual climate zones on 60 square meters in office premises. Thanks to such technology each employee could have comfortable temperature regime and light. Furthermore, for example, each installation is equipped with rotor recuperative heat exchangers, special parts returning heat energy and humidity (eliminating the need in additional moisturizers). Such technology of recuperation is the key element of environment protection against the negative influence of human. Hi-tech features of BC ASTARTA ensure its renter‘s reasonable decrease in exploitation expenses. For example, considering utility tariffs valid in September 2016, annual saving of a renter per 1 square meter of an office makes: power consumption – 2.4 USD, gas supply – 1.43 USD, water supply – 3.83 USD. Thuswise, sum total of single year‘s savings for an office space of 2000 square meters makes 7660 USD and almost 40 000 in 5 year perspective. Bearing in mind the growth of tariffs during the last year, the figures of money savings could possibly become even more reasonable.

11. Noteworthy information you consider might be relevant for the jury members Our task is not only to create modern and beautiful business center, we would like the ASTARTA QUARTER to become the impulse for the start of positive changes and transformation of business Podil and Kyiv as a whole. Expo 2017 Kazakhstan Pavilion - Nur Alem

1. Name of the Project Expo 2017 Kazakhstan Pavilion - Nur Alem

2. Web page of the Project https://expo2017astana.com/en/

3. Location of the Project Kazakhstan, Astana, 55 Mangylik El street. EXPO 2017 Pavilion in Astana is located between main streets of Astana: Kabanbai batyr avenue, Orynbor street, Hussein bin Talal and Turar Ryskulov streets. Expo 2017 site is located on the south of city center of Astana. And the most important architectural object of Expo, Pavilion Nur Alem stands on the centre of the Expo site. It is surrounded by International, Corporate and Thematic Pavilions, Art Center, Energy Hall, Best Practices Area and Amphitheater. There are also several important cultural, public, educational and residential areas around the Expo site such as, Hilton Hotel, Expo Congress Center, Mega Silk Way Shopping Mall Entertainment Center, Nazarbayev University and Astana Ballet Theatre. Regarding transportation, the area is easy accessible by motorway with private cars and public buses. People can use many public bus routes numbered as 10, 12, 18, 37, 40, 51, 53, 200 (night), 301, 302, 303, 308, 309 and 506. Also, The Astana Metro which is planned as light rail rapid transit system will come into use very soon. With a minimum number of stops it can take around 30 minutes to get to the exhibition centre from the city centre the pavilion is about 3 km from Baiterek City Center, 11 km from the central railway station, 8 km from Astana International airport Astana.

4. Date of start and completion of the project 05.09.2014 – 30.04.2017

5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) General Contractor: Sembol Construction http://www.sembolinsaat.com.tr/ Controller: Hill International https://www.hillintl.com Architectural Design: Adrian Smith + Gordon Gill Architecture (AS+GG) http://smithgill.com/ Structural Design: Werner Sobek Stuttgart Gmbh www.wernersobek.de Mechanical Projects: Positive Energy Practice Electrical Projects: Lighting Design Partnership International Ltd http://www.ldp.net/ Landscape: The Planning Partnership Limited (TPP) http://planpart.ca/ Interior Design: KCA International Designers http://www.kca-int.com/ Interior Lighting Design: Light Touch PLD http://lighttouchpld.com/ Acoustic Consultancy: AJ ACOUSTICS http://www.adrianjamesacoustics.co.uk/ AV Consultancy: Hewshott http://www.hewshott.com/ Daylight analysis: Lighting Lab1 http://www.lightinglab1.com/ Visitor flow analysis: Aecom http://www.aecom.com Content Design Consultancy: Raid Sabbah Local Content Design and Consultancy: Texspire LLP http://texspire.com/ Media Production Consultancy: Filmdeney http://www.filmdeney.com/ Photographer: Emre Dorter http://emredorter.com/

6. Project Type Public-use property: Exhibition hall and Museum.

7. Description and major characteristics of the project (technical and functional specifications) The defining symbol and the central venue of the EXPO-2017 site is Nur Alem - the spherical Main Pavilion in the centre of the Expo City. It is a glass ball of 80 meters in diameter – the largest of its kind – with two wind generators and 13.132 solar cells on the exterior upper part. While it‘s floors cover a total area of 41.633 m2, the 8 exhibition levels contain almost 70 independent exhibitions. There are 3 big atriums which are important impressive spaces through the sphere. One of them is located on the center, surrounded by 8 panoramic elevators and the rest 2 are on the north and south sides of the building. This iconic building is devoted to Future Energy and therefore looks to our global energy future. Accordingly, each floor has its own theme to focus on. Level 1 – National Pavilion Level 2 – Water Energy Level 3 – Kinetic Energy Level 4 – Biomass Energy Level 5 – Wind Energy Level 6 – Solar Energy Level 7 – Space Energy Level 8 – Future Astana Future Energy contemplates raising awareness regarding energy as an inherent asset of humanity that should be used responsibly and efficiently. Visitors will be able to see the future energy technologies and concepts related to floor themes as well as the perspective to Kazakhstan starting from its history to the future with digital, multimedia and interactive tools.

8. Visual materials (link to pictures of exterior and interior design, layouts) Photos https://goo.gl/wqcspi Layouts https://goo.gl/bZxDJQ All rights reserved by Sembol and cannot be used by others

9. Innovative solutions implemented in the project (describe why it is innovative on the market?) Building architecture and engineering • A specialized steel shell called `diagrid` was used to form the perfect sphere shape. It does not have any internal support. All the load gets collected through and transferred to 2 central main elements. This is never done before as a system. 12.500 tons of steel used for this structure. • The sphere is largest of its kind, it is 100 m height, 80 m diameter. • Double curved unique glass pieces used on facade with high-performance glazing that will maximize solar heat gain in winter while providing shading in summer. • Special triple silver coating fritted glasses used for protection from sun and energy efficiency • 13.132 solar cells on the facade that generates electricity • On top of sphere, there are 2 wind turbines located that generates electricity Construction phase challenges and solutions • The winter conditions of -40 C create a unique challenge. Many engineering solutions implemented for almost all of the installations starting from the first pile for the foundation till the last piece. • The heavy winds had negative effects to installation works which means there were always innovative precautions against that. • Due to time limitations, the installation of facade is started before the completion of steel structure. • The project and construction phases carried out in parallel due to limited time, which is ended with innovative ways in time and project management.

10. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) Sphere itself is a very challenging building, consists of many innovative engineering and construction solutions. Also, with the future energy museum function, it contains recent technologies and projects from all around the world as well as Kazakhstan. Just to be present in this unique building brings awareness for engineering, design, construction and technology, as well as the Future Energy concept.

11. Noteworthy information you consider might be relevant for the jury members Please consider the related parts in the documentary by National Geographic called `Mega Structures Astana. Over 100 companies, including Zaha Hadid Architects, UNStudio, Snøhetta, HOK, and Coop Himmelblau, participated in a competition to design the grounds of Expo 2017. Chicago firm Adrian Smith + Gordon Gill Architecture (AS+GG) won the competition for the design idea. The main project, according to the design was realised by Swiss company IT-Engineering. Several national and international construction companies were awarded contracts to build the grounds. The main contractor Mabetex Group, and Sembol, CC Bazis-A LLC, ABK Kurylys-1 LLC, Turquaz-YDA Stroy LLC, Sredazenergostry LLC have completed the construction part. The financing of project is done by the Kazakhstan Government and some private investor like Plast Invest Production LLP, Sonik Company LLP, PolimerMetal-T LLP and Alyugal LLP. • Nur Alem became the most visited in Expo 2017 Astana • One of the best places of public is the glass cantilever skywalk on level 8. • Libraries on each floor`s balcony sides are open to public. • Kinetic Energy and Tokamak shows became most exciting and interesting activities for the public • Mobile Application Nur Alem which is developed for better communication with public The International Recognised Exhibition EXPO 2017 held in Astana is one of Kazakhstan's key national projects. The initiative for organising such a grand event in our capital city was launched by the President of the Republic of Kazakhstan, Nursultan Nazarbayev. Construction of the Astana EXPO 2017 venues is proceeding according to the plan. A growing number of states have confirmed their participation. These include Germany, France, Russia, Turkey, India, China, Japan and many others. Moreover, holding exhibitions also has a positive impact on both the city and the country where they take place. They promote investments and facilitate the development of construction and industry. New unique facilities are built that attract tourists from different countries. Therefore, our main task now is the adequate preparation of Kazakhstan for a large-scale international event: Astana EXPO 2017. The logo of Astana EXPO 2017, ―Wind Energy‖, symbolizes interaction of natural elements and is framed by the most recognizable symbol of alternative energy – the wind generator. JACK HOUSE 1. Name of the Project JACK HOUSE

2. Web page of the Project http://jackhouse.com.ua/en/

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) * Country: Ukraine City: Kyiv, capital of Ukraine Place: Pechersk — central district of Kyiv A modern apartment building in the historical center of Kiev is located in the business center and the cultural heart of the capital. All the best restaurants, boutiques, clubs and wellness centers are located within a walking distance from Lesi Ukrainki boulevard, while JACK HOUSE itself is located in the quiet and comfortable Leonid Pervomaisky street. You can see all the beautiful landmarks from your windows: St. Michael's Cathedral, St. Sofia‘s Cathedral, the Motherland Monument, the center of old Kyiv, the Stadium ―Olimpiyskiy‖, simply choose your favorite view to suit your morning cup of coffee. 4. Date of start and completion of the project 02/2014-04/2017 5. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) All development projects of TARYAN Group are the most progressive, innovative and ambitious on the Ukrainian real estate market. Investors in our real estate projects at early stages of construction benefit from an up to 30% annual growth of their investment value. web-site: http://taryangroup.com/en/main/ The buyer always chooses a company with a good reputation and high construction quality. TARYAN Group‘s subsidiary and general contractor is POZNYAKYZHILBUD, one of the largest Ukrainian construction companies. It specializes in construction of elite residential developments with social infrastructure facilities and business centers. > 1000 000 m2 BUILT 45 OBJECTS COMMISSIONED 21-YEAR HISTORY web-site: http://pjs.com.ua/en/main

6. Project Type Residential

7. Description and major characteristics of the project (technical and functional specifications) * By choosing apartments in JACK HOUSE, customers get new quality of life. Unique 31-floors premium residential building, located in the epicenter of social life of Kiev. The best restaurants, boutiques, clubs and wellness centers are within walking distance. On the roof of JACK HOUSE we have created Jack Club brought by our life style development TSARSKY. It offers everything needed for a quality lifestyle: spectacular lounge-zone, restaurant, a modern fitness club, SPA and all year-round thermal pool. APARTMENT BUILDING AREA 41 681.5 м² RESIDENTIAL FLOORS NUMBER 31-6 APARTMENTS NUMBER 256 NON-RESIDENTIAL PREMISES 1433.3 м² PARKING Three-level parking in the substructure with a separate elevator 238 parking lots for cars 74 parking lots for any other motor vehicles + chargers for electric cars MODERN APARTMENTS You can decide how your apartment will look by having absolute freedom in the layout choice, you can separate areas inside the apartment in a way which is convenient for you. In addition, Our TARYAN Interiors design studio made trendy and modern solutions: exclusive design projects of apartments in different styles with complex turnkey refurbishment. We use only the best materials, and we are confident in their quality. All design solutions are tested by technical expertise and accompanied by supervision until all works are complete. LUXURY LOBBY Jack House apartments' owners receive: their own lobby, helpful staff at the reception and concierge service COMFORT Apartment owners shouldn‘t choose between an active social life and a comfortable home-like atmosphere – they can get everything at once. JACK HOUSE entrance is situated in a convenient Pechersk yard which is protected from the noise of Lesia Ukrainka boulevard. We have made a modern playground for children and a park for walks and recreation – all of that for the comfort of our residents. A convenient bicycle parking and the opportunity to charge your electric car without going to the underground parking can also be found in the park.

8. Visual materials (link to pictures of exterior and interior design, layouts) * Gallery: http://jackhouse.com.ua/en/#gallery layouts: http://jackhouse.com.ua/en/#layouts VIDEO: http://jackhouse.com.ua/en/ (second block) TEXT: Sometimes it's so important to stop and look around. Perfection is nearby. Perfection of lines, forms and style is an essential part of your life. Its quintessence. Feel how easy it is to be free, feel the weightless. Listen to yourself, moving only forward. These are your rules and this is your space, filled with lightness - your lightness. Following your desires, you choose only the best. New house from Taryan. Jack House - better than Jack Pot. 360-View: https://goo.gl/ETKcVD VR-room (video): https://goo.gl/6WbuPi Modern Show-room (video): https://goo.gl/g5Y9J3

9. Innovative solutions implemented in the project (describe why it is innovative on the market?) An innovative approach to creating a fashionable house, modern trends in the choice of materials and decor, the newest comfort and safety technologies, the exclusivity of every detail and attention to the guests – every little detail here creates a unique engineering and design solution of JACK HOUSE. From a ventilated facade and panoramic windows and to an artist-built lamp in the bar - everything is made to ensure that you feel at the center of the universe. Choosing an apartment in JACK HOUSE, you do not simply buy square meters but a certain standard of living. ROOF THERMAL POOL ROOF FITNESS ROOF SPA ROOF REUSTARANT 10. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) * All development projects of TARYAN Group are the most progressive, innovative and ambitious on the Ukrainian real estate market. Investors in our real estate projects at early stages of construction benefit from an up to 30% annual growth of their investment value. Choosing an apartment in JACK HOUSE, you do not simply buy square meters but a certain standard of living. On the roof of JACK HOUSE we have created Jack Club brought by our life style development TSARSKY. It offers everything needed for a quality lifestyle: spectacular lounge-zone, restaurant, a modern fitness club, SPA and all year-round thermal pool. During the construction, the latest European technologies and only certified materials were used, due to which the building has high heat and noise insulation properties. The tower was built on monolithic frame technology with thermal insulation of brick walls using mineral wool. An innovative approach to creating a fashionable house, modern trends in the choice of materials and decoration, the newest comfort and safety technologies, the exclusiveness of each detail and aTen@on to the guests – every litle detail here creates a unique engineering and design solution. * 24/7-monitoring of all life support systems of the building due to the automated monitoring and building management system. * Secured area, 24/7 video surveillance, security posts, * Personal electronic pass system, card access to elevators * 2 heavy-load elevators and 1 passenger elevator. Manufacturer: Mizui. Travel speed: 3 meters per second LIGHTING LED lighting is installed in all places in the house, which allows you to save energy and reduce the cost of maintaining public spaces ENERGY EFFICIENCY As in all houses that the TARYAN GROUP is building, heating systems with automatic temperature controllers are installed in all JACK HOUSE apartments as well as separate meters to account for the consumption of thermal energy. This will significantly reduce your costs for utility bills. "WARM HOUSE" TECHNOLOGY In the construction of the house we have used environmentally friendly building materials. In addition, JACK HOUSE is built using a unique "Warm House" technology, which was developed and introduced for the first time in Ukraine by the TARYAN Group construction company Poznyakizhilbud. This technology has optimized energy-saving and sound-proof characteristics, which will make you comfortable under any circumstances. Warm exterior walls, self-supporting walls, 400 mm thick (bricks - 250 mm; insulation (mineral wool based on basalt) - 150 mm; suspended facade system with a ventilated air gap - 60 mm). 250 mm thick demising walls, the walls between the apartments and public hallways are partially made of reinforced concrete, and partially made of bricks - 250mm. Suspended facade, ventilated with the use of basalt insulation and stoneware tiles. Such walls conserve heat during winters and do not let heat to enter during summers. Energy-saving windows. Plastic steel windows REHAU (Germany) with double glazing (Switzerland) and a micro-ventilation system. Protecting design of balconies - translucent structures based on the aluminum system Reynaers (Belgium). Such windows conserve heat during winters and do not let in the warmth of sunlight through in summers. Recycling According to the Ukrainian legislation on garbage separation, we voluntarily participate in the garbage separation program, so special garbage dividing containers for the residents are provided. Water Next to the house there is a purification system for water filtration. The water, which is used in the thermal pool on the roof, undergoes special cleaning, so that it can be used for watering green areas in the house area. Подобрать картинки THE DRIVEWAY OF THE FIRE-FIGHTING EQUIPMENT IS PROVIDED AND AGREED The ability of fire equipment to access the residential building is arranged according to the general plan and specially designed access and reversal system as well as the positioning of fire equipment, stairs and car lifts. The entrance system is designed in a way that allows firemen access to all premises of the residential development, and is coordinated in accordance with the established procedure with relevant agencies. The entrance to the house is organized from two sides of the streets the width of which allows fire equipment to perform tasks related to the elimination of fires and the evacuation of people. JACK HOUSE is the embodiment of the latest innovative technologies, not only in architecture, building materials and engineering equipment, but also in fire protection systems. DURING THE CONSTRUCTION NON-COMBUSTIBLE MATERIALS WERE USED During the construction of the house, non-combustible fireproof materials and means were used to ensure the fire resistance of building structures up to 180 minutes (3 hours). For example, the hinged ventilated facade of the house is made with the use of incombustible insulation and ceramic granite tiles, and all rooms (residential, public and parking) are separated by beams and partitions with a non-flammable mineral wool lining on a basalt base. AUTOMATIC FIRE EXTINGUISHING SYSTEM IS INSTALLED All common areas and exits from apartments in JACK HOUSE are equipped with a special automated fire extinguishing system, which in case of fire creates a water curtain above the apartment exits and does not allow the fire to spread both through evacuation corridors or apartments. Each apartment in the development has fire doors with a fire resistance limit of 60 minutes (1 hour), so even in the event of a fire in a residential apartment, the fire cannot spread along the corridor, as special doors will not allow the fire to spread to common areas. Each floor of the residential building and the parking lot have modern fire-fighting cranes installed, which provide the ability to extinguish the fire before the arrival of fire brigade. FIRE ALARM SYSTEM INSTALLED All premises of the parking, residential and office divisions at the JACK HOUSE are equipped with modern automatic fire alarm systems, which are the first to detect the slightest indicators of fire and its primary signs (smoke or elevated temperature), so they automatically inform the nearest fire department about the occurrence of a fire, for them to arrive as soon as possible. AUTOMATIC FIRE EXTINGUISHING SYSTEM IS INSTALLED All common areas and exits from apartments in JACK HOUSE are equipped with a special automated fire extinguishing system, which in case of fire creates a water curtain above the apartment exits and does not allow the fire to spread both through evacuation corridors or apartments. Each apartment in the development has fire doors with a fire resistance limit of 60 minutes (1 hour), so even in the event of a fire in a residential apartment, the fire cannot spread along the corridor, as special doors will not allow the fire to spread to common areas. Each floor of the residential building and the parking lot have modern fire-fighting cranes installed, which provide the ability to extinguish the fire before the arrival of fire brigade. SMOKE REMOVAL SYSTEM IS ALSO AUTOMATIC All evacuation corridors at JACK HOUSE are equipped with a modern smoke and heat removal system during a fire. In addition, the residential complex is equipped with two smoke- free and indestructible evacuation staircases, which in case of fire, will work in a standard manner to allow every resident to evacuate from any floor of the house. THE FIRE ALERT AND EVACUATION MANAGEMENT SYSTEM IS INSTALLED All JACK HOUSE premises are equipped with modern voice fire notification systems, which automatically helps and accompanies the movement of people during a fire with voice prompts in three different languages. Indicators of emergency exits, which operate autonomously for 3 hours, even in the event of the entire house being de-energized. Alongside with this, JACK HOUSE is equipped with a special fire-fighting elevator, which in case of fire can be used by fire departments to perform tasks to save people and extinguish the fire. An additional generator is also installed in the complex, which provides electrical energy to all fire safety and evacuation systems in the event of de-energization of two main power sources.

11. Noteworthy information you consider might be relevant for the jury members None Galleria Minsk

1. Name of the Project Galleria Minsk

2. Web page of the Project http://galleria-minsk.by

3. Date of start and completion of the project (its phase) 2012-2016

4. Link to the promo video https://www.youtube.com/watch?v=SB6Sm0a2CaU

5. Participants of the Project (specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Investor and developer of the project - JLLC «Galleria Concept» General Contractor - Renaissance Construction‖ group of companies http://rencons.com/ Hotel Operator - Hilton Worldwide http://doubletree3.hilton.com/en/hotels/belarus/doubletree-by-hilton-hotel-minsk-MSQDTDI/ Project management consultant - Jones Lang LaSalle (JLL) http://www.jll.com/about Project’s official broker - Jones Lang LaSalle (JLL), Colliers International http://www.jll.com/about http://www.colliers.com/en-gb/belarus/ Architect – MGP http://www.mgp-arch-eng.ca/ Interior design - Alexander James Interior Design https://www.aji.co.uk/; Latvian bureau SZK/Z

6. GBA / GLA About 100 000 m2 - GBA of the multifunctional complex From which: 54 500 m2 – Shopping and leisure center Galleria Minsk (GLA – 36 000m2) 18 900 m2 – Hotel Double Tree by Hilton (193 guest rooms) 25 900 m2 – Parking

7. Project structure description (gallery, supermarket, food court, entertainment zone etc) Shopping and entertainment center Galleria Minsk GBA 54 500 m2 GLA – 36 000m2 Parking – 1000 lots. There are 2 groups of escalators in shopping mall, 2 panoramic and 3 passenger elevators. There 8 elevators in DoubleTree by Hilton hotels. The largest outdoor LED screen in Belarus (300 m2) is installed on the facade of the shopping mall. Technical characteristics of the screen allow to broadcast videos in 4K format. Galleria Minsk is located in the very city center (see on map) and in a short distance from 2 metro stations. There are also 6 stops for 28 routes of public transport. Shopping mall with more than 100 shops, food courts and summer terraces and entertainment center. Zoning for shopping and entertainment center Galleria Minsk • For convenience of shopping, each floor of the shopping center is zoned by category and price positioning of brands • 7th floor - summer terrace • 6th floor - food court and summer terrace • 5th floor - goods and services for children • 4th floor - specialized goods: sports, technology, goods for hobbies and creativity • 3rd and 2nd floors - fashion gallery, men's and women's clothing and footwear • 1st floor - related products: perfumery, cosmetics, accessories, jewelry • -1 floor - supermarket and related services

8. Format of the project (regional, super-regional etc) Regional

9. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.dropbox.com/sh/mo3rva40b06vcer/AABEoRA3OsMxRSFuGkZMRtHsa?dl=0

10. Location of the Project (country and city; CBD/historiс area of the city, suburban area etc) The object is located in the business, cultural and tourist center of Minsk, at one of the most important main streets – Pobediteley Avenue. Main republican square, the place for main national holidays, is located across the street, in front of the Galleria Minsk.

11. Description of location (amenities, infrastructure, transport accessibility, etc) Galleria Minsk is a modern mixed-use complex where shopping & living are easy and pleasant. Firstly, there are 7 floors in the shopping mall where you can buy everything you need - from food and clothes to children's products and medicines. Secondly, here is presented world‘s famous brand DoubleTree by Hilton, perfect place for accommodation and business meetings, conferences. Third, here is one of the largest and innovative parking in Minsk with chargers for electric vehicles. And, finally, this is a state-of- the-art shopping center, both from the technical and architectural and design point of view. 12. Technical and engineering specifications Specific architectural look of the Shopping and leisure center developed by Latvian bureau SZK/Z, exclusive design solutions, modern sound materials. The building façade is covered with the factory processed glass panels with LED lighting. On the façade will be placed the largest in Belarus LED- screen with the area of 336 m2. The main concept behind the shopping mall interior design has been to facilitate an intuitive flow of people, proper use of atrium space and public areas. A sense of extra space and comfort among the customers will be created by the glass façade of the main entrance. During the daytime the texture of a 28-meters atrium will sparkle in the sunlight, while at night it will be highlighted by LED lamps. Art Deco theme and a palette of decoration materials will create an atmosphere of comfort and coziness. The distinctive features of ―Galleria Minsk‖ will become a unique terrace with a spectacular view of the river Svisloch and the old town, and a unique construction of the Hotel incorporated into the Shopping center.

13. Parking (number of parking slots, type of parking, innovative solutions for parking) Five-level Car Park for 1000 lots has been designed with the use of the most contemporary technologies. ―No columns‖ structure is a unique architectural solution that allows any driver to feel maximum comfort while parking. Parking equipped with special-purpose ―family‖ parking places and the ones reserved for the disable people. There are chargers on the 3rd floor for electric vehicles.

14. Tenants (anchor tenants, mini-anchor tenants, other gallery tenants) Anchor tenants: Reserved, Cropp, Mohito, Sinsay, Finn Flare, Gloria Jeans, NYX, Salateira, Tashir Pizza, Intimissimi, Calzedonia. Here there are also brands with which the Belarusians are well acquainted. Clothes: Reserved, Koton, LC Waikiki, House, Cropp, Nadine Milano, Alexander Konasov, Sister's, TVOE, Gloria Jeans, Finn Flare. Footwear: RYLKO, Nursace, Salamander, Sneaker Bar, Ecco, Remonte, Basconi. Underwear and swimwear: Milavitsa / Lauma, Hunkemoller, Undine. Perfumes and cosmetics: MINA, L'occitane, NYX, Kravt, Perfume, Mila. Jewelry, watches, imitation jewelry: Tsar's gold, Swiss Time, Pandora, 7 carats, Diamante, ORO, Oliver Weber. Accessories: Optics WDL, bags Igermann, Mattioli. Tech & household appliances: Communication / velcom, MTS, Bork, World of espresso, Sony Center, 5 element, I-store, Xiaomi. Children's products: Buslik, Next, Mothercare, 4seasons. Pharmacies: Planet of health, veterinary pharmacy Doctor Vet. Supermarket Euroopt Prime (4500 m2, the first premium class supermarket in Minsk). Services, food courts and additional services Restaurants: Salateira, TM Waffles & Coffee, Coffeecake, Kartoffel, Mom at home, Sub's, Doner House, Tashir Pizza, Marconi, Bubble sweet. Services and Entertainment: Beauty Lounge, Children's art center Kropka, children's entertainment center L-Club, Sam master (key making). Currency exchange offices: Technobank, Belarusian People's Bank. ATMs: BSB Bank, Belarusian People's Bank, BPS-Sberbank, Technobank. Calling-desk terminal: Kiwi. Terminal for the purchase of gift certificates: Daroo.

15. Occupancy rate More than 75%

16. Noteworthy information you consider might be relevant for the jury members Galleria Minsk was recognized as the best shopping and entertainment center of the year, according to the prestigious real estate award Realt Golden Key. Galleria Minsk was recognized as the best shopping center by the version "City idol" award.The winner was chosen by the citizens of Minsk. 17. Environmental - Certification (LEED, BREEAM) or sustainable practices in place None 1. Name of the Project Galleria Tbilisi

2. Web page of the Project www.galleria.ge

3. Date of start and completion of the project (it's phase) July 2015-November 2017

4. Link to the promo video

5. Participants of the Project (specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies, etc.) "Galleria Tbilisi" - Development Company, Property Management Company "Anagi" - General Constructor (http://anagi.ge) "Casa Calda" - HVAC, MEP, FF (http://www.casacalda.ge) "Veziri" - Low Voltage (http://www.veziri.ge) "CMC" - Project Management Company (http://cmconsulting.ge) "Moshe Tzur Architects", Amiran Kakachia ("Galleria Tbilisi"), "The Architects", "Dephan" (www.dephan.com) – Architects

6. GBA / GLA GBA-65,000 m2 GLA-25,000 m2

7. Project structure description (gallery, supermarket, food court, entertainment zone, etc.) Fashion shops, supermarket, household shops, food court, entertainment zone (cinema, 2 theaters, family entertainment center), service units (dry cleaning, bank, salon etc.)

8. Format of the project (regional, super-regional, etc.) Street Retail Center

9. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.dropbox.com/sh/7atkwly1wtz68s7/AAC2Xf28dyFhNDDvUPjTKkoqa?dl=0

10. Location of the Project (country and city; CBD/historiс area of the city, suburban area, etc.) Georgia, Tbilisi, Main avenue of the city/Heart of the city - Rustaveli Avenue

11. Description of location (amenities, infrastructure, transport accessibility, etc.) Metro is integrated in the building of Shopping Center Transport Availability - Bus, Metro, Mini Buses

12. Technical and engineering specifications Building height - 44 M, Max length 133 M, Max width 128 M, Volume - 300,000 m3, parking area - 11,000 m2, Technical area - 16,000 m2, Land plot - 13,588 m2, Power Consumption - 6,000 kwt, Fresh air consumption - 140,000 m3/h, 22 escalators, 17 elevators

13. Parking (number of parking slots, type of parking, innovative solutions for parking) 260 parking slots, underground

14. Tenants (anchor tenants, mini-anchor tenants, other gallery tenants) H&M, Calvin Klein Jeans, Armani Exchange, Lacoste, Lagerfeld, Trussardi, Guess, Roman, BNG, OVS, New Yorker, Waikiki, Okadi, IKKS, Va Bene, Pull Love, United Colors of Benetton, Yves Rosher, Calzedonia, Franco Fontana, Precious Craft, Mother Care, Camicissima, Di OGGI, JYSK, Kigili, Roberto Bravo, Lee/Wrangler, Levis, Pandora, Six, Timbeland, Stenders, Delfy, Mavi, Geox, Ecco, SPX, NYX, Rossi, Miniso, Apple premium reseller, McDondals, Burger King, KFC, Delifrance, Tashir Pizza, Mado and other Georgian brands.

15. Occupancy rate 80%

16. Environmental certification (LEED, BREEAM, DGNB) or sustainable practices in place None

17. Noteworthy information you consider might be relevant for the jury members Landmark building, Liberty Theater (private theater) which is part of the complex was fully renovated.

1. Name of the Project Mega Silk Way

2. Web page of the Project http://astana.megacenter.kz/

3. Date of start and completion of the project (it's phase) November 2014-December 2016

4. Link to the promo video https://www.youtube.com/watch?v=yb8JqGjQ1O8

5. Participants of the Project (specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies, etc.) Developer: Mega Center Management http://astana.megacenter.kz/ General contractor: Renaissance Construction http://rencons.com/ Architect: Chapman Taylor http://www.chapmantaylor.com/

6. GBA / GLA GBA 140 000 m2 GLA 74 450 m2

7. Project structure description (gallery, supermarket, food court, entertainment zone, etc.) The shopping center combines the best quality of MEGA Development projects. English architects ―Chapman Taylor‖ have designed the basic concept for creating one of the best projects in their portfolio - the shopping and entertainment center MEGA Silk Way in Astana. MEGA Silk Way is a modern shopping mall of a new format which offer a new level of leisure in the capital. The ratio of the commercial area of MEGA Silk Way to the total - 62%. One third of the commercial space (32%) is occupied by educational, sports, entertainment and social projects. MEGA Silk Way allows to the capital's residents new opportunities for good time, including children's educational programs, sports grounds for family recreation and cultural leisure. The largest Kazakhstani family entertainment park Happylon with a total area of more than 7,000 m2 built on the territory of the new capital's shopping center. The entertainment park includes 2 amusement parks Ocean Park and Marine Park and also HappyWorks City Profession Park. MEGA Silk Way has also Evrikum science and entertainment park of wonders (880 m2); trampoline entertainment park Kango (2500 m2) with the possibility of carrying out sports training; the creative space Marwin (1500 m2) with the concept of "home library"; the eleven-seater Cinema Chaplin (5500 m2) with the largest screen in the capital and the mobile ice rink MegaIce (800 m2), which operates seasonally, from November to February.

8. Format of the project (regional, super-regional, etc.) Superregional

9. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.facebook.com/pg/megasilkway/photos/?tab=album&album_id=1373577739355569

10. Location of the Project (country and city; CBD/historiс area of the city, suburban area, etc.) 62 Kabanbai Batyr avenue, Astana, Kazakhstan, is a part of the ultra-modern exhibition complex Astana EXPO 2017. 11. Description of location (amenities, infrastructure, transport accessibility, etc.) Mega Silk Way is located on the territory of the exhibition complex Astana EXPO 2017. The convenient location of the shopping center allows to reach it from the city center in a few minutes both on public and private transport. Public transport routes: 12 stops, 56 routes. 12. Technical and engineering specifications The total area of the mall is 140 000 m2, the length is 500 m, the width is 160 m. The height of the atriums is 25 m, which is comparable with the 8-storey building. Almost 1.5 million m3 of MEGA Silk Way interior space is filled with light and air, so that visitors always feel comfortable. The building of the shopping center consists of 3 levels: 2 above-ground floors and 1 underground; Entrances – 9, where 2 of them are underground. 13. Parking (number of parking slots, type of parking, innovative solutions for parking) Parking for 2100 cars, including 400 lots in the underground parking. Electronic parking navigation has been introduced that helps the driver to quickly find vacant space on different floors or in the parking sectors using LED displays and light indicators. Parking system allows to regulate internal traffic flows, fixes the time of entry / exit to the parking lot and accumulates statistical data on parking loads. The system also allows drivers to monitor the free and occupied cars in real time. 14. Tenants (anchor tenants, mini-anchor tenants, other gallery tenants) More than 20 domestic brands represented in the mall MEGA Silk Way: Happylon, Marwin, Evrikum, Chaplin, Technodom, Mimioriki, QLP, Cosmo Style, Altyn Alan, Kazyna-Gold, Mini city, KazTur and others. Anchor tenants: H & M, Calvin Klein, Lacoste, Tommy Hilfiger, Timberland, Zara, Bershka, Massimo Dutti, Stradivarius, Pull & Bear, Oysho, Zara Home, Uterque, Marc O'Polo, US Polo Assn, Nike, Adidas, Reebok, Koton, DeFacto, LCWaikiki, Armani Jeans, Armani Exchange, Levi's®, Fabiani, Enrico Marinelli, Miniso, Walker, Guess, Renascimento and others. Among the leading fast food restaurants and Cafe MEGA Silk Way included Burger King, McDonalds, KFC, Hardee's, Starbucks, Gloria Jean's Coffees, Angel-in- us Coffee and others. 15. Occupancy rate Mega Center Management has signed 99% of the lease contracts, which is the best indicator in the history of the MEGA network discovery. 16. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None 17. Noteworthy information you consider might be relevant for the jury members As Mega Silk Way is part of the international specialized exhibition EXPO 2017 Energy of the future, the construction materials of the highest quality by world‘s brands are used in the building. On the perimeter of the facade, as well as for zenith lanterns, energy-saving glass is used. In addition, the building has an automated control of lighting according to the time of day. There is a system of visitor registration (digital platform). All engineering systems are controlled by the automation and dispatching system of the building. For watering green plantations rainwater is used. The constructive solution is provided by metal tree-like columns. Decorative elements (paintings, sculptures, etc.) are made by the best masters of Kazakhstan in the spirit of the Silk Road. The greenery inside the building is distinguished by a rich variety of plants brought from Europe.

1.Name of the Project Trade and entertainment center Victoria Gardens

2. Web page of the Project www.victoriagardens.com.ua

3. Date of start and completion of the project (its phase) 2014 active – opening 2016, October 29-th

4. Link to the promo video None

5. Participants of the Project (specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Studio Quadra, architect Marek Artsishevskiy – architect of the project, Property management Fenix-capital LLC ( architects, engineering) Legal services ―Amida‖ Brokers JLL Kyiv, Kyiv Hills Developer USH-BUD

6. GBA / GLA 102 000 m2 / 52 000 m2

7. Format of the project (regional, super-regional etc) Regional

8. Project structure description (gallery, supermarket, food court, entertainment zone etc) Double mall, two atriums, three levels. Retail is located on GF and FF, sports club on the third level. Hypermarket Silpo 7500 m2, Papashon bowling (16 alleys) , Papashon kids play center 1300 m2, Cinema with 6 cinema halls, to be opened in December 2016

9. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) http://www.ex.ua/edit_storage/922016490388

10. Location of the Project (country and city; CBD/historiс area of the city, suburban area etc) Frankivskiy region, 226 A, Kulparkivska street, Lviv.

11. Description of location (amenities, infrastructure, transport accessibility, etc) Intersection of two major transportation arteries Kulparkivska and Naukova in a heavily populated district in Lviv.

12. Technical and engineering specifications. Parking (number of parking places, type of parking, innovative solutions for parking) Ground level in front of the SC and a three-level open parking in the rear of the SC

13. Tenants (anchor tenants, mini-anchor tenants, other gallery tenants) Silpo 7500 m2, Foxtrot 1800 m2, Jysk 1300 m2, Papashon bowling, 16 bowling alleys, Papashon kids 1300 m2, LCW, 900 m2, Gloria Jeans, 1300 m2, Argo center and Argosha, 1700, Food court for 9 operators, ( Lviv‘s croissants, Varenyky tut, Tomatina, Express buffet, Big berry, Kebab, Lamandjio, Blackwood burger) Coffee shops: Kredens café, Blackwood coffee, Maisternya shokoladu, Lvivski plyatski, Brown café, restaurants: Yapona khata, Chelentano, Khinkali, Mangal, Open, Papashon. Bomond 400 m2, Yves rocher, NYX, Lush. Kyiv‘s jewelry plant, Zoloty vik, Sova, Pandora etc.

14. Occupancy rate 60%

15. Noteworthy information you consider might be relevant for the jury members. Spacious, well-lit, clear architectural concept, warm atmoshere. Positioning: for the whole family with a special accent on food and entertainment

16. Environmental - Certification (LEED, BREEAM) or sustainable practices in place

1. Name of the Project Aquamarine

2. Web page of the Project http://www.megapolisdom.by/zhilaya_nedvizhimost/zhiloy_kompleks_akvamaryn/ 3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) The group of companies "Tapas" (www.tapas.by) 4. Link to the promo video None 5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://goo.gl/q5hWwQ http://www.megapolisdom.by/zhilaya_nedvizhimost/zhiloy_kompleks_akvamaryn/

6. Typical layouts of apartments (in pictures) https://goo.gl/q5hWwQ

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Republic of Belarus, Minsk, 20 Filimonova Str. Located in the prestigious district near the National Library of Belarus. Transport: 1-2 min by walk to the nearest public transport stop. Metro station: Moskovskaya, 10-15 minutes by walk. 8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Aquamarine as a good example of premium class residential complex built with modern and high-quality materials and well-thought-out infrastructure that can satisfy the needs of the most demanding citizens. Aquamarine is no exception is fenced around the perimeter. The internal infrastructure includes one of the most modern gyms in Minsk, a VIP branch of the bank, a cozy children's kindergarten, beauty studio as well as several elite stores. Several picturesque forest-park zones located within a radius of 300 meters from the complex. Public transport stops, polyclinics, schools and kindergartens are in the walk distance. Two metro stations: "Moskovskaya" and "Vostok". Drivers will appreciate the convenient access to the most important city highways: Independence Ave and MKAD.

9. Date of commencement and completion of the project (each phase) 2012-2015 10. Project Class Premium

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). The residential complex "Aquamarine" is a unique facility that has no analogues in Minsk. It is comfortable, practical and aesthetically beautiful. The exclusive author's concept consists of two residential buildings (9 floors and 6 floors), created in a single style. In the "Aquamarine" 192 apartments of improved planning from 48 to 230 sq.m., as well as 8 luxury penthouses from 180 to 230 sq.m with spacious terraces from 100 sq.m. The facility provides everything necessary for a comfortable life: access control and video surveillance systems of the territory, equipped children's playground, indoor parking (for 82 seats) and guest outdoor parking (for 136 seats). 12. Management company and services (security, concierge services, etc.) Access control system, 24/7 video surveillance, perimeter fencing. 13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height: from 2.7 to 3.3 meters. The complex is equipped with Kone elevators. 14. Construction materials/technologies used in the project Frame: monolithic reinforced concrete Exterior walls: from ceramic blocks (brick) 15. Occupancy rate (% of sold apartments) 100 % 16. Noteworthy information you consider might be relevant for the jury members "Aquamarine" – is one of the most famous and titled premium class residential complexes in Minsk. This complex was repeatedly noted by many independent experts and the media, including such a weighty awards as: Grand Prix of the 17th Republican competition for the best architectural work in the nomination "Residential multi-storey houses (over 3 floors)" Grand Prix "Realt Golden Key 2015"- "New construction of the year. Premium class". The complex is located in the prestigious and ecologically clean area of Minsk, on the embankment of the Slepyansky water channel, and a hundred meters from the forest area. The territory of the complex is completely fenced and is under 24-hour video surveillance. Another advantage of "Aquamarine" is its location: it is possible to get from the complex to the city center in 5 minutes.

17. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project Comfort Town

2. Web page of the Project http://comforttown.com.ua/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer - KAN Development, http://www.kandevelopment.com/ General contractor - KAN BUD, http://kanbud.com.ua Architect - Archimatics, http://archimatika.com/

4. Link to the promo video https://www.youtube.com/watch?v=WAsaiiAdUdI

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://www.dropbox.com/sh/wnhggnh571yenv1/AADVO5K9ALG1QjVyl3fsF4kna?dl=0

6. Typical layouts of apartments (in pictures) https://www.dropbox.com/sh/wnhggnh571yenv1/AADVO5K9ALG1QjVyl3fsF4kna?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev, st. Regenerator, 4

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Putting first the needs of people living in modern megacities, as well as their desire for European standards and quality of life, we offer our future tenants a wide range of benefits: a large area of landscaping - specially equipped park, recreational and recreational areas, creating a favorable atmosphere and coziness on the territory of the complex; Stadium and fitness center for fans of an active and healthy lifestyle; children's and sports grounds for games and physical development of the younger generation; a shopping center with a supermarket and social amenities (pharmacies, bank branches, beauty salon, dry cleaning, etc.); comfortable and modern office space; kindergarten and a specialized art school to identify and develop the talents of your children; spacious parking lots and guest parking for cars; a low altitude and variable storey of the building, which avoids the effect of the "anthill" and provides excellent species characteristics; a large selection of apartments (more than 60 different options), optimal footage and convenient layouts. The territory of the "Comfort Town" - closed, round the clock guarded is equipped with a system of video passes, which reads machine numbers and automatically opens the barrier.

9. Project Class Business Class

10. Date of commencement and completion of the project (each phase) 2012 - up to the present moment

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components) 8 bursts, of which 6 are built. 5 464 apartments are put into operation, 4 246 are under construction

12. Management company and it's services (security, concierge services, etc.) "Comfort-Town" provides the following services for maintenance and maintenance of houses and adjacent areas of residential complexes:

Cleaning of the house territory. Cleaning of staircases. Cleaning of the basement, technical floors and roofing. Watering yards, flower beds and lawns. Maintenance of in-house systems: hot and cold water supply, water disposal, central heating, storm water drain. Maintenance of elevators. Maintenance and routine maintenance of power supply and electrical equipment, fire and smoke control systems, and other in-house engineering systems, if any. Maintenance of dispatching systems. Maintenance of smoke and ventilation ducts. Removal of domestic waste (collection, storage, processing, disposal, disposal and disposal). Cleaning and removal of snow, sprinkling part of the adjacent territory, intended for passage and travel, with anti-icing agents. Current repair of structural elements, in-house systems of hot and cold water supply, water disposal, centralized heating and storm sewerage and technical devices of houses and elements of external improvement located on a fixed territory in the established order (including sports and children's and other playgrounds). Operation of license plates on houses. Illumination of common areas and basements and pumping of water. The elite concierge service (reception) functions, which provides coordination of work with the population and uninterrupted provision of services. Concierge service provides services for ordering air and railway tickets, hotel booking, taxi order and personal driver services, "reminder of important events", flower delivery, ordering of cleaning companies, etc.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height - 2,65 m, elevators - Euroformat, navigation system on the territory of the complex

14. Construction materials/technologies used in the project wall gas-block, monolithic frame, Separate individual heat point with heat exchanger, Individual heat meter energy, Boiler, TwinFresh "Comfo" ventilation system, House heat insulation, Multi-tariff electricity meter, Gable, insulated rebated metal roofing

15. Occupancy rate (% of sold apartments) 80%

16. Noteworthy information you consider might be relevant for the jury members https://fex.net/#!867953117795

17. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project Fountain Boulevard

2. Web page of the Project https://bfontanov.com

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer: City One Development - https://city1development.com.ua Customer: UDP - http://www.udp.ua General Contractor: Devenstroy General Designer: BIP-PM - http://www.bippm.com

4. Link to the promo video https://www.youtube.com/watch?v=INpt595oi28 https://www.youtube.com/watch?v=4bPrpZCTlBg

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://drive.google.com/open?id=0B-cF7zptWLv-cTJGQ3hhRnlaYXM

6. Typical layouts of apartments (in pictures) https://drive.google.com/open?id=0B-cF7zptWLv-Rmh5UjFUVEluYkU

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev. The central business district is Pechersk. 9 minutes walk to the metro / bus stop, there are ramps.

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) https://docs.google.com/document/d/1zgQx8XbGq8AvrA3dob-oHbJFNDry09jkOn30owCt- CE/edit?usp=sharing

9. Date of commencement and completion of the project (each phase) Turn 1 (1 house): the beginning of construction - II quarter of 2011, the completion of construction - II quarter of 2014, the second stage of construction (3 houses, 2 houses put into operation: house 1 - II quarter of 2016, house 3 - II quarter ): the beginning of construction - I quarter of 2013, the completion of construction - II quarter of 2019.

10. Project Class Premium

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). The queue 1 (1 house) - 140 apartments, the total area of commercial real estate - 3441 m2, the total area of parking lots - 7380 m2, the total area of apartments - 16559.48 m2; turn 2 (3 houses) - 671 apartments, the total area of commercial real estate - 9345 m2, the total area of parking lots - 25120 m2, the total area of apartments - 67101.0 m2

12. Management company and it's services (security, concierge services, etc.) Own company for the operation of "Novoservis", round-the-clock patrolling of the territory by security guards, guard-concierge in each parade, round-the-clock Concierge service from the European company, 24/7 service.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height - 3m. https://drive.google.com/file/d/0B-cF7zptWLv-R2RSTnJuNlcxSW8/view?usp=sharing

14. Construction materials/technologies used in the project https://drive.google.com/file/d/0B-cF7zptWLv-R2RSTnJuNlcxSW8/view?usp=sharing

15. Occupancy rate (% of sold apartments) 71%

16. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project Lisi Green Town 2. Web page of the Project www.lisi.ge 3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) UN Studio (www.unstudio.com) - architectural work Architects.ge - architectural work Anagi (www.anagi.ge) - construction work NCC - (www.ncc.ge) construction work FMO (Netherlands Development Finance Company; www.fmo.nl) – investment GREM – brokerage

4. Link to the promo video https://goo.gl/rFukgp

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) Complex https://goo.gl/GzyMAi Apartments https://goo.gl/1RP3SC Townhouses and villas https://goo.gl/ji5Ert Infrastructure https://goo.gl/oky7Ga Nearby infrastructure https://goo.gl/fNnbPk Interiors https://goo.gl/CkEdKU

6. Typical layouts of apartments (in pictures) https://www.dropbox.com/sh/innebsbmkk11ylf/AACpkXPJ1jDOqrwkOrpLBtXqa?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) New residential compound in the vicinity of Lisi Lake is a sort of small town in the Tbilisi city with fresh air, tranquility and lots of greenery. It is only a 10 minutes‘ drive from the city center via a new road (Godziashvili Street). In the nearest future and as a result of the new road project created by the Municipality, Lisi Green Town will be even closer to other districts of Tbilisi. 8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) It is also notable that Lisi Green Town is surrounded by one of the biggest recreational zones in Tbilisi – Lisi Lake, 2 most prestigious academies (G. Zaldastanishvili American Academy and Georgian-British Academy), mini football stadium, entertainment, cafés, outdoor gym and Lisi thermal bath. All the above mentioned makes Lisi Green Town a perfect location for living with a healthy lifestyle appropriate for families and individuals. 9. Date of commencement and completion of the project (each phase) 2017

10. Project Class Premium Class

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). There are three main phases (districts) in Lisi Green Town: First phase unites apartment blocks (168 apartments) - maximum 4-5 floor buildings with multiple apartments. There are about ten various project designs from 55 m² to 200 m². Townhouses (20 Townhouses) from 170 m² to 240 m². Villas (3 Villas) – Lisi Green Town implies construction of 3 villas with individual designs and courtyards - from 300 m² to 475 m². Second phase includes 9 apartment blocks and 11 townhouses and we will have additional 5 apartment blocks and 20 townhouses in the third district. We have 260 parking places in the first phase and 400 - in the second. Third phase will also include - 260.We have 5 offices in the first and second phase, one supermarket (international brand - Spar) and one kindergarten. 1500 m2 off commercial space is envisaged on the Lisi Green Tower territory. 7 parks, lake

12. Management company and services (security, concierge services, etc.) Managing company of Lisi Green Town is Lisi Development. We provide various services to our clients: Provision of all necessary information on technical issues, technical supervision over the power supply of the public areas during the whole day; 24/ security service - guarding the campus 24 hours a days; What implies the patrolling and controlling the territory by 15 security- men (6 security guards for the Lisi lake territory); cleaning of public areas; laundry service; gardening, taking care of greenery (seven parks on the territory); technical maintenance of water supply, water pumping and other systems; swimming pool with a gym (total area of 300 m2), kindergarten, 2 one of the most prestigious academies in Tbilisi city, cafes and restaurants. ‖Lisi Renovation‖, subsidiary company of "Lisi Development", offers full range of renovation services: measuring off works; designer services ; creation of a 3D interior design ; selection of materials ; all kinds of renovation work ; arranging apartments with furniture, selecting technical equipment and accessories. 13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Our buildings have the following specifications: - Ceiling height 3.3 m; - 274 parking units; - completely new utility infrastructure: natural gas supply, electricity supply, pot water supply, sewerage and storm water pipes, new asphalt roads; - new blocks are equipped with rain water tanks to be used for irrigation; - 80 % of the land plot is reserved for green and public spaces: - parks and recreational areas; - development area is gated and 24/7 security service is on site; - Kone Monospace 500 elevators (with load capacity up to 630 kg, speed 1 m/s, Door Opening CO900) are installed on the developed blocks; New villa district flagship villas are planned to be equipped with BMS systems, battery storage packs and net zero homes. 14. Construction materials/technologies used in the project - Schuco / reynaers aluminum windows and door profiles; - Fibrobeton; - Portland concrete; - A500 reinforcement steel; - Thermolock thermal insulation;- BASF water insulation;- Italian brick facade;- Dutch thermal wood facade system; - Marazzi floor tiles on the balcony; 15. Occupancy rate (% of sold apartments) 90% of completed buildings and 80% of the buildings which are in process are sold. 16. Noteworthy information you consider might be relevant for the jury members Lisi Development is frequantative winner of several international real estate awards, in particular we have won 10 nominations in International Property Awards starting from 2012 to 2017 in various categories. We also gained the title of Best Green Developer at the European CEO Awards 2016. Additionally we are the winners of Golden Brand Awards 2014, 2015 and 2016 as the best development company in Georgia. 17. Environmental certification (LEED, BREEAM, DGNB) or sustainable practices in place Georgian Green Business 2014 (by Ministry of Environment); Green Build Award Georgia 2015 (by USAID, Green Building Council Georgia, Winrock International Georgia) 1. Name of the Project Novaya Borovaya

2. Web page of the Project newbor.by

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Development company "A-100 Development" http://a-100development.by/ Construction company MAPID http://mapid.by, Gomelsky DSK http://gdsk.by etc. Architect Rem Pro http://www.rem.lv, LEVEL 80 Architects http://level80.rocks, Projectingstroy http://pris.by/, Belgosproject http://www.belgos.by etc. Engineering company "A-100 Development" http://a-100development.by/ Exterior & interior design LEVEL 80 Architects http://level80.rocks

4. Link to the promo video https://www.youtube.com/watch?v=456q8fqKVVc Own Youtube channel: https://www.youtube.com/channel/UCD8kLPiKobYmjSRauTrLpmw

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) Entrance: https://goo.gl/crxJpm Night view: https://goo.gl/HUaMsW Playgrounds: https://goo.gl/3TJk76 & https://goo.gl/oLm57C & https://goo.gl/5uHBej Public transport stop with solar panels: https://goo.gl/UigGeS Bicycle parking (bikeboxe): https://goo.gl/JBW3ro Events & fun for residents: https://goo.gl/JktTup & https://goo.gl/yqS54Z Art objects: https://goo.gl/hSWYUcClosed & well designed trash bins: https://goo.gl/Yvh1SM Dog parks and boxes with dog dirt bags (https://goo.gl/PWJuxm) Other Visuals https://www.dropbox.com/sh/xy7pm6y7hlbfc71/AAAig6X1SohE-8z5Wx1lCthla?dl=0

6. Typical layouts of apartments (in pictures) Layouts https://www.dropbox.com/sh/dn99emf2l50dy56/AAAcQPzxVYz22XK04ax_mB6ya?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Minsk, Belarus, 2 Leonardo da Vinci Str.

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Novaya Borovaya is a large-scale & mixed-use residential project of "A-100 Development" company which is based on SMART + SOCIAL principle. Due to its favorable location, the district creates all conditions for improving the quality of life like well-thought out infrastructure, European territory planning & housing design, green streets, bicycle tracks & solar panels. "Novaya Borova" became an icon of modern & comfortable life. Novaya Borovaya residential mixed-use complex is being built in according to a modern urban infrastructure and includes: - сonvenience stores (home stores) - supermarkets - medical center - fitness centers - kindergartens and schools - polyclinic - developing children's playgrounds - noiseless recreation areas - closed yards & roof yards - bicycle parking and bicycle tracks - zones for sport activities - 24/7 video surveillance - dog parks and boxes with dog dirt bags - closed & well designed trash bins 9. Date of commencement and completion of the project (each phase) 2014-2027

10. Project Class Comfort

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components) Novaya Borovaya will include 12 residential quarters and more than 1 000 000 sq m of living apartments. The overall area of residential mixed-use complex: 100 hectares.

Residential quarter №9 (2015-2017) Kedrovy quarter 7 residential houses (5-19 storey) which include 1491 apartments. Residential quarter №8 (2017-2019) Sosnovy quarter 7 residential houses (4-23 storey) which include 1187 apartments. Residential quarter №6 (2017-2020) Kvartal-park 7 residential houses (6-23 storey) which include 1014 apartments. Residential quarter №5 (2018-2020) 11 residential houses (4-23 storey) which include 1233 apartments. Residential quarter №11 (2018-2020) 5 residential houses (8-23 storey) Residential quarter №12 (2019-2021) 3 residential houses (8-storey)

12. Management company and services (security, concierge services, etc.) Management company: "A-100 Comfort"

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Class: comfort class. 12 quarters (phases), more than 10 000 apartments and 1 000 000 sq m of living space & activity Novaya Borovaya residential mixed-use complex is being built in according to a modern urban infrastructure and includes: - сonvenience stores (home stores)- supermarkets- medical center- fitness centers- kindergartens and schools- polyclinic- developing children's playgrounds- noiseless recreation areas- closed yards & roof yards- bicycle parking and bicycle tracks- zones for sport activities- 24/7 video surveillance - dog parks and boxes with dog dirt bags- closed & well designed trash bins Ceiling height: from 2.5 to 5.5 meters, depending on the house and category of the apartment. French windows are installed with a height of 2 and more meters. Entrance units: glass doors with convenient access for disable people and mothers with little children. Elevators: OTIS and Schindler (2 per porch). 14. Construction materials/technologies used in the project Construction materials For precast reinforced concrete (PRC) houses Exterior wall - a combined energy-efficient three-layer panel, reinforced concrete with insulation, internal panels and partitions - precast reinforced concrete. For monolithic frame houses External walls made of autoclaved aerated concrete blocks; Out-of-apartments partitions made of CRPU bricks with a thickness of 120 mm; in-between-apartments partitions made of cellular concrete blocks with a thickness of 250 mm; Internal apartment‘s walls made of cellular concrete blocks with a thickness of 100 mm. 15. Occupancy rate (% of sold apartments) 83%

16. Noteworthy information you consider might be relevant for the jury members New Borovaya - winner of the Realt Golden Key 2017 in two nominations - "Residential Complex of the Year" and "New Construction of the Year. Comfort class. https://dh.img.tyt.by/p/09/0/a100_308_kkartinka_2_golden_key.jpg 1. Name of the Project Central Park

2. Web page of the Project http://centralpark.com.ua/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer - KAN Development, http://www.kandevelopment.com/ General contractor - KAN BUD, http://kanbud.com.ua Architect - TAM A. Pashenko, http://www.pashenko.com.ua/

4. Link to the promo video https://www.youtube.com/watch?v=PmKQR1fDTLc

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://www.dropbox.com/sh/fk9co0ekqafqqlu/AABx8AN0alKPYezbb0Qi03EMa?dl=0

6. Typical layouts of apartments (in pictures) https://www.dropbox.com/sh/fk9co0ekqafqqlu/AABx8AN0alKPYezbb0Qi03EMa?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev, the central business district, the nearest metro station - "Lybidska", ramps are provided on the territory of the complex. 3 metro stations (Lybidska, Palace Ukraine, Friendship of Peoples), trolleybus / bus stops on the street. Bolshaya Vasilkovskaya and boulevards. Friendship between nations

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Concierge service 24/7, children's club "Academy of Modern Education A +", cleaning service, underground parking. Closed from outsiders, access control on the cards of residents, in the courtyard of the complex is a children's playground, landscape gardening of the adjacent territory. Three-level underground parking for 316 cars, parking in the adjacent territory, Shopping Center Ocean Plaza (8 min.), Palace Ukraine (13 min.), Maria Zankovetskaya Park (15 min.) Botanical Garden. MM Grishka (20 min.), NSC Olimpiyskiy (20 min.)

9. Date of commencement and completion of the project (each phase) 2012 - June 9, 2015 (1st line), 2015 - 2017 (2nd line)

10. Project Class Business Class

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components) 2 turns, 444 apartments - 1 turn, 145 apartments - 2 queues

12. Management company and it's services (security, concierge services, etc.) "Comfort-Town" LLC provides the following services for maintenance and maintenance of houses and adjacent areas of residential complexes: Cleaning of the house territory. Cleaning of staircases. Cleaning of the basement, technical floors and roofing. Watering yards, flower beds and lawns. Maintenance of in-house systems: hot and cold water supply, water disposal, central heating, storm water drain. Maintenance of elevators. Maintenance and routine maintenance of power supply and electrical equipment, fire and smoke control systems, and other in-house engineering systems, if any. Maintenance of dispatching systems. Maintenance of smoke and ventilation ducts. Removal of domestic waste (collection, storage, processing, disposal, disposal and disposal). Cleaning and removal of snow, sprinkling part of the adjacent territory, intended for passage and travel, with anti-icing agents. Current repair of structural elements, in-house systems of hot and cold water supply, water disposal, centralized heating and storm sewerage and technical devices of houses and elements of external improvement located on a fixed territory in the established order (including sports and children's and other playgrounds). Operation of license plates on houses. Illumination of common areas and basements and pumping of water. The elite concierge service (reception) functions, which provides coordination of work with the population and uninterrupted provision of services. Concierge service provides services for ordering air and railway tickets, hotel booking, taxi order and personal driver services, "reminder of important events", flower delivery, ordering of cleaning companies, etc.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height - 3 m, navigation system throughout the complex, concierge service and security 24/7, elevators KONE

14. Construction materials/technologies used in the project Hinged ventilated facade (plates ATEM, a heater - mineral cotton wool)

15. Occupancy rate (% of sold apartments) 70%

16. Noteworthy information you consider might be relevant for the jury members

17. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project LEONARDO

2. Web page of the Project www.narisan.kg/lp

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) NARISAN DEVELOPMENT GROUP ltd. Nikita Ryjih - CEO, co-owner Irina Kemple - co-owner Cholpon Beishenalieva - co-owner Andrey Murdasov - co-owner

4. Link to the promo video

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://www.dropbox.com/sh/9u49fnzh4jfng5p/AAAmuu57CpVakksF2oV_0TNQa?dl=0

6. Typical layouts of apartments (in pictures) http://narisan.kg/?page_id=3459

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Business centre of Bishkek (capital of Kyrgyzstan), close to lots of restaurants, parks, malls, shops, museums, cultural and historical buildings. All kinds of public transportation in 1-2 minutes. Located in the "golden square" of the capital. 8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Ground parking, underground parking, fitness gym for residents, 90 square meters entrance hall, children playground outside and children room inside the building, 2-5 minutes away from restaurants, parks, malls, grocery stores and etc.

9. Date of commencement and completion of the project (each phase) 2017 End of year

10. Project Class Business Class

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components). Underground parking, first and second floor commercial units, 3-12 floors residential area, M-floor (top floor) for apart hotel. Total of 8 300 square meters.

12. Management company and it's services (security, concierge services, etc.) Concierge, security, cleaning services, gym membership for all residents.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height - 3,15 meters, elevators - total of 4 made by Meriha (Turkey) with italian motors, 24/7 video surveillance, 100% of facade made of stone with ventilation system of installation, all walls inside the building are made of top quality bricks, individual ventilation pipes for each apartment free of any smell, top quality 3 glass layers with SOLAR system windows from REHAU company everywhere in the building, marble on the entrance hall floor and next to commercial entrances.

14. Construction materials/technologies used in the project Concrete, ceramic bricks, natural stone for facade, TECHNONIKOL insulation, personal ventilation pipes.

15. Occupancy rate (% of sold apartments) 91%

16. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project Tetris Hall

2. Web page of the Project http://tetrishall.com.ua

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, etc.) Developer - KAN Development, http://www.kandevelopment.com/ General contractor - KAN BUD, http://kanbud.com.ua Architect - TAM A. Pashenko, http://www.pashenko.com.ua/

4. Link to the promo video https://www.youtube.com/watch?v=iBa0WdiQzok

5. Visual materials (link to pictures of exterior and interior design, parking and nearby environment) https://www.dropbox.com/sh/qjbuiun8193ip7w/AACPiTlUTQ4fC-pZ2iCuZG6xa?dl=0

6. Typical layouts of apartments (in pictures) https://www.dropbox.com/sh/qjbuiun8193ip7w/AACPiTlUTQ4fC-pZ2iCuZG6xa?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city, public transport/care accessibility, etc.) Ukraine, Kiev, the central business district, the nearest metro - "Olimpiyskaya", on the territory of the complex there are ramps

8. Description of location and infrastructure (amenities, parking, playground, fitness center, social infrastructure facilities: groceries, supermarkets, leisure centers, etc.) Megamarket, 3 kindergartens, municipal schools, honey. Institutions, cultural and public sights, a lot of catering facilities and more. Detailed scheme of the nearest infrastructure in the application.

9. Date of commencement and completion of the project (each phase) 2013 - May 11, 2016

10. Project Class Business Class

11. Number of phases, number of units of each phase and total (including non-residential premises designated for commercial use, parking and other project components) 190 apartments

12. Management company and it's services (security, concierge services, etc.) "Comfort-Town" provides the following services for the maintenance and servicing of houses and dwelling areas of residential complexes:

Cleaning of lodging territory. Staircase cleaning. Cleaning of basement, technical floors and roof. Watering yards, flower beds and lawns. Maintenance of intra-house systems: hot and cold water supply, drainage, central heating, storm sewerage. Maintenance of elevators. Maintenance and repair of power supply networks and electrical equipment, fire-prevention automation systems and smoke removal, as well as other internal-internal engineering systems, if any. Maintenance of dispatch systems. Maintenance of smoke and ventilation ducts. The removal of household waste (collection, storage, processing, recycling, disposal and burial). Cleaning and removal of snow, sprinkling of part of the territory of the commune, intended for passage and passage, with anti-icing means. Current repair of building elements, interior heating systems of hot and cold water supply, water drainage, centralized heating and storm sewerage, and technical devices of houses and elements of external improvement, located on the assigned territory in the established order (including sports and children's and other platforms). Operation of license plates on houses. Illumination of common areas and cellars and pumping water. An elite concierge service (reception) operates, which ensures coordination of work with the population and uninterrupted rendering of services. The Concierge Service provides services for booking air and rail tickets, booking hotels, ordering a taxi and personal driver services, "reminders about important events", delivery of flowers, ordering services of cleaning companies, etc.

13. Technical and engineering specifications to prove class of the project (ceiling height, parking, information infrastructure, security systems, elevators, etc.) Ceiling height 3 m, interior navigation system The unique façade of a combined glazed building combined with glossy ventilated slabs, through-lifts from parking to living floors, integrated BMS system through an entire building, an individual roof top boiler house

14. Construction materials/technologies used in the project The combination of glazing mixed with exclusive hinged ventilated panels creates a unique effect of the famous game "Tetris", which fully justifies the name of the building. Warming of the facade of the building is done with the help of mineral wool. For the first time in Ukraine a dynamic system of backlighting of the facade of the structure is used. Manufacturers of facade elements: Leonardo ceramica (ceramic tiles), Alutech, Reynaers, Sun-Guard. 15. Occupancy rate (% of sold apartments) 30%

16. Noteworthy information you consider might be relevant for the jury members The inner courtyard, closed from strangers, is located on a stylobate adjacent to the building. The roof of the stylobate has been landscaped and used for the needs of the residents of Tetris Hall. It has a private indoor and outdoor playground with exclusive equipment and simulators.

17. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None 1. Name of the Project "Minskaya" - "McDonald's Ukraine Ltd"

2. Web page of the Project https://www.dropbox.com/s/mr32k6djvzrsy5t/MCD_MINSKAYA_2017%20%282%29.pptx?dl=0

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine Kiyv city Obolonsky district Obolonsky Avenue 26, A

4. Date of start and completion of renovation start - of June 2016 / end - of September 2017

5. Project Type Restaurant

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, etc.) "Bureau of investment projects" - Chief Engineer of the project (General designer) - Evdokimova Natalia "Format Project" - Chief Engineer of the project - Biabyak Bogdan "JI TI ENGINEERING" - Development Director - Varenytsya Evgeny "BR4 KMB1" - Director (General contractor) - Lyadecky Konstantin "Capital constraction Ltd" - Chief Architect of the project - Shadyrya Oleksiy, Architect - Korol Yurii, Architect - Khuder Samir "McDonald's Ukraine Ltd" - Senior Architect - Pastushenko Andrey

7. Description of key technical and functional characteristics (e.g. GBA/GLA, room count, infrastructure components, etc.) Land area - 2324m2 Building area - 753,1m2 Ground floor - 387,7m2 Basement floor - 365,4m2 Lobby area - 159,83m2 Seats in lobby - 102 Seats on terrace - 128 McDrive - Yes Express window - Yes

8. Goals of the renovation (enhance comfort for tenants, visitors; optimise of operating costs, etc.) Goals of the renovation - enhance comfort for visitors (comfortable environment and quick service); optimise of operating costs.

9. Construction works conducted as part of renovation a. Cross recuperator. This solution is not used in our market segment, due to the difficulties of cleaning the air in the hood systems. b. Purification of technological air by ultraviolet. Unique for Ukraine system (Jimco patent), which uses a combination of exposure to ultraviolet and ozone. Complete absence of fat and odor. As a consequence, no costs for cleaning the channels and recuperator, as well as lack of odor. c. Use of the catalyst (filter unit of 30 cartridges of 3 kg with special activated charcoal), which completely neutralizes odors and excess ozone (during hours of reduced demand). d. Adjusting the performance of the HVAC system at night to reduce the noise of the condenser units in accordance with the standards. e. Heat pump system with heat pump Vaillant

10. Major changes (provide visual material before and after renovation via link on YouTube or through slide share) https://wetransfer.com/downloads/54af840fc65e4368a21d6271fcd2f38d20171013140432/b764d329f13 0a4304a640f6f7799eba220171013140432/28d5a7

11. Describe added value for tenants and guests after the renovation a. Cross recuperator - 19 273,00 EUR b. Air cleaning Jimco - 17 200,00 EUR c. Catalyst Jimco - 2 632,00 EUR d. The system of hot water with a heat pump Vaillant - 10 000,00 USD Resource Saving: a. Cross-flow recuperator - 275,4 thousand kW * hour / year (heating season 5 months) or 236.8 Gcal b. The system of hot water with a heat pump Vaillant - approx. 3500 kWh / hour

12. Noteworthy information you consider might be relevant for the jury members https://www.dropbox.com/s/mr32k6djvzrsy5t/MCD_MINSKAYA_2017%20%282%29.pptx?dl=0

1. Name of the Project Hôtel de Paris Odessa MGallery by Sofitel

2. Web page of the Project www.hoteldeparisodessa.com www.accorhotels.com/9944 sofitel.com

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Hôtel De Paris, member of MGallery by Sofitel, offers its guests a unique experience and the opportunity to enjoy memorable moments in Odessa. The boutique hotel allows guests to take a memorable journey into magical elegance within the very heart of Odessa, in the historical centre located on the fashionable Ekaterininskaya Square. The hotel is housed in a listed building which is of invaluable architectural importance and was first constructed in 1849 - 1850 by renowned architect Morandi as a private residence for a well-know Odessa banker and epicurean baron Maas. The building‘s windows overlook a panoramic view to Ekateriniskaya Square, which is rightfully considered to be the most beautiful square of Odessa and is one of the most important architectural sightseeing in the city. The famous Potemkin Stairs, Primorsky Boulevard, Deribasovskaya Street, Opera and Ballet Theatre are just a stone throw away. For those seeking knowledge, the Literature and Archaeological museum is close to the hotel, The Passenger Ship terminal and other attractive tourist places are situated within minutes of from the Boutique Hotel.

4. Date of start and completion of renovation 2014-2017

5. Project Type Public property

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, etc.) Ana Moussinet - AMID (Ana Moussinet Interior Design group) architect & interior designer, Paris France JSC Magnificient Group WSP Auditors, London, UK City Group Development, UA

7. Description of key technical and functional characteristics (e.g. GBA/GLA, room count, infrastructure components, etc.) GBA - 4 000 м² 5* luxury boutique hotel has 51 lavish guestrooms (1200 m2), Café de Paris with international cuisine and Le Bar with regular live music. Guests can unwind in the cozy health club.

8. Goals of the renovation (enhance comfort for tenants, visitors; optimise of operating costs, etc.) Conversion from private residence to hotel, in keeping of the historical value of the listed building dated to 1850, the property was purchased and branded to an Accor international hotel, create additional luxurious environment for the tourists and local residents

9. Construction works conducted as part of renovation Creation of additional 3rd floor with rooftop, creation of guestrooms and public areas, facade rec lading, kitchen installation, installation of machinery room and water holding tanks, fire alarm, ventilation & security systems

10. Major changes (provide visual material before and after renovation via link on YouTube or through slide share) https://youtu.be/dKwpZU7Jtig https://www.dropbox.com/sh/4r5cxaz2oz51q8t/AAA3VkKQCpgjqFLMCI6bmCUka?dl=0

11. Describe added value for tenants and guests after the renovation Magical historical building passionately designed by French architect and interior designer Ana Moussinet creating boutique hotel with luxurious accommodation options and upscale facilities at the very heart of the city. Inviting home away from home boasts more than the usual to the discerning cliental, it provides an ideal escape from reality and ensures the refinement of French savoir-faire in the form of extravagant and personalized service. 5* luxury boutique hotel has 51 lavish guestrooms, Café de Paris with international cuisine and Le Bar with regular live music. Guests can unwind in the cozy health club.

12. Noteworthy information you consider might be relevant for the jury members AccorHotels MGallery by Sofitel hotels are an exclusive collection of distinctive and discerning properties around the world, which embody three unique atmospheres including Heritage Hotels - steeped in history with classic and evocative architectural style; Serenity Hotels - true havens of relaxation in natural sanctuaries; and Signature Hotels - reflecting a combination of sense of place and contemporary style. Hotel de Paris Odessa belongs to Heritage Hotels and its aim to maintain the historical value and charm of Odessa with an added French Flair. 1. Name of the Project Shopping mall Asia Park

2. Web page of the Project www.asia-park.kz

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Kazakhstan, Almaty, Raiymbek Avenue, 514a.

4. Date of start and completion of renovation Date of reconstruction: January 2016

5. Project Type Retail

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, etc.) The group of companies "ARCADA" is a leading development company operating in the market of the Republic of Kazakhstan since 1999, specializing in investments, construction and management of commercial real estate. Possessing rich experience and knowledge, the Company implements projects qualitatively and efficiently at all stages of the investment cycle - from pre-project development to construction, commissioning of buildings and professional management of facilities. The total area of the realized objects is more than 300 000 sq. m. During the activity of the CC ARCADA, the technologies of commercial real estate management, corresponding to international standards, were developed and introduced. The management team consists of high-class professionals with extensive experience and adhering to modern business standards, combined with an understanding of the specifics of the Kazakhstan market.

7. Description of key technical and functional characteristics (e.g. GBA/GLA, room count, infrastructure components, etc.) GBA: 34 000 sq m GLA: 15 262 sq m

8. Goals of the renovation (enhance comfort for tenants, visitors; optimise of operating costs, etc.) Renovation of the project has been made in order to increase the comfort for tenants and visitors, install new energy efficient systems. "Asia Park" shopping mall is a member of ARCADA Group since January 2016. During the first year of operation the following results were achieved: • New large anchor tenants were opened. • The cinema "Arman 3D" was opened. • Attendance of the SEC increased by 2 times, and reached 10,000 people a day. • The occupancy of the mall by tenants increased from 60% to 95.17%.

9. Construction works conducted as part of renovation  Renovation of the facade  Reconstruction of parking zone  Implementation of new internal planning decisions  Expansion of the food court zone  Reconstruction of the cinema and children's entertainment center

10. Major changes (provide visual material before and after renovation via link on YouTube or through slide share) Pictures of exterior and interior design https://goo.gl/w6nZkc Presentation https://goo.gl/ZXmG1H Video presentation https://www.youtube.com/watch?v=xjxt-E4CbKA

11. Describe added value for tenants and guests after the renovation New modern infrastructure: reconstructed gallery, convenient navigation, energy efficient illumination, optic fibre internet, free ultraspeed Wi-Fi, ip telephony etc. New HVAC System New parking zone New assistance program for tenants: - Merchandising and training for staff - Assistance in obtaining franchises - Cooperation with suppliers of commodity groups - Consulting in the field of advertising, pr and marketing - Strengthening of event-marketing, implementation of the program of basic and regular events - Development and implementation of the B2B & B2C loyalty - A package of activities within the loyalty program for tenants

12. Noteworthy information you consider might be relevant for the jury members Asia Park" shopping mall was a member of ARCADA Group in January 2016. During the first year of operation of the management company the following results were achieved: New large anchor tenants were opened. The cinema "Arman 3D" was opened. The attendance of the SEC increased by 2 times, and reached 10,000 people a day. The occupancy of the mall by tenants increased from 60%, to 95.17%.

1. Name of the Project The concept of development of VDNG for 40 years

2. Web page of the Project vdng.ua/letsfuture

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine; Kiev; Goloseevsky district; VDNG (National Complex "Expocenter of Ukraine")

4. Date of start and completion of renovation June 2016 - July 2017

5. Project Type Public property

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, etc.) The national complex "Expocenter of Ukraine" is the cultural and innovative center of the country (vdng.ua), CIVITTA is one of the leading companies in management consulting in the countries of the resurgent part of Europe (http://www.civitta.com/), PUPA (public urbanism personal architecture) - an innovative team of urbanists (http://pu-pa.eu/)

7. Description of key technical and functional characteristics (e.g. GBA/GLA, room count, infrastructure components, etc.) 285 hectares of territory, including ensemble of 19 architectural monuments, open and closed exposition areas, forest park area, open areas for development, 3 metro stations in walking distance (from 3 to 10 minutes on foot), Kiev district road, 20 minutes by car to the international airport Zhuliany, all communications and networks (electricity, water, sewage, gas, road network, communications). Available services: forest park, Concert Hall, robotics center, swing park, contact zoo, private transport rental (bicycles and electric transport), bank, Lemurashnik Child Development Center, Midgard Private School, retorts, cafes, food courts, art-gallery 3D illusions, coworking, show-room of Ukrainian designers of clothes (will open in December), attraction of virtual reality X-Land (opens in December), outdoor pool, club of the new amateur sport system Live Love, event organization (festivals, fairs to, conferences, etc..) of any size and complexity, electrical services, transport services, landscaping services, security services, PR and promotions, free wifi on the part of the territory, toilets.

8. Goals of the renovation (enhance comfort for tenants, visitors; optimise of operating costs, etc.) * The goal of the project is to answer three fundamental questions: 1. What program should VDNG carry out on working days, in winter, in frost, in bad weather? 2. How is it better to use such a large asset (285 hectares in Kiev), how to preserve and create a legacy? 3. How to implement development plans that require significant investments and which the state will not be able to allocate / when the state's resources are limited? How to attract a private investment resource and ensure the protection of investors' interests?

Realization of functions and development of the corresponding functional clusters: - Exhibition - Art and Exposition - Educational - Sports and Activities - Recreation - Business Campus - Leisure

9. Construction works conducted as part of renovation * Repair pavilion for school, repair pavilion for coworking, repair pavilions for IT accelerator, create a virtual reality attraction X-Land, built an outdoor pool, 2 pavilions converted into Concert Hall, the pavilion converted to a spherical cinema, the pavilion converted to a robotics center, built a swing park, built a contact zoo, built a children's development center "Lemurashnik", built a restaurant Hay Loft, repaired the premises under the cafe "VDNG point", launched the pavilion of the automated branch of the bank and VDNG information center

10. Major changes (provide visual material before and after renovation via link on YouTube or through slideshare) * http://www.rbc.ua/static/files/gallery_uploads/images/%D0%9F%D0%B0%D0%B210_1.jpg http://2.bp.blogspot.com/- k2JFHd15pR0/UZidppSFt6I/AAAAAAAACPE/t1yxO_BaNRU/s1600/IMAG2623.jpg https://i.ytimg.com/vi/H2kTlFVSF7o/maxresdefault.jpg http://i045.radikal.ru/1111/fa/1150dad4a5f7.jpg http://animalpark.com.ua/files/animal-2016/DH7B1622-1200.jpg http://cs625219.vk.me/v625219861/4edaf/RTaRUWDG2OE.jpg https://life.bodo.ua/upload/files/cm-event/7/6148/image/theater_planetarium-r1r1h500w711zc2.jpg

11. Describe added value for tenants and guests after the renovation

12. Noteworthy information you consider might be relevant for the jury members * The brand and corporate identity of VDNG won the Red Dot award (2017), the prize in the "Eventive tourism of Kyiv 2016" competition, we expect 2 million visitors by the end of 2017, the largest music festival of the country Atlas weekend with 350 thousand visitors was held in the summer of 2017 at VDNG , the largest theatrical festival of the country GogolFest was held in 2017 at VDNG, the largest Swing Park in the world - at VDNG, the largest contact zoo in Ukraine - at VDNG (there is a record in the book of records of Ukraine in 2016) 1. Name of the Project Astana Expo 2017 Kazakhstan Pavilion - Nur Alem

2. Web page of the Project https://expo2017astana.com/en/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) General Contractor: Sembol Construction http://www.sembolinsaat.com.tr/ Controller: Hill International https://www.hillintl.com Architectural Design: Adrian Smith + Gordon Gill Architecture (AS+GG) http://smithgill.com/ Structural Design: Werner Sobek Stuttgart Gmbh www.wernersobek.de Mechanical Projects: Positive Energy Practice Electrical Projects: Lighting Design Partnership International Ltd http://www.ldp.net/ Landscape: The Planning Partnership Limited (TPP) http://planpart.ca/ Interior Design: KCA International Designers http://www.kca-int.com/ Interior Lighting Design: Light Touch PLD http://lighttouchpld.com/ Acoustic Consultancy: AJ ACOUSTICS http://www.adrianjamesacoustics.co.uk/ AV Consultancy: Hewshott http://www.hewshott.com/ Daylight analysis: Lighting Lab1 http://www.lightinglab1.com/ Visitor flow analysis: Aecom http://www.aecom.com Content Design Consultancy: Raid Sabbah Local Content Design and Consultancy: Texspire LLP http://texspire.com/ Media Production Consultancy: Filmdeney http://www.filmdeney.com/ Photographer: Emre Dorter http://emredorter.com/

4. Date of start and completion of the project 05/09/2014 – 30.04.2017

5. Description of the project (its functions, services, goals etc) The defining symbol and the central venue of the EXPO-2017 site is Nur Alem - the spherical Main Pavilion in the centre of the Expo City. It is a glass ball of 80 meters in diameter – the largest of its kind – with two wind generators and 13,132 solar cells on the exterior upper part. While its floors cover a total area of 41,633 m2, the 8 exhibition levels contain almost 70 independent exhibitions. This iconic building is devoted to Future Energy and therefore looks to our global energy future. Both in its construction as well as in the message it conveys, Future Energy presupposes an abstraction that assumes the adoption, implementation and use of the best energy practices for the immediate future, with sustainable development. Future Energy also contemplates raising awareness regarding energy as an inherent asset of humanity that should be used responsibly and efficiently. Visitors will be able to see the future energy technologies and concepts related to floor themes as well as the perspective to Kazakhstan starting from its history to the future with digital, multimedia and interactive tools. 6. Link to the promo video Promo video https://expo2017astana.com/en/page_id=22 Grand Opening Euronews https://www.youtube.com/watch?v=mKApoRKDywI Full live opening ceremony https://www.youtube.com/watch?v=K6iEfgoQa_k

7. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) From official website https://expo2017astana.com/en/page_id=22 Photos https://goo.gl/wqcspi Layouts https://goo.gl/bZxDJQ

8. Location of the Project (country and city; CBD/historiс area of the city etc) Kazakhstan, Astana, 55 Mangylik El street EXPO 2017 Pavilion in Astana is located between main streets of Astana: Kabanbai batyr avenue, Orynbor street, Hussein bin Talal and Turar Ryskulov streets.

9. Description of location (amenities, infrastructure, transport accessibility by car / public transport, etc) Expo 2017 site is located on the south of city center of Astana. And the most important architectural object of Expo, Pavilion Nur Alem stands on the centre of the Expo site. It is surrounded by International, Corporate and Thematic Pavilions, Art Center, Energy Hall, Best Practices Area and Amphitheater. There are also several important cultural, public, educational and residential areas around the Expo site such as, Hilton Hotel, Expo Congress Center, Mega Silk Way Shopping Mall Entertainment Center, Nazarbayev University and Astana Ballet Theatre. Regarding transportation, the area is easy accessible by motorway with private cars and public buses. People can use many public bus routes numbered as 10, 12, 18, 37, 40, 51, 53, 200 (night), 301, 302, 303, 308, 309 and 506. Also, The Astana Metro which is planned as light rail rapid transit system will come into use very soon. With a minimum number of stops it can take around 30 minutes to get to the exhibition centre from the city centre the pavilion is about 3 km from Baiterek City Center, 11 km from the central railway station, 8 km from Astana International airport Astana.

10. Technical characteristics (total area, layouts and space usage etc) The total area of the building is 41,633 m2, consists of 8 exhibition levels contain almost 70 independent exhibitions. Since it is a spherical building, all the floor plans have circular facade boundaries except level 1 and the basement. This iconic building is devoted to Future Energy and therefore looks to our global energy future. Accordingly, each floor has one theme to focus on. Level 1 – National Pavilion Level 2 – Water Energy Level 3 – Kinetic Energy Level 4 – Biomass Energy Level 5 – Wind Energy Level 6 – Solar Energy Level 7 – Space Energy Level 8 – Future Astana There are 3 big atriums which are important impressive spaces through the sphere. One of them is located on the center, surrounded by 8 panoramic elevators and the rest 2 are on the north and south sides of the building.

11. Accessibility for disabled people (specialized infrastructure, technologies) Disabled people have direct access to the facilities and exhibition areas through the building with certain tools, starting from the design phase. The minimum design dimensions in spaces are always considered, ramps and elevators used for the continuous accessibility. 8 big special designed panoramic elevators on the main atrium is open for the usage of all visitors including with disabled people. In case of further assistance, the operational team is always ready to assist. Also, on every floor there is specialized WC for disabled people.

12. Comfort environment (zone for kids, WC/cafes/additional services/wi-fi etc) 2 bars, WC on each level, wi-fi free, medical point, souvenir shop and many exhibits that are developed to the kids

13. Noteworthy information you consider might be relevant for the jury members 115 states and 22 international organizations confirmed their participation in EXPO 2017 in Astana. This turnout exceeded the organizing company's expectations of 100 countries and 10 international organizations. Expo 2017 attracted €125 million in sponsorships from large international companies. The sponsors of Expo 2017 included Samsung, Shell, Chevron and others. Over 100 companies, including Zaha Hadid Architects, UNStudio, Snøhetta, HOK, and Coop Himmelblau, participated in a competition to design the grounds of Expo 2017. Chicago firm Adrian Smith + Gordon Gill Architecture (AS+GG) won the competition for the design idea. The main project, according to the design was realised by Swiss company IT-Engineering. Several national and international construction companies were awarded contracts to build the grounds. The main contractor Mabetex Group, and Sembol, CC Bazis-A LLC, ABK Kurylys-1 LLC, Turquaz-YDA Stroy , Sredazenergostry have completed the construction part. The financing of project is done by the Kazakhstan Government and some private investor like Plast Invest Production LLP, Sonik Company LLP, PolimerMetal-T LLP and Alyugal LLP. • Nur Alem became the most visited in Expo 2017 Astana • One of the best places of public is the glass cantilever skywalk on level 8. • Libraries on each floor`s balcony sides are open to public. • Kinetic Energy and Tokamak shows became most exciting and interesting activities for the public • Mobile Application Nur Alem which is developed for better communication with public 14. Environmental certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project The Metropolitan Andrey Sheptytsky Center 2. Web page of the Project http://library.ucu.edu.ua/ or https://www.facebook.com/sheptytskycenter/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Behnisch Architekten, Stuttgart with AVR Development, Lviv 4. Date of start and completion of the project start construction in 2015, completion 2017 5. Description of the project (its functions, services, goals etc) it's a world-class humanities library and also a modern educational center. The ground floor of the library will be devoted to public creativity. 6. Link to the promo video https://www.youtube.com/watch?v=_3P9BIlUz2c https://www.youtube.com/watch?v=v_MX8D09H-k

7. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) http://www.the-village.com.ua/village/business/wherework/262661-ya-pratsyuyu-v-tsentri-sheptitskogo

8. Location of the Project (country and city; CBD/historiс area of the city etc) 31 Stryiska Street Lviv Ukraine 79000 9. Description of location (amenities, infrastructure, transport accessibility by car / public transport, etc) The Metropolitan Andrey Sheptytsky Center combines various functions: a world-class humanities library and also a modern educational center. The ground floor of the library will be devoted to public creativity. The new Information-Resource Center will be an innovative, progressive project which will provide new opportunities for study, collective work and research projects for students, teachers and UCU‘s guests. The main features of the new library are flexibility and openness, as they play a great role in its design and structure. Sheptytsky center opened on the territory of the campus of the Ukrainian Catholic University with a comfortable transport decoupling. Festive Opening of the Metropolitan Andrey Sheptytsky Centre Lviv‘s Ukrainian Catholic University (UCU) marked the start of the new academic year with ‗Celebration Week‘ from 9-14 September. The events marked the culmination of the university‘s ‗Comprehensive Campaign‘ and featured a concert at the Opera Theatre, a pilgrimage to Galician spiritual centres, a series of lectures and discussions, a TEDx conference, and a meeting between graduates of the Lviv Theological Academy, UCU, and the UCU Business School. The highlight of the event was the consecration and opening of the Metropolitan Andrey Sheptytsky Centre on 10 September. The ceremony attracted founder James Temerty, architect Stefan Behnisch, German Bundestag VP Johannes Singhammer, German non-profit leader Archbishop Koch, as well as Lviv Mayor Andriy Sadovyi and Lviv Region Head Oleh Syniutka. Following the ceremony, the guests toured the five-story facility and an on-site exhibit dedicated to Metropolitan Sheptytsky. The centre features a library, office areas, exhibition and conference halls, and other spaces designed to accommodate business events, musical performances, and academic lectures. The Sheptytsky Centre is Lviv‘s newest intellectual meeting place; a place of intersection for people from various cultural, scholarly, and artistic environments. 10. Technical characteristics (total area, layouts and space usage etc) 6027 м2 11. Accessibility for disabled people (specialized infrastructure, technologies) The barrier-free ground floor of the building. 12. Comfort environment (zone for kids, WC/cafes/additional services/wi-fi etc) Zone for kids, WC, Cafe, wi-fi, library, book shop 13. Noteworthy information you consider might be relevant for the jury members This is the first library built during the independence of Ukraine 14. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None 1. Name of the Project Theater on Podol

2. Web page of the Project http://drozdov-partners.com/projects/337

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Architect: "Drozdov and Partners" http://drozdov-partners.com/

4. Date of start and completion of the project May 2015 - September 2017

5. Description of the project (its functions, services, goals etc) Drama Theater

6. Link to the promo video None

7. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) http://drozdov-partners.com/projects/337

8. Location of the Project (country and city; CBD/historiс area of the city etc) Andreevsky Spusk 20, Kiev, Ukraine, Podol - historiс area of the city and CBD

9. Description of location (amenities, infrastructure, transport accessibility by car / public transport, etc) The Theater on Podol is located in the heart of Kiev, in historical part. Since the 90s there was an unfinished building of the theater on this site, which was reconstructed only two years ago, thanks to a private investment.

10. Technical characteristics (total area, layouts and space usage etc) "Couloirs" - small spaces to the left and right of the building - are part of a general recreational story that is at the disposal of theater guests. They are filled with life during intermission, as well as before and after performances. A special chamber atmosphere is formed that promotes communication and emphasizes the home scale of Andreevsky.

The new reconstruction project involves a change in almost the entire planning structure and most of the marks, as a result of which the interaction between the theater space itself, visitors and the city has become much simpler. The entrance portal creates a physical and visual connection between the street and the foyer space, filled with day and evening events. The portal broadcasts events from one space to another, turning theater guests and passers-by into actors and viewers, and vice versa, depending on the point of view. Thus, the functional nature of the building is turning the theater from the "palace" into a "place for everyone."

The auditorium of the Theater on Podol has cutting edge technical capabilities. The stage is equipped with modern acoustic, light and projection equipment. To achieve a better acoustic effect, the lower part of the hall is lined with wooden panels with a precisely calculated angle of rotation. In the resulting grooves built-in lighting, creating soft lighting. Based on the parameters of the scene, the slope of the amphitheater is designed so that from every place in the audience the scene was visible from the most favorable angle. On the balcony are organized "benches", tickets for which can be sold at more democratic prices.

In addition to the public foyer and the auditorium there are many spaces accessible to actors only as well as those who are involved in the theater's inner life. These are dressing rooms, workshops, rehearsal rooms and recreation facilities for actors. In addition, on the back of the theater a chamber green courtyard is formed for recreation.

11. Accessibility for disabled people (specialized infrastructure, technologies) For disabled people at the entrance to the left side of the elevator works, then - the elevator to the auditorium. In the building of the theater there are two special bathrooms (in the foyer and at the level of the hall). In the hall itself there are four removable seats, which free space for two strollers. Installation of special equipment for the visually impaired. In addition, as far as we know, it is planned to organize a shuttle for inactive groups of the population, so that they can get to the theater building along the steep Andreevsky Descent.

12. Comfort environment (zone for kids, WC/cafes/additional services/wi-fi etc) Caffee, public foyer, multi-function auditorium

13. Noteworthy information you consider might be relevant for the jury members None

14. Environmental - Certification (LEED, BREEAM, DGNB) or sustainable practices in place None

1. Name of the Project BC ASTARTA 2. Web page of the Project http://abc-kyiv.com/uk/

3. Link to the promo video https://www.youtube.com/watch?v=7nCxt4CEJ68

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) http://dropmefiles.com/MKjYZ

5. Location of the Project (country and city; CBD/historiс area of the city, etc.) ASTARTA business-center is situated in the business district of Kyiv‘s historical center in Podil. A fabulous view of Dnipro River, St. Andrew's Church and St. Michael's Cathedral opens from the business-center. BC ASTARTA is located at the address: 58 Yaroslavska Street, Kyiv 04071 Ukraine. Main facades of the office building are facing to Nyzhnij Val, Yaroslavska, and Naberezhno- Khreschatytska streets, actually creating ―a city in the city‖, shielding cozy courtyard from the noise of adjacent streets. Windows and terraces of the BC open spectacular view on Dnipro slopes and the river itself, Andriivska church and Mykhailivskyi Cathedral. 6. Description of location (amenities, infrastructure, transport accessibility, etc.) BC ASTARTA has a total area of 62,685 sq m, of which 35,500 sq m is office space and 2560 sq m is the space for retail. There are 3 lines for renting, each one having its own entrance, underground and surface parking. Thanks to tailored planning and architectural decisions, renters of the BC have possibility to extend office volume using ―open space‖ format. Area of an office could reach 4100 square meters on a single level and locate 400-500 employees. Office of a company could harmonically enlarge in accordance with the speed of its development and growth. The BC consists of 3 stages. The first stage was put into service in June 2016, the second – in August 2017, and the third stage in the second quarter of 2018. Last year the 1st stage of BC ASTARTA won the reward ―Office Project‖. This year we nominate the 2nd stage for this reward as it‘s already put into service. The official opening is scheduled on the 25 October 2017. Speaking about BC ASTARTA, it is the first building in Ukraine constructed in accordance with green/eco technologies and is certified according to the international standard BREEAM. For building and further use of the BC, environmental-friendly materials, energy- saving technologies, modern engineering, and intellectual control systems are applied. BC ASTARTA was created from greenfield to operation. Two Metro stations are within a walking distance: Kontraktova ploscha station 8 minutes and Taras Shevchenko station 15 minutes. Convenient transportation is also available. The main concept of ASTARTA is taking care of the environment and tenants who will spend here most of their time, rational and reasonable exploitation of the building. The main objective of green building is to reduce consumption of energy and material resources throughout the life cycle of the building. Workability of the BS significantly reduces operating costs. For example, focusing on utility tariffs (expired in September 2016) the annual saving on 1 square meter is as follows: electricity – USD 2.4, gas – USD 1.43, water – USD 3.83. Thus, the total savings per year for the office area of 2000 sq.m in BC ASTARTA is around USD 7660 and almost USD 40 000 in the 5 years‘ perspective. Speaking about amenities, intelligent control systems help tenants to fell easy and comfortable in BC ASTARTA, standard operational risks are minimized and inconveniences - imperceptible. For example, due to motion sensors and saline valves, in case of breakup of the mixer tap of the water supply systems, water flow will be blocked. 7. Date of start and completion of the project (phase) Stage 2: Аugust 2014 – put into service in August 2017. 8. Project Class A Class

9. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc.) The architectural concept and design have been developed by a leading consulting company in the field of commercial real estate - SCG INTERNATIONAL (UK), the concept has been adapted by a Ukrainian design bureau Kramall Studio. General Contractor – Corporation DBK Zhytlobud. ―TEC Energoinvest‖ LLC is the developer company that performs the building of BC ASTARTA. Ivan Pugolovkin, project manager of BC ASTARTA, Project Management Deputy Director of TEK Energoinvest. Julia Schastlivaja, Deputy Direcrot on lease issues of TEC Energoinvest. 10. GBA / GLA Stage 2: GBA is 18 607 sq m. 11. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) BC ASTARTA applies a unique approach to green space confirmed by a certified equipment of the highest class: • Energy: - energy-efficient windows Schuco - 2 independent power inputs and an uninterruptible power supply (diesel generator), - chargers for electric vehicles • Design: - ceiling height - 3.32 m - lift equipment Kone (speed - 1.75 m/s); the total number of lifts in the BC – 19 - 11 floors - space of the first line of BS for renting – 1812 sq m, of the second – 1275 sq m, of the third - 890 sq m. • Comfort: - autonomous heating system Buderus, gas boiler - multi-zone climate control system, ventilation with heat recovery - modern security system - IP telephony - high-speed Internet BC ASTARTA has underground and open parking. For environmental-oriented ―dwellers‖ of BC ASTARTA, who prefer bike to automobile, a special separate infrastructure is stipulated. It includes bike parking as well as hygienic facilities located directly nearby enabling to take shower and dress up for comfortable working day. Parking is designed for 500 places, bike parking – for 122 places. 12. Tenants (name major tenants of the project) BC ASTARTA have concluded rental contracts with the following companies: Ukrainian representative office of the international IT company ―Sigma Software‖, creative office space ―Creative Quarter‖, agricultural holding ―Astarta-Kyiv‖, the first Ukrainian touristic hub ―Travel Hub‖; with infrastructure operators: ―Raiffeisen Bank Aval‖, ―Dinners‖ eating house. Furthermore, the following are going to be located in the BC: central office of ―Siemens‖ in Ukraine, ―Netcracker‖ and ―SBTech‖ IT companies. In this way, thanks to BC ASTARTA Podil becomes the center of IT business community, digital technologies and solutions for the industry in Kiev. BC ASTARTA will launch the second location of the famous creative office space ―Creative Quarter‖. Essentially, CQ is a 5-star hotel for business, where its residents could concentrate of growth and development thanks to the set of operational services and elaborated office infrastructure. ―Travel Hub‖ shall become the first Ukrainian space for work and communication, devoted exclusively to tourism, interesting and cozy as for professionals, as for those who like to travel. Kyiv office of international company, representing the services of IT consulting, 13. Occupancy rate Occupancy rate for the 2 stage is 62%. 14. Additional services provided to the tenants (walkway connection, conference centre, fitness centre, service oriented retail such as convenience store, cafes/ food court type restaurants, dry cleaning services, ATM, etc.) BC ASTARTA is the only one office building in Ukraine, having a courtyard with recreation zone for the BC‘s renters and guests of the quarter: stylish small park, green lawn for walking, fountain with lighting, cozy benches and beautiful small structures, summer terrace. The quarter possessed by the building is packed with services and facilities required by contemporary metropolis dwellers. BC‘s infrastructure is a ―city in the city‖ and includes: zone of domestic services, bank branch, post office, notary office, restaurants, cafés, eating house, sports club, supermarket, drugstore, dry-cleaner‘s, beauty salon. One could drink a cup of coffee in several cafes of the business-center and have a lunch or dinner in a stylish premium-segment restaurant, city café or cozy eating house with democratic process and tasty home cuisine. In the building next to the BC there is a big supermarket, healthy food restaurant ―Salateria‖, ―Podolskyi‖ club of active rest; thanks to well-developed transport and walking scheme at the level of -1st floor, it is easy to reach it in 2 minutes not going out the building. ―Podolskyi‖ club has big playroom for children, where a child could be during the whole day. 15. Noteworthy information you consider might be relevant for the jury members BC ASTARTA‘s motto is ―SPACE FOR GROWTH‖. The similar is the concept of BC ASTARTA, unique and exclusive. It includes its own green ―oasis‖ – the green zone in its courtyard. There is a small park with attractive landscape design, fountain, and big green lawn for barefoot walking, summer terraces of cafes. All of this is the BC ASTARTA‘s zone for rest. Here BC‘s ―inhabitants‖ could spend their lunch time or negotiate or have informal meeting. The garden shall be opened not only for the BC‘s employees, but for all Kyivans and guests of the city. Tradition of such ecologic spaces is strong in Canada, the USA and Europe. As for Ukraine – BC ASTARTA is the first and still only one business center with its own green zone. For some minutes of rest and relax are also intended landscape terraces and usable roof with one of the most beautiful Kyiv sunsets. Thanks to the unique concept and use of the most modern technologies, 16. Certification (LEED, BREEAM, DGNB) or sustainable practices in place BREEAM 1. Name of the Project Multispace Astana

2. Web page of the Project http://multispace.kz/

3. Link to the promo video https://vimeo.com/114110843

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://goo.gl/84GJBc

5. Location of the Project (country and city; CBD/historiс area of the city, etc.) Kazakhstan, Astana, Tauelsizdik Ave. 34, Shopping Mall ASTANA MALL 3rd floor. Multispace Astana is located in the center of the most populated district in Astana, surrounded by a huge residential area and shopping streets. It is located at the intersection of Tauelsyzdyk and Momyshuly avenues. The most sights are placed in placed a short distance from the coworking space: Khazret Sultan Mosque, Palace of Peace and Reconciliation, National Museum of the Republic of Kazakhstan. 15 min drive to Astana EXPO 2017.

6. Description of location (amenities, infrastructure, transport accessibility, etc.) Multispace Astana is located in the central business district of the city, in one of the biggest shopping malls in the country. It has convenient access for private transport (car) with external parking near the shopping center for 240 cars and underground parking for 1000 cars. There are also several stops for public transport. There are entrances for disable people.

7. Date of start and completion of the project (phase) Start of the project - 2014 Last renovation - 2016

8. Project Class A Class

9. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc.) Founder – Emil Maldjanov https://www.facebook.com/emaldjanov Official partner – Google Design – Kaz Norozian, PLP Architecture (http://www.plparchitecture.com/kaz-norozian.html) Philip Ball (UK), Oleg Stupin (KZ), Viktoria Bayleeva.

10. GBA / GLA GBA – 7000 m2 GLA – 6500 m2 Capacity: 750 people, 100 table, 10 conference halls & rooms.

11. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Ceiling height - 5.5 m, fire alarm, 24/7 video surveillance, 24/7 security, elevators, HVAC, 250 telephone lines, IP-telephony, fiber optic internet. Eco offices: ―Copenhagen‖, ―Boston‖, ―Brusells‖, ―Lancaster‖.Forbo Flooring Systems – hypoallergenic floor.3D multi shelves, art figures and art furniture by PLP ArchitecturePlaces for 750 customers. 20 Smart offices: 25 sq.m., 35 sq.m, 45 sq.m; separate entrance group for each office.Parking: 1000

12. Tenants (name major tenants of the project) 100 resident companies and workers. Anchor tenants: Google Apps for Work, Sabilayev studio, BEC Systems, SNC Kazakhstan, Home Magazine, Bastau, Sarap, METROPOLITAN Business School, Astana Toastmasters Club, PechaKucha Astana and others. 13. Occupancy rate 81 %

14. Additional services provided to the tenants (walkway connection, conference centre, fitness centre, service oriented retail such as convenience store, cafes/ food court type restaurants, dry cleaning services, ATM, etc.) Coworking structure: 750 seats, 10 meeting rooms, 8 conference areas, 2 conference rooms. Other services and facilities: secretary, high-speed Wi-Fi, cafe, ATM. Nearby there is a boutique gallery from the shopping mall, food courts, children's playground, parking for 1000 parking spaces. Functional areas:for presentations, negotiations and small conferences (10 meeting rooms with a capacity of 4 to 20. The meeting rooms are designed for urgent meetings, training sessions and mini lectures, without being distracted by the construction of noise.In addition to strict business style, the interior of the meeting rooms is displayed in a specific subject: the Arctic, Japan, Australia, France, etc. Each room is equipped with a large table, comfortable chairs and a marker board / flipchart);"Round room" room for trainings, seminars, training. Ideal place for training and public speaking. The room is simply amazing acoustics, since it has rounded walls that enhance the voice of the speaker located in the center. "Round room" is equipped with a large TV, sound solution, comfortable portable chairs and a flip chart;"Gray Zone" for trainings, seminars, online webinars and conferences. The place is equipped with a TV and a flipchart. The capacity of the "Gray Zone" is from 30 to 100 people. Most of informal and free of charge activities are held here. This is a favorite venue for clubs, presentations, seminars, trainings, designed for 30-100 people;for conferences, presentations, master classes (spacious and bright conference room with excellent acoustics, the space of the hall simultaneously can accommodate up to 200 guests) 15. Noteworthy information you consider might be relevant for the jury members MULTISPACE Astana is one of the biggest coworking spaces on the planet. It is much more stylish and technological than all the known analogues in the world. 16. Certification (LEED, BREEAM, DGNB) or sustainable practices in place None 1. Name of the Project Optima Plaza

2. Web page of the Project http://optima-plaza.com.ua/en/kompleks/

3. Link to the promo video https://www.youtube.com/watch?v=PnD1ziWQ9bo&feature=youtu.be

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://www.dropbox.com/sh/9g5m6vxth2lzbf4/AABg2rrXdaxNS4gUYeZKXpIYa?dl=0

5. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine, Lviv, Naukova Str. 7D

6. Description of location (amenities, infrastructure, transport accessibility, etc.) Business Center is a 15-minute drive from the city center on the active main street. in the building there are dining facilities, a gym, three chargers for electric vehicles.

7. Date of start and completion of the project (phase) Start of the project - 15.05.2015 Date of putting into operation - 01.08.2016

8. Project Class A Class

9. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc.) Architecture bureau - ARCHIMATIKA Consulting company - Cushman & Wakefield (former DTZ) Project bureau - One M2 ARCHITECTS General contractor «Kreator-Bud»

10. GBA / GLA GBA – 18 800 m2 GLA – 14 400 m2

11. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Optima Plaza is A-class business center The area of office space (NIA - net internal area) on one floor is approximately 1,900 m2.This is the optimal area for renting a whole floor by a large company. In this case, the layout of the standard floor consists of three blocks, with the possibility of splitting it into rental units from 100 m2 to 500 m2, which provides convenient division into small office spaces. The floor height is 3.3 m. There are 8 floors in the building. The longitudinal step of the columns of 8.1 m is optimal both for efficient use of office space and suitable for convenient arrangement of cars in the parking lot. Office complex is equipped with false floors LINDNER, sound insulation, access control, an automatic climate control, a system of heat recovery, alternative sources of energy, internal wiring, which allows maximum flexibility in the workplace. There are four passenger and one freight elevators (ThyssenKrupp) All engineering services were performed according to the BREEAM standard. The parking area has 268 parking spaces for cars, 50 free parking places for bicycles and 3 EV Green Chargers. The building has 24-hour protection. There is the multilevel security system. The building is equipped with fire suppression system, smoke and lightning protection.

12. Tenants (name major tenants of the project) IT company «Intellias» IT company «Sigma Software» Famous network of the fitness center «Sport Life»

13. Occupancy rate 90,6%

14. Additional services provided to the tenants (walkway connection, conference centre, fitness centre, service oriented retail such as convenience store, cafes/ food court type restaurants, dry cleaning services, ATM, etc.) Fitness centre «Sport Life», café «Smachni Sezony», Concierge service

15. Noteworthy information you consider might be relevant for the jury members To create a larger lighting front, the total volume of the building was divided into three blocks. The facades of the southern and northern sides differ, reacting to the sides of the world, architects created the form, emphasizing its function. The project has received the international award "Crystal Brick" for the best construction investment on both sides of the eastern border of Europe in category - "Objects of public use" in 2016.

16. Certification (LEED, BREEAM, DGNB) or sustainable practices in place BREEAM In-Use Very Good

1. Name of the Project TALAN TOWERS OFFICES

2. Web page of the Project http://talantowers.com Web page of Talan Towers Offices http://talantowers.com/talan-towers-office/general-info/

3. Link to the promo video https://vimeo.com/236046721 - Video presentation of the project (Rus) https://vimeo.com/240441188 - Short video of the event ―Official presentation of the Talan Towers Offices‖

4. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Exterior https://goo.gl/hkkWBJ Talan Towers Offices https://goo.gl/Y5hvJK Astana Property Management Office https://goo.gl/5cr1qx Parking https://goo.gl/roYA47 City view https://goo.gl/Pj4Ho2 Emporium https://goo.gl/koJG9c Restaurant Selfie Astana https://goo.gl/pdwaA1 Starbucks bar https://goo.gl/Tokb7d

5. Location of the Project (country and city; CBD/historiс area of the city, etc.) 010016, 16 Dostyk Street, Esil District Astana, Kazakhstan The project sits on a privileged location at the heart of the new city. Astana, being the youngest capital in the World, is considered as one of the most rapidly growing ambitious and bold teenager among the family of global capitals. Being just 17 years old, Astana hosted important international events as Congress of World Religions, various international summits, Asiada – 2011 and Expo-2017. 6. Description of location (amenities, infrastructure, transport accessibility, etc.) The place where Talan Towers has found its home is more than just prestigious. Forming a superbly impressive background to the main square and the symbol of Kazakhstan – Baiterek – Talan Towers itself became the new landmark representing Astana. Around the towers, one can see all the major sightseeing destinations of Astana: the above-mentioned Baiterek, the President`s Palace Ak Orda, the Nurzhol Boulevard, spectacular modern skyscrapers and government buildings. GBA of Talan Towers – 120 000 sqm. Amount of capital invested - $430 000 000. Talan Towers Offices: A class and 30 floors, LEED certification.

7. Date of start and completion of the project (phase) Start 2013 Completion 2017 LEED Certificate – 2018

8. Project Class A Class

9. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc.) Talan Towers is the first high-end mixed-use development in Astana to create a new level of lifestyle and luxury experience in the capital. The project became the excluding brand, the pre-eminent destination point in Astana and emblematic of the city and its growing power and prominence. To realize such a complex task, we gathered the best professional international team in Astana and it became one of the main strengths behind Talan Towers. On every level of project execution, we engaged the best companies and professionals in the world. Investor – Verny Capital https://vernycapital.com/ Developer – Astana Property Management Construction management - Turner International http://www.turnerconstruction.com/ Structural / MEP Contractor – Renaissance Construction http://rencons.com Architecture - SOM (Skidmore, Owings & Merrill LLP) http://www.som.com/ Interior design (Retail) – Callison https://www.callisonrtkl.com/ Interior design (Office) - Pringle Brandon Perkins+Will www.perkinswill.com Interior design (Hotel) – Richmond Branding LandorLEED Consultancy – Jain Sustainable Engineering Solutions (Amman, Jordan)LEED commissioning services consultancy - Salimus (Dubai, UAE) http://salimus.com/ Facility and Property Management – JLL http://www.jll.ru/ Engineering - Dizayn Group http://www.dizayngrup.com/en/ Lighting Design & Consulting - Paul Nulty (London, UK) Traffic consulting - Walker (New York, USA) http://walkerconsultants.com/ Hotel Pool & Spa consulting - Promet http://promet.com.tr/en/index.html Facade Design & Consulting – AFC http://www.afc1.com/ Facade works - Metal Yapi http://www.metalyapi.com/ Fit-out works - Kukbo (Seoul, South Korea) Elevators, turnegates, escalators - KONE http://www.kone.com/en/ Landscape design - AGS Pro Engineering http://www.ags-eng.kz/ Kitchen & Laundry consulting - Makpa http://www.makpa.com/ Wind engineering consulting - Wacker Ingenieure http://www.wacker-ingenieure.de Acoustics consulting - Mezzo Studyo (Ankara, Turkey) Audio visual consulting - Asimetrik http://asimetrik.com Design adaptation - Lighthouse http://lhk.kz Signage consulting - Baltic Signs http://balticsigns.com/ru/ Artwork consultancy - VISTO Images http://www.vistoimages.com/ F&B consulting - Blacksheep http://www.blacksheep.uk.com/

10. GBA / GLA GBA – 120 000 sqm GLA – 30 000 sqm

11. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Talan Towers Offices is developed in compliance with international requirement for A-class office areas: - 8 modern KONE high-speed elevators (4 m/sec) with energy efficient components and waiting time being no more than 30 seconds; - In addition the tower is equipped by VIP and service elevators - Destination Control System - Custom designed cabins - New generation motors - Cooling and heating is provided by 4 pipe system. Parking includes both underground and ground parking areas with convenient access and equipment according with modern requirements: - 2-level underground parking provides the offices with parking slots at the rate of 1 parking slot for 70 m2 of GLA. Parking Control: Other services, technologies and systems Recirculating condensate from fcu, usage for irrigation Water cooling chillers, COP bigger then 6, frequency driven compressors Last generation of cooling towers, frequency driven fans PMS (last generation management for reducing power consumption from chillers compressors) Frequency driven pumps • Highest level of reactive power factor on pumps, compressors, fans Recuperating AHU Fire fighting in electrical rooms, using powder, in small el. Rooms, data tele rooms on office floors, Bontel shall be used (still not in design, but it will be). Energy-efficient lighting fixtures. Water-efficient water fixtures. Gaseous and powder fire-fighting system selected do NOT contain CFC, HCFC and Halons. CO2 sensors will be installed within densely occupied spaces. Outdoor Airflow measurement devices have been installed for all systems where 20% or more of the design supply airflow services non-densely occupied spaces. Adhesives, Sealants, Paints, Coatings do not exceed VOC limits defined by LEED Requirements. Concrete & Reinforcement is used 100% Regional materials. Bicycle storage facilities to serve at least 3% of the LEED project occupants for the space up to 300,000 square feet, then an additional 0.5% for the occupants for the space over 300,000 square feet, and shower facilities have been provided for at least 0.5% of the LEED project FTE occupants. Recycling bins are used dedicated areas for the collection and storage of materials for recycling. Roof area materials are SRI compliant and also has vegetated roofing surfaces is greater than or equal to the total building roof area.

12. Tenants (name major tenants of the project) Talan Towers Offices hosts the offices of major international and local companies, including VERNY CAPITAL group of companies (the investor of the project) BTA Bank Astana International Financial Center Representative Office Kazzinc Holding Astana Property Management White & Case LLP KaR-Tel (Beeline) Jones Lang LaSalle (JLL)

13. Occupancy rate 33%

14. Additional services provided to the tenants (walkway connection, conference center, fitness center, service oriented retail such as convenience store, cafes/ food court type restaurants, dry cleaning services, ATM, etc.) Professional management, well-developed infrastructure and additional services will give a feel and spirit of safety, comfort and prestige. The high-level image of Talan Towers will certainly increase the significance of company image and its Astana office. • Professional management company • Parking spaces – timing – we will have additional parking spaces where you can pay per each hour separately; • Synergy effect – hotel + retail, we may provide corporate discounts at the ―The Ritz-Carlton, Astana‖ hotel; • All the infrastructure needed for this business: Starbucks Reserve Bar cafeteria, Rabbit canteen, three restaurants in the ―The Ritz-Carlton, Astana‖, ballroom and The Ritz-Carlton conference rooms; • Prime location; • Transparency; • Prestige – luxury project (A-class building); • Famous architects and the rest of the Team; • Green certificate; • Marketing: - we are present in social media (Facebook/LinkedIn/Instagram); - we are present in most journals (Forbes, Tengri, etc.), airports; - we organize many events (networking) Moreover, the building is going to be LEED certified. 15. Noteworthy information you consider might be relevant for the jury members TALAN TOWERS noted in the international property contest, Asia Pacific Property Awards 2017. This prestigious international competition, held in Asia and which for more than 20 years has been determining the best representatives in the field of real estate, has proved that Kazakhstani companies are able to build to the highest international standards. The awards ceremony for the winners of the Asia Pacific Property Awards 2017 was held at the Marriott Marquis Queen's Park in Bangkok, Thailand. Astana Property Management won awards in the Development and Architecture sections with the Talan Towers project, winning for Mixed-use Architecture and Mixed-use Development. These awards open up new prospects for the winning companies. For more information, please go: https://forbes.kz/process/property/kazahstan_zavoeval_9_nagrad_na_konkurse_nedvijimosti_v_tailand e/ The Ritz-Carlton, Astana - the first luxury hotel in the center of Astana was opened in the Talan Towers multifunctional complex, situated near the well-known Baiterek monument. The Ritz-Carlton, Astana, has 157 spacious rooms (including 32 suites with panoramic views), a spa, a ballroom with an area of 1000 square meters, a business center and a shopping gallery - all that is needed for the perfect business trip. If one wants to hold a business meeting or a conference at short notice, the hotel is ready to offer special rooms and offices. As for the restaurants, there are three of them: Lobby Lounge Өzen, which specializes in organic natural products, Mökki with an open kitchen and the Selfie Astana (White Rabbit Family). Testimonials Pablo De Miguel, Chief Project Architect SOM (USA) Talan Towers is the result of a very rigorous design approach and a very fruitful collaboration with our clients. This enabled the creation of an architecture that is distinctive, functional, sustainable and meaningful. At a time when much of architecture has been reduced to superficial imagery, Talan Towers rises as an elegant and timeless design that inspires to reflect order, permanence and prosperity. The project sits on a privileged location at the heart of the new city. Conceived as an extension of the Bayterek Plaza, Talan Towers creates a year round destination. Offering a unique and diverse visitor experience, with an exclusive mix of luxury retail, restaurants, hotel, residences and offices. Its architecture is derived and characterized by its context. The dialogue between the project and the Bayterek monument establishes the basis for the design. The distinct elements comprising the project are defined by their simplicity of forms and a strong underlying order of elements, rich materials and elegant proportions. This connection between function, context and a clear design solution allows the project to stand out as a new landmark for the city, and at the same time create spaces that, we believe, will enhance the lives of the people who inhabit them.

16. Certification (LEED, BREEAM, DGNB) or sustainable practices in place LEED This complex will be the first ―green‖ building in Kazakhstan to use energy-efficient technologies and comply with LEED requirements. The complex will have office premises that meet the requirements of the A-Category international classification, as well as the The Ritz-Carlton, Astana hotel and residences.

1. Name of the Project Galleria Minsk

2. Web page of the Project http://galleria-minsk.by/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies etc) Investor and developer of the project - JLLC «Galleria Concept» General Contractor - Renaissance Construction‖ group of companies http://rencons.com/ Hotel Operator - Hilton Worldwide http://doubletree3.hilton.com/en/hotels/belarus/doubletree-by-hilton-hotel-minsk-MSQDTDI/ Project management consultant - Jones Lang LaSalle (JLL) http://www.jll.com/about Project’s official broker - Jones Lang LaSalle (JLL), Colliers International http://www.jll.com/about http://www.colliers.com/en-gb/belarus/ Architect – MGP http://www.mgp-arch-eng.ca/ Interior design - Alexander James Interior Design https://www.aji.co.uk/

4. Date of start and completion of the project 2012-2016

5. Link to the promo video https://www.youtube.com/watch?v=SB6Sm0a2CaU

6. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Galleria Minsk shopping mall https://www.dropbox.com/sh/mo3rva40b06vcer/AABEoRA3OsMxRSFuGkZMRtHsa?dl=0 DoubleTree by Hilton https://www.dropbox.com/sh/urh81h8dnkgkyhe/AAA3VCG9ZEdGC2QY42X-oJW1a?dl=0

7. Location of the Project (country and city; CBD/historiс area of the city etc) The object is located in the business, cultural and tourist center of Minsk, at one of the most important main streets – Pobediteley Avenue. Main republican square, the place for main national holidays, is located across the street, in front of the Galleria Minsk.

8. Description of location (amenities, infrastructure, transport accessibility, etc) Galleria Minsk GBA - 100 000 m2 Galleria Minsk is a modern mixed-use complex where shopping & living are easy and pleasant. Firstly, there are 7 floors in the shopping mall where you can buy everything you need - from food and clothes to children's products and medicines. Secondly, here is presented world‘s famous brand DoubleTree by Hilton, perfect place for accommodation and business meetings, conferences. Third, here is one of the largest and innovative parking in Minsk with chargers for electric vehicles. And, finally, this is a state-of- the-art shopping center, both from the technical and architectural and design point of view. There are 2 groups of escalators in shopping mall, 2 panoramic and 3 passenger elevators. There 8 elevators in DoubleTree by Hilton hotels. The largest outdoor LED screen in Belarus (300 m2) is installed on the facade of the shopping mall. Technical characteristics of the screen allow to broadcast videos in 4K format. Galleria Minsk is located in the very city center (see on map) and in a short distance from 2 metro stations. There are also 6 stops for 28 routes of public transport. Shopping mall with more than 100 shops, food courts and summer terraces and entertainment center.

9. Phases of the project (office, retail, residential, others) Retail Hotel

10. For Retail (GLA/GBA, parking, tenants, structure of the mall (gallery, food court, entertainment) etc) Shopping and entertainment center Galleria Minsk GBA 54 500 m2 GLA – 36 000m2 Parking – 1000 lots Zoning for shopping and entertainment center Galleria Minsk • For convenience of shopping, each floor of the shopping center is zoned by category and price positioning of brands • 7th floor - summer terrace • 6th floor - food court and summer terrace • 5th floor - goods and services for children • 4th floor - specialized goods: sports, technology, goods for hobbies and creativity • 3rd and 2nd floors - fashion gallery, men's and women's clothing and footwear • 1st floor - related products: perfumery, cosmetics, accessories, jewelry • -1 floor - supermarket and related services

Tenants Anchor tenants: Reserved, Cropp, Mohito, Sinsay, Finn Flare, Gloria Jeans, NYX, Salateira, Tashir Pizza, Intimissimi, Calzedonia. Here there are also brands with which the Belarusians are well acquainted. Clothes: Reserved, Koton, LC Waikiki, House, Cropp, Nadine Milano, Alexander Konasov, Sister's, TVOE, Gloria Jeans, Finn Flare. Footwear: RYLKO, Nursace, Salamander, Sneaker Bar, Ecco, Remonte, Basconi. Underwear and swimwear: Milavitsa / Lauma, Hunkemoller, Undine. Perfumes and cosmetics: MINA, L'occitane, NYX, Kravt, Perfume, Mila. Jewelry, watches, imitation jewelry: Tsar's gold, Swiss Time, Pandora, 7 carats, Diamante, ORO, Oliver Weber. Accessories: Optics WDL, bags Igermann, Mattioli. Tech & household appliances: Communication / velcom, MTS, Bork, World of espresso, Sony Center, 5 element, I-store, Xiaomi. Children's products: Buslik, Next, Mothercare, 4seasons. Pharmacies: Planet of health, veterinary pharmacy Doctor Vet. Supermarket Euroopt Prime (4500 m2, the first premium class supermarket in Minsk). Services, food courts and additional services Restaurants: Salateira, TM Waffles & Coffee, Coffeecake, Kartoffel, Mom at home, Sub's, Doner House, Tashir Pizza, Marconi, Bubble sweet. Services and Entertainment: Beauty Lounge, Children's art center Kropka, children's entertainment center L-Club, Sam master (key making). Currency exchange offices: Technobank, Belarusian People's Bank. ATMs: BSB Bank, Belarusian People's Bank, BPS-Sberbank, Technobank. Calling-desk terminal: Kiwi. Terminal for the purchase of gift certificates: Daroo.

11. For Hotel (class, number of units, % of sold units, construction materials and technologies used in the project, management company and its services) Developer - Gallery Concept LLC, operator - Hilton Worldwide Number of rooms: 193 193 rooms, including 15 suites and three suites (Diplomat, Ambassador, President) are decorated in an art deco style and equipped with everything necessary for comfortable rest and productive work: • beds with unique branded mattresses Sweet Dreams by DoubleTree, • ergonomic work area and free Wi- Fi • free tea, coffee, water and a mini-bar are served, and there are also coffee machines in the higher categories • panoramic windows with a breathtaking view on the center of Minsk • 24-hour gym, delivery of food and drinks to the room • business center, laundry, and concierge services • guests have access to over-ground parking. DoubleTree by Hilton Minsk is also a central international conference venue. A large ballroom of flexible configuration with modern audiovisual equipment and a capacity of more than 350 guests, meeting rooms, a lobby for coffee breaks and cocktails, a business center, a restaurant and a large summer terrace are comfortably located on one level. It is an ideal place for conferences, presentations, business meetings, banquets and weddings. On the ground floor of the hotel is located the city cafe Beans & Leaves, open from early morning until late in the evening for hotel guests, visitors to the shopping center and nearby business centers. Large selection of tea and coffee, fresh sandwiches and a variety of pastries, salads, cereals and soups. Here you can quickly grab a snack or take food and drinks with you. The restaurant and bar Ember, created according to the Wine & Dine concept, offer international cuisine, including a grill menu, pizza in a stone oven, dishes of European and Belarusian cuisine. From the height of 21 floors in the Sky Lounge BarDotXX1 offers a magnificent panoramic view of the historic center of Minsk. The international team of chefs embodies the tastes of oriental cuisine in amazing forms of authentic dishes. The first bar of champagne in Minsk with classic and author's cocktails from famous bartenders. In summer, guests can relax on the terrace with a magnificent panoramic view of the center of Minsk. A cozy lounge area, a special menu, refreshing cocktails make Ember VII Heaven an ideal place for summer holidays. Technical and engineering characteristics The ceiling height in the rooms is 2.7-3 m, in public areas and conference areas 4.5 - 4.7 m. The standard area of the rooms is 20 m2, the total area is 4 260 m2. The area of public areas is more than 3 000 m2. Parking for hotel guests is foul, uncovered, behind the barrier. The hotel has an anti-fire system Siemens, a smoke exhaust system. In the event of a fire, 1 fire elevator operates. The hotel is equipped with a diesel generator, capable of supporting the hotel at least during the day. The degree of air filtration G5, ventilation system chiller-fancoil. The hotel is equipped with access control and video surveillance. Occupancy rate (%) The average occupancy rate since November 2017 is 80% Cooperation with online booking systems (Booking.com, etc.) Booking.com, Expedia, HRS, Academservice, TripAdvisor and others.

12. Noteworthy information you consider might be relevant for the jury members Galleria Minsk was recognized as the best shopping and entertainment center of the year, according to the prestigious real estate award Realt Golden Key. Galleria Minsk was recognized as the best shopping center by the version "City idol" award.The winner was chosen by the citizens of Minsk. DoubleTree by Hilton Minsk combines international service, comfortable living conditions and a lot of opportunities for recreation, is under the direct management of Hilton Worldwide and is part of the shopping and entertainment complex. Guests can feel at home, plunged into an atmosphere of warmth and genuine comfort; visit cafes and restaurants with a variety of cuisine and take advantage of all the comforts of stylish rooms of various categories. DoubleTree by Hilton Minsk presents the international loyalty program Hilton Hhonors. It is based on a system of points that are assigned to the guests for accommodation, events and stay in the hotels. The resulting points can later be converted into aviation miles. There are seasonal sales and travel auctions within the Hilton Hhonors. Members of Hilton Hhonors receive additional discounts if they book rooms on Hilton.com.

13. Environmental certification (LEED, BREEAM) or sustainable practices in place None 1. Name of the Project Lisi Green Town 2. Web page of the Project www.lisi.ge 3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies, etc.) UN Studio (unstudio.com) - architectural work Architects.ge - architectural work Anagi (www.anagi.ge) - construction work NCC - construction work FMO (Netherlands Development Finance Company) - investment GREM – brokerage 4. Date of start and completion of the project (it's phase) The construction of the project - Lisi Green Town has started in 2011. The first phase unites 168 apartments, 20 townhouses and 3 villas. The first phase was fully completed in August, 2013. At the moment more than 200 families live in the first district (Lisi Veranda) of Lisi Green Town. Second phase of the town integrates 9 apartment blocks and 11 townhouses. 70 % of the second phase is complete and it will be totally finished in 2018. 80% of the living units is already sold. 5. Link to the promo videos https://goo.gl/rFukgp

6. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Complex https://goo.gl/GzyMAi Apartments https://goo.gl/1RP3SC Townhouses and villas https://goo.gl/ji5Ert Infrastructure https://goo.gl/oky7Ga Nearby infrastructure https://goo.gl/fNnbPk Interiors https://goo.gl/CkEdKU

7. Location of the Project (country and city; CBD/historiс area of the city, etc.) New residential compound in the vicinity of Lisi Lake is a sort of small town in the Tbilisi city with fresh air, tranquility and lots of greenery. It is only a 10 minutes‘ drive from the city center via a new road (Godziashvili Street). In the nearest future and as a result of the new road project created by the Municipality, Lisi Green Town will be even closer to other districts of Tbilisi. 8. Description of location (amenities, infrastructure, transport accessibility, etc.) It is also notable that Lisi Green Town is surrounded by one of the biggest recreational zones in Tbilisi – Lisi Lake, 2 most prestigious academies (G. Zaldastanishvili American Academy and Georgian-British Academy), mini football stadium, entertainment, cafés, outdoor gym and Lisi thermal bath. All the above mentioned makes Lisi Green Town a perfect location for living with a healthy lifestyle appropriate for families and individuals. 9. Phases of the project (office, retail, residential) Office Retail Residential Public property

10. For Residential (class, number of units, % of sold units, construction materials and technologies used in the project, management company and its services) Lisi Green Town is operated by Lisi Development. First residential unit of the overall Lisi Green Town was launched on 1st July, 2011 and was completed in August 2013. First phase of Lisi Green Town - Lisi Veranda covers a 5 hectare land plot and assumes to room three types of residential houses: Apartment blocks (168 apartments) - maximum 4 floor buildings with multiple apartments. There are about ten various project designs of them from 55 m² to 200 m². > Townhouses (20 Townhouses) - completely new styleof residential building in Georgia. There are several different types of designs tailored for the project Townhouses - from 170 m² to 240m². Each of them has its own yards. > Villas (3 Villas) – Lisi Green Town implies construction of 3 villas with individual designs and courtyards - 300 m² to 475 m². Second residential unit of Lisi Green Town is 70% complete and will be totally finished in 2018. It includes 9 apartment blocks and 11 townhouses. 90% of complete buildings and 80% of the buildings in process are sold. Technical specifications: Ceiling height 3.3 m; 274 parking units; completely new utility infrastructure: natural gas supply, electricity supply, pot water supply, sewerage and storm water pipes, new asphalt roads, new blocks are equipped with rain water tanks to be used for irrigation; 80 % of the land plot is reserved for green and public spaces: parks and recreational areas; development area is gated and 24/7 security service is on site, Kone Monospace 500 elevators (with load capacity up to 630 kg, speed 1 m/s, Door Opening CO900) are installed on the developed blocks; Construction specifications: Schuco / reynaers aluminum windows and door profiles; Fibrobeton; portland concrete; A500 reinforcement steel; thermolock thermal insulation, BASF water insulation; Italian brick facade, dutch thermal wood facade system; Marazzi floor tiles on the balcony;. 11. For Retail (GLA/GBA, parking, tenants, structure of the mall (gallery, food court, entertainment, etc.) Lisi Greens Lisi Greens nursery offers particularly wide range of quality plants exclusively from Italy: evergreen and deciduous flowering trees and shrubs, rare species of fruit trees, Japanese maple, Liana, bonsais, Rose and Juniper collections. Exclusive partner of Lisi Greens is the Italian nursery Innocenti & Mangoni Piante, which has been dedicated to the production and marketing of top quality outdoor ornamental plants since 1950. Lisi Bath Some may not even know that there are thermal springs around the Lisi Lake territory. Sulphur Bath house has been built for those who wants to enjoy the healing effects of sulphur springs, special massage service and the beautiful view on the Lake. Kids zone and several cafes and restaurant are also located at the Lisi Lake territory. Additionally we have international supermarket brand on the territory - SPAR. 1500 m2 commercial space will be completed in the second phase of Lisi Green Town in 2018. 12. For Office (class, tenants, ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system, occupancy rate, additional services provided for the tenants) There 7 offices on Lisi Green Town territory: 1. Lisi Development Office 2. Lisi Renovation 3. Architects.ge 4. Bokhua Design Studio 5. Marazzi Ceramic Tiles Showroom 6. 109 Degree Design Studio 7. TET Group (Logistics Service) Technical specifications: Ceiling height 3.3 m; 274 parking units; completely new utility infrastructure: natural gas supply, electricity supply, pot water supply, sewerage and storm water pipes, new asphalt roads, new blocks are equipped with rain water tanks to be used for irrigation; 80 % of the land plot is reserved for green and public spaces: parks and recreational areas; development area is gated and 24/7 security service is on site, Kone Monospace 500 elevators (with load capacity up to 630 kg, speed 1 m/s, Door Opening CO900) are installed on the developed blocks. 13. For Public property (name & short description; school, kindergarten, medical center, stadium, park, recreation zone) The Lisi lake with its surroundings is located at the 615-730 meters above the sea level. In contrast with other districts of Tbilisi, which are at the level of 380-600 meters above the sea level, the Lisi lake has been one of the most popular and developed recreation zones since 30‘s of the 20th century. The lake has the most interesting and diverse flora and fauna in Tbilisi. Lisi Development has initiated the project of Lisi recreational area development which consists of sports facilities (walking and bicycle trails, soccer field, tennis courts, sand volleyball), as well as other leisure facilities (recreational zones, beach, thermal bath, open cafes boating and fishing amenities). The first stage initiated in 2012 includes boating activities, leisure places, beach, fishing activities. In partnership with the City Municipality Lisi Development has built a new 3 km bicycle and running track which increased the traffic at the lake territory.. Elene Zamtaradze Guyi Zaldastanishvili American Academy in Tbilisi Dreams come true! American Academy in Tbilisi (GZAAT) was incorporated in 2001 by a Georgian US citizen, genuine supporter of Georgia, Guivy Zaldastanishvili. over the ten years of existence the GZAAT grew from an idea to the best education institution. It has 280 graduates, majority of which study at such famous universities of US and Europe as the Harvard, Yale, Princeton, Columbia, Brown and Emory universities, US Marine and navy academy, Bocconi university in Milan, American university in Paris, London School of economics(LSE), Saint Andrews and Edinburg Universities in Scotland and many others. Elene Zamtaradze The British-Georgian Academy (BGA) The British-Georgian Academy (BGA) is a private secondary school established in 2006 in Tbilisi, Georgia. The school delivers a first class holistic education that prepares students for the challenges of the 21st century. BGA offers Georgian and British International Programmes and enrolls about 450 students across all the educational levels. IQ Kids kindergarten is also available for the tenants on our territory. 14. For other phases (general description and technical specification) New villa district flagship villas are planned to be equipped with BMS systems, battery storage packs and net zero homes; In case of consuming a villa the consumer can get involved in the process of architecture and design. Construction specifications: Schuco / reynaers aluminum windows and door profiles; Fibrobeton; portland concrete; A500 reinforcement steel; thermolock thermal insulation, BASF water insulation; Italian brick facade, dutch thermal wood facade system; Marazzi floor tiles on the balcony; 15. Noteworthy information you consider might be relevant for the jury members Lisi Development is frequantative winner of several international real estate awards, in particular we have won 10 nominations in International Property Awards starting from 2012 to 2017 in various categories. We also gained the title of Best Green Developer at the European CEO Awards 2016. Additionally we are the winners of Golden Brand Awards 2014, 2015 and 2016 as the best development company in Georgia. 16. Green certification of project (phase) or sustainable practices in place

Green Business 2014 (by Ministry of Environment) and Green Build Award Georgia 2015 (by USAID, Green Building Council Georgia, Winrock International Georgia)

1.Name of the Project Multifunctional complex "Sokol"

2. Web page of the Project Falcon Club sports & Entertainment center http://falconclub.by/en/ Falcon Club sports & entertainment https://www.facebook.com/falcon.club.minsk/ Hotel http://www.marriott.com/hotels/travel/mhpmc-minsk-marriott-hotel/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies, etc.) Development company: LLC "Investment company" Sokol " Management Company: Sokol Investment Company LLC Architects: Architectural company "Vorobiev and Partners"; COOO "Magnus Group" Engineering company: COOO "IT TI Engineering"; Proleed Engineering Consultants Consulting company: PD Vivat Project Development Law Firm: Advocate Bureau "Sysuyev, Bondar, Khraputsky SBC"; Law firm "Aleinikov and partners"; Law Office "VMP Vlasova, Mikhel & Partners"

4. Date of start and completion of the project (it's phase) Expiration: May 16, 2017

5. Link to the promo video https://www.youtube.com/watch?v=ZAjDPiXQ0Ko

6. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) https://goo.gl/LwpcCY

7. Location of the Project (country and city; CBD/historiс area of the city, etc.) 20 Pobediteley Avenue, Minsk 220020, Republic of Belarus, in a picturesque area of the city on the river bank.

8. Description of location (amenities, infrastructure, transport accessibility, etc.) On one of the largest highways of the capital, which allows you to get to the city center in 8 minutes, on public land transport - for 15 minutes. Near two exhibition centers, two large shopping centers, a multifunctional sports complex Minsk-Arena, Victory Park.

9. Stages of the project • Designing • I Start-up Complex (completed on 04/22/2016) • II Launch Complex (completed on September 21, 2016) • III Start-up Complex (completed on 08/11/2016) • IV Start-up Complex (completed on December 22, 2016) • V Launch Complex (completed on May 16, 2017)

10. For Hotel (class, number of units, % of sold units, construction materials and technologies used in the project, management company and its services) Minsk Marriott Hotel http://www.marriott.com/hotels/travel/mhpmc-minsk-marriott-hotel/ 217 hotel rooms (192 standard rooms, 25 suites) Minsk Marriott Hotel is conveniently located on 20 Pobediteley Avenue, in the prestigious area of the city on the bank of the Svisloch River. Only 3 km from the heart of Minsk, a few steps from the main exhibition and administrative centers: Football Manege, Minsk Arena, Palace of Independence. The hotel is located under one roof with a modern sports and entertainment complex Falcon Club, including a universal arena, boutique cinema with 8 cinema halls, fitness center, SPA, tennis and squash academy, boutique center, cafes and bars, children's educational academy, indoor parking for 284 parking spaces. Rooms Marriott Minsk has 217 modern rooms, including 25 suites. The hotel is one of the largest venues in the city offering 8 meeting rooms, banquet hall for up to 600 people, modern event-space, as well as professional catering services, high-speed WiFi and advanced conference facilities. Mediterranean restaurant ―Fornello‖, stylish bar "Barrel Bar", Marriott Greatroom lobby are opened for guests as well as the SPA-center. Hotel is set within high-end Sports & Entertainment Complex Falcon Club expanding opportunities for business travel and leisure. 13. Technical and engineering specifications Multifunctional power-efficient complex with vitrage front and panoramic view on the Svisloch river. Reliability of construction is conditioned by synthesis of ―Heidelbercement‖ and clear Ukrainian armature. Guarantee of cosines and comfort is sound-damping material used between apartments, warmed blocks and low-seismic, warm-resistant glasses, temperature regimen regulated by program, super-modern system of heating and cooling

11. For Retail (GLA/GBA, parking, tenants, structure of the mall (gallery, food court, entertainment, etc.) Falcon club sports and entertainment center http://falconclub.by/en/ Main arena with an area of 1980 sq. m. Sliding seats, VIP-lodges (12 seats), press-lodges (16 seats), a persic center for 80 seats, cloakrooms and massage rooms, a wardrobe. Arena capacity: 2000+  Fitness club: gym, Cross Fit hall, martial arts hall, group training room  2 SPA-centers  6 squash courts  4 tennis courts Cinema: Falcon Club Cinema Boutique 8 room Boutique center: 20 premium boutiques. Restaurants, cafes and bars: Fornello Mediterranean cuisine restaurant, Barrel bar, Oscar Lounge cafe, Falcon Coffee cafeteria, sports bar WINgs Sport Bar. Children's Academy Parking: 4-level heated parking for 284 cars, outdoor parking for 100 cars Conference halls 9 functional conference halls, 1 banquet hall

12. Other important information that may be relevant to the jury members The project of the multifunctional complex "Sokol" on Pobediteley Avenue, which includes Minsk Marriott Hotel, sports and entertainment complex Falcon Club and accompanying facilities, is one of the most ambitious and ambitious in recent years in the Republic of Belarus. The project includes the following functional parts: hotel of the international brand Marriott Hotels & Resorts, universal sports arena with the area of 1980 sq. m, fitness center and tennis and squash academy, spa, cinema, commercial block and multi-level parking. All buildings are connected by pedestrian connections and, apart from the hotel, are located under one roof of a complex shape, the outlines of which resemble a hovering falcon and ideologically correspond to the logo of the Sports Club of the Armed Forces of Qatar. The building of the hotel picturesquely repeats the line of the river Svisloch, on the shore of which the complex is located, and is the dominant of the composition of the entire hotel and sports complex, completing the integrity of the image of the hovering falcon.

13. Environmental certification (LEED, BREEAM) Positive conclusions of the ecological commission were received in accordance with the laws of the Republic of Belarus.

14. Contact details of the person responsible for the nominations (phone number, e-mail address) Egor Denisenok +375 25 6020412 [email protected]

1. Name of the Project TALAN TOWERS

2. Web page of the Project http://talantowers.com/

3. Participants of the Project (please specify names, roles and web pages of development company, property management company, architects, engineering company, consulting company, law, brokerage companies, etc.) Investor – Verny Capital https://vernycapital.com/ Developer – Astana Property Management Construction management - Turner International http://www.turnerconstruction.com/ Structural / MEP Contractor – Renaissance Construction http://rencons.com Architecture - SOM (Skidmore, Owings & Merrill LLP) http://www.som.com/ Interior design (Retail) – Callison https://www.callisonrtkl.com/ Interior design (Office) - Pringle Brandon Perkins+Will www.perkinswill.com Interior design (Hotel) – Richmond Branding LandorLEED Consultancy – Jain Sustainable Engineering Solutions (Amman, Jordan)LEED commissioning services consultancy - Salimus (Dubai, UAE) http://salimus.com/ Facility and Property Management – JLL http://www.jll.ru/ Engineering - Dizayn Group http://www.dizayngrup.com/en/ Lighting Design & Consulting - Paul Nulty (London, UK) Traffic consulting - Walker (New York, USA) http://walkerconsultants.com/ Hotel Pool & Spa consulting - Promet http://promet.com.tr/en/index.html Facade Design & Consulting – AFC http://www.afc1.com/ Facade works - Metal Yapi http://www.metalyapi.com/ Fit-out works - Kukbo (Seoul, South Korea) Elevators, turnegates, escalators - KONE http://www.kone.com/en/ Landscape design - AGS Pro Engineering http://www.ags-eng.kz/ Kitchen & Laundry consulting - Makpa http://www.makpa.com/ Wind engineering consulting - Wacker Ingenieure http://www.wacker-ingenieure.de Acoustics consulting - Mezzo Studyo (Ankara, Turkey) Audio visual consulting - Asimetrik http://asimetrik.com Design adaptation - Lighthouse http://lhk.kzSignage consulting - Baltic Signs http://balticsigns.com/ru/ Artwork consultancy - VISTO Images http://www.vistoimages.com/ F&B consulting - Blacksheep http://www.blacksheep.uk.com/

4. Date of start and completion of the project (it's phase) Start 2013 Completion 2017 (Talan Towers Offices, The Ritz-Carlton, Astana; The Ritz-Carlton Residences, Astana) Luxury fashion gallery EMPORIUM – 2018 LEED Certificate – 2018

5. Link to the promo video https://vimeo.com/236046721 Video presentation of the project (Rus) https://vimeo.com/170450497 Video ―Idea‖ (Rus) https://vimeo.com/156371865 Video ―Idea‖ (Eng) Design development presentation from SOM (February 2014): https://www.dropbox.com/s/1fd28uw6y04nmsc/2014_02_28_100%20DD%20Booklet_FINAL.pdf?dl=0

6. Visual materials (link to pictures of exterior and interior design, layouts, parking and nearby environment) Exterior https://goo.gl/hkkWBJ City view https://goo.gl/Pj4Ho2 Talan Towers Offices https://goo.gl/Y5hvJK The Ritz Carlton Astana Hotel https://goo.gl/AyG9mM The Ritz-Carlton Residences Astana Residences https://goo.gl/rPehXJ Parking https://goo.gl/roYA47 Emporium https://goo.gl/koJG9c Restaurant Selfie Astana https://goo.gl/pdwaA1 Starbucks bar https://goo.gl/Tokb7d Astana Property Management Office https://goo.gl/5cr1qx

7. Location of the Project (country and city; CBD/historiс area of the city, etc.) The building completes the southeast corner of the Bayterek Tower plaza defined by the corner of Dostyk and Turkishtan Streets. The project‘s prominent location allows the project to be a new landmark and a popular destination in Astana, offering direct views towards the Bayterek Tower and a unique visitor experience. This dialogue between the new structure and the Bayterek monument establishes the basis for the design. The new building inspires to reflect order, permanence and prosperity, complementing the Bayterek monument with a timeless design. 8. Description of location (amenities, infrastructure, transport accessibility, etc.) The place where Talan Towers has found its home is more than just prestigious. Forming a superbly impressive background to the main square and the symbol of Kazakhstan – Baiterek – Talan Towers itself became the new landmark representing Astana.

9. Phases of the project (office, retail, residential) Office Retail Residential Hotel Talan Towers consists of three major components: - Hotel tower with the first luxury hotel in Astana ―The Ritz-Carlton, Astana‖ and luxury apartments ―The Ritz-Carlton Residences, Astana‖; - Business Centre Talan Towers Offices – the first office complex of international standard in the capital; - EMPORIUM – a luxury fashion gallery.

10. For Residential (class, number of units, % of sold units, construction materials and technologies used in the project, management company and its services) The Ritz-Carlton Residences, Astana. Residences are located in the second tower (130 m tall) 27 luxury residences located on the upper 7 floors of the hotel tower -The Ritz-Carlton, Astana. The target market for these residences are mostly UHNWIs from Kazakhstan‘s Forbes list. In order to enhance the privacy and exclusiveness, there is a separate entrance as well as three passenger elevators for the owners and inhabitants of the residences. Without leaving the building, the owners of residences have access to restaurants, bars, fitness center, swimming pool, spa, beauty salon, conference rooms, and high-end shopping. Moreover, the location of Talan Towers provides breathtaking views of Astana‘s main attractions, especially Baiterek. It is not only about the residence itself, but the entire complex that offers a true feeling of luxury. All blocks of the residential complex have full thermal and sound isolation, ensuring economy of resources and peaceful living conditions. Smart Home Power systemICT SystemTelephone system Local area network Fire Alarm Fire Alarm and Notification System provided by approved brands of Marriot Fire Life Safety team Honeywell. Meanwhile all apartments and corridors covered by public announce system, which warn or inform people. The brand is ESSER.30% sold flats. 11. For Retail (GLA/GBA, parking, tenants, structure of the mall (gallery, food court, entertainment, etc.) Talan Towers gallery EMPORIUM is the most glamorous, stunning and attractive part of the Project. On the second level, several stores have double-height shop windows that provide additional visibility and an impressive appearance. Careful positioning of the escalators here directs the flow of visitors past the shop windows so that the traffic paths are both convenient for customers and effective for retailers. 12. For Office (class, tenants, ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system, occupancy rate, additional services provided for the tenants)

Talan Towers Offices is developed in compliance with international requirement for A-class office areas: - 8 modern KONE high-speed elevators (4 m/sec) with energy efficient components and waiting time being no more than 30 sec; - In addition the tower is equipped by VIP and service elevators - Destination Control System - Custom designed cabins - New generation motors - Cooling and heating is provided by 4 pipe system. It can give the possibility to get heating and cooling all year round. Free cooling during winter is obtained; - Design temperatures are winter temperature: - 21 °C; summer temperature: 24 °C; - 2 independent power sources, emergency power generators ensure the continuing electricity supply; - For each floor 90 kW of electrical power is reserved (100 W/m2); - Emergency backed up power by generator for office floor (power and lighting): 100%; - Emergency backed up power for mechanical equipment: 60%; - 3 independent telecommunication providers ensure modern unbroken communications for offices; - Modern security systems door access control (CCTV and Access control). Modern constructive solutions let you settle a high-level open-space office perfectly equipped and organized. The effective floor planning and constructive solutions include: - Ceiling height in shell & core is more than 4 m, that allows to set up a false floor and suspended ceiling; - Open space floor planning with 9-meter column spacing; - Sufficient quantity of daylight (floor-to-ceiling windows); - High quality finish materials and interior design specially developed by Perkins + Will (London, UK). Parking includes both underground and ground parking areas with convenient access and equipment according with modern requirements. - 2-level underground parking provides the offices with parking slots at the rate of 1 parking slot for 70 m2 of GLA. Professional management, well-developed infrastructure and additional services will give a feel and spirit of safety, comfort and prestige. The high-level image of Talan Towers will certainly increase the significance of company image and its Astana office. - Professional management company - High-level cafeteria for office tenants - Additional services Moreover, the building is going to be LEED certified. Presentation: https://www.dropbox.com/s/g534l3m0olerb74/Talan%20Towers%20Offices%20presentation_rus.pdf?dl =0

13. For other phases (general description and technical specification) Facility and Property Management services offered at TALAN TOWERS: -Technical maintenance of BMU (building maintenance unit);Technical maintenance of elevators; Technical maintenance of chillers;Disinfection of AHUs;Technical maintenance of CCTV system; Technical maintenance of ACS system;Technical maintenance of BMS;Technical maintenance of fire fighting system;Collection and disposal of fluorescent lamps;Collection and disposal of grease; Maintenance of 4 х diesel generator unit of total capacity 8 000 kVA Cleaning services for public areas and adjacent area;Snow and garbage removal;Security services; Reception services. A Digital Closed Circuit TV Image networking and storage system designed to follow visitor and staff traffic inside the building. An Access Control System is designed to work via IP system network. Access control system is integrated to security and CCTV systems. 15. Noteworthy information you consider might be relevant for the jury members TALAN TOWERS noted in the international property contest, Asia Pacific Property Awards 2017. This prestigious international competition, held in Asia and which for more than 20 years has been determining the best representatives in the field of real estate, has proved that Kazakhstani companies are able to build to the highest international standards. The awards ceremony for the winners of the Asia Pacific Property Awards 2017 was held at the Marriott Marquis Queen's Park in Bangkok, Thailand. 16. Green certification of project (phase) or sustainable practices in place This complex will be the first ―green‖ building in Kazakhstan to use energy-efficient technologies and comply with LEED requirements. The complex will have office premises that meet the requirements of the A-Category international classification, as well as the The Ritz-Carlton, Astana hotel and residences.

1. Name of the Project BC ASTARTA 2. Web page of the Project http://abc-kyiv.com/uk/ 3. Location of the Project (country and city; CBD/historiс area of the city, etc.) * ASTARTA business-center is situated in the business district of Kyiv‘s historical center in Podil. A fabulous view of Dnipro River, St. Andrew's Church and St. Michael's Cathedral opens from the business-center. BC ASTARTA is located at the address: 58 Yaroslavska Street, Kyiv 04071 Ukraine. Main facades of the office building are facing to Nyzhnij Val, Yaroslavska, and Naberezhno- Khreschatytska streets, actually creating ―a city in the city‖, shielding cozy courtyard from the noise of adjacent streets. Windows and terraces of the BC open spectacular view on Dnipro slopes and the river itself, Andriivska church and Mykhailivskyi Cathedral. 4. Date of start and completion of the project * The BC ASTARTA consists of 3 stages. The first stage was put into service in June 2016, the second – in August 2017, and the third stage in the second quarter of 2018. 6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) * The architectural concept and design have been developed by a leading consulting company in the field of commercial real estate - SCG INTERNATIONAL (UK), the concept has been adapted by a Ukrainian design bureau Kramall Studio. General Contractor – Corporation DBK Zhytlobud. ―TEC Energoinvest‖ LLC is the developer company that performs the building of BC ASTARTA. Ivan Pugolovkin, project manager of BC ASTARTA, Project Management Deputy Director of TEK Energoinvest. Julia Schastlivaja, Deputy Director on lease issues of TEC Energoinvest. 7. Project Type Office 8. Green certification (LEED, BREEAM, DGNB) or sustainable practices in place BREEAM

9. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) BC ASTARTA applies a unique approach to green space confirmed by a certified equipment of the highest class: • Energy: - energy-efficient windows Schuco - 2 independent power inputs and an uninterruptible power supply (diesel generator), - chargers for electric vehicles • Design: - ceiling height of 3.32 m - lift equipment Kone, speed of 1.75 m / s - the total number of lifts in the BC – 19 - 9-11 floors - space of the first line of BS for renting – 1812 sq m, of the second – 1275 sq m, of the third - 890 sq m. • Comfort: - autonomous heating system Buderus, gas boiler - multi-zone climate control system, ventilation with heat recovery - modern security system - IP telephony - high-speed Internet 10. Innovative solutions implemented in the project (describe why it is innovative on the market?) BC ASTARTA is the first building in Ukraine, constructed in accordance with ―green‖ building technologies. Its first stage is certified in accordance with international standard BREEAM (August 2016). The second stage is planned to be certified soon. For building and further use of the BC, environmental-friendly materials, energy-saving technologies, modern engineering, and intellectual control systems are applied. For example, orientation of the building in relation to compass points, natural light of the premises, ventilation with efficient recuperation, use of modern materials, contemporary LED illumination and automatic management of the building‘s engineering networks. The concept of BC ASTARTA includes looking after environment, renters, who spend the majority of time here, as well as after reasonable and well-minded use of the building. High-tech technologies applied for BC ASTARTA allow reasonable decrease of a renter‘s exploitation expenses. Intellectual management systems are designed to ensure that renters of offices in BC ASTARTA feel easy and comfortable, to minimize standard exploitation risks and to eliminate any possible routine household inconveniences. Thanks to motion sensors and solenoid valves of water supply, in case of broken or running tap in absence of motion the system shall block water supply and eliminate the possibility of flood. Balanced magnetic switch shuts off conditioning system, if a window is crack-opened. 100% of office spaces have access to sunlight, and illumination system is equipped with the most up-to-date LED-decisions (energy performance now in 15% exceeds the requirements of ASHRAE standard). Each floor is equipped with premises for smoking with individual system of conditioning and ventilation. Thuswise, tobacco smoke shall never bother the non-smoking employees; the smokers will have comfortable smoking place, and a company – efficient use of employees‘ working day. The project stipulates the use of alternative transport means at the account of bike parking and plugs for electric vehicles. Developing the project, we applied complex access to creation of environment with public transport, facilities for bikers and pedestrians, created transport plan, aimed at improving transport access to the building. For energy effective and environmental secure ventilation system, BC ASTARTA used 24 plants of different efficiency. These supply and exhaust systems not only preserve fresh air and comfort temperature all year round, but also to decrease is several times the use of power resources (maximum value of saving – 87%). The BC is also equipped with high quality and hi-tech lifts by the world leading manufacturer of lift equipment, escalators and mechanical doors. The lifts being installed are produced in Italy and boast good technical characteristics: speed 1.7m/sec., cargo capacity – 1000 kg. Conditioning system of BC ASTARTA also involved a range of innovation technologies. Conditioning systems use nature-friendly Freon R410A, and technologies of VRV-systems allow adjustment of individual climate zones on 60 square meters in office premises. Thanks to such technology each employee could have comfortable temperature regime and light. Furthermore, for example, each installation is equipped with rotor recuperative heat exchangers, special parts returning heat energy and humidity (eliminating the need in additional moisturizers). Such technology of recuperation is the key element of environment protection against the negative influence of human. 11. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) Hi-tech features of BC ASTARTA ensure its renter‘s reasonable decrease in exploitation expenses. For example, considering utility tariffs valid in September 2016, annual saving of a renter per 1 square meter of an office makes: power consumption – 2.4 USD, gas supply – 1.43 USD, water supply – 3.83 USD. Thuswise, sum total of single year‘s savings for an office space of 2000 square meters makes 7660 USD and almost 40 000 in 5 year perspective. Bearing in mind the growth of tariffs during the last year, the figures of money savings could possibly become even more reasonable. Also BC ASTARTA is the only one office building in Ukraine, having a courtyard with recreation zone for the BC‘s renters and guests of the quarter: stylish small park, green lawn for walking, fountain with lighting, cozy benches and beautiful small structures, summer terrace. The quarter possessed by the building is packed with services and facilities required by contemporary metropolis dwellers. BC‘s infrastructure is a ―city in the city‖ and includes: zone of domestic services, bank branch, post office, notary office, restaurants, cafés, eating house, sports club, supermarket, drugstore, dry-cleaner‘s, beauty salon. One could drink a cup of coffee in several cafes of the business-center and have a lunch or dinner in a stylish premium-segment restaurant, city café or cozy eating house with democratic process and tasty home cuisine. 12. Visual materials (link to pictures of exterior and interior design, layouts) http://dropmefiles.com/MKjYZ

13. Noteworthy information you consider might be relevant for the jury members BC ASTARTA‘s motto is ―SPACE FOR GROWTH‖. The similar is the concept of BC ASTARTA, unique and exclusive. It includes its own green ―oasis‖ – the green zone in its courtyard. There is a small park with attractive landscape design, fountain, and big green lawn for barefoot walking, summer terraces of cafes. All of this is the BC ASTARTA‘s zone for rest. Here BC‘s ―inhabitants‖ could spend their lunch time or negotiate or have informal meeting. The garden shall be opened not only for the BC‘s employees, but for all Kyivans and guests of the city. Tradition of such ecologic spaces is strong in Canada, the USA and Europe. As for Ukraine – BC ASTARTA is the first and still only one business center with its own green zone. For some minutes of rest and relax are also intended landscape terraces and usable roof with one of the most beautiful Kyiv sunsets. Thanks to the unique concept and use of the most modern technologies, BC ASTARTA is not just a business center, it is one of buildings that make Kyiv a modern European capital city, and that is a city‘s decoration and landmark. Our task is not only to create modern and beautiful business center, we would like the ASTARTA QUARTER to become the impulse for the start of positive changes and transformation of business Podil and Kyiv as a whole.

1. Name of the Project Optima Plaza 2. Web page of the Project

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine, Lviv, Naukova Str. 7D. Business Center is a 15-minute drive from the city center on the active main street 4. Date of start and completion of the project Start of the project - 15.05.2015 Date of putting into operation - 01.08.2016 6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) Architecture bureau - ARCHIMATIKA Consulting company - Cushman & Wakefield (former DTZ) Project bureau - One M2 ARCHITECTS General contractor «Kreator-Bud» 7. Project Type Office

8. Green certification (LEED, BREEAM, DGNB) or sustainable practices in place BREEAM In-Use "Very good"

9. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Optima Plaza is A-class business center Number of floors - 8GBA – 18 800 m2 GLA – 14 400 m2 Office complex is equipped with false floors LINDNER, sound insulation, access control, an automatic climate control, a system of heat recovery, alternative sources of energy, internal wiring, which allows maximum flexibility in the workplace.There are four passenger and one freight elevators (ThyssenKrupp) All engineering services were performed according to the BREEAM standard. The parking area has 268 parking spaces for cars, 50 free parking places for bicycles and 3 EV Green Chargers. The building has 24-hour protection. There is the multilevel security system. The building is equipped with fire suppression system, smoke and lightning protection. 10. Innovative solutions implemented in the project (describe why it is innovative on the market?) The project includes engineering energy-efficient solutions, due to which the business center has received BREEAM In-Use certificate with the mark "Very good" Heat pump for heating and hot water supply systems, solar collectors. 11. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) In the building of the business center there is a fitness club "Sport Life" and a bistro chain "Tasty seasons", an automobile and bicycle park, as well as charging stations for electric vehicles Mechanical with heat recovery, heat recovery with 63% of recuperation In restrooms and common corridors there are sensors of presence and movement. There are 60% LED lamps in general areas, fluorescent lamps category T-5 in office areas All floors of the building are accessible for physically challenged people. Amount of renewable energy - 39 kWh / m2 * year - air heat pump; 15 kWh / m2 * year - solar collectors. Sun protection system on the southern facade reduces the consumption of electricity for air conditioning in summer period.The coefficient of thermal conductivity is 0.21 W / (m · K) 12. Visual materials (link to pictures of exterior and interior design, layouts) https://www.dropbox.com/sh/9g5m6vxth2lzbf4/AABg2rrXdaxNS4gUYeZKXpIYa?dl=0

13. Noteworthy information you consider might be relevant for the jury members To create a larger lighting front, the total volume of the building was divided into three blocks. The facades of the southern and northern sides differ, reacting to the sides of the world, architects created the form, emphasizing its function.The project has received the international award "Crystal Brick" for the bestconstruction investment on both sides of the eastern border of Europe in category - "Objects of public use" in 2016. 1. Name of the Project TALAN TOWERS

2. Web page of the Project http://talantowers.com

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) 010016, 16 Dostyk Street, Esil District Astana, Kazakhstan The project sits on a privileged location at the heart of the new city. Astana, being the youngest capital in the World, is considered as one of the most rapidly growing ambitious and bold teenager among the family of global capitals. Being just 17 years old, Astana hosted important international events as Congress of World Religions, various international summits, Asiada – 2011 and Expo-2017. The building completes the southeast corner of the Bayterek Tower plaza defined by the corner of Dostyk and Turkishtan Streets. The project‘s prominent location allows the project to be a new landmark and a popular destination in Astana, offering direct views towards the Bayterek Tower and a unique visitor experience. This dialogue between the new structure and the Bayterek monument establishes the basis for the design. The new building inspires to reflect order, permanence and prosperity, complementing the Bayterek monument with a timeless design.

4. Date of start and completion of the project Start 2013 Completion 2017 (Talan Towers Offices, The Ritz-Carlton, Astana; The Ritz-Carlton Residences, Astana) Luxury fashion gallery EMPORIUM – 2018 LEED Certificate – 2018

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) Talan Towers is the first high-end mixed-use development in Astana to create a new level of lifestyle and luxury experience in the capital. The project became the excluding brand, the pre-eminent destination point in Astana and emblematic of the city and its growing power and prominence. To realize such a complex task, we gathered the best professional international team in Astana and it became one of the main strengths behind Talan Towers. On every level of project execution, we engaged the best companies and professionals in the world.

Investor – Verny Capital https://vernycapital.com/ Developer – Astana Property Management Construction management - Turner International http://www.turnerconstruction.com/ Structural / MEP Contractor – Renaissance Construction http://rencons.com Architecture - SOM (Skidmore, Owings & Merrill LLP) http://www.som.com/ Interior design (Retail) – Callison https://www.callisonrtkl.com/ Interior design (Office) - Pringle Brandon Perkins+Will www.perkinswill.com Interior design (Hotel) – Richmond Branding Landor LEED Consultancy – Jain Sustainable Engineering Solutions (Amman, Jordan) LEED commissioning services consultancy - Salimus (Dubai, UAE) http://salimus.com/ Facility and Property Management – JLL http://www.jll.ru/

7. Project Type Mixed-use building (Office, Hotel, Residential, Retail)

8. Green certification (LEED, BREEAM, DGNB) or sustainable practices in place LEED

9. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Facility and Property Management services offered at TALAN TOWERS: Technical maintenance of BMU (building maintenance unit); Technical maintenance of elevators; Technical maintenance of chillers; Disinfection of AHUs; Technical maintenance of CCTV system; Technical maintenance of ACS system; Technical maintenance of BMS; Technical maintenance of fire fighting system; Collection and disposal of fluorescent lamps; Collection and disposal of grease; Maintenance of 4 х diesel generator unit of total capacity 8 000 kVA Cleaning services for public areas and adjacent area; Snow and garbage removal; Security services; Reception services.

10. Innovative solutions implemented in the project (describe why it is innovative on the market?) Office Tower unitized panels area: 18,700 m2 Hotel Tower unitized panel area: 15,200 m2 Podium unitized panel area (3rd Floor panels): 2.560 m2 Overall project stone area: 19,100 m2 Short video about facade: https://vimeo.com/156379629 - English Solutions • Recirculating condensate from fcu, usage for irrigation • Water cooling chillers, COP bigger then 6, frequency driven compressors • Last generation of cooling towers, frequency driven fans • PMS (last generation management for reducing power consumption from chillers compressors) • Frequency driven pumps • Highest level of reactive power factor on pumps, compressors, fans • Recuperating AHU • Firefighting in electrical rooms, using powder, in small el. Rooms, data tele rooms on office floors, Bontel shall be used.

In Talan Towers Offices: • The distance between floor decks being more than 4 m lets to set up a false floor, to arrange all the service lines under the ceiling and get after fine finish work 3-meter ceiling height • Floor-to-ceiling windows made of ultra modern materials and providing for sufficient natural light are interspersed with wide stone blocks for winter heat loss enhancement • 8 modern KONE high-speed lifts (4m/sec) with energy efficient components and waiting time being no more than 30 sec; in addition to this the tower is equipped by VIP and utility lifts • Destination Control System • Custom designed cabins • New generation motors • Multi-zone air conditioning (VRF), providing equipment rooms with precise air conditioners. Air handling units 100% fresh air • Cooling with 4 pipes fan coil units. Heating with floor type convector and 3 pipes fan coil units. • 2 independent power sources, emergency power generators ensure the continuing electricity supply • Electrical power load for office floor: 90 kW (100VA/m²) • Emergency backed up power by generator for office floor (power and lighting): 100% • Emergency backed up power for mechanical equipment: 60% • 3 independent telecommunication providers ensure modern unbroken communications for offices • Modern security systems door access control (CCTV and DAC)

11. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) • Professional management company • Parking spaces – timing – we will have additional parking spaces where you can pay per each hour separately; • Synergy effect – hotel + retail, we may provide corporate discounts at the ―The Ritz- Carlton, Astana‖ hotel; • All the infrastructure needed for this business: Starbucks Reserve Bar cafeteria, Rabbit canteen, three restaurants in the ―The Ritz-Carlton, Astana‖, ballroom and The Ritz- Carlton conference rooms; • Prime location; • Transparency; • Prestige – luxury project (A-class building); • Famous architects and the rest of the Team; • Green certificate – the building is going to be LEED certified;• Marketing: - we are present in social media (Facebook/LinkedIn/Instagram); - we are present in most journals (Forbes, Tengri, etc.), airports; - we organize many events (networking)

12. Visual materials (link to pictures of exterior and interior design, layouts) Design development presentation from SOM (February 2014): https://www.dropbox.com/s/1fd28uw6y04nmsc/2014_02_28_100%20DD%20Booklet_FINAL.pdf?dl=0

13. Noteworthy information you consider might be relevant for the jury members TALAN TOWERS noted in the international property contest, Asia Pacific Property Awards 2017.

This prestigious international competition, held in Asia and which for more than 20 years has been determining the best representatives in the field of real estate, has proved that Kazakhstani companies are able to build to the highest international standards. The awards ceremony for the winners of the Asia Pacific Property Awards 2017 was held at the Marriott Marquis Queen's Park in Bangkok, Thailand.

1. Name of the Project TSUM

2. Web page of the Project http://tsum.ua/ua

3. Location of the Project (country and city; CBD/historiс area of the city, etc.) Ukraine, Kiev, Khreshchatyk

4. Date of start and completion of the project 2012-2017

5. Project participants - indicate the names and activities of companies, as well as their web pages (management company, architect, engineering company, consulting company, law firm, brokerage company, etc.) * ESTA Holding developer http://tsum.ua/ua General Contractor Altis Holding http://altis-holding.com/ Architect Benoy http://www.benoy.com/ Design of Four IV interiors https://studiofouriv.com/ Parking project http://walkerconsultants.com/ Management Company ESTA Property Management http://epm.ua/

6. Participants of the Project (please specify names, roles and web pages of development company, architects, engineering company, consulting company, law, brokerage companies, etc.) Retail (shopping center)

7. Project Type One of the features of TSUM - the mechanisms for controlling and adjusting the temperature regimes in the premises of the Central Chamber of Commerce - in addition to standard air conditioning and heating systems, the ring heat pump system will be used. Illumination of the interior of the Central House Museum deserves special mention. At his planning, it was decided to abandon traditional fluorescent lamps in favor of LED light sources. LED fixtures have become an integral part of the world's retail business lately. In addition, they are very economical, they absolutely do not harm the environment, unlike traditional fluorescent lamps that use mercury. LED lamps will be installed in all rooms of TSUM Transformers with reduced losses. Following the principles of environmental safety, Green T.HE energy efficient transformers (high efficiency) are performed by the Legrand Group in accordance with EN 50541-1. Due to low losses, transformers provide a reduction in energy consumption and, consequently, savings in finances and reduce CO2 emissions into the atmosphere. Decreasing the energy consumption of a transformer means reducing the harmful effects on the environment. Over 20 years of operation, the Green T.HE (high efficiency) series transformer will reduce carbon dioxide emissions by more than 1 500 tonnes.

8. Green certification (LEED, BREEAM, DGNB) or sustainable practices in place None

9. Technical and engineering specifications to prove class of the project (ceiling height, layout type, column spacing, parking, information infrastructure, security systems, elevators, electricity supply, air ventilation system) Height of ceilings - 5 m, in underground parking - 3,5 m For parking cars there are two levels of parking under the building of the Central House of Commerce, designed for 180 parking spaces, 6 of them - for the disabled. Visitor access is provided by three input groups. Access for low mobility groups is provided by two input groups and vertical vehicles meeting normative requirements. The floors of the parking area provide for the connection of all floors of the Central Station with the help of elevators. Lifts and escalators are the basis of vertical communications between the ground floor shopping floors. Escalators are located in the zone of the central atrium, which passes through the entire building with a cascade displacement and ends with a glass dome. Security - access control systems, video surveillance. Supply and exhaust ventilation installations with the function of heat recovery or cold recovery. Power supply is provided from 6 power transformers with a capacity of 1600 kVA each for the second category of reliability with the device for automatically switching on the reserve.

10. Innovative solutions implemented in the project (describe why it is innovative on the market?) Illumination of the interior of the Central House Museum deserves special mention. At his planning, it was decided to abandon traditional fluorescent lamps in favor of LED light sources. LED fixtures have become an integral part of the world's retail business lately. In addition, they are very economical, they absolutely do not harm the environment, unlike traditional fluorescent lamps that use mercury. LED lamps will be installed in all rooms of the Central Chamber of Commerce Refrigeration units The refrigeration units will be equipped with heat utilizers which are used for the preparation of hot water in the water supply system. One of the features of TSUM - the mechanisms for controlling and adjusting the temperature regimes in the premises of the Central Chamber of Commerce - in addition to standard air conditioning and heating systems, the ring heat pump system will be used. 11. Describe added value of innovative solutions for the object and its tenants/visitors (cost and resource saving, additional benefits for tenants, etc.) Transformers with reduced losses. Following the principles of environmental safety, energy-efficient Green T.HE (high efficiency) transformers have been implemented by the Legrand Group in accordance with the requirements of EN 50541-1. Due to low losses, transformers reduce energy consumption and, consequently, save money and reduce CO2 emissions into the atmosphere. European Directive 2009/125 / EC. Reducing the power consumption of the transformer means reducing the harmful impact on the environment. Over 20 years of operation, the Green T.HE (high efficiency) transformer will reduce carbon dioxide emissions by more than 1,500 tonnes.

12. Visual materials (link to pictures of exterior and interior design, layouts) https://we.tl/Kkiu8y1io3

13. Noteworthy information you consider might be relevant for the jury members TSUM is the main department store of the country, located in the historical part of the city at the intersection of Khreshchatyk and Bogdana Khmelnitskogo streets. TSUM works in a unique for Ukraine format - a classical department store. The six floors feature products in the categories of men's, women's, children's clothing, footwear, accessories, as well as household goods and toys. The 6th floor is completely allocated for the first in Ukraine food-hall with 25 food departments with a total area of 3200 m². The unique format works on the principle of "saw - tried - bought" and combines a farmer's market, a deli and a buffet. On the 7th floor of the department store, cafes, bars and restaurants will occupy 3,500 m² with panoramic terraces with a total area of 1000 m², revealing a view of the center of Kiev from a 30-meter height. On the lower floors there is a two-level underground parking for 180 cars.