REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION XI DAVAO ORIENTAL 2ND DISTRICT ENGINEERING OFFICE MATI, DAVAO ORIENTAL
C.Y. 2021 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR LUPON COASTAL ROAD FROM AROMA, BRGY. POBLACION TO BRGY. ILANGAY LEADING TO ILLA DIO BEACH RESORTS, BRGY. ILANGAY, LUPON, DAVAO ORIENTAL SECTION : ILLA DIO BEACH RESORTS LOCATION : LUPON, DAVAO ORIENTAL STATION LIMITS : STA. 0+630.00 - STA. 0+841.00 NET LENGTH : 211 LN.M. ROAD SECTION ID : -
SUBMITTED: RECOMMENDED: APPROVED:
BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: DATE: PROJECT LIMITS :
BEG. OF PROJECT = STA. 0+630.000 END OF PROJECT = STA. 0+841.000
THIS LENGTH OF PROJECT = 211.00 LN.M. SITE
BEG. OF PROJECT STA.0+630.000 VICINITY MAP
END OF PROJECT
STA.0+841.000 N
FISH POND PC: 0+635.65 PC:
BP: 0+630.00 BP: Mid: 0+687.86 M A N G R O V E S C L E O T I L D E PI: 0+656.26 PI:
PT: 0+740.06 BP: 0+630.00 BP: EXISTING CONCRETE PAVEMENT 0+660 0+680 PI-1 0+6300+640 0+700 0+720
0+740 0+6300+640 0+660 0+760 0+780 0+800
0+820
EXISTING SEAWALL 0+680 0+840 EP: 0+921.84 0+860 0+937.06 EP:
0+880 0+700 0+900
0+9200+922
STA 0+630.00 STA 0+720 0+937
0+920
PI: 0+757.88 0+740
PI: 0+857.31 0+900 0+760 0+780 0+800 0+880 0+820 0+840 0+860
CONSTRUCTION OF 211.00 LN.M. SEAWALL W/ CONCRETE WAVE DEFLECTOR @ STA. 0+630.000 - STA. 0+841.000 LOCATION PLAN
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES JEROME C. DOLOTINA LUPON COASTAL ROAD FROM AROMA, BRGY. SURVEY AIDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOCATION PLAN REGION XI POBLACION TO BRGY. ILANGAY LEADING TO ILLA DIO BEACH RESORTS, BRGY. ILANGAY, PROJECT LIMIT PREPARED: EDWIN A. MATIAS, JR. BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG DAVAO ORIENTAL 2ND DEO VICINITY MAP MATIAO, CITY OF MATI, DAVAO ORIENTAL LUPON, DAVAO ORIENTAL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER QUEENIE G. ONDON DATE: DATE: DATE: DATE: ENGINEER II SUMMARY OF QUANTITIES
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES JEROME C. DOLOTINA SURVEY AIDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LUPON COASTAL ROAD FROM AROMA, BRGY. REGION XI POBLACION TO BRGY. ILANGAY LEADING TO SUMMARY OF QUANTITIES DAVAO ORIENTAL 2ND DEO ILLA DIO BEACH RESORTS, BRGY. ILANGAY, PREPARED: EDWIN A. MATIAS, JR. BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG MATIAO, CITY OF MATI, DAVAO ORIENTAL LUPON, DAVAO ORIENTAL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER QUEENIE G. ONDON DATE: DATE: DATE: DATE: ENGINEER II SCHEDULE FOR RULE OF 7 + e% < 5 = -3 + e% ≥ 5 = -2 + e% ≥ 6 = -1 + e% ≥ 7 = 0 + e% ≥ 8 = 1
CUT/FILL SLOPE SCHEDULE CUT SLOPE CUT SLOPE NATURE OF MATERIAL MOUNTAINOUS FLAT SURFACE FILL SLOPE COMMON EARTH 1/2 : 1 1 : 1 1.5 : 1 RIPPABLE ROCK 1/2 : 1 1/2 : 1 1.5 : 1 SOLID ROCK 1/4 : 1 1/4 : 1 1.5 : 1 1.000
VARIABLE 3.590
HIGH TIDE ELEVATION 6.670m 1.000
CL 0.500 9.100 VARIABLE DETAIL OF SEAWALL W/ CONCRETE WAVE DEFLECTOR
3.590
FIN. GR. TOP DEFLECTOR ELEV.= 8.420m
UNSUITABLE 104(2)a
ITEM 200(1) AGGREGATE SUBBASE COURSE HIGH TIDE ELEVATION 6.670m (0.20m thk. FOR COMMON/RIPPABLE)
TYPICAL ROADWAY SECTION W/ SEAWALL & CONCRETE DEFLECTOR
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES JEROME C. DOLOTINA DESIGN PARAMETER SURVEY AIDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LUPON COASTAL ROAD FROM AROMA, BRGY. REGION XI POBLACION TO BRGY. ILANGAY LEADING TO TYPICAL ROADWAY SECTION W/ DAVAO ORIENTAL 2ND DEO ILLA DIO BEACH RESORTS, BRGY. ILANGAY, SEAWALL & CONCRETE DEFLECTOR PREPARED: EDWIN A. MATIAS, JR. BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG MATIAO, CITY OF MATI, DAVAO ORIENTAL LUPON, DAVAO ORIENTAL DETAIL OF SEAWALL W/ CONCRETE WAVE DEFLECTOR ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER QUEENIE G. ONDON DATE: DATE: DATE: DATE: ENGINEER II 1.00 CONCRETE CLASS "A" 12mmØ X 6m. LONG BAR
1.000 0.300
0.695 R-4.0
12mmØ X 6m. DEF. BARS SP. @ 0.40m. ON CENTER 3.590 0.150
3.233 0.300
AT STA. 0+630.00 - STA. 0+841.000 DETAIL OF REINF. CONC. DEFLECTOR SEAWALL DETAIL SCALE NTS 1.500 1.00
A 0.500
3.000
STAIR DETAILS 0.150
1.453 A 3.000 1.453 0.300
0.80m SECTION "A - A"
1.20m S L O P E S L O P E
104(1)a - EMBANKMENT S L O P E GRANULAR COARSE MATERIALS 1.00m
SECTION
CLOSURE @ BEG. AND END OF SLOPE PROTECTION 0.50m FOUNDATION DETAIL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES JEROME C. DOLOTINA SURVEY AIDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LUPON COASTAL ROAD FROM AROMA, BRGY. STAIR DETAIL REGION XI POBLACION TO BRGY. ILANGAY LEADING TO CLOSURE DETAIL ILLA DIO BEACH RESORTS, BRGY. ILANGAY, FOUNDATION DETAIL PREPARED: EDWIN A. MATIAS, JR. BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG DAVAO ORIENTAL 2ND DEO DETAIL OF REINF. CONC. DEFLECTOR MATIAO, CITY OF MATI, DAVAO ORIENTAL LUPON, DAVAO ORIENTAL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER QUEENIE G. ONDON DATE: DATE: DATE: DATE: ENGINEER II CH CONCRETE HOUSE E L E M E N T S O F C U R V E WH WOODEN HOUSE PI NUMBER STATION NORTHING EASTING I D R T E LC PC PT e w V (kph) ELECTRIC POST PI-1 0+688.049 761228.905 612234.324 11°57'50" 2°17'30" 500.000 52.396 2.738 104.410 0+635.653 0+740.063
TREES SEAWALL ALIGNMENT T R A V E R S E L I N E T R A V E R S E L I N E
PI No. DISTANCE AZIMUTH PI No. DISTANCE AZIMUTH CONCRETE FENCE T1 to T2 26.258 130° 02' 38.263" T1 to PI.1 58.049 130° 02' 39.354" MONUMENTS T2 to T3 101.620 163° 03' 30.194" PI.1 to T2 234.177 142° 00' 30.566" BENCH MARK T3 to T4 99.437 138° 02' 34.152" PCC PAVEMENT T4 to T5 79.743 112° 47' 05.243"
BEG. OF PROJECT STA.0+630.000 N
END OF PROJECT
STA.0+841.000 FISH POND PC: 0+635.65 PC:
BP: 0+630.00 BP: Mid: 0+687.86 M A N G R O V E S C L E O T I L D E PI: 0+656.26 PI:
PT: 0+740.06 BP: 0+630.00 BP: 0+660 0+680 PI-1 0+6300+640 0+700 0+720
0+740 0+6300+640 0+660 0+760 0+780 0+800
0+820
EXISTING SEAWALL 0+680 0+840 EP: 0+921.84 0+860 0+937.06 EP:
0+880 0+700 0+900
0+9200+922
STA 0+630.00 STA 0+720 0+937
0+920
PI: 0+757.88 0+740
PI: 0+857.31 0+900 0+760 0+780 0+800 0+880 0+820 0+840 0+860
CONSTRUCTION OF 211.00 LN.M. SEAWALL W/ CONCRETE WAVE DEFLECTOR @ STA. 0+630.000 - STA. 0+841.000
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES JEROME C. DOLOTINA SURVEY AIDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LUPON COASTAL ROAD FROM AROMA, BRGY. REGION XI POBLACION TO BRGY. ILANGAY LEADING TO PLAN DAVAO ORIENTAL 2ND DEO ILLA DIO BEACH RESORTS, BRGY. ILANGAY, PREPARED: EDWIN A. MATIAS, JR. BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG MATIAO, CITY OF MATI, DAVAO ORIENTAL LUPON, DAVAO ORIENTAL ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER QUEENIE G. ONDON DATE: DATE: DATE: DATE: ENGINEER II