Site Reference REAY1 LOCATION Remaining Plots

Total Page:16

File Type:pdf, Size:1020Kb

Site Reference REAY1 LOCATION Remaining Plots Site Reference REAY1 Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity Remaining plots in Phase 1 of Keoltag Housing 1.2 development 4 3 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 1 0 2 2 3 0 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Developments with Planning permission or under development Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 2 Site Reference REAY3 Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity Keoltag (Phases 2, 3 and 4) Housing 6.1 26 26 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 2 2 8 8 10 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Effective Sites without Planning permission and undeveloped Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 3 Site Reference REAY2d Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity East of Old Reay Housing 1.5 10 10 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 0 10 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Developments with Planning permission or under development Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 4 Site Reference REAY2a Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity West of the Crescent, New Reay Housing 0.2 4 4 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 0 4 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Constrained SITE STATUS SITE TYPE Q Development Constrained Greenfield :\I Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 5 Site Reference REAY2c Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity North of the Terrace, New Reay Housing 1.5 20 20 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 0 20 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Developments with Planning permission or under development Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 6 Site Reference REAY2b Reay Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity West of the Avenue, New Reay Housing 0.3 4 4 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 0 4 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Constrained SITE STATUS SITE TYPE Q Development Constrained Greenfield :\I Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 7 Site Reference LYER5c Lybster Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity West of the Police Station Housing 2.1 25 16 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 6 2 1 2 2 9 0 7 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Developments with Planning permission or under development Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 8 Site Reference LYER5a Lybster Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity East of Stewart's Building Housing 3.4 40 40 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 10 10 10 10 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Effective Sites without Planning permission and undeveloped Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 9 Site Reference LYER5b Lybster Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity Russel Street Housing 1.8 15 15 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 0 5 5 5 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Constrained SITE STATUS SITE TYPE Q Development Constrained Greenfield :\I Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 10 Site Reference LYER5d Lybster Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original Site Remaining Capacity Capacity South of Harbour Road Housing 3.3 5 7 BUILT PROGRAMMING 2000-2007 2008 2009 2010 2011 2012 First 5 5 to 10 10 to 15 15 to 20 20 years Years Years years years plus 0 0 0 0 3 4 0 0 0 PLANNING STATUS CONSTRAINTS © Crown Copyright. The Highland Council 100023369, 2011 Local Plan Status Year Ownership Caithness Adopted September 2002 Physical Infrastructure Landuse DEVELOPMENT STATUS Deficit Funding Not Developed Under Construction / Partly Developed Marketability Site with Extant Planning Permission SITE EFFECTIVENESS Complete Effective SITE STATUS SITE TYPE Q Greenfield :\I Developments with Planning permission or under development Further Information © Crown Copyright. The Highland Council 100023369, 2011 Highland Council's Housing Land Audit 2010- Figures up to 31st December 2010 email: [email protected] 11 Site Reference LYER5e Lybster Ward 4 Landward Caithness LOCATION Allocation Type Area (HA) Original
Recommended publications
  • Caithness and Sutherland Proposed Local Development Plan Committee Version November, 2015
    Caithness and Sutherland Proposed Local Development Plan Committee Version November, 2015 Proposed CaSPlan The Highland Council Foreword Foreword Foreword to be added after PDI committee meeting The Highland Council Proposed CaSPlan About this Proposed Plan About this Proposed Plan The Caithness and Sutherland Local Development Plan (CaSPlan) is the second of three new area local development plans that, along with the Highland-wide Local Development Plan (HwLDP) and Supplementary Guidance, will form the Highland Council’s Development Plan that guides future development in Highland. The Plan covers the area shown on the Strategy Map on page 3). CaSPlan focuses on where development should and should not occur in the Caithness and Sutherland area over the next 10-20 years. Along the north coast the Pilot Marine Spatial Plan for the Pentland Firth and Orkney Waters will also influence what happens in the area. This Proposed Plan is the third stage in the plan preparation process. It has been approved by the Council as its settled view on where and how growth should be delivered in Caithness and Sutherland. However, it is a consultation document which means you can tell us what you think about it. It will be of particular interest to people who live, work or invest in the Caithness and Sutherland area. In preparing this Proposed Plan, the Highland Council have held various consultations. These included the development of a North Highland Onshore Vision to support growth of the marine renewables sector, Charrettes in Wick and Thurso to prepare whole-town visions and a Call for Sites and Ideas, all followed by a Main Issues Report and Additional Sites and Issues consultation.
    [Show full text]
  • 1 P32 Papers of Henry Henderson (Bard of Reay)
    P32 Papers of Henry Henderson (Bard of Reay) RECORDS’ IDENTITY STATEMENT Reference number: GB1741/P32 Alternative reference number: Title: Papers of Henry Henderson (Bard of Reay) Dates of creation: 1908-1945 Level of description: Fonds Extent: 1 bundle Format: Paper RECORDS’ CONTEXT Name of creators: Henry Henderson (Bard of Reay) Administrative history: Henry Henderson, whose pen name was The Bard of Reay, was born on a croft in Wester Borrowston, Caithness in 1873. He was educated locally and on leaving school helped his father on the family farm and with contract work in quarries. He was already interested in poetry and by the age of 20 had collected over 300 books. In 1892 he sent his first poem to the 'John O'Groat Journal' and over the next 50 years had over 2000 poems published in this and other newspapers. He also contributed regular articles on local history and issues and was noted for his strongly held views especially regarding crofting and land reform. Henderson was married in 1906 and he and his wife, Margaret, had nine children. In 1909 he was made sub postmaster at Dounreay, a post he held until his death. An active participant in many community activities, Henderson was a parish councillor in Reay and Bard of the Thurso Jolly Beggars Burns Society. He died in 1957. Custodial history: RECORDS’ CONTENT Description: Poems, notes and letters Nucleus: The Nuclear and Caithness Archives 1 Appraisal: Accruals: RECORDS’ CONDITION OF ACCESS AND USE Access: open Closed until: Access conditions: Available within the Archive searchroom Copying: Copying permitted within standard Copyright Act parameters Finding aids: Available in Archive searchroom ALLIED MATERIALS Related material: Publication: Notes: Date of catalogue: August 2011 Ref.
    [Show full text]
  • Gàidhlig (Scottish Gaelic) Local Studies Vol
    Gàidhlig (Scottish Gaelic) Local Studies Vol. 22 : Cataibh an Ear & Gallaibh Gàidhlig (Scottish Gaelic) Local Studies 1 Vol. 22: Cataibh an Ear & Gallaibh (East Sutherland & Caithness) Author: Kurt C. Duwe 2nd Edition January, 2012 Executive Summary This publication is part of a series dealing with local communities which were predominantly Gaelic- speaking at the end of the 19 th century. Based mainly (but not exclusively) on local population census information the reports strive to examine the state of the language through the ages from 1881 until to- day. The most relevant information is gathered comprehensively for the smallest geographical unit pos- sible and provided area by area – a very useful reference for people with interest in their own communi- ty. Furthermore the impact of recent developments in education (namely teaching in Gaelic medium and Gaelic as a second language) is analysed for primary school catchments. Gaelic once was the dominant means of conversation in East Sutherland and the western districts of Caithness. Since the end of the 19 th century the language was on a relentless decline caused both by offi- cial ignorance and the low self-confidence of its speakers. A century later Gaelic is only spoken by a very tiny minority of inhabitants, most of them born well before the Second World War. Signs for the future still look not promising. Gaelic is still being sidelined officially in the whole area. Local council- lors even object to bilingual road-signs. Educational provision is either derisory or non-existent. Only constant parental pressure has achieved the introduction of Gaelic medium provision in Thurso and Bonar Bridge.
    [Show full text]
  • North Highland Sg Walk
    SCOTLAND – THE NORTHERN HIGHLAND WAY 9-day / 8-night SELF-GUIDED inn-to-inn walk - the far north of Scotland with John O’ Groats & Orkney Scotland’s Northern Highland Way is a moderate walk on the wild side, taking you through some of the most scenic and remote landscapes in the far north of Scotland. This 120km trail begins in Thurso, the northernmost town on the British mainland, and allows you to take in stunning yet extreme backdrops from white sandy beaches to awe inspiring coastal cliffs, where the Atlantic Ocean meets the North Sea. This is your opportunity to see a wide variety of wildlife including magnificent puffin bird colonies; to walk to the iconic Cape Wrath, named by the Vikings as the Norse for “turning point” and to visit the lighthouse built there in 1828. This is your chance to see the fascinating and historical Orkney Islands, to visit the picturesque harbour at Scrabster and to walk across the golden sand beaches at Torrisdale Bay. Stay in welcoming B&Bs, inns and guesthouses where walkers are well looked after, with a hearty Scottish breakfast each morning perhaps including a traditional porridge, tattie scones, black pudding square and sausage, all local fare. Carry only a daypack as your luggage is transferred for you. Accommodation on the Northern Highland Way is in high demand and is limited especially in the small villages along the way. Early booking is essential especially if you plan to travel in the popular months of May or September. Departs: Daily from April to September Cost from: $1415 per person twin share Single supplement limited and on request Starts: Thurso Ends: Durness.
    [Show full text]
  • The Scottish Highlanders and the Land Laws: John Stuart Blackie
    The Scottish Highlanders and the Land Laws: An Historico-Economical Enquiry by John Stuart Blackie, F.R.S.E. Emeritus Professor of Greek in the University of Edinburgh London: Chapman and Hall Limited 1885 CHAPTER I. The Scottish Highlanders. “The Highlands of Scotland,” said that grand specimen of the Celto-Scandinavian race, the late Dr. Norman Macleod, “ like many greater things in the world, may be said to be well known, and yet unknown.”1 The Highlands indeed is a peculiar country, and the Highlanders, like the ancient Jews, a peculiar people; and like the Jews also in certain quarters a despised people, though we owe our religion to the Hebrews, and not the least part of our national glory arid European prestige to the Celts of the Scottish Highlands. This ignorance and misprision arose from several causes; primarily, and at first principally, from the remoteness of the situation in days when distances were not counted by steam, and when the country, now perhaps the most accessible of any mountainous district in Europe, was, like most parts of modern Greece, traversed only by rough pony-paths over the protruding bare bones of the mountain. In Dr. Johnson’s day, to have penetrated the Argyllshire Highlands as far west as the sacred settlement of St. Columba was accounted a notable adventure scarcely less worthy of record than the perilous passage of our great Scottish traveller Bruce from the Red Sea through the great Nubian Desert to the Nile; and the account of his visit to those unknown regions remains to this day a monument of his sturdy Saxon energy, likely to be read with increasing interest by a great army of summer perambulators long after his famous dictionary shall have been forgotten, or relegated as a curiosity to the back shelves of a philological library.
    [Show full text]
  • Housing Application Guide Highland Housing Register
    Housing Application Guide Highland Housing Register This guide is to help you fill in your application form for Highland Housing Register. It also gives you some information about social rented housing in Highland, as well as where to find out more information if you need it. This form is available in other formats such as audio tape, CD, Braille, and in large print. It can also be made available in other languages. Contents PAGE 1. About Highland Housing Register .........................................................................................................................................1 2. About Highland House Exchange ..........................................................................................................................................2 3. Contacting the Housing Option Team .................................................................................................................................2 4. About other social, affordable and supported housing providers in Highland .......................................................2 5. Important Information about Welfare Reform and your housing application ..............................................3 6. Proof - what and why • Proof of identity ...............................................................................................................................4 • Pregnancy ...........................................................................................................................................5 • Residential access to children
    [Show full text]
  • Malcolm Bangor-Jones
    Malcolm Bangor-Jones 'Abounding with people of dyvers languages': The Church and Gaelic in the Presbytery of Caithness in the Second Half of the 17th Century In the history of the decline of the Gaelic language within Scotland, the church is seen as a key element in the anglicisation process. But while both state and church in the seventeenth century favoured the suppression of Gaelic in the longer term, there was a recognition by the church that, if the Highlands were to be brought within a unified 'religious jurisdiction', then Gaelic had to be used for religious instruction. Such usage, however, took place within particular ideological and institutional contexts.1 This article examines how the Church of Scotland attempted to accommodate Gaelic speakers .during the second half of the seventeenth century within the presbytery of Caithness, an area which was then on the linguistic frontier between Scots and Gaelic. In the mid-seventeenth century the presbytery of Caithness comprised not only the whole of the shire of Caithness, but also the province of Strathnaver in Sutherland containing the parishes of Dumess, Farr and part of Reay. The presbytery of Sutherland was thus restricted to the south east of the county, equivalent to what is sometimes referred to as the ancient earldom of Sutherland, and the parish of Assynt. The presbyteries of Caithness, Sutherland and Orkney combined to form a 'northern' synod. Most of the ministers in Caithness had been deposed for welcoming or failing to denounce the Marquis of Montrose during his ill-fated expedition of 1650.2 The combination of the Crornwellian conquest, royalist resistance and divisions within the church took a severe toll upon the personnel and 55 NORTHERN STUDIES· 33 administration of the church in Caithness.
    [Show full text]
  • Erection of General Storage Shed at Land 30 M East of 1 Reay, Thurso by Barrie Robertson
    Agenda 6.7 item Report PLN/057/17 no THE HIGHLAND COUNCIL Committee: North Planning Applications Committee Date: 12 September 2017 Report Title: 17/03270/FUL Land 30M East Of 1 Reay Thurso Report By: Area Planning Manager (North) 1. Purpose/Executive Summary 1.1 Applicant : Barrie Robertson Description of development: Erection of general storage shed measuring (9.144m wide x 15.240m long x 5.800m high) (in retrospect to adjust from 15/00850/FUL) Ward 02 - Thurso And North West Caithness Category: Local Development Reason referred to committee: Number of objections All relevant matters have been taken into account when appraising this application. It is considered that the proposal accords with the principles and policies contained within the Development Plan and is acceptable in terms of all other applicable material considerations. 2. Recommendations 2.2 Members are asked to agree the recommendation to grant as set out in section 11 of the report. 1. PROPOSED DEVELOPMENT 1.1 Erection of general storage shed measuring (9.144m wide x 15.240m long x 5.800m high) (in retrospect to adjust from 15/00850/FUL) 1.2 This application is for retrospective planning permission to regularise changes to a storage shed. Planning permission was originally granted on 8 June 2015 for the erection of a shed on this site. As a result of a discrepancy in the submitted drawings, the height of the shed as built varies from that approved. The originally approved drawings of the shed states dimensions of: 9.144m wide x 15.240m long x 4.267m in height.
    [Show full text]
  • Drum Hollistan Renewables
    Redacted Planning and Environmental Appeals Division Report to the Scottish Ministers SECTION 36 OF THE ELECTRICITY ACT 1989 AND SECTION 57 OF THE TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 Report by Christopher Warren and Andrew Fleming, reporters appointed by the Scottish Ministers Case reference: WIN-270-9 Site Address: Drum Hollistan, approximately 2 kilometres west of Reay and 3 kilometres east of Melvich, Highland Application by Drum Hollistan Renewables LLP Application for consent (S36 Electricity Act 1989) and deemed planning permission (S57 Town and Country Planning (Scotland) Act 1997) The development proposed: construction and operation of Drum Hollistan Wind Farm Dates of inquiry / hearing sessions: 26 February 2018 – 07 March 2018 Date of this report and recommendation: 16 October 2018 Planning and Environmental Appeals Division 4 The Courtyard, Callendar Business Park, Falkirk, FK1 1XR abcde abc a DX 557005 Falkirk www.gov.scot/Topics/Planning/Appeals CONTENTS Page Summary Report 2 Preamble 13 Abbreviations used in the report 15 Chapters 1. Background 16 2. Legislative and policy context 21 3. Landscape and visual impact 32 4. Impact on wild land 53 5. Economic impacts, tourism and 76 recreation 6. Carbon balance and peat 82 management 7. Other relevant issues 87 8. Proposed conditions 96 9. Overall conclusions and 97 recommendations Appendices Appendix 1: Recommended Section 36 104 conditions Appendix 2: Recommended conditions 106 of deemed planning permission Appendix 3: Document lists 121 Appendix 4: Appearances
    [Show full text]
  • North Strathcoul Harpsdale, by Halkirk, Caithness Thurso About 9 Miles
    NORTH STRATHCOUL HARPSDALE, BY HALKIRK, CAITHNESS THURSO ABOUT 9 MILES. NORTH STRATHCOUL WICK ABOUT 20 MILES. HARPSDALE, BY HALKIRK, CAITHNESS INVERNESS ABOUT 110 MILES. An exceptional house site in a unique and unspoilt landscape with panoramic views over the River Thurso. • Elevated site with uninterrupted views over open countryside. • Outline planning consent. • Mains electricity and water supply on site. • Close to a famous salmon and sea trout river. • Set in a National Nature Reserve. About 3 acres (1.2 hectares) in all. Inverness Office Reay House 17 Old Edinburgh Road Inverness IV2 3HF 01463 224343 [email protected] www.ckdgalbraith.co.uk turning right for Halkirk. After approximately 2.5 miles 2 Areas, measurements and distances are given as a guide. turn left before JGC Engineering and continue along Photographs depict only certain parts of the property. this road for 1.5 miles. North Strathcoul is situated on Nothing within the particulars shall be deemed to be a the right hand side. statement as to the structural condition, nor the working order of the services and appliances. 3 These particulars shall not be binding on our clients VIEWING whether acted on or otherwise, unless the same is Viewing is by prior appointment only through the incorporated within a written document, signed by our Selling Agents, CKD Galbraith, Reay House, 17 Old clients or on their behalf, satisfying the requirements of Edinburgh Road, Inverness IV2 3HF. Telephone Section 3 of The Requirements of Writing (Scotland) Act (01463) 224343. The person who may accompany you 1995. may however not be an employee of CKD Galbraith.
    [Show full text]
  • Far North Mobile Library Routes 2019
    Far North Mobile Library Routes 2019 The mobile library operates a three weekly schedule as follows. Please note: these times are subject to change. Stops at primary schools (marked *) are normally suspended during the school holidays. Please note: there is no visit on May Day 06 May and Easter Monday 22 Apr 2019. Mobile Routes: Armadale, Caithness and Tongue. Armadale Mondays: 07 Jan, 28 Jan, 18 Feb,11 Mar, 01 Apr, 22 Apr, 13 May, 03 Jun, 24 Jun, 15 Jul, 05 Aug, 26 Aug, 16 Sept, 07 Oct, 28 Oct, 18 Nov, 09 Dec 2019. 11:50 27 Langdale, Strathnaver 11:55 Syre Lodge 14:00 Altnaharra Primary – village stop 15:00 Grummore Caravan Site 15:30 Stoneyburn 15:45 17 Strathnaver 16:00 Old Schoolhouse (Post Office) 16:30 Inverskail Tuesdays: 08 Jan, 29 Jan, 19 Feb, 12 Mar, 02 Apr, 23 Apr, 14 May, 04 Jun, 25 Jun, 16 Jul, 06 Aug, 27 Aug, 17 Sept, 08 Oct, 29 Oct, 19 Nov, 10 Dec 2019. 09:25 Farr School- term time 10:30 Munro Place 11:25 Strathen Road end 12:00 34 Lotts 12:15 Skerray Post Office 12:45 Eildon Cottage 12:55 Borgie 14:30 Church car park Bettyhill 15:05 Kirtomy 15:30 177 Armadale High Life Highland Libraries, 31a Harbour Road, Inverness, IV1 IUA, Telephone: 01349 781340 – Email: [email protected] High Life Highland is a company limited by guarantee registered in Scotland No. SC407011 and is a registered Scottish charity No. SC042593 15:45 Viewfield, Armadale 16:00 Laidnagullan – phone box 16:15 Lay by before Brawl junction Wednesdays: 09 Jan, 30 Jan, 20 Feb, 13 Mar, 03 Apr, 24 Apr, 15 May, 05 Jun, 26 Jun, 17 Jul, 07 Aug, 28 Aug, 18 Sept, 09 Oct, 30 Oct, 20 Nov, 11 Dec 2019.
    [Show full text]
  • THE HIGHLAND COUNCIL Committee: Sutherland County
    Agenda Item 4. Report SCC/12/21 No THE HIGHLAND COUNCIL Committee: Sutherland County Committee Date: 16 August 2021 Report Title: North West 2045 Our Future Our Choice Report By: ECO Communities and Place 1. Purpose/Executive Summary 1.1 This report provides background to the North West 2045 project and the development of a long-term vision for north west Highland – “North West 2045 Our Future Our Choice”. The report proposes that the Vision is adopted by Sutherland County Committee and outlines how Highland Council, its partners and communities can contribute to and work towards achieving the Vision. 2. Recommendations 2.1 Members are asked to: i. Adopt the NW2045 Vision “North West 2045 Our Future Our Choice” ii. Note the development of a Regional Land Use Partnership pilot in NW Sutherland 3. Implications 3.1 Resource implications There are no direct resource implications of the Sutherland County Committee adopting the NW2045 Vision. Although Highland Council support for initiatives outlined in the vision may have resource implications in the future, these would be subject to appropriate Committee or service decision making. 3.2 Legal implications There are no legal implications rising from the adoption of the NW2045 Vision, which is a commitment to support the vision. It is not a legally binding contract. 3.3 Community (Equality, Poverty, Rural and Island) impacts The NW2045 Vision outlines key challenges faced by remote rural communities including rural poverty and inequalities in those communities and priorities outlined in the vision to address these challenges. 3.4 Climate Change / Carbon Clever implications The NW2045 Vision aligns with the Council’s Highland Adapts initiative which will bring organisations from across Highland together to develop a shared adaptation strategy and action plan which will embed action to adapt across organisational, community and sector plans, strategies and investments.
    [Show full text]