FORM-1 Vide para 6 of S. O. 1533 dated 14 September 2006

STONE QUARRY Area (2.00 Ha), Village : Deulgaon Gada, Tehsil: , District ,

Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL APPRAISAL COMMITTEE (SEAC Maharashtra)

* Project Proponent Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra

* EIA Consultant EIA Consultant SRUSHTI SEWA Harihar Apartment,Agresen Road, Near Adivasi Bhavan , Giripeth, -440010(Maharashtra) Phone : 0712-688545 Email : [email protected]

Accredited by NABET: No.- NABET/EIA/127/SA062/0613 Dated 26/06/2013 Form I REVISED FORM – 1

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14.09. 2006

(I) Basic Information: S. No Item Details 1. Name of the Project/s : Stone Quarry

2. S. No. in the schedule : 1 (a) as per S.O.1533dt 14.09.06 3. Proposed Capacity / area / length : (2.00 Ha) / tonnage to be handled/command 1000 Brass/month Stone metal or Stone area/lease area/ number of wells dust to be drilled. 4. New/Expansion/Modernization : Existing lease applied for EC Vide OM No. L-11011/47/2011-IA.II(M) dated 18.05.12 5. Existing Capacity/Area etc. : 2.00 Ha 800 Brass/month Stone metal or Stone dust 6. Category of project i.e. ‘A’ or ‘B’ : ‘B’ 7. Does it attract the general : No condition? If yes, please specify. 8. Does it attract the specific : No condition? If yes, please specify. 9. Location : Plot/Survey/Khasra No. : Survey No. 18 PART, Refer Map I Village : Deulgaon Gada Tehsil : Daund District : Pune State : Maharashtra. 10. Nearest Railway station/airport : Kedgaon Rly station :4 Km. along with distance in kms. Baramati Airport :35 Km. 11. Nearest Town, city, District : Nearest Town Kedgaon –5 km, Headquarters along with distance in kms. 12. Village Panchyats, Zilla Parishad, : Deulgaon gada Gram Panchayat. Municipal Corporation, Local Tahsil Daund body (complete postal address District Pune with telephone nos. to be given.) Maharastra 13. Name of the applicant : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare 14. Registered Address : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra 15. Address and correspondence: : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare 1 Form I Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra Name : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare

Designation(Owner/partner/CEO) : Partner Address : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra Pin Code : - E-mail : - Telephone : - Fax. No. : - 16. Details of Alternative Site : Mining is site specific activity hence no examined, if any location of these alternative sites examined. sites should be shown on a topo sheet. 17 Interlinked Projects : Not Applicable 18. Whether separate application of : Not Applicable interlinked project has been submitted? 19. If yes, date of submission : Not Applicable 20. If no, reason : Not Applicable 21. Whether the proposal involves : approval/clearance under: if yes, details of the same and their status to be given. a) The Forest (Conservation) Not applicable Act, 1980 ? b) The wildlife (Protection) Not applicable Act, 1972? c) The C.R.Z Noticefication, Not applicable 1991? 22. Whether there is any Government : Refer Annexure I Order/ Policy relevant/relating to this site? 23. Forest land involved(hectares) : Nil 24. Whether there is any litigation : No Litigation is involved pending against the project and /or land in which the project is proposes to be set up? a) Name of the Court b) Case No. c) Order/directions of the Court, if any and its relevance with the proposed project.

2 Form I * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.1 Permanent or temporary Yes The existing terrestrial configuration will change in land use, land cover undergo progressive changes due to quarry or topography including development, basalt extraction, creation of increase in intensity of land haul roads, storage dumps, reclamation and use (with respect to local land rehabilitation during quarrying and use plan) decommissioning. 1.2 Clearance of existing land, No There is no vegetation or buildings existing vegetation and buildings? in the area proposed of quarry development.

1.3 Creation of new land uses? Yes Present land use will undergo gradual changes during quarry life due to quarry development, basalt extraction, storage, reclamation and rehabilitation. The new land use at the end of quarry life will be as follows. 1. Mined-out void shall be converted in a water body. 2. Plantation in the open space. 1.4 Pre-construction investigations No Not Required e.g. bore holes, soil testing?

1.5 Construction works? No -

1.6 Demolition works No No demolition work is involved in the proposed mining lease area.

1.7 Temporary sites used for Yes Temporary structures are made to meet the construction works or housing needs of construction, manpower of construction workers? machinery deployed and sanitation facilities.

1.8 Above ground buildings, Yes Surface infrastructures like mine office & structures or earthworks stores, crushing & screening plant, first aid including linear structures, cut station, etc. and fill or excavations

1.9 Underground works including No Not Applicable mining or tunneling? 3 Form I Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data

1.10 Reclamation works? Yes Reclamation plan will be prepared and approved from competent authority before closer of mine.

1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing Yes The quarrying will be carried out by processes? opencast method.

1.14 Facilities for storage of goods No Extracted Mineral will be dispatched or materials? directly, transit storage at site. .

1.15 Facilities for treatment or Yes Solid Waste OB is Stored within lease disposal of solid waste or boundary along the periphery. liquid effluents? Liquid Effluent: There is no effluent generation. The quarry dose not intercepts the water table. Only rain water is accumulated in the pit during monsoon which is used for plantation & dust suppression etc.

1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea traffic No • Existing road network is adequate for during construction or transportation of produced material. operation? • No transportation by Sea.

1.18 New road, rail, air waterborne No • Road : Not Applicable or other transport infrastructure including new or altered routes • Rail link : Not required and stations, ports, airports etc? 1.19 Closure or diversion of No Not Applicable existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not Applicable lines or pipelines? 1.21 Impoundment, damming, No No crossing of natural drainage culverting, realignment or other changes to the hydrology of water courses or aquifers?

4 Form I Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of No Not Applicable water from ground or surface waters? 1.24 Changes in water bodies or the No No seasonal streams falling within the ML land surface affecting drainage area . or run-off? 1.25 Transport of personnel or Yes As far as possible, local people from materials for construction, surrounding villages will be engaged. The operation or transportation of personnel and decommissioning? construction materials by road. Existing road network is adequate.

1.26 Long term dismantling or Yes Mine will be systematically closed as per decommissioning or decommissioning plan, which is prepared a restoration works? few years prior to mine closure.

1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Company employees except the local either temporarily or employees. permanently? 1.29 Introduction of alien species? No Not Applicable

1.30 Loss of native species or No No ecological losses genetic diversity? 1.31 Any other actions? No Not Applicable

5 Form I 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supply) Details thereof (with approximate Information/Checklist quantities / rates, wherever possible) S. No. Yes/No confirmation with source of information data

2.1 Land especially undeveloped or No Private Land agricultural land (ha)

2.2 Water (expected source & Yes Dust Suppression & Plantation: 2.0 competing users) unit: KLD KLPD Drinking Purpose : 0.5 KLPD 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Stone, No Not required aggregates, and/soil (expected source – MT) 2.5 Forests and timber (source – MT) No Not Required. 2.6 Energy including electricity and Yes Electricity Source: Nearby HT Power fuel (source, competing users) Line of Maharashtra State Power Unit: fuel (MT), energy (MW) Distribution Company.

2.7 Any other natural resources (use No Not Applicable appropriate standard units) 3. Use storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 3.1 Use of substances or materials, Yes Approved Explosives used for blasting. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not Applicable or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes About16 persons benefited by the way by changing living conditions? of regular employment and some person will also get indirect employment it will improve socio economic status due to creation of employment opportunities for the local people. 3.4 Vulnerable groups of people who No Site is 3.5 km away from Hospital, could be affected by the project School and Villages e.g. hospital patients, children, the elderly etc. 6 Form I Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 3.5 Any other causes No Nil

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate Information/Checklist S. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 4.1 Soil, overburden or mine wastes No No top Soil, OB variable and meager 4.2 Municipal waste (domestic and or Yes Approx 0.05 MT/Month domestic commercial wastes) waste only

4.3 Hazardous wastes (as per No Nil Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge No Not Applicable from effluent treatment 4.7 Construction or demolition wastes No Nil 4.8 Redundant machinery or Yes Only at mine closure stage. equipment 4.9 Contaminated soils or other No Not Applicable materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 5.1 Emissions from combustion of Yes From operation of diesel driven fossil fuels from stationary or machinery, trucks etc. mobile sources 5.2 Emissions from production Yes The production process involves processes drilling, blasting, excavation and crushing / screening, which will generate dust. Adequate measures will be adopted for its control. 5.3 Emissions from materials Yes Dust emissions during loading and handling including storage or unloading, storage and transportation of transport mineral 7 Form I Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data

5.4 Emissions from construction Yes Dust and vehicular emissions activities including plant and equipment 5.5 Dust or odours from handling of Yes Only fugitive dust materials including construction materials, sewage and waste 5.6 Emissions from incineration of No Not Applicable waste 5.7 Emissions from burning of waste No Not Applicable in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

8 Form I 6. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 6.1 From operation of equipment e.g. Yes Operation of trucks will generate noise. engines, ventilation plant, Besides, crushing blasting and crushing crushers & screening operations are also some of the noise generating sources. Adequate precautions will be taken to minimize the noise at source. 6.2 From Industrial or similar No Not Applicable processes 6.3 From construction or demolition No Not Applicable 6.4 From blasting or piling Yes During blasting 6.5 From construction or operational Yes plying of trucks. traffic 6.6 From lighting or cooling systems No Not Applicable 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, ground water, coastal waters or the sea: Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 7.1 From handling, storage, use or No Not Applicable spillage of hazardous materials 7.2 From discharge of sewage or Yes Excess Quarry water during monsoon to other effluents to water or the land be released into natural drain after (expected mode and place of treatment discharge)

7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable 7.5 Is there a risk of long term build No Not Applicable up of pollutants in the environment from these sources?

9 Form I 8. Risks of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 8.1 From explosions, spillages, fires Yes etc from storage, handling, use or production of hazardous substances 8.2 From any other causes Yes Accident due to human error may occur some times while operating the machinery. Training as per rule will be provided for personnel to minimize such happenings.

8.3 Could the project be affected by No The area is not prone to any natural natural disasters causing disaster. environmental damage (e.g. floods, earthquake, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 9.1 Lead to development of supporting, Yes The produced material shall be used for facilities, ancillary development the infrastructure developmental stimulated by the project which projects of the region.. could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc. • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after use of the site, which Yes Depending on Reclamation Plan could have impact on the environment 9.3 Set a precedent for later Yes Depending on Reclamation Plan developments

9.4 Have cumulative effects due to Yes There are other quarry projects located proximity to other existing or within 10 km radius. planned projects with similar effects

10 Form I (III) Environmental Sensitivity Aerial distance (within 15 km) S. No. Area Name/Identity Proposed project location boundary 1 Areas protected under No Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value.

2 Areas which are important or Yes Not Applicable sensitive for ecological reasons – Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

3 Areas used by protected, No Not Applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

4 Inland, coastal, marine or No Not Applicable underground waters

5 State, National boundaries No Not Applicable

6 Routes or facilities used by the No Not Applicable public for access to recreation or other tourist, pilgrim areas

7 Defense installations No Not Applicable

8 Densely populated or built-up No Not Applicable area

9 Areas occupied by sensitive No Not Applicable man-made land uses (hospital, schools, places of worship, community facilities)

10 Areas containing important, No Not Applicable high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11 Areas already subjected to No Not Applicable 11 Form I Aerial distance (within 15 km) S. No. Area Name/Identity Proposed project location boundary pollution or environmental damage. (those where existing legal environmental standards are exceeded)

12 Areas susceptible to natural No Not Applicable hazard which could cause the project to present environmental problems (earthquake, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

"I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: Place:

Signature of the applicant With name and full Address (Project Proponent/Authorized Signatory) NOTE: 1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden'thereon (at the stage of EC)."

3. All correspondence with the Ministry of Environment & Forests including submission "of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project."

12 Form I (IV) Proposed Terms of Reference for EIA studies. It is requested to consider this minor mineral extraction project in B2 category as per the provisions of EIA notification 2006.