STONE QUARRY Area (2.00 Ha), Village : Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra
Total Page:16
File Type:pdf, Size:1020Kb
FORM-1 Vide para 6 of S. O. 1533 dated 14 September 2006 STONE QUARRY Area (2.00 Ha), Village : Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL APPRAISAL COMMITTEE (SEAC Maharashtra) * Project Proponent Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra * EIA Consultant EIA Consultant SRUSHTI SEWA Harihar Apartment,Agresen Road, Near Adivasi Bhavan , Giripeth, Nagpur-440010(Maharashtra) Phone : 0712-688545 Email : [email protected] Accredited by NABET: No.- NABET/EIA/127/SA062/0613 Dated 26/06/2013 Form I REVISED FORM – 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14.09. 2006 (I) Basic Information: S. No Item Details 1. Name of the Project/s : Stone Quarry 2. S. No. in the schedule : 1 (a) as per S.O.1533dt 14.09.06 3. Proposed Capacity / area / length : (2.00 Ha) / tonnage to be handled/command 1000 Brass/month Stone metal or Stone area/lease area/ number of wells dust to be drilled. 4. New/Expansion/Modernization : Existing lease applied for EC Vide OM No. L-11011/47/2011-IA.II(M) dated 18.05.12 5. Existing Capacity/Area etc. : 2.00 Ha 800 Brass/month Stone metal or Stone dust 6. Category of project i.e. ‘A’ or ‘B’ : ‘B’ 7. Does it attract the general : No condition? If yes, please specify. 8. Does it attract the specific : No condition? If yes, please specify. 9. Location : Plot/Survey/Khasra No. : Survey No. 18 PART, Refer Map I Village : Deulgaon Gada Tehsil : Daund District : Pune State : Maharashtra. 10. Nearest Railway station/airport : Kedgaon Rly station :4 Km. along with distance in kms. Baramati Airport :35 Km. 11. Nearest Town, city, District : Nearest Town Kedgaon –5 km, Headquarters along with distance in kms. 12. Village Panchyats, Zilla Parishad, : Deulgaon gada Gram Panchayat. Municipal Corporation, Local Tahsil Daund body (complete postal address District Pune with telephone nos. to be given.) Maharastra 13. Name of the applicant : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare 14. Registered Address : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra 15. Address and correspondence: : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare 1 Form I Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra Name : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Designation(Owner/partner/CEO) : Partner Address : Shri Manik Baburao Kokare Shri Vithal Baburao Kokare Survey No. : 18 Part, Deulgaon Gada, Tehsil: Daund, District Pune, Maharashtra Pin Code : - E-mail : - Telephone : - Fax. No. : - 16. Details of Alternative Site : Mining is site specific activity hence no examined, if any location of these alternative sites examined. sites should be shown on a topo sheet. 17 Interlinked Projects : Not Applicable 18. Whether separate application of : Not Applicable interlinked project has been submitted? 19. If yes, date of submission : Not Applicable 20. If no, reason : Not Applicable 21. Whether the proposal involves : approval/clearance under: if yes, details of the same and their status to be given. a) The Forest (Conservation) Not applicable Act, 1980 ? b) The wildlife (Protection) Not applicable Act, 1972? c) The C.R.Z Noticefication, Not applicable 1991? 22. Whether there is any Government : Refer Annexure I Order/ Policy relevant/relating to this site? 23. Forest land involved(hectares) : Nil 24. Whether there is any litigation : No Litigation is involved pending against the project and /or land in which the project is proposes to be set up? a) Name of the Court b) Case No. c) Order/directions of the Court, if any and its relevance with the proposed project. 2 Form I * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.1 Permanent or temporary Yes The existing terrestrial configuration will change in land use, land cover undergo progressive changes due to quarry or topography including development, basalt extraction, creation of increase in intensity of land haul roads, storage dumps, reclamation and use (with respect to local land rehabilitation during quarrying and use plan) decommissioning. 1.2 Clearance of existing land, No There is no vegetation or buildings existing vegetation and buildings? in the area proposed of quarry development. 1.3 Creation of new land uses? Yes Present land use will undergo gradual changes during quarry life due to quarry development, basalt extraction, storage, reclamation and rehabilitation. The new land use at the end of quarry life will be as follows. 1. Mined-out void shall be converted in a water body. 2. Plantation in the open space. 1.4 Pre-construction investigations No Not Required e.g. bore holes, soil testing? 1.5 Construction works? No - 1.6 Demolition works No No demolition work is involved in the proposed mining lease area. 1.7 Temporary sites used for Yes Temporary structures are made to meet the construction works or housing needs of construction, manpower of construction workers? machinery deployed and sanitation facilities. 1.8 Above ground buildings, Yes Surface infrastructures like mine office & structures or earthworks stores, crushing & screening plant, first aid including linear structures, cut station, etc. and fill or excavations 1.9 Underground works including No Not Applicable mining or tunneling? 3 Form I Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.10 Reclamation works? Yes Reclamation plan will be prepared and approved from competent authority before closer of mine. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing Yes The quarrying will be carried out by processes? opencast method. 1.14 Facilities for storage of goods No Extracted Mineral will be dispatched or materials? directly, transit storage at site. 1.15 Facilities for treatment or Yes Solid Waste OB is Stored within lease disposal of solid waste or boundary along the periphery. liquid effluents? Liquid Effluent: There is no effluent generation. The quarry dose not intercepts the water table. Only rain water is accumulated in the pit during monsoon which is used for plantation & dust suppression etc. 1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea traffic No • Existing road network is adequate for during construction or transportation of produced material. operation? • No transportation by Sea. 1.18 New road, rail, air waterborne No • Road : Not Applicable or other transport infrastructure including new or altered routes • Rail link : Not required and stations, ports, airports etc? 1.19 Closure or diversion of No Not Applicable existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not Applicable lines or pipelines? 1.21 Impoundment, damming, No No crossing of natural drainage culverting, realignment or other changes to the hydrology of water courses or aquifers? 4 Form I Details thereof (with approximate Information/Checklist Sr. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of No Not Applicable water from ground or surface waters? 1.24 Changes in water bodies or the No No seasonal streams falling within the ML land surface affecting drainage area . or run-off? 1.25 Transport of personnel or Yes As far as possible, local people from materials for construction, surrounding villages will be engaged. The operation or transportation of personnel and decommissioning? construction materials by road. Existing road network is adequate. 1.26 Long term dismantling or Yes Mine will be systematically closed as per decommissioning or decommissioning plan, which is prepared a restoration works? few years prior to mine closure. 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Company employees except the local either temporarily or employees. permanently? 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or No No ecological losses genetic diversity? 1.31 Any other actions? No Not Applicable 5 Form I 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supply) Details thereof (with approximate Information/Checklist quantities / rates, wherever possible) S. No. Yes/No confirmation with source of information data 2.1 Land especially undeveloped or No Private Land agricultural land (ha) 2.2 Water (expected source & Yes Dust Suppression