National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State/ UT of

Overall status of the State: I. Total Population: 6,86,21,012; Urban Population 1,10,80,776, Rural Population: 5,15,40,776 (As per census of 2011).

II. Estimated Sewage Generation (MLD): 1550.81 MLD

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 80 and 999.18 MLD  Capacity Utilization of existing STPs: 694.54 MLD  MLD of sewage being treated through Alternate technology: 17 KLD through FSSM.  Gap in Treatment Capacity in MLD: 304.64 MLD (existing Capacity – capacity utilized)  No. of Operational STPs: 80 and 999.18 MLD  No. of Complying STPs: 22  No. of Non-complying STPs: 39

Details of each existing STP in the State No. Location Existing STP Capacity Being Operational Status Compliance Capacity Utilized of STP Status of STP As per Annexure_1

Details of under construction STPs in the State No. Location Capacity of Physical Status of I&D or Incremental Completion the plant in Progress in House sewer progress Timeline MLD % connections As per Annexure_2

1

Details of proposed STPs in the State No. Location Capacity of Status of Project (at Incremental Likely Date of the STP DPR Stage/ Under progress Completion proposed in Tendering/ Work to be MLD Awarded) -

IV. Details of Industrial Pollution:  No. of industries in the State: NA  No. of water polluting industries in the State: 1199  Quantity of effluent generated from the industries in MLD: NA  Quantity of Hazardous Sludge generated from the Industries in TPD: 834.03 TPD  Number of industrial units having ETPs: No. of ETPs-1167  Number of industrial units connected to CETP: 4618  Number and total capacity of ETPs (details of existing/ under construction / proposed) o Total ETPs: 1167 o Total installed capacity: 3173.61 MLD  Compliance status of the ETPs: o Complying ETPs: 1129 o Non-Complying: 38  Number and total capacity of CETPs (details of existing/ under construction / proposed) o Total CETPs: 16, (14 Operational, 01 under construction and 01 closed) o Total installed capacity: 159.88MLD  Status of compliance and operation of the CETPs o Complying CETPs: 03 o Non-Complying: 11  Status of compliance and operation of the CETPs Complying CETPs: 03 Non-Complying: 11

Town No. of industries Industrial Status of ETPs Status of CETPs

2

discharge (existing, under construction & proposed) NA NA 46 1 NA NA 443 1 NA NA 5 0 Baran NA NA 8 0 Barmer NA NA 112 3 Bharatpur NA NA 1 0 NA NA 35 0 NA NA 78 0 NA NA 28 0 NA NA 8 0 NA NA 1 0 NA NA 7 0 NA NA 3 0 NA NA 20 0 NA NA 139 3 NA NA 1 0 NA NA 4 0 NA NA 5 0 NA NA 11 1 Kota NA NA 43 0 NA NA 05 0 Pali NA NA 48 7 Rajsamandh NA NA 4 0 Sawai NA NA 2 0 Madhopur NA NA 16 0 NA NA 22 0 Shri NA NA 19 0 Ganganagar Tonk NA NA 8 0 NA NA 45 0

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population : 196  Current Municipal Solid Waste Generation: 6500 TPD

3

 Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc a. Running Centralized Plants-08 with capacity of 947 TPD b. Running MRF- 66 Nos with capacity of 450 TPD  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) Installed capacity are running as full utilization  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) a. 50 TPD Plant is running in Udaipur Municipal Corporation b. 300 TPD plant LOI has been issue by Jaipur Municipal Corporation  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source a. Total wards are 5389 and door to door collection is 99%.  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) a. Details are attached at Annexure-1  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline Details are attached at Annexure-1

VI. Bio-medical Waste Management:  Total Bio-medical generation: 20685.65 kg/day  No. of Hospitals and Health Care Facilities: 8584

4

 Status of Treatment Facility/ CBMWTF: Details are attached at Annexure-2

VII. Hazardous Waste Management:  Total Hazardous Waste generation: 562463.96 MT  No. of Industries generating Hazardous waste: 1633  Treatment Capacity of all TSDFs: 760481 MTA  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated: 150462.41 MT  Details of on-going or proposed TSDF: NIL

VIII. Plastic Waste Management:  Total Plastic Waste generation:  Treatment/ Measures adopted for reduction or management of plastic waste:

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment: Drain identified for contribution in River in Kota Region.

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Chief Secretary Review is being held regularly. XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: As per Annexure Action Plan XV. Good irrigation practices being adopted by the State: As per Annexure Action Plan XVI. Rain Water Harvesting: As per Annexure_Action Plan XVII. Demarcation of Floodplain and removal of illegal encroachments: As per Annexure_Action Plan XVIII. Maintaining minimum e-flow of river: As per Annexure_WRD XIX. Plantation activities along the rivers: As per Annexure__Forest

5

XX. Development of biodiversity park: Development of Abheda Biological Park Kota is under progress and is likely to be completed by March 2021 XXI. Reuse of Treated Water: As per Annexure_Action Plan XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring.

*Note: Incremental progress made by the State/UT in each activity to be provided.

6

351 Polluter Stretches in the country

Name and designation of designated officer for ensuring compliance to provisions under statute: Compliance being made by co- ordination among all concerned Departments with RSPCB. Matter does not fall under any statute.

Current Status Desirable level as per statutes Gap between Current status and desired Timeframe for levels addressing the Gap

Contamination reaching 1. Characterization of runoff of Kota: Samples were collected from main Continuous river stretch due to first main drains for first four storm drains (Municipal drain and nallah joining Process flush water flows, Outcome would be: river Chambal) on 23/08/2019 and I. Identification of most 09/09/2020. Analysis results reveal that contaminated drains and drains carrying untreated domestic effluent. level of contamination II. Quantity of water to be Pali: Samples were collected on 14.08.2019. handled, based on As per analysis results BOD level has been available flow data found as 1.17 mg/l which is well within the prescribed level i.e. more than 6 mg/l (10-20 mg/l) for polluted river stretches.

Jaipur: Samples were collected in June & August 2019 and analysis report shows pesticide below detection limit. First meeting of Special Environment Surveillance Task force was conducted on 02.04.2019 at District Collectorate Jaipur. During meeting it was decided that

Rajasthan State information being submitted to CPCB Page 26

stakeholder departments will be informed to work out for characterization of runoff of main drains of nevta dam for first four storm water flows. i. For Kota UIT has started the work. Nagar Nigam has collected samples from various nallahs for sewerage analysis and submitted to RSPCB for analysis. ii. Six drain are identified in municipal area which is discharge into chambal river. Two waste water treatment plant proposed for treatment of drain water. Land allotted for WTP & FSTP Plant demarcation of land is done and leveling sheet of exiting land topographical map of town prepared. soil testing of proposed land submitted to MNIT. Work order for making DPR has been issued for the establishment of Waste Water Treatment Plant. DPR has been prepared and submitted for Budget approval. 13 Crore Fund will be required for construction of integrated wastewater and Septage management plant. Budget provision not approved by Finance Department and ULB doesn't have funds. ULB has installed the gratings and regular cleaning is being done at all 06 Drains. Timeline:-

Rajasthan State information being submitted to CPCB Page 27

2 Years after budget availablity. Budget:- 13 Crore required. iii. RSPCB collects samples from the identified water bodies for pre-monsoon analysis. Samples have been collected in Bharatpur on 26.06.2019 and Jaipur in June 2019 at Nevta Dam.

2. Based on 1st step, design of i. Six drains have been identified by Feb. 2020 detention basin, if needed K'patan and action on detention plan will be taken after DPR preparation. DPR has been prepared and it is under submission. 13 Crore Fund will be required for construction of integrated wastewater and septage management plant. Drains are chocked before Clearing of drains and disposal i. WRD Department: Being done as regular Before arrival of monsoon of extracted material before activity pre-monsoon, every year by Water next monsoon (Till monsoon. Resource Department, however, May 2019) contamination still reaching rivers in first flush. ii. RIICO In RIICO industrial area cleaning of drain and disposal of extracted material is a ongoing process.

For FY 2019-20:

 Expenditure = 38.26 Lacs

Rajasthan State information being submitted to CPCB Page 28

 Physical achievement= 22.0 km drain length has been cleaned and repaired with immediate lifting of sludge in RIICO I/A located in Kota city .  For current FY 2020-21:

There is a financial provision of Rs 32.00 lacs for cleaning & repairing of 26.0 km drains in RIICO I/A located in Kota City.

 For cleaning& repairing of drains before coming monsoon , W/o of amounting Rs 30.89 lacs has already been issued for IA IPI, Chambal and Electronic complex. Presently works are under progress. LSG Department: iii. All drains of municipal area are cleaned in month of May & June 2020.

Rajasthan State information being submitted to CPCB Page 29

Biomedical waste disposal Monitoring and technical Jaipur: Joint inspection of CBMWTDF by 12 months after auditing of Bio-medical waste RSPCB & Health Department, GoR on award of work and treatment and review/monitoring 31.07.2019. environmental of processing plant. clearance. Kota:

 At present, there is no CBMWTDF at Kota.  Presently, M/s Hoswin Incinerator, Jhalawar (CBWTDF) has been authorised by Nagar Nigam, Kota (under working arrangement) for disposal of biomedical waste generated from HCFs of Kota and Bundi districts. M/s Hoswin Incinerator, Jhalawar was inspected on 25/06/2019 and 03/02/2020.  Work order has been given to M/s Bio- medical Waste Disposal Agency for establishment of new common facility (under working arrangement) by Nagar Nigam, Kota. Lease deed is under process.

Currently Bio Medical waste of Kota and is being treated at Jhalawar Plant. Runoff from agriculture Adopting water conservation i. Subsidy to the farmers is being granted One year fields is reaching river practices like drip and sprinkler for the use of drip and sprinkler irrigation stretches. irrigation systems Agriculture systems, by Agriculture Department. department should collect

Rajasthan State information being submitted to CPCB Page 30

Also, fertilizers and information on irrigation water ii. Director, Agriculture Research Station, pesticides are found in river used/hectare for different seasons Durgapura, Jaipur has been requested by water for different crops for different RSPCB to do the same as per action plan. areas and evaluate whether the iii. For preventing runoff from agriculture use of irrigation water/hectare fields and increasing water use has decreased or not. efficiency, some efforts are being made to promote drip and sprinkler irrigation systems in the region. During the year 2018-19, an area of 875 hectares and 261 hectares has been covered under sprinkler and drip systems respectively. An area of 2500 hectares and 900 hectares is proposed to be covered under sprinkler and drip systems respectively in Kota &Bundi region during the year 2019-20. iv. In the region, 74 farm ponds on individual farmer fields and 01 community farm pond have been constructed to collect the runoff and reuse it for irrigation purpose in general and for life saving irrigation purpose in particular. RSPCB: Samples were collected from:

a. D/s of Kota Barrage, Kota at Karbala (Kota stretch);

Rajasthan State information being submitted to CPCB Page 31

b. U/s near Shri Raj Rajeshwar Mahadev Temple (Keshoraipatan stretch); c. Keshoraipatan D/s near Keshoraipatan (Keshraipatan Stretch); d. Kota Barrage at Kota at Karbala, River Chambal; e. Distt- at Rameshwar Ghat, Bathing Ghat, River Chambal; f. River Banas, Distt. Sawai Madhopur, Nar Banas Bridge, Lalsoth to Sawai Madhopur Road; g. Nevta Dam, Jaipur, Rajasthan.

The analysis report shows all tested pesticides below detection limit (Detection limit was 0.1 ng/l,) Adopting best management i. Agriculture department is already taking One year practices for fertilizer and actions to minimize the use of fertilizers pesticide usage. However, like and pesticides. runoff spatial and temporal data ii. For minimizing the use fertilizer & may be collected and analyzed pesticides, organic farming is being promoted in the region. 100 clusters of organic farming have been created covering an area of 2000 hectares and 4864 farmers. 64 training programs for

Rajasthan State information being submitted to CPCB Page 32

promoting organic farming have also been organized thus benefiting 4540 farmers. iii. 115501 Soil health cards have been distributed in Kota and 153423 Soil health cards in Bundi district to the farmers for balanced use of fertilizers. For minimizing indiscriminate use of pesticides, 30 training programs have been organized for promoting integrated pest & management practices. Farmer education for reducing Designing of mass awareness program in Six months to runoff, use of fertilizer and vernacular language for farmers is being design such pesticides as well as reducing done. training workshops groundwater over exploitation and then next one etc. Also, organic farming must year for organizing be encouraged in these stretched. such workshops at regular interval (twice every year)

Monitoring presence of pesticides in water samples At regular interval including analysis of other (suggested twice groups also in addition to organo- every year) chlorines Agriculture department: The one time sampling report available shows the presence of DDT much below the standard limit.

Rajasthan State information being submitted to CPCB Page 33

RSPCB:

Samples were collected from:

a. D/s of Kota Barrage, Kota at Karbala (Kota stretch); b. Keshoraipatan U/s near Shri Raj Rajeshwar Mahadev Temple (Keshoraipatan stretch); c. Keshoraipatan D/s near Keshoraipatan (Keshraipatan Stretch); d. Kota Barrage at Kota at Karbala, River Chambal; e. Distt- Sawai Madhopur at Rameshwar Ghat, Bathing Ghat, River Chambal; f. River Banas, Distt. Sawai Madhopur, Nar Banas Bridge, Lalsoth to Sawai Madhopur Road; g. Nevta Dam, Jaipur, Rajasthan.

The analysis report shows all tested pesticides below detection limit (Detection limit was 0.1 ng/l,)

During SESTF meeting dated 07/01/2020 and 18/03/2020 at Kota, representative of Agriculture Department, Kota informed that they don’t have funds to get the samples

Rajasthan State information being submitted to CPCB Page 34

tested. He was advised to get the samples tested at Agriculture Laboratory, Durgapura Jaipur in the same way RSPCB got the samples tested Solid waste dumping sites Develop landfill site with LSG Department: without proper sanitary leachate collection (with its i. In Kota, 04 time waste to energy landfill sites scientific treatment before processing facilities tendering has been done. Tender was not finalized disposal) and monitoring well because first time EMD forfeited and in remaining case no bidder turned up. 5th time waste to compost tender was done but no bidder turned up. ii. Again, Waste to Compost tender shall be invited after preparation of DPR. The tender has been invited for preparing DPR. iii. Ground water monitoring will be done by concessionaire. iv. Construction of MRF shade work is complete. Door to Door collection is happening. Tender invited to Solid Waste Management facility and is under approval. According to the rules of Solid Waste Management Rules 2016, for disposing of transported solid waste, scientific landfill is required to be developed at a distance of 500 meters from the population area. Due to non- availability of land at a distance of 500 meters from the population area near the municipality, the proposal for allotment of land has been sent to Tehsildar Tehsil

Rajasthan State information being submitted to CPCB Page 35

K.patan by selecting suitable land Khasra number 1255 acre 6.64 ha and Khasra number 1264 acre 5.16 ha. After the allotment to the land municipality, a tender will be invited for the construction of Landfill Plant. Currently waste is being segregated at dumping site and RDF is being prepared.

RIICO:

i. For collection of industrial solid waste from stone industry, RIICO has earmarked dumping sites (12500 sqm.) In Indraprastha industrial area Kota. ii. At present SPV- Pashan Welfare Society (created by stone based industries of Kota) is utilizing waste produced by Kota stone industries for making of Tiles, Bricks, and Interlocking Tiles etc. Pashan Welfare Society is working from 16 June 2018 and till date approx. 7000 MT stone slurry and about 9000 MT waste (Kota Stone Pieces) has been utilized for making Tiles, Bricks, Interlocking Tiles etc.

Industrial untreated/ Drains passing through industrial RSPCB: four times every partially treated waste is area must be identified and

Rajasthan State information being submitted to CPCB Page 36

reaching river in Kota marker pollutants (based on  Samples of effluent from drains passing year monitoring by stretch industries) should be regularly through industrial area were collected on RSPCB at regular monitored. Steps should be taken 02/08/2019 and found compliant of interval to prevent any violations and effluent standards.  Samples of the treated effluent being punitive action initiated on recycled/ reused and being discharged by continued violations. industries (M/s Shriram Rayons, Kota & M/s DCM Shriram Limited, Kota) were collected on 02/08/2019 and found compliant of effluent standards.  Samples from these points were re- collected on 05.11.2019 and 06/08/2020.  Ground water samples of non-PHED tube wells/ hand pumps located on both the bank of River Chambal () non-PHED tube wells/ hand pumps located on the bank of River Chambal (Bundi District) were collected on 08/04/2019 & 09/04/2019 (Kota) and on 17/05/2019 (Bundi) to identify infected tube wells/hand pumps (if any).  Analysis report revealed presence of coliform in all the samples of non-PHED tube wells/ hand pumps located on both the bank of River Chambal.  Analysis report revealed 4 out of 15 tube wells of Kota and 2 out of 11 tube wells of Bundi have potable water and rest are infected and the infected tube wells are to be either recovered or to be abandoned by the PHED at Bundi and jointly by PHED & Ground Water Department for Kota District as decided in the SESTF Meetings

Rajasthan State information being submitted to CPCB Page 37

at Bundi and Kota respectively. Letters in this regard have been issued to the PHED & GWD on 16.03.2020.  As decided in the SESTF Kota meeting dated 16/09/2020 sampling of all the borewells be again carried out post- monsoon and be tested by PHED, samples being collected.  During SESTF meeting dated 01/07/2019, Chairman (Additional District Magistrate -Administration, Kota) directed Jr Hydrogeologist, Ground Water Department to take necessary action for recovery of these ground water sources by the way disinfection otherwise abandoned these ground water sources.  Meetings of Special Task Force of Police Department:  STF, Kota (Kota) – Last meeting was held on dated 08/04/2019, 01/07/2019, 18.10.2019, 8/1/2020 & 18/03/2020, 17.06.2020, 16.09.2020.  STF, Kota (Bundi) – Last meeting was held on dated 16/05/2019 & 27/1/2020, 30.06.2020, 16.09.2020.  STF, Jaipur (South) – Last meeting was held on dated 02/04/2019, 02.09.2019, 05.08.2020.  STF, Pali (Sirohi) – Last meeting was held on dated 09/04/2019.  STF, Bharatpur (SawaiMadhopur) – Last meeting was held on dated

Rajasthan State information being submitted to CPCB Page 38

09/04/2019, 10.08.2020, 24.08.2020, 14.09.2020, 28.09.2020 Recycling of treated effluent by i. RIICO is agreeing to provide all Three months industries itself by treating trade possible assistants to RSPCB for effluent up to reuse level. Check motivating industries for reuse of compliance. treated trade effluent. RSPCB has been informed accordingly by RIICO vide letter dated 07.03.2019. ii. For environmental management and pollution control in Industrial Areas, RIICO incorporated various clauses in RIICO lease deed. iii. To bind the Lessee with term and conditions imposed by RSPCB in CTE/CTO, RIICO incorporated following clause in lease deed. iv. As per Lease Deed, clause (4a)…….. "The Lessee shall obtained all requisite clearances/consent/ approval/authorization from the competent authorities such as MoEF&CC, SEIAA, CPCB, RSPCB, CGWA etc. for the project/industry. The lessee shall also observe and comply with the terms and conditions so imposed by aforesaid authorities and shall also strictly adhere the guidelines/directions/orders issued from time to time in this regard.

Rajasthan State information being submitted to CPCB Page 39

v. Sample of treated effluent being recycled/reused & being discharged by M/S Shriram Rayons Kota & M/S DCM Shriram Limited Kota have been collected on 1.4.19 by RSPCB.

Identification of clusters of During the meeting dated 08.03.2019 Six months for small-scale industries in the Kota under chairmanship of CS, after DPR preparation city. CETP should be establish discussions it was informed that no CETP and tendering for these clusters has been proposed for Kota industrial area process as there is no requirement of the same at present.

Out of 33 drains monitored Identify reason for high BOD Six drain are identified in municipal area Six months one time in Kota, some have (open defecation, leaching from which is discharge into chambal river. Two high BOD range. solid waste dump site, and waste water treatment plant proposed for Similar in Keshoraipatan contributions from some small treatment of drain water. Land allotted for area scale industrial/commercial WTP & FSTP Plant demarcation of land is clusters). Take scientific done and leveling sheet of exiting land measures to control that. Action topographical map of town prepared. Soil based on analysis. testing of proposed land submitted to MNIT. Work order for making DPR has been issued for the establishment of Waste Water Treatment Plant. DPR has been prepared and submitted for Budget approval. 13 Crore Fund will be required for construction of integrated wastewater and septage management plant. Budget provision not

Rajasthan State information being submitted to CPCB Page 40

approved by Finance Department and ULB doesn't have funds. ULB has installed the gratings and regular cleaning is being done at all 06 Drains. Low level of BOD in Explore possibility of closed A. Close conduits Six months to sewage reaching existing conduit sewerage system for STP i. It is stated that the work of package RBS- identify sources of STP. Microbial growth or identify sources of dilution and 02 regarding construction of 30 MLD & leakage and would be adversely affected propose action plan for the same. related sewer lines is rescinded due to slow propose action on due to low BOD. progress of work by the UIT Kota after the same. prior approval of UDD on 3.8.2016. ii. For completion of remaining work under this package revised proposal has been submitted to UDD. iii. Till the rescind date closed conduit of 1000/1200 mm diameter RCC pipes NP4 is already laid in a length of about 1200 mtr upstream of 30 MLD STP, which carries flow of SajidehraNallah to receiving chamber to 30 MLD. The low level of BOD reaching 30 MLD is due to collection of carries flow of SajidehraNallah as sewerage network. iv. After receiving revised A&F sanction of remaining work balance sewer lines will be laid & property connection will be done to get raw sewage. Water pipeline leakage. v. As per MNIT report, low level of BOD in sewage is also due to leakages in water

Rajasthan State information being submitted to CPCB Page 41

pipeline which would be controlled by PHED. Seepage from canal: vi. The FSL of CRMC is at lower level as compared to invert level of open drains. Hence possibility of seepage from canal is not practical. In Kota additional 55MLD Ensure diluted sewage is not i. In Kota, two STP of 30 MLD and 20 +6 MLD STPs are under reaching planned STPs. MLD are working. process. This would lead to Explore possibility of closed ii. Total 05 STP's are proposed under 65% population coverage conduit sewerage system for STP different scheme with the total or else possibility of capacity of 78 MLD. Work of all 5 decentralized STPs to avoid STPs is under progress and will be dilution by other streams than completed by 2022. After completion domestic sewage of these STP's total coverage will 80% In Kota. iii. Timeline:- June 2022. iv. Budget:- Total cost is 584 Crore and being executed From RUIDP Fund. v. A&F sanction of remaining work, balance sewer lines will be laid & property connection will be done to get raw sewage. 35% of Kota population is Faecal sludge characterization i. For remaining 35% population of still not covered under lab may be established in any Kota the co-treatment of faecal sludge sewerage system. existing institute/research lab. is proposed in existing STP by Also, no sewerage system at Scientific management of faecal RUIDP. Keshoraipatan. sludge should be carried out for ii. Two STP of 30 MLD and 20 MLD are on-site treatment facilities. working.

Rajasthan State information being submitted to CPCB Page 42

For remaining 35% population in iii. Total 05 STP's are proposed under Kota the co treatment of faecal different scheme with the total sludge is proposed in existing capacity of 78 MLD. Work of all 5 STPs. STPs is under progress and will be Similarly, in Keshoraipatan, completed by 2022. After completion concept note for FSTP is made of these STP's total coverage will but funds not allocated 80% In Kota. iv. Timeline:- June 2022. v. Budget:- Total cost is 584 Crore and being executed From RUIDP Fund. vi. For Keshoraipatan Work of DPR for Integrated Wastewater and Septage Management Plan has been given to NIUA by LSG Department. NIUA submitted the feasibility report for the work and total cost of the project will be Rs 10 crores made by MNIT. Due to Non availability of land till April 2019 the DPR work could not started. Land for Waste treatment plant and for FSTP has been allotted at Keshoraipatan by Collector Bundi in June end. Direction has been issued to ULB for preparing the DPR by tendering process. DPR has been prepared and it is under submission. 13 Crore Fund will be required for construction of

Rajasthan State information being submitted to CPCB Page 43

integrated wastewater and septage management plant.

Poor ghat/temple Public toilets must be prepared. Three community toilet constructed K.patan Six Months management leading to Proper solid waste management Chambal river bank & all are in functional pollution of river at system should be developed. condition Keshoraipatan (Also, at Rangpur, other side of Chambal river) It was discussed that Similar monitoring and action i. None of the sources have been found to Six months periodic water quality must also be taken on non- be infected, in PHED’s database of water assessment of all tube drinking water TW/HP of these quality assessment of TW/HP used for wells/hand pumps stretches. Standard for non- drinking purpose, of the area suggested (TW/HP) used for drinking drinking TW/HP must be framed. by MNIT (Akelgarh, Rangpur, water purpose is made. Database of such reporting and Keshoraipatan & Nevta Dam) Also, an immediate action taken must be available ii. Concerned District collectors are taking remedial action of sealing action for the assessment of non-drinking of infected TW/HP is taken. water TW/HPs. Subsequently if it is determined that infected TW/HP could be recovered by disinfection, it is recovered, and otherwise it is abandoned. However, no database of such action is easily available Over exploited Many RWH structures RWH structures which had been constructed Maintenance for groundwater regions in constructed. by WRD Department in Kota – next year must Kota, Keshoraipatan and Keshaoraipatan stretches have been handed start from March Nevta Dam stretches over to Gram Panchayat. Maintenance of 2019.

Rajasthan State information being submitted to CPCB Page 44

Regular monitoring and these structures is to be done by Panchayati maintenance must be carried out Raj Department. No RWHS are constructed before monsoon in the catchment of Nevta Dam by WRD. Requirement of e-flow must E-flow of 5000 cusec released Compliance is being made. E-flow of 5000 be maintained for 35 minutes from Kota cusecs for 35 minutes in river Chambal is Barrage every Monday during being released from Kota Barrage. on each non-e-flow period only, i.e. all Monday. Mondays during January to Date Water Remarks onset of Monsoon. released in cusec 06.1.20 5100 13.01.20 5128 20.01.20 5120 27.01.20 5128 03.02.20 5128 10.02.20 5128 17.02.20 5128 24.02.20 5128 02.03.20 5128 09.03.20 5128 16.03.20 5128 23.03.20 5128 30.03.20 5084 06.04.20 5034 13.04.20 5055 20.04.20 4970 27.04.20 4848 04.05.20 4874 11.05.20 4938 18.05.20 4862 25.05.20 4982

Rajasthan State information being submitted to CPCB Page 45

01.06.20 4894 08.06.20 5040 15.06.20 4996 22.06.20 4918 29.06.20 4996

122 Non-attainment cities

Name and designation of designated officer for ensuring compliance to provisions under statute: Matter does not fall under any statute. Nodal department for monitoring is Department of Environment, GoR.; The officials mentioned below are from RIICO: Jaipur: Satish. K. Gupta (Sr. DGM), Ajay Gupta (Sr. DGM), Mahendra Singh (Sr. RM), R.K.Singh Ruhela (Sr. RM). Udaipur: Sanjay Nenavati (Sr. RM) Kota: Sunil.K.Garg (Sr. RM) Jodhpur: Sanjay K. Jha (Sr. RM),Kuldeep Dhadich (RM) Alwar: Aditya.K.Sharma (Sr. RM) Sl. Item Source Current Status Desirable level Gap between Timefra No group as per statutes/ Current status me for approved action and desired addressi plan levels ng the Gap

Rajasthan State information being submitted to CPCB Page 46

owfdq alfrftfr sqrq gw dq slz76 (1-*"r1 vqvnn dqg( inrq-d\rvqdt ?ffq,.+tqi, gtclFgrenr g€m{iF. qqgs_sozool rqrenF-o elr,Sa Fr*n) ftFn, Ailq w ftiero, q-qt{ioT fr.,1rl q-qg{ Rl-Renc.

ftEq :-submission of State Dossier and Monthly progress Report (MpR) to Central Monitoring Commitee in Matter of O.A. No. 673/20tg. qr+f :-erqOf !:{ @-qf6-s.xo o6(31/Env/20r7 ftqiO_re rr zozo. T6)qs,

q-r Bq0-ff liirq.qrm.in r4sffi-d d o-q { qr+ftq W.dr.O. o1 efR-w+o ;r1q\ qrE$ \drdclq 673/2018 d i EilH G q-qd c-fi d ftqlt w o-qrt qq of qrft-f, rt Eefitu'r c.rft Rfd gd s-gg-d o1 qr g+t B (cfr g{, e-f,q) asTr Tw|fo droqs G-crrd-q) tnt Format eq-a-er orrit deir q6,ff erq,ro Orrii fu.sm G)fu'w d fu'c fr-gerI or r+qd$ qrfl.t fu-qr r ro'q-sqoEeT{

TS-drqT,

,^St^.,,g- (RTqT q6-{) erfrftff cqFr gq c=r s{Ettn, (,t-sqer"T) {K*en-q. qqg{

D:\All letter and file parewa\Tejendra pal singh\kaarmik.docx orqfdq aftfu yqq W Fr vwv (q.-lvt'ttrvr) wftn,n, wirdl qrfi, flqnr riprtff.o eta, wqqc_gozooa ({rs.) Cw 08( )Nar7t /\q./201647 / AUgs 22lq 2+ w ft*{rfi. qq{svw ftqFT -q'qgq clstTsr|;I,

ftT{l:-submission of Monthly progress Reports( I\IPR to Central ,::0 Monitoring Commitee in Matter of O.A. No. 673r qEd{rTc"d orqfdq qrT q" @-qrfi-F.No 12(83)/Env/20: 15.07.18. c-dcq,

scciffi ftvqmrf-d riEffi-d tr{doqitftfs-{tfoq ix-{.fi.a. qft 3lifu-q-f, \'fr1'q TR-{ o7sl201s d qW it qqm vq qq-d .'lql d frrflt c-{ m-trt W qe{ttq'ur of errrqn 2o2o da'.bt qfto. errfr ffid Trf,rr

$ct.1-$c|(trg$rt

qq:-

str (Rret oTfrfrfi qqn (q-{i{eTor) -// c

D:\All letter and file paqewa\Te.iendra pal singh\kaarmik.docx clql hl H (91I

qi TRet-6 ,T{I Glcl,\r tq

1 t.qdi T|qId 50 20r4-t5 r0000 2 n+dr -llq l'5 5(I 2014-t5 10000 -J 3 erDrqN) nqn* 5(l 20 t4-15 t0000 4 \111t '.] | -l tq i.5 5(r 20t4-15 10000 Uq qi (l (tilq'1, q -tfullq 5 vr$q eE-f, qgvld R"a-qrel-q RDF' 5(, 2015-16 25000 6 ft-f,qlqT-fr RDF 5C 20r5-16 25000 7 \5lcli RDF 5C 20r5-16 25000 qcDerI{I 8 -.-_Jttqt.5 50 2015-16 10000 9 qr€Ef{f nrflrt 50 2015-r6 10000 ]Tf,I .--.--'-_t.l 10 t6t l{i 50 20t 6-17 I 000c1

s-t s{e 6,{al \rltq, a tc { ,.-'1 Sakatpura Campa 50 20l4-l5 27000 2 Sakatpura - A Cam pa 50 201 5- l6 25000 3 E;I rwem, Tqffs Sakatpula -B Campa J .18 20t6-t7 r7000 4 Tg Tqflr {Sq serq, Akelgarh Nabar,l 50 2013-14 10000 5 BoLkui Nabard Cptcl 50 2015-16 r 0000 b Sakatpura - II Nabarrl 50 20r5-r6 r0000 7 Sakatpura - III Nabard 4< 2016-17 9000

8 Sakatpura - IV Nabard U 20t6-17 I 0000 q;I sftrd

1 uflft-qrdT Nabard 50 2013-14 10000 2 rTdqf{-1 Nabard 50 20t3-14 t0000 3 -x--q\\5 Campei 50 2013-14 I0000

4 ddfqrdr tr{qrq -- r Nabald 50 2013-14 I 7000 TIGcIR_TI 5 Nabarcl 50 20r4-15 I 0000

o d$ql-dT E-{qTq il Nabard 50 2014- l5 10000 gq zt{ 7 ${effi , 6i-fr ]T6qT{-ITI Nabald 50 .20 I 5- 16 10000

8 gTR-T Nabard 50 201 5- 16 10000

9 gTR*TI Nabard 50 2015-16 10000 qR cci 6T f6rtT{ oT qf.riT 50 1016-17 25000 10 qilrq)q"oT

11 sq$r Nabard 50 20t6-17 t0000 'J.2 1\sll Campa 4 95: l0l6-17 3500 T.nq8-r II 20 r0 7000 1l 20 r0 8500 1: 201 0 900 I. 20 r0 rsq [. 201 0 $o C 20t0 5000 ! 20t 0 5000 5 U 201 0 r0000 5 2010 r000 5 2011 r0000 5( 20il r0000 5( 201| w ++ mao. utagr i2000 5C 201 1 500 50 20ll r000 50 20t2 r0000 r0c 20 t2 20000 50 2013 25000 50 20t3 2s000 50 20t3 25000 50 20 t3 25000 50 2014-15 35000 50 20t5-t6 3 5000 50 2016-17 10000 s0 20 t 6,t7 r0000 50 20 t 6-)7 r0000 50 20 | 6-t7 r0000 ql TReffi q'q dq, gq qq s{ero gq w e}-a fttpTo &-fiq wTsrer)-{ zvtJ-t4 r0000 eTq qRmq-fl ft*+fr

20t8-19

.^St.,'.i-. (iPr?rr q-d-{r)

srft r. rT;r5Cq Tr FTerF, 1T Tiy,. $qi€n{, u-q!{ l: I 1_ r;I. Uqqr

6.H. SI]I!'€NT OI flq o|fierd qIvHl 6'r ilq Hqs sd qlqi al*qT

q{l a.r T{tt6 3ra{ l? 1 Ert'$Td RFBP 60 2006 I0000 2 rTdg-sr RFBP 50 2006 25000 3 4lRl FDA 50 2009 10000 qq{l I'DA 50 t0 r0 10000 5 clt19l FDA 50 2010 10000 6 Flt\rt6 Canpa AllR 50 20 r:l t0000 1 iq{rqr gs RFBP RDF^I i5 20 ll 17500 8 ffiqi RFBP RDF.II 50 20t4 10000 9 snhifAqr RFt]P RDl].II 5U 2011 t0000 10 =.1+dg.rq fiDA A^NR 50 2014 10000 't1 u9 ql n,(fl(f), tniliRqr S. Plan RDF 50 2014 25000 '12 m-c|4reT cptcl RFBP RD.F-I 35 2015 17500 13 IErrT'r RFBP RDII-I1 50 20 t5 r0000 T4 IIq|lT{I RFB P-F\I/P 25 2015 20000 15 g\nt(sl S, Plan RDI. 50 2015 25000 1,6 cplcl RFBP.RDF 50 20t6 2 5000 !7 rrrorfr q-or S. Plan RDF 50 l0l6 25 000 18 qzlT;lrf{i RFDP.RDF II' 50 2016 I0000 19 3nsr qftql S, Plan RDF 50 20t6 25000 20 oib-q Wr Canrpa A\lR 50 20t6 r0000 2r ordi re-rg za i-{-{ Crnrpa AlrlR l8 20 t9-20 5 600 22 r<{q o}-gr 2o1e-20 50 *r-{ S. Plan Rl,F 50 20:0..: r 25 000 mrrtati6 1 Campa 50 20 t9-20 10000 2 Campa 50 2020-21 10000 3 Campa 50 3014.t5 10000 4 Nabard 50 20t4, t5 t0000 gq ?FI rl-{effi \rq F 5 E6-f,Iq-r rtsd 3rffi (\a{.fr Nabard 50 20 t3- I.1 r0000 6 qFfitq-ll a)ea(mngr Nabard 50 20ti- i4 10000 7 Itfq{ T|{q MJSA.II 5 2017 - 18 t000 8 qTrr-T ItNl IVIJSA-iI 5 20t7- r8 1000 9 ffq irmt d^

.,-SL't^-.* {lfl'gl Tf,a) oitclt(.tcl qqn Tct qi {erm(T-s{eT'r) TqrcRarF,wrg{ 1- Detail of each existing STPs in Rajasthan State Annexure -1 Existing STP Capacity being S.No. Location Capacity utilized Operational Status of STP Compilance Status of STP (MLD) (MLD)

1 Khanpura (Ajmer) 20 12.00 Operational (Upgradation work under AMRUT)

2 Anasagar (Ajmer) 13 10.00 Operational CTO applied on dated29.05.2019

3 Jerla () 9 3.00 Operational CTO applied on dated_18.03.2020

4 Near Madela Road () 3 1.00 Operational CTO granted & complied

Pratappura (Bhoikhera) 5 5 1.00 Operational CTO granted & valid upto 31.10.2022 (Chitttorgarh) Near Abhimanyu Park 6 3 1.00 Operational CTO applied on dated 03.01.2017 permission awaited (Chitttorgarh) 7 Mela Maidan (Deedwana) 5 3.00 Operational CTE applied on dated_14.12.2016 Nari Bari Road (Fatehpur 8 7.5 6.00 Operational CTO Applied 30.09.2020. ) Near Jaipur Highway (Gangapur CTO Not applied shall be applied with in 02 months 9 5.5 1.56 Operational City) Near Railway bridge over Ghaggar 10 5 4.28 Operational CTO granted & complied river (Hanumangarh) CTE expired on 30.11.2013 and fresh appliucation for CTE 11 Jadkiya Phatak (Hanumangarh) 7.5 5.00 Operational shall be applied with in 02 months 12 Jaccha ki bawri ( City) 0.75 0.75 Operational CTO granted & complied

13 Brahmpuri STP (Jaipur) 8 8.00 Operational CTO granted & complied

14 Dehlawas unit I (Jaipur) 62.5 62.5 Operational (Upgradation work under AMRUT)

15 Paladi Meena (Jaipur) 3 0.80 Operational CTO granted & complied

16 Central Park (Jaipur) 1 0.70 Operational CTO granted & complied

17 Ralawta (Jaipur) 30 22.00 Operational CTO granted & complied

18 Gajdharpura (Jaipur) 30 22.00 Operational CTO granted & complied

19 Ram Niwas Bagh (Jaipur) 1 0.60 Operational CTO granted & complied

20 Jawahar Circle (Jaipur) 1 0.35 Operational CTO granted & complied

21 Swarnjayanti Park (Jaipur) 1 0.90 Operational CTO granted & complied CTO Not applied 22 Sahkar Marg (Jaipur) 1 0.30 Operational (will be applied with in 02 months 23 Kiro Ki Dhani (Jaipur) 1 0.50 Operational CTO granted & complied

24 Dravyawati River- PaniPech (Jaipur) 20 15.00 Operational CTO granted & complied Dravyawati River- Mansarovar 25 15 12.00 Operational CTO granted & complied (Jaipur) Dravyawati River- Taruchya Nagar 26 100 70.00 Operational CTO granted & complied (Jaipur) Dravyawati River- Pratap Nagar 27 25 13.00 Operational CTO granted & complied (Jaipur) 28 Dravyawati River- Goner (Jaipur) 10 5.00 Operational CTO granted & complied

29 Dehlawas unit II (Jaipur) 62.5 62.50 Operational Under upgradation

30 Jaisinghpura Khore (Jaipur) 50 50.00 Operational CTO granted & complied

31 Near Karolia village (Jaipur) 2 0.60 Operational CTO granted & complied Near Indira Awas colony 32 1.5 0.68 Operational CTO granted & complied () 33 Near Kidwai Stadium () 6 3.50 Operational CTO applied on dated_13.07.2020. Detail of each existing STPs in Rajasthan State Annexure -1 Existing STP Capacity being S.No. Location Capacity utilized Operational Status of STP Compilance Status of STP (MLD) (MLD) CTE expired on 31.07.2018 and fresh application for CTE 34 Balwa Road (Nagaur) 8 3.50 Operational shall be applied with in 02 months (Upgradation taken under AMRUT) 35 road (Sriganganagar) 10 1.73 Operational CTO Applied on dated_ CTO expired on 31.07.2015 and fresh application for CTO Bharatpur Road near Agyarah Dam 36 20 14.00 Operational shall be applied with in Two month (Alwar) (Upgradation taken under AMRUT) Near Vijay Nagar Private Bus Stand CTO Not applied 37 5 1.00 Operational () (will be applied with in 02 months) CTO Not applied 38 Near Narsingh Pura (Beawar) 4 2.00 Operational (will be applied with in 02 months) CTO Not applied 39 Near Bichral Tank (Beawar) 1.5 0.30 Operational (will be applied upto 31.03.2021) CTO Not applied 40 Kundan Nagar (Beawar) 1 0.10 Operational (will be applied upto 31.03.2021) 41 RHB () 1.5 0.70 Operational CTO granted & complied

42 MundenaMev (Bhiwadi) 2 0.15 Operational CTO granted & complied

43 Santhalka (Bhiwadi) 3 0.80 Operational CTO Applied dated 25.01.2019

44 Nr. Existing STP (Bhiwadi) 3 1.30 Operational CTO Applied dated 25.01.2019

45 Dhauheda (Bhiwadi) 4 4.00 Operational CTO Applied CTO Applied on dated 14.09.2020. 46 Vallabgarden (Bikaner) 20 20.00 Operational (Upgradation work under AMRUT) CTO Not applied 47 Sareh Nathania (Bikaner) 12 8.35 Operational (will be applied with in 02 months) (Upgradation work under AMRUT) CTO Not applied 48 Tagawali (Dholpur) 10 7.75 Operational (will be applied upto 31.03.2021) (Upgradation taken under AMRUT) 49 Shekhupur (Dholpur) 3 2.00 Operational CTO Applied CTO Applied 50 Nandari (Jodhpur) 20 15.00 Operational (Upgradation work under AMRUT) 51 Salawas Unit I (Jodhpur) 50 40.00 Operational CTO Granted

52 Salawas Unit II (Jodhpur) 50 30.00 Operational CTO Applied Detail of each existing STPs in Rajasthan State Annexure -1 Existing STP Capacity being S.No. Location Capacity utilized Operational Status of STP Compilance Status of STP (MLD) (MLD)

CTE applied on 28.12.2020) 53 Nasirabad Highway () 10 6.00 Operational

54 Goshala land (Sikar) 2 1.25 Operational CTO Granted

55 Near Shiv Colony (Sikar) 8 4.50 Operational CTO Granted Near Shamshan Ghat, Kartana 56 2 0.8 Operational CTO Applied 30.07.2020. () 57 Near Panchayat Samiti () 1 1 Operational CTO Applied on dated 20.02.2020.

58 Kisanghat (Jaisalmer) 10 3.91 Operational CTO Applied on 20.04.2017 permission still awaited

59 Jalore 10 3.21 Operational CTE not applied, shall be applied with in 2 months. Baga Road Near Agrasen Circle 60 8.5 0.00 Operational CTO Not applied () 61 5 0.98 Operational CTO Applied CTO Not applied shall be applied with in 02 months 62 Hetam Ji Village (Mt. Abu) 6 0.10 Operational

63 Village Sorwal (Sawai Madhopur) 10 2.91 Operational CTO Applied

64 10 1.01 Operational

65 Village Kundla (Barmer) 10 4.00 Operational CTO Applied on dated 16.08.2016 permission is pending Gopal Nangla (Rundhikiran) 66 8 1.20 Operational CTO Applied (Bharatpur) 67 Devpura (Bundi) 8 4.00 Operational CTO granted and valid upto 31.03.2023. CTE expired on dated 31.07.2016 and fresh application 68 Village Gajsar (Churu) 7 7.00 Operational shall be apply within Two month Not applied CTE expired on 31.10.2015, fresh CTE shall be applied 69 Gagrol Road (Jhalawar) 6 Operational with in 2 months 4.00 70 Girdharpura () 3 Operational CTE applied on 01.07.2020 for upgradation

71 Dhakarkhedi (Kota) 20 17.82 Operational CTO Not applied Sajidhera (Kishorepura ladpura) 72 30 22.00 Operational CTO Applied (Kota) Mandia Road, Near ESI Hospital CTE expired on 31.12.2013 and fresh application shall be 73 7.5 2.00 Operational (Pali) applied with in 2 Months CTO Applied on 20.05.2017 under water act, application 74 5 1.70 Operational for DG set under Air act also required 75 Sardar Shahar 5 Operational CTO Not applied 2.45 CTO Not applied shall be applied with in 02 months 76 Sardar Shahar 2 Operational

77 Eklingpura (Udaipur) 20 12.00 Operational CTO Applied

78 Eklingpura (Udaipur) 25 25.00 Operational CTO granted & complied

79 Ghamaniya (banswara) 6.43 3.50 Operational CTO Not applied

80 Kewada (Bhilwara) 10 10.00 Operational CTO granted & complied

Total 999.18 694.54 Detail of under construction STPs in Rajasthan State Annexure -2

Capacity Status of I&D Physical of the or House Incremental S.No. Location Progress Completion Timeline* plant in Sewer Progress (%) MLD Connections

1 Road (Chirawa) 2 98% 2.00% Jan'2021 Near Existing Sedimentation tank 2 1 54% 7.67% June'2021 (Chittorgarh) Near Abhimanyu Park 3 2 59% 6.83% June'2021 (Chittorgarh) 4 Near Gandhi nagar (Chittorgarh) 2 - - Work is yet to be started. Near Mukhyamantri Jan Awas 5 1 59% 6.83% June'2021 Yojna (Chittorgarh) 6 Near Railway Station (Chittorgarh) 1 47% 8.83% June'2021

7 Near Kushal Lake (Gangapur City) 1.5 84% 5.33% March'2021 Near PHED campus (Gangapur 8 2.5 94% 6.00% Jan'2021 City) Near Aliganj Tiraha (Gangapur 9 1.5 89% 3.67% March'2021 City) 10 Karauli road (Hindaun City) 3 85% 5.00% March'2021

11 Ragahv das Bagichi (Hindaun City) 5 90% 10.00% Jan'2021

12 Kartarpura Nallah (Jaipur) 1.3 - Nil land allotment is pending. 13 Kartarpura Nallah (Jaipur) 2.4 -

14 Chaugan Stadium (Jaipur) 1 3% 4.04% Sep'2022

15 Dehlawas (Jaipur) 90 1% 2.75% March'2023 Payment issue with UIT, work with held 16 Khanpura (Ajmer) 40 95% due to financial crisis,. JnNURM schemen closed in March 2017 17 (Ajmer) 3.5 60% 1.67% March'2022 Near Basin Road Banjara Basti 18 1 95% 5.00% Jan'2021 (Laxmangarh) 19 TodhiKui (Laxmangarh) 3 99% 1.00% Jan'2021

20 Dulai Pond (Nagaur) 1.5 32% 6.80% Oct'2021

21 Idgah (Sriganganagar) 10 2% 10.89% Sep'2021

22 Sugarmill (Sriganganagar) 15 98% 0.67% March'2021 Near existing STP at Ikran Village 23 5 99% 1.00% Jan'2021 (Bharatpur) Under litigation with Hon'ble High Court. 24 Khanpura (Bhiwadi) 2 61% - Next hearing date is yet to be alloted. 25 Vallabh garden (Bikaner) 20 95% 2.50% March'2021 Near Kali Mata Mandir 26 20 72% 9.33% March'2021 Sujendarsar (Bikaner) 27 TajusaTakiya (Churu) 2.5 95% 2.50% Feb'2021 B/W Cremation ground 28 1 95% 2.50% Feb'2021 andAgarsen Nagar (Churu)

HSC shall be completed after commissionin g of STPS Detail of under construction STPs in Rajasthan State Annexure -2

Capacity Status of I&D Physical of the or House Incremental S.No. Location Progress Completion Timeline* plant in Sewer Progress (%) MLD Connections

29 Devi pura Beed (Sikar) 5 6% 18.80% May'2021

30 Near Mangri road (Badi Sadari) 1.5 99% 1.00% Jan'2021 Shamshan ghat (Ramgarh 31 2 99% 1.00% Jan'2021 Shekhawati) 32 Gogamedi (Ramgarh Shekhawati) 1 55% 15.00% March'2021

33 Gogamedi (Ramgarh Shekhawati) 1 55% 15.00% March'2021 Near Dashhera Maidan HSC shall be 34 4.5 5% 7.92% Dec'2021 (Nimbahera) completed after 35 Kasod Basti Nalah (Nimbahera) 1 99% 1.00% Jan'2021 commissionin Changedi village ( 36 1 99% g of STPS 1.00% Jan'2021 Sanwar) 37 Near subjail (Suratgarh) 2.5 99% 1.00% Jan'2021 Adarsh Kalyan Bhumi near 38 2.5 99% 1.00% Jan'2021 highway (Suratgarh) 39 Mahipaloka Mohalla (Bhadra) 1 97% 1.00% March'2021

40 Nathwana johad (Bhadra) 3.5 97% 1.00% March'2021

41 Near Fire station (Nawalgarh) 1 47% 17.67% March'2021

42 Bhakto Ka Johad (Nawalgarh) 1 6% 3.92% March'2022

43 Near Bus stand (Nawalgarh) 3 93% 7.00% Jan'2021

44 Gopalpura (Baran) 7 61% 7.80% May'2021 Gopal Gaushala on Thardaa Village 45 5.5 42% 6.44% Sep'2021 () Gaushala on Salasar Road 46 1.5 16% 9.33% Sep'2021 (Sujangarh) Chaptia pond near F.C.I. Godown 47 1.5 12% 9.78% Sep'2021 (Sujangarh) 48 Near Kalkanda (Sujangarh) 2 41% 6.56% Sep'2021

49 FCI godown (Udaipur) 10 99% 1.00% Jan'2021

50 Kajrali house (Udaipur) 5 97% 1.50% Feb'2021 The STP was partially constructed in 2016. Cost revision is under submission for 51 Balitalad pura (Kota) 6 48% - approval. Matter is pending with GoI for revised A&F. 52 Dhakar kheri (Kota) 40 20% 3.33% June'2022

53 Kala Talab (Kota) 15 16% 3.50% June'2022

54 IL Township (Kota) 2 Nil 4.55% Oct'2022

55 Balita (Kota) 15 Nil 4.55% Oct'2022

HSC shall be completed after commissionin g of STPS HSC shall be completed after commissionin g of STPS

Detail of under construction STPs in Rajasthan State Annexure -2

Capacity Status of I&D Physical of the or House Incremental S.No. Location Progress Completion Timeline* plant in Sewer Progress (%) MLD Connections

56 Basni Bainda (Jodhpur) 40 35% 5.42% Dec'2021 Near RIICCO Bypass 57 4 10% - (Hanumangarh) Contract terminated. Near Railway bridge over Ghaggar matter is under arbitration. 58 2 10% - river (Hanumangarh)

HSC shall be completed after commissionin g of STPS HSC shall be completed after commissionin g of STPS

Detail of under construction STPs in Rajasthan State Annexure -2

Capacity Status of I&D Physical of the or House Incremental S.No. Location Progress Completion Timeline* plant in Sewer Progress (%) MLD Connections

59 Baga Road (Jhunjhunu) 7 99% - Jan'2021 Near Existing Jindal STP Kuwada 60 30 82% 6.00% Dec'2021 (Bhilwara) 61 Mandiya Road (Pali) 15 100% - HSCs will be completed by April'2022

62 Molai Pura (Tonk) 16 76% 3.43% Dec'2022

63 Dhaula Khera (Tonk) 4 82% 3.60% Dec'2022

64 South STP (Sardar Shahar) 2.3 Nil 3.57% June'2023

65 North STP (Sardar Shahar) 3.4 Nil 3.57% June'2023 Gandhi Vidhya Mandir (Sardar 66 1.6 Nil 3.57% June'2023 Shahar) The unit of STP are not functinal as the flow 67 Ward No. 07 (Nokha) 1 100% - recahing at STP is higher than the designed capacity.

Total 510 0 *Subject to availibility of funds.

HSC shall be completed after commissionin g of STPS Local Self Government Department

1. Compliance of SWM Rules 2016 Total MSW generation: ~ Approx 6500 TPD Total Wards - 5464 Door to Door Collection: - 5464 wards Bye laws have been finalized and issued. State action plan has been approved and circulated and sent to RSPCB for submission to Hon'ble NGT.

Solid Waste Management Plant Details Plant Number of Plant Capacity (TPD) Running Centralized 8 947 Processing Plant Processing Plant Running 20 2337 under Pipeline Processing Plant Under 5 760 Tendering Process Tender Document Under 9 280 preparation Operational MRF 66 450

1052 TPD is being processed by BWGs/ Recyclers and pit Composting, garden composting and Remaining 674 TPD is being dumped unplanned at landfill sites.

City wise Status of Processing & Disposal of waste:

S.No City/Town Processing Plant Highest Name of Status Technolog Capacity Royalty Firm y (TPD) payable by Contractor to ULB Running Centralized Processing Plant 1 Jaipur WtE 350 On PPP M/s Grasim Running full (RDF) Ltd capacity 2 Jaipur Compost 250 Royalty M/s IL&FS Running full capacity 3 Pratapgarh Vermi 6 By ULB Fund By ULB Running Compost 4 Dungarpur Vermi 7 By ULB Fund By ULB Running Compost 5 Pali Compost+ 100 Royalty Rs M/s Rollz Construction RDF 301/Ton on Material work has been SLF input Handling finished and Plant System Pvt. has been Ltd. New commissioned. Delhi 6 Bhilwara Compost+ 144 Royalty Rs M/s Rollz Construction RDF 401/Ton on Material work has been SLF input Handling finished and Plan System Pvt. has been Ltd. New commissioned. Delhi 7 Udaipur MRF cum 30 By ULB Fund Running RDF 8 Udaipur Compost 60 By ULB Fund M/s Sandal Running + RDF Buildcon Pvt. limited Total 947 Processing Plant Running under Pipeline 1 Bikaner Compost+ 258 Tipping fee Rs M/s IL&FS Firm has stopped RDF 608 per ton on the work, out put Termination letter has been issued to firm. BG has been seized. 2 Sikar Compost+ 100 Tipping fee Rs M/s IL&FS Firm has stopped RDF 1000 per ton the work, Final on out put notice has been issued to firm for restart the work. Hanuman Compost+ 60 Royalty Rs M/s Allied Firm has started garh RDF 153/Ton on Energy the work of SLF input Systems Pvt. boundary wall S.No City/Town Processing Plant Highest Name of Status Technolog Capacity Royalty Firm y (TPD) payable by Contractor to ULB Ltd. New and commit to Delhi finish the work till Oct 2020. 4 + Compost+ 40 Tipping fee on M/s Durga Boundary wall Sumerpur RDF input for Impex work 80% + Processing is Udaipur Completed and Takhatgar Rs 351/Ton approach road has h been build. Lease deed pending. 5 Bharatpur Compost+ 100 Royalty Rs M/s Rollz EC will be RDF 101/Ton on Material granted after TPZ SLF input Handling NOC. System Pvt. Ltd. New Delhi 6 Karauli+H Compost+ 123 Tipping fee Rs M/s IL&FS Company didn't indon+Ga RDF 1000 per ton submit the Lease ngapur on out put deed fees. 7 Baran- Compost+ 60 Royalty Rs M/s Zonta CTE issued and Anta RDF 38/Ton on SLF Infratech Pvt. work will be start input Ltd. in Bangalore August end. 8 Bundi Compost+ 42 Royalty Rs M/s Zonta New land has RDF 59/Ton on SLF Infratech Pvt. been allotted. input Ltd. Land Lease Bangalore agreement has been done. Firm will apply for EC. Notice has been issued to expedite the work. 9 Tonk- Compost+ 82 Royalty Rs M/s Zonta CTE issued. RDF 57/Ton on SLF Infratech Pvt. Notice has been input Ltd. issued to expedite Bangalore the work. 10 Jhunjhunu Compost+ 65 Royalty Rs M/s Allied Gram Panchayat + RDF 101/Ton on Energy refuse to transfer Baggar+ SLF input Systems Pvt. the land. Letter Udaipurw Ltd. New has been sent to ati Delhi DM for resolving the land dispute. S.No City/Town Processing Plant Highest Name of Status Technolog Capacity Royalty Firm y (TPD) payable by Contractor to ULB 11 Sri Compost+ 95 Royalty Rs M/s Allied Public Hearing Ganganag RDF 230/Ton on Energy has been done. ar SLF input Systems Pvt. Ltd. New Delhi 12 Jaipur Waste to 600 Royalty Rs M/s JITF Land allotment Energy 66/Ton on Urban has been done. processing Infrastructure Lease Deed plant input Ltd. New Pending. PPA & Delhi. Lease Deed is pending 13 Jodhpur Waste to 400 Royalty Rs M/s JITF PPA & Lease Energy 126/Ton on Urban Deed is pending. processing Infrastructure plant input Ltd. New Delhi. 14 Alwar Compost 129 Royalty Rs M/s Rollz Construction + RDF 155/Ton on Material work started. SLF input Handling System Pvt. Ltd. New Delhi 15 Udaipur MRF 60 By ULB Fund Civil Work under Facility + process. Dry waste processing Centre 16 Udaipur Biometha 20 By ULB Fund M/s Work order nation Mahindra Awarded Plant 17. Jhalawar Compost 26 By ULB Fund M/s Ajay Civil Work Plant Jain Started Construction Pvt. Limited 18 Churu MRF+Dry 30 By ULB Fund M/s Rupesh Work Order waste Construction Awarded. processing centre 19 Churu Composti 15 By ULB Fund M/s Rupesh Work Order ng Construction Awarded. 20 Kota Bio Gas 02 By ULB fund Work Order Awarded. Total 2337

S.No City/Town Processing Plant Highest Name of Status Technolog Capacity Royalty Firm y (TPD) payable by Contractor to ULB

Processing Plant (Compost+RDF) Under Tendering Process 1 Kota Compost+ 400 Tender has been invited, no firm has participated. RDF Re tender has to be done with modification in VGF amount to be provided. DPR is being prepared for installation of waste to compost and RDF plant. 2 Beawar Compost+ 61 Retendering has been done. No firm has RDF participated. 3 Ajmer Compost+ 200 Under Tendering Process RDF 4 Rajsmand Compost+ 44 Tender Evaluation process has been completed. RDF Work Order shall be awarded soon. 5 Swai Compost 55 No bid received. Tender to be re-invited. Madhopur + RDF Total 760 Tender Document Under Preparation 1 Compost+ Nagour 37 RDF 2 Compost+ Dausa 30 RDF 3 Compost+ Dholpur 47 RDF 4 Compost+ Barmer 34 RDF 5 Compost+ Jaisalmer 23 RDF 6 Compost+ Jalore 20 RDF 7 Compost+ Sirohi 14 RDF 8 Compost+ Banswara 36 RDF 9 Compost+ 41 Chittorgarh RDF 280 Total

Details of each existing STP in the State Annexure- A S No. Location District Address Location coordinates Existing Capacity Operational Compliance Status of STP Being Status of STP STP Capacity (in Utilized (in MLD) MLD) 1 JAIPUR DEVELOPMENT Jaipur Between Raiway Line and Lat: 26.891994 & Long: 2 2 Operational Complying AUTHORITY STP SAHKAR MARG Road Boundary - 302005 75.793711

2 JAIPUR DEVELOPMENT Jaipur PALDI MEENA, JAIPUR - Lat: 26.875819 & Long: 3 3 Operational Non Complying AUTHORITY STP PALDI MEENA 302031 75.967328

3 JAIPUR DEVELOPMENT Jaipur Rajeev Awas Yojana, Muhana, Lat: 26.797278 & Long: 1 1 Operational Complying AUTHORITY STP RAJIV AWAS Jaipur - 302015 75.762717 YOJNA 4 JAIPUR DEVELOPMENT Jaipur Central Park, Jaipur - 302007 Lat: 26.901678 & Long: 1 1 Operational Complying AUTHORITY STP CENTRAL PARK 75.812722

5 JAIPUR DEVELOPMENT Jaipur Ramnivash Bagh, Jaipur ,Tehsil-Lat: 26.912547 & Long: 1 1 Operational Non Complying AUTHORITY STP RAMNIWAS Jaipur, Dist.-Jaipur - 302001 75.817822 BAGH 6 JAIPUR DEVELOPMENT Jaipur Jawahar circle, Tehsil- Jaipur, Lat: 26.840750 & Long: 1 1 Operational Complying AUTHORITY STP JAWAHAR Dist.-Jaipur - 302018 75.799560 CIRCLE 7 JAIPUR DEVELOPMENT Jaipur Ralawata, Village-Goner, Lat: 26.768772 & Long: 30 6 Operational Non Complying AUTHORITY STP RALAWATA Tehsil-Sanganer, Dist.- Jaipur - 75.930464 302002 8 JAIPUR MUNICIPAL Jaipur DELAWAS , PRATAP NAGAR Lat: 26.462567 & Long: 62.5 62.5 Operational Non Complying CORPORATION STP DELAWAS ,SANGANER - 302033 75.838019 UNIT II 9 JAIPUR MUNICIPAL Jaipur DELAWAS, PRTAP NAGAR - Lat: 26.462567 & Long: 62.5 62.5 Operational Non Complying CORPORATION STP DELAWAS 302033 75.838019 UNIT-I 10 Mundana Mev STP Alwar Khasra No 253, In front of Lat: 28.192686 & Long: 2 1 Operational Complying madarsa, RIA, Kehrani, Ward 76.882373 No 43, Mundana Mev, Bhiwadi - 301019 11 BIDA STP Alwar Near Star Hospital Bhiwadi - Lat: 28.208446 & Long: 4 2 Operational Non Complying 301019 76.810531 12 Sewage Treatment Plant (Unit Alwar Rajasthan Housing Lat: 28.205606 & Long: 1.5 0.75 Operational Complying ID- 85899) Board,Arravali Vihar Bhiwadi - 76.819885 301019 13 Sewage Treatment Plant, Sawai Village- Surwal, Lat: 26.084166 & Long: 10 2.5 Operational Complying Surwal Madhopur Sawaimadhopur - 322255 76.376388 14 Sewage Treatment Plant, Karauli Khasra No. 5931, Behind Lat: 26.505277 & Long: 5 1 Operational Complying Behind Govt. College, Karauli Govt. College, Karauli - 77.009444 322255 15 Sewage Treatment Plant, Dholpur Village:- Thagawali, Tehsil:- Lat: 26.712981 & Long: 10 9 Operational Complying Thagawali , DIstrict:- Dholpur - 77.907078 328001 16 Sewage Treatment Plant, Dholpur Village:- Shekhupura, Tehsil & Lat: 26.678200 & Long: 3 1.5 Operational Complying Shekhupura District:- Dholpur - 328001 77.900791

17 Common sewage treatment Bundi Devpura, Bundi - Lat: 25.393725 & Long: 8 4 Operational Non Complying plant 75.655106 18 Common sewage treatment Jhalawar Girdharpura Jhalawar - Lat: 24.526174 & Long: 3 2 Operational Non Complying plant 76.216386 19 Municipal council, Alwar Alwar near village Agayara - 301030 Lat: 27.512308 & Long: 20 14 Operational Non Complying 76.766355 20 Common sewage treatment Kota Sajidhera, Kishorepura, Lat: 25.171204 & Long: 30 20 Operational Complying plant Ladpura - 75.834113 21 Common sewage treatment Kota Dhakar Khedi, Near village Lat: 25.130772 & Long: 20 10 Operational Complying plant dhakar khedi, Kota - 75.916476 22 UIT, Sriganganagar (Sewage Sri Near Suratgarh Road, Sri Lat: 29.881340 & Long: 10 10 Operational Non Complying Tratment Plant) Ganganagar Gangnagar - 73.864290

23 Municipal Council (Sewage Hanumangar Near Railway Bridge on Lat: 29.595900 & Long: 5 5 Operational Complying Treatment Plant) h Ghaggar River, Hanumangarh 74.299220 Town, Tehsil & Dist- Hanumamngarh -

24 Sewage Treatment Plant of Jaipur Village Gajadharpura, Lat: 26.563100 & Long: 30 30 Operational Non Complying Jaipur Development Autho Kalwar Road, Jaipur Sanganer 75.465200 JAIPUR 25 Sewage Treatment Plant (Cap. Churu village Gajsar, Churu - 331001 Lat: 28.332210 & Long: 7 7 Operational Non Complying 7 MLD) 74.942740

26 Sewage Treatment Plant (Cap. Sikar Khasra no. 380/446, Shiv Lat: 27.374000 & Long: 8 3 Operational Complying 8 MLD) Colony, Sikar - 332001 75.072640 27 M/s Sewage Treatment Plant Sikar Khasra No. 300, Gousala Land, Lat: 27.616415 & Long: 2 1.2 Operational Complying (Cap. 2 MLD) Salasar Road, Sikar - 332001 75.127431

28 Sewage Treatment Plant Sikar Nari-Bari Road, Fatehpur, Lat: 27.999770 & Long: 7.5 6 Operational Non Complying (Cap.7.5 MLD) Distt. Sikar - 332301 74.915000 29 Jaipur Municipal Corporation, Jaipur STP Campus Area, Brahmpuri, Lat: 26.563284 & Long: 8 8 Operational Non Complying Deen Dayal Upadhaya Amber, Jaipur - 75.500780

30 Jaipur Development Authority Jaipur Khasra No. 1930 , Lat: 26.570248 & Long: 50 50 Operational Non Complying (1 MLD Jaisighpura ST Jaisinghpura, Khor on Delhi 75.532952 Road, Jaipur - 31 Sewerage Treatment Plant, Chittorgarh Sewage Treatment Plant Near Lat: 24.422887 & Long: 1.5 1.2 Operational complying Bari Sadari Idgah area at Kali mangari 74.477868 road, Bari Sadari , Chittorgarh - 312403 32 Municipal Council (Sewage Hanumangar Norht of Sriganganagar Lat: 29.687600 & Long: 7.5 5 Operational Non-Complying Treatment Plant) h Abohar By Pass Road, Near 74.283400 Railway Track, Teh & Dist- Hanumangarh - 33 Urban Improvement Trust Bikaner Vill-Sarai Nathania, Kharaa No Lat: 28.147690 & Long: 12 10 Operational Non Complying (Sewage Treatment Plant) 05, Tehsil & Dist-Bikaner - 73.265790

34 Nagar Nigam (Sewage Bikaner Near Jorbeer, Jaipur Jodhpur Lat: 27.972800 & Long: 20 20 Operational Non- Complying Treatment Plant) by Pass, Bikaner - 73.345990 35 Jindal Saw Limited (City Bhilwara Khasra No. - 338, Village- Lat: 25.363432 & Long: 10 3.8 Operational Complying Sewage Treatment Plant) Kewara, Bhilwara - 311001 74.657060 36 Sewage Treatment Plant for Rajsamand Near Pratapura Village Lat: 25.063587 & Long: 5 1.7 Operational Non Complying Rajsamand Rajsamand - 313324 73.930408

37 M/s Sewage Treatment Plant, Banswara Near Heera River City Lat: 23.190148 & Long: 1 0.8 Operational Non-Complying Kushalgarh Kushalgarh Tehsil Kushalgarh 74.449367 District Banswara - 327801

38 Hindustan Zinc Limited Udaipur Eklingpura,Teh- Girwa, Lat: 24.567993 & Long: 25 19 Operational Complying Udaipur - 313003 73.749862 39 Hindustan Zinc Limited Udaipur Eklingpura, Teh- Girwa, Lat: 24.567993 & Long: 20 14 Operational Complying Udaipur - 313003 73.749862 40 STP BALOTRA Barmer Municipal Council Balotra Lat: 25.881388 & Long: 9 3 Operational Non Complying ,Pachpadra , Barmer - 344022 72.220000

41 Hindustan Zinc Limited Udaipur Near FCI Godown, Udaisagar Lat: 24.575950 & Long: 10 7 Operational Complying road, Udaipur - 313001 73.734367

42 STP JALORE Jalore Municipal Council Jalore - Lat: 25.372222 & Long: 10 5 Operational Non Complying 343001 72.606388 43 STP , Kishanghat Jaisalmer Jaisalmer Kisanghat Road,Jethwai Lat: 26.943866 & Long: 10 6 Operational Non Complying ,Jaisalmer - 345001 70.941067 44 STP BARMER Barmer 10 MLD STP, Near Kurla Lat: 25.748055 & Long: 10 4 Operational Non Complying Village, Barmer - 344001 71.473055 45 Sewage Treatment Plant Jodhpur STP phase -2 , Salawas Lat: 26.148198 & Long: 50 30 Operational Non Complying (Phase 2) 50 MLD Jodhpur - 342001 72.986828 46 Sewage Treatment Plant Jodhpur Village Nandari, Banar Lat: 26.304873 & Long: 20 15 Operational Non Complying Nandri Jodhpur Tehsil:Jodhpur 73.109863 District:Jodhpur - 342001 47 STP (50MLD) Phase-I, Salawas, Jodhpur Salawas - 342001 Lat: 21.150025 & Long: 50 40 Operational Non Complying Jodhpur 72.985723 48 M/S Superintending Engineer Ajmer Khanpura Nasirabad Road, Lat: 26.413072 & Long: 20 12 Operational Non Complying RUIDP Tehsil & Dist.- Ajmer - 305001 74.644853

49 Commissioner, STP (7.5 Pali Khasra no.943/3, 952/1, near Lat: 25.772363 & Long: 7.5 2 Operational Non Complying MLD)ID-23924 Pali ESI Hospital,Mandiya Road 73.294749 Industrial Area,Punayata Road Pali - 306401

50 Commissioner, Nagar parisad Pali Kh. No. 943/3,952/1, Mandia Lat: 25.771915 & Long: 15 15 Operational Complying pali ,STP 15.0 MLD (ID Road Industrial Area, District- 73.290666 Pali - 306401 51 M/s , Sewerage Treatment Chittorgarh Sewerage Treatment Plant, Lat: 24.637193 & Long: 2 0.8 Operational Non Complying Plant, Nimbahera Behind Karthana Samsan ghat, 74.697658 Nimbahera, Chittorgarh. - 312601 52 Sewerage Treatment Plant, Chittorgarh Sewerage Treatment Plant, Lat: 24.916647 & Long: 5 1 Operational Non Complying Bhoikhera Bhoikhera, Chittorgarh - 74.641659 312001 53 Sewerage Treatment Plant Chittorgarh Sewerage Treatment Plant Lat: 24.887467 & Long: 3 1 Operational Non Complying Abhiminyu Park Abhiminyu Park Chittorgarh - 74.627417 312001 54 M/s Municipal Council, Nagaur Khasra no. 661,Village Lat: 27.039827 & Long: 6 3.5 Operational Non Complying Makrana Makrana ,Tehsil- Makrana, 74.702876 Dist.- Nagour - 341505 55 M/S Municipal Board, Nagaur Khasra no.818,822, Village- Lat: 27.385666 & Long: 5 3 Operational Non Complying Didwana, Dist.-Nagaur - 74.551055 341001 56 M/S Municipal Board, Nagaur Nagaur Balwa Road Towards Bikaner, Lat: 27.238987 & Long: 8 3.5 Operational Non Complying Tehsil & Dist.-Nagaur, - 73.687167 341001 57 M/S Commissioner Nagar Ajmer Ajmer - 305001 Lat: 26.476464 & Long: 13 9 Operational Non Complying Nigam, RUIDP, PIU 74.612597 58 Sewage Treatment Plant, Bikaner Ward No. 7, Nokha, Bikaner - Lat: 37.470800 & Long: 1 Nil Non- Non Complying Nokha 27.583880 Operational 59 Common sewage treatment Jhalawar near village faisalpura, Gagron Lat: 24.617662 & Long: 6 Nil Non- Non Complying plant fort road Jhalawar - 76.173346 Operational 60 Jaipur Development Authority Jaipur Swarn Jayanti Park, Vidyadhar Lat: 26.580900 & Long: 1 Nil Operational Non Complying (1 MLD) Nagar, Jaipur - 75.484900 61 M/S Ajmer Development Ajmer Khanpura Nasirabad Road, Lat: 26.413072 & Long: 40 Nil Non- Non Complying Authority Tehsil & Dist.- Ajmer - 305001 74.644853 Operational

62 STP, Pali Jaitaran, Pali Not available 2 1 Operational Complying 63 STP-1 Suratgarh (2.5 MLD SriganganagSTP) (UnitBehind ID 88194) Sub-Jail, Suratgarh, Not available 2.5 2.5 Operational Non-complying ar Dist- Sriganganagar 64 STP-1 Suratgarh (1.0 MLD STP)Sriganganag (UnitAdarsh ID 88194) Kalyan Bhoomi, Not available 1 1 Operational Non-complying ar Suratgarh, Dist- Sriganganagar

817 568.75 Details of under construction STPs in the State Annexure-B

Sl. Responsibl Address District Location of Status Capacit Physica Status of I Increment No e authority STP with y of the l & D or al Progress Coordinates Plant in Progres House (Latitude MLD s in % sewer and connection Longitude, s 1 M/S Taal Jaipur if available)Not under 1 Municipal Katora,Jaipur Available Constructio Corporation n

NA NA NA 2 M/S Urban Village- Ajmer 26.4851 under 3.5 Improveme Ganahera, 74.5515 Constructio nt Trust Khasra No.- n 1981 &1984,Tehsil- Puskar,Dist.- NA NA NA 3 M/S Nasirabad Ajmer 74.898066 under 10 Municipal Bypass, 26.577198 Constructio Council Kishangarh, n RUIDP Ajmer

NA NA NA 4 M/S Near Vill- Bharatpur NA under 8 RUSDIP Gopal nangla, Constructio Bharatpur Kharsa no. 44, n STP T&D- Bharatpur NA NA NA 5 M/S Commissioner , Jhunjhunu 21.19571o under 8.5 municipal Municipal N 72.8084oE Constructio Council Council, On n Baggar Road, Jhunhjunu NA NA NA 6 M/S nagar Near Churu 28 o under 9.6 palika , Gaushalla, 26’31’’N 74 Constructio Sardarsahar Bikaner o 30’20’’E n Road,Tahsil- Sardharsahar, Dist.-Churu NA NA NA 7 M/S nagar Near Churu 28 o under 4 palika , Gaushalla, 26’31’’N 74 Constructio Sardarsahar Giurgicha o 30’20’’E n Road,Tahsil- Sardharsahar, Dist.-Churu NA NA NA 8 M/S Housing Board Tonk Not under 1.016 Rajasthan Colony Available Constructio Housing n Board

NA NA NA 9 M/S UIT Near Idgah Sri 29.55104 N, under 10 Srigangana Colony , Shri Ganganag 73.5115 E Constructio gar Ganganagar, ar n Rajasthan

NA NA NA 10 M/S UIT Near Sugar Sri 29.5531 N, under 15 Srigangana Mill Shri Ganganag 73.537 E Constructio gar Ganganagar, ar n Rajasthan

NA NA NA 11 M/S Jaipur Khasra no. Jaipur Not under 1 Developme 1930, Village- Available Constructio nt Authority Jaisingpura, n Khor on Dehli Road, Tehsil- Jaipur, Dist.- NA NA NA 12 M/S Jaipur Khasra no. Jaipur Not under 0.85 Developme 792, Village- Available Constructio nt Authority Jaisingpuravas n Bhakrota, Tehsil- Sanganer, Dist.- NA NA NA 13 M/S Jaipur Swapan lok-I, Jaipur Not under 0.38 Developme Sikar road, Available Constructio nt Authority T&Dist.- n Jaipur

NA NA NA 14 M/S Jaipur Anand lok-I, Jaipur Not under 0.41 Developme Sikar road, Available Constructio nt Authority T&Dist.- n Jaipur

NA NA NA 15 M/S Jaipur Anand Lok-II, Jaipur Not under 0.25 Developme 384 DUs Sikar Available Constructio nt Authority Road, Tehsil- n Amber, Dist.- Jaipur NA NA NA 16 Nagar Vill-Soran, Tonk 26°10'01.3"N under 4 Parisad, Near Ghanta 75°51'23.6"E Constructio Tonk Ghar, Tonk n

NA NA NA 17 M/S Nagar Khasra no. 2, Tonk under 16 Parisad, Vill-Molaipura, 26°10'35.6"N Constructio Tonk Tonk 75°44'42.3"E n

NA NA NA 18 M/S Near Existing Alwar Not under 3 Muncipal STP, Planned Available Constructio Council, Area by UIT n Bhiwadi Bhiwadi, In front of Star Hospital, Bus NA NA NA 19 M/S Khasra No. Alwar Not under 3 Muncipal 547,Near Shiv Available Constructio Council, Mandir, n Bhiwadi Santhalka Bhiwadi Tehsil: NA NA NA 20 M/S Khasra No. Alwar Not under 2 Muncipal 368/783,Khanp Available Constructio Council, ur Tehsil:Tijara n Bhiwadi

NA NA NA 21 M/S Khasra Jhunjhunu 21.19571 N, under 7 Jhunjhunu No.2082-2089 72.8084 E Constructio Municipal and 2093-2094 n Council Jhunjhunu

NA NA NA 22 M/S Sadulpura Hanuman Not under 3.5 Municipal Road,Bhadra , garh Available Constructio Board,Bhad Hanumangarh n ra

NA NA NA 23 M/S STP behind Sri Not under 2.5 Muncipal subjail,Shrigan Ganganag Available Constructio Board, ganagar,Suratg ar n Suratgarh arh

NA NA NA 24 Municipal Near Transport Hanuman 29.30990 N, under 1 Board,Surat Nagar, garh 73.88565 E Constructio garh Hanumangarh, n Bhadra

NA NA NA 25 STP of Near C.M Jan Chittorgar Not under 1 Nagar Aawas Yojana h Available Constructio Parishad,Ch , Gandhi nagar n ittorgarh. Chittorgarh.

NA NA NA 26 M/S Nagar STP of Nagar Chittorgar Not under 2 Parishad, Parishad,Abhi h Available Constructio Chittorgarh manyu park, n Near Roadways Bus Depot. NA NA NA 27 M/S Nagar Nagar Churu Not under 2.5 Parishad, Parishad, Available Constructio Churu Churu n Rajasthan

NA NA NA 28 Nagar Near Shree Churu Not under 1 Parishad, Ram Bharti Available Constructio Churu Public School n Churu

NA NA NA 29 M/S Nagar Railway colony Chittorgar Not under 1 Parishad chittorgarh h Available Constructio n

NA NA NA 30 Near Nagar Bundi road Chittorgar Not under 1 Parishad h Available Constructio n

NA NA NA 31 Nagar Gas Agency Churu Not under 5.5 Parishad, Dumping Yard, Available Constructio Churu Sujangarh n Churu, Rajasthan NA NA NA 32 M/S Nagar near Gularia Churu Not under 2 Parishad,Ch Hotel , Khasra Available Constructio uru no. 787, 246 n city Sujangarh

NA NA NA 33 Muncipal Near Basni Jodhpur 26.24250000 under 40 Corporation Benda Jodhpur , Constructio Jodhpur 73.08666667 n

NA NA NA 34 Nagar Near Kali Mata Bikaner 27.5830 N, under 20 Nigam., Temple, 37.1655 E Constructio Bikaner Sujandesar, n Tehsil and District- Bikaner NA NA NA 35 STP, Nagar Khasara No 44, Bharatpur Not under 5 Nigam, Ikaran, Village- Available Constructio Bharatpur Nagla Gopal , n Bharatpur

NA NA NA 36 M/S STP Khasara No. Karauli Not under 3 MLD Nagar 5430,Near Available Constructio Nigam Ganesh Hotel, n Hindaun City

NA NA NA 37 Commissio Jaccha Ki karauli Not under 0.75 ner Nagar Bawri, Tehsil- Available Constructio MLD Parishad, Hindaun City, n Hindaun district- City, Karauli Karauli NA NA NA 38 STP (2.5) Khasra No. Sawaimad Not under 2.5 MLD, 275, Gangapur opur Available Constructio Nagar City, Sawai n Parishad, Madhopur Gangapur City NA NA NA 39 M/S STP Khasara No. Sawaimad Not under 5.5 Nagar 167, Hingotia , opur Available Constructio Parishad, Gangapur City n Gangapur City NA NA NA 40 M/S STP behind Chittorgar Not under 2 for Pakage shamshan ghat h Available Constructio 4, Under Karthana Road n RUDSICO STP , Nimbahera NA NA NA 41 M/S STP near Kasod Chittorgar Not under 1 for Pakage Basti, h Available Constructio 4, Under Nimbahera n RUDSICO Tehsil:- Nimbahera NA NA NA 42 STP, Nagar Gopal churu Not under 1.5 Parishad Goushala Land Available Constructio Sujangarh Near Salasar n Near Road, Khasra Gandhi No. 202, Chowk, Sujangarh, NA NA NA 43 Ambuja Ambuja Nagour 27.0409, under 0.3 Cement Cement Ltd., 73.4830 Constructio Ltd., Marwar n Marwar , Mundwa, Mundwa, Mundwa, Nagaur NA NA NA 44 M/S Near Karjali Udaipur Near Alu under 5 Hindustan House Tehsil Factory - Constructio Zinc Girwa, Udaipur Karjali n Limited House, Pula, Tehsil :Girwa, dist : NA NA NA 45 Commissio Village- Bhilwara 25.361251,7 under 30 ner, Nagar Kuwada, 4.666631 Constructio Parishad, District- n Bhilwara Bhilwara

NA NA NA 46 M/S Nagar Gogamedi, Sikar 28 o under 1 Palika Ramgarh 10’11’’N 74 Constructio Ramgarh Shekhawati o 58’8’’E n

NA NA NA 47 STP(Cap.2 At near Churu 28 o under 2 MLD ) Gaushala 26’31’’N 74 Constructio Bikaner road o 30’20’’E n Sardarshar

NA NA NA 48 Municipal Bhageniya Jhunjhunu 281455 N, under 2 Counci, Johda, 753834 E Constructio Chirawa Chirawa, n Jhunjhunu

NA NA NA 49 M/S STP near Chittorgar Not under 4.5 for Pakage Ambamata h Available Constructio 4, Under temple, n RUDSICO neemuch highway, Nimbahera, NA NA NA 50 M.C, Near Todikui, Sikar 27 o 48’41’’ under 3 Laxmangar Sikar N 75 o Constructio h 01’17.4’’ E n

NA NA NA Details of Proposed STPs in the State Annexure- C Sl. Responsible Address District Location of STP Status Capacit Status of Increment Likely Date of No authority with Coordinates (Operational y of the Project(at al Progress Completion (Latitude and /Non- STP DPR Longitude, if operational/ propose Stage/Und available) under d in er construction MLD Tendering/ ) Work to be Awarded

1 M/S Nagar Devipura, Near Bus Sikar 273555.7 N Proposed 5 Parishad,Sikar Stand, Sikar 750901.9E NA NA NA 2 M/S STP at Beawar, Near Vijaynagar Private Ajmer 26.097846 Proposed 5 Near Bus stand,Tehsil:- 74.324677 Beawar, Ajmer NA NA NA 3 M/S Municipal STP (Bus Depot. Jhunjhunu 27.84951 N, Proposed 3 Council Jhunjhunu. Nawalgarh), Khasara No. 75.25335 E 174, Nawalgarh, Jhunjhunu. NA NA NA 4 M/S Nagar Palika STP at Khasra No.1332 Jhunjhunu 27.8477377 N, Proposed 1 fire station , Nawalgarh, 75.2677945 E Jhunjunu NA NA NA 5 M.C, Chirawa STPNagar Palika, Jhunjhunu 28.1455 N, Proposed 3 Chirawa,( Mandrela 75.3834 E Road), 1480/692, Chirawa, Jhunjhunu. NA NA NA 6 M/S Nagar Palika, Khasara No. 421, Sikar 281015 N, 745815 Proposed 2 Ramgarh Shekhawati, Shamshan Ghat, Ramgarh E Sikar Shekhawati, Sikar NA NA NA 7 M/S Muncipal Khasara No. 1548/78/2 Sikar 27.84626 N, Proposed 1 Council, Banjara Basti, Basni 75.3509 E Laxmangarh, Sikar Road, Laxmangarh, Sikar NA NA NA 8 M/S Nager Palika, 1381/339/1, Indra Aawas Sikar 27.83094 N, Proposed 1.5 Laxmangarh, Sikar colony, Laxmangarh, 75.01857 E Sikar NA NA NA 9 M.C, Beawar Vijaynagar Road, Bichrali Ajmer 26.094783 Proposed 1.5 Tank, Beawar 74.325388 NA NA NA 10 Narsinghpura, Nehru Narsinghpura, Nehru Ajmer 26.116714 Proposed 4 Bhawan, NH-8, Bhawan, NH-8, Beawar 74.327274 Beawar NA NA NA 11 M/S STP Fatehnagar, Changeri Village- Udaipur STP Fatehnagar, Proposed 1 Sanwar, RUDSICO Fatehnagar, Sanwar, Sanwar, Tehsil-Mavli RUDSICO NA NA NA 12 M.C Kushalgarh Near Heera River Banswara Not Available Proposed 1 Kushalgarh, Banswara NA NA NA 13 STP (2.5) MLD, Khasra No 152, 153 STP Sawaimadopur Not Available Proposed 1.5 Nagar Parishad, (2.5) MLD, Nagar Gangapur City Parishad, Gangapur City NA NA NA 14 M/S Nagar Nigam , at Village - Sujadesar Bikaner Not Available Proposed 20 Bikaner (khasra no.341,357,358,359,360) Bikaner NA NA NA 15 Commissioner, Hanumangarh Town, Hanumangarh 29.5959 N, Proposed 2 Municiapl Council, District-Hanumangarh 74.29922 E Hanumangarh NA NA NA 16 Commissioner, Hanumangarh Junction, Hanumangarh 29.6876 N, proposed 4 Municipal Council, Hanumangarh 74.2834 E Hanumangarh NA NA NA 17 M/S Nagar Palika , Bibnawa Road,Tehsil:- Bundi Common sewage Proposed 0.5 Bundi Bundi treatment plant, Bhinwa Road, Bundi(25.429676 75.660378) NA NA NA 18 M/S Nagar Palika , near Gandhi Gram Tehsil:- Bundi Common sewage Proposed 0.5 Bundi Bundi treatment plant, Gandhigram , Bundi(25.393725 75.655106) NA NA NA 19 M/S Nagar Parishad Kundan Nagar, Beawar, Ajmer 26.092024 Proposed 1 Beawar Ajmer 74.321139 NA NA NA 20 M.C. Kota Dhakar Kheri Kota Common sewage Proposed 40 treatment plan, Dhakar Khedi, Near village dhakar khedi, Kota(25.44025 75.67717) NA NA NA 21 M.C. Nagaur Khasra No. 405, STP Nagour 27.1955961 Proposed 1.5 station road, badi kuwa 73.730085 NA NA NA 22 Municipal K.no. 1146, 1189, 1192, Kota (25°12'33.7647 Proposed 15 corporation, kota 1193, 1217, 1218, 1220, 75°55'57.4767) 1277, 1281-1284, 1286, Kala Talab, Dhakar Kheri NA NA NA 23 STP(Cap.1 MLD ) Khasra no.721,Bhagat Jhunjhunu Not Available proposed 1 Singh Joha ,Nawalgarh,Jhunjhunu NA NA NA 24 M.C Near Swaminarayan Sirohi Not Available Proposed 0.17 School Mount Abu Sirohi NA NA NA 25 M.C Mount Abu Near Delwara Jain Sirohi Not Available Proposed 0.315 Temple Mount Abu Sirohi NA NA NA 26 M.C Mount Abu Village- Naval Nagar, Sirohi Not Available Proposed 0.06 Infront of hotel Miskil Asan Mount Abu NA NA NA 27 M.C.Mount Abu Village- Naval Nagar, Sirohi Not Available Proposed 0.07 aakash wani road, Torna, Mount Abu NA NA NA 28 M.C. Nimbahera Vill- Sigari, Tehsil, Chittorgarh Not Available Proposed 4.5 Nimbahera NA NA NA 29 M.C FSTP at, Khandela Sikar Not Available Proposed 0.01 NA NA NA 30 M.C. FSTP at, Lalsot Dausa Not Available Proposed 0.02 NA NA NA 31 Rajasthan Housing Indira Gandhi Nagar Jaipur Not Available Proposed 3 Board NA NA NA 32 Rajasthan Housing Dastkar Nagar Jaipur Not Available Proposed 1 Board NA NA NA 33 M.C. Sambahar FSTP at Sambhar Jaipur Not Available Proposed 0.02 NA NA NA 34 M.C. Ratangarh Khasra No. 4, 28, NH- Churu Not Available Proposed 11, Derajsar 3.8 NA NA NA 35 M.C. Ratangarh Khasra no. 639, Churu Not Available Proposed Gaushala Land, Ratangarh 6.1 NA NA NA 36 M.C. Sardarsahar Near Girgichiya road, Churu Not Available Proposed Sardarsahar 3.4 NA NA NA 37 M.C. Sardarsahar Near Bikaner Road, Churu Not Available Proposed Sardarsahar 2.3 NA NA NA