Pennsylvania Turnpike Commission

Total Page:16

File Type:pdf, Size:1020Kb

Pennsylvania Turnpike Commission Pennsylvania Turnpike Commission Gary L. Graham, P.E. Bridge Engineering Manager, Pennsylvania Turnpike Commission Welcome to the 2004 Interna- from the Pennsylvania Motor Truck fense Highways was legislated and tional Bridge Conference. The Association, proposed the idea of funded by Congress. The PTC was Pennsylvania Turnpike Commis- building a four-lane, all-weather, the forerunner of all other toll sion is proud to be this year’s Fea- toll road utilizing the old aban- roads in the country. tured Agency and the first doned South Penn Railroad bed. Due to the success of the origi- “Agency” to be featured by this Many thought the idea of building nal section of the Turnpike, other prestigious Conference in its his- a highway, and a toll road at that, extensions followed. It was ex- tory. We are excited to share the through the rugged barriers of the tended to Valley Forge in the east many chapters of our history, and Alleghenies and across so many Pennsylvania Turnpike, circa 1940 in 1950, and then onto the New to present our current and future waterways, was “hairbrained”. Es- Jersey border in 1954. To the west, plans to reconstruct, improve, and pecially, since two trans-state high- minimum sight distance of 600 the Turnpike was extended to the expand the Turnpike. ways already existed in the Lincoln feet. Ohio line in 1951. The Northeast The origin of the Pennsylvania highway (U.S. 30) and the William On October 1, 1940, the road Extension opened in 1957, and Turnpike Commission (PTC) goes Penn Highway (U.S. 22). built on the South Penn Railroad took the Turnpike north to back to the glory days of the rail- On May 21, 1937, Act No. 211 alignment was officially opened Scranton. In 1992, the Beaver roads. A new east-west passage was signed into law, authorizing the to traffic at a total cost of $70 mil- Valley Expressway was com- through Pennsylvania called the construction of a 160-mile toll lion. America’s first long-dis- pleted, and in 1993, the Amos K. South Penn Railroad was to be con- highway between Middlesex, tance superhighway was an im- Hutchinson Bypass was com- structed to compete against the for- Cumberland County, and Irwin, mediate success. More than pleted, both in the western part of midable Pennsylvania Railroad. Westmoreland County, both termini 26,000 vehicles were using it the state, bringing the total mile- The alignment was cleared, the rail- linking to existing roads (U.S. 11 daily. That skyrocketed to over age to approximately 500 miles of road bed surveyed, and the boring and the Lincoln highway). It also 2.4 million in twelve month’s toll road. of nine tunnels started. However, created the Turnpike Commission time. This was far more than the The original section of the due to a settlement between the to supervise the project. The law 715 cars per day estimated in a Turnpike contained 307 bridges competing railroad owners, work stipulated, however, that not a cent 1939 study by the Bureau of Pub- and culverts. The current Turnpike on the South Penn Railroad was of State tax money should be spent; lic that also stated toll roads system has over 1300 structures, stopped and the rail line was never it was up to the Commission to would be big money losers (so many of which are original con- completed. One of the design en- handle the financing through the much for studies). struction. We are currently reha- gineers, bitter over ending the sale of bonds. The bonds were to For the first time in the history bilitating or replacing of many of project, wrote “And here, for the be paid off by revenues generated of roads in Pennsylvania a super- these original structures including time being, and probably for a long through tolls. highway existed which provided some of our largest bridges. time to come, is buried the best Ground was broke on October free flow of traffic 160 miles The Susquehanna River route ever devised, or that can be 27, 1938, and in 23 months time, across the State. The Turnpike Bridge, in the middle part of the devised, between the Ohio Valley motor vehicles were traveling the was termed the foundation of a na- state, is the longest span on the and the Atlantic.” The abandoned “Dream Highway”. The original tionwide system of superhighways Turnpike at over 4,500 feet, and railroad bed sat idle for many years. section employed over 1,100 design and sixteen years later the Na- will be replaced in its entirety start- Then, in 1934, two individuals, one engineers and 155 contractors from tional System of Interstate and De- ing next year by dual concrete seg- from the Pennsylvania State Plan- 18 states for a total work force of ning Commission, and the other 20,000. More than 5,000 men worked on seven tunnels at one time, an engineering and construc- tion feat never again known to man. It was an exciting time to be an engineer or constructor involved with the project. The engineers de- veloped and used design criteria and safety standards that were only dreamed about before in this coun- try. Some of the new criteria in- cluded a maximum grade of 3 per- cent and a maximum curvature of 6 degrees. Travelers were provided South Penn Railroad construction, 18?? with super-elevated curves and a The Susquehanna River Bridge 4 IBC 2004 — The Official Publication of the International Bridge Conference® only four remain operational. A duel tube was constructed at each of the remaining four tunnel loca- tions to handle the increased traf- fic volume. The other three origi- nal tunnels were bypassed at some time to reduce operational expen- ditures. The Northeast Extension also has a set of tunnels in Lehigh County, for a total of five active tunnel locations on the current Turnpike system. We are currently Lehigh County Tunnel studying the feasibility of bypass- ing the Allegheny Tunnel and ma- efficient traffic movements at all Lehigh and Pohopoco River Bridges jor rehab is planned for the other interchanges. And an even newer tunnels. “high-speed” E-Z Pass system is mental bridges. These will be the ders and a 10-foot median for a to- Today, the Turnpike continues currently being planned and in- first major concrete segmental tal width of 78 feet. The recon- to expand with its newest sections stalled at certain locations. bridges in Pennsylvania. structed roadway section provides of toll highway in western Penn- All these projects, the large The Allegheny River Bridge is for a future third lane in each di- sylvania. The Mon/Fayette Ex- bridge replacements, the total re- located in western Pennsylvania, rection, full 12-foot shoulders, and pressway will stretch about 65 constructions, the new expansions and is approximately 2,600 feet a wider median for a total width of miles south of Pittsburgh and con- and interchanges, and many others, long. It is currently in preliminary over 110 feet. This requires almost nect to Interstate 68 in West Vir- make it an exciting time again at design for total replacement. all the bridges crossing over the ginia. The Southern Beltway will the Turnpike. We welcome you to The Lehigh and Pohopoco Turnpike to be replaced with longer form an arc about 30 miles long hear more about Turnpike and these River Bridges, two of our larger structures. The majority of the with a radius reaching approxi- projects during our Featured structures on the Northeast Exten- mainline brides are also being re- mately 15 miles out from Agency Session and by stopping by sion of the Turnpike, are in final placed for the wider widths. Pittsburgh’s Golden Triangle. the Featured Agency Room. We design and will also be replaced in To date, over 24 miles have been At the eastern end of the state, a hope you enjoy the Conference! their entirety. reconstructed and another 21 miles new connection between the Turn- Many of our other lesser bridges are in construction. Future plans call pike and Interstate 95 is being de- are being replaced as part of our To- for over 16 miles to be reconstructed signed by way of a high-speed in- tal Reconstruction Program. Just every year for the next ten years. terchange. The project will involve like many of our bridges, the Turn- Many things have changed since the widening nine miles of the Turn- pike roadway is nearing the end of Turnpike was originally constructed, pike and the construction of a new its life expectancy, and has to be re- most noticeably the cost. Today, re- bridge crossing the Delaware River. habilitated or replaced. Our Total construction of one mile of Turnpike The project will also incorporate Reconstruction Program calls for roadway is averaging at $10 million the latest in intelligent transporta- completely rebuilding the Turnpike compared to $500,000 per mile tion systems. roadway from the sub-grade up. when the Turnpike was originally Electronic Toll Collection (E-Z The original Turnpike provided for constructed, which included the con- Pass) is another relatively new fea- two 12-foot wide travel lanes in struction of seven tunnels. ture to be implemented throughout each direction with 10-foot shoul- From the original seven tunnels, the Turnpike system providing for E-Z Pass System Bridge Name? Pennsylvania Turnpike - Interstate 95 interchange Pittsburgh ENGINEER 5 The Overbrook Era: From Freight to Transit By: John M. Stasko DMJM/Gannett ing done to keep the Overbrook subway system into and around the The Birth of a Railroad Line in operation.
Recommended publications
  • Pennsylvania Turnpike Commission a Component Unit of the Commonwealth of Pennsylvania Fiscal Years Ended May 31, 2012 and 2011
    C OMPREHENSIVE A N N U A L F I N A N C I A L R EPORT Pennsylvania Turnpike Commission A Component Unit of the Commonwealth of Pennsylvania Fiscal Years Ended May 31, 2012 and 2011 Pennsylvania Turnpike Commission A Component Unit of the Commonwealth of Pennsylvania Comprehensive Annual Financial Report Fiscal Years Ended May 31, 2012 and 2011 Prepared by: Lynn R.Stakem, Senior General Accountant Christopher G. Will, Investment Manager Catherine L. Sabo, Accounting Manager Theodore A. Rusenko, Accounting and Financial Reporting Manager Sharon S. Jones, Senior Accounting Manager Anthony Q. Maun, Assistant CFO/Accounting and Budget (This page intentionally left blank) Pennsylvania Turnpike Commission A Component Unit of the Commonwealth of Pennsylvania Comprehensive Annual Financial Report Fiscal Years Ended May 31, 2012 and 2011 Table of Contents Introductory Section 1 Letter of Transmittal 3 Organizational Chart 11 List of Principal Officials 12 Certificate of Achievement 13 Financial Section 15 Independent Auditors’ Report 17 Management’s Discussion and Analysis 19 Basic Financial Statements 31 Balance Sheets 33 Statements of Revenues, Expenses, and Changes in Net Assets 35 Statements of Cash Flows 36 Notes to Financial Statements 39 Required Supplementary Information 85 Schedule of Funding Progress – Postemployment Healthcare Benefits 87 Other Supplementary Information 89 Section Information 91 Statistical Section 105 Summary of Revenues and Expenses 107 Schedule of Net Assets 108 Debt Coverage – All Sections 109 Ratios of Mainline Outstanding
    [Show full text]
  • PENNSYLVANIA TURNPIKE COMMISSION a Component Unit of the Commonwealth of Pennsylvania
    PENNSYLVANIA TURNPIKE COMMISSION A Component Unit of the Commonwealth of Pennsylvania Comprehensive Annual Financial Report Fiscal Years Ended May 31, 2020 and 2019 With Independent Auditor’s Report PENNSYLVANIA TURNPIKE COMMISSION A Component Unit of the Commonwealth of Pennsylvania Comprehensive Annual Financial Report Fiscal Years Ended May 31, 2020 and 2019 TABLE OF CONTENTS Page(s) INTRODUCTORY SECTION Letter of Transmittal 1─9 Organization Chart 10 List of Principal Officials 11 Certificate of Achievement 12 FINANCIAL SECTION Independent Auditor’s Report 13─15 Management’s Discussion and Analysis (Unaudited) 16─32 Basic Financial Statements Statements of Net Position 33─34 Statements of Revenues, Expenses, and Changes in Net Position 35 Statements of Cash Flows 36─38 Notes to Financial Statements 39─117 Required Supplementary Information (Unaudited) Schedule of Commission’s Proportionate Share of Net Pension Liability – Pennsylvania State Employees’ Retirement System – Pension Fund 118 Schedule of Commission’s Contributions – Pennsylvania State Employees’ Retirement System – Pension Fund 119 Schedule of Changes in the Commission’s Net OPEB Liability and Related Ratios 120 Schedule of Commission’s Contributions to the Other Postemployment Welfare Plan Program 121─122 Other Supplementary Information Section Information 123 As of and for the Year Ended May 31, 2020 Schedule of Net Position 124─125 Schedule of Revenues, Expenses, and Changes in Net Position 126 Schedule of Cash Flows 127─129 As of and for the Year Ended May 31, 2019
    [Show full text]
  • 1 I-68/I-70: a WINDOW to the APPALACHIANS by Dr. John J
    I-68/I-70: A WINDOW TO THE APPALACHIANS by Dr. John J. Renton Dept. of Geology & Geography West Virginia University Morgantown, WV Introduction The Appalachian Mountains are probably the most studied mountains on Earth. Many of our modern ideas as to the origin of major mountain systems evolved from early investigations of the Appalachian region. The Appalachians offer a unique opportunity to experience the various components of an entire mountain system within a relatively short distance and period of time. Compared to the extensive areas occupied by other mountain systems such as the Rockies and the Alps, the Appalachians are relatively narrow and can be easily crossed within a few hours driving time. Following I-68 and I-70 between Morgantown, WV, and Frederick, Maryland, for example, one can visit all of the major structural components within the Appalachians within a distance of about 160 miles. Before I continue, I would like to clarify references to the Allegheny and Appalachian mountains. The Allegheny Mountains were created about 250 million years ago when continents collided during the Alleghenian Orogeny to form the super-continent of Pangea (Figure 1). As the continents collided, a range of mountains were created in much the same fashion that the Himalaya Mountains are now being formed by the collision of India and Asia. About 50 million years after its Figure 1 1 creation, Pangea began to break up with the break occurring parallel to the axis of the original mountains. As the pieces that were to become our present continents moved away from each other, the Indian, Atlantic, and Arctic oceans were created (Figure 2).
    [Show full text]
  • Cumberland Narrows: Portal to the National Road
    12 m o u n t a i n d i s c o v e r i e s The Cumberland Narrows: Portal to the National Road Written by: Dan Whetzel New Photography by: Lance C. Bell he Cumberland Narrows has played an important events that occurred there have dimmed with the passing part Tin Western Maryland history, as it provided a natural of time. Cumberland’s Narrows is unique because it break in the Appalachian Mountains that stretched combines natural history with political, economic, and north/south through the region. Formed thousands of military events that have determined the course of our years ago, the Narrows is a one mile water gap dominated nation since 1755. To trace those recorded events, we at the lowest elevation by Will’s Creek and transportation need to turn back the clock to early European explorers arteries, while its higher elevations feature the spectacular and entrepreneurs who established themselves in lands beauty of Tuscarora and Juniata sandstone rock forma- formerly occupied by members of the Shawnee Tribe. tions. According to a geological report filed in 1978, Topography and abundant natural resources were key it was speculated the Narrows resulted from forces reasons Europeans migrated to Western Maryland during generated in the formation of the Eastern Appalachian the mid 18th century. The Ohio Trading Company con- Mountains. A stream began eroding the water gap structed a significant settlement in the area, a storehouse across Will’s Mountain and surrounding weaker rocks about one mile from the Narrows, at the confluence of were eroded into the valley, thereby causing a 900- foot Will’s Creek and the Potomac River.
    [Show full text]
  • G-I-E-195 Bloomington Survey District
    G-I-E-195 Bloomington Survey District Architectural Survey File This is the architectural survey file for this MIHP record. The survey file is organized reverse- chronological (that is, with the latest material on top). It contains all MIHP inventory forms, National Register nomination forms, determinations of eligibility (DOE) forms, and accompanying documentation such as photographs and maps. Users should be aware that additional undigitized material about this property may be found in on-site architectural reports, copies of HABS/HAER or other documentation, drawings, and the “vertical files” at the MHT Library in Crownsville. The vertical files may include newspaper clippings, field notes, draft versions of forms and architectural reports, photographs, maps, and drawings. Researchers who need a thorough understanding of this property should plan to visit the MHT Library as part of their research project; look at the MHT web site (mht.maryland.gov) for details about how to make an appointment. All material is property of the Maryland Historical Trust. Last Updated: 12-01-2003 G-I-E-195 Bloomington Survey District Bloomington Private 1800-1899 The town of Bloomington is located on the southeast side of Backbone Mountain where the Savage River drains into the North Branch of the Potomac River. Roughly half a square mile in area, the town is bounded by the Savage River to the north, the Potomac to the east and south, and by Bloomington U111 to the west. The historic district comprises about seven blocks at the northern end of town banded by Virginia Avenue to the south, Hampshire Avenue and the County Road to the west, the Baltimore and Ohio Railroad to the northeast, and North Branch and Hamill Avenues to the east.
    [Show full text]
  • 7 Sensitive Areas Garrett County’S Physical Landscape Is Characterized by Mountainous Ridges, Stream Valleys, Extensive Forests, and Productive Agricultural Areas
    2008 Garrett County Comprehensive Plan 7 Sensitive Areas Garrett County’s physical landscape is characterized by mountainous ridges, stream valleys, extensive forests, and productive agricultural areas. The County is home to the four highest mountains in Maryland, the state’s first designated Scenic and Wild River (the Youghiogheny River), and the state’s largest freshwater lake (Deep Creek Lake). These features are scenic and recreational resources for the County’s residents and visitors, and many are also environmentally sensitive. The Planning Act of 1992 and subsequent legislation requires each comprehensive plan in Maryland to establish goals and policies related to sensitive environmental areas, specifically addressing: • Steep slopes, • Streams, wetlands, and their buffers, • 100-year floodplains, • The habitat of threatened or endangered species, • Agricultural and forest land intended for resource protection or conservation, and • Other areas in need of special protection. The County’s Sensitive Areas Ordinance (adopted in 1997) and Floodplain Management Ordinance (adopted in 1991) provide detailed guidance for development affecting these sensitive areas. This chapter updates the 1995 Plan’s description of the County’s sensitive areas, and, in conjunction with the Water Resources and Land Use chapters of this Plan, further strengthens policies to protect sensitive areas. This chapter includes a discussion of ridgelines as a sensitive area in need of protection. 7.1 Goals and Objectives The County’s sensitive areas goal is: Continue to protect Garrett County’s sensitive environmental resources and natural features. The objectives for achieving this goal are: 1. Limit development in and near sensitive environmental areas, including steep slopes, streams, wetlands, 100-year floodplains, and the habitats of threatened or endangered species.
    [Show full text]
  • How They Named the Western Maryland Mountains • Part III
    56 m o u n t a i n d i s c o v e r i e s How They Named the Western Maryland Mountains • Part III If you stand high up on Wills Mountain in Cumberland, “Will” certainly doesn’t sound like an Indian name. you can look down on “The Narrows” mountain gap and But English settlers sometimes used nicknames for Indians imagine pioneer families in their covered wagons, driving they knew, probably because they found Indian names west through the gap in the early 1800s. You can picture hard to pronounce and spell. Lowdermilk didn’t mention runaway slaves as they may have traveled through the Narrows, Will’s tribe, nor call him a chief; but others later called hidden in wagons driven by black teamsters who were hauling him Chief Will. Lowdermilk presented Will as a benign cargo to Pennsylvania. You can imagine private coaches and fellow who gave “a kindly greeting” to English settlers stagecoaches rumbling through in the other direction, carrying and lived in “intimate friendship with them.” He said the presidents and other political leaders east to Washington. settlers gave Will “some trifl e as a pretended compensation” when they obtained grants to his land. He indicated that A 1755 map showed Wills Creek; and Charles Mason, Will died in the early 1780s and was buried on top of of the Mason-Dixon surveying team, mentioned “Will’s Creek Wills Knob, a hill near Wills Mountain. Mountain” in his 1760s journal. Early travellers used the Wills Creek name for what soon would be called Cumberland.
    [Show full text]
  • Land Use This Chapter Describes the Proposed Land Use Plan for Garrett County
    2008 Garrett County Comprehensive Plan 3 Land Use This chapter describes the proposed land use plan for Garrett County. It lists land use goals and objectives, discusses land use and development trends since the 1995 Comprehensive Plan, and provides detailed information about existing and proposed land use in the County’s major watersheds.1 The Deep Creek Watershed is covered briefly in this Chapter, and is covered in greater detail in Chapter 4. 3.1 Goals and objectives The County’s land use goals and objectives are: 1. Conserve forest resource land. 2. Conserve agricultural resource land. 3. Encourage growth in designated growth areas, including the County’s incorporated towns, and especially where development can be served by public water and sewerage systems. 4. Provide land in appropriate locations for growth and expansion of economic development opportunities. 5. Continue to encourage growth and development around Deep Creek Lake and its associated resort activities. 6. Provide land in appropriate locations and densities for a variety of housing types and choices. 7. Provide land in appropriate locations to allow for the development of affordable housing. 8. Improve the layout and design of residential subdivisions to conserve resource land and rural character. 9. Discourage strip commercial development. 10. Encourage high quality building and site design. 3.2 Land Use and Development Trends This section discusses land use and development trends as background to the proposed land use plan. 3.2.1 Existing Land Use Existing land use as of 2005 is shown on Map 3.1. Garrett County is a natural resource-rich County, with approximately 90 percent of the County comprised of resource lands—primarily forest and agricultural land.
    [Show full text]
  • Engineering Fast Facts Fast Facts
    ENGINEERING FAST FACTS FAST FACTS LENGTH OF TURNPIKE TRAFFIC COMPOSITION Delaware River to Ohio 359 miles Passenger Vehicles 86.3% Northeastern Extension 112 miles Commercial Vehicles (Trucks/Buses) 14.0% Western Expansions 82 miles Expansions Include: Beaver Valley Expressway, Southern Beltway, AVERAGE TRAFFIC VOLUME Mon/Fayette Expressway and Greensburg Bypass Total Vehicles 208,254,303 Vehicles per Day 570,560 Total Turnpike Miles 553 miles Vehicles in 1941 (First Full Year of Operation) 2,400,000 Total Lane Miles 2,426 miles Vehicles per Day (1941) 6,575 TOTAL RECONSTRUCTION PROJECTS # OF YEAR TOTAL MILES LOCATION COUNTY TOTAL COST LANES # OF (MP = Milepost) (in millions) ADDED LANES 2000 5.09 miles MP 94 - 99 Westmoreland $ 33 1.9 5 2001 10.01 miles MP 186 - 199 Franklin & Huntingdon $ 58 0 4 2002 10.41 miles MP 75 - 85 Westmoreland $ 77 12.8 4 2004 12.53 miles MP 109 - 121 Somerset $172 1.95 4 1.69 miles MP 38 - 40 Allegheny $ 19 0 4 2005 9.00 miles MP 85 - 94 Westmoreland $ 111 9.91 4 2006 1.72 miles MP 331 - 333 Montgomery $ 38 3.43 6 2.55 miles MP 245 - 247 Dauphin & York $190 5.02 6 2008 5.55 miles MP 326 - 331 Chester & Montgomery $236 9.2 6 9.29 miles MP 0 - 10 Lawrence & Beaver $157 14.72 6 2009 4.37 miles MP 210 - 215 Cumberland $ 83 8.72 6 2010 1.93 miles MP 48 - 50 Allegheny $232 3.79 6 2011 6.97 miles MP 67 - 75 Westmoreland $196 13.94 6 7.08 miles MP 31 - 38 Allegheny $189 12.68 6 5.01 miles MP 215 - 220 Cumberland $ 83 10.02 6 2012 0.69 mile MP 319 - 320 Chester $ 75 0 4 161 miles MP A73.5 - A 75.3 Carbon $118 0 4 2013
    [Show full text]
  • Allegany County
    763 MARYLAND GEOLOGICAL SURVEY ALLEGANY COUNTY MARYLAND GEOLOGICAL SURVEY ALLEGANY COUNTY BALTIMORE THE JOHNS HOPKINS PRESS 1900 ^6e jfrnbenmafS Company BALTIMORE, MD., U. S. A. COMMISSION JOHN WALTEE SMITH, President. GOVERNOR OF MARYLAND. JOSHUA W. HEEING, COMPTROLLER OF MARYLAND. DANIEL C. OILMAN, . Executive Offickk. PRESIDENT OF THE JOHNS HOPKINS UNIVERSITY. E. W. SILVESTEE, Secretary. PRESIDENT OF THE MA-BYLAND AGRICULTURAL COLLEGE. SCIENTIFIC STAFF Wm. Bullock Clark, . ... State Geologist. SUPERINTENDENT OF THE SURVEY. Edward B. Mathews, . Assistant State Geoi.ogist. Charles S. Prosser, Chief of Division of Appalachian Geology, L. A. Bauer, . Chief of Division of Terrestrial Magnetism. C. C. O'Harra Assistant Geologist. E. B. Eowe, Assistant Geologist. Also with the cooperation of several members of the scientific bureaus of the National Government. LETTER OF TRANSM1TTAL To His Excellency John Waltee Smith, Governor of Maryland and President of the Geological Survey Commission. Sir:—I have the honor to present herewith a report on The Physi- cal Features of Allegany County. The Volume constitutes the first of a series of reports on county resources, and is accompanied by an Atlas with large scale topographical and geological maps. The infor- mation brought forward in these publications is of both economic and educational significance and I believe will prove of interest and value both to those who are residents of the county and those from a distance who may be considering sites for homes or for the investment of capital therein. I am, Very respectfully, Wm. Bullock Clark, State Geologist. Johns Hopkins University, Baltimore, 'November, 1900. CONTENTS PAGE PREFACE 17 INTRODUCTION 33 THE PHYSIOGRAPHY OF ALLEGANY COUNTY.
    [Show full text]
  • G-I-B-178 Mason-Dixon Line: Milestone No. ___ (180)
    G-I-B-178 Mason-Dixon Line: Milestone No. ___ (180) Architectural Survey File This is the architectural survey file for this MIHP record. The survey file is organized reverse- chronological (that is, with the latest material on top). It contains all MIHP inventory forms, National Register nomination forms, determinations of eligibility (DOE) forms, and accompanying documentation such as photographs and maps. Users should be aware that additional undigitized material about this property may be found in on-site architectural reports, copies of HABS/HAER or other documentation, drawings, and the “vertical files” at the MHT Library in Crownsville. The vertical files may include newspaper clippings, field notes, draft versions of forms and architectural reports, photographs, maps, and drawings. Researchers who need a thorough understanding of this property should plan to visit the MHT Library as part of their research project; look at the MHT web site (mht.maryland.gov) for details about how to make an appointment. All material is property of the Maryland Historical Trust. Last Updated: 12-01-2003 ABSTRACT G-IB-178 MASON-DIXON LINE: MILESTONE NO. ---(180) 1902 Finzel, Maryland vicinity Public/private Milestone No. ---(180), on Little Savage Mountain ridge, marks a new point about midway between Mason and Dixon's 166th and 167th miles from the northeast corner of Maryland, the beginning of their 230.228-mile West Line. It is a very plain, dressed marble post with a low pyramidal top, quarried and carved in Cockeysville, Maryland; is in fairly good condition, unaltered, firmly set; measures about 10 inches square by about 20 inches high above ground; and is embellished only by the capital letter P on the north side facing Pennsylvania, M on the south side facing Maryland, the year 1767 on the east side (when this area was surveyed and marked), and 1902 on the west side (when the/i5~ument was added to the Line).
    [Show full text]
  • National Road Journal of Elizabeth Miller
    National Road Journal of Elizabeth Miller [this is a fictional story - Merle C Rummel] ******************************************************************************** [inside front cover] Mother, Elizabeth Miller Petry, Died Nov 1861 – This Is CLOSED – till 1962 Mother was buried in the Wehrly-Petry Cemetery, in the opposite corner from Daddy. She did say that since there was no room beside him, to bury her clear away from him -that maybe she wouldn’t pester him so much for eternity. Daddy was buried there, then my sister Nancy, who died when she was 19, was buried in the lot beside him. Mother was laughing every time she said it! Sometimes I did wonder how daddy could take her so calmly all the time. Mother would get excited, and yell – every so often. Maggy Petry Stump (found in an old trunk of the Stump family – 1982 – Preble Co OH) ******************************************************************************** NOT TO BE READ – till I’m 100 years DEAD - (added - top of page) I’m Angry! – I’m Scared! – I Don’t Know What to Do! I’m Angry at Mother, I’m Angry at Stephen. I don’t Want to go to Ohio! And – Mother says that I have Got to go! Grandpa gave me this journal book, and told me to keep a record of our trip west. Grandpa is George Petry and he said I was the only one who could do it so good. I think grandpa did it just to distract me, that maybe this would help, I am in love with Stephen, we’re going to get married – or – we WERE going to get married!.
    [Show full text]