Widen Turnpike Mainline (SR 91) from Neptune to Osceola FPID: 436194-1 Project Description

This project widens a 7-mile section of Turnpike Mainline (SR 91) from Neptune Road to just north of the Osceola Parkway. This widening will increase the number of trav- el from four to eight.

Work includes pavement milling and resurfacing, bridge reconstruction, and roadside safety enhancements.

Project Status

This project is in Design.

Right-of-Way is funded in Fiscal Years 2021 – 2023.

Environmental is funded in Fiscal Year 2021.

Railroad & Utilities is funded in Fiscal Year 2023.

Construction is funded in Fiscal Year 2024

Contact Information

Brandon Bobo, PE Project Manager / HNTB Florida’s Turnpike Enterprise 407-264-3277 [email protected]

July 2021 Information is preliminary and subject to change. Turnpike Mainline (SR 91) Improvements at Kissimmee Park Road FPID: 441224-2 Project Description

This project removes the existing ramps at the Kis- simmee Park Road partial interchange. A proposed new Turnpike interchange will be constructed at an extension of W. New Nolte Road, located approximately 1/2 a mile north of the existing Kissimmee Park Road interchange. This new interchange will provide all directional access to and from the Turnpike.

The proposed interchange features a diverging diamond configuration, which offers improved capacity with a smaller footprint. The PD&E and Design for the inter- change modification will be conducted concurrently.

For information, please visit: www.turnpikestcloud.com

Project Status

This project is in a Project Development and Environment Study.

Environmental is funded in Fiscal Year 2021.

Right-of-Way is funded in Fiscal Years 2021 and 2022.

Design-Build is funded in Fiscal Year 2024.

Contact Information

Snehal Ambare, PE Project Manager / HNTB Florida’s Turnpike Enterprise 407-264-3414 [email protected]

July 2021 Information is preliminary and subject to change. Widen Turnpike Mainline (SR 91) from Kissimmee Park Road to US 192 FPID: 441224-3 Project Description

This project widens a 4-mile section of Turnpike Mainline (SR 91) from Kissimmee Park Road to US 192. This wid- ening will increase the number of travel lanes from four to eight.

Work includes pavement milling and resurfacing, bridge reconstruction, and roadside safety enhancements.

Project Status

This project is reserved for Future phases.

Design is funded in Fiscal Years 2021.

Construction is funded in Fiscal Year 2025.

Contact Information

Snehal Ambare, PE Project Manager / HNTB Florida’s Turnpike Enterprise 407-264-3414 [email protected]

July 2021 Information is preliminary and subject to change. Turnpike Mainline/SR 91 Truck Parking at Canoe Creek Service Plaza FPID: 443879-1 Project Description

The project expands truck parking at the Canoe Creek Service Plaza. In addition, the project will add passenger parking spaces near the Service Plaza.

Work includes pavement, potential Turnpike Mainline (SR 91) plaza ramp improvements, pond and ditch reconstruction, and lighting upgrades at the plaza.

Project Status

This project is in Design.

Utilities are funded in Fiscal Year 2023.

Construction are funded in Fiscal Year 2026.

Contact Information

Brian Ribaric, PE Project Manager/Atkins Florida’s Turnpike Enterprise 407-264-3095 [email protected]

AprilJuly 20212021 Information is preliminary and subject to change.