COUNTRY SESSION

CURRENT SITUATION AND FUTURE PLAN OF INFRA DEVELOPMENT

Road Development Authority

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . ROAD INFRASTRUCTURE – OVERVIEW

 National Highways (Class A &B) : 12,380 km

 Expressways : 170 km

 Provincial Roads(Class C & D) : 15,532 km

 Local Governments Road : 84,208 km

 Other ( Mahaweli, Irrigation etc) : 4,000 km

 Total : 116,286 km

 Land Area : 65,610 km2

 Average Road Density : 2.77 km/km2

 Railway : 1,445 km

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . DEVELOPMENT IN TRANSPORTATION – SRI LANKA

Centered on the Port of

Development of Coconut as an Export

Eg. Dutch Canal, St. Sebastian Canal , Hamilton Canal etc.

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . POLICY OF THE COLONIAL GOVERNMENT- RAILWAY CONSTRUCTION

 The Government considered that the construction of railways was necessary for the advancement of production, trade and commerce of the island.

 The reduction of transport costs were of importance as cart charges were very high in 1870s.

 It is evident that the policy towards the construction of railways in Sri Lanka was generally based on advancing the economic prosperity of the island.

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . Roads & Rail During Early 20th Century

 Source : The Colonial Economy on Track, Prof. Indrani Munasinghe

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . HISTORICAL LAND MARKS

 First car was imported to Ceylon in 1902

 Bridge of boats near Colombo to cross the Kelani River was

completed in the year 1822. The bridge of boats was used till 1895

 The road through Kadugannawa also completed in the year

1831. The construction of the road took about eleven years

 The first lattice girder bridge by the name Victoria Bridge was built

in 1895 over the Kelani River

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . ROAD LENGTHS IN SELECTED YEARS (km)

120,000

100,000

80,000 Main roads

Secondary Roads 60,000

ROAD LENGTH (km) LENGTH ROAD All roads 40,000

20,000

0 1946 1963 1971 1981 1991 1996 YEAR

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . PRESENT TRANSPORTATION SYSTEM

 Affected by the socio economic policies

 Up to 1950 it was a compact and simple

 In 1977 with implementation of open economic system the transport

was de-regularized and privatised

 Present Transport system consists of Land, Sea and Air transport

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . LAND TRANSPORT -ROAD NETWORK IN SRI LANKA

 The Road Development Authority (RDA) is the Principal Highway Authority for the construction and maintenance of National Highways Network of Sri Lanka.

 National Highways Network consists of 12,380 km roads and 4796 bridges.

 Roads in Sri Lanka shares a more demand compared to rail tracks

Demand Road Rail Passenger Demand 92% 8% Freight Demand 98% 2%

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . ROLE OF RDA

 RDA is the premier highway authority in Sri Lanka & it is responsible

for

 Planning, Construction, Maintenance & Administration of National

Highway Network comprising of A & B class roads and bridges

 Also, expressway network of approximately 800 km has been

identified and under different stages of development to augment the

road network.

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . CURRENT SITUATION

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . SOUTHERN TRANSPORT DEVELOPMENT PROJECT

Funding : JICA, ADB & EXIM Bank

Section : Makumbura - Godagama

Length : 124.80 km

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 13 COLOMBO – KATUNAYAKE EXPRESSWAY

Funding : China

Length : 25.80 km

Section: Peliyagoda – Katunayake

Contractor : MCC

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 14 OUTER CIRCULAR EXPRESSWAY PHASE I

Funding : JICA Section: Kottawa - Kaduwela Length : 11 km Contractor : China Harbour Engineering Co. Ltd

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 15 OUTER CIRCULAR EXPRESSWAY PHASE II

Funding : JICA

Section: Kaduwela - Kadawatha

Length : 8.90 km

Contractor : Taisei Corporation

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 16 HIGHWAYS DEVELOPMENT PROJECTS

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . PRIORITY ROAD PROJECT I (PRP I) Funding : CDB

Loan Amount : US$ 152.8 Millions Scope : 177.07 km Including 8 Roads & 1 flyover @ Siribopura

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 18 PRIORITY ROAD PROJECT II (PRP II)

Funding : CDB

Loan Amount : US$ 500 Mn Scope : Northern roads - 415 km Southern roads - 190 km, 2 flyovers & 2 bridge packages

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 19 NATIONAL HIGHWAYS SECTOR PROJECT (NHSP)

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 20 NORTHERN ROAD CONNECTIVITY PROJECT (NRCP)

 Project 1

Funding : ADB

Loan Amount : US$ 154.40 Mn

Road Length : 186.44 km

 Project 2 Funding : ADB – Additional Financing Loan Amount : US$ 84 Mn Road Length : 117.57 km

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 21 INTEGRATED ROAD INVESTMENT PROGRAMME (I-ROAD PROJECT)

Funding : ADB Project Summary

No. of Lengths (km) Length (km) Province Districts Present Status Roads (District wise) (Province wise) Galle 66 197 Southern Matara 67 218 582 Construction in progress Hambantota 51 167 Ratnapura 38 255 04 packages awarded & 02 to Sabaragamuwa 472 Kegalle 63 217 be awarded Kandy 50 221 Central Matale 51 194 595 Construction in progress Nuwara Eliya 43 180 Polonnaruwa 55 170 North Central 500 Procurement in progress Anuradapura 60 330 76 485 North Western 705 Procurement in progress Puttalam 38 220

Western Kalutara 83 276 276 Procurement in progress

Total 741 3,130

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 22 CURRENT SITUATION CONT’D

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 23 CURRENT SITUATION CONT’D Colombo National Highway Project (CNHP)

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 24 – CHENKALLADI ROAD IMPROVEMENT PROJECT (BCRIP)

Section : Badulla – Chenkalladi

Funding : SFD and OFID

Loan Amount : SFD - US$ 60 Mn OFID - US$ 60 Mn

GOSL Contribution: US$ 20 Mn

Length : 145.60 km

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 25 CONSTRUCTION OF BRIDGES & FLYOVERS

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . NEW BRIDGE CONSTRUCTION PROJECT OVER KELANI RIVER (NKBCP)

Funding : JICA

Loan Amount : Rs. 46,755 Mn

GOSL Contribution : Rs. 8,558 Mn

Major Resettlement Activities:

- Relocation of Atomic Energy Authority

- Relocation of Automotive Engineering Training Institute

- Resettlement of families

- Converting of CEB transmission lines to under ground

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 27 ONGOING BRIDGE PROJECTS Funding : Kuwait Fund for Arab Economic Development Loan Amount : Kuwait Dirham 10 Mn , 25 Bridges

Funding : French Government Loan Amount : € 22.05 Mn , 46 Bridges

Funding : HSBC – UK Loan Amount : £ 45 Mn Contractor : Mabey Bridge Ltd No. of Bridges : 80 (62 permanent & 18 temporary)

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 28 STUDIES IN PROGRESS

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . STUDIES IN PROGRESS

 Advanced Traffic Management System

Project Area/Scope : Colombo Metropolitan Area

Present Status : Detail Design in progress

 Establishment of Bridge Management System (BMS) and Bridge Assessment Unit

(BAU)

Funding : JICA

Present Status : Bridges in Western, Central and Southern provinces are being inspected

 Establishment of Sri Lanka Road Asset Management System (SLRAMS)

Funding : World Bank Present Status : In the process of updating data

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 30 ONGOING PROJECTS

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . OUTER CIRCULAR EXPRESSWAY PHASE III

Funding : EXIM Bank, China

Section: Kadawatha - Kerawalapitiya

Length : 9.20 km

Contractor : MCC

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 32 EXTENSION OF STDP

Length: 96 km

Section: Godagama - Mattala – Hambanthota

No. of Packages : 4 PKG I : Godagama – Beliatta PKG II : Beliatta – Wetiya PKG III : Wetiya – Andarawewa PKG IV : Mattala Hambantota

Present Status: Construction commenced for PKG I

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 33 CENTRAL EXPRESSWAY (CEP) Section: Kadawatha to Dambulla & Kandy

Length : 197.30 km

Section Name

1 Kadawatha - Mirigama 2 Mirigama – Kurunegala 3 Pothuhera - Galagedara 4 Kurunegala - Dambulla

Present Status: Section 1 awarded

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 34 Central Expressway cont’d

Section 1 Section 2

Length 38 km Length 40 km Project cost 985 M USD Project cost 673 M USD Funded by EXIM Bank - China Funded by ADB ( Under discussion ) Consultant To be nominated Consultants Structural consultant – AIT Solutions Geometric consultant – Oriental Contractor MCC - China Consultants Status Contractor mobilized Contractor To be nominated Status Detail Design in progress

Section 3 Section 4

Length 33 km Length 63 km Project cost 718 M USD Project cost 804 M USD Funded by To be nominated Funded by To be nominated Consultant To be nominated Consultant To be nominated Contractor To be nominated Contractor To be nominated

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 35 PROJECTS TO BE COMMENCED

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . RUWANPURA EXPRESSWAY

Section: Gelanigama - Pelmadulla Present Status: Feasibility in progress

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 37 PROJECTS TO BE COMMENCED CONT’D

Project Funding Present Status

Elevated Highway from New Kelani Bridge to Feasibility Completed Not finalized Malambe via Battaramulla (funded by ADB)

Preliminary work in Western Province National Highways Project OFID progress

Rehabilitation & Improvement of Priority Roads Preliminary work in CDB Projects 3 – Ph II progress

Contract agreement Construction of flyovers at , Ganemulla Spanish signed between RDA and and Rajagiriya Government CENTUNION

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 38 ELEVATED HIGHWAY from New Kelani Bridge to Fort through Harbour access Road

Length : 5.8 km Present Status :Feasibility Completed (Funded by ADB)

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 39 PROJECTS TO BE COMMENCED CONT’D

Project Funding Present Status

Output and Performance based Road Contract Preparation of bidding World Bank (OPRC) documents

Marine Drive Extension - - (Kollupitiya – Fort & Dehiwala – Panadura)

Baseline Ph – III - - (Kirulapone – Ratmalana)

Kandy Tunnel Project Pre-feasibility study done - (Suduhumpola – Thennekumbura) by CECB

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 40 CHALLENGES …

 Traffic Congestion

 Natural Disasters

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 41 Eye Opener – Recent Flood in May 2016

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . Eye Opener – Recent Landslides

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 43 LANDSLIDE DISASTER PROTECTION PROJECT (LDPP)

. ROAD DEVELOPMENT AUTHORITY . SRI LANKA . 44 THANK YOU