AIP SUPPLEMENT

INDIA TEL: 91-11-24632950 AERONAUTICAL INFORMATION SERVICE 228/2020 Extn: 2219/2233 AUTHORITY OF AFS: VIDDYXAX BHAVAN FAX: 91-11-24615508 SAFDARJUNG Email: [email protected] 26 NOV 2020 NEW – 110003

File No. AAI/ATM/AIS/09-09/2020 Following supplement is issued for information, guidance and necessary action.

sd/- हﴂ द सﴂ अरव ARVIND SINGH अ鵍यक्ष/CHAIRMAN भारतीय व मानपत्तन प्राधिकरण AIRPORTS AUTHORITY OF INDIA

CHECKLIST OF CURRENT AIP SUPPLEMENTS (As on 26 NOV 2020)

AIP Title of AIP Supplement Supplement No. 1989 IAL Procedure 33/1989 Kota Aerodrome 1990 NDB IAL Procedure 02/1990 Rourkela Aerodrome 2007 Implementation of air traffic flow management procedures over Bay of Bengal, 25/2007 South Asia and Pakistan through Kabul FIR 2008 RNAV SIDs and STARs 33/2008 Ahmedabad Airport VOR Procedure Runway 27 35/2008 Fursatganj Airport VOR Procedure Runway 09 36/2008 Fursatganj Airport ILS Procedure Runway 27 37/2008 Fursatganj Airport 40/2008 Establishment, Operation of a Central Reporting Agency

Airports Authority of India AIP Supplement 228/2020 Page 1 of 11 NDB Circling Procedure Runway 04/22 46/2008 Airport VOR Procedure Runway 04 47/2008 VOR Procedure Runway 22 48/2008 Gondia Airport 2009 RNAV SIDs & STARs 29/2009 Chennai Airport 2010 Helicopter Routing 09/2010 CSI Airport, RNAV-1 (GNSS or DME/DME/IRU) SIDS and STARs 14/2010 RGI Airport, Shamshabad 2011 NON-RNAV Standard Instrument Departure Procedure 09/2011 Cochin International Airport RNAV-1 (GNSS) SIDs and STARs 61/2011 Thiruvananthapuram Airport NON-RNAV SIDs – RWY 27 67/2011 Cochin International Airport RNP-1 STARs & RNAV (GNSS) Approach RWY 27 68/2011 Cochin International Airport 2012 Implementation of Data Link Services I Departure Clearance (DCL) 27/2012 ii Data Link – Automatic Terminal Information Service (D-ATIS) iii Data Link – Meteorological Information for Aircraft in Flight (D-VOLMET) 38/2012 Changes to the ICAO Model Flight Plan Form

2013 RNAV-1 (GNSS) SIDs & STARs 37/2013 Guwahati Airport. 2014 Automatic Dependent Surveillance-Broadcast (ADS-B) Out Based ATS 18/2014 Surveillance Services 2015 RNAV 1 (GNSS) SIDs & STARs 36/2015 Goa Airport (VOGO) 2017 RNAV-1 (GNSS) SIDs and STARs 28/2017 Netaji Subhash Chandra Bose International Airport, Kolkata (VECC)

Airports Authority of India AIP Supplement 228/2020 Page 2 of 11 RNAV-1 (GNSS/DME-DME-IRU) SIDS AND STARS – 53/2017 Indira Gandhi International Airport, New Delhi (VIDP) Aerodrome Data 65/2017 Chhatrapati Shivaji International Airport, Mumbai (VABB) 2018 Aerodrome Data 27/2018 (VEBD) Aerodrome Data 108/2018 Daman Airport (VADN) Automatic Dependent Surveillance - Broadcast (ADS-B) Out 148/2018 Equipage Mandate in India VOR Procedure RWY 26 (CAT A/B) (DME Required) 150/2018 Jamshedpur Airport (VEJS) VOR Procedure RWY 05, (DME Required) 157/2018 (VAMA) VOR Procedure RWY 23, (DME Required) 158/2018 Mundra Airport (VAMA) 2019 VOR Procedure Runway 08 06/2019 Jamshedpur Airport, (VEJS) 14/2019 Establishment of Upper Area Control Centre, Guwahati (UGT) Aeronautical Charts 37/2019 Bagdogra Airport (VEBD) Implementation of Indian Satellite Based Augmentation System 58/2019 GPS Aided Geo Augmented Navigation (GAGAN) System Runway Capacity Enhancement Measures 59/2019 Kempegowda International Airport, Bengaluru (VOBL) Aerodrome Data 61/2019 Goa Airport Aerodrome Data 89/2019 (VAPO) Establishment of Temporary Reserved Areas 127/2019 TRA603(A) and TRA603(B) at Purnea Closure of Runway 09L/27R Due to RWY Resurfacing Work and Rapid Exit 168/2019 Taxiway Construction Works Rajiv Gandhi International Airport, Shamshabad (Hyderabad) (VOHS) Commissioning of Taxiways and Taxilanes and Decommissioning of Aircraft 184/2019 Stands, Taxiway Rajiv Gandhi International Airport, Shamshabad (VOHS)

2020 Airport Collaborative Decision Making (A-CDM) 19/2020 Lokpriya Gopinath Bordoloi International Airport Guwahati (VEGT)

Airports Authority of India AIP Supplement 228/2020 Page 3 of 11 Kempegowda International Airport Bengaluru (VOBL) i. Closure of RWY 09L/27R For Rehabilitation Works 34/2020 ii. Closure of TWY - A, A1, A4, A5, A6, A7, A8, A9 and A11 iii. Closure of TWY-K, Twy-J, Twy-B3, Twy-B4 & Taxilane L4 iv. Closure of Alpha Stands From 69A To 86A Work Activities On Aircraft Movement Areas 57/2020 Chhatrapati Shivaji Maharaj International Airport Mumbai (VABB) [From 16 Jul 2020, 0400 UTC To 19 Dec 2020, 1200 UTC] Instrument Approach Chart – RNP Y RWY 01 58/2020 , Khajuraho (VEKO) Instrument Approach Chart – RNP Y RWY 19 59/2020 Khajuraho Airport, Khajuraho (VEKO) Instrument Approach Chart – RNP Y RWY 09 60/2020 , Shirdi (VASD) Instrument Approach Chart – RNP Y RWY 27 61/2020 Shirdi Airport, Shirdi (VASD) Instrument Approach Chart – RNP Y RWY 09 62/2020 , Hyderabad (VOHY) Instrument Approach Chart – RNP Y RWY 27 63/2020 Begumpet Airport, Hyderabad (VOHY) Instrument Approach Chart – RNP Y RWY 09 64/2020 Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB)

70/2020 Establishment of ATS Route V94

71/2020 Establishment of ATS Route W87

Aerodrome Data 72/2020 (VEJT) Aerodrome Data 73/2020 Cochin International Airport, Cochin (VOCI) Hot Spot Locations and Re-Designation Of Aircraft Stands In Apron II 74/2020 Indira Gandhi International Airport, Delhi (VIDP) Instrument Approach Chart – ILS RWY 32 75/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – VOR RWY14 76/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – VOR RWY 32 77/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – NDB RWY 04 (Cat A/B) 78/2020 , Salem (VOSM) Instrument Approach Chart – RNP Y RWY 27 79/2020 , Aurangabad (VAAU) Aerodrome Data 80/2020 (VERU)

Airports Authority of India AIP Supplement 228/2020 Page 4 of 11 Low Visibility Procedures 81/2020 Bhubaneswar Airport (VEBS) Radio Communication Failure Procedures 82/2020 Jaipur International Airport, Jaipur (VIJP) Standard Arrival Charts – Instrument (STAR) & Standard Departure Charts – 83/2020 Instrument (SID), [RNAV1 (GNSS) Surveillance Required] Jaipur International Airport, Jaipur (VIJP) Standard Arrival Charts – Instrument (STAR) & Standard Departure Charts – 84/2020 Instrument (SID), [RNAV1 (GNSS/ DME-DME-IRU) Surveillance Required] Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB) Instrument Approach Chart – RNP Y RWY 14 85/2020 Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB) Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 23 88/2020 Rupsi Airport (VERU)

89/2020 Amendments To ENR 3.1 of AIP India

90/2020 Amendments To ENR 5.2.1 of AIP India

Helicopter VFR Routes 91/2020 Dr. Babasaheb Ambedkar International Airport Nagpur (VANP) Aerodrome Data 92/2020 , (VOGB) Instrument Approach Chart – VOR RWY 05 93/2020 , Dibrugarh (VEMN) Aerodrome Data 94/2020 , Belgaum (VOBM) Establishment of Temporary Reserved Areas TRA502(A) [Nagpur] And 95/2020 TRA502(B) [Nagpur]

96/2020 Establishment of Temporary Reserved Area Tra606 [Prayagraj]

97/2020 Restructuring of Restricted Area VIR 146-A Prayagraj

98/2020 Amendment To Restricted Area VIR 146-B Prayagraj

99/2020 Establishment of Temporary Reserved Area TRA703(A) [Pathankot]

100/2020 Restructuring of Restricted Area VIR 161-A Pathankot-I

101/2020 Establishment of Temporary Reserved Area TRA703(B) [Pathankot]

102/2020 Restructuring of Restricted Area VIR 161-B Pathankot-II

103/2020 Establishment of Temporary Reserved Area TRA704(A) [Chandigarh]

Airports Authority of India AIP Supplement 228/2020 Page 5 of 11 104/2020 Restructuring of Restricted Area VIR 150 Chandigarh 1(A)

105/2020 Establishment of Temporary Reserved Area TRA704(B) [Chandigarh]

106/2020 Restructuring of Restricted Area VIR 151 Chandigarh 1(B)

107/2020 Establishment of Temporary Reserved Area TRA705 [Ambala]

108/2020 Restructuring of Restricted Area VIR 145 Ambala (B)

109/2020 Establishment of Temporary Reserved Area TRA807(D) [Sulur]

110/2020 Restructuring of Restricted Area VOR 182 Sulur-I

111/2020 Establishment of Temporary Reserved Area TRA810 [Car Nicobar]

112/2020 Restructuring of Restricted Area VOR 192 Car Nikobar

113/2020 Establishment of Temporary Reserved Area TRA811(A) [Tambaram]

114/2020 Restructuring of Restricted Area VOR 183-A Tambaram-I

115/2020 Establishment of Temporary Reserved Area TRA811(B) [Tambaram]

116/2020 Restructuring of Restricted Area VOR 183-B Tambaram-II

117/2020 Establishment of Conditional Route J6

118/2020 Establishment of Conditional Route J20

119/2020 Establishment of Conditional Route J21

120/2020 Establishment of Conditional Route J22

121/2020 Establishment of Conditional Route J24 (CDR3)

122/2020 Establishment of Conditional Route J26

123/2020 Establishment of Conditional Route J27

124/2020 Establishment of Conditional Route Z1 [RNP2]

125/2020 Establishment of Conditional Route Z2 [RNP2]

126/2020 ENR 1.9 Air Traffic Flow Management And Airspace Management

Airports Authority of India AIP Supplement 228/2020 Page 6 of 11 Instrument Approach Chart – RNP Y RWY 09 127/2020 Jaipur Airport, Jaipur (VIJP) Instrument Approach Chart – RNP Y RWY 09 128/2020 Chaudhary Charan Singh Airport, Lucknow (VILK) Instrument Approach Chart – RNP Y RWY 27L 129/2020 Kempegowda International Airport, Bengaluru (VOBL) Aerodrome Data 130/2020 , Vadodara (VABO) Instrument Approach Chart – ILS RWY 22 131/2020 Vadodara Airport, Vadodara (VABO) Instrument Approach Chart – VOR RWY 04 132/2020 Vadodara Airport, Vadodara (VABO) Instrument Approach Chart – VOR RWY 22 133/2020 Vadodara Airport, Vadodara (VABO) Aeronautical Charts 134/2020 Coimbatore Airport, Coimbatore (VOCB) Aerodrome Data 135/2020 , Imphal (VEIM) Commissioning of Apron and Taxiways 136/2020 Airport, (VAUD) Aerodrome Data 137/2020 , Ranchi (VERC) Instrument Approach Chart – RNP RWY 10 138/2020 Airport, Darbhanga (VEDH) Instrument Approach Chart – RNP RWY 28 139/2020 , Darbhanga (VEDH) Aerodrome Data 140/2020 Mundra Airport, Mundra (VAMA) Instrument Approach Chart – RNP Y RWY 05 141/2020 Airport, Kishangarh (VIKG) Instrument Approach Chart – RNP Y RWY 23 142/2020 , Kishangarh (VIKG)

143/2020 Establishment of Temporary Reserved Area TRA607(A) [Chabua]

144/2020 Restructuring of Restricted Area VER 88(A) Chabua

Establishment of Temporary Reserved Area TRA607(B) [Chabua] and 145/2020 TRA607(C) [Chabua]

146/2020 Restructuring of Restricted Area VER 202 Chabua

147/2020 Establishment of Temporary Reserved Area TRA608 [Gorakhpur]

148/2020 Restructuring of Restricted Area VER 75-A Gorakhpur

Airports Authority of India AIP Supplement 228/2020 Page 7 of 11 149/2020 Establishment of Temporary Reserved Area TRA609(A) [Hashimara]

150/2020 Restructuring of Restricted Area VER 85-I Hashimara (A)

151/2020 Establishment of Temporary Reserved Area TRA609(B) [Hashimara]

152/2020 Restructuring of Restricted Area VER 85-II Hashimara (B)

153/2020 Establishment of Temporary Reserved Area TRA610 [Guwahati]

154/2020 Restructuring of Restricted Area VER 86 Guwahati

Establishment of Temporary Reserved Area TRA611(A) [Kalaikunda], 155/2020 TRA611(B) [Kalaikunda] and TRA611(C) [Kalaikunda]

156/2020 Restructuring of Restricted Area VER 81 Kalaikunda (B)

157/2020 Establishment of Temporary Reserved Area TRA612(A) [Tezpur]

158/2020 Restructuring of Restricted Area VER 87-A Tezpur-I

159/2020 Establishment of Restricted Area VER 87(D) Tezpur-IV

160/2020 Establishment of Temporary Reserved Area TRA612(B) [Tezpur]

161/2020 Restructuring of Restricted Area VER 87-B Tezpur-II

162/2020 Establishment of Temporary Reserved Area TRA612(C) [Tezpur]

163/2020 Restructuring of Restricted Area VER 87-C Tezpur-III

Instrument Approach Chart – RNP Y RWY 26 164/2020 , Udaipur (VAUD) Instrument Approach Chart – RNP Y RWY 25 165/2020 , Bhavnagar (VABV) Instrument Approach Chart – RNP Y RWY 27 166/2020 Chhatrapati Shivaji International Airport, Mumbai (VABB) Instrument Approach Chart – ILS (Z) RWY 28 167/2020 Pune Airport, Pune (VAPO) Instrument Approach Chart – ILS (CAT II) RWY 28 168/2020 Pune Airport, Pune (VAPO) Instrument Approach Chart – VOR (Z) RWY 28 169/2020 Pune Airport, Pune (VAPO) Instrument Approach Chart – VOR (Y) RWY 28 170/2020 Pune Airport, Pune (VAPO)

171/2020 Establishment of Nanded CTR

Airports Authority of India AIP Supplement 228/2020 Page 8 of 11 Taxi Routes in Low Visibility Procedures 172/2020 Indira Gandhi International Airport, New Delhi (VIDP) Aerodrome Data 173/2020 (VAPR) Instrument Approach Chart – RNP Y RWY 09 174/2020 Porbandar Airport, Porbandar (VAPR) Instrument Approach Chart – RNP Y RWY 27 175/2020 Porbandar Airport, Porbandar (VAPR) Runway Capacity Enhancement Measures 176/2020 Kempegowda International Airport, Bengaluru (VOBL) Commissioning of Apron 3, Link Taxiway and Aircraft Stand Taxilanes 177/2020 Sardar Vallabhbhai Patel International Airport, Ahmedabad (VAAH) Closure of Runway 09R/27L for Pavement Resurfacing, Upgradation of Aeronautical Ground Lights and Construction Work for New Rapid Exit 178/2020 Taxiway. Rajiv Gandhi International Airport, Shamshabad (Hyderabad) (VOHS)

179/2020 Establishment of Temporary Reserved Area TRA706(C) [Gwalior]

180/2020 Restructuring of Restricted Area VIR 143 Gwalior

181/2020 Establishment of Temporary Reserved Area Tra706(A) [Gwalior]

182/2020 Restructuring of Restricted Area VIR 153 A Gwalior - I

183/2020 Establishment of Temporary Reserved Area TRA706(B) [Gwalior]

184/2020 Restructuring of Restricted Area VIR 153 B Gwalior – II

185/2020 Establishment of Temporary Reserved Area TRA708(A) [Hindon]

186/2020 Restructuring of Restricted Area VIR 155-A [Hindon-I]

187/2020 Establishment of Temporary Reserved Area TRA716(D) [Bareilly]

188/2020 Restructuring of Restricted Area VIR 155-B Hindon-II

Establishment of Temporary Reserved Area TRA709(A) [Jodhpur] And 189/2020 TRA709(B) [Jodhpur]

190/2020 Restructuring of Restricted Area VIR 156-B [Jodhpur (2)]

191/2020 Establishment of Temporary Reserved Area TRA709(C) [Jodhpur]

192/2020 Restructuring of Restricted Area VIR 156-C [Jodhpur (3)]

193/2020 Establishment of Temporary Reserved Area TRA709(D) [Jodhpur]

Airports Authority of India AIP Supplement 228/2020 Page 9 of 11 194/2020 Restructuring of Restricted Area VIR 156-D [Jodhpur (4)]

195/2020 Establishment of Temporary Reserved Area TRA613 [Kanpur]

196/2020 Restructuring of Restricted Area VIR 157 Kanpur (Chakeri)

Establishment of Temporary Reserved Area TRA710(A) [Nal] And TRA710 (B) 197/2020 [Nal]

198/2020 Restructuring of Restricted Area VIR-164 C (Nal III)

199/2020 Restructuring of Restricted Area VOR 186 [Hyderabad]

200/2020 ENR 1.9.14 Flexible Use of Airspace

Aerodrome Data 201/2020 Cochin International Airport, Cochin (VOCI) Commissioning of Realigned Portion of TWY E2 in Terminal-1 Apron 202/2020 Indira Gandhi International Airport, New Delhi (VIDP) Aerodrome Data 203/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – ILS RWY 07 204/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – ILS RWY 25 205/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – VOR RWY 07 206/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – VOR RWY 25 207/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – VOR RWY 12 208/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – VOR RWY 30 209/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – RNP Y RWY 07 210/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – RNO Y RWY 25 211/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – RNP Y RWY 12 212/2020 Chennai International Airport, Chennai (VOMM) Instrument Approach Chart – RNP Y RWY 30 213/2020 Chennai International Airport, Chennai (VOMM) Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 09L 214/2020 Rajiv Gandhi International Airport Shamshabad (Hyderabad) (VOHS) Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 27R 215/2020 Rajiv Gandhi International Airport Shamshabad (Hyderabad) (VOHS)

Airports Authority of India AIP Supplement 228/2020 Page 10 of 11 Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 09R 216/2020 Rajiv Gandhi International Airport Shamshabad (Hyderabad) (VOHS) Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 27L 217/2020 Rajiv Gandhi International Airport Shamshabad (Hyderabad) (VOHS) Aerodrome Obstacle Chart – Type B 218/2020 Rajiv Gandhi International Airport Shamshabad (Hyderabad) (VOHS) Instrument Approach Chart – ILS W RWY 27 219/2020 Cochin International Airport, Cochin (VOCI) Aerodrome Data 220/2020 Mysuru Airport, Mysuru (VOMY) Instrument Approach Chart – VOR RWY 09 (Cat A/B) 221/2020 Porbandar Airport, Porbandar (VAPR) Instrument Approach Chart – VOR RWY 27 (Cat A/B) 222/2020 Porbandar Airport, Porbandar (VAPR) Low Visibility Procedure for South RWY 09R/27L 223/2020 Kempegowda International Airport, Bengaluru (VOBL) Instrument Approach Chart – RNP Y RWY 09R 224/2020 Kempegowda International Airport, Bengaluru (VOBL) Instrument Approach Chart – ILS CAT II/IIIA/IIIB RWY 09R 225/2020 Kempegowda International Airport, Bengaluru (VOBL) Instrument Approach Chart – ILS CAT II/IIIA/IIIB RWY 27L 226/2020 Kempegowda International Airport, Bengaluru (VOBL)

227/2020 Amendment to Para II of VECC AD 2.23 of eAIP India

AMENDMENT/CANCELLATION:

1. Cancel AIP Supplement 87/2020

Airports Authority of India AIP Supplement 228/2020 Page 11 of 11