M E M O / N O T E D E S E R V I C E

Information previously distributed / Information distribué auparavant

TO: Transportation Committee

DESTINATAIRE : Comité des transports

FROM: John Manconi, Contact: Phil Landry, Director, Traffic General Manager, Transportation Services & Vivi Chi, Director, Services Department Transportation Planning

EXPÉDITEUR : John Manconi, Personne ressource : Philippe Landry, Directeur général, Direction générale Gestionnaire Services de la circulation & des transports Vivi Chi, Planification des transports

DATE: March 19, 2020

Le 19 mars 2020

FILE NUMBER: ACS2020-TSD-GEN-0001

SUBJECT: Report on the use of Delegated Authority during 2019 by the Transportation Services Department as set out in Schedule “G” By-law 2019-280

OBJET : Rapport sur l’utilisation de Délégation de pouvoirs en 2019 par la direction générale des Services des Transports, comme il est indiqué à l’annexe G, du régulant 2019-280

PURPOSE

The purpose of this memorandum is to report to the Transportation Committee on the use of delegated authority for 2019 under Schedule ‘G’ – Transportation Services Department By-Law 2019-280.

1

BACKGOUND

By-law 2019-280 is “a by-law of the City of respecting the delegation of authority to various officers of the City”. The By-law was enacted by Council on September 11, 2019 and is meant to repeal By-law No. 2018-397.

This By-Law provides delegated authority to officers within the Transportation Services Department to perform various operational activities, and requires that use of delegated authority be reported to the appropriate standing committee at least once per year.

DISCUSSION

Traffic Services and Transportation Planning are the two Service Areas of the Transportation Services Department that report to the Transportation Committee. To meet the reporting requirements as identified in Schedule “G” Transportation Services By-Law 2019-280, each Service Area has produced a consolidated list which highlight the use of delegated authority in 2019 (see Documents 1 and 2).

CONCLUSION

The Transportation Services Department will continue to report to Transportation Committee once per year on Schedule “G” – Transportation Services Department By- Law 2019-280.

For additional information on any of the items listed in Document 1, please contact Phil Landry, Director, Traffic Services at 613-580-2400 extension 23185, [email protected].

For additional information on any of the items listed in Document 2, please contact Vivi Chi, Director, Transportation Planning at 613-580-2400 extension 21877, [email protected].

Original signed by John Manconi

CC: Extended Senior Leadership Team Transportation Services Department Management Team Director, Public Information and Media Relations Coordinator, Transportation Committee

2

SUPPORTING DOCUMENTATION

Document 1 – 2019 Delegated Authority under Schedule “G” Transportation Services Department By-Law 2019-280:  Traffic Services

Document 2 – 2019 Delegated Authority under Schedule “G” Transportation Services Department By-Law 2019-280:  Transportation Planning – Capital Projects  Transportation Engineering Services – Development Projects  Additions to the Winter-Maintained Cycling Network

3

Document 1 – 2019 Delegated Authority Traffic Services - Schedule “G” Transportation Services Department By-Law 2019-280

Section G 5. (1) – Intersection and Road Modifications:

In 2019, Traffic Services supported the installation of 19 Pedestrian Crossovers (PXOs) city-wide. A total of 11 of the 19 locations, including one multilane roundabout, were funded and managed by the Transportation Services’ PXO Program. Delegation of authority for intersection and road modifications was required for only four of the 11 PXO locations, while approval was received for exemption to the Integrated Accessibility Standards Regulation (IASR) and the City’s Accessibility Design Standards (ADS) for a multilane roundabout location which already had curb-depressions, but no Tactile Walking Surface Indicators (TWSIs).

Three different types of PXOs were implemented in 2019, however, as indicated above, not all installations required intersection and roadway modifications. Such modifications are not necessary when the appropriate existing curbside depressions and TWSIs are already in place (i.e. pathway connections, roundabouts, school crossing guard locations, etc.) or when an exemption to the IASR and the City’s ADS has been approved through the departmental exemption review/approval process.

Type B PXOs

Type B PXOs require the installation of side mounted poles with flashers, PXO signs overhead, and the necessary pavement markings. In 2019, one Type B PXO was installed and required delegation of authority for essential roadway modifications. Details on the implementation location is listed below:

Location Ward # Description Longfields 3 Work to implement a PXO crossing on the north side of the Drive at intersection was initiated in 2018, however, curb and Portrush sidewalk modifications for necessary curb depressions and Avenue for Tactile Walking Surface Indicators (TWSIs) took place in 2019.

Type C PXOs

Type C PXOs require the installation of side mounted poles with flashers, PXO signs, and the necessary pavement markings. In 2019, one Type C PXO was installed and required delegation of authority for essential roadway modifications. Details on the implementation location is listed below:

4

Location Ward # Description March Valley 4 Work to implement a PXO crossing on the west side of the Road at Terry intersection was initiated in 2018, however, curb and Fox Drive sidewalk modifications for necessary curb depressions and for Tactile Walking Surface Indicators (TWSIs) took place in 2019.

Type D PXOs

All Type D PXOs require the installation of PXO signs along with the necessary pavement markings. In 2019, a total of nine Type D PXOs were installed. Only two of these locations required delegation of authority to implement the required roadway modifications. Locations requiring roadway modifications are listed below:

Location Ward # Description Grey Nuns Drive at 70m north 1 A sidewalk extension was installed on the of Brookside Lane/Harvest west side of the crossing and TWSI’s were Crescent installed on both sides.

Beaverpond Drive at St. John 11 Sidewalk extensions and TWSI’s were Paul II School installed on both sides of the crossing.

PXOs on Multilane Roundabouts

PXOs on multilane roundabouts require a PXO type B, C or D depending on the posted speed limit, the width of the crossing distance, and eight-hour traffic volume. In 2019, Type D PXOs were installed at one multilane roundabout which already had curb depressions, however, did not have TWSIs. Exemptions to the Integrated Accessibility Standards Regulation (IASR) and the City’s Accessibility Design Standards (ADS) were approved for this location through the departmental exemptions review/approval process. Details on this specific location are listed below:

5

Location Ward # Description Brian Coburn 1 PXOs type D were installed on all approaches of the Boulevard at multilane roundabout in 2019. Roadway modifications were not required given the departmental approval of

the exemption to the IASR and the ADS.

Section G 6. (1) and (2) Signs, Traffic Signals, Pavement Markings and Street Lighting

In 2019, Section G 6. (1) and (2) – Signs, Traffic Signals, Pavement Markings and Street Lighting was used to install, operate and maintain the following:  ~40,000 signs;  ~4.7 Million meters of longitudinal pavement markings;  1,183 signalized intersections, of which 79.8% are equipped with audible signals;  54 active red-light cameras across the City;  264 traffic cameras; and,  73,484 street lights.

Costs associated to the above items are the following:  $12,968,193.77 for work undertaken on behalf of other departments or external agencies;  $4,342,053 for sign maintenance and production;  $6,630,984 for signal maintenance and production;  $3,967,395 for pavement markings; and,  $16,466,318.38 for streetlighting.

Note: Costs pertaining to the installation of signs and pavement markings associated to the seven PXOs installed in 2019 that did not require DOA are included in sign maintenance and production and pavement markings, as listed above.

6

Section G 5. (1) – Temporary Traffic and Parking Control

In 2019, Section G 8. (1) – Temporary Traffic and Parking Control was used to respond and manage:  Approximately 1,514 incidents managed with moderate to high impacts on the flow of traffic;  Approximately 1,398 incidents managed that required temporary lane or road closures; and,  828 Special Event Permits and 203 related Work Orders in support of miscellaneous events including demonstrations, festivals, parades, etc.

The work associated with temporary traffic and parking control work related to special events, including demonstrations, festivals, parades and temporary road closures/emergency events totalled $ 326,522.24.

7

Document 2 – 2019 Delegated Authority under Schedule “G” Transportation Services Department By-Law 2019-280

Transportation Planning – Capital Projects

The following roadway modifications were approved in 2019, under Section 2 – Intersection and Road Modifications of Schedule “G” of By-law 2018-280. The approvals for these functional design studies were initiated by the Transportation Planning Service Area or were for projects stemming from Integrated Road-Water-Sewer Renewal, Intersection Control Measures and Network Management programs. These are all projects with Council-approved capital budgets. Infrastructure Services in the Planning, Infrastructure and Economic Development Department manages the construction of these projects, as well as the capital budget of the renewal program.

Title Ward # Description Approval Date RMA-2018-TPC-083 1 - Traffic calming measures Jan-2019 Amiens Street that include raised between Duford Drive crosswalks at the and Tenth Line Road intersections of Amiens Street and St. Georges Street, and Amiens Street and Prestwick Drive; curb radii reductions Amiens Street and St. Georges Street and Amiens Street and Prestwick Drive; intersection narrowing at Amiens Street and Duford Drive; and yellow centerline on Amiens Street.

RMA-2018-TPC-055 16 - To replace the southside Jan-2019 sidewalk with a 3m-wide between Riverside asphalt multi-use pathway. Drive to Flannery Drive RMA-2018-TPC-087 18 - To construct a new multi-use Feb-2019 Industrial Avenue pathway (MUP) along the from Trainyards Drive south side of Industrial to 628 Industrial Avenue approximately 200m Avenue in length from the intersection of Industrial Avenue and Trainyards Drive to the existing MUP at 628 Industrial Avenue

8

Title Ward # Description Approval Date

RMA-2018-TPC-059 14, 15 - To construct cycling facilities Feb-2019 Scott Street between Smirle Avenue and City Centre Avenue RMA-2018-TPC-050 14 - Transit priority measures to Feb-2019 Lyon Street and construct a new northbound Wellington Street left turn lane from Lyon intersection Street northbound to Wellington Street westbound

RMA-2019-TPC-005 18 - Modification to the existing Feb-2019 Tremblay Road from line painting and Avenue U to St. implementation of no- Laurent Boulevard stopping zone on Tremblay Road to introduce an eastbound bike lane as part of 2019 resurfacing projects.

RMA-2019-TPC-006 16 - Implementation of a no- Feb-2019 Hunt Club from Paul stopping zone on both sides Anka Drive to North of to Bowesville Road accommodate bike lanes with buffers as part of 2019 resurfacing projects.

RMA-2019-TPC-007 10 - Addition of bike lanes where Mar-2019 Heatherington Road feasible and sharrows between otherwise within the existing Heatherington Road road geometry. and - Modifications to curbside regulations to no-stopping on alternating and select sides of Heatherington Road. - Modification to curbside regulations to relocate some on-street parking spaces to the same side of the road as the community centre and school. - Pavement marking delineation of on-street parking spaces for improved traffic calming. 9

Title Ward # Description Approval Date - Addition of painted road narrowings for traffic calming. - Conversion of the school crossing to a pedestrian crossover type ‘D’ to better serve the community outside of school hours.

RMA-2019-TPC-004 23 - New traffic control signals at May-2019 Fernbank Road at the intersection of Fernbank Romina Road at Romina Street/Templeford Street/Templeford Avenue Avenue

RMA-2019-TPC-008 – 13 - Road narrowing by May-2019 Borthwick Avenue approximately one meter on from Clarke Avenue to Borthwick Avenue between Gardenvale Road, and Clarke Avenue and Gardenvale Road from Gardenvale Road to Borthwick Avenue to accommodate a new Trojan Avenue concrete sidewalk on the east side of Borthwick Avenue and new curbs on both sides. - Construction of new curbs on both sides and a new concrete sidewalk on the south side of Gardenvale Road.

RMA-2019-TPC-012 21 and - New eastbound left-turn May-2019 Hope Side Road at 23 lane on Hope Side Road. Crownridge Drive - New concrete medians on the east leg of the intersection. - New fully-paved shoulders on both sides of Hope Side Road within the construction limits.

10

Title Ward # Description Approval Date RMA-2019-TPC-001 3 - New traffic control signals at May-2019 Cambrian Road at the intersection of Cambrian Tucana Way/Kilbirnie Road and Tucana Drive Way/Kilbirnie Drive.

RMA-2019-TPC-019 9 - New concrete sidewalk on May-2019 Hogan Street, Ness the west side of Hogan Street and Wigan Street. Drive - New concrete sidewalk on the east side of Ness Street. - New concrete sidewalk on the north side of Wigan Drive. - Restriction of on-street parking to one side of the street in lieu of widening the roads to accommodate parking on both sides.

RMA-2019-TPC-015 18 - Intersection narrowings at : May-2019 Tampa Avenue, - The northeast corner of Orlando Avenue, Tampa Avenue and Denver Avenue and Wesmar Drive. Gibson Street - The northeast corner of Orlando Avenue and Wesmar Drive. - Southeast corner of Gibson Street and Orlando Avenue. - Northeast and southwest corners of Denver Avenue and Orlando Avenue.

11

Title Ward # Description Approval Date RMA-2019-TPC-029 14 - Construction of a new Jul-2019 Bay Street between southbound cycle track Wellington Street and along Bay Street between West Laurier Avenue and Wellington Street. - Construction of a new northbound cycle track along Bay Street between Laurier Avenue and . - New bike boxes at the following Bay Street intersections: the east leg at Sparks Street, east and west leg at . - Construction of crossrides at the following Bay Street intersections: east and west sides at Sparks Street and Queen Street, all legs at Laurier Avenue. - Construction of a painted buffer between the northbound travel lane and cycle track between Sparks Street and Wellington Street.

RMA-2019-TPC-026 12 - To construct new bike lanes Aug-2019 St Patrick Street on the north side of St. between King Patrick Street, west of King Edward Avenue and Edward Avenue and Dalhousie Street extending to the east side of

Dalhousie Street. A bus platform with cycle track on the north side of St. Patrick Street west of Cumberland Street.

12

Title Ward # Description Approval Date RMA-2019-TPC-020 14 - All curb extensions are Oct-2019 McLeod Street from traffic calming measures to to improve the safety of Lyon Street vulnerable road users: - Curb extension on the southwest corner of McLeod Street and Bronson Avenue to prevent northbound right- turns from Bronson Avenue. - Curb extension on the south side of McLeod Street between Bronson Avenue and Percy Street. - Curb extensions on the northeast and southeast corners of the McLeod Street and Percy Street intersection. - Curb extension on the northwest corner of the McLeod Street and Bay Street intersection. - Eastbound contraflow bike lane on McLeod Street from Lyon Street to Percy Street.

RMA-2018-TPC-004 11, 13 - Traffic calming measures Dec-2019 Cummings Avenue that include intersection between Montreal narrowings at Cummings Road and Donald Avenue and Burn Street and Street at Cummings Avenue and Gardenvale Road, including a raised crosswalk at Cummings Avenue and Gardenvale Road and five centre-island medians along Cummings Avenue between and Wilson Street, Wilson Street and Clarke Avenue, Quebec Street and Burn Street, Gardenvale Road and Shane Street, Burleigh Private South and Steele Park Private.

13

Transportation Engineering Services – Development Projects

The following roadway modifications were approved in 2019, under Section 2 – Intersection and Road Modifications of Schedule “G” of By-law 2018-208. The approvals for these projects were sought by the Transportation Engineering Services Branch for projects stemming from new private developments. The construction of these projects are managed by development proponents with inspections completed by City staff.

Title Ward # Description Approval Date RMA-2018-TPD-048 21 - New eastbound and Feb-2019 Fernbank Road at westbound left-turn lanes on Edenwylde Drive Fernbank Road to facilitate access to new residential developments at Edenwylde Drive and Street No. 1. - Fully paved shoulders along Fernbank Road on the east and west legs of the intersection.

RMA-2019-TPD-003 16 - Permanent road closure of Mar-2019 1354 and 1376 Carling Archibald Street Avenue approximately 33 m north of Thames Street to improve network functionality as a result of a new mixed-use development fronting . - New road widening south of the closure to accommodate vehicle turnaround. - New sidewalk on the west side of Archibald Street.

RMA-2018-TPD-056 6 and - New three-leg intersection Apr-2019 Fernbank Road at 21 on Fernbank Road at the Rouncey Road future Rouncey Road to serve a new development at 5505 Fernbank Road. - New eastbound left-turn lane on Fernbank Road. - New westbound right-turn lane and bike pocket on Fernbank Road.

14

Title Ward # Description Approval Date RMA-2018-TPD-032 20 and - New three-leg protected and Apr-2019 at Dun 22 signalized intersection on Skipper Drive Bank Street at Dun Skipper Drive to serve a new residential subdivision. - New northbound left-turn and southbound right-turn lanes on Bank Street at Dun Skipper Drive. - Paved shoulders on both side of Bank Street within the construction limits.

RMA-2018-TPD-022 10 and - New three-leg signalized Apr-2019 Leitrim Road from 22 and protected intersection Kelly Farm Drive to on Leitrim Road at Kelly Muscari Street Farm Drive with a concrete median on the west leg to support a new subdivision. - New westbound left-turn lane and eastbound right- turn lanes on Leitrim Road at Kelly Farm Drive. - New paved shoulders on the north side of Leitrim Road within the construction limits. - Paved shoulder on the south side of Leitrim Road, west of Kelly Farm drive within the construction limits. - New multi-use pathway on the south side of Leitrim Road between Kelly Farm Drive and Muscari Street.

15

Title Ward # Description Approval Date RMA-2018-TPD-031 20 and - New east leg of the Bank Apr-2019 Bank Street at Findlay 22 Street at Findlay Creek Creek Drive Drive intersection with southbound left-turn lane to serve a new subdivision. - Paved shoulder on the east side of Bank Street within the construction limits. - New concrete sidewalk on the northeast and southeast corners on the intersection.

RMA-2018-TPD-086 18 - Raised intersection on Apr-2019 1910 St. Laurent Othello Avenue at Hamlet Boulevard Road/site access as part of the City’s resurfacing projects and to serve a redevelopment within the Elmvale Shopping Centre. - Curb modification on the southeast corner of the Othello Avenue at Hamlet Road intersection to facilitate the construction of a pedestrian crossover Type ‘D’ on the south leg of the intersection. - Construction of new concrete sidewalks on both sides of Othello Avenue north of Hamlet Road to . - Median modification on the east leg of the Smyth Road and Othello Avenue intersection.

16

Title Ward # Description Approval Date RMA-2019-TPD-014 15 - Implementation of a Apr-2019 at pedestrian crossover type Clearview Avenue “B” on the west leg on Island Park Drive at Clearview Avenue as a condition of approval for a development at 1451 Wellington Street.

RMA-2019-TPD-018 17 - Implementation of a second May-2019 Bronson Avenue at eastbound left-turn lane at University the intersection of Bronson Drive/Sunnyside Avenue and University Avenue Drive/Sunnyside Avenue to facilitate traffic exiting Carleton University during the O-Train shutdown. - Modifications to the concrete islands, sidewalks and pedestrian crossings on the southwest and northwest corners of the intersection.

RMA-2019-TPD-017 16 - Installation of a new May-2019 at pedestrian cross-over type Viscount Avenue ‘D’ and additional sidewalks on Merivale Road at Viscount Avenue to improve pedestrian safety and connectivity to Westgate Shopping Centre.

17

Title Ward # Description Approval Date RMA-2018-TPD-051 3 - Implementation of a new Jul-2019 Longfields Drive at four-leg roundabout with Golflinks Drive South truck apron at Longfields Drive at Golflinks Drive South to better serve the community and provide access to a new development located at 2741 Longfields Drive. - Implementation of new splitter islands, pedestrian crossovers and multi-use pathways on all approaches to the roundabout.

RMA-2019-TPD-032 23 - Removal of the eastbound Jul-2019 10 Cope Drive right-turn acceleration lane and curb relocation on the west side of south of Cope Drive fronting the proposed development at 10 Cope Drive to accommodate a new multi- use pathway and grass boulevard. - Construction of two new site accesses on Eagleson Road. The southernmost access is a signalized intersection with cross-ride on the east leg, while the north access will be restricted to right in right out movements, with a thermoplastic crossride across the access. - New stairway and sidewalk on the east side of the new signalized intersection to provide connectivity to residential developments to the east.

18

Title Ward # Description Approval Date RMA-2019-TPD-034 22 - Construction of a boulevard, Sep-2019 Spratt Road between cycle track delineating strip Cambie Road and and concrete sidewalk on Solarium Avenue both sides of Spratt Road between Cambie and just south of Solarium to provide more sustainable transportation options for the developing Riverside South community. - New bus pads on: the east side of Spratt Road north of Borbridge Avenue and Solarium Avenue, and on the west side of Spratt south of Borbridge Avenue and south of Solarium Avenue.

RMA-2019-TPD-023 3 - Construction of a new, four- Sep-2019 Cambrian Road at legged intersection on Delphinus Cambrian Road at Avenue/Apolune Delphinus Avenue/Apolune Street Street to serve the expanding Half Moon Bay development. - Delphinus Avenue and Apolune Street are to have one travel lane per direction with auxiliary left-turn lanes, along with sidewalks and boulevards on both sides. - Widening of Cambrian Road within the project limits to accommodate eastbound and westbound left-turn lanes as well as a sidewalk along the north side of the road.

RMA-2019-TPD-013 14 - To construct a lay-by, a Dec-2019 383 Albert Street cycle track and a bus platform.

19

Title Ward # Description Approval Date RMA-2019-TPD-024 14 - Realignment of a sidewalk Oct-2019 412 Sparks Street and relocation of a catch basin to accommodate a new parking lay-by to facilitate egress from a new retirement residence at 412 Sparks Street.

RMA-2019-TPD-009 10 and - Construction of a new, four- Oct-2019 2480 18 legged intersection on Walkley Road at Melfort Street/site access. The new site access is to have one southbound lane, a northbound right-turn lane and a shared through/left- turn lane and will have northbound through movements restricted during PM peak hours to serve the redevelopment of 2480 Walkley Road. - Intersection narrowing on the southeast corner of the new intersection to accommodate bike boxes on the north and south legs of the intersection to encourage sustainable transportation. - Closed median to remove eastbound left-turn access to 2282 from Walkley Road.

20

Title Ward # Description Approval Date RMA-2019-TPD-030 4 - Construction of a new right- Nov-2019 471 Terry Fox Drive in right-out access with rumble aprons to serve the development of a commercial plaza with gas station at 471 Terry Fox Drive. - Construction of one site access along Tillsonburg Street and one on Kanata Avenue.

Additions to the Winter-Maintained Cycling Network

Delegated authority has been granted to the General Manager, Transportation Services in consultation with the General Manager, Public Works and Environmental Services, to modify the Winter Cycling Network as each cycling project is completed in accordance with winter cycling needs, connectivity and affordability, and reported through Transportation Services’ annual Delegated Authority Report.

The January 30, 2020 memo 2020 Cycling Network Winter Maintenance Update issued to Mayor and Members of Council from the Director of Transportation Planning provided an update of new cycling facilities completed during 2019 and plans for their winter maintenance. The memo noted that in consultation with Public Works and Environmental Services, the following roadways were added to the City’s winter- maintained cycling network and updated on GeoOttawa:

 Flora Bridge across Rideau Canal (Fifth Avenue to Clegg Street).  Mackenzie Avenue ( to Murray Street).  Multi-use pathway along the O-Train Line 1 guideway (Laurier Avenue to Hurdman Station).