ONGOINGProjects construction underway

(Projects added for the current month are highlighted and in bold face type) GAS – The Americas BURK ROYALTY CO. LTD./ the replacement of the segment by SEM OPERATING CO. LLC – (3/15) constructing and operating a 30-inch- U.S. Owner: Midcoast Energy Partners LP diameter pipeline Project: Ghost Chili Lateral Miles: 3.8 AMERICAN MIDSTREAM LLC – (2/17) Type: Project includes the construction of a new Location: Wayne County, WV Project: Natchez Pipeline Project natural gas pipeline gathering header Comments: The replacement pipeline would allow Type: Project includes the relocation and Location: Houston County, TX that segment of Line SM-80 to operate at reconfiguration of the Winnsboro Meter Start: 2015 its original maximum allowable operating Station in order to avoid building pipeline Completion: 2016 pressure laterals to tie into the meter station Location: Winnsboro, LA CANYON MIDSTREAM PARTNERS LLC – (9/16) COLUMBIA PIPELINE GROUP INC. – (5/16) Comments: Company will use 0.21 acres for relocation Project: James Lake Midstream System Expansion Owner: Columbia Gulf Transmission LLC of the pipeline permanent right-of-way Type: Project includes a trunkline expansion Project: Tri County Bare Steel Replacement to the new meter station site and 0.67 Miles: 22 Type: Project involves the replacement and acres for additional temporary workspace Location: Winkler County, TX modernization of 34 miles of bare steel during construction Comments: Project will be capable of delivering up pipeline to 60 MMcf/d to the James Lake plant for Miles: 34 ANR PIPELINE CO. – (1/17) treating and processing Location: Washington, Greene and Allegheny Project: Collierville Expansion Project counties, PA Type: Project includes the addition of a 4,700 CB&I – (1/17) Start: 2016 hp compressor stations and modification Owner: Puget Sound Energy Inc. Completion: 2017 of an existing meter station Type: Project includes the engineering, Location: Shelby County, TN procurement, fabrication and DOMINION CAROLINA – (1/17) Comments: Project will increase the delivery capability construction of a multi-purpose LNG Project: Columbia to Eastover Pipeline of the Collierville Meter Station by 200 storage and fueling terminal Type: Project involves the construction of new MDth/d to 300 MDth/d Location: Tacoma, WA pipeline Comments: The scope of work includes a 30 Mcm full Miles: 29 APEX PIPELINE SERVICES – (3/16) containment storage tank, liquefier and Location: South Carolina Owner: EQT Midstream Partners LP vaporizer Comments: Project will have an additional capacity of Project: Maco Pipeline 18 MMcf/d Type: Pipeline will involve the construction CENTRAL NEW YORK OIL & of pipeline and installation of 32,000 GAS CO. LLC – (12/14) DOMINION TRANSMISSION – (1/17) horsepower of compression Project: MARC II Pipeline Project: New Market Project Miles: 32 Type: Project includes the construction of a new Type: Project includes the installation of two Location: Pennsylvania natural gas pipeline gathering header new compressor stations and additional Start: 2016 Miles: 30 compression at an existing station Completion: 2017 Location: Madison and Chemung counties, NY Location: Luzerne County, PA Comments: The project will be completed in two Start: 2017 Start: 2015 phases Completion: 2016 Project: Leidy South Project Comments: Crestwood has received non-binding Type: Project includes the addition of 48,120 ASSOCIATED PIPE LINE – (12/16) indications of interest for firm hp of compression and new metering Owner: Cheniere Pipeline transportation on the proposed MARC II and regulation equipment to an existing Project: Corpus Christi Pipeline Pipeline in excess of 700 MMcf/d Type: Project includes the construction of interstate pipeline transmission system 48-inch pipeline Miles: .2 COLUMBIA GAS TRANSMISSION – (2/17) Location: Pennsylvania and Virginia Miles: 23 Project: Line WB2VA Integrity Project Location: Sinton, TX – Corpus Christi, TX Completion: 2017 Type: Project includes the installation of various Comments: Project will have a capacity of 155 MMcf/d Start: 2016 pieces of auxiliary equipment, including Completion: 2017 launchers and receivers, replacement of DTE GAS – (5/16) existing mainline valves, replacement of Owner: DTE Gas ATLANTA GAS LIGHT – (11/16) an existing dual pipe river crossing, and Project: Cumming Lateral Type: DTE will modernize its cast iron and steel replacement of short sections of existing main pipelines with newer, more durable Type: Project includes the construction of pipeline within or proximate to existing 16-inch pipeline material, and new service lines compressor stations, to create a common Miles: 100 Miles: 11 diameter pipeline from beginning to end Location: Michigan Location: Cumming, GA that can be internally inspected using Start: 2016 Start: 2016 smart pigs Completion: 2021 Location: Hardy County, WV - Greene County, VA BLACK HILLS ENERGY – (2/16) Comments: The goal of this pipeline integrity Project: Northeast Nebraska Line EASTERN SHORE NATURAL GAS – (1/17) project is to modify portions of the Project: White Oak Mainline Expansion Type: Line will run from Bancroft to Norfolk existing WB2VA line to facilitate the Type: Project includes the construction of Miles: 50 use of the smart pig inline inspection two segments of 16-inch pipeline Location: Bancroft, NE - Norfolk, NE technology (Kemblesville Loop and Daleville Loop) Start: 2016 and two compressor units Completion: 2017 Project: Line SM-80 Project Miles: 5.5 Type: Project includes the abandonment Location: Chester County, PA and New Castle of a segment of existing pipeline and County, DE

www.pipeline-news.com • March 2017 • Pipeline News 23 ONGOINGProjects construction underway Start: 2017 ETC KATY INTRASTATE PIPELINE – (7/16) HENKELS & MCCOY – (2/17) Comments: Project will allow it to provide 45,000 Dth/d Type: Project includes the construction of Owner: Natural Gas of off-peak firm transportation service on 24-inch pipeline Project: Orion Project its mainline to the White Oak Lateral Miles: 32 Type: Project includes the construction Location: Pennsylvania of pipeline looping (i.e., installation Owner: Eastern Shore Natural Gas Project: Completion: 2017 of additional pipe adjacent to and Reliability Expansion Project Comments: Project will have a capacity of 500 MMcf/d connecting with the existing pipeline) Type: Project involves the construction of 15 and minor modifications to one existing miles of 16-inch pipeline and two loops FEMACA – (7/16) compressor station (Dover and Porter) Owner: CFE Miles: 13 Miles: 15 Project: Encino-La Laguna Pipeline Location: Pike and Wayne counties, PA Location: New Castle, Kent and Sussex counties, DE Type: Pipeline will transport gas from southern Completion: 2018 Start: 2016 and supply northern Chihuahua and Comments: Project will have up to 135,000 Dth/d of Durango states additional firm natural gas capacity and is EMERSON – (8/16) Miles: 263 expected to generate approximately 275 Owner: Pemex/ENGIE Location: Texas - Chihuahua and Durango construction jobs at its peak Project: Los Ramones II Sur Pipeline Start: 2015 Type: Project includes the upgrade and Completion: 2017 Owner: Spectra Energy expansion of pipeline Project: Atlantic Bridge Miles: 180 Owner: CFE Type: Project includes the take up, relay and Location: Texas-Mexico Project: San Isidro-Samalayuca Pipeline new lays of 12-inch to 42-inch pipeline Start: 2016 Type: Pipeline will transport gas from southern and compressor station work Texas to the new Norte III power plant in Miles: 35 – (2/17) Chihuahua State Location: Westchester County, NY; Fairfield, New Project: Rover Pipeline Miles: 14 Haven and New London counties, CT; Type: Project includes the construction of Location: Texas - Chihuahua Norfolk County, MA 24-inch, 30-inch, 36-inch and 42-inch Start: 2015 Completion: 2017 pipeline, four mainline compressor Completion: 2017 Comments: Project will have a peak capacity of stations, six supply lateral compressor 132,700 Dth/d stations and other ancillary facilities GULF SOUTH PIPELINE – (1/17) Miles: 713 Project: Katy Lateral Project Owner: Tennessee Gas Pipeline Co. LLC Location: Western West Virginia - Southwestern Type: Project includes the take up and relay of Project: Connecticut Expansion Pennsylvania - Ohio - Michigan 30-inch pipeline Type: Project includes the looping of 24-inch Comments: Pipeline will transport 3.25 Bcf/d of Miles: 1.25 and 36-inch pipeline domestically-produced natural gas Location: Fort Bend County, TX Miles: 320 Start: 2017 Location: New York, Massachusetts and Connecticut Project: Trans-Pecos Pipeline Completion: 2017 Type: Project includes the construction of Project: St. Charles Parish Expansion Project Comments: Project will meet increased demand in the 42-inch pipeline Type: Project includes the construction of 900 U.S. Northeast for transportation capacity Miles: 143 feet of 16-inch pipeline for natural gas Location: Fort Stockton, TX - Presidio, TX Miles: 1.25 Start: 2017 Location: Montz, LA HOWARD MIDSTREAM ENERGY Completion: 2018 Start: 2017 PARTNERS LLC – (1/17) Comments: Project will transport 1.4 Bcf/d of clean- Project: Nueva Era Pipeline burning natural gas GULF STATE ENGINEERING – (5/16) Type: Project includes the construction of two Owner: Kinder Morgan Inc. 30-inch pipeline laterals— 17 miles in Project: Comanche Trail Pipeline Project: Mier-Monterrey Pipeline Webb County, TX (Impulsora Pipeline) Type: Project includes construction of 42-inch Type: Project includes the looping of the and 171 miles in Mexico (Midstream de pipeline existing system and construction a new Mexico) Miles: 195 lateral Miles: 190 Location: Ft. Stockton - El Paso, TX Location: Pesquería, Nuevo León, Mexico Location: Webb County, TX - Escobedo, Nuevo León Start: 2016 Completion: 2017 Completion: 2018 Comments: Pipeline connects to a 1,000-megawatt Comments: Project will provide seamless Project: Revolution Pipeline power plant complex and to the Pemex transportation service for 600 MMcf/d Type: Project involves the construction of 100 natural gas transportation system of natural gas (expandable to 900 miles of 24- and 30-inch pipeline MMcf/d), connecting producers in Miles: 100 Owner: Kinder Morgan Inc. South Texas directly with end-users in Location: Butler County, PA Project: Utica Marcellus Texas Pipeline northern Mexico Start: 2016 Type: Project includes abandonment and conversion of 964 miles of natural gas H&S CONSTRUCTORS – (10/16) ENLINK MIDSTREAM – (2/17) service on the Tennessee Gas Pipeline, the Owner: Targa Resources Project: Chisholm III construction of new pipeline and laterals Project: Carnero Dimmitt Extension Type: Project includes a new 200 MMcf/d to provide basin connectivity Type: Project includes the construction of processing expansion of its existing Miles: 320 24-inch pipeline system Location: – Texas Miles: 9 Location: Oklahoma Completion: 2018 Location: South Texas Completion: 2017 Comments: Project will be designed to transport Comments: Upon completion of the Chisholm III propane, butanes, natural gasoline, IHI E&C – (7/16) expansion, EnLink’s Central Oklahoma y-grade and condensate in batches along Owner: Kinder Morgan processing capacity will total the system, with a maximum design Project: Elba Liquefaction Project approximately 1 Bcf/d, which represents capacity of 430,000 bpd Type: Project includes modifications to the existing nearly a three-fold increase from the 350 Elba facilities and will include compression for MMcf/d of capacity operated in 2015 vapor handling and new pumps for loading

26 Pipeline News March 2017 • www.pipeline-news.com ONGOINGProjects construction underway the LNG on vessels for export MERITAGE MIDSTREAM 60 MMcf/d cryogenic processing plant, Location: Savannah, GA SERVICES II LLC – (2/15) the Newberry plant, near the existing Completion: 2018 Project: Thunder Creek NGL extension Spraberry plant Type: Project includes the extension of pipeline IROQUOIS GAS TRANSMISSION Miles: 140 NEXUS GAS TRANSMISSION LLC– (2/17) SYSTEM LP – (REV 2/16) Location: Cheyenne, WY Owner: NEXUS Gas Transmission System Owner: Tennessee Gas Pipeline Co. LLC Completion: 2016 Contractor: Fluor Project: South-to-North Comments: The extension will include an interconnect Subcontractors: Michels Corp. / Latex Construction / Type: Project includes the reverse flow on near Cheyenne, WY, into the Overland MG Dyess existing pipeline Pass Pipeline Co.’s 760-mile pipeline Project: Project includes the construction of a Location: Canajoharie, NY; Brookfield, CT; and that provides NGL deliveries to the mid- 42-inch interstate natural gas transmission Wright, NY continent market center in Conway, KS pipeline to deliver 1.5 Bcf/d of clean- Completion: 2017 burning natural gas Comments: Project would transport up to 300,000 MICHELS CORP. – (9/16) Miles: 255 Dth/d of natural gas Owner: Vermont Gas Location: Ohio, Michigan and Ontario Type: Project includes the construction of Completion: 2017 KAISER-FRONTIER MIDSTREAM LLC – (7/16) 12-inch and 16-inch pipeline Comments: In addition to the main line, Fluor is Project: Silo Pipeline Miles: 41 designing and managing the construction Type: Project includes construction of 6-inch Location: Chittenden, Addison and Franklin of up to four compressor stations and 8-inch pipeline, and installation of counties, VT ancillary facilities including pig launchers, Start Date: 2016 NORTHWEST INNOVATION WORKS – (6/16) pig receivers, and new mainline valves Owner: Northwest Miles: 31 MINNESOTA LTD. – (6/16) Project: Timber Rock Location: Laramie County, WY – Weld County, CO Owner: Columbia Pipeline Type: Project involves construction of a Completion: 2018 Project: Tri County Bare Steel Replacement Project 3.1-mile, 24-inch diameter natural gas Comments: Project includes a new reservoir providing Type: Project involves the replacement and pipeline and related facilities up to 2.5 Bcf of available storage and modernization of 34 miles of bare steel Miles: 3.1 an additional compressor station with a pipeline Location: Cowlitz County, WA design capacity of 120,000 Dth/d of gas Miles: 34 Start: 2017 Location: Washington, Greene and Allegheny Comments: The route is the same preferred route KINDER MORGAN – (2/17) counties, PA as the previously filed Kalama Lateral Project: Gulf Coast Southbound Expansion Project Start: 2016 Pipeline Type: Project includes the construction of a new compressor station, modifying NAPP-GRECCO CO. – (12/16) OTIS EASTERN – (1/17) existing valve sites and replacement of Project: White Oak Mainline Expansion Project Operator: Rice Energy a minimal length of pipeline facilities, as Owner: Eastern Shore Natural Gas Project: Ohio Gathering Pipeline well as modifications to NGPL’s existing Type: Project includes the construction of a new Type: Project includes the construction of compressor station facilities pipeline lateral 16-inch pipeline Location: Cass, Victoria, Wharton and Angelina Miles: 5.4 Miles: 12 counties, TX; White County, AR Location: Chester County, PA Location: Monroe County, OH Completion: 2018 Completion: 2016 Start: 2017 Comments: The first phase of the project is Comments: Project will have an additional capacity of designed to transport 460,000 Dth/d 45 MMcf/d Owner: National Fuel of natural gas and in May 2016 NGPL Subscontractors: T.G. Mercer/SpreadBoss/Mercer announced it is seeking non-binding Owner: Eastern Shore Natural Gas Project: Seneca Gathering solicitations of interest for a second Project: Reliability Project System Type: Project includes the construction of phase of the project Type: Project includes facility reinforcements to 8-inch and 12-inch pipeline enhance system reliability Miles: 4 KINDER MORGAN LOUISIANA Miles: 10 Location: Smethport, PA PIPELINE LLC – (REV 11/15) Location: New Castle, Kent and Sussex counties, DE Start: 2016 Project: KMLP Pipeline Expansion Start: 2016 Type: Project includes the installation of PASO NORTE PIPELINE GROUP – (REV 8/14) new compression facilities and the NATIONAL FUEL GAS SUPPLY CORP. – (1/17) Project: Paso Norte Pipeline interconnect facilities between the MLNG Project: Line T2KNY/Line TNY/Line KNY Type: Project includes the construction of project and the KMLP Pipeline Type: Project includes the installation of Line 30-inch pipeline Location: Evangeline Parish, LA T2KNY, the replacement of Line TNY and Miles: 340 Completion: 2017 the abandonment of Line KNY Location: Deming, NM - Mexico/Chihuahua Comments: Project will enable gas supply of up to Miles: 8.2 Comments: The pipeline will have a capacity of 366 1,400,000 Dth/d for the Magnolia LNG Location: New York MMcf/d of natural gas Project site from several major interconnected Comments: Project will have a capacity of 2.6 MMcf/d interstate pipelines in the region PAULSBORO NATURAL GAS NAVITAS MIDSTREAM – (REV 12/16) PIPELINE CO. – (11/16) LAKE CHARLES LNG – (2/16) Project: Howard County Expansion Project Project: Delaware River Pipeline Relocation Project: Lake Charles LNG Type: Project includes the construction of Type: Project includes the replacement of Type: Project includes the construction and low-pressure gathering lines, multiple 12-inch and 24-inch pipeline operation of a natural gas liquefaction and compressor stations, a 38-mile, 16-inch Miles: 2.6 export facility high-pressure pipeline and a 35-mile, Location: Delaware and Gloucester counties, NJ Location: Lake Charles, LA 20-inch loop of the existing Spraberry Start: 2016 Completion: 2020 high pressure pipeline. Comments: Lake Charles LNG Project is expected Miles: 73 PLATEAU PIPELINE LTD. – (11/16) to be one of the largest LNG export Location: Midland, TX Owner: Pembina initiatives in the U.S. Completion: 2017 Project: Northeast B.C. Expansion / Plateau Pipeline Comments: Company is also constructing a new Type: Project includes the expansion of existing

www.pipeline-news.com • March 2017 • Pipeline News 27 ONGOINGProjects construction underway

pipeline and construction of new pipeline two; Troy Construction has been awarded processing plant and a natural gas liquids Miles: 100 a contract for spread three; and Rockford takeaway pipeline Location: Wonowon to Taylor Corp. has been awarded contracts for Location: Eddy County, NM Comments: Expansion will add 75,000 bpd of spreads six and seven Completion: 2017 condensate NGLs to the company’s system, while the Eagle Mountain- PRIMORIS SERVICES CORP. – (7/16) SHELL PIPELINE – (12/16) Woodfibre Gas pipeline is another step Owner: Northwest Natural Gas Co. Project: Falcon Pipeline towards constructing B.C.’s first liquefied Project: North Mist Expansion Type: Project includes the construction of new natural gas export terminal Type: Project includes removing and replacing pipeline natural gas pipe, removing and replacing Miles: 94 PRICE GREGORY – (5/16) fourteen mainline valves, and automating Location: Pennsylvania, West Virginia and Ohio Owner: UGI seventeen mainline valves Completion:2018 Project: Sunbury Pipeline Miles: 15 Comments: Project will collect ethane from MarkWest Type: The 35-mile, 20-inch Sunbury Pipeline Location: North Carolina Energy Partners LP’s Houston Processing will run from Lycoming County to a plant Completion: 2017 and Fractionation facility in Washington near Shamokin Dam in Snyder County, PA Comments: Primoris will also hydro-test 20.5 miles County, PA and from its Cadiz Complex in Miles: 35 of 30-inch pipeline after the pipeline Harrison County, OH Location: Lycoming County, PA - Snyder County, PA replacement is completed Start: 2016 SIERRITA GAS PIPELINE LLC – (12/16) Completion: 2017 Type: Project consists of 36-inch diameter Project: Sierrita Gas Pipeline pipeline and work includes 42 road bores, Type: Project includes the construction of Owner: Energy Transfer Partners LP/Regency five directional drills, and six mainline test 36-inch pipeline Energy Partners LP sections Miles: 60 79 Project: Roadrunner Gas Transmission Pipeline Miles: Location: Tucson, AZ - Sasabe, AZ Location: Florida Type: Project includes the construction of Start: 2017 Start: 2016 30-inch pipeline Completion: 2017 Completion: 2017 Miles: 200 Comments: Project will provide 200 MMcf/d of firm Location: Coyanosa, TX – Mexico transportation capacity Completion: 2019 PUMPCO INC. – (5/15) Comments: First phase of the pipeline project for Owner: Energy Transfer Partners LP SNC-LAVALIN – (1/17) Type: Project includes the construction of two 170 MMcf/d of available capacity is Owner: Crestwood Equity Partners LP 42-inch pipelines expected to be completed by the first Type: Project includes the engineering, Miles: 342 quarter 2016. The second phase, which procurement, construction and will increase the pipeline’s available Location: Pecos, TX - Presidio, TX; El Paso, TX - operations of multiple gas compression capacity to 570 MMcf/d, is expected to Pecos, TX and dehydration facilities (over 100,000 be completed in the first quarter 2017. Completion: 2016 horsepower of compression, inlet The third and final phase of the project separation and filtration, gas dehydration, is expected to be completed in 2019 PUMPCO INC./STRIKE and station measurement and controls) and will increase available capacity on CONSTRUCTION – (8/15) Location: Permian Basin the pipeline to 640 MMcf/d Owner: Energy Transfer Partners LP/Regency Energy Partners LP SOUTHEAST CONNECTIONS – (2/17) Owner: Columbia Pipeline Group Project: Lone Star NGL Pipeline Owner: AGL Resources Project: Gibraltar Pipeline/Buffalo Creek Project Type: Project includes the construction of Project: Suwanee to Friendship Pipeline Type: Project includes the construction of 24-inch and 30-inch pipeline Type: Project includes the construction of a 16-inch and 36-inch pipeline Miles: 533 12-inch high-pressure transmission line Miles: 25 Location: Bosque County, TX - Mont Belvieu, TX Miles: 12 Location: Claysville, PA - Houston, PA Completion: 2017 Location: North Gwinnett and South Hall counties, Completion: 2017 Comments: The new pipeline is being built to GA Comments: Both projects will run adjacent to accommodate Lone Star’s contracted NGL Comments: Pipeline is part of the Georgia STRIDE Columbia Gas Transmission’s Line 1758 transportation volumes that will exceed program Lone Star’s existing 290,000 bpd of Owner: Williams Partners LP (3/16) capacity from the Permian Basin SPECTRA ENERGY – (8/16) Project: Hillabee Expansion Owner: Comisión Federal de Electricidad Type: Project involves a multi-phase project to ROCKFORD CORP. – (2/17) Project: Nueces-to-Brownsville Pipeline add a total of 1.13 MM Dth/d of capacity Owner: DTE Energy Type: Project includes constructing and Location: Florida Project: Bluestone Loop 3C operating a header system Start: 2016 Type: Project includes the construction of Miles: 168 Completion: 2017 24-inch pipeline looping Location: Nueces County, TX – Brownsville, TX Comments: Project is part of an expansion of the Miles: 4.5 Start: 2016 Transco interstate natural gas pipeline Location: Binghampton, NY Completion: 2018 Completion: 2017 Comments: The pipeline will connect with the Sur de PRICE GREGORY/MPG/TROY Texas – Tuxpan Pipeline, which will extend CONSTRUCTION/ROCKFORD CORP. – (3/16) Owner: DTE Energy into Mexico Owner: Rockies Express Pipeline LLC Type: Project includes looping on 30-inch pipeline Project: Sabal Trail Pipeline Miles: 5 Project: Algonquin Incremental Market Type: Project includes the construction of new Location: Binghamton, NY Type: Project includes the construction pipeline of 42-inch diameter mainline, loop Miles: 513 SENDERO MIDSTREAM PARTNERS LP – (2/17) extension, take-up/relay, installation of Location: Alabama - Florida Type: Project includes the construction of a new pipeline and compressor station Completion: 2017 natural gas gathering and processing modifications Comments: Price Gregory has been awarded contracts system consisting of both low and high Miles: 40 for spreads one, four and five; MPG P/L pressure gas gathering pipelines, a Location: Connecticut - New York - Massachusetts has been awarded a contract for spread highly-efficient 130 MMcf/day cryogenic Completion: 2017

28 Pipeline News March 2017 • www.pipeline-news.com ONGOINGProjects construction underway

Comments: Project will have a capacity of 342,000 Start: 2016 Project: Northern Supply Access Dth/d of natural gas Completion:2017 Type: Project includes the modification of Comments: The processing plant is expected to have existing facilities and construction of Project: Gulf Markets Expansion Project initial capacity of 200 MMcf/d with the a new 23,877 horsepower compressor Type: Project includes the construction of new ability to in-crease to 260 MMcf/d station pipeline Location: , Ohio, , Tennessee, and Location: Texas, Louisiana, , Tennessee, TENNESSEE GAS PIPELINE – (2/17) Mississippi Kentucky, Ohio and Pennsylvania Project: Triad Expansion Project Start: 2016 Completion: 2017 Type: Project involves the expansion of 36-inch Completion: 2017 Comments: Project will have a capacity 650,000 Dth/d pipeline looping along existing line right- Comments: Project will provide efficient north-to- of natural gas of-way south natural gas transportation on Texas Miles: 7 Gas’ existing system, while maintaining SUNLAND CONSTRUCTION – (1/17) Location: Susquehanna County, PA the current south-to-north flow Operator: Gulf South Pipeline LP Completion: 2017 Project: Coastal Bend Header Comments: Project will have an additional capacity of TRANSCANADA CORP. – (8/16) Type: Project includes the construction of 180 MDth/d Owner: CFE 36-inch pipeline, three compressor Project: Sur de Texas-Tuxpan Pipeline stations and seven meter stations Project: Southwest Louisiana Supply Type: Project includes the construction of Miles: 66 Type: Project includes the installation of two pipeline Location: Wharton and Brazoria counties, TX 36-inch pipeline laterals and compressor Miles: 497 Start: 2017 stations Location: Gulf of Mexico - Tuxpan, Veracruz Miles: 4 Start: 2016 Owner: Boardwalk Pipeline Partners Location: Madison and Richland parishes, LA Completion: 2018 Project: Sasol & Evangeline Completion: 2017 Type: Project involves the construction of TRC COMPANIES INC. – (6/16) 12-inch and 16-inch pipeline Project: Susquehanna West Project Owner: PSNC Energy Miles: 25 Type: Project includes the construction of 36-inch Type: Project involves providing additional Location: Sulphur, LA pipeline looping and piping modifications engineering design, mapping, right-of- Start: 2016 Miles: 8.2 way and surveying services Location: Tioga County, PA Miles: 46 Owner: Cameron LNG Comments: Project will provide 145,000 dekatherms Location: North Carolina Project: Cameron Access of additional capacity for one customer Start: 2016 Type: Project includes the installation of 30-inch and 36-inch pipeline Project: Broad Run Expansion Project Owner: Chevron Pipeline Miles: 34 Type: Project includes the construction of Type: Project involves the construction of 41 Location: Lake Arthur, LA four new compressor stations and the miles of 18-inch diameter pipeline Start: 2016 modification of two existing compressor Miles: 41 Completion: 2018 stations by replacing existing capacity Location: Mont Belvieu, TX – Port Arthur, TX with new, higher-rated horsepower Start: 2016 Owner: East Tennessee Natural Gas compression units Project: Loudon Expansion Project Miles: 2.6 TRISTREAM ENERGY LLC – (6/16) Type: Project involves the construction of 10 Location: Kanawha County, VA; Davidson County, Project: Candilight Junction miles of 12-inch pipeline TN; Madison County, KY Type: Project includes the construction of a new Miles: 10 Comments: Project will have a capacity of 200 MMcf/d pipeline injection facility Location: Bradley and Loudon counties, TN and will expand transportation capacity of Location: East Texas Start: 2016 natural gas on the existing Tennessee Gas Start: 2016 Pipeline system Completion: 2017 Owner: Williams Transco Project: Gulf Trace Project TEXAS EASTERN TRANSMISSION – (10/16) TROY CONSTRUCTION – (4/16) Type: Project involves the construction of 8 Project: Adair Southwest Extension/Access South Owner: Praxair Inc. miles of 36-inch pipeline Extension/Lebanon Extension Project: Gulf Coast Expansion Miles: 8 Type: Project includes the extension of 36-inch Type: Project includes the construction of dual Location: Cameron Parrish, LA pipeline located on existing right-of-way 14-inch and 24-inch pipelines Start: 2016 Miles: 16 Miles: 42 Location: Alabama and Ohio Location: Texas City, TX - Freeport, TX SUNOCO LOGISTICS – (11/16) Start: 2016 Start: 2016 Contractors: Welded Construction (spreads 1 and Completion: 2017 Completion: 2017 5)/Trinity Energy (spread 2) Services/ Associated Pipe Line Contractors Inc. Project: TEAL U.S. PIPELINE / (spread 3) /Precision Pipeline LLC (spread Type: Project includes the construction of two HENKELS & MCCOY INC. – (11/16) 4) /Otis Eastern Service Inc. (spread 6) 36-inch and 30-inch pipelines, and new Owner: AGL Resources / Williams Transco Project: Mariner East Phase II compressor stations Project: Dalton Expansion Project Start: 2016 Miles: 5 Type: Project includes the construction of Completion: 2017 Location: Alabama and Ohio 16-inch, 20-inch, 24-inch and 30-inch Comments: Project will expand the total takeaway Start: 2017 pipeline and a new compressor facility capacity to 345 Mbpd Comments: One pipeline will tie into NEXUS Miles: 111 Location: Murray County, GA – Holmesville, MS TARGA RESOURCES PARTNERS LP – (11/15) Start: 2016 Project: Bayway Lateral Type: Project includes the construction of a new Completion: 2017 Type: Project includes the construction of 24-inch cryogenic natural gas processing plant Comments: Project is part of the Transco Pipeline and pipeline, meter and regulating stations and associated high pressure gathering will transport approximately 448,000 Miles: .5 pipelines Dth/d of natural gas per day (enough Location: Linden, NJ Miles: 45 natural gas to meet the daily needs of Start: 2017 Location: La Salle County, TX about 2 million homes)

www.pipeline-news.com • March 2017 • Pipeline News 29 ONGOINGProjects construction underway WESTERN GAS PARTNERS LP – (10/16) Owner: Williams Partners LP (4/16) Location: Goldboro, Nova Scotia Type: Project includes the construction of Project: Gulf Trace Completion: 2018 36-inch and 42-inch pipeline Type: Project involves a 1.2 MM Dth/d expansion Comments: The company expects the facility to Miles: 80 Location: Cameron Parish, LA produce five million metric tons of LNG Location: Reeves, Loving and Ward counties, TX Start: 2016 per year with an onsite storage capacity of Start: 2016 Completion: 2017 420,000 cubic meters of LNG Comments: Additional receipt connections may Comments: Project is part of an expansion of the potentially be added at the tailgates of the Transco interstate natural gas pipeline WILLBROS GROUP INC. – (9/15) MiVida Gas Processing Plant and Bone Type: Poject includes assessment digs and Spring Gas Processing Plant preventative maintenance work on a Canada network of existing pipeline infrastruc- WHC ENERGY SERVICES – (2/17) ABB – (3/16) ture Owner: EnLink Midstream Owner: TransCanada Corp. Location: Western Canada Project: Ascension Pipeline Project: Energy East Pipeline Comments: Willbros has also won a construction Type: Project includes the construction of Type: Project includes delivering a number of multi- contract for pipeline and off-site 12-inch pipeline million dollar electrical houses for the pump fabrication services to support tail-ings Miles: 35 stations along the Ener-gy East Pipeline facility requirements at a major oil sands Location: Geismar, LA - Garyville, LA Location: Montreal site Start: 2016 Comments: Project will create up to 120 jobs in Comments: Project will increase Cajun-Sibon Pipeline Québec and a further 90 spin-off jobs capacity by an additional 50,000 bpd of outside of the greater Montreal area Caribbean/South & raw-make NGL Central America AECON GROUP INC. – (8/16) Owner: ONEOK/Fermaca CFPS ENGENHARIA E PROJETOS S.A. – (4/15) Owner: Union Gas Ltd. Project: KA North Condensate Pipeline Type: Project includes the construction of Project: Dawn-Parkway Expansion 30-inch pipeline Type: Project includes the construction of a Type: Project includes the construction of 6-inch pipeline and a second 10-inch Miles: 200 natural gas compressor facilities Location: Coyanosa, TX – Tarahumara, Mexico raw gas pipeline (KA North II) to accept Location: Ontario additional gas production Comments: Pipeline will connect to the Tarahumara Supt: Jeff Sanderson Pipeline Miles: 5 Start: 2016 Location: Maranhão, Brazil Completion: 2017 WILLIAMS PARTNERS LP – (2/17) Completion: 2017 Comments: Project will have approximately 17,000 Project: Leidy Southeast Expansion CH2M HILL INCORPORATED – (6/14) bpd of capacity Type: Project consists of construction of new Owner: TransCanada Corp. pipe within or parallel to existing pipeline Project: Energy East Pipeline ENARSA/VERTÚA/HELPORT/CPC/TECHINCT/ and utility rights-of-way, horsepower Type: Project includes converting an existing additions at existing compressor stations CONTRERAS HERMANOS/PANEDILE/ natural gas pipeline to transport crude oil ROVELLA CARRANZA/CHEDIACK/UCSA/ and existing facility modifications along its Location: Western Canada - Eastern Canada mainline CONTA WALTER MARIO/BTU/ESUCO/ VICTOR CONTRERAS/JCR – (2/16) Miles: 30 ENHANCE ENERGY INC. – (11/16) Owner: Argentine Government Location: Pennsylvania and New Jersey Owner: TransCanada Corp. Project: Noreste Argentino Pipeline Comments: Project will expand the Leidy Line’s Project: Energy East Pipeline Type: Project includes the construction of trunk currently subscribed firm transportation Type: Project includes the construction of lines and branch lines capacity of 1.7 MMDth by about 30 16-inch pipeline Miles: 2,574 percent Miles: 149 Location: Buenos Aires - Uruguay Location: Western Canada - Eastern Canada Start: 2016 Project: New York Bay Expansion Project Comments: System will have a design capacity of 800 Type: Project includes the installation of MMcf/d with initial throughput planned at TIPIEL S.A. – (6/15) additional horsepower at three existing 100 MMcf/d compressor facilities, modifications to Owner: Consorcio Constructor Ductos del Sur Project includes the front-end engineering existing meter & regulator stations, and PEMBINA PIPELINE CORP. – (11/16) Type: design and detailed engineering design of uprating the existing Lower New York Project: Canadian Diluent Hub a new 32-inch pipeline Bay lateral and replacing with 42-inch Type: Project includes the construction of Miles: 1,056 pipe 600,000 bbls of above ground storage, Location: Camisea field - Southern Peru Miles: .2 multiple inbound and outbound pipe-line Comments: Project will improve the existing Location: Middlesex County, NJ and Richmond connections, plus associated pumping Peruvian Energy Network, contributing County, NY and metering facilities to the development of an Energy Node Completion: 2017 Location: Fort Saskatchewan and Petrochemical Hub in Southern Comments: Project will provide an additional 115,000 Completion: 2017 Peru Dth/d of natural gas in time for the Comments: Project is designed to augment 2017/2018 winter heating season Pembina’s existing diluent handling facilities in the Fort Saskatchewan Mexico Owner: Williams Partners LP area which includes 20,000 bpd of Project: Garden State Expansion rail import capacity, 500,000 bbls CARSO ENERGY/ENERGY TRANSFER Type: Project involves an expansion to deliver of underground diluent storage and PARTNERS/ MASTEC INC. – (2/15) 180,000 Dth/d of additional natural gas approximately 180,000 bpd of existing Project: Waha-Presidio Pipeline capacity delivery capacity to third-party diluent Type: Project includes the design, engineering, Location: Burlington County, NJ delivery pipelines supply, construction, operation, and Start: 2016 maintenance of a 42-inch pipeline Completion: 2017 PIERIDAE ENERGY CANADA – (12/14) Miles: 143 Comments: Project is part of an expansion of the Type: Project includes a liquefaction plant, Location: Waha Header - Presidio, TX Transco interstate natural gas pipeline storage facilities and marine jetty for Comments: Project will connect with the Ojinaga-El loading LNG Encino gas pipeline in Mexico’s Chihuahua

30 Pipeline News March 2017 • www.pipeline-news.com ONGOINGProjects construction underway

state to supply gas to central, northern 16-inch pipeline crude oil gathering system and western Mexico and will have a Miles: 37 Location: Frio, La Salle and McMullen counties, TX capacity of 1.35 Bcf/d Location: Dry Creek, ND – Tioga, ND Start: 2016 FAIRWAY ENERGY PARTNERS LLC – (9/15) FERMACA – (6/16) Comments: Pipeline would be designed with an initial Project: Pierce Junction Crude Oil Storage facility Owner: Comisión Federal de Electricidad capacity of 100,000 bpd and will tie into Type: Project includes the conversion of three Type: Project involves building and operating a the Garden Creek Pipeline existing underground storage caverns natural gas pipeline at the Pierce Junction Salt Dome into Miles: 290 BLUEKNIGHT ENERGY PARTNERS LP – (12/15) crude oil storage service and to build Location: Durango - Zacatecas - Aguascalientes Project: Oklahoma Condensate Pipeline out all of the requisite pipelines (two Start: 2016 Type: Project includes the conversion of a separate bi-directional 24-inch pipelines), Completion: 2018 portion of its existing Oklahoma Mainline brine ponds, interconnects and pumping System to meet growing de-mand for capacity INFRAESTRUCTURA ENERGÉTICA dedicated condensate service Miles: 21 NOVA SAB DE C.V. – (9/15) Location: Maysville, OK – Cushing, OK Location: Houston, TX Owner: Comisión Federal de Electricidad Completion: 2016 Completion: 2016 Type: Project includes the construction and Comments: Blueknight’s Cushing Oil Terminal provides Comments: Pipeline would have a capacity of 10 operation of a 42-inch natural gas shippers and producers direct access MMbbls pipeline to several key con-necting terminals, Miles: 127 refiners, as well as the important Gulf GRAND MESA PIPELINE LLC – (1/15) Location: Ojinaga - El Encino, Chihuahua Coast market Project: Grand Mesa Pipeline Completion: 2017 Type: Project includes the construction of a new Comments: Project will have a design capacity capable BOOTS SMITH – (9/15) transportation pipeline, multiple truck of transporting approximately 1.4 Bcf/d of Project: Hawkeye Crude Oil Project injection bays and operational storage natural gas Type: Project includes the construction of dual Miles: 550 12-inch and 10-inch pipelines Location: Weld County, CO JACOBS ENGINEERING GROUP INC. – (6/16) Miles: 26 Completion: 2016 Owner: TransCanada Corp. Location: Koene, ND - Tioga, ND Project: Tuxpan-Tula Pipeline JOMAX CONSTRUCTION– (7/16) Type: Project involves engineering, procurement CALIBER MIDSTREAM PARTNERS LP – (10/16) Owner: Saddlehorn Pipeline Co. LLC and field engineering support for the Project: Caliber Bear Den Interconnect Pipeline Project: Carr Extension installation of a compressor station, a Type: Project includes the construction of a new Type: Project includes construction of pipeline meter station and associated pipeline pipeline Miles: 50 appurtenances Miles: 440 Location: Platteville, CO – Carr, CO Miles: 155 Location: McKenzie County, ND – Watford, ND Start: 2016 Location: Tuxpan, Veracruz - Tula Completion: 2016 Completion: 2016 Start: 2016 Comments: The pipeline will provide up to 50,000 Comments: Project is an extension of the Saddlehorn Completion: 2018 bpd of crude oil throughput capacity Pipeline Comments: TransCanada Corp. was awarded a contract to build and operate the pipeline – (REV 11/16) MEDALLION MIDSTREAM LLC – (1/17) in November 2015 Contractors: Savage Services Corp. / Michels Corp. / Owner: Parsley Energy Precision Pipeline Type: Project includes the construction of a new SAPURAKENCANA MEXICANA Project: Savage DAPL Connector Pipeline 16-inch Delaware Basin crude oil pipeline S.A.P.I. DE C.V. – (9/16) Type: Project will connect Savage’s Bakken system, including crude oil storage and Owner: Pemex Petroleum Services Hub to Dakota Access truck unloading facilities Project: KMZ – 76 Pipeline Pipeline’s pipeline facilities Miles: 45 Type: Project includes the procurement and Location: Trenton, ND Location: Pecos and Reeves counties, TX construction of 36-inch pipeline Start: 2016 Completion: 2017 Miles: 11 Completion: 2017 Comments: Pipeline will have an initial capacity of 100 Location: Ciudad del Carmen, Campeche, Mexico Comments: Construction is currently on hold Mbpd Start: 2017 DUPHIL PIPELINE – (6/16) MICHELS CORP./LOENBRO/ TRANSCANADA CORP. – (6/16) Owner: Fairway Energy Partners PRECISION PIPELINE – (REV 5/16) Comisión Federal de Electricidad Owner: Project: Pierce Junction Crude Oil Project Owner: NorthStar Midstream Tula - Villa de Reyes Pipeline Project: Type: Project involves the construction of 21 Project: NST Express Pipeline Project involves building and operating Type: miles of dual 24-inch pipeline Type: Project includes the construction of the 261-mile, 36-inch pipeline Miles: 21 12-inch and 30-inch pipeline, including a 261 Miles: Location: Houston, TX storage facility Location: Tula, Hidalgo - Villa de Reyes, San Luis Start: 2016 Miles: 1,134 Potosí Location: Bakken/Three Forks area - Patoka, IL Start: 2016 ENLINK MIDSTREAM – (8/16) Completion: 2018 Completion: 2018 Project: Greater Chickadee System Comments: Michels will have spreads 1-3 and The project will interconnect with Comments: Type: Project includes the construction of high Precision will have spreads 4-6. The TransCanada’s Tamazunchale and Tuxpan and low-pressure pipelines, multiple pipeline will transport 450,000 bpd with a - Tula pipelines as well as with other central tank batteries and pump, truck capacity as high as 570,000 bpd or more transporters in the region injection, and storage stations – which could represent approximately Miles: 150 half of Bakken current daily crude oil OIL - The Americas Location: Midland, TX production Start: 2016 U.S. Completion: 2017 ORYX MIDSTREAM SERVICES LLC – (7/16) BAKKENLINK PIPELINE – (11/16) Project: Oryx Trans Permian Pipeline System Project: BakkenLink Pipeline EVX MIDSTREAM PARTNERS LLC – (11/16) Extension Type: Project includes the construction of Type: Project includes the construction of a Type: Project involves the expansion of 16-inch

www.pipeline-news.com • March 2017 • Pipeline News 31 ONGOINGProjects construction underway transmission pipeline PRECISION PIPELINE/ Comments: The project had an open season in Miles: 120 WHC ENERGY SERVICES – (1/16) December 2016 and started construction Location: Pecos, Crane and Midland, TX Operators: Energy Transfer Partners/ Inc. in January of 2017 Completion: 2016 Project: Trunkline Conversion Project Comments: Oryx will expand the system’s storage Type: Project includes the conversion of 30-inch STRIKE CONSTRUCTION / capacity to more than 390,000 bbls with pipeline from natural gas to crude oil VENABLES CONSTRUCTION – (11/15) additional tankage in Reeves, Ward and Miles: 700 Owner: Plains All American Crane counties, TX Location: Patoka, IL - St. James, LA Project: Red River Pipeline Start: 2015 Type: Project includes the construction of PARADIGM ENERGY PARTNERS LLC – (4/16) Comments: The pipeline will initially provide 320 12-inch, 30-inch and 16-inch pipeline Type: Project includes the construction of a new Mbpd of capacity, and ETP could increase Miles: 226 gathering system the capaci-ty of the Bakken Pipeline based Location: Duncan, OK to Longview, TX Miles: 23 on additional customer demand Completion: 2017 Location: Palermo, ND Comments: Strike Construction has been awarded Comments: From Palermo, producers can access PRICE GREGORY INTERNATIONAL – (7/16) spreads one and three, and Venables east and west coast markets via the Operator: SemGroup Construction has been awarded spread two BNSF Railway, as well as downstream Contractor: Quanta Services Inc. markets near Stanley, ND, where Project: Maurepas Pipelines SUNOCO LOGISTICS PARTNERS LP – (8/15) Paradigm has existing pipeline Type: Project includes the construction of 34.2 Owner: Plains All American connections miles of 24-inch pipeline, 35 miles of Project: Permian Longview and Louisiana 12-inch pipeline and 34 miles of 6-inch Extension PARADIGM MIDSTREAM/PHILLIPS 66 – (3/16) pipeline Type: Project includes the construction of Project: Sacagawea Pipeline Location: St. James & St. Charles parishes, LA 12-inch, 30-inch and 16-inch pipeline Type: Project includes the construction of Completion: 2017 Location: West Texas – East Texas – Louisiana 16-inch and 20-inch pipeline Comments: Project is anticipated to have initial Miles: 76 PUMPCO/STRIKE LLC – (3/16) capacity to transport 100,000 bpd Location: McKenzie County, ND – Stanley, ND Owner: Sunoco Logistics Comments: Pipeline will cross Lake Sacagawea at one Project: Delaware Basin Extension SUNLAND CONSTRUCTION INC. – (9/16) of its narrowest points located several Type: Project includes the construction of new Owner: TransCanada Corp./Magellan Midstream miles south of the Four Bears Memorial pipeline Project: HoustonLink Bridge near New Town, ND, using the Miles: 125 Type: Project includes the construction of a HDD method of crossing Location: Reeves County, TX - Lea County, NM 24-inch pipeline Completion: 2017 Miles: 9 PLAINS ALL AMERICAN PIPELINE LP – (10/15) Comments: Spreads one and two are in the process of Location: Houston, TX Project: Caddo Pipeline rebidding, and spreads three, four and five Start: 2016 Type: Project includes the construction of have been awarded to Pumpco Completion: 2017 12-inch pipeline Comments: Project will provide TransCanada’s Miles: 80 SADDLEHORN PIPELINE LLC – (12/16) customers access to Magellan’s Houston Location: Longview, TX - Shreveport, LA Project: Laramie County Pipeline and Texas City crude oil distribution Completion: 2016 Type: Project includes the construction of a new system Comments: Pipeline will have the capacity to move pipeline lateral up to 80,000 bpd to refineries in the Miles: 10 TALL OAK MIDSTREAM LLC – (7/15) Shreveport area and Delek Logistics’ Location: Laramie County, WY Project: Eagle Ford JV Pipeline System Expansion pipeline system supplying Delek US Start: 2016 Type: Project includes the construction of a Holdings’ El Dorado, AR refinery Completion: 2017 20-inch condensate gathering system and Comments: Project will have an initial design capacity expansion on an existing pipeline system PLAINS ALL AMERICAN PIPELINE LP/ of 10,000 bpd Miles: 125 ENTERPRISE PRODUCTS PARTNERS LP – (12/14) Location: Gardendale, TX - Corpus Christi, TX Project: Eagle Ford JV Pipeline System Expansion SEABROOK LOGISTICS LLC – (1/17) Completion: 2017 Type: Project includes the construction of a Owner: Magellan Midstream Partners LP/LBC Tank Comments: Project includes a new terminal on the 20-inch condensate gathering system and Terminals LLC Corpus Christi ship channel to support expansion on an existing pipe-line system Type: Project includes the construction of the increased volumes to be shipped via Miles: 125 270 Mcm of additional crude oil and pipeline to the region Location: Gardendale, TX - Corpus Christi, TX condensate storage and the construction Completion: 2017 of a 24-inch bi-directional pipeline TALLGRASS PONY EXPRESS Comments: Project includes a new terminal on the Location: Seabrook, TX PIPELINE LLC – (9/16) Corpus Christi ship channel to support Completion: 2018 Project: Northeast Colorado Lateral the increased volumes to be shipped via Comments: If warranted by market demand, Seabrook Type: Project includes the construction of pipeline to the region Logistics could construct an additional 16-inch pipeline and associated facilities 480 Mcm of storage, a second 24-inch Miles: 100 PLAINS ALL AMERICAN PIPELINE LP/ diameter pipeline between the Seabrook Location: Weld County, CO - Logan County, CO PHILLIPS 66 PARTNERS LP – (9/16) Logistics’ facility and Magellan’s Houston Comments: Project will connect to an interconnect Project: STACK Pipeline crude oil distribution system and a second with the Tallgrass Pony Express Pipeline Type: Project includes the expansion of the Aframax ship dock STACK Pipeline by constructing a truck U.S. PIPELINE – (11/14) station and a pipeline lateral STAKEHOLDER MIDSTREAM Owner: Sunoco Energy Miles: 55 CRUDE OIL PIPELINE – (1/17) Project: Rocky Mountain Pipeline Location: Cushing, OK Project: San Andres Crude Gathering System Type: Project includes the construction of Start: 2016 Type: Project includes the construction of 16-inch pipeline Comments: Plains contributed an existing terminal a greenfield crude oil gathering and Miles: 70 with 200,000 bbls of crude oil storage trunkline pipeline Location: Cheyenne, WY - Fort Lupton, CO Location: Yoakum County, TX – Denver City, TX Completion: 2016 Completion: 2017 Comments: The oil pipeline will be completed in

32 Pipeline News March 2017 • www.pipeline-news.com ONGOINGProjects construction underway the following spreads: 102 miles of Comments: Project will produce up to 100 Mbpd of ITC PIPELINE CO. LLC – (7/16) 12-inch pipeline from Chey-enne, WY bitumen and require bitumen blend and Project: Petroleum products pipeline system to Commerce City, CO; 32 miles of diluent transportation capacity over the Type: System consists of two new 36-inch pipeline from Fort Lupton to Commerce long term diameter injecting pipelines and two City; and 1.5 miles of the existing 16-inch diameter return lines and a new pipeline will be re-routed entirely within PEMBINA PIPELINE CORP. – (6/16) 16-inch diameter pipeline Commerce City Owner: Pembina Pipeline Corp. Miles: 5 Project: Fox Creek to Namao Pipelines Location: Harris County, TX WELSPUN TUBULAR/PUMPCO/ Type: Project involves the construction of two Start: 2016 STRIKE – (10/16) 168-mile, 24- and 16-inch pipelines Completion: 2016 Owner: Diamond Pipeline LLC Miles: 336 Project: Diamond Pipeline Location: Fox Creek - Namao, Alberta MINNESOTA LTD. – (8/16) Type: Project includes the construction of a new Start: 2016 Owner: Wolverine Pipe Line Co. pipeline Completion: 2017 Project: Detroit Metro Access Pipeline Miles: 440 Comments: Project is part of a series of projects that Type: Project includes the construction of Location: Cushing, OK - Memphis, TN form the company’s Phase III Expansions 16-inch pipeline Comments: The pipeline will be capable of Miles: 35 transporting 200,000 bpd of domestic Project: Vantage Pipeline Expansion Location: Washtenaw County, MI crude oil from the storage hub in Cushing Type: Project includes the installation of mainline Start: 2016 to Valero’s refinery in Memphis pump stations and the construction of a new 8-inch gath-ering lateral MAGELLAN MIDSTREAM PARTNERS LP/ WYATT CONSTRUCTION – (10/16) Miles: 50 TRANSMONTAIGNE PARTNERS LP – (6/16) Owner: Paradigm Midstream/Phillips 66 Location: Tioga, ND - Empress, Alberta Owner: Magellan Midstream Partners LP and Project: Sacagawea Pipeline Completion: 2016 TransMontaigne Partners LP Type: Project includes the construction of Comments: Expansion will increase the pipeline’s Type: Project involves the construction of a 150- 16-inch pipeline mainline capacity from 40,000 bpd to mile, 16-inch diameter pipeline capable of Miles: 4.5 68,000 bpd transporting 150,000 bpd Location: Mountrail County, ND Miles: 150 Start: 2016 TRANSCANADA CORP. – (10/15) Location: Corpus Christi, TX - Brownsville, TX Project: Grand Rapids Pipeline Completion: 2018 Type: Project includes the construction of new Canada pipeline SOUTHERN PIPELINE CONSTRUCTION – (11/15) BANISTER PIPELINE – (7/16) Miles: 287 Owner: Magellan Midstream Location: Fort McMurray, Alberta - Edmonton Owner: Access Pipeline Inc. Type: Project includes the construction of a Completion: 2016 Project: Northeast Expansion 20-inch pipeline Comments: Project will have an ultimate capacity to Type: Project includes the construction of Miles: 50 move up to 900,000 bpd of crude oil and 42-inch pipeline Location: Fort Smith, AR - Little Rock, AR 330,000 bpd of diluent Miles: 185 Comments: Project will also use 159 miles of existing Location: Conklin, Alberta – Redwater, Alberta pipe Start: 2016 WILLBROS GROUP INC. – (11/15) Completion: 2018 Type: Project includes the construction of 10-inch TROY CONSTRUCTION – (4/16) pipeline and the engineering, procurement Owner: Dow Pipeline Co. ENBRIDGE ATHABASCA – (7/14) and construc-tion of 150,000 bbls of Type: Project includes the construction of a additional storage at an existing facility Project: Athabasca Pipeline Twinning 12-inch pipeline Miles: 60 Type: Project includes: a new pump station at Miles: 78 Location: Panola County, TX - Angelina County, TX the existing Kirby Lake Terminal; a new Location: Freeport, TX - Mont Belvieu, TX Completion:2016 pump station at the existing Bonnyville Station; and a new 36-inch pipeline WOOD GROUP MUSTANG – (11/14) Miles: 214 PRODUCTS – Owner: Dow Pipeline Co. Location: Kirby Lake Type: Project includes the construction of new Comments: Pipeline will generally follow the existing The Americas pipeline, associated interconnections and Athabasca Pipeline right-of-way station modifications U.S. Miles: 140 ENBRIDGE INC. – (8/14) AEGION CORP. – (9/16) Location: Freeport, TX - Mont Belvieu, TX Project: Woodland Pipeline Extension Owner: Columbia Gas Type: Project includes the construction of Type: Project includes wastewater pipeline 36-inch pipeline and pump stations rehabilitation Mexico Miles: 228 Miles: 2.6 TRANSCANADA CORP. – (9/16) Location: Cheecham - Edmonton Location: Chicago, IL Type: Project involves the development of Completion: 2016 Start: 2016 storage and transportation infrastructure, Comments: Project will have an initial capacity of Completion: 2018 including a marine terminal, storage hub 400,000 bpd, with the ability to be and pipeline expanded to approximately 800,000 bpd BUCKEYE PARTNERS LP – (10/16) Miles: 165 dependent upon crude viscosity Project: Michigan/Ohio Pipeline Expansion Location: Mexico Type: Project includes the reversal of a portion Comments: The 100,000 bpd refined products INTER PIPELINE – (2/17) of the existing Laurel Pipeline pipeline will parallel TransCanada’s Project: Kirby North Project Location: Detroit, MI, Lima, OH and Midland, PA recently awarded Tuxpan-Tula natural gas Type: Project includes the construction of Comments: This phase of the project is in addition to pipeline project 16-inch and 8-inch pipeline laterals, as the first phase, which offered expanded well as a new pumping and metering transportation services from Midwestern Canada facility origin points to destination points as far east as the Pittsburgh area ENBRIDGE INC. – (10/15) Miles: 15 Project: Norlite System Location: Conklin, AB

www.pipeline-news.com • March 2017 • Pipeline News 33 ONGOINGProjects construction underway

Location: Cheecham conditioning plant Owner: Shell Start: 2017 Miles: 120 Type: Project includes roads, rail, Comments: System will be capable of transporting Location: Veracruz, Mexico airstrips, marine structures, power, 270,000 bpd of diluent from Edmonton Completion: 2017 telecommunications, water and sewerage into the oil sands re-gion and has the Comments: Saipem will develop the subsea, systems, as well as offices, warehouses potential to be further expanded with the umbilicals, risers, and flowlines facilities, and workforce accommodation addition of pump stations to an ultimate which include subsea equipment, infield Location: California capacity of over 400,000 bpd umbilicals, flexibles, and trees and control system installation Owner: Piedmont Natural Gas Type: Project includes the installation of 12-inch OFFSHORE – pipeline via horizontal directional drilling The Americas Caribbean/South & Location: Guilford County, NC Central America Supt: Ben Gruetzmacher U.S. Start: 2016 TECHNIP – (12/15) AUDUBON ENGINEERING SOLUTIONS – (6/16) Owner: Libra Oil & Gas BV Owner: Phillips 66 Co. BIGINCH FABRICATORS AND Project: Libra Field CONSTRUCTION INC. – (12/16) Type: Project involves various pipeline, Type: Project includes the supply of 6-inch and Owner: Energy Transfer measurement, rotating equipment, truck 8-inch flexible pipes Type: Project includes nine 22-inch pipeline rack and marine terminal, and tank Miles: 120 anomaly digs integrity projects Location: Santos Basin, Brazil Location: Eastern and Gulf Coast Location: Parke County, IN Supt: Jim Shepler Start: 2016 Owner: BP Trinidad and Tobago LLC Completion: 2019 Project: Lakach Field Owner: Energy Transfer Panhandle Eastern Type: Project includes the design, Type: Project includes the installation of a new SUBSEA 7 S.A. – (1/15) detailed engineering, procurement, regulator station Owner: Royal Dutch Shell construction, load out, and mechanical Location: Macon County, IL Type: Project includes the installation of completion of 4,300-ton topsides that Supt: Frank Ayers 8-inch flowlines and steel catenary can process 590 MMcf/d of gas, and Start: 2016 risers with associated structures such a 6,100-ton jacket. Contract will also as pipeline end terminations and inline cover the design, detailed engineering, Owner: Enbridge structures procure-ment, fabrication, transport, Type: Project includes the installation of a Miles: 27 installation, and pre-commissioning 24-inch spool piece and assisting with Location: Gulf of Mexico of 10-inch and 8-inch inside-diameter running an information pig flexible flowlines; 26-inch-outside- Location: Will County, IL TECHNIP – (3/16) diameter, 6-mile concrete-coated rigid Supt: Brad Hartman Owner: Deep Gulf Energy III LLC subsea pipeline; a diving campaign Start: 2016 Type: Project includes project management to support LNG train and field and engineering services; fabrication turnarounds; and a large number of Owner: Energy Transfer Panhandle Eastern and installation of pipe-in-pipe subsea structures and tie-in spools Type: Project includes the investigation of flowline; design, fabrication Location: Trinidad 24-inch and 26-inch anomalies and installation of flowline end Comments: Technip’s S-Lay pipelay vessel, the Location: Monroe County, MI; Paulding and terminations; fabrication and G-1200, will install the rigid pipelines installation of jumpers; pre- Defiance counties, OH commissioning for the flowline Supt: Chris Elliot Miles: 14 OTHER – Start: 2016 Location: Mississippi Canyon, Gulf of Mexico The Americas Comments: Technip’s vessel the Deep Blue, the BLACKWELL ENTERPRISES INC. – (12/16) group’s flagship vessel for deepwater U.S. Contractor: Rodenberg Diversified LLC pipelay Type: Project includes the restoration of 10,000 APEX PIPELINE SERVICES INC. – (12/16) feet of 20-inch pipeline right-of-way Owner: Shell Offshore Inc. Owner: Columbia Gas Location: Noble County, OK Project: Stones Field Type: Project includes the installation of 1O-inch Supt: Bob Blackwell Type: Project includes engineering of the and 8-inch control valves and a gas heater required second pipeline end terminations Miles: 19 Contractor: Strike (PLETs); fabrication of the PLETs and piles; Location: Kanawha County, WV Type: Project includes seeding on 16-inch installation of the subsea production Supt: Ransford Vickers pipeline right-of-way system; inclusive of associated project Miles: 140 management, engineering and stalk Owner: Blue Racer Midstream Location: Lincoln, Pottawatomie, Oklahoma, fabrication Type: Project includes the installation of 2,700 Cleveland , McClain, Garvin and Carter Location: Walker Ridge, Gulf of Mexico feet of 16-inch pipeline counties, OK Comments: Technip’s vessel the Deep Blue, the Location: Wetzel County, WV Supt: Bob Blackwell group’s flagship vessel for deepwater Supt: Dave Starcher Start: 2016 pipelay Start: 2016 BRANDENBURG DRAINAGE INC. – (12/16) APPALACHIAN PIPELINE Contractor: Michels Corp. Mexico CONTRACTORS LLP – (12/16) Type: Project includes drain tile repair on a Owner: Kennett/Missouri City Light Gas & Water 16-inch pipeline SAIPEM – (11/14) Type: Project includes the installation of 6-inch Project: Lakach Field Location: Scott and Clinton counties, IA pipeline replacement Supt: Stephen Brandenburg Type: Project includes engineering, Miles: 6 procurement, construction, and Location: Dunklin County, MO DUN TRANSPORTATION & installation of the system connecting Supt: Anthony Campbell the off-shore field with the onshore gas STRINGING INC. – (1/17) Contractor: Welspun ONGOINGProjects construction underway Operator: Plains All American HENKELS & MCCOY INC. – (11/16) of 1,300 feet of 6-inch pipeline Type: Project includes the offloading and Owner: Williams Transco Location: Morgan County, IL stockpiling of 20-inch pipe Type: Project includes the installation of 20-inch Supt: Clark DeGroot Miles: 270 and 16-inch pipeline Location: McIntosh County, OK; Prairie and Franklin Miles: 56 Owner: Ameren counties, AR Location: Bartow, Murray, Gordon and Whitfield Type: Project includes the installation of 80 Supt: Greg Norman counties, GA feet of 8-inch pipeline and 2,800 feet of Supt: Scott Schoenherr 6-inch pipeline Contractor: U.S. Pipeline Inc. Start: 2016 Location: Marion County, IL Type: Project includes the loading, hauling and Supt: Clark DeGroot stringing of 30-inch, 24-inch and 12-inch HOOVER CONSTRUCTION CO. – (12/16) Start: 2016 pipeline Contractor: U.S. Pipeline Inc. Miles: 60 Type: Project includes drilling and blasting on Owner: Cascade Natural Gas Location: Coweta, Carroll, Douglas, Paulding and 30-inch and 24-inch pipeline right-of-way Type: Project includes the installation of 750 Bartow counties, GA Miles: 60 feet of 6-inch and 4-inch pipeline Supt: Mike Bruce Location: Coweta, Carroll, Douglas, Paulding and Location: Grant County, WA Bartow counties, GA Supt: Gunner Anderson Start: 2016 Owner: Tenaska Pennsylvania Partners Supt: Gus Jones Type: Project includes the offloading and Owner: Puget Sound Energy stockpiling of 20-inch pipe INDIANHEAD PIPELINE Type: Project includes the installation of a Miles: 10 SERVICES LLC – (11/16) Contractor: Troy Construction heater Location: Westmoreland County, PA Type: Project includes providing spray services Location: Snohomish County, WA Supt: Greg Norman on 36-inch pipeline Supt: Gunner Anderson Start: 2016 Miles: 91 Start: 2016 Location: Mitchell, Colquitt, Brooks and Lowndes Contractor: U.S. Pipeline Inc. counties, GA; Madison and Hamilton Owner: Mears/Ameren Type: Project includes the hauling of 36-inch counties, FL Type: Project includes ten integrity digs pipe Start: 2016 Miles: 140 Miles: 1.5 Location: Adams, McDonough and Pike counties, IL Location: Louden County, VA - Franklin County, PA Contractor: Precision Pipeline LLC Supt: Clark DeGroot Supt: Greg Norman Type: Project includes the buoyancy control of Start: 2016 Start: 2016 30-inch pipeline Miles: 158 INTERCON CONSTRUCTION INC. – (2/17) FOLTZ WELDING LTD./ Location: Jasper, Polk, Story, Boone, Webster, Contractor: J.F. Kiely Construction Inc. CONTINENTAL PIPELINE SERVICES – (12/16) Calhoun, Buena Vista and Cherokee Type: Project includes the installation of 1,700 Owner: Marathon Pipeline counties, IA feet of 12-inch pipeline via horizontal Type: Project includes anomaly digs on 12-inch Start: 2016 directional drilling pipeline Location: Cape May County, NJ Location: Allen County, OH Contractor: Precision Pipeline LLC Supt: Joe Schmelzer Supt: Hank Hull Type: Project includes the hydroseeding on Start: 2016 36-inch and 24-inch pipeline right-of-way LETOURNEAU ENTERPRISES LLC – (2/17) Completion: 2017 Miles: 73 Contractor: Price Gregory International Inc. Location: Braxton and Lewis counties, WV Type: Project includes the clearing, grubbing Owner: Marathon Pipeline Supt: Bradie Johnson and matting of 36-inch pipeline right-of-­ Type: Project includes seven 24-inch pipeline Start: 2016 way anomaly digs Miles: 16 Location: Carter and Boyd counties, KY Contractor: Precision Pipeline LLC Location: Russell County, AL Supt: Hank Hull Type: Project includes buoyancy control, Supt: Mark A. Letourneau Start: 2016 seeding and/or foam of 3O-inch pipeline Miles: 476 Contractor: MPG Pipeline Contractors LLC Owner: Plains All American Location: Illinois Type: Project includes the clearing, grubbing Type: Project includes the fabrication and Start: 2016 and matting of 36-inch pipeline right­of- installation of 30-inch station piping way Location: Marion County, IL Contractor: Precision Pipeline LLC Miles: 89 Supt: Jonathan Feather Type: Project includes providing foam, seeding Location: Dougherty, Mitchell, Stewart, Terrell and Start: 2016 and buoyancy control services on Webster counties, GA 30-inch, 24-inch, 20-inch and 12-inch Supt: Larry F. Cassidy Owner: Marathon Pipeline Co. pipeline Start: 2016 Type: Project includes the installation of 1,500 Miles: 311 feet of 30-inch pipeline Location: Mercer, Morton, McKenzie, Dunn, MDS BORING AND DRILLING INC. – (10/16) Location: Marion County, IL Mountrail and Williams counties, ND Contractor: Precision Pipeline LLC Supt: Tim Rinehart Supt: Randy Rubenzer Type: Project includes road boring on 30-inch Start: 2016 Start: 2016 pipeline Miles: 63 FORMOSA PLASTICS – (7/16) INFRASOURCE LLC – (12/16) Location: Calhoun, Sac, Buena Vista and Cherokee Owner: Formosa Plastics Owner: Ameren Illinois counties, IA Type: Project includes the construction of Type: Project includes the installation of 4,200 Supt: Randy Cassell 16-inch pipeline feet of 6-inch pipeline Start: 2016 Miles: 177 Location: Litchfield, IL Location: Point Comfort, TX - Mont Belvieu, TX Supt: Clark DeGroot NORTHERN CLEARING INC. – (12/16) Completion: 2017 Contractor: Price Gregory International Inc. Owner: Ameren Illinois Type: Project includes the clearing of 48-inch Type: Project includes the installation of 1,660 and 42-inch pipeline right-of-way feet of 6-inch pipeline and the installation Miles: 20 ONGOINGProjects construction underway

Location: Coosa, Tallapoosa, Autauga and Chilton Contractor: Rockford Corp. assorted fabrication assembles counties, AL Type: Project includes the unloading, racking Miles: 96 Supt: Jim Junker and stockpiling of pipeline Location: Ascension, St. James, St. John the Baptist Miles: 130 and St. Charles parishes, LA Contractor: U.S. Pipeline Inc. Location: Polk County, FL Supt: Greg Newcomb Type: Project includes the clearing of 30-inch Supt: Toby Prawl Start: 2016 and 24-inch pipeline right-of-way Start: 2016 Miles: 59 Owner: Spectra Energy Location: Coweta, Carroll, Douglas, Paulding and PHILLIPS & JORDAN INC. – (10/16) Project: Sabal Trail Pipeline Barton counties, GA Contractor: Rockford Corp. Type: Project includes the installation of 36-inch Supt: Dennis Bergman Type: Project includes the clearing and grubbing and 24-inch pipeline on 36-inch pipeline right-of-way Miles: 26 Contractor: Precision Pipeline LLC Miles: 67 Location: Tallapoosa, Chambers, Lee and Russell Type: Project involves the clearing of 157 miles Location: Lake, Orange, Osceola, Polk and Sumter counties, AL; Stewart County, GA; and of 30-inch pipeline right-of-way counties, FL Suwannee, Gilchrist, Alachua, Levy, Miles: 157 Supt: James “Bucky” Lane Marion and Sumter counties, FL Location: Marion, Fayette, Bond, Montgomery, Start: 2016 Supt: Tommy Hardwick and Terry McDaniel Macoupin, Morgan, Scott, Pike, Brown, Start: 2016 Schuyler, Adams and Hancock counties, IL PRECISION PIPELINE LLC – (11/16) Supts: James Junker, Jr. and Dennis Bergman Owner: Marathon PROFOAM LLC – (1/17) Start: 2016 Type: Project includes welding on three pipeline Contractor: Welded Construction LP laterals Type: Project includes providing foam breakers Owner: Precision Pipeline LLC Miles: 128 on 20-inch pipeline Type: Project involves the clearing of 160 miles Location: Williston, ND Miles: 54.5 of 30-inch pipeline right­of-way Supt: William Martel Location: Harrison and Jefferson counties, OH; Miles: 160 Start: 2016 Washington County, PA and Brook Location: Jasper, Mahaska, Keokuk, Wapello, County, WV Jefferson, Van Buren and Lee counties, IA Owner: Energy Transfer Supt: Kevin Smith Start: 2016 Type: Project includes welding on 30-inch pipeline RIGHT-OF-WAY CLEARING & Owner: Precision Pipeline LLC Miles: 161 MAINTENANCE INC. – (12/16) Type: Project involves the clearing of 183 Location: Burlington, IA Contractor: Otis Eastern Service LLC miles of 30-inch pipeline right-of- Supt: Jimmy Dick Type: Project includes maintenance work on way and 23 miles of 12-inch, 55 miles Start: 2016 36-inch and 30-inch pipeline right-of-way of 20-inch and 50 miles of 24-inch Miles: 28 pipeline right-of-way Owner: Energy Transfer Location: Westmoreland County, PA Miles: 311 Type: Project involves the installation of 476 Supt: James Merenda Location: North Dakota miles of 30-inch pipeline Supt: Duanne Krnieciak Miles: 476 SNELSON COMPANIES INC. – (2/17) Start: 2016 Location: Illinois and Iowa Owner: Pacific Gas & Electric Supts: Kevin Olerud, Jim Cunningham and Brad Type: Project includes two anomaly digs on PE BEN USA INC. – (2/17) Moser 34-inch pipeline Contractor: Price Gregory International Inc. Start: 2016 Location: Stanislaus County, CA Type: Project includes the hauling of an Supt: Jack Symonds undetermined length of 36-inch pipe to Owner: Energy Transfer the right-of-way Type: Project involves the installation of 183 Operator: TransCanada Location: Macon County, AL miles of 30-inch pipeline right-of-way and Type: Project includes the lowering of 230 feet Supt: Norman Lake 23 miles of 12-inch, 55 miles of 20-inch of 30-inch pipeline HQ: Shorter, AL and 50 miles of 24-inch pipeline Location: Imperial County, CA Miles: 311 Supt: Trevor Thayer Contractor: Welded Construction LP Location: North Dakota Type: Project includes the loading, hauling and Supts: Rick Swing, Jake Breunig and Chad Ward Owner: Pacific Gas & Electric stringing of 20-inch pipe Start: 2016 Type: Project includes 4-inch mainline valve Miles: 54 replacement, 34-inch pipeline anomaly Location: Weirton, WV PRICE GREGORY digs and hydrovac excavation of a valve Supt: Tommy Haynes INTERNATIONAL INC. – (2/17) nest and fourteen potholes Start: 2016 Owner: Spectra Energy/Sabal Trail Transmission LLC Miles: 28 Type: Project includes the installation of 36-inch Location: Merced, San Benito and San Bernardino Contractor: Precision Pipeline LLC pipeline counties, CA Type: Project includes the loading, hauling and Miles: 15.75 Supt: Jeff Gregory/Norm Glenn/Jake Fagan stringing of 30-inch pipeline Location: Russell County, AL and Stewart County, Miles: 95 GA Owner: Pacific Gas & Electric Location: Jasper, Polk, Story, Boone and Webster Supt: Russell York Type: Project includes the installation of 200 counties, IA HQ: Opelika, AL feet of 8-inch and 6-inch pipeline and Supt: Cory Strandlien removal and reinstallation of an 8-inch Start: 2016 Owner: Transcontinental Gas Pipeline Co. LLC mainline valve Type: Project includes the installation of 48-inch Location: Sacramento County, CA Contractor: Precision Pipeline LLC and 42-inch pipeline Supt: Matt Groeneveld Type: Project includes the loading, hauling and Miles: 19 stringing of 30-inch pipeline Location: Chilton and Autauga counties, AL Owner: Pacific Gas & Electric Miles: 64 Supt: Doug Gregory Type: Project includes two camera inspection Location: Calhoun, Sac, Buena Vista and Cherokee excavations on a 12-inch pipeline, the counties, IA Contractor: QPS Engineering re-route of 700 feet of 6-inch pipeline Supt: Chane Keeling Type: Project includes the installation of and the installation of 40 feet of 6-inch Start: 2016 12-inch, 24-inch and 6-inch pipeline and pipeline

36 Pipeline News March 2017 • www.pipeline-news.com ONGOINGProjects construction underway

Location: San Joaquin, Merced and Fresno counties, CA Supt: Heiko Mossner/Jake Fagan/Chris Sullivan

Owner: Pacific Gas & Electric Type: Project includes the excavation, removal and replacement of 200 feet of 12-inch pipe and the excavation and shoring of three 12-foot by 15-foot bell holes Location: Yolo and Kern counties, CA Supt: Reiko Moessner

Owner: Pacific Gas & Electric Type: Project includes the installation of 8-inch and 6-inch pipeline and the removal and replacement of an 8-inch mainline valve set fabrication assembles Miles: 96 Location: Ascension, St. James, St. John the Baptist and St. Charles parishes, LA Supt: Greg Newcomb Start: 2016

U.S. PIPELINE INC. – (12/16) Owner: Williams/Transcontinental Gas Pipeline Co. LLC Type: Project includes the installation of 30-inch, 24-inch and 12-inch pipeline Miles: 59 Location: Coweta, Carroll, Douglas, Paulding and Bartow Counties, GA Supt: Thad Hutchens

WELDED CONSTRUCTION LP – (1/17) Operator: Consumers Energy Type: Project includes the construction of a warehouse yard and pipe yard Location: Genesee County, MI Supt: Jeff Sanderson

Owner: Sunoco Pipeline LP Type: Project includes the installation of 20-inch pipeline Miles: 54.4 Location: Harrison and Jefferson counties, OH; Brooke County, WV; and Washington County, PA Supt: Gerald Hill Start: 2016

www.pipeline-news.com • March 2017 • Pipeline News 37