APIWell  Number:43013507180000

FORM 3 STATE OF DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT DIVISION OF OIL, GAS AND MINING

1. WELL NAME and NUMBERLNCUFMEEE1R22D-56 APPLICATION FOR PERMIT TO DRILL LC FEE 1-22D-56 2. TYPE OF WORK 3. FIELD OR WILDCAT

DRILL NEW WELLWELLI REENTER P&A WELL DEEPEN WELL I LAKELAKE CANYON

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAME Oil Well Coalbed Methane Well: NO 6. NAME OF OPERATOR 7. OPERATOR PHONE BERRY COMPANY 303 999-4044 8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT, 84066 [email protected] 10.10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP (FEDERAL, INDIAN, OR STATE)STATEE) I I I FEEl FEE FEDERALFEDERAL INDIANINDIAN STATE FEE FEDERAL INDIANINDIAN STATE FEE

13.13. NAME OF SURFACE OWNER (if box 1212 = 'fee') 14. SURFACE OWNER PHONE (if box 1212 = 'fee') RANDY NIELSEN 435-733-1502

15.15. ADDRESS OF SURFACE OWNER (if box 1212 = 'fee') 16. SURFACE OWNER E-MAIL (if box 1212 = 'fee') PPO O BOX 628, DUCHESNE, UT 84021 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT 17.17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM MULTIPLE FORMATIONS (if box 1212 == 'INDIAN')

YES (Submit(Submit Commingling Application) NO VERTICAL DIRECTIONAL HORIZONTAL I

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 876 FNL 129 FEL NENE 22 5.0 S 6.0 W U

Top of Uppermost Producing Zone 741 FNL 464 FEL NENE 22 5.0 S 6.0 W U

At Total Depth 661 FNL 657 FEL NENE 22 5.0 S 6.0 W U

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNIT DUCHESNE 129129 40 25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH (Applied For Drilling or Completed) or MD: 6189 TVD: 6150 3000

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER / WATER RIGHTS APPROVAL NUMBER IF APPLICABLE 6501 RLB0005651RLBOOO5651 43-11041

Hole, Casing, and Cement Information String Hole Size Casing Size Length Weight Grade & Thread Max Mud Wt. Cement Sacks Yield Weight SURF 12.2512.25 8.625 0 - 650 24.0 J-55 ST&C 9.5 Class G 410 1.151.15 15.815.8 PROD 7.875 5.55.5 0 - 6189 15.515.5 J-55 LT&C 9.5 Type V 180180 3.82 11.011.0 Class G 320 1.71.7 13.113.1

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP DRILLED)

NAME Kathy K. Fieldsted TITLE Sr. Regulatory & Permitting Tech. PHONE 435 722-1325 SIGNATURE    DATE 05/03/2011 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL 43013507180000

Permit Manager

   APIWell  Number:43013507180000

BERRY PETROLEUM COMPANY LC FEE 1-22D-56 Surface location: NE ¼, NE ¼, 876' FNL 129' FEL, Sec. 22, T5W, R6W, U.S.B.& M. BHL: NE ¼, NE ¼, 661' FNL, 657' FEL Duchesne County, Utah

ONSHORE ORDER NO. 1

DRILLING PROGRAM

1,2 Estimated Tops of Geological Markers and Formations Expected to Contain Water, Oil and Gas and Other Minerals

FORMATION DRILL DEPTH * DRILL DEPTH* Measured @SHL (TVD) @BHL (TVD) Depth

Uinta Fm Surface Surface Green River 374' 373' 374' Green River Upper Marker 926' 923' 926' Mahogany 1,501' 1,500' 1,506' Tgr3 2,522' 2,519' 2,536' *Douglas Creek 3,296' 3,296' 3,317' Black Shale 3,926' 3,927' 3,952' *Castle Peak 4,202' 4,200' 4,231' *Uteland Butte 4,574' 4,570' 4,605' *Wasatch 4,801' 4,800' 4,833' CR-6 (base U Wasatch) 6,003' 5,997' 6,035' TD 6,150' 6,150' 6,189'

Base of Moderate Saline H2O 4,443' 4,452'

*PROSPECTIVE PAY

Berry is locating the well at the proposed surface location and directionally drilling to the proposed bottom hole location. By drilling directionally, Berry Petroleum Company will improve field development efficiency by potentially combining multiple surface hole locations together. This will significantly reduce total surface disturbance plus combine the use of access roads and existing pipelines. Furthermore, Berry hereby certifies that it is the sole working interest owner with 460 feet of the entire directional well bore and the remainder of the Ute Tribal   

   APIWell  Number:43013507180000

Berry Petroleum Company Drilling Program LC FEE 1-22D-56 Duchesne County, UT

3 Proposed Casing and Cementing Program

Purpose Depth Hole Size Casing Size Type Connection Weight

Surface 650' 12.25" 8-5/8" J-55 ST&C 24# Production 6189' 7.875" 5-1/2" J-55 LT&C 15.5#

Surface Fill Type & Amount

0' - 650' 650' Approximately 410 sks Premium Plus (TypeG) + additives or similar slurry with a minimum weight of 15.8 #/gal and approximate yield of 1.15 cuft/sx, minimum 24 hr compressive strength = 500 psi (Cement will be circulated to surface and topped off, if necessary.)

Production Type & Amount

0' - 3500' Lead: +/- 180 sks Premium Type V + additives or similar slurry with a minimum weight of 11.0 #/gal and approximate yield of 3.82 cuft/sx

3500' - 6189' Tail: +/- 320 sks Premium Lite Tail + additives or similar slurry with a minimum weight of 13.1 #/gal and approximate yield of 1.70cuit/sk.

For production casing, actual cement volumes will be determined from the caliper log plus a minimum of 15% excess.

4 Drilling Fluids Program

Interval Weight Viscosity Fluid Loss Remarks

0' - 650' 8.4 - 9.5 27 NC DAP Mud

650 -6189' 8.4 - 9.5 27 NC DAP Water

5 Pressure Control Equipment : (Schematic Attached)

The BOP and related equipment shall meet the minimum requirements of Onshore Oil and Gas Order No. 2 for equipment and testing requirements, procedures, etc. A 2M system will be utilized. The attached diagram depicts the use of an annular in conjunction with double rams. However, an annular, double rams or both may be used depending on the drilling rig contracted.    Chart recorders will be used for all pressure tests. Test charts, with individual test results identified, shall be maintained on location while drilling and shall be made available to representative upon request.

Mud volumes will be monitored visually. Upper and Lower Kelly cocks will be utilized. A gas buster will be utilized, if

   APIWell  Number:43013507180000

Berry Petroleum Company Drilling Program LC FEE 1-22D-56 Duchesne County, UT

Depth Intervals BOP Equipment

0 - 650' No Pressure Control

650' - 6189' 11" 2000# Ram Type BOP 11" 2000# Annular BOP

6 Evaluation Program

Logging Program: HRI-GR-SP with SDL-DSN-PE: surface casing to TD. Preserve samples from all show intervals.

Sampling: 10' dry cut samples: Douglas Creek to TD. Preserve samples From all show intervals.

Surveys: As deemed necessary

Mud Logger: As deemed necessary

Drill Stem Tests: As deemed necessary

Cores: As deemed necessary

7 Anticipated Abnormal Pressures or Temperatures

No abnormal temperatures or pressures or other hazards are anticipated.

Shallow gas and/or water flows are possible below surface casing.

Maximum anticipated bottom hole pressure equals approximately 3014 psi* and maximum anticipated surface pressure equals approximately 1661**psi (bottom hole pressure minus the pressure of a partially evacuated hole calculated at 0.22 psilfoot).

*Max Mud Wt x 0.052 x TVD = A (bottom hole pressure) **Maximum surface pressure = A - (0.22xTVD)

8 Anticipated Starting Dates and Notification of Operations

Drilling Activity:

Anticipated Commencement Date: Upon approval of the APD. Drilling Days: Approximately 10 days.    Completion Days: Approximately 7

   co o   o  BASIS U.S.B on z 1 /4 a = of &M bench OF SECTION NB9 Section SB94752"W ELEV; Elev 55'25"W mark 609 9, CORNERS Elevat - located - T5S, -- TSS, 2644 257706' I ons LC R4W, ELEV 67' LOCATED in LL see·59'W are EEE (Meos (Meas N89 the R6W, UNGRADED LOCA based 59'W ) SW 1-22D-56 - - 710N.• 7962 79.84 . U.S.B. S8952'J8"W NB9°5612"W . GROUND (GLO.) -- (GL O.) - - = - - &M· 2626.21' 2644 NA NAD . o . 27 2 86 3 (SOTT suoracE SURFACE 4 (Meas) (Meas - M 1 HOLE ) LOCADON) LOCADONJ e t CAflON - USB LOCATED WELL DATE o 1/4 TRI OF MADE PREPARED THE THIS 180 - o o 3o - MY Note: right 2. positioning 1 BERRY OF STATE SAME DRAWN: IS NORTH &M. LOCATION, BY KNOWLEDGE Bearings Footages TO SECTION angles ME - o L AS ARE FROM RE CERTIFY BAR DUCHESNE VERNAL PETROLEW OR LAND ' satellite SHOWN TRU to are FlELD UN. are r oF (435) SCALE r. the LC 22, THA based SURVEYINC AVE measured observations section FEE IN 781-2501 T5S, COUNTY, - -" on Ná.189377 SURvEYED DRAWl. STACY THE COMPMY 1-22D- i VERNAL, RECT global ti ¯- .I. lines R6W, at OF ¯ o o NE & E

   ¯. _ W. UTAH .L Ut. Ei l..TAH 1/4 56, Bi CONSULTING S, ¯h ' }i WAS M 84078 NE RVEYS I- N THAT ST

   APIWell  Number:43013507180000

10 Exhibit "B" Map

Proposed Location LC Fee 1-22D-56

I

Legend

1 Mile Radius - Proposed   Location P:f435)781-2501 N BERRY PETROLEUM COMPANY F (435; 7ßi-25f3 Tri State LC Fee 1-22D-56 Land Surveying, Inc. SEC. 22, T5S, R6W, U.S.B.&M. 180NORTHVERNALAVE. VERNALUTAHS4078 DUchesne County, UT.

DRAWNBY C.H.M REVISED: 01-11-2011 SHEET DATE 09-09-2010 T OG RA PMjg M A P SCALE. 1 e 2.000 '

   APIWell  Number:43013507180000

Well Planning Proposal FOR

Berry Petroleum Co. LC FEE 1-22D-56 Duchesne Co., UT

Well File: Design #2 (1/19/11)

Presented By:

Pat R ussen Regional Manager

Bret Wolford Well

  

   APIWell  Number:43013507180000

Berry Petroleum Company Project: Duchesne Co., UT (UT27C) $°if,22RD6W6 1.T A GREATWHiTE 03 r.» Wellbore: Wellbore #1 N m- ac aj,L_- J . Design: Design #2 Latitude: 40° 2' 13.146 N Longitude: 110° 32' 11.440 W Ground Level: 6501.00 WELL @6515.00usft (Berry Rig 5)

WELL DETAILS: LC FEE 1-22D-56

Ground Level: 650100 +NI-S +El-W Northing Easting Latittude Longitude Slot 0.00 0 00 621969.845 2269764.543 40 2'13146 N 110 32' 11.440 W

WELLBORE TARGET DETAILS(MAP CO-ORDINATES AND LATILONG)

Name TVD +NI-S +El-W Latitude Longitude Shape 40° 110° LC FEE 1-22D Tgt 6150 00 214 23 -529.32 2'15 263 N 32 18.245 W Polygon

SECT10N DEYA1L5

MD Inc Azi TVD +NI-S +Ef-W DLeg TFace VSec Annotation 0 00 0 00 0.00 0.00 0 00 0 00 0.00 0.00 0 00 ti. 1 600.00 0.00 0.00 600.00 0 00 0 00 0.00 0.00 0.00 Start Build 2.00

1013 50 8 27 292.03 1012.07 11 18 -27 61 2.00 292 03 29 79 Start 3348 63 hold at 1013 50 MD

4362 12 8 27 292.03 4325.87 191 88 -474 09 0 00 0.00 511.45 Start Drop -1 00

5189 12 0 00 0.00 5150.00 214 23 -529.32 1.00 180.00 571 03 Start 1850 00 hold at 5189.12 MD | 6189 12 0.00 0.00 6150 00 214 23 -529.32 0.00 0.00 571 03 TD at 6189.12 PROJECT DETAILS: Duchesne Co UT (LIT27C) I , REFERENCE INFORMAT10N Geodetic SDystem US St PlaneD1C9027(CEx solution) Co-ordinate (NIE) Reference: Well LC FEE 1-22D-56, True North Vertical (TVD) Reference: WELL@ 6515 00usft (Berry Rig 5) Ellipsoid: Clarke 1866 I Section (VS) Reference: Slot - (0.00N, 0 00E) Zone: Utah Central 4302 Measumd Depth Reference: WELL @6515 00usft (Berry Rig 5) Calculati RMethod MirümumA Lrvatum System Datum: Mean Sea Level

I TVDPath MDPath Formation I I 374.00 374.00 Green River 925 77 926.48 Green River Fouch Mkr 1499.77 1506.33 Mahogany 2518.96 2536.23 Tgr3 Mkr 3291.59 331G.98 Douglas Creek I 3920 47 3952 47 Upr Black Shale L 4195 98 4230 87 Castle Peak 1 4567 39 4605.50 Uteland Butte 4794 16 4833 05 Wasatch 5996 02 6035.15 CR-6

PBHL 214 23 N, 529 32 W 'la ii, ti.. Fiel.I I, 661 FNL&65TFEL mir till S2DS.Str,T .... I SEC 22-TES-R6W 3500 _ 2 11 I TargetBoxis460'Within i IGREhio NENE1/41/4

4000-

I

4500- L ¯l I i

5000 - 250 -   

SHL 876' FNL & 129' FEL SEC 22-T5S-R6W 7000 - IIIIIIII 1000 -750 -500 -250 West(-)/East(+) (500 usftlin) 7500 - - I I | | l | Plan: Design #2 (LC FEE 1-22D-56/Wellbore #1) -1000 0 500 1000 1500 03° Vertical Section at 292 (1000 usftlin) Created By: BRET WOLFORDDate: 21:37, January 19

   APIWell  Number:43013507180000

Berry Petroleum Company Duchesne Co., UT (UT27C) Sec.22-T58-R6W LC FEE 1-22D-56

Wellbore #1

Plan: Design #2

Standard Planning Report

19 January, 2011

   A GREATI/VHlTE B&iEERMLSBrmm4

   APIWell  Number:43013507180000

Great White Directional LLC Servicea, GREATMilTE Planning Report , ,

Database: EDM 5000.1 EDMDBBW Local Co-ordinate Reference: Well LC FEE 1-220-56 Company: Berry Peiroleum Company TVD Reference: WELL @ 8515.00usft (Berry Rig 5) Project: Ouchesne Co., UT (UT27C) MD Reference: WELL @ 6515.00usft {Berry Rig 5) site: Sec.22-T5S-R6W North Reference: True Well. LC FEE 1-220-56 Survey Calculation Method: Minimum Curvature Wellbore: Wellbore itt Design: Design #2

Project Duchesce Co., UT (UT27Ci

Map System: US State Plane 1927 (Exact Sciulion) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS} Map2one: Utah Cen1sal d302

Site Sec.22-TSS-R6W

Site Position: Northing: 619.689.9220sfi Latitude: 40 l' 50.850 N From: Lat/1.ong Easting: 2.267,536.354usfi 1106 32'40.400 W Longitude; ' Position Uncertainty 0.00 usit Slot Radius: 13-3/16 Grid Convergence: 0.61

We|| LC FEE 1-220-56 2° Well Posillon +NI-5 2.255.99 asfi Northing: 621,969.845 osfl Latitude: 40 13.146 N +El-W 2.252.42 asil Easting: 2.269,764.543 usft Longitude: 110' 32' 11.410 W

Position Uncertainly 0.00 usil Wellhead Elevation: Usft Ground Level; 6,501.00 usft

Wellbere Wellbare #1

Magnetics Mociet Name Sample Date Declination Dip Angle Field Strength (*) (*) (nT) IGRF2010 01/20/11 11.55 65.71 52.229

Design Desrgn //2

Audit Notes:

Vorsion. Phase: PL/\N Tie On Depth: 0.00

Vertical Section. Depth From (TVD) +N/-S +El-W Dïrection (usf1) (usft) (usft) (*) 0.00 0.00 0.00 292.03

Plan Sections

Measured Vertical Dogleg Build Turn Depth Incllnation Azimuth Depth +N/-S +El-W Rate Rate Rate TFO (°/100usft) (°/100usft) (usit) ( ) (") (usit) (ustt) (ustt) ( 1100usft) (*) Target

O.00 0.00 0.00 0.00 0.00 0 OD 0.00 0.00 0.00 0.00 600.00 0.0û 0,00 600.00 0.00 0.00 0.00 0.00 0.00 0.00

1 013.50 8.27 292.03 1 012,07 11.18 -27.61 2.00 2.00 0.00 292.03

4.367.12 8.27 292.03 4 325.87 191.88 --171.09 0.00 0.00 0.00 0.00

189.12 0.00 0.00 5.150.00 214.23 -529.32 1.00 -1.00 0.00 180,00

6 189.12 0.00 0.00 6 150.OD 214.23 -529 32 0.00 0.00 0.00 0.00   

OUf 9 11 9 28 43PM Page 2 COMPASS 5000 I Build

   APIWell  Number:43013507180000

Great White Directional Services, LLC Planning Repod GREMIVRTE W B-EBM---EM.C

Database: EDM 5000.1 EDMDBBW t.ocal Co-ordinate Roference: Well LC FEE 1-22D-56 Company: Berry Petroleum CompanY TVD Reference: WELL @6515.00usft (Berry Rig 5) Project: Duchesne Co., UT (UT27C) NIO Reference; WELL @6515.00usft (Berry Rig 5) Site: Sec.22-T5S-R6W North Reference: True Well: LC FEE 1-22D-56 Survey Calculation Method: Minimum Curvature Wellbore: Wellbore #1 Design: Design #2

Planned Sutvey

Measured Vertical Vertical Dogleg Bulld Turn Depth Inclina1ion Azimells Depth +N/-S +El-W Section Rate Rato Rate (=) (°1100usft) (*/100usft (Usft) {j (usft) (usfty ustt) (usft) (1100usft) 0.00 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0 00 0 00 100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0 00 0 00 200.00 0.00 0.00 200 00 0.00 0 00 0.00 0.00 0 00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 Green River 374.00 0.00 0.00 374.00 0.00 0.00 0.00 0.00 0.00 0.00

400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 8 5/8" Csg. 500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 Start Build 2.00 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00

700.00 2.00 292.03 699.98 0.65 -1.62 1.75 2.00 2.00 0 00

800.00 4.00 292.03 799.84 2.62 -6 47 6.98 2.00 2.00 0.00

900.00 6.00 292.03 899.45 5.89 -14 55 15.69 2.00 2.00 0.00 Green River Fouch Mkr

926.48 6.53 292.03 925.77 6.97 -17.23 18.58 2.00 2.00 0.00

1,000.00 8.00 292.03 998.70 10.46 -25.84 27.88 2.00 2.00 0.00 Start 3348.63 hold at 1013.50 MD

1,013.50 8.27 292.03 1,012.06 11.18 -27.61 29.79 2.00 2.00 0.00

1,100.00 8 27 292.03 1,097.67 15.84 -39.15 42.23 0.00 0.00 0.00

1,200.00 8.27 292.03 1,196.63 21.24 -52.48 56.62 0.00 0.00 0.00

1,300.00 8.27 292.03 1,295 59 26.64 -65.81 71.00 0.00 0.00 0 00

1,400.00 8.27 292.03 1,394.55 32.03 -79.15 85.38 0.00 0.00 0.00

1,500.00 8.27 292.03 1,493.51 37.43 -92.48 99.77 0.00 0.00 0.00 Mahogany

1,506.33 8.27 292.03 1,499.77 37.77 -93.32 100.68 0.00 0.00 0.00

1,600.00 8.27 292.03 1,592.47 42.83 -105.81 114.15 0.00 0.00 0.00

1,700.00 8.27 292.03 1,691 43 48.22 -119.15 128.54 0.00 0.00 0 00

1,800.00 8 27 292.03 1,790.39 53.62 -132.48 142.92 0.00 0.00 0.00

1,900.00 8.27 292.03 1,889.35 59 02 -145.81 157.30 0.00 0.00 0.00

2,000.00 8.27 292.03 1,988.31 64 41 -159.15 171.69 0.00 0.00 0.00

2.100.00 8.27 292.03 2,087.27 69.81 -172.48 186.07 0.00 0.00 0.00

2,200.00 8.27 292.03 2,186.23 75.20 -185.81 200.45 0.00 0.00 0.00

2,300.00 8.27 292.03 2,285.19 80.60 -199.15 214.84 0.00 0.00 0 00

2,400.00 8.27 292.03 2,384 15 86.00 -212.48 229 22 0.00 0.00 0.00

2,500.00 8.27 292.03 2,483.11 91.39 -225.81 243.61 0.00 0.00 0.00

Tgr3 Mkr

2,536 23 8 27 292.03 2,518.96 93.35 -230.64 248.82 0.00 0.00 0 00

2.600.00 8.27 292.03 2,582.07 96.79 -239.14 257.99 0.00 0.00 0.00

2,700.00 8.27 292.03 2,681 03 102.19 -252 48 272.37 0.00 0.00 0 00

2,800.00 8 27 292.03 2,779.99 107.58 -265.81 286.76 0 00 0.00 0.00

2,900.00 8 27 292 03 2,878 95 112.98 -279.14 301.14 0 00 0.00 0.00

3,000.00 8 27 292.03 2,977 91 118.38 -292.48 315 52 0.00 0.00 0 00

3,100.00 8.27 292.03 3,076.87 123.77 -305.81 329.91 0.00 0.00 0.00

3,200.00 8.27 292.03 3,175 83 129.17 -319.14 344.29 0 00 0.00 0 00 3,300 00    8 27 292.03 3,274.79 134.57 -332.48 358.68 0.00 0.00 0 00 Douglas Creek

3,400.00 8.27 292.03 3,373.75 139.96 -345.81 373.06 0.00 0.00 0.00

3,500.00 8 27 292.03 3,472 71 145.36 -359.14 387.44 0.00 0.00 0 00

3,600.00 8.27 292.03 3,571.67 150.75 -372.48 401.83 0.00 0.00 0.00

3,700.00 8 27 292.03 3,670 63 156.15 -385.81 416.21 0.00 0 00 0 00

3,800.00 8.27 292.03 3,769 59 161.55 -399 14 430.60 0.00 0.00 0 00

01/19/11 9:28:43PM Page 3 COMPASS 5000.1 Build

   APIWell  Number:43013507180000

Great White Directional Services, LLC Planning Report GREATW¾llE

Database: EDM 5000.1 EDMDBBW Local Co-ordinate Refe

Planned Survey

Meastired Vertical Verlic

(=) °/1000sit) (usft) ( ) {osít) (astti (usit) (usft) ('l1000sft) (50Dustt)

3,900.00 8.27 292.03 3,868.55 166.94 -412.48 444.98 0.00 0.00 0.00 Upr Black Shale

3,952.47 8.27 292.03 3,920.47 169.77 -419.47 452.53 0.00 0.00 0.00

4,000.00 8.27 292.03 3,967.51 172.34 -425.81 459.36 0.00 0.00 0.00

4,100.00 8.27 292.03 4,066.47 177.74 -439.14 473.75 0.00 0.00 0.00

4,200.00 8.27 292.03 4,165.43 183.13 -452.48 488.13 0.00 0.00 0.00

Castle Peak

4,230.87 8.27 292.03 4,195.98 184.80 -456.59 492.57 0.00 0.00 0.00

4,300.00 8.27 292.03 4,264.39 188.53 -465.81 502.51 0.00 0.00 0.00

Start Drop -1.00

4,362.13 8.27 292.03 4,325.87 191.88 -474.09 511.45 0.00 0.00 0.00

4,400.00 7.89 292.03 4,363.37 193.88 -479.03 516.77 1.00 -1.00 0.00

4,500 00 6.89 292.03 4,462.54 198.71 -490.95 529.64 1.00 -1.00 0.00

4,600.00 5.89 292.03 4,561.91 202.88 -501.27 540.77 1.00 -1.00 0.00 Uteland Butte

4,605.50 5.84 292.03 4,567.39 203.09 -501.79 541.33 1.00 -1.00 0.00

4,700 00 4.89 292.03 4,661.47 206.41 -509.98 550.17 1.00 -1.00 0.00

4,800.00 3.89 292.03 4,761.17 209.28 -517.08 557.82 1.00 -1.00 0.00 Wasatch

4,833.05 3.56 292.03 4,794.16 210.08 -519.07 559.97 1.00 -1.00 0.00

4,900.00 2.89 292.03 4,861.00 211.50 -522.56 563.74 1.00 -1.00 0.00

5,000 00 1 89 292.03 4,960.91 213.06 -526.43 567.91 1.00 -1.00 0.00

5,100.00 0.89 292.03 5,060.88 213.97 -528.68 570.34 1.00 -1.00 0.00 Start 1850.00 hold at 5189.12 MD

5,189.12 0.00 0.00 5,150.00 214 23 -529.32 571.03 1.00 -1.00 76.26

5,200.00 0.00 0.00 5,160.88 214.23 -529.32 571.03 0.00 0.00 0.00

5,300.00 0.00 0.00 5,260.88 214.23 -529.32 571.03 0.00 0.00 0.00

5,400.00 0.00 0.00 5,360.88 214.23 -529.32 571.03 0 00 0.00 0 00

5,500.00 0.00 0.00 5,460.88 214.23 -529.32 571.03 0.00 0.00 0.00

5,600.00 0.00 0.00 5,560.88 214.23 -529.32 571 03 0.00 0.00 0.00

5,700.00 0.00 0.00 5,660.88 214.23 -529.32 571.03 0.00 0.00 0.00

5,800.00 0.00 0.00 5,760,88 214.23 -529.32 571.03 0.00 0.00 0.00

5,900.00 0.00 0.00 5,860.88 214.23 -529.32 571.03 0.00 0.00 0.00

6,000.00 0.00 0.00 5,960.88 214.23 -529.32 571.03 0.00 0.00 0.00 CR-6

6,035.15 0.00 0.00 5,996.02 214 23 -529.32 571.03 0.00 0.00 0.00

6,100.00 0.00 0.00 6,060.88 214 23 -529.32 571.03 0.00 0.00 0.00

TD at 6189.12 - LC FEE 1-22D Tgt

6.189.12 0.00 0.00 6,150.00 214.23 -529.32 571.03 0.00 0.00 0.00   

01/19/11 9:28:43PM Page 4 COMPASS 5000.1 Build

   APIWell  Number:43013507180000

Great White Directional Services, LLC GREATWillfE Planning Report

Database: EDM 5000.1 EDMDBBW Local Oc·ordinate Reference: WellLCFEE1-22D-56 Company: Berry Petroleum Company TVD Reference; WELL@ 6515.00usil(Berry Rig 5) Project: Duchesne Co.. UT (UT27CF MD Reference, WELL @6515.00usit (Berry Rig 5) Site: See.22-TSS-R6W North Reference. True Well: LC FEE 1-220-56 Survey Calculation Method: Minimum Curvature Wellbare: Wellbore #1 Design: Design "2

Design Targets

Target Name

- bit/miss targel Dip Angle Dip Dir. TVD +N/-S +El-W Northing Easting

- (*) Shape (') (usft) (usft) (ustt) (ustt) (usft} Latitude Longitude

LC FEE 1-22D Tgt 0.00 0.00 6,150.00 214.23 -529.32 622.i78.365 2,269,232.946 40" 2' 15.263 N 110 32' 18.245 W

. plan hits large! cenler

- Polygori

Point 1 5 150.00 200.21 -197.89 622.3/5.43 2,269,032.91 Poin[ 2 6.150.00 201.06 190.03 622.381.53 2,269,426.80

Point 3 6 150.00 -200.28 198.24 621,960,23 2,269,433.33

Point -1 6.150.00 -200.99 -196.38 621.975.27 2,269.038.74

Point 5 6 150.00 200.21 -197.89 622.376.43 2.269.032.91

Casing Points

Measured Vertical Casing Hole Oepth Depth Diameter Diameter (ustt) (usft) Name 500.00 500.00 8 6/8 Csg. 8-5/8 11

Formations

Measured Vorttcal Dip Depth Depth D1p Direction (ustt) (usit) Name Lithology ( l 374.00 374.00 Green Rwer -0.70 292.03

926.-18 926.00 Green Roer Fouch Mkr -0.70 292-03

1.506 33 1 501 00 Mahogany -0.70 292.03

2.536.23 2.522.00 Tgr3 Mkr -0.70 292.03 3,316.98 3.296.00 Douglas Creek -0.70 292 03

3.952.47 3926.00 Upa Black Shale -0.70 292.03

4.230.87 a 202.00 Castle Peak -0.70 292.03

1,605.50 4.574.00 Uteland Balte -0.70 292.03

4.833.05 4.801.00 Wasatch -0.70 292.03

6.035,15 6.003.00 CR-6 -0.70 292.03

Pian Annotations

Measured Vertical Local Coordinates Depth Depth +N/-S +EhW (usft) (usft) (usft) (usft} Comment 600.00 600.00 0.00 0.00 Staii Stidd 2.00 013.50 1 012.06 11.18 -27.61 Sear13348.63 Ilold 31 ¾113.50 MD

4.362.13 4.325.87 191.88 -474 09 Slart Drop -1.00

5 189.12 5.150.00 214.23 -529.32 Start 1350.00 liold a15189 12 MD 6   189.12 5.150.00 21-1.23 -529 32 TD m 6189 12

QUI9 11 9:28 43PM Page S COMPASS 5000 i Sailfl

   APIWell  Number:43013507180000

Ent 434198 Sk AGi6 Pi 461 Date: 21-APR-2011 12:06:579M Fee: $19.00 Check Filed Sv: CBM CAROLYNE l'IADSEH, Recorder TION NURI'ACE DAMAGE AND RIGIIT-OF-WAY SitT]

This Agreement, made and entered into this the _14_th day of April, 2011, by and between R.tudv Nielsen. PO Box 628. Duchesne, UT 84021. liinmv Nielsen, P.O. Box 837, Duchesrae, UI' 84021 and Rodnev Nielsen. PO Box 65L Duellesne, UT 84021 ("Surface Owner") and Berry Petroleum Company, 1999 Broadway, Suite 3700, Denver,

CO 80202 , ("Berry").

WITNESSETH THAT:

WHEREAS, Berry owns undivided interests in certain oil and gas leases ("leases") covering and affecting the El/2NE1/4 and the SW1/4NEl/4 of Section 22, Township 5 South, Range 6 West, USM, of Duchesne County, Utah; and,

WHEREAS, such leases grant to Berry the right and privilege of ingress, egress, exp1UElng, drilling, mining, operating for, protiueing and owning oil and gas and all other products produceel therewith, together wilb the right to make surveys on said lands, lay plpelin€$, ConblEUCÍTOads and brielges, dig canais, build power stations, telephonelines, employee houses and other structures on said lands, necessary or useful in Berry's operations; and,

WHEREAS,Berry, pursuant to its rights under the Leases, intends to drill the L__C Tribal 1-22D-56 Well at a legal drill-site location in the NE1/4NEl/4 of Section 22, Township 5 South Range 6 West, USM, Duchesne County, Utah; and,

WHEREAS,Surface Owner warrants ownership to the surface of at least specific portions of the El/2NEl/4 and the SW1/4NE1/4 of Section 22, Township 5 South, Range 6 West, USM, Duchesne County, Utah, and which warranted ownership is further subject to all oil, gas and other mineral rights which are reserved for the use and benefit of the owners thereof;and,

WHEREAS, Berry has agreed to reimburse Surface Owner for actual damages and injuries to all crops, timber, fences and other improvementslocated on the surface which results from Berry's operations hereunder, provided that Berry shall not be held liable or responsible for acts of providence or occurrences beyond Berry's control; so,

NOW, THEREFORE, in considerationof TEN (10) AND MORE DOLLARS ($10.00)and other good and valuable consideration paid by Berry to SurfaceOwner,the receipt and sufficiency of which is hereby acknowledged, said Surface Owner does hereby release Berry, its agents, employees, licensees, permittees, successors and assigns from all claims for damages as hereinafter provided, which are occasioned by any drilling, testing, completing, producing, operating, reworking and abandoning operations conducted by Berry at the above mentioned well, and agrees that Berry, its agents, employees, licensees, permittees, successors and assigns, may enter upon said premises and construct and maintain such roadways, bridges, and other means of access as are necessary to enable Berry on said location, for the purpose of erecting all necessary surface equipment, including but not limited to separators and tank battery storage facilities and other related facilities for the operating of the subject well or any other well(s) operated by Berry in the general area. Said location and road to be located as shown on Exhibit "A" attached hereto.

For the same consideration, Surface Owner does hereby grant and convey unto Berry, its successors and assigns, the right, at any time and from time to time, to lay,    construct, reconstruct, replace, renew, operate, maintain, repair, change the size of, and remove pipes-and pipelines for the transportationof oil, petroleum or any of its products, gas, water, saltwater and other substances, or any byproducts thereof, along, over, through, upon under and across the route of any such lines constructed hereunder, together with rights of ingress and egress to and from said line or lines for the purposes aforesaid. Suchpipeline or pipelines to be constructed within the boundariesof the right- of-way granted herein as shown on Exhibit "A" attached

   APIWell  Number:43013507180000

Ent 434198 Sk $40616 Pi 8462 SurfaceOwnerhereby releases Berry, its successors and assigns, from any and all damages and claims asserted. The consideration paid by Berry to Surface Owner is accepted by Surface Owner as full and final satisfaction for any and all damages and claims for damages to the surface which result from any of Berry's operations and privileges granted under the above Leases. Surface Owner hereby waives the right to collect any further and additional damages that may hereafter be asserted in connection with Berry's use of the land as further described on Exhibit "A" attached hereto and agrees to accept in lieu of any such future claims the agreed upon payment provided for in this Agreement.

Nothing herein shall alter or affect the rights of either party hereto with respect to surface use or disturbance of Surface Owner's land surrounding the drillsite locations, respectively, and Berry agrees to give Surface Owner advance notice of its intendeduse of any such surrounding land before commencing any operations thereon pursuant to its rights.

Surfàce Owner and Berry do herebyrelease, discharge and acquit the other from any and all liability, and shall indemnify the other against any and all claims and demandsfor damages,attorneys fees, injury or loss, existing now or done hereafter,to the surface of said lands or to any third parties arising out of or being the result of their or their agents, contractors licensees, permittees, successors and assigns own activities on or use of the subject property. However, such parties' potential liability under this paragraph to the other shall be limited to the acts and/or omission of its, or its predecessors, agents, contractors, licensees, permittees, successor and assigns, and shall not include any acts and/or omissions of the other party, it agents, contractors, licensees, permittees, successors or assigns. Berry shall reasonably maintain the subject property in order to prevent unnecessary deterioration of the surface and to keep the property in an unlittered condition.

Any topsoil which is removed by Berry on Surface Owner's land will be stockpiled at the drillsite and will be redistributed on the drillsite upon completion of all operations and the land reseeded with grasses and/or native plants by Berry upon written request by Surface Owner. All mud pits will be filled and material and debris will be removed from the drillsite upon completion of operations. Berry shall have the right to remove from the lands covered hereby, at any time duringthe term hereof or within six (6) months after the terminationof this Agreement, any or all structures, pipes, equipment and other facilities placed on, over, under, through and across any lands covered hereby, excepting fences, culverts, and other land improvements required by the Surfàce Owner, and title thereto shall be vested in Berry at all times, and shall in no event be considered or construed as fixtures thereto.

Berry shall maintain all roads used pursuant to this Agreement and shall install culverts where necessary to insure adequate drainagefrom all roads. Berry shall install cattle guards where necessary and repair any fences damaged by their operations.

This Agreement shall inure to the benefit of the parties hereto, their heirs, successors and assigns and shall be a burden running with the land.

This Agreement may be executed in any number of counterparts and all such counterparts shall be deemed to constitute a single Agreement and the execution of one counterpart by any party hereto shall have the same force and effect as if said party had signed all other counterparts.

   IN WITNESS WHEREOF, the parties have executed this Surface Damage Settlement Agreement effective as of the Rday of Ana¤st. 29¾L

Page 2 of 3 SURFACE

   APIWell  Number:43013507180000

ihu en Ent 434198 Ek AO616 Pg 8463

' immy Nielsen

Rociney Nielsef

STATE OF UTAH '

COUNTY OF DUCHESNE )

Onthis \6 day of , 2011,beforeme personally appeared Randy Nielsen, known to me to be the person who is described in and who executed the within instrument and acknowledged to me that he executed the same.

Notary Public 2-° My Commission Expires: i Residing at: L e de

----- 1 NOTARY PUBLiC JENNiFER ADAMS Commissic NO 6Û4467 c STATE OF UTAH ) ) STATE F UTAH COUNTY OF DUCHESNE )

On this day of , 2011, beforeme personally appeared Timmy Nielsen, known to me to be the person who is described in and who executed the within instrument and acknowledged to me that he executed the same.

Notary P

My CommissionExpires: \ to - 2ol c> Residing at: L

| NOTARY PUBLtC STATE OF UTAH ) I JENNJFER ADAMS CO tssion No 604467 Coinmission Expres COUNTY OF DUCHESNE ) y TÉ"o's On this day of Šn \ , 2011, before me personally appeared Rodnev Nielsen, known to me to be the person who is described in and who executed the withing instrumentand acknowledged to me that he executed the same.

Notary P    My Commission Expires: \ 4 . 2o i & Residing at: L NOTARY PUBLiC JENNIFER ADAMS Commission No 604467 | Commiss.on Excires JANUARY 6. 2015 STATE OF UTAH I Page 3 of

   APIWell  Number:4301:1507180000 BERRY PETROLEUMCOMPANY ROAD RIGHT-OF-WAY OFSCRIPTION RIGHT-OF-WAY A 30' WIDEROADRIGHT-OF-WAYLOCATEDIN SECTION 22, T5S, R6W, PROPOSED ROAD U.S.B.&M. THE WIDTH OF SAIDRIGHT-OF-WAY BEING 15' ON EACH SIDEor RIGMT-OF-WAY En Ñ THE CEN1ERLINE. THE CENTERLINEof SAID BEINGMORE he - PARTICULARI..Y DESCRIBEDAS FOLLOWS: Located in the NE 1/4 of ROW. BEGINNINGAT A POINTIN THE NE 1/4 NE 1/4 OF SECTION 22. T5S, R6W, Sections 22. TES, U.S.B.kAf. S15°48'34"W U.S.B.&M. WHICH BEARS 1129.51' FROM THE NORTHEASTCORNER Duchesne County, Utah OF SAID SECTION, THENCES7795'04"W 5.19': THENCES55 48'55"W 39.83'; 14°44"W S43·39'59°W b o - o Northeast Cœnar: 1HENCES50 to 60.64'; THENCE 55.96'; THENCE o kle 22 542 21'56"W 57.22'; THENCES29'20 32"W 63.68': THENCE S28°1B'09"W 17.93°; N51'08'59°W (Set Stme) 27.45'; THENCE55334'53 W THENCE 59.68 TO A POINTIN THE SAIDNE 1/4 NE 1/4 OF SECTION 22 WHICH BEARS SC A LE S24'05'57"W 1407.41' FROMTHE SAIDNORTHEAST CORNEROF SECTION 22. THE SIDELINES OF SAID DESCRIBEDRIGHT--OF-WAY BEINGSHORTENED OR ELONGATEDTO MEET THE GRANTOR S PROPERTY UNES. BASIS OF BEARINGS IS THE EAST LINEOF SECTION 22 WHICH IS TAKEN FROM GLOBAL NOO°18'58"W POSIRONINGSATELUTEOBSERVAllONSTO BEAR A MEASURED

DISTANCEOF 5286.00 . CONTAINS0.267 ACRESMOREOR LESS.

PROPOSFD DISTURBANCEBOUNDARY DESCRIPTION B A TRIBAL 1-22D-56 BEGINNINGAT A POINT IN THENE 1/4 NE 1/4 OF SECTION 22. T5S, LC R6W, U.S.B.&M.WHICHBEARS 5195417"W 1134.15' FROMTHE (Corsta/ns 2.044 Acres) NORTHEASTCORNEROF SAIDSECTION, THENCEN40'49'30"E 174.71': THENCEN22'09'11 E 312.05'; THENCES78'31'55"E 98.10'; THENCE 256.90°; S26°51'31"W SO934'19"E THENCE 161.54'; THENCE NS2 03'28"W 64.51'; THENCES59 53'14"W 99.96'; THENCE N75 55'34 W 151.96' TO THE POINT OF BEGINNING.BASIS OF BEARINGS IS THE EAST LINEOF SECTION 22 WHICH IS TAKEN FROM GLOBAL POSITIONINGSATELLITEOBSERVATIONS TO BEAR NOO18'58 W A MEASUREDDISTANCEOF 5286.00'. CONTAINS2.044 ACRES MORE OR LESS.

di Pad LC TR BAL 1-220-56

ROAD RIGHT-OF-WAY LENGTH - N eisen. Rondy Section 22 Totoi = 387.58 e

Nielsen, Randy NE 1/4 NE 1/4

Rishi-of-Wav Deing

7he Pont of Baghning (Mrst Cuner) of the Prquosed Disturbance Boundary hears CimfR 17 NOJE S1954'17"W 11J4.15' Bagh Sta 0+00 hears S15 fa J4"W korn the Northeast camerof 1129.51' kom the Northeast Cœnar Sectár! 22 of Sectim Carrtarline of Proposed 22 Road Right-of-Huy * . BEGINN/NCDE PROPOSED EIGHT-CV-MY . ? ROAO comre nr som y - STA. 0+00 End Sta. J+87.58 bears S247557"W storocace Scondary 1407.41' from the Northeast Camer c. rocas±a LC fraal of Sectim 22 pog)

ENDGF PRŒ0SED ROAD RIGHT-GF-WAY S A. J+87.56 c 9 (At Existing Road)

. i THISIS TO CERT1FYTh a.    Tri State and Surveying. Inc. sco; ; . to \(435) 781-2501 -ÛÛ DMG/ Ÿ 15 NOÑTh RNAL AvE - VERNALUTAH

   APIWell  Number:43013507180000 Berry Petroleum Company Brundage Canyon Field 4000 South 4028 West Rt. 2 Box 7755 Roosevelt, UT 84066 Ph: (435) 722-1325 Fax: (435) 722-1321 www.bry.com

January 20, 2011

State of Utah Division of Oil, Gas and Mining P.O. Box 145801 Salt Lake City, UT 84115-5801

Re: Directional Drilling R649-3-11 LC FEE 1-22D-56 876' FNL, 129' FEL (NENE) (surface) 661' FNL, 657' FEL (NENE) (bottomhole) Section 22, T5S-R6W Duchesne, County, Utah

Pursuant to the filing of Berry Petroleum's Application for Permit to Drill regarding the above referenced well, we are hereby submitting this letter in accordance with Oil & Gas Conservation Rule R649-3-11 pertaining to the Exception to Location and Siting of Wells.

• The LC FEE 1-22D-56 well is to be located within the Lake Canyon Field Area. • Berry is locating the well at the surface location and directionally drilling from this location to minimize surface disturbance and Berry will be able to utilize the existing road and pipelines in the area. • Furthermore, Berry hereby certifies that it is the sole working interest owner with 460 feet of the entire directional well bore and the remainder of the Ute Tribal section. Therefore, based on the above stated information Berry Petroleum Company requests the permit be granted pursuant to R649-3-11.

Re ec lly u

Kathy K. 2ieldsted Sr. Regulatory   & Permitting Technician

Corporate Headquarters - 1999 Broadway, Ste. 3700 • Denver, CO 80202    -   E  BASIS U.S.B.&M. 1/4 on z o a = of bench OF SECTION Section NB9'55'25"W S8947'52"W ELEV; Elev. mark 6097 9, CORNERS Elevations located - - T5S, T5S, 2644.67 257ZO6' LC R4W, ELEV LOCATED in 589°59'W are EEE (Meas.) (Meas.) N69°59'W the R6 UNGRADED based QÛÂ SW 1-22D-56 - W, - 79.62 ÑOÑ.• r 79.84 2,, U. SB952'J8"W NB9°56'12"W GROUND (G.L.O.) (G.L.O.) S. B. = _._ LONG!TUUË i.o.scoruar LATiTJDË - LAlllUDi - '^Til-DE & cacauct ___NAO Bott- 6501. 2626.21' 2644.86' 1 M. NAD NAD NAD i a 27 83,(80TTOM 27 83 = - = - = = J' (BOTTOM 109'371044 (SURFACE (SURFA_C NOJ2'18, near2o.77" 1Ío 40"Of15.26 40'0713,15" 4c·oris.o (Meos (Meas) · 657 - HOLE HOLE 7 ) -- C (110.538360) MW.5365 g40.û36985) (40. 010.539090) I-OCA_TION) LOCAllON) ILONS so.osisa4) o ) NJ sa 3/6/33 - REVISED' DATE 08-30-10 DATE U.S.B.&M. 1/4 LOCATED WELL L 09-09-10 TRI OF THE MADE PREPARED THIS C.S. 180 MY Note: gggg right positioning 2. 1. OF DRAWN· SURVEYED: STATE SAME IS NORTH LOCATION, BY ' KNOWLEDGE Bearings Footages TO SECTION angles ME y AS ARE FROM · CERTIFY DUCHESNE BAR VERNAL pyrgoism LAND OR satellite SHOWN 180 to are UN FIELD are (435) SCALE the LC 22, based SURVEYING AVE. measured AA 1A section observations. FEE a IN 781-2501 T5S, COUNTY, - on SCALE: DRAWN SURVEYED SACY THE coxygr 6 1-220-56, VERNAL, sRE OF global Aga 189377 lines. R6W, at NE ' .L BY: & W. UTAH. 1"

   O UTAH 1/4 BY: CONSULTING .. = F.T.M H 1000' S.H- WAS 84078 NE RVEYS N THAT T

      L BHL: sHL:870'FNL.12B'FEL DIRECTIONAL LC 681° FEE1·22D-66 FNL, 657 WELL FEL BERRY DIrectional WO Sec Lake Plats 22 PETROLEUM LC Oil Oil Location T5S Canyon TTR & EL FEE Gas R6W Drilling BEU Only SYMBOLS Well - 1-22D-56 Duchesne Location MAP Project

   COMPANY C Plat UT

   APIWell  Number:43013507180000

ª â * + API Number: 4301350718 UTEUTE TRIBALTRIBAL 4-13-564.13-56 43013332564301333256 Well Name: LC FEE 1-22D-56

Township T0.5TO.5. .Range R0.6RO.6 . Section 22 13-56 LC FEE 6-15D-56 LC TRIBAL 3-15D-56 UTEUTE TRIBALTRIBAL 5-13-565 4301333257 4301350597 74301350598 TAYLORTAYLOR FEEFEE 7-14-56 4301333257 Meridian: UBM ! 430L1c33xE2L2iAsoN7-15-56 â WILCOX ELIASON 7-15-56 â 43013331404301333140 C 4301333122 ' Operator: BERRY PETROLEUM COMPANY â LCLC TRIBAL 5-14D-56 4301350661 Map Prepared: Map Produced by Diana Mason

15 INDIANINDIAN CANYON FIELD Units """='.°""Wells Query 16is INDIAN CANYON FIELD 1414 1313 STATUS""is Status RIBAL9-16D-56 LC TRIBAL 9-16D-56 AcrivsACTIVE * APDAeo-Aproedeermt - Aproved Permit â 4301350600 *g EXPLORATORYExPeonavaav Ho DRLone-spadeato - Spuded (Drilling Commenced) LC TRIBALoA9L98-16D-56 8-16D-56 GASoAssvaamos STORAGE 4 GIWops-casioission - Gas Injection 4301350599 UTEUTE TRIBALTRIBAL 12-13-5612-13-56 ci 14-1 NF PP OIL MARSING 14-1 43013332584301333258 !* GSes - GasGasstorao Storage 4301330386 NIELSEN MARSING 13-14-56 NFEsseo SECONDARYoAav N LAen - LocationLocatonAbandone Abandoned ª4301332737 PIPiol' OIL ' ! LOC - New Location PP GAS 7 OPS - Operation Suspended PP GEOTHERML PA - Plugged Abandoned PP OIL ª PGW - Producing Gas Well SECONDARY * ' POW - Producing Oil Well â TERMINATED O RET - ReturnedReturnedAPD APD Fields STATUSSTAlus ¸ SGWSG* - Shut-inshutincasweii Gas Well Unknown · SOW3°* - Shut-in Oil Well LAKE CANYON FIELD LAKE CANYON FIELD :: ABANooNeoABANDONED 6p TAIA - TempTemp. AbandoAbandoned LCTRIBAL5-23D-56 LC TRIBAL 5-23D-56 AcriveACTIVE "o TWTw - TeuweilTest Well 4301350625 COMBINEDcorisi so ¸ WDWwow - wateroisposaWater Disposal LCOT TRIBALL 4-23D-56 INACTIVE ¸ WIW - Water Injection Well 4301350624 LCOFEE017-1282D-56 FEE 1-22D-56 STORAGE â â =*e WSWwsw - Water Supplyspoiyweii Well 4301350718 T 5 S R 6 W TERMINATED ! Sections Township

â â -24-56 CacheCachreRich UTE430E133RIB1A8L TRIBAL 5-24-56 Box Elder Location Map 4301333318 Rich Weber Morgan Davisvis SummitSum DaggettDa SaltaltLak Lake 21 222 23 2424 TooeleToosis 6-22D-56 Wasatchsate DuchesneDuchesn LC TRIBAL 6-22D-56 LC TRIBAL 15-22D-56 UtahUta Uintah 4301350260 4301350606 UTEUTE TRIBALTRIBAL 12-24-5612-24-56 ' AYLOR HERRICK 10-22-56 Juab NTAYLOR HERRICK 10-22-56 43013333174301333317 Carbon NIELSEN UTE 1-22 4301332738301332738 4301330450 Sanpete Millardrd Emery Grand Sevier

Beaver Piute Wayne UTEUTE TRIBALTRIBAL 13-24-563-24-56 43013333194301333319 Ironiron GarfieldGarfeld TAYLOR01L33R1FEE FEE 13-22-56 â San Juan 4301333121    ' Kane

LC TRIBAL 4-27D-56 :La 4301350262 ' UTEUTE TRIBALTRIBAL 4-25-56-25-56 N 43013332954301333295 F 28 27 26 25 1,400700 0 1,400soo Feet â 1:13,324

   APIWell  Number:43013507180000

SCHEMATIC DIAGRAM OF 2,000 PSI BOP STACK

Flow Line

Fill-Up Line I I I I Annular Preventer

Blind Rams

Pipe Rams

Adjustable Choke

To Mued/Gas Separator and/or Pit

ndeLineTo Pit 3 L Blowout Preventer Stack Outlet  

To Mud/Gas Separator and/or Pit 2" Line

Adjustable

   APIWell  Number:43013507180000

BOPE REVIEW BERRY PETROLEUM COMPANY LC FEE 1-22D-56 43013507180000

Well Name BERRY PETROLEUM COMPANY LC FEE 1-22D-56 430135071800004301350

String Surfsurf Prod

Casing Size(") 8.625 5.500

Setting Depth (TVD) 650 6150

Previous Shoe Setting Depth (TVD) 0 650

Max Mud Weight (ppg) 9.5 9.5

BOPE Proposed (psi) 0 2000200

Casing Internal Yield (psi) 2950 4810

Operators Max Anticipated Pressure (psi) 3014 9.4

Calculations Surf String 8.625 "" Depth*MW= Max BHP (psi) .052*Setting.052*Setting Depth*MW= 321 BOPE Adequate For Drilling And Setting Casing at Depth? BHP-(0.12*Setting Depth)= MASP (Gas) (psi) Max BHP-(0.12*Setting Depth)= 243 NO BHP-(0.22*Setting Depth)= MASP (Gas/Mud) (psi) Max BHP-(0.22*Setting Depth)= 178178 NO OK *Can Full Expected Pressure Be Held At Previous Shoe?

- Depth)= Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous ShoeShoc Depth)= 178178 NO Pressure= Required Casing/BOPE Test Pressure= 650 pSipsi *Max Shoe= *Assumes *Max Pressure Allowed @ Previous Casing Shoe= 0 psi *Assumes 1psi/ftlpsi/ft frac gradient

Calculations Prod String 5.500 " Depth*MW= Max BHP (psi) .052*Setting.052*Setting Depth*MW= 3038 BOPE Adequate For Drilling And Setting Casing at Depth? BHP-(0.12*Setting Depth)= MASP (Gas) (psi) Max BHP-(0.12*Setting Depth)= 2300 NO BHP-(0.22*Setting Depth)= MASP (Gas/Mud) (psi) Max BHP-(0.22*Setting Depth)= 16851685 YES OK *Can Full Expected Pressure Be Held At Previous Shoe?

- Depth)= Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous Shoe Depth)= 18281828 NO Reasonable Pressure= Required Casing/BOPE Test Pressure= 2000 pSipsi *Max Shoe= *Assumes *Max Pressure Allowed @ Previous Casing Shoe= 650 psi *Assumes 1psi/ft1psi/ft frac gradient

Calculations String " Max BHP (psi) .052*Setting.052*Setting Depth*MW=

BOPE Adequate For Drilling And Setting Casing at Depth? BHP-(0.12*Setting Depth)= MASP (Gas) (psi) Max BHP-(0.12*Setting Depth)= NO BHP-(0.22*Setting Depth)= MASP (Gas/Mud) (psi) Max BHP-(0.22*Setting Depth)= NO *Can Full Expected Pressure Be Held At Previous Shoe?

- Depth)= Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous Shoe Depth)= NO

Required Casing/BOPE Test Pressure= psi *Max Pressure Allowed @ Previous Casing Shoe= psi *Assumes 1psi/ft1psi/ft frac gradient

" Calculations    String " Max BHP (psi) .052*Setting.052*Setting Depth*MW=

BOPE Adequate For Drilling And Setting Casing at Depth? BHP-(0.12*Setting Depth)= MASP (Gas) (psi) Max BHP-(0.12*Setting Depth)= NO BHP-(0.22*Setting Depth)= MASP (Gas/Mud) (psi) Max BHP-(0.22*Setting Depth)= NO *Can Full Expected Pressure Be Held At Previous Shoe? Depth)= Pressure At Previous Shoe Max BHP-.22*(Setting Depth - Previous Shoe Depth)= NO

Required Casing/BOPE Test Pressure= psi

   APIWell  Number:43013507180000 *Max Pressure Allowed @ Previous Casing Shoe= psi *Assumes 1psi/ft1psi/ft frac gradient

  

   APIWell  Number:43013507180000

43013507180000 I C FEE 1-22D-56 Casing Scheng c

Surface COC@ t

8-5/8" Surface MW 9.5 I 650. MD Frac 19.3 650. TVD

   5-1/2" Production MW 9.5 6189. MD L 2 EL 6150. TVD /

EL

E/UE 96 22 - Syg

   APIWell  Number:43013507180000

Weli name: 43013507180000 LC FEE 1-22D-56 Operator: BERRY PETROLEUM COMPANY String type: Surface Project ID: 43-013-50718 Location: DUCHESNE COUNTY

Design parameters: Minimum design factors: Environment: Collapse Collapse: H2S considered? No °F Mud weight: 9.500 Design factor 1.125 Surface temperature: 74 ppg °F Design is based on evacuated pipe. Bottom hole temperature: 83 Temperature gradient: 1.40 °F/100ft Minimum section length: 100 ft Burst: Design factor 1.00 Cement top: 8 ft Burst Max anticipated surface pressure: 572 psi

Internal gradient: 0.120 psilft Tension: Directional Info - Build & Drop Calculated BHP 650 psi 8 Round STC: 1.80 (J) Kick-off point 600 ft 8 Round LTC: 1.70 (J) Departure at shoe: 0 ft No backup mud specified. Buttress: 1.60 (J) Maximum dogleg: 2 °/100ft Premium: 1.50 (J) Inclination at shoe: 1 ° Body yield: 1.50 (B) Re subsequent strings: Next setting depth: 6,150 ft Tension is based on air weight. Next mud weight: 9.500 ppg Neutral point: 557 ft Next setting BHP: 3,035 psi Fracture mud wt: 19.250 ppg Fracture depth: 650 ft injection pressure: 650 psi

Run Segment Nominal End True Vert Measured Drift Est. Seq Length Size Weight Grade Finish Depth Depth Diameter Cost (ft) (in) (Ibs/ft) (ft) (ft) (in) ($) 1 650 8.625 24.00 J-55 ST&C 650 650 7.972 3346

Run Collapse Collapse Collapse Burst Burst Burst Tension Tension Tension Seq Load Strength Design Load Strength Design Load Strength Design (psi) (psi) Factor (psi) (psi) Factor (kips) (kips) Factor 1 321 1343 4.186 650 2950 4.54 15.6 244 15.64 J

Prepared Helen Sadik-Macdonald Phone: 801 538-5357 Date: June 23,2011 by: Div of Oil,Gas & Mining FAX: 801-359-3940 Salt Lake City, Utah Remarks:    Collapse is based on a vertical depth of 650 ft, a mud weight of 9.5 ppg The casing is considered to be evacuated for collapse purposes. Collapse strength is based on the Westcott, Dunlop & Kemler method of biaxial correction for tension.

Burst strength is not adjusted for tension. Collapse strength is (biaxially) derated for doglegs in directional wells by multiplying thetensilestress by the cross section area to calculate a

Engineering responsibility for use of thisdesign willbe thatof the

   APIWell  Number:43013507180000

Well name: 43013507180000 LC FEE 1-22D-56 Operator: BERRY PETROLEUM COMPANY String type: Production Project ID: 43-013-50718 Location: DUCHESNE COUNTY

Design parameters: Minimum design factors: Environment: Collapse Collapse: H2S considered? No °F Mud weight: 9.500 Design factor 1.125 Surface temperature: 74 ppg °F Design is based on evacuated pipe. Bottom hole temperature: 160 Temperature gradient: 1.40 °F/100ft Minimum section length: 100 ft Burst: Design factor 1.00 Cement top: 1,439 ft Burst Max anticipated sudace pressure: 1,682 psi internal gradient: 0.220 psilft Tension: Directional Info - Build & Drop Calculated BHP 3,035 psi 8 Round STC: 1.80 (J) Kick-off point 600 ft 8 Round LTC: 1.80 (J) Departure at shoe: 571 ft No backup mud specified. Buttress: 1.60 (J) Maximum dogleg: 2 °/100ft Premium: 1.50 (J) Inclination at shoe: 0 ° Body yield: 1.60 (B)

Tension is based on air weight. Neutral point: 5,305 ft

Run Segment Nominal End True Vert Measured Drift Est. Seq Length Size Weight Grade Finish Depth Depth Diameter Cost (ft) (in) (Ibs/ft) (ft) (ft) (in) ($) 1 6189 5.5 15.50 J-55 LT&C 6150 6189 4.825 21853

Run Collapse Collapse Collapse Burst Burst Burst Tension Tension Tension Seq Load Strength Design Load Strength Design Load Strength Design (psi) (psi) Factor (psi) (psi) Factor (kips) (kips) Factor 1 3035 4040 1.331 3035 4810 1.58 95.3 217 2.28 J

Prepared Helen Sadik-Macdonald Phone: 801 538-5357 Date: June 23,2011 by:   Div of Oil,Gas & Mining FAX: 801-359-3940 Salt Lake City, Utah Remarks: Collapse is based on a vertical depth of 6150 ft, a mud weight of 9.5 ppg The casing is considered to be evacuated for collapse purposes. Collapse strength is based on the Westcott, Dunlop & Kemler method of biaxial correction for tension.

Burst strength is not adjusted for tension. Collapse strength is (biaxially) derated for doglegs in directional wells by multiplyingthe tensile stress by the cross section area to calculate a

Engineering responsibility for use of thisdesign wi/Ibe thatof the

   APIWell  Number:43013507180000

ON-SITE PREDRILL EVALUATION Utah Division of Oil, Gas and Mining

Operator BERRY PETROLEUM COMPANY Well Name LC FEE 1-22D-561-22D-56 API Number 43013507180000 APD No 3698 Field/Unit LAKE CANYON Location: 1/4,1/4 NENE Sec 22 Tw 5.0S Rng 6.0W 876 FNL 129129 FEL GPS Coord (UTM) Surface Owner RANDY NIELSEN

Participants Floyd Bartlett (DOGM), Jeff Crizier (Berry Petroleum Company), Randy Nielsen, (Surface Owner).

Regional/Local Setting & Topography The general area is within the bottom of the Indian Canyon drainage. This canyon begins at the south edge of Duchesne, Utah where it joins the Duchesne River as an intermittent stream. The site is approximately 12.112.1 miles up Indian Canyon following a paved highway. Approximately 204 feet of new road will be constructed leaving the highway to reach the location. Topography in Indian Canyon consists of a moderately wide-bottomed canyon rimmed by excessively steep to vertical sidewall cliffs. Outwash plains or deposits of till are common along both sides of the canyon. A few narrow bottomed side drainages exist and have similar steep sides. Seeps and small springs infrequently occur within the drainage. Wider areas in the canyon are used for agriculture.

The location for the LC Tribal #1-22D-56, proposed oil well, which is to be directionally drilled, is on the west side of Indian Canyon. It is bordered on the west by US highway 191191 and on the east by the incised bottom of Indian Canyon. The space to position a pad is limited in width. The pad has been narrowed from the desired width of approximately 210 feet to 180180 feet at the critical point to fit the available space between the highway and creek. Original plans were to divert the creek to the east to miss the pad. This would require an Army Corps 404 permit and may not have been attainable. Indian Canyon thru this stretch contains a perennial stream. During the current spring time snow melt is flowing about 25+ cfs. To protect the stream from silt from the location, the east side must be bordered by large rock and an outer silt fence installed. Maximum fill along the creek side is 5.8 feet at corner 8. This side of the location should also be bermed to keep flow or spills from leaving the pad. The west side of the site will be excavated with a maximum cut of 8.0 feet. To the west of the highway is a side canyon outwash. This does not appear to be active and any flows from the canyon should be diverted by the road. The well will be drilled using a closed loop mud circulation system. The site itself should be stable and suitable for drilling and operating the well.

Mr. Randy Nielsen of Duchesne, Utah owns the surface. A surface use agreement has been executed.

Surface Use Plan Current Surface Use Grazing Wildlfe Habitat

New Road Miles Well Pad Src Const Material Surface Formation 0.02 Width 180180 Length 310 Onsite UNTA    Ancillary Facilities N

Waste Management Plan Adequate? N

Environmental Parameters Affected Floodplains and/or Wetlands N

I 6/27/2011 Page 1

   APIWell  Number:43013507180000

Flora / Fauna

The site is well vegetated with big sagebtrush and rabbitbrush. Understory species include whitetop, mustard and dandelions.

Cattle, deer, elk, coyotes, and numerous small mammals, birds and raptors.

Soil Type and Characteristics Deep shaley sandy clay loam.

Erosion Issues N

Sedimentation Issues Y To protect the stream from silt from the location, the east side must be bordered by large rock and an outer silt fence installed.

Site Stability Issues N

Drainage Diverson Required? N

Berm Required? Y This east side of the location should also be bermed to keep flow or spills from leaving the pad.

Erosion Sedimentation Control Required? Y To protect the stream from silt from the location, the east side must be bordered by large rock and an outer silt fence installed.

Paleo Survey Run? Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?

Reserve Pit

Site-Specific Factors Site Ranking Distance to Groundwater (feet) 20 Distance to Surface Water (feet) 20 Dist. Nearest Municipal Well (ft) >5280 0 Distance to Other Wells (feet) >1320 0 Native Soil Type Mod permeability 1010

Fluid Type Fresh Water 5 Drill Cuttings Normal Rock 0 Annual Precipitation (inches) 0 Affected Populations Presence Nearby Utility Conduits Not Present 0 Final Score 55 11 Sensitivity Level    Characteristics / Requirements The well will be drilled utilizing a closed loop mud circulating system. An area for piling the drilling cuttings has been designated in the south west corner of the location. It 150150 feet x 35 feet, narrowed at the north end.

Closed Loop Mud Required? Y Liner Required? Liner Thickness Pit Underlayment Required?

I 6/27/2011 Page 2

   APIWell  Number:43013507180000

Other Observations / Comments

Floyd Bartlett 3/3/2011 Evaluator Date / Time

  

I 6/27/2011 Page 3

   API Well Number: 43013507180000    

I Application for Permit to Drill Statement of Basis 6/27/2011 Utah Division of Oil, Gas and Mining Pagerage 1i

I

APD No API WellNo Status Well Type Surf Owner CBM 3698 43013507180000 LOCKED OW P No Operator BERRY PETROLEUM COMPANY Surface Owner-APD RANDY NIELSEN Well Name LC FEE 1-22D-561-22D-56 Unit Field LAKE CANYON Type of Work DRILL Location NENE 22 5S 6W U 876 FNL 129129 FEL GPS Coord (UTM) 539551E 4431745N Geologic Statement of BasisRasis Berry proposes to set 650’650' of surface casing at this location. The base of the moderately saline water is estimated to be at 4,600 feet in this area. This location lies on the Uinta Formation and is located on alluvial valley fill material. The Uinta Formation is not expected to produce prolific aquifers. Water may be found in alluvium deposited in valley floors. A search of Division of Water Rights records indicates 3 water wells within a 10,00010,000 foot radius of the proposed location. The wells are all located over 11 mile from the proposed location. The wells are listed as producing from depths of 400, 100100 and 80 feet and probably produce from a

combination of Uinta Formation and deep valley fill material. Listed uses are irrigation , stock watering and domestic use. Production casing cement should be brought up above the base of the moderately saline ground water in order to isolate it from fresher waters uphole.

Brad Hill 6/16/2011 APD Evaluator Date / Time

Surface Statement of Basis The general area is within the bottom of the Indian Canyon drainage. This canyon begins at the south edge of Duchesne, Utah where it joins the Duchesne River as an intermittent stream. The site is approximately 12.112.1 miles up Indian Canyon following a paved highway. Approximately 204 feet of new road will be constructed leaving the highway to reach the location. Topography in Indian Canyon consists of a moderately wide-bottomed canyon rimmed by excessively steep to vertical sidewall cliffs. Outwash plains or deposits of till are common along both sides of the canyon. A few narrow bottomed side drainages exist and have similar steep sides. Seeps and small springs infrequently occur within the drainage. Wider areas in the canyon are used for agriculture.

The location for the LC Tribal #1-22D-56, proposed oil well, which is to be directionally drilled, is on the west side of Indian Canyon. It is bordered on the west by US highway 191191 and on the east by the incised bottom of Indian Canyon. The space to position a pad is limited in width. The pad has been narrowed from the desired width of approximately 210 feet to 180180 feet at the critical point to fit the available space between the highway and creek. Original plans were to divert the creek to the east to miss the pad. This would require an Army Corps 404 permit and may not have been attainable. Indian Canyon thru this stretch contains a perennial stream. During the current spring time snow melt is flowing about 25+ cfs. To protect the stream from silt from the location, the east side must be bordered by large rock and an outer silt fence installed. Maximum fill along the creek side   is 5.8 feet at corner 8. This side of the location should also be bermed to keep flow or spills from leaving the pad. The west side of the site will be excavated with a maximum cut of 8.0 feet. To the west of the highway is a side canyon outwash. This does not appear to be active and any flows from the canyon should be diverted by the road. The well will be drilled using a closed loop mud circulation system. The site itself should be stable and suitable for drilling and operating the well.

Mr. Randy Nielsen of Duchesne, Utah owns the surface. A surface use agreement has been executed.. Mr. Nielsen attended the first site visit and had no concerns with the proposal. He was not invited to the re-visit. The minerals are FEE.

   API Well Number: 43013507180000    

I Application for Permit to Drill Statement of Basis 6/27/2011 Utah Division of Oil, Gas and Mining Page 2

I

Floyd Bartlett 3/3/2011 Onsite Evaluator Date / Time

Conditions of Approval / ApplicationAppliçation for Permit to Drill Category Condition The east side of the location should be armored with large rock and a silt fence constructed to keep silt from leaving the pad and entering the stream. Pits A closed loop mud circulation system is required for this location. Surface The well site shall be bermed to prevent fluids from leaving the pad.

  

   APIWell  Number:43013507180000

WORKSHEET APPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 5/3/2011 API NO. ASSIGNED: 43013507180000 WELL NAME: LCLC FEE 1-22D-561-22D-56 OPERATOR: BERRY PETROLEUM COMPANY (N2480) PHONE NUMBER: 435 722-1325 CONTACT: Kathy K. Fieldsted

PROPOSED LOCATION: NENE 22 050S 060W Permit Tech Review:

SURFACE: 0876 FNL 0129 FEL Engineering Review:

BOTTOM: 0661 FNL 0657 FEL Geology Review:

COUNTY: DUCHESNE LATITUDE: 40.03689 LONGITUDE: -110.53642 UTM SURF EASTINGS: 539551.00 NORTHINGS: 4431745.00 FIELD NAME: LAKE CANYON LEASE TYPE: 4 - Fee LEASE NUMBER: FEEFEE PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 4 - Fee COALBED METHANE: NO

I RECEIVED AND/OR REVIEWED: LOCATION AND SITING: PLAT R649-2-3.

Bond: STATE - RLB0005651RLBOOO5651 Unit:

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

R649-3-11 Water Permit: 43-11041 Board Cause No: R649-3-11

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I Comments: Presite Completed   

Stipulations: 5 -- Statement of Basis - bhill 1212 -- Cement Volume (3)(3) -- ddoucet 1515 -- Directional -- dmason 23 -- Spacing - dmason 25 -- Surface Casing -- hmacdonald

   API Well No: 43013507180000API Well No: 43013507180000

State of Utah DEPARTMENT OF NATURAL RESOURCES

-/ MICHAEL R. STYLER Exoutim Drotor GAR . H BE RT comrmr Division of Oil, Gas and Mining GREGORY S. BELL JOHN R. BAZA Lieuterant Gowrær Busion Director Permit To Drill ******************kkkkkkkkkkkkkkkkkk Well Name: LC FEE 1-22D-56LC FEE 1-22D-56 API Well Number: 4301350718000043013507180000 Lease Number: FEEFEE Surface Owner: FEE (PRIVATE) FEE (PRIVATE) Approval Date: 6/27/20116/27/2011 Issued to: BERRY PETROLEUM COMPANY, 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT 84066BERRY PETROLEUM COMPANY, 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT 84066

Authority: Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., thePursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., the Utah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listed well. This permit is issued in accordance with the requirements of R649-3-11. The expectedwell. This permit is issued in accordance with the requirements of R649-3-11. The expected producing formation or pool is the GREEN RIVER Formation(s), completion into any other zonesproducing formation or pool is the GREEN RIVER Formation(s), completion into any other zones will require filing a Sundry Notice (Form 9). Completion and commingling of more than one poolwill require filing a Sundry Notice (Form 9). Completion and commingling of more than one pool will require approval in accordance with R649-3-22.will require approval in accordance with R649-3-22. Duration: This approval shall expire one year from the above date unless substantial and continuous operationThis approval shall expire one year from the above date unless substantial and continuous operation is underway, or a request for extension is made prior to the expiration dateis underway, or a request for extension is made prior to the expiration date General: Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas Conservation General Rules, and the applicable terms and provisions of the approved Application for permit to drill.General Rules, and the applicable terms and provisions of the approved Application for permit to drill. Conditions of Approval: In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit aIn accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit a complete angular deviation and directional survey report to the Division within 30 days followingcomplete angular deviation and directional survey report to the Division within 30 days following completion of the well. completion of the well.

This proposed well is located in an area for which drilling units (well spacing patterns) have not beenThis proposed well is located in an area for which drilling units (well spacing patterns) have not been established through an order of the Board of Oil, Gas and Mining (the “Board”). In order to avoid theestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid the possibilitypossibility of waste or injury to correlative rights, the operator is requested, once the well has beenof waste or injury to correlative rights, the operator is requested, once the well has been drilled, completed, and has produced, to analyze geological and engineering data generateddrilled, completed, and has produced, to analyze geological and engineering data generated therefrom, as well as any similar data from surrounding areas if available. As soon as is practicabletherefrom, as well as any similar data from surrounding areas if available. As soon as is practicable after completion of its analysis, and if the analysis suggests an area larger than the quarter-quarterafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quarter section upon which the well is located is being drained, the operator is requested to seek ansection upon which the well is located is being drained, the operator is requested to seek an appropriate order from the Board establishing drilling and spacing units in conformance with suchappropriate order from the Board establishing drilling and spacing units in conformance with such analysis by filing a Request for Agency Action with the Board. analysis by filing a Request for Agency Action with the Board.

Compliance with the Conditions of Approval/Application for Permit to Drill outlined in theCompliance with the Conditions of Approval/Application for Permit to Drill outlined in the Statement of Basis (copy attached). Statement of Basis (copy attached).

Surface casing shall be cemented to the surface. Surface casing shall be cemented to the API Well No: 43013507180000API Well No: 43013507180000

Cement volume for the 5 1/2" production string shall be determined from actual hole diameter inCement volume for the 5 1/2" production string shall be determined from actual hole diameter in order to place cement from the pipe setting depth back to surface as indicated in the submittedorder to place cement from the pipe setting depth back to surface as indicated in the submitted drilling plan. drilling plan.

Additional Approvals: The operator is required to obtain approval from the Division of Oil, Gas and mining beforeThe operator is required to obtain approval from the Division of Oil, Gas and mining before performingperforming any of the following actions during the drilling of this well:any of the following actions during the drilling of this well: • Any changes to the approved drilling plan – contact Dustin Doucet• Any changes to the approved drilling plan - contact Dustin Doucet • Significant plug back of the well – contact Dustin Doucet• Significant plug back of the well - contact Dustin Doucet • Plug and abandonment of the well – contact Dustin Doucet• Plug and abandonment of the well - contact Dustin Doucet

Notification Requirements: The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringThe operator is required to notify the Division of Oil, Gas and Mining of the following actions during drilling of this well:drilling of this well: • Within 24 hours following the spudding of the well – contact Carol Daniels• Within 24 hours following the spudding of the well - contact Carol Daniels OR OR submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websitesubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website at http://oilgas.ogm.utah.govat http://oilgas.ogm.utah.gov

• 24 hours prior to testing blowout prevention equipment - contact Dan Jarvis• 24 hours prior to testing blowout prevention equipment - contact Dan Jarvis • 24 hours prior to cementing or testing casing – contact Dan Jarvis• 24 hours prior to cementing or testing casing - contact Dan Jarvis • Within 24 hours of making any emergency changes to the approved drilling program• Within 24 hours of making any emergency changes to the approved drilling program – contact Dustin Doucet- contact Dustin Doucet • 24 hours prior to commencing operations to plug and abandon the well – contact Dan Jarvis• 24 hours prior to commencing operations to plug and abandon the well - contact Dan Jarvis

Contact Information: The following are Division of Oil, Gas and Mining contacts and their telephone numbers (pleaseThe following are Division of Oil, Gas and Mining contacts and their telephone numbers (please leave a voicemail message if the person is not available to take the call):leave a voicemail message if the person is not available to take the call):

• Carol Daniels 801-538-5284 - office• Carol Daniels 801-538-5284 - office

• Dustin Doucet 801-538-5281 - office•Dustin Doucet 801-538-5281 - office

801-733-0983 - after office hours801-733-0983 - after office hours

• Dan Jarvis 801-538-5338 - office• Dan Jarvis 801-538-5338 - office

801-231-8956 - after office hours801-231-8956 - after office hours

Reporting Requirements: All reports, forms and submittals as required by the Utah Oil and Gas Conservation General RulesAll reports, forms and submittals as required by the Utah Oil and Gas Conservation General Rules will be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:will be promptly filed with the Division of Oil, Gas and Mining, including but not limited to: • Entity Action Form (Form 6) – due within 5 days of spudding the well• Entity Action Form (Form 6) - due within 5 days of spudding the well • Monthly Status Report (Form 9) – due by 5th day of the following calendar month• Monthly Status Report (Form 9) - due by 5th day of the following calendar month • Requests to Change Plans (Form 9) – due prior to implementation• Requests to Change Plans (Form 9) - due prior to implementation • Written Notice of Emergency Changes (Form 9) – due within 5 days• Written Notice of Emergency Changes (Form 9) - due within 5 days • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation • Report of Water Encountered (Form 7) – due within 30 days after completion• Report of Water Encountered (Form 7) - due within 30 days after completion • Well Completion Report (Form 8) – due within 30 days after completion or plugging• Well Completion Report (Form 8) - due within 30 days after completion or

Approved By: API Well No: 43013507180000API Well No: 43013507180000 Approved By:

For John RogersFor John Rogers Associate Director, Oil & Gas Associate Director, Oil & Sundry Number: 16472 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEEEASE DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t LAKE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S05.05 Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: 7/6/2011 REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE NOTE THAT THE LC FEE 1-22D-561-22D-56 WAS SPUD ON JULY 6, 2011 AT APPROX 10:0010:00AM AM BY LEON ROSS. Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 07/14/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 7/7/2011

Jul. 07, 2011 O

Berry Petroleum Company CONFilENTIAL RT 2 Box 7735 3846 S Hwy 40 Roosevelt, Utah (435) 722-1325

f)p.T 4/ 43-d/3-TØlÑ July5,20ll

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: Spud Notice

LC FEE 1-22D-56 876 FNL, 129 FEL NENE Begin at approx. 10:00 am on Wednesday July 6, 2011

Section 22 T5S R6W

Lease # FEE

If you have any questions or need more information, please call me at 435-722- 1325

Sincerely Kathy Fieldsted

Thank You RECEIVED JULO5 2011 STATE OF UTAH FORM 6 DEPARTMENT OF NATURALRESOURCES DIVISION OF OIL, GAS AND MINING

ENTITYACTION FORM

Operator: BERRY PETROLEUM COMPANY Operator Account Number: N 2480 Address: 4000 S. 4028 W. ciWROOSEVELT 722-1325 state UT zip 84066 Phone Number: (435)

Well 1 API Number Well Name QQ Sec Twp Rng County 4301350718 LC FEE 1-22D-56 NENE 22 5S 6W DUCHESNE Action Code Current Entity New Entity Spud Date Entity Assignment Number Number A 7/6/2011 Comments: PUD BY LEON ROSS DRILLING

wellA2PI Number Well Name QQ Sec Twp Rng County

Action Code Current Entity New Entity Spud Date Entity Assignment Number Number Effective Date

Comments:

weilAPI Number Well Name QQ Sec Twp Rng County

Action Code Current Entity New Entity Spud Date Entity Assignment Number Number Effective Date

Comments:

ACTION CODES: A - Establish new entity for new well (single well only) HY K FIELDSTED B - Add new well to existing entity (groupor unit well) N (P se Pri ) C - Re-assign wellfrom one existing entity to another existing entity D - Re-assign wellfromone existing entity toa new entity signatur

E - Other (Explain in 'comments' section) SR, RE & PERMITTING 7/7/2011 RECEIVED "*l• Da*• (5/2000) JUL07 2011 OlV.0F0lL,GAS& Berry Petroleum Company RT 2 Box 7735 3846 S Hwy 40 Roosevelt, Utah CONFllENTIAL (435) 722-1325

V3- d/3- Ed July l9, 2011 /]/A:c 4/ Ÿ/ Ñ

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: Run Surface casing & cement

LC FEE 1-22D-56, NE/NW 876' FNL 129' FEL Sec. 22, T.5S, R.6W

Lease # FEE If you have any questions or need more information, please call me at 281-605-2103.

Sincerely, James Marsh Consultant

Thank You RECElVED JUL19 2011 Berry Petroleum Company RT 2 Box 7735 a faffil CONFilENTIAL(435) 722-1325

July,19, 2011

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: Rig up and BOPE test for 7/20/2011 in the am.

LC FEE 1-22D-56, NE/NE 876' FNL 129' FEL Sec. 22, T.5S, R.6W

Lease # FEE If you have any questions or need more information, please call me at 281-605-2103.

Sincerely, James Marsh Consultant

Thank You RECElVED JUL2 0 2011

DIV.OFOlL,GAS& CONFIDENTIAL Berry Petroleum Company RT 2 Box 7735 3846 S Hwy 40 Roosevelt, Utah (435) 722-1325

Ÿ3-d/3-5~d July 27, 2011 Ñ/ ..L Ñ ÿ /g

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: Run Production casing & cement

LC FEE 1-22D-56, NE/NW 876' FNL 129' FEL Sec. 22, T.5S, R.6W

Lease # FEE If you have any questions or need more information, please call me at 281-605-2103.

Sincerely, James Marsh Consultant

Thank You

RECEIVED JUL2 7 2011

DNOFOIL,GAS& Sundry Number: 17136 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEEEASE DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t LAKE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S05.05 Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 7/30/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED DRILLING REPORT FOR THE LC FEE 1-22D-56.1-22D-56.

Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 08/11/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/1/2011

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/19/2011 Report #: 3, DFS: · Name: 1-22D-56 Well LC FEE Depth Progress: 559 API/UWI Surface Legal Location Spuci Date Nolice APO Slate IAFE Number TolaF AFE Amount 43013507180000 T5S-R6W NENE Sec 22 Utah C11 032019 Spud Dale Rig Aelease Date K und Distance (ft) Ground Elevalton itKB) DarlyCost ¡Cum Cos1To Date 2 2 1 6 .503 OT Dily MN Date Dr ng surface TD surface hole, run casing and cement install well 4.431 4.431 head nippleup bop and test, Deciti Start IIIKB) opthEnd {flÍ( Operations Summary 26 585 Drill rat and mouse holes, drill surface from 26 to 219 service rig drill from 219' to 244 tripout of hole ospihsianITvoultKB ihWTŸDiiffRB1 change bits, tripin hole, drill from 244' to 585 . 26 585 Remark ¯ ¯¯ ¯ ,TargetFormallon TargelDepthtfl¾B) Safety Meeting= Drilling mousehole iCR-6 (base U wasatch) I 6,189 Weather TémperalúreTF) Road Condit on Hote bondidon ally COntaCtS Clear 54.0_ cod _ Good ¯ . Rai¯ ¯GO eaa h à¾ë2 Jäö osserpro set ospinli ( mment Tony Hardman 866-716-9434 a niractor uiÌ Time Log ¯¯ Pioneer Drilling 58 iTÍnEe Einfiiin r(hrs) [ 0p iriÏeÏ 1.50iMiscellaneous Mud Pu iC600 07:30 Drill mouse and rat holes. -- - s 07:30 12:00 4.60\ Drilling Drill12 1/4 surface from26' 219' #1, Gardner-Denver, Pz-8 to Pump Raisag inp) IRod D.ameierim Sia i Gi iiiii 12:00 12:30 0.50 Lubricate Rig Service rig, inspect brake pins and linkage 750.0 7.99 12 30 15:00 2.50|Drilling fi.ineiŠiz¯(iÑ Drill 12 1/4 hole from 219' to 244'. TöfÏ5t 0 (Oblfatk} 15:00 15:30 0.50iTrips Trip out of hole to change bits. -Esur e¯(%) 15 30 |16:30 1.00|Trips Makeup HäÏiùrtonEQH278, and trip in (psi) isiersiper strokes(spm) hole. No i 16:30 |18:00 1.50 Drilling DrilÏ12 1/4 hole from 244' to 280'. J 2dardner-Denver, PZ.8 18:00 '19:30 -Pump Racing(ng] IRod Diameter(in) Stroke Longib 1.50 Drilling Drill12 1/4 hole from 280' to 310'. l 19 30 I20:00 0.50 Lubricate Rig 750.0 7 99 Service rig, grease blocks , swivetand drive Linersize IJnes lini vovsmoR (bevstri 6 1/2 0 078 0:00 106:00 10.00 Dr ling .Dri)I12 1/4 hole from 310' to 585. Presáre(pm Slow Spd 81;okestspm} Eff(% No

Oepäiliinii ns.ly libyij 9 lšÏqÏ) V Õ Ín(cp i N inÏlÍSÎÏfó6k Mud Adpl e A unts

Gel Base 06:00 130.0 . . 9.00 60 12.0 23.000 uï ti |Bar io i t o tiäi 62 0(6ític f(!öräilibu o Flitrale(musomin] F.nercare ts2) i N ÃÕO 0 00 iEngineer 1.0 450.00 ¯ Cii¯um 0 0 MBT(neto isscent Percent i¯Siab · oliin) watert¾) :chin nuestogTL.i lirgil. Ki 16( Ëie (V Gel 60.0 900.00 98.0 300.000 ihigh yield bentonite 70.0 385.00 CEC for Collings Whole , Mud Add (bbil Mud Lost to Hole (bbl) iMud Lost (Suril (bb]) Muti Voi(Res) (bbi Mud VOI(Adi (bbly Rental 1.0 50.00 177.0 Tax 1.0 656.00 Air Data Trailer rental 2.0 100.0Q Trucking i 1.0 1,250.00 Parasile ACFM(ft imini :DnllpipeACFM fPimini ECD BII (Ibige E s gill Job Supplies - L - Diesel i Corrosion Inhibitor inþcted Fuel, gal us¯ ¯ in 24hr _Perked _ supplymmDesonni.on ¯ 6 "Jecied down Parasite (gal) ______UnTtLabel gis injected n Mud (gal) igls Biocide Inecied in Mud (gau Diesel Fuel gal us Total Received Total Consumed Tola1Relumed Drill Strings 6,950.0 6.866.0 i

1 12 1/4in, QHC1RC 11607246 -- ¯ 0.47 . ones li32 Sinny Length (fl) .Sinng Wi (1000Ilyll BHAROP 7/18/2011 378.0 11/16/11/11 :7/19/2011 371.01 678.12 | 12 25.1 | Drill String Components 7/20/2011 557.0 i ma I 7/21/2011 371.0 Lobe Bit-Bendft :minggm SP 7/22/2011 ats I Item Description OD (ini Leo ift) confi9 Stages rpm/gpm (It) igpmi 19Þ 927.0 7/23/2011 1 12 1/4 bi1 6 1/4 1.00 i 556.0 7/24/2011 1 Mud Motor 6 1/4 27.81 7.8 2.9 0.170 7.08 200 500 464.0 4 DrillCollar 6 1/4 119.12 7/25/2011 464.0 16 HWDP 6- 1/4 490.19 17/26/2011 834.0 1 Kelly 7/27/2011 920.0 6 1/4 40.00 -- -- ¯ 7/28/2011 746.0 te E e e Fitoliifk à u äsif i on Time ncs] comDriiiTime int ROP (IUhr) Flow Rate gpm 7/29/2011 278.0 IOriginal 26.0 585.0 559.00 21.50 21.50 26.0 393 |Hole ¯ WOB (1000 RPM rymþ $ P Ipi Roi HL{100Dibfi PU HLflOOOlÜ O ML (IDOOlm) Onl]Ing Torque OprSim Tq 1 60 700.0 40 42 40 Q (g inj) (ft4 Motor RPM (rpm) T (In]) P (BHAnn) T ("F) f (bn) (F} P(Sarf Ano) T(sud ano O (fig r1tn} g O ig

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Report Report Date: 7/20/2011 . Report #: 4, DFS: Well Name: LC FEE 1-22D-56 Depth Progress: 93 Drill String Components ¯ ¯ max Í Lebe , BA Send it min gpm tipm llem Jts Descoption D lin) Len fl confi9 Slages, rpnVgpm (fil (Opm) (OP 1 12 1/4 bit 6 1/4 1.00 1 1 Mu

Ibo e t f Éi ÒepinÈndflK ÖuÑ h ft me firii Cum Dni!Time ilni ROP (filbr) F v Aale Original 585,0 678.0 682.00 4.50 26.00 20.7 Hole . 393 WÖB (1000Ibf (rpm) FiÜÑ SPP (psd Roi HL(1000Ib PU HL(1 [60 ÜHL (1000101) |DnilingTontve Alm Tq 14 | 60 700.0 42 42 40

Deviat on Surveys I Azim Data i Descripi EVVlië neto MDTid in (fl NGTiein TVOTiein rt 0,00 7/21/201 I 0.00 0.00 0 00 0.00 i 0.00 . urvey Data MD fflKB) incI t') Arm (') i TVD(ftKB) NS(it) EW ft) VS (It) DLS ('/10

I I I , i

I I I I I

I I I

i

I I I i i

i

I i

i

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/21/2011 . Report #: 5, DFS: 0.1 Well Name; LC FEE 1-22D-56 APlibWI Surface Legal Location Depth Progress: 69 Spud Dale NOIIce APD State 143013507180000 .AFE Numbet TotalAFE Amouni NENE Sec 22 T5S-R6W Utah 89ud Date Rig Release C11 032019 Datt KB-Giound Dra1ance(tti Ground Elevati Cum¯ÒTÝoÚiiÏe¯ 7/21/2011 I ) |Daily Cost 4:30:00 AM 7/30/2011 6:00:00 AM 14.00 Operations at Repott Time 6,501 31,445 144.118 Operabons Meat24 Hours Drilling7 7/8 production IQailyMudCost MudAddifve Cosi Ì ÒaÏe hole ¡Drill 7 7/8 production hole. perations Summary 1,764 8,971 Depth Star! Wait on cement, clean cellar, cut conductor [flKB Depli Ënd(flKB) pipe. weld on wellhead, nipple up and test BOP install head and flowline,wash down mousehole rotating 678 747 sock, pre-spud inspection, make up bit and directional trip in hole, tag cement too s and Depih Slart ITVD (ftKB} iDepth Efid TVD](fiMBI @600', drill shoe track, drillformation from 678' to 747'. 678 ¯ 747 Target Formation Safety Meeting= testingbops. Tärgel Depih ((IKB) ICR-6 (base U wasatch) 6,189 Weather .Temperature CFi Acadcondigen ;Ho½ Conditen i iClear ÛOlly COnt0CÍS | 54.0 Good Good \ . ¯ . Last Casing_Set fa s 9 cailiiiiössëiipiran Isei Õ625 Ì 85 Depth (firal .00 emi ce mem Surface Tony Hardman 6-716-9434 655 i 8 5/8 Cemented Time Log Dur¯ál Šlandiiiil End T Pioneer Operabon túlinát ¯ Drilling 5B 76:00 08:30 2.50 Wait on Cement Mud Wait on cement, clean out cellar. prepare for Pumps ¯ welder #1, Gardner-Denver,Ö¾¯ PZ-8 08:30 Purii¡iinisii 2:30 ! 4.00 NU/ND.BCP Welder cut Rod Diameleciali Kiiöiie¾gthin casingand Installed well head. ( 750.0 fillmudpits. repair 7.99 transmission leak on Lmer Sw.a ilŠik ¯ draw works.) 0 V OÑÕÏbliiÑ 2 30 4 Š0 00 IIIÏce¾u Ïai¾eÏÏ he diol after being welag P< säiÑ(poi |SÏŒŠpd ,Strokes(spm) Err|%) in place, prepare well head flange, clean i No Ì bop bolts. # 2, Gardnet-Denver, PZ-8 14:30 19:00 4.50 NU/ND BOP Nipple up SOP. killline, choke line, rotating liiiipiRaimg (hp) Rod Diameler Øn SIroke Length [m head. replaœ valves in flowline. - 750,0 , . 7.99 ------19:00 23 00 4.00 est BOP HSMw/A-1 Testing. testblind rams.pipe 6 112 i 0 078 rams, annular. Choke line. killline, upper ¯Ësidi Pressure (psi) ,si w sad Ïñm Ett (%) kelly,safety valves, choke manifold, and casingto 2000 psi No Mud 23:00 i00:00 1.00 Miscellaneous Additive Amounts Install rotating heâd and flow line. Dempen suoi repair _ Co hydraulic _ leak on carrier, wash down Engineer 1 0 450 00 mousehole sock. Gypsum 40 0 420.00 00:00 00:30 0.50 Miscellaneous Pre-spud sig inspection.set up pipe racks Pallets 3 0 60,00 and bha Rental 1 0 80.00 00:3Ö 0ž:ŠÒ .00 Ïrips ÑIakeópŸfÏ$bit ano Jfractionaltools,trip Sawdust 15.0 67.50 in hole w/ bha.install rotating rubber and Shink wrap 3.0; 60.00 drive ¯ bushings. Tax 1.0, 656.00 02:30 04.00 1.50 ÖriÏÏ 0010emenÜRetainers Ïag cement@Š00',orillout fÌoat Sii Job Supplies 678•. drillshoe @655', drillformation @ Diese[ Fuel, gal us 04:00 06:00 2.00 Orilling elreFmonsenplion Drill 7 7/8 production hole from 678' to 747 uniiLabei Mud Check ii6/diif¯ oisikedived (Toraiconsumed Totalastumed hpe Time Deptii fii ë) GWr¯ DelisiTw |Gs s7qt) WVäer¿t p i 6,950.0 6.866.0 DAP . 06:00 655.0 8.40 27 1.0 Gel l10s) ([bil100f Gel 1.000 Diesel Fuel Consumption (10m) (Inft10 . Gel 30m) (Ibf/10 Fil[rate {mt.(30mini Filter Cake /32 pH Soirds Date 1.000 1.000 (%) [ Õonsiluied BT 7.0 1.0 7/17/2011 i (Jb/bbi) ,Percent Oil (%) Percent Waler (%) Chlorides {mg/L} Õabumi(a Li KÖLi%) Elecine Stab (v) 7/18/2011 99.0 500,000 378.0 CEC for Cunings Whole MudAdd (bbl} Med Losi to Hole 7/19/2011 (bbli ;Mud I.osi (Surf) (DDR Mud Vol(Resifbh0 Muti 371.0 Voi(Act) (bbl) 7/20/2011 - e 187.0 | 557.0 Air Data . 7/21/2011 371.0 7/22/2011 927.0 Parasite ACFM (ff/min) Drilipipe ACFM (fP/min) ECD Bit (Ib/gal) EØ(Ïb 7/23/2011 556.0 7/24/2011 464.0 Corrosion Inhibitor injected in 24hr Period 7/25/2011 464 gis lniec‡ed down Parasile 0 (gsi) gFs injected in Muri(gall gis Biomdeinected in Mud Lgal) 7/26/2011 834.0 17/27/2011 920.0 | Drill Strings 7/28/2011 746.0 BM.¾, Steerable 7/29/2011 278.0 Bil Run DritiBrr JAOCBA Dull 2 7 7/8in, FX55M, TFA tale 102) (inn 11544984 ---- NazzFes t/32") 0 98 L h SEÏn WÑÄROP (Ít 16/16/16/16/16 6,214.69 143

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/21/2011 Report #: 5, DFS: 0.1 Well Name: LC FEE 1-22D-56 Depth Progress: 69 Drill String Components

I , max Lobe Bil-Bendit mangpm Spm I JIs Llem Des¢nplion OD (m) Len (It) Conng siegesrpuvgpm (II) igÞ©l 100 SN I 1 7 7/8 bit 7 7/8 1.00 | Mud Motor 8 1/4 27.81 7.8 3.0 0.150 5.58 300 600 I 1 DrillCotlar - Non Mag 6 1/4 30.95 1 GAP SUS 6 1/4 5.56 2, DrillCollar 6 1/4 59.75

30 HWDP 6 5/8 920.05 ¯¯ ¯ 18.6 . ¯ X-O 6 5/8 2.56 1 162 OrillPipe 4 5.127 02 Ke‡Iy 6 5/8 40.00| Drilling Parameters IWeilbore Stari LilKB) IDepth End (flKB) Cum Depih (fD |DrillTime (hrs) Cum OnllTme nt ROP Ifithr) Flow Rale (gpm) Original 678.0 747.0 69.00 2.00 2.00 34.5 i Hole WOB (1000lbt) IRPM (rpm SPPÏpsl} Rot HL 1000\b0 PU HL(100mb0 SO HL(1000161) .DrillingTorque q I (¯TR )¯ Q (ganj (fPI Motor RPM ipm) T In])PF |P BHAnnt CF) P(Suri Ann} T (surf ann} Q (Ipcirun) (g mii

Deviation Surveys ¯ ¯ Azrm Date Description ËWho Fn E1nchn MD Tie in (fl [ÑSÌieI TŸÕ¾etÃ(f 0 00 7/21/2011 i 0.00 i 0,00 0.00 0.00 0.00

701.00 3.38 173.56 700.59 -20.64 2.32 -8.57 0.48

I I i i

I

I

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/22/2011 Report #: 6, DFS: 1.1 Well Name: LC FEE 1-22D-56 Depth Progress: 1,259 APUUW1 Surface I,egal Localian Spoti Dale Notice APO Slate AFE Number TotalAFEAmount 43013507180000 NENE Sec22 T5S-R6W Utah C11 032019 ŠpudDate Rig Release Date 'KB-Ground DJstence (ft) Ground Elevation JtKB) D Cost Cum Cost To Dale 7/21/2011 4:30:00 AM 7/30/2011 6:00:00 AM 14.00 6,501 33,150 177.268 Opernbons at Repen Time Opetalions Next 24 Hours Daily Mud Cost Mud AddihvaCosi To Dale Drilling 7 7/8 production hole. Drill 7 7/8 production hole. 3,429 12,400 ons Summary Depth Slan (ftKB) Depth End !ItKBJ Drill from 74Tto 991', sentiœ rig, drill from 991' to 1658', service rig, drill from 1658' to 2006', layed down 6 747 2,006 joints drill pipe to get above water flow, shut annular preventer, let water trucks catch up, trip in 6 joints wash Depth siaritTvoùfixel Depin endTúõ il e to 2006'. 747 1,991 Remarks - - - iTarget Formation Target Depth [RKB) Safety Meeting= shutting well in, ,CR-6 (base U wasatch) 6,189 weather Temperaiure PF) Road on Hale condd conoition . Daljy Contacts Clear 56.0 Good GOOd Jobcontact Mobile . . ..L __ |970-623-7085 , James Marsh Üa¯lngLast Casing Set ¯ . scripton Set Depin IIIKB) ,OD (in) Commani Tony Hardman 866-716-9434 I Surface 655 8 5/8 Cemented (gg Conirector IRlg Number Time¯ÌÑÏleLog Pioneer Drilling 58 Ši ^ ¯ ÉndTime) Durlhrs)00°CiriÍÏiI ¯¯ Operaton a¯ Commeni - 06:00 10:00 Ïg rÍÑithrota d s¾es Ïro!Ýii' tB01, Mud Pumps #1, Gardner-Denver, PZ-8 10:00 10:30 (in¯ , 0.50 Lubricate Rig Service rig. inspect brake pads pins and IPump natmainp aca ommerern) siroke in Iinkage. Check draw works SPR and trans. | 750.0 7 99 |#1 pump= 150psi 58 stks. #2 pump= 155 Sϯ(m} @ Lirier Ÿõ iÍ ÓR (bbIlstk) psi @ 58 stks, OBP= 600 psi. 10:30 18:00 7.50 Drilling Drillwith rotary and slides from 991' io ""' SPi is" 1562', 76 ft/hr avg. NO 18 00 19:30 1.50 Drilling DiÏlÏwÏfhrotary and sÍidesfrom 1Š6Tto #2, Gardner-Denver, PZ-8 i 658'. Pump Raimg (hp) Rod Diameter (in! StroRe Length (m) I 750.0 7.99 19 30 20:00 0.50 Lubricate Rig Service rig, bleed air ¯ from TOTCO pump psi uners.aelini voirsthOR obusik) line, repair grease line on brake linkage. a¯d 6 1/2 0.078 0:00 23:Ò0 3.00 Drilling Drillwith rotary slides from iŠ55'tO Pressure (ps} .Slow Spa iSirokes (som) IEff(%)

1911'. Hit water flow @1840', 8 bbl per . No minute Mud Additive Amounts

_consumaa Daly.cost , 23:00 00:00 1 00 Condition Mud & Circulate Circulate hole, guide water trucks on __ _gescomen_ _i | location and hooked them up to frac tanks. cement 22.0 179.96 00:00 01:00 1 00 Drilling DRiflwi1hrotary and slidesfrom 1911' to t.uiluaiua ring 1.0 100.00 2006· Defoamer 1.0 125.00 01:00 01:30 0 50 Trips Lâyed down 6 Jointsof drillpipe in v-door to Engineer 1.0 450.00 a depth of 1816'. Water trucks unable to Gypsum 140.0 1,470.00 keep up with well flow Pallets 3.0 60.00 Poly plus 1.0 01:30 05:00 3.50 Miscellaneous Shut annular preventer on diillpipe, open i 121.00 choke line to pits. 9 trucks haallng water Out Rental 1.0 50.00 offrac tanks. Iowered volumein fracs to Sawdust 35.0 157.50 keep up with well flow. Shink wrap 3.0 60.00 05:00 |06:00 | 1.00 Trips Open annular preventer, pick up 6 joints drill Tax 1.0 656.00 pipe, wash to 2006'. Job Supplies 1Diesel Fuel, gal us Mud checkS ,Supply Item Descnption Una Label (Ibf/100ft2) Type Time Depin irtKB} ,Densily (Ibigal) Vis (5/40 PV Calc (cp} Yield Pmni Diesel Fuel gal us

DAP , 06:00 925.0 ! 8.50 28 I 1.0 1000 TolaiRecewed Totaiconsumed Tola1Retamen eÏ(10s)(IEÏl100fGel (10m) (lbfl10.. Gel (30m) (Ibf/10.. 'Filtrate (mLl30min) Filter Cake (/32") pEÏ Soliás i 6,950.0 6,866.0 1.000 1.000 __ _ _ 9.0 1 0 _ Dieset Fuel Consumption MBT (Ib/bbl) PercentO.I t%) Percent Water (%) |Chlondes (mg/L) Caloum (mg/L) KOL ¾l Elecinc Stab (Vi Date Consumed 99.0 1,200.000 7/17/2011 CEC for Callings Whole MudAdd (bbl) Mud Lost lo Hole (bbl) |Mud Lost (bbl) Mua Voi (Surf) (Resi(bol 1 Väl (Ä«t)66i) 7/18/2011 378.0 7/19/2011 371.0 Air Data _ __ .. . . _. _ _.. . _ . _ 7/20/2011 557.0 iiÄä¯ ni¯¯ ¯ Ë¯Õ ParasifiÏÏI¯Ñ> 7/21/2011 371.0 i:Tm Onilì6ãACFiÏVimm) I (iálgil ËÕÕ 7122/2011 927.0 - 7/23/2011 556.0 Corrosion Inhibitor injected in 24hr Period gls Injected down Parasite (gal) gis Infected m Mud (gar) gis Ëiocideinjected m Mud (gal3 7/24/2011 464.0 7/25/2011 464.0 7/26/2011 834.0 Drill Strings _ _ . ______7/27/2011 920.0 BHA#2, Steerable 7/28/2011 746.0 Sti Run DnilBli IADCBit Dull TFA(Ïnci No2}(In') 7/29/2011 278.0 2 7 7/Bin FX55M. 11544984 -- 0.98 Nozzles H32 Stang Length (ft) String Wt (100DIbf) BHA ROP (ft 16/16/16/16/16 | 6,214.69 143

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/22/2011 Repoñ#:6,DFS:1.1 Well Name: LC FEE 1-22D-56 Depth Progress: 1,259 Drill String Components max Lobe Bit-Bend ft min gpm gpm Jts item Description OD (in) config Len (ft) i Stages rpmigpm (ft) (gpm) (gpm) SN 1 7 7/8 bit i 7 7/8 1.00 Mud Motor 6 1/4 27.81 7.8 0 0.150 5.58 300 600 1 Drill Collar - Non Mag 6 1/4 30.95 I 1 GAP SUB 6 1/4 5.56| 2 Drill Collar 6 1/4 59.75 30 HWDP 6 5/8 920.05 18.6... 1 X-O 6 5/8 2.55 ¯ 162 Drill Pipe 4, 5,127.02 Kelly 6 5/8 40.00 ¯ Drilling Parameters IWeilbore Statt (ftKB) Depth End (ftKB) Cum Depth (ft) DriltTime (hrs) Cum DrillTime ,Int ROP (ft/hr Flow Rale (gpml Original 747.0 2,006.0 1,328.00 17.00 19.00 i 74.1 393 Hole i WÕB (1000lbf MŠm) SPP D¯iiiing (TiÏ IÑoÏÏiL (1000Tbf)PU HL (100ÕIbf) SO HL (1000\bf) Torqüe Off Btm Tq 14 65 950.0 63 75 ¯ 60 ing (10/ (rpm} return)¯ Q (g MolorRPM T (Ini; CF} |P (BH Ann) T (bh) ri) ( À T (surf ann) ... Q (ligrtrn) (g Q (g

IDeviation Surveys Azim Date Description jEWTie in inclin MDTie In (ft NSTie in TVDTieIn (ft 0.00 7/21/2011 i 0.00 0.00 0.00 0.00 i 0.00 ISurvey Data ¯(¯ MD(ftKB) Ïn Arm (*) TVD (ftKB) I NS (ft) EW ffi) VS (ft] DLS tú

758.00 2.90 195.01 -23.60 757.51 2.13 -9.34 2.21

820.00 3.69 239.92 -26.12 819.42 0.00 -8.09 4,23

-27.45 881.00 5.49 263.21 -4.60 880.22 -4.13 4.19

-27.41 942.00 -11.32 7.25 275.69 940.85 2.28 3.66

1,035.00 -25.41 10.41 -25.45 279.73 1,032.73 16.33 3,46

-21.79 1.132.00 11.03 283.34 1,128.04 -43.12 34.25 0.94 I 1,227.00 9.80 289.22 1,221.48 -17.03 -59.59 51.39 1.71

1.322.00 -11.28 9.45 293.27 1,315.14 -74.39 67.24 0.80

1.417.00 -5.73 8.92 289.66 1,408.92 -88.49 82.37 0,82 1,516.00 9.14 293.71 1,506.70 0.02 -102.92 97.86 0.68 1,612.00 8.44 288.61 1,601.57 5.33 -116.58 112.50 1.09\ 1.707.00 9.01 288.52 1,695.47 9.92 -130.24 126.91 0.60 1,842.00 8.83 293.00 1,828.84 17.33 -149.80 147.80 0.53 1.897.00 9.80| 297.49 1,883.12 21.14 -157.84 156.62 2.20 1,988.001 9.76 -171.61 296.61 1,972.79 28.17 171.89 0.17.

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/23/2011 . Report #: 7, DFS: · 2.1 A_ Well Name: LC FEE 1-22D-56 Depth Progress: 1,073 APf/UT Surface Lugal Locaban Spua Dam Notice APD Stale AFE Number TolarAF€ Amoum 43013507180000 NENE Sec22 T5S-R6W Ulah SPud C11 032019 i Dale Rtg Release Dale KB·Ground Distance (It ¯ Ground Elevallon iltKBa Daly Cost Cum Cost To Date 7/21/2011 4:30:00 AM 7/30/2011 Rep¯ii 6:00:00 AM 14.00 6.501 i 37,040 Operains ai 214.308 Time Operations Next 24 Mours Dady Mud Cost Mud Additive Cost ToDaire Drilling 7 7/8 production hole. IDRill 7 7/8 production hole. 2,742 1g42 perations Summary Depth Start (ftKB) Deplii End (flKB) Diill from 2008' 222T, shut to annular,wait for water trucks to suck down frac tanks. Drill from 2227' to 2575', rig, drill fram . 2.006 3.079 Iservice 2575 to 2828 , service rig, drill from 2828' to 2985', shut annular wait for water trucks to lÕepihSierl(TVD) (riKB) Depm Ena ITVD}illKSI suck down frac tanks. Drill from 2985' to 3079', shut annular - ¯ - - wait for water trucks to suck down frac tanks. 1.991 3,051 Remarke Tafget Formalcon Target Depth (flKB) Meeting=Drilling Safety with water flow. CR-6 (base U wasatch) 6, 9 I Weather iTemperature CFi Road Conddton Hole Condil on Daily Contacts Clear 57 O Good iGood JobContact MonWe Lasta¯ Casing Set James Marsh 970-623-7085 icoption Set Depth (11KBI im; Comment TOny Hardman 866-716-9434 Surface i 655 8 5/8 Cemented mLe C r Rig Number a End Time ¯ ¯¯ Pioneer Drilling 58 ÏErs) piÑàÍió ownsm 05 00 08:30 Mud 2.50 Drilling Drillwith rotary and slidesfrom 2006' to Pumps I222T. 1 Gardner-Denver, P2-8 08:30 ft:30 3.00 tulisceltaneous tamp Efatng gi TRoo Diameler On) Siroke Longih (in Shüt in well, wail on water truckstohaul 750.0 from frac tanks. 7.99 13nersaae(ir Volisik ti siki 11:30 15:30 4.00 Drillirig Drillwith rotaryalid slidesfrom 222T to 12575'. P saure (Ps Slow SPd Sie (6 -- s ElÏ(%) 16:30 16:00 0.50 Lubricate Rig Service rig, 1: 188 No SPR * . psi/538tks. #2: .. 180 psi/ 50 stks.OBP 818 psi@ 120 spm. 12,_ Gardner-Denver, P2-8 inspect brake pins, pads, linkage. |PumpRaimg(up Roenameterfern sirakeLeagm n 16:00 18:00 --- a 750.0 7.99 2.00 Drilling Drill with rotary and slides from 2575' to ¯ . I 2669' asizelini vovsikOR otii/Bii 6 1/2 0.078 18:00 I20:00 2,00 Drilling Drill with rotary and slides from 2669' to Pressu

eTai¯¯ain ¯ - d iMuni a isãoe utgali 7/24/2011 464.0 7/25/2011 464.0 7/26/2011 Drill Strings . 834.0 _ _ 7/27/2011 BHA42.Steerable ___ _ _ 920.0 Bit Run OnliBit ______7/28/2011 746.0 IADCBd Oull TFA incF Nozi linn 2 l77/8in FX55M,11544984 7/29/2011 278.0 0.98 ------zz - ng Length (ft) IStang Wt (100 BHÃRÖP ( 16/16/16/16/16 6,214.69 143 42.9 Drill String Components mai tote Bit-Bend it mmgym gpm Jts 11em Desenption OD pn) gr I confi9 Len Stages rpmfgp (fg igpm) (GPml gg 1 7 7/8 bit 7 7/8

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repo Report Date: 7/23/2011 Report #: 7, DFS: 2.1 Well Name LC 1-22D-56 FEE Depth Progress: 1,073 Drill String Components max i Lobe Bit-Bend fL min gpm gpm Jts ; Item Descriplion OD (in) config Len (ft) Stages rpm/gpm (ft) (gpm) (gpm) S iMud Motor 6 1/4 27.81 7.8 3.0 0.150 5.58 300 600 ¯1 DrillCollar - Non Mag 6 1/4 30.95 GAPŠUŠ ¯5.56 61/Î1¯4 2 DrÏÏÏÓollar¯ Š 59 7 Ñ ŠÓ VDP 6 5/8 920.05 18 6 6 5/8 2.55

162 Drill Pipe 4 i 5,127.02

.JSÙ... --65/8 40.00 Drilling Parameters ¯ Wellbore Slar1{flKB} pth End (flKB) Cum Deptn (ft) DrBITime (hrs) Cum Onli Time in RÒP (ft/hr Flow Rate (gpm) Original 2,006.0 I 3,079.0 2,401.00 16.50 35.50 65.0 393 Hole

oand RPM (rpm) SPP (psi) |Rot HL (1000lbf) IPU HL (1000Ibf) SO HL (10001 g Torque ff Btm Tq 14 65 1,020.0 69 82 60 (ft=/. Ó (gin]) Motor RPM (rpm) T (Inj) F) P (BH Ann) T (bh) (°F) ( ( P(Surf Ann) T (surf ann) Q (lig rt g retum

IDeviation Surveys Description?> ate Descaption EWTie In iticim MDTie in it 'NSTie in TVÖÍrein (ft 7/21/2011 i 0.00 0.00 0.00 o.oo 0.00 Sg ci¯( M B Azm 'I TVD I NS (fú Ï*ÏÏÕ0tT EW (fi) , VS (ft) S 2,083.00 9.54 295.73 | 2 066.45 35.19 -185.90; 187.65 0.28

2.177.00 -199.78. 9.18 293.79 2 159.20, 41.60 202.83 0.51 2.271.00 8.88 292.65 2.252,03 47.42 213.33, 217.53 0.37 2.366.00 8.17 -226.30 293.36 2,345.98 52.92 231.56 0.76

2.461,00 9.01 -239.30 293.71 2,439,92, 58.58 245.68 0.89 2.556.00 8.66 292.92 2.533.79 64.36 -252.70 260.21 0.39 9.27 2,651.00 294.76 2.627.63- 70.351 -266.24 274.94 0.71 2,746,00 8.88 293.00 2.721.44 76.42 -279.94' 289.84 0.50 2.839.00 8.57 297.57 2.813.36 82.43 -292,69 303.82 0.82

2.934.00 7.91 -304.88- 295.20 2.907.38 88.49 317.29 0.78

3,029.00 8.66 -317.45 291.42 3.001.39 93.89 330.92 0.98

I

I

I

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/24/2011 Report #: 8, DFS: 3.1 A Well Name: LC FEE 1-22D-56 Depth Progress: 286 APIAJWI Surface Legal Locatron Souti Dam Noilee APD State AFE Namner Total AFE Amoum 43013507180000 NENE Sec 22 T5S-R6W Utah C11 032019 Spud Date Rig Release Date IKB-Giound Distance (ft) Ofound Elevation (flKB) DailyCost Cum COSI TO Dale 7/21/2011 4:30:00 AM 7/30/2011 6:00:00 AM I 14.00 6.501 48,975 263,282 Operations at Report Trme Operations Next 24 Houts DailyMud Cost MudAddeva Cost To Ô ie Drilling ahead Drill 7 7/8 production hole 14.556 ¯ 29,698 erations Summa Depth Start (tKBI epih End (ItKEÏl Drill from 3079' to 3131', shut annular, mud up to 55 vis and 12.5 mwt, pump 872 stks(68 bbls) mud down 3,079 3,365 hole to 1400'. shut annular, build volume in pits and mud up to 55 vis and 13.0ppg, open annular and circulate Oepth Slart (TVD) (flhB) Depth End {ÑO) (iÏWBi mud through out system, mantaining 40 vis and 9.3 ppg. with no water flow.Drill with rotary and slides from 3,051¯ 3,334 3131' to 3365'. Targel Formation Target Depth (fiKB} CR-6 (base U wasatch) 6,189 Nemans Safety Meeting= soft shut -in proceedures Dally Contacts ¯ Job Coniact MObtle viesther Tet perduto ("F) AcadCoÑdtion Hole Condilion i Clear 57.0 Good IGood James Marsh ,970-623-7085 Mike Hancock 70-623-7081 . Last¯ibCasing¯n Set NoÑ Sei Depih (IIRS) -OD (in) Õommini R(gg I i Surface i 655 8 5/8 Cemented ömramer Eimber Pioneer Drilling 58 ITie Log WIird¯Pumps¯ ¯ Sist Time End Time Durthrs) Operahon Comment 1, Gardner-Denver, P2-8 l06:00 3079°10 .07 00 1.00.Rttiling Drillwith r_ota and slidesfrom mp Rahng(hp ·Rod Diameler (in) Siroka I.ength {in) 3131'. 750.0 7.99 07:00 17 00 10.00 Condition Mud &Circulate Circulate mud pits, mud up system to 60 vis L.rieišläimi poilààó inuitstà I 12.5 ppg. Unloaded 5 1/2 casing, unloaded mud materials, repair gas buster feed line Pressure (pso sionsyd |Stroites Ispm) .Eff t¾) i during mud up process. No | #2, Gardner-Denver, PZ-8 17:00 17 30 0 50ÖonditionNIud &Öilcuinte umpecÏ$7Žstrokes , (60 b61s) ŠÕvis.12.6 Pump Rating (np} Rod Drameter(ird Stroke LengEh lin) mud down hole and shut in well. ppg 750.0 7.99 Diverted water returnsto frac tanksduring ...... _. OR¯VäiEi Ivousik pumping. L.ner $iieimi 6 1/2 0.078 17:Š0 ži 30 4.00 Condition Mud &Circulate ICOndition mud, mix 160 bbls mud to 60 viS Pressure(psi) Slow Sod Strokes(spm) Eff(%) and 13.0ppg. No p¯ nia¯ÏfÏ t¯ 21:30 23:30 2.00 Condition Mud &Circulate cÏioi I eÏië ressure, Mud Additive Arnou and open annular, pump 13# mud @95 Desenpbon Û¤nsuÑleS aËiyÕOS1 spm, divert water return to catch pen. Bar 640.0 10.240.00 Circulate mud, mantain 9.3# and 40 vis Dap 10.0 335.00 throughout system, no water flow.Mix saw Engineer 1.0 450.00 dust to control seepage Gypsum 60.0 630.00 Rig¯Üp high yleid bentonile 70.0 385.00 23:30 0600 6.50 &Tear Öown Orillwim rotary and slides rom Ši3Ïc 3366'. Pallets 14.0 280.00 Rental 1.0 50.00 Mud Checks Shink wrap 14,0 280.00 Type Time Depth (flKB) Denssly Obgal) Vis (stat] PV CBFC Icp Teki Poini (int/100fi'l Tax 1.0 656.00 11.0 Gel Base 18:00 3,91.0 9.70 37 25.000_ _ Trucking 1.0 1,250.00 Gel (10s) (Ibf/100f Ge] (10m) (Ibf/10 Gel (30m (161/10 Filltale ImLI30min Filter Cake (/32} pH Sciise - - - Job Supplies MBTilbÏbol]¯5.000 | 11.000 7.0 i 1.0 ÄÏœtitOll(%) Percent'Ñaterini blondes(mgi) balaumtmg/L) RúLtŸol ËIactacStab|VI DieSe]Fuel,galus 99.0 500.000 Süpply Item Description Unit Labei -Diesel Fuel gal us CEC ft Culbrigs Whole MudAdd (Dim Mud Lost to Hole (bbb Mud Lost (Surf) (bbb Med Voi(Resi (bbb Mud VOI (AGU(bbl) 324.0 Tolel Received TotalConsurned Total Retumed 6,950.0 6.866.0 Air Data -- _ _ . Diesel Fuel Consumption - -- Dale i Consumed e ACFM (ft imin) OnllpipeACFM[fthmin} ECO Btt Obigal) ECD Para le ilt/gall 7/17/2011

------7/18/2011 378.0 Inhibitor1njected in 24hr Period Corrosion ¯ --- -17/19/2011 371.0 gl in ected down Paramte igal) gis Fajected in Mud (gal) gis Biocide injected m Mud (gail 7/20/2011 557.0 7/21/2011 371.0 Drill Strings 7/22/2011 927.0 BHA#2, Steerable 7/23/2011 556.0 EÏiÏFÏJÑOnli IADCBit Dull TFAonciNor) (in') en 7/24/2011 464.0 2 7 7/8in, FX55M, 11544984 ---- 0.98 7/25/2011 464.0 ÑOzzles (/32") ŠmngLengtidli) Stang \ÑI Ï6001bf)iBHÁROP (fl 16/16/16/16/16 6,214.69 143 42.9 7/26/2011 834.0 7/27/2011 920.0 Drill String Components |7/28/2011 746.0 Lobe Bit-Bend it min gpm ogni 7/29/2011 278.0 (OÑMI JIs IIern D6 dripben 00 (m) Led (II) . MAfÍÿ Stages yp /gpm [flþ (gpml SN 1 7 7/8 bit 7 7/8 1.00 Mud Motor 6 1/4 27.81 7.8 3.0 0.150 5.58 300 600

I 1 Drill Collar - Non Mag 6 1/4 30.95 1 GAP SUB 6 1/4

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repo Report Date: 7/24/2011 Report #: 8, DFS: 3.1 Well Name: LC FEE 1-22D-56 Depth Progress: 286 Drill String Components max Lobe Bit-Bend ft min gpm gpm Jts item Descriotion OD (in) Len (ft) config Stages ipm/gpm i (ft) (gpm) (gpm) SN I 2 DrillCollar 6 1/4 59.75 ¯ ¯ ¯¯¯ 30 HWDP 6 5/8 920.05 18.6. . 1 X-O 6 5/8 2.55 162 DrillPipe 4 5,127.02 Kelly 6 5/8 40.00 Drilling Parameters Ibore Start (ftKB) Depth End (ftKB) Cum Depth (ft) iDnilTime (hrs) Cum DrillTime ini ROP (futir) Flow Rate (gpm) Original 3,079.0 | 3,365.0 2,687.00 7.50 43.00 38.1 Hole 393 WOB (1000 RWÃ(rpm; ,SPP (psi) Rot HL(1000]bf) PU HL (1000Ibf) iŠO HL(1000ibf) DnllingTorque IOffBlm TQ 1 65 1,200.0 80 100 62 (ft3/ (°F) O (ginj) Motor RPM (rpm) r (Inj) P (BH Ann) T (bh) (°F) ( P(Surf Ann) T (surf ann) |Q (lig rim) (g Q tg retum) iDeviation Surveys I es iption?> ¯ Descn EWTie In Inclin D Tie in (ft. NSTie In . TVDTieIn 0 00 7/21/2 (fl 0.00 0.00 0.00 0.00 ( 0.00 Survey Data ¯ ¯J)icÏÏ• Di è Kzm TVD (ftKB) li)¯¯T (") NS (ft) | EW (ft V ÕÏS ("I100ft) 3,124.00 8.13 295.46 -330.17 3,095.37 99.39| 344.72 0.83 3,219.00 8.39 292.92 3,189.39 104.97| -342.62 358.29 0.471 3,315.00 8.17 288.87 -355,53 3,284.39| 109 91 I 372.08, 0.65 i

|

|

|

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repo Report Date: 7/25/2011

. Report #: 9, DFS: 4.1 · Well Name: LC FEE 1-22D-56 Depth Progress: 947 Drilling Parameters (n¯s) Weilbore Štart(Ïtr) Depth End (ftKB) Curii Depth (ft) lantlTil le Com Ontl Time int ROP (t r; Flow Rate (gpm) Original 3,365.0 4,312.0 3,634.00 23.00 66.00 41.2 393 Hole WOB (10001bf) RPM (rpm) SPP (psi) Roi HL (1000]Df) Pt.J HL it000larl SO HL (1Ó00\bf)Onlling Torque Off Btm Tq 1 65 1,750.0 85 110 80 O (g in]) (ft'/ Motor RPM (rpm; T (In])('F) |P (BH Ann) ( T [bn} CF} P(Surf Ann) |T (surf ann) . |Q (iiq rtrn) (g |Q (g retum)

Deviation Surveys Azim Date Descnption ]EWTie In. Incim... MDTie In (ft . |NSTie in |TvDTie in (ft . 0.00 7/21/2011 | | 0.00 0.00 0.00 | 0.00 | 0.00 Survey¯ Data MD(flKB) Inci V) | Azm F) | TVD(ItKB) NS (It] I EW (4) VS (ft) i DLS ("Il00tt) I

3,410.00 8.92. 291.16 3,378.33 114.75 -368.78 386.19 0.87

3,505.00 7.65 285.80 3,472.34 119.13 -381.74 399.86 1.56

3,599.00 8.39 285.62 3,565.42 122.68 -394.36 412.97 0.79

3,694.00 8.44 285.97 3,659.40 126.46 -407.74 426.86 0.08

3,789.00 7.21 289.40 3,753.51 130.36 -420.07 439.79 1.38

3,884.00 6.81, 284.83 3,847.80 133.78 -431.13 451.37 0.72

3.977.00. 7.65 283.51. 3.940.06: 136.64. -442.48 463.05. .0.92

4,072.00 7.21 282.02 4,034.27 139.36 -454.46 475.28 0.51 4,167.00 7.60 283.25 4,128.47 142.04 -466.41 487.47 0.44

4,262.001 8.66 278.33 4.222.52 144.52 -479.60 500.78 1.33

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/26/2011 Report #: 10, DFS: 5.1 Well Name: LC FEE 1-22D-56 Depth Progress: 825 APlfuWI ¯ Sustace Legal Location ŠÑüdDate Notice APD $†ale AFE Number ITotalAFEAmount iNENE 43013507180000 Sec 22 T5S-R6W Utah C11 032019 Sputi Dale Rig Release Date .KB·Ground Distance fiti Ground Elevation (flKB) DarlyCost Cum Cosi To Date i 7/21/2011 4:30:00 AM i 7/30/2011 6:00:00 AM 14.00 6.501 24,790 328.687 Operations at Report Time Operations Next 24 Hours Daily MLid Così dAdditiveCosifö Õste ÏDrill Drillingahead 7 7/8 production hole to td. _3.210 41.120 Operations Summary IDepih Slari (itKB Depin End rtKB} Drillfrom 4312' to4693'. Service rig, drillfrom 4693' to 4820'. Service rig, drillfrom 4820' to 5137'. 4,312 5,137 Remarks (liKSf¯ ¯ Depth Slart (TVD)ittKB) epth End TVD) Meeting=mixing Safety chemicais. ¯ 4,272 5,092 ITërriperãEu

Surface 655 i 8 5/8 Cemented James Marsh 970-623-7085 Mike Hancock 970-623-7081 Time Lo Št me Dur(hrs) Operation Comment ¯ ¯¯ Ë Rig Number5B 06:00 16:00 10.00 Drilling Drill with rotary and slides from 4312' to P one Drilling 4693 . Mud Pum s 16:00 16:30 0.50 Lubricate Rig Service rig inspect brake pins, pads, il d ata gs 68 psil 53 stks, #2= 366 nn L¯gtt Bom Slfoke n 750.0 7.99 16:30 {18:00 1.50 Drilling Drillwith roatry and slides from 4693' to Dr arŠ e VoNSikOR (bbifsik ¯ 4756'. ¯ ¯ ÏŠiÕÕ 20:00 2.00 with rotary afslides from 4756' to F¾isureT: isiowsgu SimRas (spm) ¡Eff(%) 4820'. . No I

20:00 ,20:30 0.50 Lubricate Rig Service rig, check draw works, grease #2. Gardner-Denver,_PZ-8 blocks, swivel and drive lines. Pump Rating (np) Rod Diameter(m) Stroke Lengib n 750.0 7.99 I 20:30 06:00 9.50 Drilling Drillwith rotanj and slides from 4820' to L.ners.ze (in) Vel/SlÑÔÊÌ(bbl/stk) |5137' _ 6 1/2 0.078 Mud Checks Pressure (psi) |Slow Spd trokes Ispm) Eff (%] i No Type Trme Depth (ItKB) Density (Ibigan Vis {s/ql) |PV Calc (cp) [ŸÏÏdint (IbÏÏiÖOlt Gel Base 06:00 4,406.0 9.90 38 | 12.0 | 23.000 Mud Additive Amounts -Description Consumed Get (10s) (Lbf/1001 Gel florn) librifD Gei (30m) (IbF/10 EiÏÏái (ÑNin FTt siie ÏÏž) pH Sonds |½i - - Daly 6.000 12.000 7.0¯ ¯ 1.0 al(Ï64b1| Pit a (Öli¾ÿ ere IWÄier( ÒÑöndeãÏiiÍÏÜ Cal u (mg/L} KCL(%) Elecinc5Ïáby Dap 30,0 1,005.00 99.0 200.000 Engineer 1.0 450.00 CECforCultings WiioleMudAdd abl MudLostio oleib IÏ M dLoëÍlSärŸí bÏ| ÑaidoÏ(RÄsf{hbi) R dŸoÏÏÁc.t)(tiÏI high yield bentonite 25.0 137.50 397.0 ;Pallets 3.0 60.00 Air Data iPoly plus 1.0 121.00 :Rental 1.0 50.00 Paraste ACFM(†F/min DnlipipeACFM (Italmin) EÔD Bit (Ibigati 'ECD Parasite Golgal Sawdust , 60.0 270.00 Shink wrap 3.0 60.00 Corrosion inhlbitor Injected in 24hr Period cted down Parasite . . JTax 1.0 656.00 (gal) |gis injected in Mud (ge gls Blocide injected in Med (gal) b Supplies LDiesel Fuel, gal us Drill Strings Supply item Desenpilon Und Label M #2 teerable Diesel Fuel gal us iÏÀun Onil Bd Total :[ADCBrt Du l TFAlinci Noz) (ing Received TotalCensumed TolaiRetumed 2 7 7/Bin,FXSSM.11544984 -- 0.98 6,950.0 6,866.0 No22les t/32"I Smog Length (le String WI (1000mf) HWOPiri DIOSei Fuel C0nsumption 16/16/16/16/16 6,214.69 143 42.9 Date i consumea Drill String components 7/17/2011 . max 7/18/2011 378.0

I Lobe Bit-Bendft gpm . mingpm 7/19/2011 371.0 Jts Item Description OD (in) Len (ft) I config Slages rpmigpm (ft) (gpm) (gpm) SN--- 1 7 7/8 bit i 7 7/8 1.00 7/20/2011 557.0

- 7/21/2011 Mud Motor 6 1/4 27.81 7.8 3.0 0.150 5.58 300 600 371.0 1 DrillCollar - 7/22/2011 927.0 Non Mag 6 1/4 30.95 -- 1 GAP SUB 6 1/4 5.56 7/23/2011 556.0 2 DrillCollar 6 114 59.75 7/24/2011 464.0 30 HWoe 6 sis 920.05 18.6. 7/25/2011 464.0 1 X-0 6 5/8 2.55 7/26/2011 834.0

-- - 162 OrillPipe 4 5.127.02 · ----· -- 7/27/2011 920.0 Kelly 6 5/8 40.00 7/28/2011 746.0 7/29/2011

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/26/2011 Report #: 10, DFS: 5.1 Well Name: LC FEE 1-22D-56 Depth Progress: 825 Drilling Parameters Weilbote .Start (ftNB) Depth End (ftKB) Cum Deptn Dnil Time (hrs) Cum im ROP (ft) , Dnii Time (ft/hr) Flow Rate (gpm) Original 4,312.0 5,137.0 4,459.00 23.00 89.00 35.9 393 Hole WOB (10001bf) RPM trpm) !SPP (psi) Roi HL(10001bf) PU HL (1000lbt) SOBL (1000tbf; DrillingTorque Off Btm Ta 20 65 1,550.0 100 124 84 (°F) Q (g in]) (ft9 IMotor RPM (rpm) T (in]) CF) P (BH Ann) ( T (bh) P(Surf Ann) T (surf ann) Q (lig rtrn) (g Q (gretum) iDeviation Surveys I Azim... Date Description EWTie In.. Inclin... |MD lle in (ft NSTie in TVDTie in (ft. 0.00 | 7/21/2011 0.00 0.00 | 0.00 | 0.00 0.00 ¯ ¯ Survey Data l -r ¯ ÚD ÛiiŒ¡ Incif) | Azm C) I TVD (ttKB) NS tit) RifÍ) I VS (ft) Š(1100ft) 4,358.00 8.75, 277.71 4,317.41 146.55 -493.99 515.08 0.14

4,453 001 7.91| 279.56 4,411.41 148.60 -507.59 528.66 0.93

4,584.00. 7.08 292.92 4,541.30 153.24 -523.92 545.62 1.47

4,643.00 6.64 293.76 4,599.88 156.03 -530.39 552.64 0.76

4,738.00 5.98 291.86 4,694.30 160.09 -540.01 563.04 0.73

4,833.00 5.36 288.43 4,788.83 163.33 -548.81 572.41 0.74

4.928.00. 5.64. 296.26, 4.883.38. 166.87. -557.36. 581.63. 0.95

5,024.00 5.32 300.83. 4,978.93 171.32 -565.56 590.81 0.71

5,119.00 4.49 310.58 5,073.58 175.99 -572.16 598.54 1.24

I

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repod Report Date: 7/27/2011 Report #: 11, DFS: 6.1 Well Name: LC FEE 1-22D-56 Depth Progress: 862 Deviation Surveys scription?> ¯ Description T¯n ¯ EVVlin in (ft Ns0 00n TVD in 0.00 7/21/2011 i 0.00 . 0.00 0.00 00 Survey Data (*) MD(itKB) | Inci Aim (°i VD (ftKB) NS (ft) I DLS (/100ft) 5,213.00 3.69 308.91 5,167.34 180.29 -577.31 604.76 0.86 5,308.00 2.55 303.46 5,262.20 183.37 -581.46 609.66 1.24 5,403.00 2.72 302.41 5,357.10 185.74 -585.12 613.88 0.19 5,498.00 2.20 308.91 5,452.01 188.10 -588.44 617.77 0.62

5,594.00 2.20 309.00 5,547.94 190.42 -891.31 621.21 0.00 5,689.00 2.20 305.22 5,642.87 192.61 -594.22 624.65. 0.15 5,784.00 1.89 295.20 5,737.81 194.33 -597.12 627.95 0.50 5,879.00 1.93 289.84 5,832.76 195.54 -600.05 631.10 0.19 5,974.00 1.93 288.52 5,927.70 196.59 -803.07 634.30 0.05

I I

i i I

I

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repon Report Date: 7/28/2011 Report #: 12, DFS: 7.1 Well Name: LC FEE 1-22D-56 Depth Progress: 216 Suria.-e APilUWI Legal Lncalien Spud Dam Notice APD Stme AFE Number Told AFE Amount 43013507180000 NENE Sec22 T5S-R6W Utah C11 032019 Spud Date RegRelease Date KB-Ground Ostance [fli Ground Elevalian iltKB) Daily Cosi Cum Cost To Date

7/21/2011 4:30:00 AM | 7/30/2011 6:00:00 AM 14.00 6,501 , 34,768 395,806 Operahons at Report Eme Opetalions Ner! 2d Hour6 Daily Mud Cost Mud Addihva Cost To Dale

Run Magnetic Resonance Image Log Finish logs, tripin, circ , LDDP, run 5.5" csg, cement, 3,388 46.432 set slips, rig down ¯ ¯ e iriitánink ÓëpinEnd ÏÏ\ÑBJ operanonssummary 5,999 6,215 Repair both mudpurnps. DrillFIS999-6214 TD. Pump sweeps,POOH F/logs &log instan:TvDiutKB1 DepihEnd(TVD}(ItKB} Remarks 5,953 Safety Meeting=working around logging tools Targel Fermaban Targe! De sinItk$ Weather Tempera are {'Fþ Road Condulen Hole Conmilon CR-8 (base U wasalch) 6,189 Clear 60.0 Good _ Good y Contacts

¯ ¯ ¯¯ ¯ ¯ ¯ ¯ C on 3ii ÖepiniiRäi 00 tim comment Jaies M ri 9 0Äž3- Š5 Surface 655 8 5/8 Cemented Mike Hancock (970-623-7081 Rigs ¯¯ ¯ I¯ ¯ ¯¯ RigNumW5B a ime EndTime Dur(hrs) 1 Operation I Comment Po e Drilling 06:00 08:30 2.50 Repair Rig Changed out valve seat on #1 mud pump, # r ------2 mud pump down, unable to keep on line. eM_udPumps # i, Gardner-Denver, PZ-8 08:30 14:00 5.50: Drilling .Drilltotary1rom ¯ump¯Renna 5999' to 6214'.ID @ inpi ne ameiertin) sironetengin ini 14:00hrs. AVGft/hr 39.0, _ __ _ 750.0 7.99 14:00 15:00 1.00. Condition Mud &Circulate Circulate and pump polymer sweeps to Liner Size (in) Vol/SikOR [bbifsik1 surface. Prepare for trip. 15:00 20:00 5.00:Trips Pressure (psi) Slow Spd Slrokes (spm) Eff(%) Trip out filogs. L.D. Dir toolSf¯/T 20:00 06:0 ÏÕ00 Wire Line Logs Run Triple ÒoÍnboLog D. to stioe, 2nd I i No | run Magnetic Resonance Image Log #2, Gardner-Denver, PZ-8 Pump Rating (tip) Rod Diameter (in) Stroke Length (in) Mud Checks 750.0 | 7.99 Type Time Depln (ftKB) Density (Ibigal) Vis (s/qt) |PV Calc (cp) IYield Point (Ibf/100fl 1 Liner Size (in) VoWSikOR (bblistk) Gel Base 06:00 6,214.0 10.00 44 12.0 I 6 1/2 0.078 , | 23.000 Pressure (psi) ISlow Spd Strokes (spm) Eff (%) Ò I (10sÜIbf/10Ò.. Ge [10m) (ibfl10. Gel130mHibF/10 Filtrale (mU30min) Filter Cake (/32") pH Solids (%) I 6.000 | 12.000 I 7.0 | No | MEIT (ib/bbi) .Peteent Oil (%) Percenl Water (%) Óhlonden(mg/L) Caimum (mg/L) IKCL(%) Eiectnc Stab (v) NIudAdditive Amounts . 1.0 99.0 500.000 Desäiptión u nsumea [ Daily cãst CEC for Cuttings Whole Mud Add b5 ud Lost Ë ole ( 6|) Mtid Lost (Surf) (bbl) Mud Vol (Res) (bbl) Mu V61 (AcÍ)(btii) ËBâr 40.0, 640.00 | 501.0 Dap 25.0 837.50 Air Data Engineer 1.0 450.00 high yield bentonite 20.0 110.00 Parasite ACFM (ft3/riiin) DrillpipeACFM (ft3/min) ECD Bit (Ib/gal) EÚD Parasile (Ib/gsu i Pallets 5.0 100.00 Poly plus 2.0 242.00 Corrosion Inhibitor Injected in 2411r Perlod - Sawdust 45.0 202.50 gls injected down Parasite [gal) :gls Injected in Mud (gal) .gis Stocide Inlected in Mud(gal) Shink wrap 5.0 100.00 Tax 1.0 656.00 11Strings Trailer rental 1.0 50.00 ______BHA#2, Steerable ______Job Supplies Bit Ron Drill Bit IADCBit DUJI TRAtincl (m') Noz) OÏGSOIFUSI gal US ¯ 2 17 7/8in, FX55M, 11544984 -- 0.98 Igügity ffemDesenpilon Unliin Nonies (/37) ŠkingLÆngitWin Sinng WI (10001bff :BHA ROP (fl Diesel Fuel gal us 16/16/16/16/16 | 6,214.69 143 42.9 TolaFReceived Tola1Consumed Tola Retumed Drill String Components 6,950.0 6,866.0 ma Diesel Fuel Consumption Bit-Bend - - - - | Lobe ft min gp gpm . Consumed Item Descapflan (in) (to conf!9 (ft) (gpm) | (00m} Jis OD Len Slages , ¢pogpm , | SN -- 7/1 Ì/ŽÒÏ1 Ï 1 7 7/8 bit 7 7/8 1.00 | -E ¯ ¯ 7/18/2011 378.0 Mud Motor 6 1/4 27.61 f.8 3.Õ 0.150 Š.55 300 Š00 - 7/19/2011 371.0| 1 DrillColFar - Non Mag 6 1/4 30.95 7/20/2011 557.0 1 GAP SUB 6 1/4 5.56 - 7/21/2011 371.0 2 ÒÏiÏICollai 6 Iχ 59.75 7/22/2011 927.0 30 HWDP 6 5/6 920.05 18.6... - - 7/23/2011 556.0 1 X-0 6 5/8 2.55 7/24/2011 464.0 ' 162 Drill Pipe 4 5,127.02 7/25/2011 464.0 Kelly 6 5/8 40.00| 7/26/2011 834.0 | Drlfling Parameters Rale¯qpm) 7/27/2011 920.0 i Wellbore Slart rflKSI Depm End (fiKB) Cum Depih (fD DrillTime (hrs) Cum OtillTime ini ROP (ft/hr) i iow I 7/28/2011 746.0| Original 5.999.0 6.2147 5,536.69 , 17.00 129.00 12.7 400 |Hole 7/29/2011 278.0

WOB (1COOloff RPM (rpm) SPP (psi) Rol HL,(1GGGlbf; PLI HL (100DIbFJ SO HI.{190010[] Da[irig Torque Off BTrn Tq 22 65 1,550 0 108 138 90 (ft3/. (°F) O (gm]) Motor RPM (rpm) T (inj) P (BH Ann) ( T (bh) ( F) P(Surf Ann) (surfann) |Q (lig rtm) (g. O (g

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Report Report Date: 7/28/2011

. Report #: 12, DFS: 7.1 Well Name: LC FEE 1-22D-56 Depth Progress: 216 Deviation Surveys Azim... |Date |Description |EWTie In incIm... MD Tie in (h . ÑŠTie m TVDTieIn {fi 0.00 | 7/21/2011 | | 0.00 0.00 0.00 i 0.00 0.00 Sunrey Data MD(itKB) Inci (") AZm (") TVD (ItKB) NS (ft) EW (ft) 1 VS (ft) DLS ('iiCOft) 6,069.00 1.71 289.93 6,022.65 197.59 -605.92 637.32 0.24

6,164.00 1.63 284.21 6,117.61 198.40 -608.56 640.08 0.19

6,214.00 1.59 281.20 6,167.59 198.71 -609.93 641.48

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Repon Report Date: 7/29/2011 Report #: 13, DFS: 8.1 Well Name: LC FEE 1-22D-56 Depth Progress: AÑ/UW1 Surface Legal Localion Spud Dale Nolice ,APD State .AFE 43013507180000 Number Total AFE Amouni NENE Sec 22 T5S-R6W IUtah ŠgiuiDate C11 032019 Rig Release Date iKB-Ground Distance ilt) ,Gound Elevation irtKB} DailyCost Cum Cos1To Dale I 7/21/2011 4:30:00 AM 7/30/2011 6:00:00 AM 14.00 ¯¯ ¯ ¯ 6,501 47,712 Opershons al Repor! ¯ ¯¯ 443,517 Ó¾RÑe t 24 Ñours iÑ ud IRaise MWT fosi MtÏdidÏÑveCosi T Dale to 13.0 ppg Finish L/D drill sting, Run Csg parations Summary 7 47,709 |Depth Start Finished MRIL Log.Tripped (itKB) )Depth End (ftKB) in. Circ. Lay down drillstrir.g. Trip in hole to 1800' &raise MvYi Remarks to13 0 ppg i 6.215 6.215 IDepth Glart(TVD)IIIKB) Depth End Safety Meeting= Workingaround L/D Machine (TVD)(f!KB1 0 eëifie Tamperaiece rFI Road Condahon HOFeCondition Target Formation Targel Depit (ftKB) Clear . 60.0 Good Flowing CR-6 (base U wasatch) 6,189 ngC t _ a eÏDepth(ftKB} OD(in) C Comment riÍact ,Production 6,190 5 1/2 ÎÑI Cemented Frank 970-623-7086 I I Dorierty . Time Log Mike Hancock 970-623-7081 TT e Bliã¾ ii[ Dur(brs) Opisiälion comment 06 0 11:30 5.50 Wire Line Logs Finish running MRIL log RTÑliiib r 11:30 l Pioneer 15:¾ 4.00 Trips Trip in hole Orilling 5B 16:30 17:00 L50 Reaming W & R 90' to bim Mud Pum_ps 00 18:00 1.00 Condition #1, PZ-8 Mud & Circulate Circ & rig up Weatherford L/D Machine Gardner-Denver, 18:00 03:00 PumpaannafhpBod rum (In) tŠÏÌÍlä GiiigÏh e L/D Drill String, well started flow to ,Pick up 750.0 i = bha & pipe to 1800' 7.99 inernië ún) vollsthOR 0Š:00 06:00 3.00 (bwsik: Condition Mud & Circulate Well flowing 400 BBLs/Hr.Close Annula .: raise MWT Pressure (psi) . I _ Slow Spd Strokes(spm) ¡Eff .. .. __ _ _ i _ (%) No Mud Checks pe Time |Depth |# 2. Gardner-Denver, PZ-8 (ftKB) Density (IbIgal) ¡Vis (sigt) iPV Öa cp )RÑÃDrameler (in) _Stroke Length Gel Base 06:00 i 6.214.0 9.90 38 In) ] 11.0 21.000 750.0 I GWeibr/10Ûf Gel (10m) (Ibfl10. Gei (30m} (Ibl/10 Filirale S¯œ 7.99 ml.I30min) Fdi C pH ISMtds (%} 6.000 12.000 i ne lÍSU(bbitstki . 7.0 MBTTabi) Poicent Oil 6 1/2 0.078 i%) PäßentWeier ( Crifoidei (mouj Öaletum(mgfl.) I KCL %) ËfecÏÑciŠÏëb Ñ Pressure (psi) Slow Spd Strokes (spm) Elf 1%) 1.0 500 000 i 80 000 No CECfor Cuti.ngs Whole MudAnci(bbi) Mud Lost to Hole lib i Mud Lost (Suff}(blil) Mud Voi {Res) (bbi) Mud Vol(Act} Bul} Mud Additive Amounts 501 0 341.0 Air Data _ Descnption Consumed . DailyCOBI Engineer 1.0 450.00 arasile ACT «t9n Poly plus 1.0 121.00 in) DrulptpeACFM(ftymin) ECD diÏIb ÏÏ e Tax 1.0 656.00

.-- I - . orrosion Inhlbitor niected in 24hr Period Trailer rental 1.0 50.00 gis In¡ected down Paramie d) gls Ingetted in Mud(gal - - gis Blocide e led in Mud (gal} p-Job S Iles

-- .Diese1Fueh gal us ------Supply Item Descripton Unil Lebel tr gS Diesel Fuel gal us H #2 rable Reälved ITotal dorkumed Total Retamed FA¯Ð - Köcéibuii Moyi. 6,950.0 , 6.866.0 2 7 7/8in, FX55M, 11544984 -- 0.98 Diesel Fuel Consumption NDZzles (132"} Sinng Length (ft) Sinny Wt (100010 ISHAROP (ft Dale Consumed 16/16/16/16/16 | 6,214.69 7/17/2011 143 . 42.9 | Drill String Components 7/18/2011 378.0 ma \7/19/2011 371.0 . Lobe , Bit·Bend fl. :min gpm SP* liem Descapuen OD conFia 7/20/2011 . Len 557.0 N. Qn)__ _ in)_ i slagesrp igom (fi) tsomi 90"') SN _ _ 1 7 7/8 bil 7 7/8 1.00 7/21/2011 371.0 Mud Motor . .. . . 7/22/2011 6 1/4 27.81 7.8. 3.0 0.150 5.58 300 600 927.0 i ÖrÍÍÏÙoilerÑonMag 6 114 Š0.95 7/23/2011 556.0 1 GAP SUB 6 1/4 6.56 7/24/2011 464.0 2 DrillCollar ¯ 6 1/4 59.75 7/25/2011 464.0 30 HWDP ¯ - - 5 920.05 15.6 7/26/2011 834.0 X-O - 1 6 5/8 2.55 7/27/2011 920.0 162 DrillPipe 4 5.127,02 7/28/2011 746.0 Kelly 6 5/8 40.00 7/29/2011 278.0 - - - Drilling Parameters iheilbor $tan (flKB Depth End (f!K Com Depib (M) Onli Time (hts) Cum OnilTime Int ROP (ft/hr) Flow Rate (gpm) Original 6.214.7 5,536.69 0.00 iHole 129.00 400

WOS (10001bf) ÄPM (rpm) $NP tosi} Roi ÑL (1000|bf) ÉÜHL(10001bf t SÖHL,(1000fbtl T (Que 22 Onilog ÒHBÏmTq 65 1,550.0 108 ; 138 90 ÍÒ (•F) ¯ (g in;} (ItV MotorRPM (rpmi T (Int) lŠHÃni T (ba) (Fi PISurlAnn} 1 (surfanni O (lia rtm) (g O (g

Aug. 01, 2011 Sundry Number: 17136 API Well Number: 43013507180000

Berry Daily Drilling Report Report Date: 7/30/2011 ' Report #: 14, DFS: 9.1 Well Name: LC FEE 1-22D-56 Depth Progress: APllUWJ Surface Legal Locaban ŠpudDate Nolice APD Slate AFE Number TeralAFEAmount 43013507180000 NENE Sec22 TS&R6W Utah . C11 032019 pud Dale Rig Release KO,Ground Dale Digiance (fil Ground Elevallon (flKB} OSLly COSI ÛUM ÛO$1 TO ÛBIS 7/21/2011 4:30:00 AM 7/30/2011 6:00:00 AM 14.00 6,501 127,149 570,666 Operailonsal Report Time 0perationsNext 24 Houri DailyMud Cost iMudAdditive Cosi To Dale Rig Down & Prepare rig to move Rig down & move 26 miles to UT 5-20 10,529 58,237 Operaisons Summary Depin Start (f!KB Depth End iflKB) Raise MWT to 12.6 to kill water flow, finish LDDP, run 140 jts of 5 1/2" csg, cement,set slips & rig down 6.215 6,215 :Remarks ÖãpiiiSiaÏEfÑÒ)(tiñË) IDepih End (TVD)irtKB) Meeting=LOTO Safety Procedures O 0 Weather Temperature CF) Road Condnion Hole Conditten Target Formation Target Deplh (ItKB) Clear 60.0 Good Good CR-6 (base U wasatch) 6,189

Production I 6,190 5 1/2 iCemented Frank Doherty 970-623-7086 Tony Hardman |866-716-9434 Time Log

06:00 10:00 4.00 Condition Mud &Circulate Raise MWTto 12.6 (ppg) to kill water flow @ 1800' Pioneer Drilling 5B Mud Pum a 10:00 12:30 2.50 I..DDrilipipe Finish laying down drill String 1, Gardner-Denver,_PZ-8 12:30 18:00 5.50 Run Casing &Cement Rig up Weatherford Casers &run 140¾ N mp Rehrig (hp} Rea ameter fin} Stroke Length(in) 5 1/2" 15.50 j-55 casing M/Ulanding jt & 750.0 7.99 land casing @6189'Shoe@6189' MD e uni VölistkoR ibtwsiki FC:6143'MD Marker jt:3494'MD ¯ S¯kes(spm) ¯ ;18:00 19:30 1.50 Condition Mud &Circulate Circulate casing while R/D WFTeasers & essu pasi slowsT ÏEt | L/D machine No I _ _ . I19:30 22:30 3.00 Run Casing &Cement RIU ProPetro cementers &pump cement #2, Gardner-Denver. PZ,8 I Pump Rahng (m) Stroke ijob as follows: mp) TÃniiÏiiiimeler Length lin) 10 waterspacer- 750.0 7.99 bbls. fresh 20 bbls. Mud _ | flush- 10 bbls fresh water spacer. Liner siiEviin) versikOR otus*) Lead cement:170 sx Hifill16% gel-10#sx 6 1/2 0.078 Gilsonite- 3#sx GR3- 3% Salt 1/4#sx Pressure (piú) :Slow Spa SuoKes (spm) IEff [%) Flocele.Yield 3.82 Wt 11 ppg No Tail cement: 305sx HiFill 65% G Cmt 35% Mud Additive Amounts 6%Ge!- Poz- 10#/sx Gilsonite- 2%CD _ Desenpton consumed 1 Dailycasi i 133-2% CFL 175-10% Salt 1/4#sx Flocele. Bar 520.0 8.320.00 Yield 1.70 Wt 13.1ppg Displaced w/145bbis Engineer 1.0 450.00 2%KCL. Bumped plug @20:30w/500 psi high yield bentonite 70.0 385.00 FCP=1250 psi Mud Flush back surface to Pallets I (No cement) 15.0 300.00 Sawdust i 15.0 67.50 Shink wrap 15.0 300.00 Ta 22:30 01:30 3.00 NUINDBOP NIO Bop, FloWline, Choke line & hang 80p. 1.0 656.00 Set w/70K Trailer rental 1.0 50.00 slips ¯ ¯ 01:30 06:00 4.50 Rig Up & Tear Down Clean Mud & rig J_obSupplies --._ tanks, down _ . . .. _ ¯ Diesel Fuel, gal us Mud Checks Supply item Descapilon Urhi I.abel Type TLrne Depth (flKB) Density [thfgel) VLstsigt} PV Cale (cp} Yield Point IDfh00 Ï DiBSel Fuel gal toäinac1¯¯Totaiconsumed us Gel Base 10:00 6.214.0 10.00 12.0 23.000 TotaimãEumed leel ¯ni (iösj (Thiiiidofdel(iomi tïbrild. Gãi (5ònifooliië.. FiiliateTma Fliter cae (15ž) PEi Solids (%) 6,950 0 6,866.0 6.000 12.000 7.0 Diesel Fuel ¯ Consumption MET (Ib/bol) Perceni Oil (%] Percen! Waler (% Chlondes (mg/L, ¯ ¯ ¯ j Calcium mgn.) KCI. (%) Elecine Slab (V Òaie ons med 1.0 | 500.000 80.000 7/17/2011 CEC lor Cullings Whole Mua Add (bbl Mud Losi to Hole (bbl) Mud Lost {Surft Voi (bbi) Med (Res) (bbli MudVoi(ACI) (bbl} 7/18/2011 378.0 160.0 501.0 7/19/2011 371.0 AirData _ _ _ _ . _ _ _ _ _ . _ __. _ _7/20/2011 557.0 1¯ ¯ ¯C 7/21/2011 371.0 arasetiÀCFM {flNmini Unilpipe ACFú (WT BilfibigšÏÏ ECD Parasite ( 7/22/2011 927,0 Corrosion Inhibitor Injected in 24hr Period 7/23/2011 556.0 - -- gis Mjected (lona Parasile (gal] Inlected in igel) 7/24/2011 |gis Mud gis Blocide niecteil .n Mud{ge 464.0 7/25/2011 464.0 7/26/2011 834.0 Drill Orings . _ __ . ______.7/27/2011 920.0 .7/28/2011 I Bit Run IDnll Bit ITFA 746.0 .IADCBiÏDull lmti N I; [mi) 7/29/2011 278.0

Norzles (132") Shing Length (ft) String Wt (TOODibt)BHA ROP (it

Drill String_Components max Lebe Bal-Bennti min gpo gpm Jts I Item Description OD (in) Len 111 coni G Stages rpm/gpm [fli (gpm) OPol

Aug. 01, 2011 Sundry Number: 17333 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEEEASE DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t LAKE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S05.05 Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 8/11/2011 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCAT WELL DETERMINATION OTHER OTHER: Cmpl Procedure

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED COMPLETION PROCEDURE FOR THE LC FEE 1-22D-56.1-22D-56. Approved by the Utah Division of Oil, Gas and Mining

Date: 08/18/201108/18/2 1

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/5/2011

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000

Berry Petroleum Company 1999 Broadway, Suite 3700 Denver, CO 80202 Main (303) 999-4400 Fax (303) 999-4401 www.bry.com Date: August 5, 2011

Well Name: LCT1-22D-56 APl#: 43-013-50718 Location: Sec 22-T5S-R6W County, State: Duchesne County, Utah

SHL: 876FNL&129FEL BHL: Elevations: 6515 ft KB; 6501ft GL RTD: 6214 ft PBTD: 6141ft; float collar Surf Csg: 8 5/8" 24#J-55 @ 655 ft; cmt w/ 330 sks cmt Prod Csg: 5 1/2" 15.5# J-55 @ 6189 ft; cmt w/ 170 sks lead & 305 sks tail Mkr Jnts: ? ft Tbg: SN: TOC:

Wasatch Frac Procedure:

1. MIRU wireline unit. Perforate Wasatch CR-4A f/ 5807 to 5809 ft & Wasatch CR-4 f/ 5659 to 5755 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 2. RU frac equip. Frac Stage 2 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 3. RU wireline unit. Set CBP @ ~5700 ft. Perforate Wasatch CR-4 f/ 5531 to 5607 ft & Wasatch CR-3f/ 5487 to 5489 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD, See attached table. RD wireline off wellhead. 4. RU frac equip. Frac Stage 3 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 5. RU wireline unit. Set CBP @ ~5480 ft. Perforate Wasatch CR-3 f/ 5301to 5459 ft w/ 2 spf, 20 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 6. RU frac equip. Frac Stage 4 down 5 ½" csg per design (see attached table). Record 1SIP. RD frac equip off wellhead. 7. RU wireline unit. Set CBP @ ~5290 ft. Perforate Wasatch CR-3 f/ 5224 to 5269 ft & Wasatch CR-2 f/ 5101to 5197 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 8. RU frac equip. Frac Stage 5 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 9. RU wireline unit. Set CBP @"5090 ft. Perforate Wasatch CR-2 f/ 5006 to 5072 ft & Wasatch f/ 4866 to 4986 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 10. RU frac equip. Frac Stage 6 down 5 ½" csg per design (See attached table). Record ISIP. RD frac equip off wellhead. 11. RU wireline unit. Set killCBP @ ~4820 ft. 12. RDMO wireline unit. RDMO frac equip. NU BOPE. 13. MIRU service unit. RU drlg equip and drill out CBP's and circulate clean to PBTD ft. Run a pump off bit sub with the drilling bit. Record fluid rates and pressures while cleaning out well. RD drlg equip. 14. If well flows, be prepared to run a production log. 15. RlH w/ tail joint, SN & tbg anchor on 2 7/8" tbg. Set EOT ~1 jt below btm perf. ND BOPE. 16. RIH w/ pump & rods. Seat pump, space out. Filltbg & pressure test to 500 psi. 17. RDMOservice unit. 18. Start well

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000

l i ' Uinta Wellbore Schematic LC FEE 1-22D-56 API/UWI Surface Legal Location APD State Field Name TSS-R6W Spud¯ate43013507180000 NENE Sec22 Utah Lake Canyon KBéouritf Dis:ance (f ) Ground Elevation (itKB) 7/18/2011 14.00 6,501

Welt Connq - OmginalHale, 8/512011 6:30.08 AM Stherrlalic-Actual ffKS(MD) - ,

O

4

610

664

- Surface Casing Cement, 14-655, 7/19/2011 655 8 5/8, 24 00, J,55, 655

1 506

2,536

3,317

3.493

3,504

3,952

4,231

4,605

4,620 Uleland Butte, 4,620

4,833

4,652 Wasalch, 4,852 |

6,035 I

6,142

6.143

6,188

,..- Production casmg cement, 14-6,189, 7129/2011 6,1Bg I - 5 1/2, 15 50, J-55 6,189

www.peloton.com Page 1/1 Report Printed:

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 000 000 000 Sand pay) 50000 38 28 8/4/2011 52,000 44 pernet Volume (3000/bs gals hole) Acid 2,800 1,800 2,800 2,000 2,000 11,400 Volume per (100 Pay 25 19 22 14 26 106 (ft) Net GR<80API 9 57 14 10 14 10 Perfed (ft) Thickness Net 802 206 168 (ft) 150 120 158 Gross Interval Thickness 28 18 20 28 114 20 Holes Stage 2 2 2 2 2 2 2 4 6 2 2 4 2 2 2 4 4 2 2 2 2 2 2 2 4 2 4 2 2 2 4 2 2 2 4 2 2 4 4 4 4 4 Total Holes 1-22D-56 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 SPF Fee LC 1 1 1 1 1 1 2 1 1 1 1 1 2 2 1 1 1 1 1 2 1 1 1 1 1 2 2 3 1 1 1 1 1 1 1 2 2 2 2 2 2 2 Feet 4,924 4,867 5,007 4,961 4,897 4,885 5,072 5,033 5,026 4,986 4,976 5,398 5,387 5,328 5,302 5,269 5,226 5,197 5,126 5,102 5,064 5,720 5,706 5,607 5,596 5,577 5,563 5,533 5,489 5,459 5.447 5,427 5,408 5,809 5,755 5,744 5,735 5,712 5,708 5,676 5,661 5,589 Bottom Top 4,922 4,896 4,884 4,866 5,024 5,006 4,960 5,125 5,071 5,063 5,032 4,985 4,975 5,446 5,425 5,407 5,386 5,327 5,301 5,267 5,224 5,194 5,101 5,718 5,674 5,605 5,595 5,588 5,576 5,562 5,531 5,487 5,457 5,397 5,807 5,754 5,743 5,734 5.711 5,707 5,705 5,659 CR-2 CR-2 CR-2 CR-2 CR-3 CR-2 CR-2 CR-2 CR-3 CR-3 CR-3 CR-3 CR-3 CR-3 CR-3 CR-3 CR-3 CR-3 CR-2 CR-4 CR-4 CR-4 CR-4 CR-4 CR-4 CR-4 CRA CR-4 CR-4 CR-4 CR-4 CR-4 CR-4 CR-4 Zone CR-4A Wasatch wasatch Wasatch Wasatch Wasatch wasatch Wasatch 607 459 5,269 5,072 5 5,809 5 StageBmt 101 866 4 5,301 5 5,487 S,659 StageTop 5 5 5 5 5 5 5 5 5 B 3 3 3 3 3 3 4 4 4 5 5 1 1 1 1 1 2 2 4 4 1 1 1 2 2 2 2 2 3 1 1 Totals Stage

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000

STnwULATIOAT COMPAATY, LLC 88 INVERNESS CIRCLE EAST, STE. G-101 ENGLEWOOD, CO 80112 PH (303) 757-7789 FAX (303) 757-7610

BERRY PETROLEUM LC FEE 1-22D-56 DUCHESNE, UTAH SEC. 22- TSS- R6W 5 STAGES 212,000 LBS 16/30 SAND 11,400 gal HCL 171 Solu-Balls

Prepared for SUSAN SEARS 1999 BROADWAY, SUITE 3700 Denver, 80202 (303) 999-4400

Prepared by RICHARD FERGUSON (970) 768-5660

Service Point - Ft Morgan, Colorado Contact: Tim Anderson (970) 867-2766

8/5/2011

Filename - LC FEE 1-22D-86 EMAILxla

File Location - CBDocuments and settings\sms\Local Settinge\Temporary Internet Flies\Content.Outlook\ZLQP46NS\

Created with StimProp Complete - Version 2.0202.15.2011 I I

I

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000

6/4/2011

I Susan Sears Berry Petroleum 1999 Broadway, Suite 3700 Denver, Colorado 80202

Thanl( you for the opportunity to present the followingtrealmentproposal This recommendation is submilled for your consideration.

WelI Data Casing: 5 1/2 in 17 lb/ft,J-55 Tubing:

Stage Irifo Stage i Stage 2 Stage 3 stage4 Stage S Slane 6 Formutlan: CR-dA I CRA CR-4 I CR-3 CR-3 CR-3 ?CR-2 CR-2 / WASATCH Packer/ECT Dealh: TVD(For Deviated Wellbore}:

Perf 91 - Tap: 5,G59 5,dB7 5,301 5.101 4,966 Bim; 5,809 5.607 5,459 5,269 5.072 SPF: 2 2 2 2 2 Perf #2 -Top: Stm: SPF:

Perf #3 - Top:

SPF:

Perf #4 - Top: Btm: SPF Perf #5 -Top: Bfm SPF Total Shots 28 20 20 18 28 Perf Diemeler 0.36 0.36 0.36 0 38 0.35 Shl (deg F,1: 166.514 162.752 160.08 155.95 153 504 Eskmaled Fryc Gradienl. 0.85 0.85 i 0,85 0.05 0 85

Treatment Summary

Primary Fluid SpGr 1.01 1.01 1 01 1 01 1,01 Treat Via Casing Casing Casing Casing CasinA Primary Fluid Type MavFrac MavFrac MavFrac MavFrac MavFrac CO2 (yln) N N N N N Estimated Treat psi 3.300 3,560 3.460 3,520 2,880 Estimated Perf Fric (psg: 360 705 705 870 360 Acid Voluine (pls): 2,600 2,000 2,000 1,800 2,800 Total Clean FluidlFoam (gls) 22.900 16.870 19.454 12,562 22.039 Pad Volume (gls): 8.340 6.230 7.134 4.722 8.039 SLF Volume (gle : 14,560 10.640 12.320 7,840 14,000 Estimated Flush Volume (gls); 11,560 11.216 10,852 10.462 10,002 Proppact Volume (Ibs); 52.000 38.000 44,000 28.000 50,000 Estimated Pump Time (mirg: 41.4 35.0 36.2 30.6 38.5

*NOTE:Total clean fluid/foam volume does not include flush volume

Pegs 2 LC FEE 1-22D-56 EMAIL

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 12 79 755 222 409 656 887 867 Clean bols Surf LLC 6 12 79 887 11.9 222 409 690 811 943 943 66.7 990 1435 1857 131.6 247 Slurry bols bb1s Surtclean Surf ya I | | 2 COMPANY, Sta - - - 90 - - - 119 66.7 143.5 7867 1214 +315 251 Cumatiative bbis CO2 Tons SurfSlurry 23DDpsi ------11-9 66.7 186.7 143,5 121,4 111,5 2812 Foam Es1.STP N2 sof bbin DH SierryStage STIMULATION 2.4 47 7.0 30 33 4.7 50 14.3 41.4 100 100 40.0 352 326 400 Rate min Avg bpm Time Stage Clean 0 50 100 10.0 400 400 40 40.0 Rate Avg opm 002 tons stage (cale) Sturry ------Starface Rate N2 sef Avg bpm stage CO2 <<=Totais=» ------31,200 20,000 » Rate tbs Avg sefm Stage N2 = Totals Proppant 52,0 52000 52000 31.200 Ibs === Total CO2% « Ramp 458 4 5452 Avs N2¾ Rate Ibimin OL' _ 3 500 0 5.0 100 100 400 400 400 ppg 40 Avg Rate Opm Cono Elinor Proppant Ramp - End 9¾ Conc 5.0 50 p 11 1645 Phase F Intemal Constani Ramp Pop (design) psi deg scf/bbl softbbl O ¼$,9 16b 1478 2060,0 Start . Gone 5 a 1.0 5,0 Downholo ppq Avg . _ppg_ . Ramp PropCone Pmp _ pole SHOTS 500 500 7,840 5,$75 2,800 6.02î 4,160 Temp 2,800 7.840 4,160 5.525 Down 6.025 10.400 Factor Factor 28 Gravity: 10.400 37.250 Fluid Foamt Foam? Pressure: gats HCL Volume Volume _gnis__ Specifc Clean CleanFluid Clean Clean Bottomhole N2 Treating GAL 5859-5809 CO2 | I em R-4 2800 1 1 Poppant % 25 25 25 25 as 845% pyt Gel CIn 1000% Smo% 100.0% 100.0% 1000% ¥Imid Calculated | | | | | | l Bottomhole R Bottomhole PETROLEUM 15 15 16/30 isr.40 18/30 1€t30 Prop Pop Mesh 4-Aug-11 Mesh HCl%f HCI%f SOLU-BALLS BERRY ... SLCAFGEE11 42 .. EMAIL 56 $_-. 1-220 PAD HCL PAD SAND SAND Stage FLUSB FLUSI1 FEE PAD HC1. FLUSM PAC smo SAND FLUSH LC

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 12 fiD 199 116 ile 335 516 589 Clean bbts Surf 1 6 12 60 718 119 47 199 335 541 757 757 72.4 630 1810 127.5 139.5 136 Clean Sierry bbts bbis Surf Surf I 1 $ 6 "'"'i · ·\ · Stage 757 • ------I 11.9 47 887 189 136.4 1276 205,5 -Y,.i. . Sturry GO2 obig Tons surf | - • - • - - - - 11.0 887 478 130.6 136.4 127.5 205.5 , stage F0am N2 sef bbis DH , Shorty ,TIM"lLATIJU 8 4 0 0 2 2A 4 a 5.1 22 3.2 50 13.9 35.0 10 1Ô 400 35 326 400 Rate min Avg opm Time Stage Clean 0 0 SC 10 10 400 40.0 400 400 . Rate Avg opm CO2 tons Stage eate) >> Slurry ------Surtam Rate N2 suf Avg bprn Stage Totals CO2 - << · ------35.200 22,800 Rate lbs Avg schn Stage N2 i Propgant 21800 28,000 38,000 38.000 ibs Total CO2% <<-Totals=» Ramp 4,436 5.842 Avg N2% Rate Ibimin 6.00 3.00 5.0 10.0 10.0 40.0 40.0 ppg 40.0 400 Avg Rate bpm Con Bindr Proppant _ . I _ . Ramp - Come 6.0 5.0 pgg 119½ 154% Phase F Inwrnal Constant RampEnd Prop (design) pst deg. sof/bbi 66 2 90.4 14A6 M W\sef/bbi cons conc 2 5 1,0 5.0 Downhole gg opg Avg RampStan Prop Prop 130 500 000 858 600 SHOTS 2 5 5 7800 3040 6365 2,000 Temp: 5.850 5,730 7,600 3,040 5,358 Oownhole Factor: Factor: Gravity: 30.066 Fluid 20 Finid Foami Pressure. gats qals HCL Volume Volume Specific Clean Clean CleanFeamt Clean Bottomhole N2 GAL Treating CO2 5487-5607 0% 1 2000 1 Proppant % 25 25 26 25 88.0% 81.5% pgt CIn Gel 100.0% 100 100.0% 100.0% 100.0% Fluid Calculated I Bottomhole Bottomhole CR-4/CR-3 1-22D-56 PETROLEUM 2 15 16 18f30 16/50 1600 10f30 FEE Pop Prop Mesh Mesia 4-Aug-11 HCI¾t HCPM SOLU-BALLS LC BERRY STAGE 30 EMAIJ. 22048 1 PAD HCL PAD SAND SAND Stage Stage FLUGH FLUSH FEE PAD FLUSH PAD EiANO SAND FLU5H HCL LC

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 12 60 196 353 562 648 769 769 - Clean bble Surf LL | 12 60 750 195 11,9 353 $91 893 $17 817 47,6 83.8 159.0 121.2 13$.3 2095 Clean Siurry bbis bbis Surf Surf (Illi"i', 1 817 ------11.9 47,5 102.8 T232 135 168.0 2379 ERICK bbis CO2 Tons surf51urry 1 AV - . - - - - - 11,9 476 135 1580 123.2 2379 102,8 Stage Foam N2 sof bbis DH Sturry 321MIILLTIGig 5 D 0 39 59 2E 31 24 48 S.0 13 88.2 10.0 100 4D 352 328 40 Rate ""'" mits Avg Time _bpm stage Clean _ 0 0 0 0 0 5 100 10 40 40 400 40 Rate Avg CO2 bpm tons Stage _ >> Sierry ------surface(cato) Rate N2 scf Avg bpm Totals Stage CO2 - << ------17.600 25.400 Rate Ibs Avg scfm Stago N2 -» Totals 26.400 44.000 44,000 44.000 = Total CO2% _Ibs « 4.439 6.562 Avg N2% Rate 1bénin 1 3.00 5,00 G 5.0 10.0 10.0 40 ppg 40.0 40.0 400 Rate bpm Bindr Cone Proppant Rau 0 Conc n)- 50 5 11.9½ 18.4% Phase F Enternal Constant RampEnd Prop (des psi deg sofibbi |sef/bbi 0 hole 2.65 1411 . 0 Conc Cone 5 3 1 5.0 Oow Avg gy __ppg Prop RarnpStart Prop . _ SOD 176 500 5,576 0.800 3520 5,176 2.000 6.838 Temp: 2.000 5,676 6.634 8.800 3,520 5, Factor Factor}¾¾¾¾0¾ Gravity: 32.305 Fluid Fluid Foamt Pressure: SHOTS gais gats Volume Volume 20 __ Specific Clean Clean Clean CleamFoang Bottomhole N2 Treating CO2 0¾ 1 1 Proppant % 25 26 25 25 680% 516% ppt CIn Gel 10004 100,0% 1000% 100 1000E 5301-5459 Fluid Calculated Bottomhole _ Bottomhole CR-3 1-22D-56 . 3 ô 15 - $6/30 1800 16730 imo Prop Prop Mesh FEE Mesh__ 4-Aug-11 HCl%/ HCI%f _ BERRYPETROLEUM LC STAGE 30soLU-BALLS2000GALHCL 220-56 1 _ MCL PAD PAD SAND SAND Stage Stage FLusM FLUSri FEE _ PAD BCL FLUSH PAD SAND SAND FLUSM LC L

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 12 55 185 2Bö 419 472 591 591 Cinan bhis Surf LLO | i 12 55 165 591 2BS 437 503 11.9 42.9 621 53,3 621 13DA 100.5 133.3 118.5 slurry Clean hbis bbis Surf Surt COM1MNY, ------Stacle - 621 11.2 42.8 65A 100.5 161,4 115.6 130.5 wa...... u.» Slurry CO2 bbis Tons Surt - - - . - - - - 429 11.9 65A 130.5 100.5 1$1A 118.6 a Stage Foam sof N2 bbis DH ' a Slurry STIMULATION 0 1.5 3.0 43 5.0 24 2.6 38 - 13.1 3D6 10.0 100 40 362 32.6 AG.0 Rate Avg bpm min Tirne Stage Chean 0 5.0 100 100 40 40.0 400| 40.0 Rate Avg opm CO2 tons Stage (cale) > Sturry e : ------Surfa Rate NZ sci Avg opm Stage Totals CO2 = - - - - « - - 16.800 14.200 Rate Ibs Avg setm Stage N2 =--= not Totals Prop; 16,800 28,000 28,000 28.000 Ibs ¯== Total CO2% « amp _ F 4,438 6.&S2 N2¾ Avg Rate Ibimirr 3.00 500 9 5 100 40.0 40.0 40.0 ppg 400 Rate bpm Avg .100 Bindr Conc - Proppant , . Ramp - End Conc 5.0 6.0 ppq 11.9% 18.a% Phase F Internal Constant Ramp Prop (design) psi deg. sefibbl G|sefibbt 66 336 Q[llO 2 1373 Start Conc Conc 3 5 1.0 5.0 Downhole ppg ppg Avg Ramp Prop Prop 500 500 SHOTS 1,800 5,481 4.222 5.600 2140 4351 1,800 5.491 4.222 5.600 2.240 Downhole 4.981 Temp; Factor Factor 24,824 Gravity: 18 Fluid Fluki Foasnt Foamt Pressure: gais gals___ HCL Volume Volume Clean Specific Clean clean Clean Bottomhole N2 GAL Treating 5101-5269 CO2 1800 1 i Proppant 25 25 % 25 žS ppt 880% 815% Gal Cin 1000% 100,0% 100.0% 1000% 10004 Fluki Calculated Bottomhole Bottomhole CR-3/CR-2 1-22D-56 4 15 15 _ tE/3D 16/30 16/30 16/30 FEE GAug-11 Prop Mesh Prop HCi¾r Mesh HCl%( SOLU-BALLS BERRYPETROLEUM LC STAGE 27 , I. EM/UL 55 22D 1 PAD HC1. PAD SAND SAND Stage FLUSH Stage FLUSH FEE etcL SAND ELUSH >AD PAD SAND LLU$N LC

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 12 79 383 20s 621 716 830 830 Clean "' bbis Surf I.L _ 12 79 383 770 530 20s 653 883 883 667 952 1250 179.5 23E.1 113.1 Sturry bbis bhts _ Surf SurfClean $ COMIlmTT' ------Stage 883 697 1250 179 11ES 113,1 2704 ous..saimurar CO2 Torts bbis SurfSturry 5 - - • - - - - gá7 . 1260 179 1131 2704 1155 Foam se! N2 bbis _ DH _ ' . TTIHUL.'J.TIGlT SturryStage 0 0 5 _ 5.0 4.5 G7 68 29 28 12.5 10.0 10 40.0 352 326 35 40 Rate Avg bpm niin Thne Stage _ Clean _ _ 5.0 10.0 10.0 40.0 40.0 400 40.0 Rate Avg opm CO2 Kons Stago siarry » : = - - . - - - · Surface(cale) Rate N2 sci Avg Stage Totals CO2 __bpm == - . - - - - - « Rate 30.000 20,000 >> Ibs Avg sofm stage N2 = Totals Proppant 50.000 20,000 50.000 40.000 Ibs --- Total CO2% « Ramp 4.439 6.882 N2% Ave Rate Ibimbi _ 3.00 5.00 5.0 10.0 10.0 40,0 40.0 40.0 40.0 bpm Rate Avg ppe Bindr Cone RampProppant End Conc 5.0 50 ppg 11.9¾ 18.4% Phase Intental F Constant Ramp Pop psi deg. sefibbl B Olsef/bbt a 65 1 2 1327 Start 39§ Conc 5 3 1.0 5.0 Downhole(design)- ppg Avg ppg Ragnp Prop Propcone _ SHOTS 28 _ 500 5,251 2800 7.539 4,000 4,751 2,000 6.251 7,539 4.000 4.761 Downbete Temp 10.000 Factor Factor 10.000 34.841 Gravity ‡[uid Foami Foami Pressure. gats_ gais HCL 4866-5072 Volume Volume Clean CleanFluid Specilic Clean Clean Bottomhole GAL N2 Treating , CO2 0% 2800 1 1 25 25 25 % 25 Proppant pp1 550% Gel 215¾ Cin 1000% 100.Û% 100 1000% Fluid Calculated Bottombole Bottomhole CR-2/WASATCH 1-22D-58 PETROLEUM S 16 f5 16/10 16/30 W30 FEE Pr©p TLOC Mesh 4-Aug-11 Prop HCl¾f Mesh HCf¾t SOLU-BALLS A BERRY LC STAGE 42 I I EMAIL 220-55 USH 1 HCL PAD PAD SAND SAND stage FI FLU$H Stago FEE HOL. FLUSkt PAD SAND SAND rLUSH LC

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000 \

FLUID SPEClFICATIONS AND REQUIREMENTS

Tank Requirements: 8 - 500 bbl tanks Tank Bottoms: 30 bbl/tank

Fluid1: 25 lb Gelled Water 117,116 Gallons Addit¡ves: 257 2% CL-57 Liquid KCIReplacement 2001 25 ppt MAV-3 Guar Gel 106 2 gpt NE-6 Non-Emulsifier 141 0.05 qpt BREAKER-503L Liquid Enzyme Breaker 582 0.15 ppt MAVCIDE Il Biocide 592 2.5 gpt MAVLINKBW Borate X-Linker (Winterized)

Fluid 2: 1 Ib Gelled Water 30,791 Gallons Addifives: 257 2% CL-57 Liquid KCI Replacement 2001 1 ppt MAV-3 Guar Gel 106 2 gpt NE-6 Non-Emulsifier

Fluid Required (Not Including Tank Bottoms): 147,907 Gallons 3,522 Bbis Tank Bottoms: 240 Bbis Total Fluid Requred: 3,762 Bbis |

ACID REQUIREMENTS Acid Requirements: Acid 1: 15 % HCL 11,400 Gallons Additives: 106 2 gpt NE-6 Non-Emulsifier 3004 171 0 SOLU-BALLS 7/6 inch 1.1 Spgr in the first 1000 Gallons 610 5 ppt IC-100 Iron Control 303 4 gpt MAVHIB-3 Acid Inhibitor (Moderate Temp)

LC FEE 1-22D-56 EMAILxls Page 4

Aug. 05, 2011 Sundry Number: 17333 API Well Number: 43013507180000

CO2 AND N2 REQUIREMENTS

PROPPANT REQUIREMENTS

SAND 16/30 Gold 212,000 lbs Total: 212,000 lbs

LC FEE 1.22D-56 EMAIL XIs Page S

Aug. 05, 2011 Sundry Number: 17795 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEEEASE DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t LAKE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S05.05 Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 8/22/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE NOTE THAT LC FEE 1-22D-561-22D-56 WENT TO SALES ON AUGUST 22, 2011.

Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 08/23/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/23/2011

Aug. 23, 2011 Sundry Number: 17841 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEEEASE DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t LAKE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S05.05 Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 8/20/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED COMPLETION HISTORY FOR THE LC FEE 1-22D-56.1-22D-56. Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 08/29/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/25/2011

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 1, Report Date: 8/2/2011 Well Name: LC FEE 1-22D-56 API/UWI Surface Legal Location $pud Date Fiela Name APt Štale 43013507180000 ¯¯ NENE Sec 22 T5S-R6W i 7/18/2011 7:30:00 AM Lake Canyon Utah We!IConfouration Type O nat KB Elevation (ftKB) KB&cund Olstance (ft) 13-Casing Flange Distance (El) KB Tubing Head Distance (ft) 6,515 14.00 i Primer; Job Type Secondary Job Type Completion ¯ ¯ ¯ Objective

Contractor |Rig Number I Maverick I AFE Number TolafAFE Amount Dany Cost Cum Cost To Date 032019 3,200 C11 ("F)¯¯ 3.200 ¯ ¯ Teaner T Road Condiben Tubmg Preisure (psi smg Presi r (iii) R Íim 8} ¯¯¯¯ ¯ ¯ ¯ ¯¯ ¯ ¯ ¯ ¯¯ ¯ ¯ ¯ ¯ J 17Öiih t Ttpa Mobile I Time Log StartYime [ EndTime Durthrs) Codet Î paration Comment 00:15 100.15 ]Safety Meeting. MIRU pioneer wire line, Run CBL, TOC @1900. RDMO, SWIFN Report Fluids Summary Fluh0 Toweg (bb) From well (bbl) 1 To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Òode3 Cost Cost Deschplion | ¯¯¯ ¯ ICC-WIRELI 152 ,2370 ICC 3,200 NESERVICES Safety Checks time [ Desertpbon Type ommem

Logs Dale Type | Top iflKB} | Bim (flKB) Cased No

Perforations | Date [ Zone Top (ftxB BIm (RKB) CurroM Status

Da e 2one Ìype Stim/Treal Company

No Stage Type Top (flKB) Bun fitKBI V (pumped) (bbl) I I th r In Hole Descnpbon Run Dale OD (Jn) T IKB) l Bim (flKB) I l

Cement Descnpuon ŠtartÓsle Cement Gump

I

. www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 2, Report Date: 8/5/2011 Well Name: LC FEE 1-22D-56 I APituw! [Surface Legal Location Spad DO‡e Field Name APD Siale i43013507180000 .NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah weliconfiguralloTpe IOnginatKB Etevation (ftKB) XB.Ground Distance (ft) iKB-Casing Flange Distance (ft) KB-Tubing Head Distance (ft) | 6,515 14.00 | I Pomary Joe Type Secondary Job Type C maplefon

Contraclor Ing Number Maverick

I AFE Number . Tota AFE Amount DailyCosi |Cum Cosi To Dale C11 032019 ¯ ¯¯ 3.348 6,648 iner T ('F) Road Ó©ndÏIlon ̾ng Presswo Ipsi) ising Näss iÑÏpsÏ) Ë\gTime ($rs) ¯ ¯ ¯ ¯¯ Joe contact vme i me | Time Log Slanime | End Tola [ Darthrsl | Code 1 | Operalion Commem 00:00 iCO:00 Safety Meeting, MIRU pioneer wire line, RIH wl 3-1/2" per guns w/2 spf, 120 deg phase, 19 grm charge, from 5809 - 5659 total 28 holes as follows, 5809-5807', 5755-5754', 5744-5743', 5735-5734', 5720-5718', 5712-5711', 5708,5707', 5706-5705', 5676,5674', 5661-5659'. RD Pioneer, SWI

Report Fluids Summary I F1ubd TowalF (DDI) I From well (bbl) | To Isase (bbF) | From lease (bbil

i Daily Costs ¯¯ !¯ ¯r ¯¯ ¯ ¯ ¯ ¯ dá f Cosa 2 Code 3 | Cost COSEDesenpuon i2370 I,ICC 3.348 CC-WIRELINESERVICES Safety Checks

Logs Dale | 'fype | Top itKB) ] StmilIKB) | Cased? | No Perforations Gale 2one Top (ttKey Stm (ItKB Curmet Status

¯ Dale ]Zone Type IStimtfreat Company I sto I

I Other in Hole Descripton ÀunDate OD (in Ìcpdi ) | Bim (ItKB)

Gement Descripdon 1 Slart Date ! Coment Comp I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 3, Report Date: 8/8/2011 Well Name: LC FEE 1-22D-56 APl/UWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Onginal KB Elevation (ftKB) KB-O äu IDàtaÄce(fli :KB.Casing Flange Destance (ft) KB-Tubing Head Distance (ft) 6,515 14.00

IPdmary Job Type ISecondary Job Type Completion Objeclive

Contractor Rig Number Maverick ¯ AFE Numbe< TotalAFE Amount Daily Cost Cum C65t ToDele

C11 032019 , 184,300 190,848 (°F) Weather T Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

ITime Log ¯ ¯ ¯ration alt Tune Enti Tame i Dar (rlis) I Code 1 Comment 00:00 00:00 FRAC Frac. Job 7 am Safety meeting RU Maverick press test lines to 5000 psi. CR-4 &CR-5 perforations from 5809 to 5659' @ 2660 psi, pump 67 bbls acid & balls, 150 bbls flush, Shut down surge balls off Formation, 187 bbls pad, 347 bbls 1# to 5# 16/30 sand, Ramped, 127 bbis flush with 6 bbls acid. IS1P 1370 psi. SWI RD Maverick. I Avg rate 40 bpm @ 1528 psi, Max rate 40.4 bpm @ 3335 psi. 52,000#16/30 sand in

formation. 892 totalbbls pumped FG .67

00:00 IOO:00 PFRT Perforating RU Pioneer RIHw/ 3-1/2" csg guns set CBP @5290. & pedorate the CR-4 &CR-3 from 5606- 5487' 2 SPF 20 perfs. With holes as follows: 5607-5005, 6598-5595'. 5589-6598', 5677-5576', 5563-5562'. 5533-5531·. 5489-549T, 00:00 00:00 FRAC Frac. Job 7 am Safety meeting. RU Maverick press test lines to 5000 psi. CR-4 &CR-5 perforallons from 5809 10 5659' @2660 psi, pump 67 bbis acid&balls. 160 bb1s flush. Shut down surge balls off Formation, 187 bbls pad, 347 bbls 1# to 5# 16/30 sand, Ramped, 127 bbls flush with 6 bbls acid. ]SIP 1370 psi. SWi RD Maverick. Avg rate 40 bpm @ 1528 psi, Max rate 40.4 bpm @3335 psi. 52,000#16/30 sand in

formation. 892 total bbls pumped FG .67

00:00 00:00 PFRT Perforating

Daily Costs Codi Ï Code 2 Code 3 Òost St Descnpli n 152 2370 ICC i 12,900 1CC-WFRELINESERVICES 152 2360 ICC 150,900 ICC-STIMULATION/ACIDIZING 152 2106 ICC 16,500 ICC-WATER&WATERHAULING 152 2340 ICC 4,000 ICC-HOT OILING Safety Checks Time Descriphon Type Comment

Perforations Date Zone Top (flKB Bim IttKB) CtJrrent $ itus

I ¯¯ ¯ ¯ ¯ Öate 2006 T¿pe Stim/Treat Company

sto No Stage Type Top (ItKBy BIm (IIRB) V Lpumped} (beiþ

Other in Hole ¯ ¯ Descrrpt:on Ren Date OD ici Top OtKB BIm (FIKB

Cement De3moton Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 4, Report Date: 8/10/2011 Well Name: LC FEE 1-22D-56 APl/UWI Surface Legal Location Spud Date Fleid Name APD State I 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Olst MOŒ{FI) KB-CBSmg Flange Distance (fi) KB-Tubing Head Distance (II) 6,515 14.00

Pnmasy Job Type |Secondary Job Type Completion Obisetive

Contractor ig Number Maverick AFE Ntimber YetalAFE Amount DailyCost Com Cost To bale I C11 032019 4,830 195.678 I N¯eainer ¯¯¯ ¯ F)¯ ¯JR ¯¯ lii¯Pre aÓondeon T ufaÏpi) Casrig Peso r (RI NagTime(hm)

¯¯ ¯¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ Job Con ac ( Titi I I tilië , I Time Log NU¯ŠÒR 00:00 00:00 i Safety Meeting, MISIRU, ND frac valve, NU WH, DIH wl147 jts 2 7/8" tbg offtrailer,EOT @ 4787', POOH wl147 jts 2 7/8" tbg prep for pedprate and squeeze in am

,Report Fluids Summary FluM To wel (bbl) From myil(bbi) Tofease (bbl) Fromlease (bbl) | I I lDaily Costs 162 2305 ICC 3,755 ICC-RlGCOST-COMPLETION 1$2 2385 ICC 250 ICC-RENTALS-FISHINGTOOLS 152 |2111 ICC 825 ICC-TRUCKING&HAULING Safety Checks

I-oes ¯ C¯sa B1m 8) | No

Perforations Date 2one | Top tKO | Sm (fiKB) CarmntStalog I

Date 2000 Type r ät Company

¯ ¯ - I Sig I S Type TOP(itKB) 8 ft B V (pumped) (bbi)

- - -- _L. i ¯¯Other in Hole Desemphen Run Date D n) Top (ItKB Ë1in01Sl I cement Deschfiro Sisit Dale Cement Comp

I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 5, Report Date: 8/11/2011 Well Name: LC FEE 1-22D-56 APlilJW1 Surface Legal Locabon Spud Dale F.eid Name APD Stale 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00¯ AM Lake Canyon Utah Well Configurahori Type OngmaF KB Elevation (ftKB) KB·Gigund Distance (ft) KB asing Finage Dislant.e (fl} KB-Tubing Head ÓlsÏänC II) 6.515 14.00

Pnmary Job Type Secondary Job Type Completion lObjective ¯ Comraciot Rig Number Maverick CumCostToDale AFENumber 'TOTalAFEAmount DagyCosi C11 032019 ¯ 23.976 219.654 Weather T (V) 'Road Condition Tubing Pressure (psi) Camng Pressure (Psi) Rig T 1e (I r

Time Log 1 Operation Cominent Slan 1Ïme End Time , Du misi | Cocte | i 00:00 00:00 Safety Meeting. RlH & set CBP @2190' Shoot squeeze holes from 1920-27'. Casing : psi 175 psi surface psi 175 psi. Wait 2 hours for Halliburton wireline. Set retainer. RIH & set CCR @ 1870'. RD wireline &RIH w/ stinger &57 jts 2 7/8" tubing.Space out tubing and RU Pro-Petra, Sting into retainer and pump cement job. Sting out & circulate w/ 45 bbls. RD Pro-Petra and POOH with tubing.SDFN.

Daily Costs Cae 1 I Code 2 Code¯ Cost Cos(Óssepilon 152 2385 ICC 250 1CC-RENTALS-FISHINGTOOLS 152 2106 ICC 1,000 ICC-WATER&WATERHAULING 152 2305 ICC 2,975 ICC-RIGCOST-COMPLETION 152 2345 ICC 3,764 ICC-PERFORATING 152 2358 ICC 4,987 ICC-BRIDGE PLUGS & PACKERS I 152 2355 ICC 11.000 ICC-CEMENT&CEMENTINGSERVICES

Safety¯ÏiÏneChecks L . Desonglion i Type domint

No i Perforations ¯ Date Zone Top (11KBI Bim (ttKS} Curreni Šlaks

Dale Zone Type |StlÐÍTESBl Qж3Dy

. sig No Stage Type Top (fiKBI i 61m (ftBBi V ipumped) (Obl)

Other In Hole Desenplen Run Dale ODfoi TOp liiKB} BÏm(ftKB

Coment Desenpban Start Dale Cement Comp

L.- www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 6, Report Date: 8/15/2011 Well Name: LC FEE 1-22D-56 APllUWI Surface Legal Localion Souct Date IField Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Onginal KB Ët0TGIIOn IIIKB) WB-Ground Distance (ft) B-Casing Flange Detance llt] KB-Tuhng Head Distance (fli e.515 14.00

Pomary Job T pe Serondary Job Type Completion Objeclive

CenIractor -RcgNumber Maverick AFE Nurriber TotaTAFEAmouni D¾est CumCos! To Date C11 032019 ¯ 7,768 227,422 Weather T PF) ad Cond Ilon Tubing Pressure (ps) Ces ng Pressure (psi) Rig Time (hrs) I I ' Job Coniaci TIIIe I Mobile

'¯StartTime Log ¯ Yime_i_End Time Dur(bralfCo 1 perat n 1 Commani IOO:00 00 00 Safety Meeting, PU RIHw/ 4 3/4" bit and bit sub. 58 jts 2 7/8' tbg, PU swivel , RU pump and return lines, break circ, Drill out cement retainer, @1870'. drill out cement to 1967' PRessure test csg to 500 psi for 10 min (goodtest ) check for water flow (no water flow) on 8 5/8", RD Swivel, RIH tag plug @2190'RU swivel, drill out plug, circ | i Clean, POOH w/ tbg as detailed, RU wire line RIH CBL from 2163' to surface,, TOC @i 450', RD wire line, RIH w/ 4 3/4" bit pump off sub and 148 jts 2 7/8" tbg, Tag kill plug @ 4800' RU swivel, Prep to drill out in am, SWIFN

Daily Costs Code 1 ode 2 Code 3 Cost ÖosiÓeecnpbon 152 2385 ICC LODOICC-RENTALS-FISHINGTOOLS 152 2106 ICC 600 ICC-WATER&WATERHAULI NG 152 2111 ICC 140 ICC-TRUCKING&HAULING 152 2305 ICC 4,740 ICC-RIGCOST-COMPLETION 152 2370 IICC 1,288 ICC-WIRELINESERVICES

Safety Checks n¯ Time Descupton Type mm \

995 ¯ î¯ ¯ ¯ ¯ om pe ToptttKea erotiiKB Casaa? I No

Perforations Dale i 20nu ToptfiKB) Sim(ftWB) CunentStatus

IDale iZone Type .Sumfrreat " ny

Sig No Tyne Top iltKB) (pumpass Innti , Stage I 81m (rtKB} V I Other In Hole Dedenption Run Dale OD [in) Top (flKB) BIm (RJ(B)

Coment Deschnlion _ __ SEart Dale Cemeni Comp

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 7, Report Date: 8/16/2011 Well Name: LC FEE 1-22D-56 |APllUW1 Surface Legal Localion $ÞudDalo Field Name .APD Siale 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM ILake Canyon Utah Well ConÏÏgurallonType ÖriginalKB Elevation (ftKB) KB Groun

ry Job Type Secondary Job Type Completion Objeclive ¯ ¯ ¯ ¯ I Conifacior RegNumber Maverick ¯ inar ToEalAFEAmoum -Dady Cost Cum Cost To Dme C11 032019 . 8.590 236,012 eamer T OF) Road Candillon Tubing Pressure (psi) Casing Pressure (psi) IRigTime (hrs)

I Time Log Stin Ìime I End Timo I Dur (hrs) Code t I Operah n I Comment 00:00 100:00 |Safety Meeting. Break circ. Drì\lout killplug @4800', 200 psi under plug, RDswivet i |RIH w/ 154 jts Tag fill@5000' RU swivel, clean out sand to 1st plug at 5090', Drill plug, Circ clean, RD swivel, RIH w/ tbg, tag fill on jt 162 @528T RU swivel, circ out | sand to 2nd plug @5240,drill out plug, circ clean, RD swivel, RIH to 5464' tag sand. RU swivel, clean out sand to 3rd plug @5476',Drill out plug, circ clean, RD swivel, RIH to 5564' tag fill, RU swivel, clean sand to 4th plug @5640'drill out plug circ clean RD swivel, RIH tag fill@5933',RU Swivel, clean out sand to PBTD @ 6141, circ well for 3 hrs still giving up sand, RD swivel, POOH to 4038 SWIFN.

Report Fluids summary Fluid 7bwall tbl) Fromvdlibbi) Toleasefobij fronileaselbbli

Daily Costs i ¯ Descri on 1ŠŽ¯ Code i ¯ coäe2 [ Udde3 Cosi con 2385 .ICC 2.880 ICC-RENTALS-FISHINGTOOLS 152 2305 ICC 4,910 ICC-RIGCOST-COMPLETION 152 |2106 .ICC 800 ICC-WATER&WATERHAUUNG Safety Checks __ fyue¯¯¯ ¯ corn m¯ I

No

Perforations Date 2one TÑp(flKB BIm (tthB) Curren! Slatus

ch Type liireal Cornpany I

Sig No Stage Type ToP litKB) i Br fike V (pumpeat (b

:Other in Hole

.Cement Desr.nÞt00 SluFt Date Gemed Cornp

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 8, Report Date: 8/17/2011 Well Name: LC FEE 1-22D-56 APl/U NI IEtartace Legal Location Spuci Date Field Name APÒStale 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon 'Utah Well Confguralion Type 'OrkgittalKB Elevation (ftKB) Gr und Distance (ft) KB-Casng Flange Distance (ft) .KB-TubingHead Dislance (EL) 6,515 14.00

IPnmary Job Type Secondary Job Type i Completion ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ 9 Objeetwe i I Contractor IRig Number |Maverick IAFE Ntimber TOlal AFE Amouni DailyCost |Cum COBLTo Dale I C11 032019 | 39,858 275.870 Weallier T OF) Raast Cond bon ¯'Tuting Pressure (ps4 Casing Pr niûr paiÏ ÍÀigÌIme (fire) ¯ ¯ ¯ ¯ ¯ ¯¯ ¯ TiiÏ«¯ ¯Ï ¯ ¯¯ ¯ Job Contact Mobio

Time Log angsn•..L.EndTime | Dur(h I Code Opera on Commen1 00:00 00 00 | Safety Meeting. S TP 450 psi, RIH wl 8 jts tbg, Tag fill @6111' Break circ, clean out to 6141' Circ well fro5 his stillgiving up sand, POOH w/ 9 jts 2 7/8" tbg, POOH wl tbg as detailed, LDbit and it sub, PU RIH w/ 1jt 2 7/8" tbg, SN w/ bleed collar, TAC, 179 ts 2 7/8" tbg, tryto set TAC, (would not set) POOH w/ tbg, LD tac, PU new TAC, RIH wltbg as detailed, Try to set TAC (no luck) SWIFN

Report Fluids Summary Flu To weil 000 From well (bb0 To lease ibbi) From lease (bb0 I i Daily Costs ¯ C ey Code 2 Code3 Cost Cost DescrFgtien 152 2305 ilCC i 4,608 ICC-RIGCOST-COMPLETION 152 2385 ICC | 250 ICC-RENTALS-FISHINGTOOLS LOE-TUBING&ATTACHMENTS 710 .3530 [LOE 35,000 Safety¯ Checks Time_ _¡_ Desenotion _ __ Type Comment

Logs care . Type ____I_ Top nKe> simmxsa i iisaF No I

Perforations Date one Top(fliéi Sim (flKB) Cuneril Status I

¯ äÏ \Zone Type SiiiÏrrehopany l

No Stage Type Top (ItKB) | Bim (flN6) V_(p_umped)(000

We Hole Gj¯¯¯ ¯ Descnption Run Date 00 (m} Top (Ä Bim (fi

Cement ¯ ¯ ¯ ¯ ¯ ¯ ¯ ¯ I I Descriphon Starl Date T Coment Comp I I i

i

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 9, Report Date: 8/18/2011 Well Name: LC FEE 1-22D-56 APl/UW1 Surface Legal Location Spud Date FleM Name APD Stale TSS-R6W 43013507180000 NENE Sec 22 7/18/2011 7:30:00¯ AM ¯\ Lake Canyon Utah \Wei Configuration Type Onginat XB Elevallon (RKB} Kå·ÒÏoondOslanca ÛIl KB-Casing Flange Delance Ifi) KB-TublngHead Distance (fli 6,515 14.00 i |Pnmary Job Type Secondary Job Type Completion Omeetive

I Conitaclor iRig Number Maverick ¯ ¯ ¯ AFE Number ITota1AFEAMDunt Daffy 0051 Cúrn COBLIO ÛBIO C11 032019 i 5,455 281,325 (°F) Wealhet T Road Condetton Pressure (psi) Casing Pressure (psi) Rig Time (nrs) , |Tuning ¯ Job Contact | Title Mobile I I

Time Log tÃrtÌÏiTie End Time | Dur (nrs) Code 1 Operation [ Comment 00:00 IOO:00 Safety Meeting, SICP 425, SITP 300, RU hot oiler heat flat tank,to 120 degrees, circ | well with 140 bbls clean up well, Try to set TAC (no luck) POOH w/ tbg as detailed, ITACsiezed full of sand, RIH w/ new TACtryto set 80 jts in (would not set), POOH LD I TAC, RIH open ended, RU hot oiler, pump 65 bbls at 250 degrees, Pump 200 bbls with rig pump, POOH above perfs SWIFN. I i I i Report Fluids Summary ¯ ¯ Ffuld To weli(bDI) i From well (bb1) To lease (bbi) i From lease (Dui) | I

Daily Costs i I Cd 1 Code 2 | Code 3 i Cost Cost Descnpton _ __ i 152 2305 .ICC 4,455 ICC-RIGCOST-COMPLETION 152 2385 UCC ' 1,000 ICC-RENTALS-FISHINGTOOLS

I i

Perforatlons

Date Zone Type IStm/Treat Company

NO $tage Type Top !! BIm (flKB) V (pumped} {bbij l

Other in Hole '¯¯ i Descopilon RunDale OD in) Top nKB | Bim(ItWBy I r i ------i Cement ¯ ¯ on Start Úale Corn nt Camp

l

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 10, Report Date: 8/19/2011 Well Name: LC FEE 1-22D-56 APflUWI Surface Legal Location Spud Date ,Field Name ,APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 /:30:00 AM Lake Canyon Utah I Weß Configuraicon TyÞe Öngina1NS Elevauan (ftKB) KB GroundOsalance (It) KB·Casog Flange Distance (fi) KB.Tubing Head DISlance (It) 6.515 . 14.00 Pamary Job Type Secondary Job Type Completion ¯ ¯ ¯ ¯ i Oblecuve i I Conitâctot I Rig Number Maverick . . 1 AFE Number TotalAFEAmount ady Cost CumCosiTo 0818 286.205 C11 032019 ¯¯ 4,880 , BSÏh T OF) Road tiinn Tubing Pressure (psò Casmg Pressure (psi) RagTime (bre)

I i | 1 Time Log siartTime _j__EnciTime Dur (nts Code 1 parai r Comment | 00:00 |00 00 Safety Meeting, SICP 300 SITP 250, Bleed tbg offto production tanks, flowed 100 bbls back, RU pump, circ down csg wl 200 bbls, some sand in returns, TlH w/ 16 stands tbg to 5863' circ well clean, (stillsome sand in returns) SWIFN, i

Oport Fluîds Summary From lease (nbi) Uld | TO Wel (bb1 0 wellIbbi To lease ) I I

Daily Costs ¯ 2¯ ¯ Cost¯ ¯ ¯ ¯ ¯¯ ¯ T Code 1 | Code Code 3 ¯ ¯ C i s ikon ilŠ2 2305 ICC 3.880 ICC-RÏG0ÒŠC0MPLETION 152 85 |ICC 1,000 ICC-RENTALS-FISHINGTOOLS Safety Checks | Time I Doralption Type ommeni

Logs Dale | fype Top (fiKB) Sim (IIKB) Cased? | I No I I Perforations Da one _ | Top IltKB) Et (itKO telus

No (ptimpedi (bbl) i SlageType Top (ItKB) Sm (ttKB) , V

Other in Hole Desenpuon Run Date ÓD (m) Top tWB) Bim (ItKB I ( __

Cement Desenplion i SIar1 Date Cemeni Comp I

I

i www.peloton.com Page ill Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

Report # 11, Report Date: 8/20/2011 Well Name: LC FEE 1-22D-56 APllUWI Surface Legal Location Spud Date Field Name APO Srale 43013507180000 NENE Sec22 T5S-R6W 7/18/2011 7:30:00 AM ILake Canyon lUtah Well Configuration Type Onganal KB Elevahon (flKB) =KB.GroundOssian¢e (fil :KB-Camig Flange Distance (ft) ,KB-Tubing Head Distance (ft) 6.515 14.00

Pomary Job Type Secondary Job Type Completion ¯ ¯ ¯ ¯ ¯ ¯ ¯ Objective

Òoniractor Rig Number Maverick ÄFËÑùriiber 1TotalAFE Amauni DailyCosi Cum Cast To Dale C11 032019 ¯ ¯ ¯ 0¯ndiilori 35,933 322,138 YŸeamer :T ("Fj Road Ïúbing ressuie (psi) ,Ca g PT r (isi) RegTime (lirs) I ¯ i I Job Conlagt Title Mobile 1 I I

Time Log Stan Time i End Time | Qur [hrsl Code 1 Operakon Communi I 00:00 00 00 | Safely Meeting. SICP 300, SITP 300. PU R)H w/ tbg tag fill @ 6,086' ,RU pump break circ.clean 50' sand to 6141'circelean. POOH LDw/15 jts 2 7/8" tbg, Cont. POOH w/ tbg as detailed, RIH w/1 jt 2 7/8"ibg. SN w/ bleed collar.1/4 turn TAC, 179 jts 2 7/8: i i tbg. ND BOP, Set TAC wl10,000#tension. EOT@ 5863' KB. NU WH, X-over to rod equip. PU New pump, RIH w/ 4 wb, 15 3/4" 6 per, 160 3/4" 4 per, 51 7/8" 4 per, 1- 6' 7/8" sub 1- 2' 7/8" sub 1 1/2' x 26' polish rod, Seat pump, Fill and pressure test w/ 1

bbls to 500 psi, blled off, stroke test pump, RU pumping unit. Hang off rods , RDMO PWOP.

Total water to recover 4000 bbls

I I

Report Fluids Summary leas¯(E Fiund To weN (nbQ From well(tbf) To Fease Ibby , From I) I Daily Costs ¯ ¯ ¯ Code 1 i Code 2 __[_ Code3 Cosi Cost bescriphon 152 2385 ICC 250 ICC-RENTALS-FISHINGTOOLS 152 2305 IICC 3,808 ICC-RIGCOST COMPLETION 152 2111 ICC 1,000 ICC-TRUCKING&HAULING 154 3535 TCC 30,000 TCC-SUCKER ROD, PUMPS, SINKER BARS 152 2340 ICC 875 ICC-HOT OILING Safety checks

Logs ate Type BI (flAO) Ï Câged? No Perforations ¯ ¯ Date Zone Top ifóÏBy tKB} Current Status

| Date Zone Type Slimffreal Company

NO Stage Type Top(flWB) Sim {flKS V pumped} (bbl)

I Other in Hola

Descophen , RunOste ODim) i YopiMKB1 Sto(IIAB)

Cement ¯ ¯ ¯ Des Ophon ŠtarlOmá Cement Comp

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17841 API Well Number: 43013507180000

Berry Daily Completion and Workover

' Report # 11, Report Date: 8/20/2011 Well Name: LC FEE 1-22D-56 ÃPO¯State ¯ ¯ IAPUUW1 Striace Legal Localian Spud Date Field Name 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Utah po¯ ¯ Lake Canyon WeÌI Conh r liën T rig al KEiÈÍvation (ftKB tound Dialance ÏÑ) KB-CasiÏ\gËÍnngeÜIGianci (It KB-Tu g Head DISÏaÏ10ÑÏIt} 6,515 14.00

Pnmaty Job Type Secondary Job Type Completion I obiecove I Contractor RFg Number Maverick AFE Number TotaiAFE Amouni Dady Cosi Cum Cost To Date I ¯C11¯ ¯032019 ¯ ¯ | 35,933 322.138 w atner T ("F) Road Condit on Tubing Pressure (psi) Casing Pressure (psi) Rig Time ihrs) ¯ ¯ ¯ ¯ ¯ Job Contact Tille T MObile

I li Time Log i SulifÝsine| EndTime DuftrirBI Codul [ perahon Comment 00:00 00:00 | ISafety Meeting, SICP 300, SITP 300, PU RIH wltbg tag fill @6,086',RU pump break circ,clean 50' sand to 6141' circ clean, POOH LD w/ 15 jts 2 7/8" tbg, Cont. POOH w/ \ tbg as detailed, RIH wl 1 jt 2 7/8" tbg,SN w/ bleed collar, 1/4 turn TAC, 179 jts 2 7/8: tbg. ND BOP, Set TAC w/ 10,000# tension, EOT@ 5863' KB. NU WH, X-over to rod equip. PU New pump, RIH w/ 4 wb, 15 3/4" 6 per, 160 3/4" 4 per, 51 7/8" 4 per, 1- 6' |7/8" sub 1- 2' 7/8" sub 1 1/2' x 26' polish rod, Seat pump, Fill and pressure test wl 1

bbls to 500 psi, blled off, stroke test pump. RU pumping unit, Hang off rods , RDMO PWOP

Total water to recover 4000 bbls

Daily Costs Code 1 Code 2 Cade 3 Cosi Cosi Desenphon ICC-RElvTALS-F1SHlNGTOOLS . 152 2385 ICC 250 152 2305 ICC 3,808 ICC-RIGCOST-COMPLETION 152 2111 ICC 1,000 ICC-TRUCKING&HAULING 154 3535 TCC 30,000 TCC-SUCKER ROD, PUMPS, SINKER BARS 152 2340 IICC 875 ICC-HOTOILING S ety checks Time Descephon Type Comment

Logs¯ i Date Type i TootitKB) I Em(ttW6 Cased? I I No

Perforations ¯ ¯ ¯ ¯ ¯it3iãius Dale 2ene Top iltkä (i r T §ä al , Cii i ¯ Date 2000 Type Is mIÌrealÖompiny \ \ Sig No Siege Type Top (f!KB) Etm dtKB V (pu pedHbbli

Other In Hole Desenphon Run Dale OD lin! Top itKEI) BIm (ItKB 1

Cement ¯ ¯ eschiloti Start DMa Cement Cornp

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 CONFllENTlAL C TlAL STATE OF UTAH AMENDEDREPORT FORM 8 DEPARTMENTOF NATURALRESOURCES (highlightchanges) DIVISION OF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER: FEE 6. IFINDIAN,ALLOTTEEORTRIBENAME WELL COMPLETION OR RECOMPLETION REPORT AND LOG 7. UNITor CA AGREEMENTNAME 1a. TYPE OF WELL: ELLL WESLL DRY OTHER

NUMBER: b. TYPE OF WORK: 8. WELLNAMEand EL HORZ. EP- FS LC FEE 1-220-56 N RY . OTHER 2. NAMEOF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 4301350718 WILDCAT 3. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDANDPOOL, OR 722-1325 4000 S. 4028 W. CITY ROOSEVELT STATE UT ZIP 84066 (435) LAKECANYON WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE, 4. LOCATIONOF MERIDIAN ATSURFACE: NENE 876 FNL 129 FEL NENE 22 5S 6W U

AT TOP PRODUCING INTERVALREPORTED BELOW: NENW 720 FNL 2177 FWL 12.D 13. STATE ATTOTALDEPTH: NENW862FNL HESNE UTAH 17. GL): 14. DATESPUDDED: 15. DATET.D. REACHED: 16. DATECOMPLETED: ELEVATIONS(DF, RKB, RT, READYTO PRODUCE 7/6/2011 7/30/2011 8/20/2011 ABANDONED 2 6501 GL * 18. TOTALDEPTH: MD 19. PLUG BACKT.D.: MD 20. IF MULTIPLECOMPLETIONS, HOW MANY? 21. DEPTH BRIDGE MD 6,215 6,141 PLUG SET: TVD TVD QÛ 22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN(Submit copy ofeach) 23. WAS WELLCORED? NO YES (Submit analysis) ELECTRONIC WAS DST RUN? NO YES (Submikepo DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASING AND LINERRECORD (Report allstrings set in well)

STAGED TMHENTERCNEMEONF KES VOLSUMRE ** BOTTOM(MD) CEMENTTOP AMOUNTPULLED HOLE SIZE SIZE/GRADE WEIGHT (#/ft) TOP (MD) S BL)

12.5 8.625 J-55 24 655 G 330 7.875 5.5 J-55 15.5 6,189 PL 170 0 PLHS 305

25. TUBING RECORD PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) 2.875 5,863 26. PRODUCING INTERVALS 27. PERFORATION RECORD (Top/Bot- STATUS FORMATIONNAME TOP (MD) BOTTOM (MD) TOP (TVD) BOTTOM(TVD) INTERVAL MD) SIZE NO. HOLES PERFORATION open squeezed (A) WASATCH 4,866 5,809 4,866 5,809 .360 114 Squeezed (B) Open Open Squeezed (C) Squeezed (D) Open

28. ACID, FRACTURE,TREATMENT,CEMENTSQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL 4866 TO 5809 FRAC W/ 212,000 LBS SAND & 3808 BBLS FLUID

30. WELL STATUS: 29. ENCLOSED ATTACHMENTS:

ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DlRECTIONALSURVEY PUMPING SUNDRYNOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER: HECEIVED (CONTINUED ON BACK) (5/2000) SEP13 20111

DIV.OFOIL,GAS& 31. INITIALPRODUCTION INTERVALA (As shown in item #26) WATER- DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL- BBL: GAS - MCF: BBL: PROD. METHOD:

-+ 8/21/2011 9/13/2011 24 RATES: 80 10 30 GAS PUMPll

- - WATER- CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GAS/OIL RATIO 24 HR PRODUCTION OIL BBL: GAS MCF: BBL: INTERVALSTATUS: 200 80 RATES: -* PUMPING INTERVALB (As shown in item #26) WATER- DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL- BBL: GAS - MCF: BBL: PROD. METHOD: RATES: -+

- GAS- - CHOKE SIZE: TBG. PRESS. CSG. PRESS. Pl GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL BBL: MCF: WATER BBL: INTERVALSTATUS: RATES: -+

INTERVALC (As shown in item #26)

- GAS- WATER- DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL BBL: MCF: BBL: PROD. METHOD: RATES: -+

OIL- GAS- WATER- CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION BBL: MCF: BBL: INTERVALSTATUS: RATES: -+

INTERVALD (As shown in item #26) OIL- GAS- WATER- DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION BBL: MCF: BBL: PROD. METHOD: RATES: ->

OIL- WATER- CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GAS/OILRATIO 24 HR PRODUCTION BBL: GAS - MCF: BBL: INTERVALSTATUS: RATES: ->

32. DISPOSITION OF GAS (Sold, Used for Fuel, Vented, Etc.) SOL D 33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMATION(Log) MARKERS:

Show allimportant zones ofperosity and contentsthereof:Cored intervals and alldrill-stem tests, including depth interval tested, cushion used, timetoolopen,flowingand shut-inpressures and recoveries.

o edp Formation Descriptions, Contents, etc. Nam (Measu Depth)

GR 926 MAHOGANY 1,503 TGR3 2,550 DOUGLASCREEK 3,315 BLACK SHALE 3,952 CASTLE PEAK 4,240 UTELAND 5,620 WASATCH 4,854

35. ADDITIONALREMARK: (include plugg ng procedure)

36. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records.

NAME(PLEASEPRINT) BROOKE BROADHEAD TITLE REGULATORY ASSISTANT 9/20/2011 SIGNATURE DATE :

This report must be submitted within 30 days of • completing or plugging a new well • reentering a previously plugged and abandoned well bottom-hole • drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous depth e recompleting to a different producing formation • drillinghydrocarbon exploratory holes, such as core samples and stratigraphic tests

* ITEM 20: Show the number of completions if production is measured separately from twoor more formations.

** ITEM 24: Cement Top -Show how reported top(s)ofcement were determined (circulated (CIR), calculated (CAL),cement bond log (CBL), temperature survey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-5340 1594 West North Temple, Suite 1210 Box 145801 Fax: 801-359-3940 Salt Lake City, Utah 84114-5801 A GREATWMTE DIR£CTIONAL SERVICES LLC

Survey Certification Sheet

Report Date: 8-23-11

GWDS Job #: 03044-432-21 / Directional

Operator: Berry Petroleum Co. Well Name: LC FEE 1-22D-56 API#: 43-013-50718 County/State: Duchesne Co., UT Well SHL: 867' FNL & 129' FEL (NENE) Sec. 22-TSS-R6W Well SHL: 40° 2' 13.146" N (NAD27) 110° 32' 11.440" W (NAD27)

Drilling Rig Contractor: Berry Rig 5 (RKB: 14')

Surveyed Dates: 7/21/11-7/27/11 Surveyed from a depth of: OH: 701.00' MD to 6164.00' MD

Type of Survey: MWD Surveys (STB=50')

The data and calculations for this survey have been checked by me and conform to the calibration standards and operational procedures set forth by Great White Directional Services, LLC. I am authorized and qualified to review the data, calculations and this report, and that the report represents a true and correct Directional Survey of this well based on the original data corrected to True North and obtained at the well site. Wellbore Coordinates are calculated using minimum curvature method.

Bret Wolford

Great White Directional Services, LLC - Well Planner

PO Box 427 • MILLS, WY 82644 • 63 CASPER VIEW COURT • MILLS, WY 82644 OFFICE (307) 472-7400 • FAX (307) Berry Petroleum Company Project: Duchesne Co., UT (UT27C) c 1 22D 6 GREATWHITE Wellbore: Wellbore #1 Design: Design #2 Latitude: 40° 2' 13.146 N Longitude: 110° 32' 11.440 W Ground Level: 6501.00 WELL @ 6515.00usft (Berry Rig 5)

WELL DETAILS: LC FEE 1-22D-56

Ground Level: 6501.00 +NI-S +El-W Northing Easting Latittude Longitude Slot 110° 0.00 0.00 621969.845 2269764.543 40' 2' 13.146 N 32' 11.440 W

WELLBORE TARGET DETAILS(MAP CO-ORDINATES AND LATILONG)

Name TVD +N/-S +El-W Latitude Longitude Shape 40° N10° LC FEE 1-22D Tgt 6150.00 214.23 -529.32 2' 15.263 32' 18.245 W Polygon

sECTION DETAILS - - 0 ------___ eswo MD Inc Azi TVD +NI·S +El-W Dieg TFace VSect Annotation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 Start Build 2.00 1013.50 8.27 292.03 1012.07 11.18 -27.61 2.00 292.03 29.79 Start 3348.63 hold at 1013.50 MD

-1.00 4362.12 8.27 292.03 4325.87 191.88 -474.09 0.00 0.00 511.45 Start Drop 5ÛÛ 5189.12 0.00 0.00 5150.00 214.23 -529.32 1.00 180.00 571.03 Start 1850.00 hold at 5189.12 MD 6189.12 0.00 0.00 6150.00 214.23 -529.32 0.00 0.00 571.03 TD at 8189.12

PROJECT DETAILS: Duchesno Co., UT (UT27C) REFERENCE INFORMATION

--- (Exact 1000 ------Geodetic system:US State Plano 1927 solution) Datum: NAD 1927 (NADCON CONUS) Co-ordinate (NIE) Reference: Well LC FEE 1·22D·56, True North Ellipsoid: Clarke 1866 Vertical (TVD) Reference: WELL@ 6515.00usit (Berry Rig 5) Zone: Utah Central 4302 Section (VS) Reference: Slot - (0.00N, 0.00E) Measured Depth Reference: WELL@ 6515.00usft (Berry Rig 5) System Datum: Mean Sea Level Calculation Method: Minimum Curvature

1500- -- FORMATION TOP DETAILS

TVDPath MDPath Formation 374.00 374.00 Green River 925.77 926.48 Green River Fouch Mkr - -- - 2000 -- - 1499.77 1506.33 Mahogany 2518.96 2536.23 Tgr3 Mkr 3291.59 3316.98 Douglas Creek 3920.47 3952.47 Upr Black Shale C n o

- 2500 - -- - - 5996.02 6035.15 CR-6

i Azimuths to True North 3000 M 11.49: 1250 - / \ Magnetic North: PBHL A 214.23 N, 529.32 W Magnetic Fiek 52182.1sn i 661' FNL & 657' FEL Strength: SEC.22-T5S R6W D Angi : 9 3500 .. 1000 - Target Eox is 460' Within Model: IGRF201C NE il4 il4

4000 upr Black sua 750 -

8 Wasatch C CastiePeak

Uteland Butte CastePeak

4500 - .. 500 - o

5000 - w 250

5500--

0 -- owos s

owns 6000 - - 250- seesho sono one

NENE1/41/4

6500 - - 500 - SHL 876 FNL & 129' FEL SEC.22-TSS-R6W

7000 -

1000 -1250 -1000 -750 -500 250 0 250 500 West(-)/East(+) (500 usftlin) Plan: Design #2 (LC FEE 1-22D-56/Wellbore #1) -1E00 -500 0 500 1000 1500 2000 Vertical Section at 292 03° (1000 usftlin) Created By: BRET WOLFORD Date: 8:42, July 28 Berry Petroleum Company Duchesne Co., UT (UT27C) Sec.22-TSS-R6W LC FEE 1-22D-56

Wellbore #1

Survey: Survey #1

Standard Survey Report

28 July, 2011

A GREATWillTE DarECTMML NEMIŒ4 Great White Directional Services, LLC GRERWHifE Survey Report a ...mma..mau.«

1-22D-56 Company Berry Petroleum Company Local Co-ordinate Reference: Well LC FEE WELL 6515 00usft (Berry Rig 5) Project: Duchesne Co , UT (UT27C) TVD Reference: @ Site: Sec.22-T5S-R6W MDReference: WELL @6515.00usft (Berry Rig 5) Well: LC FEE 1-22D-56 North Reference: True Wellbore: Wellbore #1 Survey Calculation Method: Minimum Curvature Design: Wellbore #1 Database: EDM5000 1 EDMDBBW

Project Duchesne Co , UT (UT27C)

Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Utah Central 4302

40° Northing: 619,689.922 usft Latitude: 1' 50.850 N Site Position: 110° From: Lat/Long Easting: 2,267,536.354 usft Longitude: 32' 40.400 W ° Position Uncertainty: 0.00 usft SlotRadius: 13-3/16" Grid Convergence: 0.61

Well LC FEE 1-22D-56 40° 13.146 N Well Position +NI-S 0.00 usft Northing: 621,969.845 usft Latitude: 2' 110° +El-W 0.00 usft Easting: 2,269,764.543 usft Longitude: 32' 11.440 W 6,501.00 usft Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level:

Wellbore Wellbore #1

Wtagnetics Modet Name Sample Date DecItnation Dip Anste Field6trength (*) (*) (nT)

IGRF2010 07/15/11 11 49 65 69 52,182

Design Wellbore #1

Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00 +NI-8 +El-W Direction Vertical Section: Depth Prom (TVD) (*) (usft) (usit) (usit) 0.00 0.00 0.00 292.03

Survey Program Date 07/28/1'l From To {usft) (usN Survey(We11bore) ToolName Description

701 00 6,214 00 Survey #1 (Wellbore #1) MWD MWD - Standard

Survey

Measured Vertical Vertical Dogleg Bulld Turn Depth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rete (°I100usft) (*/100usft) (°IiC0usft) (us¾ (*) (•) (usft) (ustt) (usft) (usft)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 First OWDS survey

-9.86 701.00 3.38 173.56 700.59 -20.54 2.32 0.48 0.48 0.00

-10.83 -0.84 758.00 2.90 195.01 757.51 -23.60 2.13 2.21 37.63

-9.80 820.00 3.69 239.92 819.42 -26.12 0.00 4.23 1.27 72.44

-6.04 881.00 5.49 263.21 880.22 -27.45 -4.60 4.19 2.95 38.18

942.00 7.25 275.69 940.85 -27.41 -11.32 0.21 3.66 2.89 20.46 1,035.00 10.41 279.73 1,032.73 -25.41 -25.45 14.06 3.46 3.40 4.34 1,132.00 11.03 283.34 1,128.04 -21.79 -43.12 31.79 0.94 0.64 3.72

-1.29 1,227.00 9.80 289.22 1,221.48 -17.03 -59.59 48.85 1.71 6.19

-0.37 1,322.00 9.45 293.27 1,315.14 -11.28 -74.39 64.73 0.80 4.26

-0.56 -3.80 1,417.00 8.92 289.66 1,408.92 -5.73 -88.49 79.88 0.82 1,512.00 9.14 293.71 1,502.75 -0.21 -102.34 94.78 0.71 0.23 4.26

07/28/11 8:42:04AM Page 2 COMPASS fi000.1Build Great White Directional Services, LLC GREATWHilE Survey Report y ..m.ma....me.

1-22D-56 Company: Berry Petroleum Company L cal Co-ordinate Reference: Well LC FEE Project: Duchesne Co., UT (UT27C) TVD Reference: WELL @6515.00usft (Berry Rig 5) Site: Sec.22-T5S-R6W MD Reference: WELL @6515.00usft (Berry Rig 5) Well: LC FEE 1-22D-56 North Reference: True Weilbore: Wellbore #1 Survey Calculation Method: Minimum Curvature Design: Wellbore#1 Database: EDM 5000.1 EDMDBBW

Survey

Measured Vertical Vertical Dogleg Bulld Turn Depth Inclination Mimuth Depth +NI-S +El-W Section Rate Rate Rate (*Ii00usft) (*I1DDusit) (*I100usit) (usft) (*) 1°) (usA) (usft) (usit) (usit)

-0.73 -5.31 1,608.00 8.44 288.61 1,597.62 5.10 -116.00 109.44 1.09 .

-0.09 1,703.00 9.01 288.52 1,691.52 9.69 -129.66 123.82 0.60 0.60

-0.19 1,798.00 8.83 293.00 1,785.37 14.90 -143.42 138.54 0.76 4.72

1,893.00 9.80 297.49 1,879.12 21.48 -157.31 153.88 1.28 1.02 4.73

-0.04 -0.93 1,988.00 9.76 296.61 1,972.74 28.82 -171.68 169.95 0.16

-0.23 -0.93 2,083.00 9.54 295.73 2,066.40 35.84 -185.97 185.83 0.28

-0.38 -2.06 2,177.00 9.18 293.79 2,159.14 42.25 -199.85 201.10 0.51

-0.32 -1.21 2,271.00 8.88 292.65 2,251.98 48.07 -213.40 215.85 0.37

2,366.00 8.17 293.36 2,345.93 53.57 -226.37 229.93 0.76 -0.75 0.75 2,461.00 9.01 293.71 2,439.86 59.24 -239.38 244.12 0.89 0.88 0.37

-0.37 -0.83 2,556.00 8.66 292.92 2,533.74 65.01 -252.78 258.70 0.39 2,651.00 9.27 294.76 2,627.57 71.00 -266.31 273.50 0.71 0.64 1.94

-0.41 -1.85 2,746.00 8.88 293.00 2,721.39 77.07 -280.01 288.47 0.50

-0.33 2,839.00 8.57 297.57 2,813.31 83 09 -292.76 302.55 0.82 4.91

-0.69 -2.49 2,934.00 7.91 295.20 2,907.33 89.15 -304.95 316.12 0.78

-3.98 3,029.00 8.66 291.42 3,001.34 94.54 -317;52 329.80 0.98 0.79

-0.56 3,124.00 8.13 295.46 3,095.32 100.04 -330.24 343.65 0.83 4.25

-2.67 3,219.00 8.39 292.92 3,189.33 105.63 -342.69 357.29 0.47 0.27

-0.23 -4.22 3,315.00 8.17 288.87 3,284.34 110.56 -355.60 371.10 0.65 3,410.00 8.92 291.16 3,378.28 115.40 -368.86 385.21 0.87 0.79 2.41

-1.34 -5.64 3,505.00 7.65 285.80 3,472.29 1t9.78 -381.81 398.86 1.56

-0.19 3,599.00 8.39 285.62 3,565.37 123.33 -394.43 411.89 0.79 0.79 3,694.00 8.44 285.97 3,659.35 127.12 -407.81 425.71 0.08 0.05 0.37

3,789.00 7.21 289.40 3,753.46 131.02 -420.14 438.60 1.38 -1.29 3.61

-0.42 -4.81 3,884.00 6.81 284.83 3,847.75 134.44 -431.21 450.15 0.72

-1.42 3,977.00 7.65 283.51 3,940.01 137.30 -442.55 461.74 0.92 0.90

-0.46 -1.57 4,072.00 7.21 282.02 4,034.21 140.01 -454.53 473.86 0.51 4,167.00 7.60 283.25 4,128.42 142.70 -466.48 485.94 0.44 0.41 1.29

-5.18 4,262.00 8.66 278.33 4,222.46 145.17 -479.67 499.10 1.33 1.12

-0.65 4,358.00 8.75 277.71 4,317.36 147.20 -494.06 513.20 0.14 0.09

-0.88 4,453.00 7.91 279.56 4,411.36 149.25 -507.67 526.58 0.93 1.95 4,548.00 7.08 292.92 4,505.55 152.62 -519.51 538.82 2.03 -0.87 14.06

-0.46 4,643.00 6.64 293.76 4,599.87 157.11 -529.92 550.16 0.48 0.88

-0.69 -2.00 4,738.00 5.98 291.86 4,694.29 161.17 -539.54 560.60 0.73

-0.65 -3.61 4,833.00 5.36 288.43 4,788.83 164.4† -548.35 569.98 0.74 4,928.00 5.84 296.26 4,883.38 167.96 -556.89 579.23 0.95 0.51 8.24

-0.54 5,024.00 5.32 300.83 4,978.92 172.40 -565.09 588.49 0.71 4.76

-0.56 5,119.00 4.79 310.58 5,073.55 177.23 -571.89 596.61 1.06 10.26

-1.17 -1.78 5,213.00 3.69 308.91 5,167.30 181.69 -577.22 603.22 1.18

-1.20 -5.74 5,308.00 2.55 303.46 5,262.15 184.77 -581.36 608.22 1.24

-1.11 5,403.00 2.72 302.41 5,357.05 187.15 -585.03 612.51 0.19 0.18

-0.55 5,498.00 2.20 308.91 5,451.97 189.50 -588.35 6t6.47 0.62 6.84 5,594.00 2.20 309.00 5,547.89 191.82 -591.22 620.00 0.00 0.00 0.09

-3.98 5,689.00 2.20 305.22 5,642.82 194.02 -594.12 623.52 0.15 0.00

-10.55 5,784.00 1.89 295.20 5,737.76 195.73 -597.03 626.86 0.50 -0.33

-5.64 5,879.00 1.93 289.84 5,832.71 196.94 -599.95 630.02 0.19 0.04

-1.39 5,974.00 1.93 288.52 5,927.66 198.00 -602.98 633.21 0.05 0.00

-0.23 6,069.00 1.71 289.93 6,022.61 198.99 -605,82 636.23 0.24 1.48

Last GWDS Survey

-0.08 -6.02 6,164.00 1.63 284.21 6,117.57 199.80 -608.47 638.98 0.19 Pr6

-0.08 -6.02 1.59 281.20 6 5 200.11 -609.84 640.37 0.19

07/28/11 8:42:04AM Page 3 COMPASS 5000.1 Build Great White Directional Services, LLC GREATWMTE Survey Report

Company: Berry Petroleum Company Local Co-ordinate Reference: Well LC FEE 1-22D-56 Reference: WELL 6515.00usft (Berry Rig 5) Project: Duchesne Co , UT (UT27C) TVD @ Site: Sec.22-T5S-R6W MD Reference: WELL @6515.00usft (Berry Rig 5) Well: LC FEE 1-22D-56 North Reference: True Wellbore; Wellbore #1 Survey Calculation Method: Mimmum Curvature Design: Wellbore #1 Database: EDM 5000 1 EDMDBBW

Survey Annotations

Measured Vertical Local Coordinates Depth Depth +NI-8 +El-W (usft) (usft) (usft) (usft) Comment

701.00 700.59 -20.54 2.32 First GWDS Survey 6,164.00 6,117.57 199.80 -608.47 Last GWDS Survey 6,214.00 6,167.55 200.11 -609.84 Proj. to TD

Checked By: Approved By: Date:

07/28/11 8:42 04AM Page 4 COMPASS5000 1 Build Sundry NumberNumber: : 21745 API Well NumberNumber: : 4301350718000043013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE DESIGNATION AND SERIAL NUMBER: DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNIT7.UNITor or CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. 1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 Box 7735 ,, Roosevelt, UT, 84066 303 999-4044 Ext LAKE CANYON

4. LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR,QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE: Qtr/Qtr:QtrlQtr: NENE Section: 22 Township: 05.0S Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIACIDIZEDIZE ALTER CASING CASING REPAIR NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 1/16/2012 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSUBSEQUENTREPORT REPORT DEEPEN FRACTUREFRACTURETREAT TREAT NEWNEWCONSTRUCTION CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCAT WELL DETERMINATION OTHER OTHER: COMPL PROCEDURE

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED COMPLETION PROCEDURE FOR THE LC FEE Approved by the 1-22D-56.1-22D-56. Utah Division of OFI, Gas and Mining

Date: January 12,12, 2012

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLE Brooke Broadhead 435 722-1325 Regulatory Assistant SIGNATURE DATE N/A 1/5/20121/5/2012

RECEIVEDRECEIVED: : JanJan. . 0505,, 2012 Sundry NumberNumber: : 21745 API Well NumberNumber: : 4301350718000043013507180000

UTAH DNR The Utah Division of Oil, Gas, and Mining

- State of Utah

- Department of Natural Resources

Electronic Permitting System - Sundry Notices OTI. GAS N1NTNG

Sundry Conditions of Approval Well Number 43013507180000

Requirements of R649-3-22 should be met prior to commingling production.

RECEIVEDRECEIVED: : JanJan. . 1212,, 2012 Sundry NumberNumber: : 21745 API Well NumberNumber: : 4301350718000043013507180000 Berry Petroleum Company 1999 Broadway, Suite 3700 Denver, CO 80202 Main (303) 999-4400 Fax (303) 999-4401 www.bry.com Date: 1-6-2012

Well Name: LCT1-22D-56 API#: 43-013-50718 Location: Sec 22-T5S-R6W County, State: Duchesne County, Utah

SHL: 876 FNL& 129 FEL BHL: Elevations: 6515 ft KB;6501 ft GL RTD: 6214 ft PBTD: 6141ft; float collar Surf Csg: 8 5/8" 24# J-55 @ 655 ft; cmt w/ 330 sks cmt Prod Csg: 5 1/2" 15.5# J-55 @ 6189 ft; cmt w/ 170 sks lead &.305 sks tall Wasatch perfs 5809-5006

Green River Completion Procedure:

1. Mí RU pulling unit. POOH with production equipment 2. Make scraper run. 3. RU EL,Set frac plug at 4950' 4. Perforate and frac Green river in multiple stages from 4788'-3620' with standard 20# borate cross linkfluid system with following additives. CL-57 Liquid Kci Replacernent MAV-3 Guar Gel NE-6 Non-Emulsifier BREAKER-503L Liquid Enzyme Breaker MAVCIDE Il Biocide MAVLINKBW Borate X-Linker (Winterized) SOLU-BALLS 7/8 Inch 1.1 Spgr IC-100 Iron Control MAVHlB-3 Acid Inhibitor (Moderate Temp) HCL 15%

5. Drillout frac plugs, 6. Run production equipment. 7. Return well to production with Green River and Wasatch

RECEIVED: Jan. 05, 2012 Sundry NumberNumber: : 21688 API Well NumberNumber: : 4301350718000043013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE DESIGNATION AND SERIAL NUMBER: DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNIT7.UNITor or CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. 1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 Box 7735 ,, Roosevelt, UT, 84066 303 999-4044 Ext LAKE CANYON

4. LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR,QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE: Qtr/Qtr:QtrlQtr: NENE Section: 22 Township: 05.0S Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIACIDIZEDIZE ALTER CASING CASING REPAIR NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 1/15/20121/15/2012 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCATWELLDETERMINATIONWILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. ININ ACCORDANCE WITH UTAH DIVISION OF OIL, GAS AND MINING RULE Approved by the R649-3-22 COMPLETION INTO TWO OF MORE POOLS, BERRY Uggl¡Lggyign2002January 19, 2012 PETROLEUM IS SUBMITTING THIS SUNDRY FOR COMINGLING THE Oil, Gas and IAining WASATCH AND GREEN RIVER FORMATIONS AS ALLOWED UNDER UTE Date: TRIBAL EDA #5500. By:

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 1/3/20121/3/2012

RECEIVEDRECEIVED: : JanJan. . 0303,, 2012 Sundry NumberNumber: : 21688 API Well NumberNumber: : 4301350718000043013507180000

AFFIDAVITOF NOTICE

I, Joe W. Judd, the affiant herein, beingof lawful age and dulysworn upon his oath deposes and states as follows:

Joe W. Judd is a landman for Berry Petroleum Company, a Corporation, with headquarters located at 1999 Broadway, Suite 3700, Denver, Colorado 80202, and is duly authorized to make fhisaffidavit on behalf of said corporation.

Berry Petroleum Company has submitted sundry notices to commingle production from the Wasatch and Green River formations in the followingwells lyingwithin the boundaries of the Ute Tribal

LakeCanyon Exploration and Development Agreement - BIALease # 14-20-H62-5500:

LCFee 1-22D-56 LCTribal 3-15D-56 #1 DLB 12-15-56

This Affidavit is made in accordance with Utah's Oil, Gas and Mining regulation R649-3-22. As operator, Berry Petroleum Company has provided sundry noticesto the owner(s) of all contiguous oil and gas reasesor drillingunits overlying the pool for the aforementioned wells to the parties listed below:

United States Department of the Interior Bureau of indian Affairs-Uintah & Ouray Agency Attention: Dinah Peltier-Acting Superintendent 988 South 7500 East Fort Duchesne, UT84026

This instrument is executed this day of December, 2011.

Berry Petroleum Company

Joe'W.Judd

RECEIVED: Jan. 03, 2012 Sundry NumberNumber: : 21688 API Well NumberNumber: : 4301350718000043013507180000

. si

e

lii 1

RECEIVED: Jan. 03, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE DESIGNATION AND SERIAL NUMBER: DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNIT7.UNITor or CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. 1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-561-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 Box 7735 ,, Roosevelt, UT, 84066 303 999-4044 Ext LAKE CANYON

4. LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR,QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE: Qtr/Qtr:QtrlQtr: NENE Section: 22 Township: 05.0S Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIACIDIZEDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE SUBSEQUENT REPORT Date of Work Completion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION 1/19/20121/ 19/2 0 12 OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORT PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT Report Date: WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCATWELLDETERMINATIONWILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED RECOMPLETION FOR THIS WELL. UTELAND Accepted by the BUTTE PERFORATIONS WERE ADDED FROM 4624-4788 (32 HOLES), Utah Division of CASTLE PEAK FROM 4280-4596 (48 HOLES) AND DOUGLAS CREEK Oil, Gas and Mining PERFORATIONS FROM 3628-3722 (24 HOLES). FOR RECORD ONLY February 01, 2012

NAME (PLEASE PRINT) PHONE NUMBER TITLE Brooke Broadhead 435 722-1325 Regulatory Assistant SIGNATURE DATE N/A 2/1/2012

RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 1, Report Date: 1/7/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 4,940 4,940 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SIRU. RD pumpipumpingng unit. Unseat pump. Flush rods w/wl 30 bbls water. LD rods on trailer. X-over for tbg. ND wellhead. NU BOP. Release TAC. Flush tbg. wlw/ 35 bbls. POOH w/wl 122 jts tbg. SWIFN.

65 BWTR.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 4,440 ICC-RIGCOST-COMPLETION No 152 2111 ICC 500 ICC-TRUCKING&HAULING No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 2, Report Date: 1/9/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 3,895 8,835 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. Cont. POOH wlw/ tbg. LD BHA. RIH wlw/ 5 1/2"1/2" csg. scraper & 182 jts 2 7/8" tbg. POOH wlw/ tbg. laying tbg. on trailer. LD scraper. X-over for 3 1/2"1/2" tbg. SWIFN.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 3,895 ICC-RIGCOST-COMPLETION No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 3, Report Date: 1/10/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 10,90810,908 19,74319,743 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. RU wireline. Perf Utteland Butte & Green River zones. RD wireline. Pressure climbed to 1200 psi after last perf run. Bleed off well. Bled down to 100100 psi on full 2" line. All gas, no fluid. Kill well wlw/ 80 bbls water. RIH wlw/ 5 1/2" TS plug, on/offonloff tool, 6' x 2 7/8" tbg. sub, 5 1/2"1/2" HD pkr & 11 jts 3 1/2"1/2" tbg. (tallying & drifting). Well kicked off flowing. Kill well wlw/ 40 bbls water. Cont. RIH wlw/ tbg. Picked up 1212 jts & well kicked off flowing. SWIFN.

Pumped 120 bbls. Recovered 40 bbls. 80 BWTR.

Total of 145 BWTR.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 3,628 ICC-RIGCOST-COMPLETION No 152 2345 ICC 7,280 ICC-PERFORATING No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 4, Report Date: 1/11/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 3,418 23,161 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 15001500 psi, SITP @ 15001500 psi. Bled well down to 100 psi on full 2" line. RU pump. Kill tbg. w/wl20 20 bbls water. Strip washington rubber tbg. RIH w/wl 15 jts 3 1/2" tbg. Well kicked off flowing. Kill tbg. wl20w/ 20 bbls water. Cont. RIH wlw/ 30 jts 3 1/2" tbg. Well kicked off flowing. Kill well wlw/ 20 bbls water. Cont. RIH wlw/ 50 jts 3 1/2"1/2" tbg. Well kicked off flowing. Kill tbg. wlw/ 30 bbls water. Cont. RIH wlw/ 3 1/2"1/2" tbg. Set TS plug @ 4851' & HD pkr. @ 4615'. RU Maverick. Pressure test lineslines & frac stage #1.

00:00 00:00 Open: 20 psi Broke @ 3043 @ 1.5 bpm. Max rate: 32 bpm Avg rate: 30 bpm Max pressure: 4760 psi. Avg pressure: 3203 psi. ISIP:ISIP: 3620 psi FG: 1.2 Total fluid pump: 811 bbls 39,000#'s 16/30 Texas Gold Open well to tank for cleanup. Flow well for 2 hrs. Recovered 300 bbls. SWIFN.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 3,418 ICC-RIGCOST-COMPLETION No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in)Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 5, Report Date: 1/12/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 2,623 25,784 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 100100 psi, SITP @ 100 psi. Bleed off well. RIH wlw/ tbg. Tag fill @ 44806'. C/OCIO to TS plug @ 4851'. Release plug. LD tbg. Set TS plug @ 4615' & HD pkr. @ 4230'. 00:00 00:00 RU Maverick. Pressure test lines & frac stage #2.

Open: psi Broke @ 1671 @ 6.1 bpm. Max rate: 35 bpm Avg rate: 33 bpm Max pressure: 5500 psi. Avg pressure: 3937 psi. ISIP:ISIP: 19981998 psi

FG: .88 Total fluid pump: 950 bbls 85000#'s 16/3016/30 Texas Gold. Screened out wlw/ 13 bbls into flush. Left approx. 3500#'s sand in tbg.

00:00 00:00 Open tbg. to tank for cleanup. Tbg. flowed for 30 min & died. Pressure up on csg. Release HD pkr. Circulate sand out of tbg. Shut down pump. Flow tbg. to tank for 2.5 hrs. Recovered 350 bbls. SWIFN.

Total BWTR: 1111 bbls.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 2,623 ICC-RIGCOST-COMPLETION No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in)Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 6, Report Date: 1/13/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 4,450 30,234 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 50 psi, SITP @ 300 psi. Bleed off well to tank. RIH wlw/ tbg. Tag fill @ 4540'. C/OCIO to TS plug @ 4615'. Release plug. Move up hole. Attempt to set TS plug w/wl no success. RIH wlw/ tbg. Tag TS 4615'. Release plug. Move up hole. Attempt to set TS plug w/wl no success. POOH w/wl tools. No plug. SWIFN.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 4,450 ICC-RIGCOST-COMPLETION No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 7, Report Date: 1/14/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 188,197 218,431 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 0 psi. RIH wlw/ TS plug, on/offonloff tool, 6' x 2 7/8" tbg., HD pkr & 3 1/2" tbg. Set TS plug @ 3748' & HD pkr. @ 3606'. 00:00 00:00 RU Maverick. Pressure test lines & frac stage #3.

Open: 83 psi Broke @ 1540 @ 7.8 bpm. Max rate: 30.1 bpm Avg rate: 15.7 bpm Max pressure: 5405 psi. Avg pressure: 2827 psi. ISIP:ISIP: 12701270 psi

FG: .78 Total fluid pump: 729 bbls 56,010#'s 16/30 Texas Gold.

00:00 00:00 RD frac crew. Open well to tank for flowback. Flow well for 3.5 hrs. Recovered 300 bbls.

15401540 BWTR.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 4,055 ICC-RIGCOST-COMPLETION No 152 2360 ICC 184,142 ICC-STIMULATION/ACIDIZINGICC-STIMULATIONIACIDIZING No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 8, Report Date: 1/17/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 20,199 238,630 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 0 psi, SITP @ 0 psi. Release HD pkr. RIH wlw/ tbg. Tag fill @ 3673'. C/OCIO to TS plug @ 3748'. ReleasReleasee TS plug. POOH w/wl tbg. (laying down 3 1/2" tbg.) LD tools. RIH wlonloffw/ on/off tooltool.. Latch on to TS plug. Release TS plug. POOH wlw/ tbg. LD tools. RIH w/wl 1 jt 2 7/8" tbg., drain collar, PSN, type T tac & 148 jts 2 7/8" tbg. SWIFN.

15401540 BWTR.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 5,005 ICC-RIGCOST-COMPLETION No 152 2381 ICC 15,19415,194 ICC-DOWNHOLERENTALS No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in) Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry NumberNumber: : 22647 API Well NumberNumber: : 4301350718000043013507180000 BerryBerry DailyDaily Completion and Workover

Report # 9, Report Date: 1/18/2012 Well Name: LC FEE 1-22D-56 API/UWIAPllUWI Surface Legal Location Spud Date Field Name APD State 43013507180000 NENE Sec 22 T5S-R6W 7/18/2011 7:30:00 AM Lake Canyon Utah Well Configuration Type Original KB Elevation (ftKB) KB-Ground Distance (ft) KB-Tubing Head Distance (ft) Ground Elevation (ftKB) 6,515 14.0014.00 6,501

Primary Job Type Secondary Job Type Recompletion Recompletion Objective

Contractor Rig Number Monument Well Service 733 AFE Number Total AFE Amount Daily Cost Cum Cost To Date 6,320 244,950 Weather T (°F) Road Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Job Contact Title Mobile

Time Log Start Time End Time Dur (hrs) Code 1 Operation Comment 00:00 00:00 Hold safety meeting. SICP @ 0 psi, SITP @ 0 psi. Cont. RIH w/wl tbg. ND BOP. Set TAC @ 5828' wlw/ 12,000#12,000# tension. NU wellhead. X-over for rods. RIH w/wl Central Hydraulic 2 1/2" x 1 3/4" x 20' x 24' RHBC pumpumpp wlw/ Eagle valve, 4- 1 1/2"1/2" weight bars w/wl stabalizer subs, 15- 3/4" guided rods (6 per), 160-160- 3/4" guided rods (4 per), 51- 7/8" guided rods (4 per), 1- 6', 2' x 7/8" pony subs, 1 1/2"1/2" x 26' polished rod. Seat pump. Fill tbg. wlw/ 2 bbls water. Stroke test to 500 psi. Good pump action. RU pumping unit. Hang off rods. RD. PWOP @ 5:00 p.m. 15421542 BWTR.

Report Fluids Summary FluidTo well (bbl) From well (bbl)To lease (bbl) From lease (bbl)

Daily Costs Code 1 Code 2 Code 3 Cost Cost DescriptionVendor Carry Fwd? 152 2305 ICC 4,575 ICC-RIGCOST-COMPLETION No 152 2340 ICC 1,145 ICC-HOT OILING No 152 2111 ICC 600 ICC-TRUCKING&HAULING No Safety Checks Time DescriptionType Comment

Logs DateType Top (ftKB) Btm (ftKB) Cased? No

Perforations Date ZoneTop (ftKB) Btm (ftKB) Current Status

Date ZoneType Stim/Treat Company

Stg No.No- Stage Type Top (ftKB) Btm (ftKB)V (pumped) (bbl)

Other In Hole Description Run Date OD (in)Top (ftKB) Btm (ftKB)

Cement Description Start Date Cement Comp

www.peloton.com Page 1/1 Report Printed: 1/24/2012 RECEIVEDRECEIVED: : FebFeb. . 0101,, 2012 Sundry Number: 22563 API Well Number: 43013507180000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE DESIGNATION AND SERIAL NUMBER: DIVISION OF OIL, GAS, AND MINING FEE

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNIT or CA AGREEMENT NAME: FOR PERMIT TO DRILL form for such proposals. 1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well LC FEE 1-22D-56

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013507180000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 4000 South 4028 West Rt 2 Box 7735 , Roosevelt, UT, 84066 303 999-4044 Ext LAKE CANYON

4. LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 0876 FNL 0129 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE: Qtr/Qtr: NENE Section: 22 Township: 05.0S Range: 06.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 1/7/2012 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCAT WELL DETERMINATION OTHER OTHER: CMPL PROCEDURE

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED RE-COMPLETION PROCEDURE FOR THE LC FEE 1-22D-56.

February 02, 2012

NAME (PLEASE PRINT) PHONE NUMBER TITLE Brooke Broadhead 435 722-1325 Regulatory Assistant SIGNATURE DATE N/A 1/26/2012

RECEIVED: Jan. 26, 2012 Sundry NumberNumber: : 22563 API Well NumberNumber: : 4301350718000043013507180000

Berry Petroleum Company 1999 Broadway, Suite 3700 Denver, CO 80202 Main (303) 999-4400 Fax (303) 999-4401 www.bry.com Date: 1-6-2012

Well Name: LCT1-22D-56 APl#: 43-013-50718 Location: Sec 22-T5S-R6W County, State: Duchesne County, Utah

SHL: 876FNL&129FEL BHL: Elevations: 6515 ft KB;6501ft GL RTD: 6214 ft PBTD: 6141 ft; float collar Surf Csg: 8 5/8" 24# J-55 @655 ft; cmt w/330 sks cmt Prod Csg. 5 1/2" 15.5# J-55 @6189 ft; cmt w/ 170 sks lead &305 sks tail Wasatch perfs 5809-5006

Green River Completion Procedure:

1. MI RU pulling unit. POOH with production equipment 2. Make scraper run. 3. RU EL,Set frac plug at 4950' 4. Perforate and frac Green river in multiple stages from 4788'-3620' with standard 20# borate cross linkfluid system with following additives. CL-57 Liquid Ket Replacement MAV-3 Guar Gel NE-6 Non-Emulsifier BREAKER-503L Liquid Enzyme Breaker MAVCIDE Il Biocide MAVL1NKBW Borate X-Linker (Winterized) SOLU-BALLS 7/8 inch 1.1 Spgr IC-100 lion Control MAVHIB-3 Acid Inhibitor (Moderate Temp) HCL 15%

5. Drillout frac plugs. 6. Run production equipment. 7. Return well to production with Green River and Wasatch

RECEIVED: Jan. 26, 2012 STATE OF UTAH FORM6 DEPARTMENTOF NATURALRESOURCES DIVISIONOF OIL,GAS AND MINING

ENTITYACTIONFORM

2480 Operator: BERRY PETROLEUM Operator Account Number: N Address: 4000 S. 4028 W.

City ROOSEVELT (435) 722-1325 state UT zip 84066 Phone Number:

Well 1

API Number Well Name QQ Sec Twp Rnf - County 4301350718 LC FEE 1-22D-56 NENE 22 SS 6W DUCHESNE Action Code Current Entity NewiEntity Spud Dale Entity Assignment Number Number Effective Date 7/6/2011 2\ 20 Q Comments: WELLCOM L TED TO THE WA TCH

Well 2 ÀÑÙNumber Well Name QQ Sec Twp Rng County

Action Code Current Entity New Entity Spud Date . Entity Assignment

Number Number . . Effective Date

Comments:

A'PÚNumber Well Name QQ Sec Twp Rng County

Assignment Action Code Current Entity , New Entity Spud Date Entity Number - Number Effective Date

Comments:

ACTION CODES: I¯stablish BROOKE KENNEDY A - new entity for new well(single well only) (Please Pri B - Add new well to existing entity (groupor unit well) e t)

C - Re-assign well from one existlng entity to another existing entity my,

- signature G D Re-assign well from one existing entity til_y REGULATORYASSISTANT 2/16/2012 E - Other (Explain in 'comments'section) IVED Title Date FEB17 2012 (5/2000) Div.of00,Gas&