Environmental Clearance for Proposed Construction Project at,

APPENDIX – I FORM – I (I) Basic Information: Sr. Item Details No. 1. Name of the Project/s Building and construction project 2. S. No. in the Schedule 8 (a) 3. Proposed capacity/area/length/tonnage to be handles/command area/lease area/number of Proposed Plot Area : 38250.00 SQM. wells to be drilled Proposed Built Up Area (FSI): 40276.67 SQM. Proposed Construction area : 45201.55 SQM. 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. NA 6. Category of Project i.e. ‘A’or ‘B’ Category ‘B’ 7. Does it attract the general condition? If yes, Not Applicable please specify 8. Does it attract the specific condition? If yes, Not Applicable please specify 9. Location Plot/Survey/Khasra No. Gut No.-133,Gut No.-134,H.No.1 &2 Village Umroli Tehsil Plaghar State 10. Nearest railway station/airport with distance in Nearest Railway station: Umroli at 1.0 km kms Nearest Airport: CST Airport at 75.0 km 11. Nearest Town, city, District Headquarters along Town: – approx. 6.5 km with distance in kms City : Palghar District: Palghar 12. Village Panchayats, Zilla Parishad, Municipal ADTP Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/S Shreenath Enterprises 14. Registered Address C/303 Shalibhadra Regency, 100 Feet, Nalasopara,Link Road,Nalasopara (West) 15. Address for Correspondence C/303 Shalibhadra Regency, 100 Feet, Nalasopara,Link Road,Nalasopara (West) Name Naresh Jain Designation (Owner/Partner/CEO) Partner Address C/303 Shalibhadra Regency, 100 Feet, Nalasopara,Link Road,Nalasopara (West) Pin Code Telephone no. 9322256788 Fax No. -

4

Environmental Clearance for Proposed Construction Project at, Palghar

16. Details of Alternative sites examined if any Not Applicable location of these sites should be shown on a toposheet 17. Interlinked Projects Not Applicable 18. Whether separate application of interlinked Not Applicable project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not Applicable a. The Forest (Conservation) Act, 1980? b. The Wildlife (Protection) Act, 1972? c. The C.R.Z Notification, 1991? 22. Whether there is any Government order/Policy NA relevant/relating to the site? 23. Forest land involved (hectares) Not Applicable 24. Whether there is any litigation pending against Not Applicable the project and /or land in which the project is propose to be set up? Name of the court Case No. Orders/directions of the court, if any and its relevance with the proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist confirmation Yes/N Details thereof (with approximate quantities/ rates, No o wherever possible) with source of information data 1.1 Permanent or temporary change in No The proposed construction is in conformity with the land use, land cover or topography Regional Plan. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing Yes Land: The plot is a having gentle slope. Land, vegetation and building? Vegetation: No tree exists on the land to be developed. 1.3 Creation of new land uses? Yes The proposal is in conformity with the land use of the area as per the Development Plan. 1.4 Pre-construction investigation e.g. Yes The pre-construction investigation is under process. borehole, soil testing? 1.5 Construction works Yes The proposed construction project is consisting of construction of total fourteen buildings.

5

Environmental Clearance for Proposed Construction Project at, Palghar

Sr. Information/Checklist confirmation Yes/N Details thereof (with approximate quantities/ rates, No o wherever possible) with source of information data residential Building : G + 4; G + 7 1.6 Demolition work No NA 1.7 Temporary sites used for construction Yes There will be temporary housing facility for the works or housing of construction construction workers and temporary sheds will be workers? used for storage of the construction goods or materials. 1.8 Above ground buildings, structures or Yes The proposed construction project is consisting of earthworks including linear structures, construction of total ten buildings. cut and fill or excavations Earthwork will include excavation for creation of basement and foundation. The approximate quantity of earthwork will be approx. 8,226 cum 1.9 Underground works including mining No Not Applicable or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes Temporary sheds will be constructed for storage of materials? construction materials 1.15 Facilities for treatment or disposal of Yes Construction Phase: solid waste or liquid effluents? Temporary sanitation facility will be provided for construction workers by installing toilets with septic tank & soak pit.

Operation Phase: The site will have sewage treatment plant (STP) for treatment & reuse of waste water generated on site. The organic waste to be treated by mechanical- composting on site and inorganic waste will be disposed to municipal solid waste management system.

Please refer Annexure – II for Solid Waste Management. . Wastewater will be treated in Sewage Treatment Plant with MBBR (Moving Bed Bioreactor) Process. . Treated water will reused for flushing, & gardening purpose.

Please refer Annexure III for Water Supply and Wastewater Management. 1.16 Facilities for long term housing of No Not Applicable operational workers? 1.17 New road, rail or sea traffic during Yes Construction Phase

6

Environmental Clearance for Proposed Construction Project at, Palghar

Sr. Information/Checklist confirmation Yes/N Details thereof (with approximate quantities/ rates, No o wherever possible) with source of information data construction or operation? There will be temporary increase in traffic due to transport of construction material. Operation Phase There will be minor increase due to residents /visitors commuting to the residential and commercial areas from outside. 1.18 New road, rail, air waterborne or other Yes. Internal roads will be constructed as a part of the transport infrastructure including new project plan. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not Applicable pipelines? 1.21 Impoundment, damming, culverting, No Not Applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossing? No Not Applicable 1.23 Abstraction or transfers of water from No Not Applicable ground or surface waters? 1.24 Changes in water bodies or the land No Not Applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials for Yes Construction Phase: construction, operation or Construction materials will be transported to the site. decommissioning? Transport of workers employed for construction. Operation Phase: The persons in residential and commercial areas during operation phase will use public transportation facilities. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Construction phase: temporarily or permanently? Temporary and minor influx of construction laborers due to employment opportunities generated during construction phase. Operation Phase: This is a proposed residential complex. There will be a permanent influx of the people.

7

Environmental Clearance for Proposed Construction Project at, Palghar

Sr. Information/Checklist confirmation Yes/N Details thereof (with approximate quantities/ rates, No o wherever possible) with source of information data 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or No Land is Non-Agricultural. agricultural land (ha) 2.2 Water (expected source & Yes Construction phase: competing users) unit: KLD Source: Tanker water for construction activity and NMC for drinking and domestic use.

Requirement: Total = 50 m3/day (For domestic & drinking purpose to construction workers = 10 m3/day For construction activity = 40 m3/day)

Operation phase: Source: MJP/Ground water for drinking and domestic use and recycled water from STP for flushing, and gardening purpose.

Total Water Requirement = 648 m3/day (Fresh Water: 408 m3/day and recycled Water: 240 m3/day)

Please refer Annexure III for Water Supply and Wastewater Management. 2.3 Minerals (MT) Yes. The proposal pertains to the construction activity only. Raw materials like cement, sand segregate, gypsum will be used during construction.

8

Environmental Clearance for Proposed Construction Project at, Palghar

2.4 Construction material – stone, Yes Raw material requirement for construction: aggregates, sand / soil (expected Raw Material Requirement source – MT) Material Unit Quantity Cement Bags 986058 Steel MT 26054 Metal Cu. ft 4028847 Sand Cu. ft 2832127 Bricks Nos 61136403 Material shall be procured from local dealers. 2.5 Forests and timber (source – MT) No Not Applicable 2.6 Energy including electricity and Source: - MSEDCL fuels (source, competing users) Power requirement : Unit: fuel (MT), energy (MW) Yes . Construction Phase: 200 KVA . Operation Phase: 3800 KVA . For D. G. Sets: 125 x 4 KVA 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data

3.1 Use of substances or materials, No Not Applicable which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not Applicable or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes Living Conditions of local people are expected to improve. by changing living conditions? 3.4 Vulnerable groups of people who No Not Applicable could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

9

Environmental Clearance for Proposed Construction Project at, Palghar

4. Production of solid wastes during Construction or Operation or Decommissioning (MT/month) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not Applicable Yes Construction Phase: Approximately 1-2 MT/day debris will be generated during construction. Excavation quantity = approx. 15,226 cum Operation Phase: Municipal waste (domestic and or 4.2 Municipal Solid waste = 2.0 TPD commercial wastes) (Biodegradable) = 1.34 TPD (Non-biodegradable ) = 0.6 TPD Biodegradable: 60% & Non-biodegradable: 40% Please refer Annexure – II for Solid Waste Management. Hazardous wastes (as per No NA 4.3 Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable Yes Operation Phase: Sewage sludge or other sludge 4.6 About 20 kg of sludge will be generated during operation from effluent treatment phase. Yes Construction Phase: Construction or demolition Approximately 1-2 MT/day debris will be generated during 4.7 wastes construction phase. Excavation quantity = approx.15,226 cum Redundant machinery or No Not Applicable 4.8 equipment Contaminated soils or other No Not Applicable 4.9 materials Yes Organic wastes generated from landscaping will be treated in the proposed on-site organic Waste Converter & 4.10 Agricultural wastes the compost from the same will be reused for landscaping on site.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 5.1 Emissions from combustion of Yes. Vehicular pollution during construction and operation fossil fuels from stationary or phase. Use of DG sets as emergency power back-up will mobile sources add to slight emission of air pollutants. 5.2 Emissions from production No. Not applicable.

10

Environmental Clearance for Proposed Construction Project at, Palghar

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data processes 5.3 Emissions from materials Yes. During the construction phase, there will be some dust handling including storage or generation due to handling of raw material and movement transport of vehicles carrying raw material. 5.4 Emissions from construction Yes. There will be minor emissions from construction activities including plant and equipment & dust generation during construction activity & equipment raw material handling 5.5 Dust or odors from handling of Yes. During the construction phase, there will be some dust materials including construction generation due to handling of raw material and movement materials, sewage and waste of vehicles carrying raw material. 5.6 Emissions from incineration of No. Not applicable. waste 5.7 Emissions from burning of waste No. Not applicable. in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No. Not applicable. sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data Yes. Construction phase: Minor increase in noise is anticipated due to the ongoing construction activity, construction equipments / machines From operation of equipment e.g. and vehicles carrying construction materials. The 6.1 engines, ventilation plant, construction activity will be restricted to day time only. crushers Operation phase: Noise will be generated due to DG sets (only in case of power failures) and vehicular traffic From industrial or similar No. Not applicable. 6.2 processes 6.3 From construction or demolition Yes. Noise will be generated from the construction activity. 6.4 From blasting or piling No. Not applicable. Yes. Construction phase: Noise will be generated due to transport of trucks carrying the raw material/debris. From construction or operational 6.5 Operation phase: traffic During operation phase, traffic noise will be generated due to vehicles. However; adequate measures will be taken to curb the noise pollution at the site.

11

Environmental Clearance for Proposed Construction Project at, Palghar

No. Noise and vibrations generated by lighting or cooling 6.6 From lighting or cooling systems systems will be controlled and eliminated by adopting appropriate measures and acoustic treatment. No D.G. sets will be enclosed in acoustic enclosures as 6.7 From any other sources prescribed by CPCB to mitigate noise while in operation phase during power failure.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data From handling, storage, use or No. Not applicable. 7.1 spillage of hazardous materials No Construction Phase: The temporary toilets will be constructed by using septic tank & soak pit system for wastewater treatment and disposal. From discharge of sewage or other effluents to water or the Operation Phase: Wastewater will be treated in Sewage 7.2 land (expected mode and place of Treatment Plant. Treated water will reuse for flushing, discharge) and gardening purpose. Remaining treated water will be sent to municipal sewer line/ Please Refer Annexure – III for Water Supply and Wastewater Management. No. Not applicable. By deposition of pollutants Dust particles generated during construction will be 7.3 emitted to air into settled continuously by spraying water. STP will be the land or into water provided for wastewater treatment. 7.4 From any other sources No. Not applicable. Is there a risk of long term build No. Not applicable. 7.5 up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment: Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data From explosions, spillages, fires No. Not applicable. etc from storage, handling, use or 8.1 production of hazardous substances 8.2 From any other causes No. Not applicable.

12

Environmental Clearance for Proposed Construction Project at, Palghar

Could the project be affected by No N. A. natural disasters causing Palghar lies in Seismic Zone - II and the design and 8.3 environmental damage (e.g. construction will be done as per Indian Standards for floods, earthquakes, landslides, Zone-III Seismic category. cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned a activities in the locality:

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data 9.1 Lead to development of Yes New Proposal supporting. facilities, ancillary The proposed construction project is consisting of development or development construction of total 14 buildings stimulated by the project which Infrastructure proposed includes: could have impact on the . STP for treatment and recycling of waste water environment e.g.: generated on site. - Supporting infrastructure . Organic waste generated will be treated in (roads, power supply, waste or mechanical waste composting units on site. waste water treatment, etc.) . Rain Water Harvesting - Housing development . Adequate parking space - Extractive industries . Common amenity areas, landscaping etc. for green - Supply industries belt development. - Other 9.2 Lead to after-use of the site, No. Not applicable. which could have an impact on the environment 9.3 Set a precedent for later No. Not applicable. developments 9.4 Have cumulative effects due to No. Not applicable. proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity: Sr. Name / Aerial distance (within 15 km.) Areas No. Identity Proposed project location boundary Areas protected under international None Not Applicable conventions, national or local legislation for 1 their ecological, landscape, cultural or other related value Areas which are important or sensitive for yes Arabian sea located with in 10 km radius. 2 ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres,

13

Environmental Clearance for Proposed Construction Project at, Palghar

mountains, forests Areas used by protected, important or sensitive None Not Applicable 3 species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration yes Arabian sea located with in 10 km radius. 4 Inland, coastal, marine or underground waters

5 State/ National boundaries None Not Applicable Routes or facilities used by the public for None Not Applicable 6 access to recreation or other tourist, pilgrim areas 7 Defense installations No Not Applicable Yes The proposed project is located at umroli 8 Densely populated or built-up area village Areas occupied by sensitive man-made land Yes Hospital, school located in 10 km 9 uses (hospitals, schools, places of worship, community facilities) Areas containing important, high quality or yes Arabian sea located with in 10 km radius. scarce resources (ground water resources, 10 surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or None Not Applicable 11 environmental damage. (Those where existing legal environmental standards are exceeded) No N. A. Areas susceptible to natural hazard which could Palghar lies in Seismic Zone - II and the cause the project to present environmental design and construction will be done as 12 problems (earthquakes, subsidence, landslides, per Indian Standards for Zone-II Seismic erosion, flooding or extreme or adverse climatic category. conditions)

I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 14-09-2018 Place: Mumbai

14