Maine Environment

Total Page:16

File Type:pdf, Size:1020Kb

Maine Environment Maine Environment Spring 2012 Milestone for the Penobscot River: Removal of the Great Works Dam By Cheryl Daigle In mid-Spring, the base of the portage trail comprise Great Works. It is the first of adjacent to Orono Dam is flooded, and birch three major construction projects that Iand silver maple trees stretch reflections collectively will improve access to nearly across the water. The river courses past a thousand miles of habitat to realize the the newly greening riverbanks, whitewater Project’s goal to restore to the watershed roaring over and around outcrops of boulder self-sustaining populations of salmon, and ledge, drowning out the sounds of early American shad, river herring, and migratory birds. This place is referred to seven other species of sea-run fish. In as Basin Mills Rips, once dammed and the partnership with hydropower companies, site of a sawmill in the 1800s. This section the restoration effort also means increasing of the mainstem Penobscot now reflects energy generation at six dams now the wildness of the river that was and offers owned by Black Bear Hydro, LLC. Total a story of hope and the precursor to the energy production within the project area CHERYL DAIGLE CHERYL collaboration seen today in the Penobscot Basin Mills Rips in Orono, the site of a failed proposal to build what would have been will remain at least the same, and the River Restoration Project. the largest dam on the lower river. It provides a glimpse at what the river will look like construction activities around Great Works at Great Works after the dam is removed, with whitewater rapids and a diverse mix of Basin Mills was for several years in the eddies and pools providing habitat for fish and other wildlife. Dam removal alone will lead to an infusion mid-1990s promoted as the ideal location of millions of dollars into the local economy. for construction of a dam larger than any other on the lower Penobscot For example, the project will maintain and create numerous jobs for the area River. Fierce opposition to the dam came from community members and in construction, engineering, landscaping, and the scientific monitoring of conservation groups, including NRCM, local salmon clubs, the Penobscot changing river conditions and fish communities. Nation, and state and federal fisheries agencies who had already been For the first time in nearly two centuries the river will flow freely between working for decades to rebuild Atlantic salmon populations. Ultimately, the the towns of Bradley and Old Town. As the impoundment is drawn down over Federal Energy Regulatory Commission denied the permit, in large part due to the course of several weeks, we will begin to see the river change back to a the devastating impact it would have on salmon restoration efforts. Now, less more natural state: rocky ledges will emerge, and a diverse habitat of eddies than a generation later, there is tremendous hope for salmon as the Penobscot and pools will offer breeding ground for mayfly, caddis fly, and other insects Project reaches its next milestone: removal of the Great Works Dam less than that thrive in free-flowing waters. This new life will attract more activity from four miles upstream. migratory songbirds that rely on insect-rich river corridors to sustain their Improving Fish Passage, Increasing Energy Production long journeys, and both resident fish and the juvenile sea-run fish that feed In June, the Penobscot River Restoration Trust—owner of the Great on the insect larvae and emerging adults. Works, Veazie, and Howland dams—begins dismantling the outdated After the Veazie Dam is removed and the Howland bypass constructed, conglomeration of concrete and timber crib works and failed fishways that Atlantic salmon, shad, and other sea-run fishes will once again reach these - Continued on page 2 E M EPA’s Proposed Carbon - T . 65 I D AGE O OF I N WICK, R T OST I P M - A UNS Pollution Standard Will NON-P U.S. P BR PER Benefit Maine On Tuesday March 27th, the Environmental Protection Agency and Obama Administration released a long-awaited proposal to limit climate-changing carbon pollution from new power plants. “Every year, power plants dump more than two billion tons of dangerous carbon pollution and other pollutants into the air,” says Lisa Pohlmann, executive director of the Natural Resources Council of Maine. “The standard announced in March will establish the first national limits on carbon pollution from new power plants and help protect people, kids, wildlife, and our environment from climate change and air pollution.” NRCM is urging Maine’s senators and Congresspeople to support these rules and not put corporate polluters’ profits ahead of our health. Power plants are the nation’s largest source of carbon pollution and big power companies, their lobbyists, and supporters have spent tens of millions of dollars to try to block clean air standards that will save thousands of lives. The Clean Air Act is an essential tool to address air pollution, from climate- changing gases to toxic mercury emissions. Please show your support by taking action. Visit our website to find out how at www.nrcm.org. 3 Wade Street 04330-6317 Maine Augusta, CHECK YOUR LABEL! Please call NRCM with corrections address duplicate mailings!or Great Works Dam - Continued from page 1 l THE big pictUre l waters without impediment. Some adults will spawn near Great Works, or stop to rest in still-water pools. A Million Cheers for the Most will continue past the new fish lift being built Carbon Rules at Milford Dam and far There’s no question that winter was too warm and spring upstream to reach prime too early in Maine this year. I wonder if you stood in your spawning and growing backyard like I did, concerned about the extraordinarily habitat in the cooler waters T ???? early appearance of perennials, migratory birds—and found in the Piscataquis ticks. It’s just plain eerie when nature isn’t “right.” The Great Works Dam this summer is first of three major and Pleasant rivers, and construction projects to significantly improve access to nearly NASA data confirms that the global average surface other tributaries that form 1000 miles of habitat for endangered Atlantic salmon and other species of sea-run fish. temperature in 2011 was the ninth warmest since 1880. the headwaters of the More disturbing is that 9 of the 10 warmest years on Penobscot watershed. Endangered shortnose and Atlantic sturgeon will find record have occurred since the year 2000. There’s no denying that it’s getting new spawning habitat as far upriver as the ledges just below the Milford Dam, hotter, and we know why. regaining access to all of their historic spawning grounds and the fresh water Every year, American power plants dump more than two billion tons of that young sturgeon reside in the two years before they are ready for the dangerous carbon and other pollution into our air, causing the kind of climate saltwater of the estuary and Gulf of Maine. change we see around us. Dirty coal-fired power plants are the nation’s Recreation and Economic Revival largest source of carbon pollution. Experts tell us that this carbon forms a With the recovery of a river will come a renewal of opportunities for layer of pollution that blankets the Earth, trapping heat and causing rising the people who live in and visit this part of Maine. This brings us again to temperatures. One result is an increase in extreme weather events. the frolicking rapids at Basin Mills that provide a welcome hint at what the Another is the cost to our health. This changing climate leads to a wide river will look like in the areas now drowned by the Great Works and Veazie range of health problems including heat-related deaths and illnesses, and the impoundments, after dam removal. Whitewater paddlers are drawn to the continued spread of infectious diseases like Lyme disease. In fact, Americans challenging conditions at Basin Mills and will soon have two “new” stretches of now spend more than $100 billion every year on coal-related health care rapids to test their skills. Within a few months, canoeists will be able to ply the costs. It is past time to hold the dirtiest polluters accountable for this pollution. Penobscot waters from below Milford to the Eddington boat launch without a near Finally, the U.S. is taking action. The Environmental Protection Agency made impossible portage around Great Works, and, within a few years, after Veazie history in March by proposing the first-ever national limits on carbon pollution for Dam is gone, will be able to journey all the way to Penobscot Bay. Fishing guides new power plants. The standard limits all new power plants to 1,000 pounds of will have a more diverse river landscape and fisheries to provide a variety of carbon pollution per megawatt hour. Energy companies can meet this standard by options to their clients, and as the river attracts more recreational activity, the using cleaner energy sources and by employing modern technology. economic benefits will spill over to area lodging and outfitting businesses. Maine and several other states, and foreign countries, already limit The landscape alongside the river in Old Town and Bradley currently carbon pollution from new power plants. Approximately 20 coal plants that reflects the breadth of the community, industry, and homes side-by-side with are currently under development in the U.S. would be subject to the EPA’s pockets of forest, but with minimal recreational use of the river. Removal of new carbon pollution standard.
Recommended publications
  • Penobscot Rivershed with Licensed Dischargers and Critical Salmon
    0# North West Branch St John T11 R15 WELS T11 R17 WELS T11 R16 WELS T11 R14 WELS T11 R13 WELS T11 R12 WELS T11 R11 WELS T11 R10 WELS T11 R9 WELS T11 R8 WELS Aroostook River Oxbow Smith Farm DamXW St John River T11 R7 WELS Garfield Plt T11 R4 WELS Chapman Ashland Machias River Stream Carry Brook Chemquasabamticook Stream Squa Pan Stream XW Daaquam River XW Whitney Bk Dam Mars Hill Squa Pan Dam Burntland Stream DamXW Westfield Prestile Stream Presque Isle Stream FRESH WAY, INC Allagash River South Branch Machias River Big Ten Twp T10 R16 WELS T10 R15 WELS T10 R14 WELS T10 R13 WELS T10 R12 WELS T10 R11 WELS T10 R10 WELS T10 R9 WELS T10 R8 WELS 0# MARS HILL UTILITY DISTRICT T10 R3 WELS Water District Resevoir Dam T10 R7 WELS T10 R6 WELS Masardis Squapan Twp XW Mars Hill DamXW Mule Brook Penobscot RiverYosungs Lakeh DamXWed0# Southwest Branch St John Blackwater River West Branch Presque Isle Strea Allagash River North Branch Blackwater River East Branch Presque Isle Strea Blaine Churchill Lake DamXW Southwest Branch St John E Twp XW Robinson Dam Prestile Stream S Otter Brook L Saint Croix Stream Cox Patent E with Licensed Dischargers and W Snare Brook T9 R8 WELS 8 T9 R17 WELS T9 R16 WELS T9 R15 WELS T9 R14 WELS 1 T9 R12 WELS T9 R11 WELS T9 R10 WELS T9 R9 WELS Mooseleuk Stream Oxbow Plt R T9 R13 WELS Houlton Brook T9 R7 WELS Aroostook River T9 R4 WELS T9 R3 WELS 9 Chandler Stream Bridgewater T T9 R5 WELS TD R2 WELS Baker Branch Critical UmScolcus Stream lmon Habitat Overlay South Branch Russell Brook Aikens Brook West Branch Umcolcus Steam LaPomkeag Stream West Branch Umcolcus Stream Tie Camp Brook Soper Brook Beaver Brook Munsungan Stream S L T8 R18 WELS T8 R17 WELS T8 R16 WELS T8 R15 WELS T8 R14 WELS Eagle Lake Twp T8 R10 WELS East Branch Howe Brook E Soper Mountain Twp T8 R11 WELS T8 R9 WELS T8 R8 WELS Bloody Brook Saint Croix Stream North Branch Meduxnekeag River W 9 Turner Brook Allagash Stream Millinocket Stream T8 R7 WELS T8 R6 WELS T8 R5 WELS Saint Croix Twp T8 R3 WELS 1 Monticello R Desolation Brook 8 St Francis Brook TC R2 WELS MONTICELLO HOUSING CORP.
    [Show full text]
  • Black Bear Hydro Partners, LLC Orono Project (FERC No. 2710)
    November 12, 2020 Orono Project (FERC No. 2710) Stillwater Project (FERC No. 2712) Ms. Shannon Ames, Executive Director Low Impact Hydropower Institute 329 Massachusetts Avenue, Suite 2 Lexington, MA 02420 Subject: Low Impact Hydropower Institute Application for the Orono Project (FERC No. 2710) and Stillwater Project (FERC No. 2712) Dear Ms. Ames: On behalf of Black Bear Hydro Partners, LLC, Black Bear Development Holdings, LLC, and Black Bear SO, LLC (collectively, “Black Bear”), owners and licensees of the Orono and Stillwater Hydroelectric Projects (“Projects”) (FERC Nos. 2710 and 2712, respectively) and affiliates of Brookfield Renewable, please find attached a revised application for recertification of the Projects, which are located on the Stillwater Branch of the Penobscot River in Maine. Black Bear is requesting recertification of these facilities, which are currently certified through November 30, 2020 per LIHI correspondence dated June 1, 2020. Black Bear submitted an initial certification application to the Low Impact Hydropower Institute (LIHI) on July 6, 2020. LIHI completed the initial Intake Review on August 5, 2020. The current application includes the following required submittals as revised in response to the LIHI Intake Review: • Introduction • Project Description and LIHI Table B-1 • Zones of Effect descriptions and overview maps and images • Matrix of Alternative Standards for each Zone of Effect identified evaluating the LIHI certification standards for each requisite criterion, including water quality, fish passage and recreation • Sworn Statement and Waiver Form • Facility Contacts Form including pertinent NGOs, as appropriate. • List of hyperlinks and supplemental documentation for pertinent FERC and regulatory documents for the Projects Please call me at (207) 755-5606 or email me at [email protected] if you have any questions or need additional information regarding this submittal.
    [Show full text]
  • Stillwater Recertification Attachments 2015
    Stillwater Hydroelectric Project (FERC No. 2712) Project Description Black Bear Hydro Partners, LLC’s Stillwater Hydroelectric Project is a run-of-river hydroelectric generating facility located on the Stillwater Branch of the Penobscot River in Old Town, Maine with a gross nameplate generating capacity of 4.18 MW. The Stillwater Project Powerhouse A commenced initial commercial operations in 1913. The Licensee applied for an amendment to increase capacity at the Stillwater Project via the construction of an additional powerhouse (Powerhouse B). The Project consists of an existing 1,720-foot-long dam consisting of 13 sections of various height, creating an impoundment with a normal full pond elevation of 94.65 feet National Geodetic Vertical Datum. The Project has two powerhouses. Powerhouse A consists of four generating units a total installed capacity of 1,950 kW and a maximum hydraulic capacity of 1,700 cfs. Powerhouse B consists of three generating units with a total installed capacity of 2,229 kW and a maximum hydraulic capacity of 1,758 cfs. Powerhouse A has 50 ft long aerial transmission lines installed from the powerhouse’s GSU to the existing substation. Powerhouse B has 300 ft long aerial transmission lines installed from the powerhouse’s generating step-up unit (GSU) to the existing, adjacent 12.5 kV distribution system located adjacent to the existing project boundary and along the south side of Stillwater Avenue. The Stillwater Powerhouse B commenced initial commercial operation September, 2013. The Stillwater Project generates clean, renewable electricity while providing recreational opportunities (portage trail, parking areas for river access and hand-carried boat launch), fish passage measures, consistent water levels that enhance habitats for waterfowl, etc., and substantial support of the local community through stable property tax payments, reliable voltage support of the electrical distribution system, etc.
    [Show full text]
  • TOWN of ORONO COMPREHENSIVE PLAN 2014 UPDATE Volume 1 Inventory & Analysis
    TOWN OF ORONO COMPREHENSIVE PLAN 2014 UPDATE Volume 1 Inventory & Analysis TOWN OF ORONO COMPREHENSIVE PLAN 2014 Update Recommended to Town Council By Comprehensive Plan Committee June 5, 2014 Philip Ruck, Chair Vinal Applebee, Vice Chair Dennis Cross Farahad Dastoor Sharon Quinn Fitzgerald Abe Furth John Jemison Mark Kittridge Dan McConville Judson McIntosh Christa Schwintzer David Thompson Ryan Tipping-Spitz Johanna Anderson (resigned 5/16/14) Kenny Ferguson (resigned 10/18/13) Staff: Evan Richert, AICP, Town Planner Ruth Vaughan, Administrative Assistant Introduction and Acknowledgements The Comprehensive Plan Committee was appointed by the Town Council in early 2012 to update the Comprehensive Plan. A part of the plan was updated in 2009, when a similar committee undertook a full review of the rural area of Town – the area then zoned as Forestry & Agriculture – and recommended wide-ranging changes. The Town Council adopted these revisions in March 2009, most of which have since been implemented. The charge to the Comprehensive Plan Committee was to leave these changes in place but to update the Comprehensive Plan in all other respects. The Committee’s first meeting was in May 2012, and it met monthly for more than two years, completing its work in June 2014. All meetings were open to the public. Along the way, the Committee conducted five, well attended and facilitated Public Forums: two devoted to spotting issues and opportunities (Nov. 7, 2012 and Apr. 24, 2013); two to developing policies and actions (June 6, 2013 and Nov. 12, 2013); and one to reviewing and revising the policies and actions (Mar.
    [Show full text]
  • Survival of Atlantic Salmon Salmo Salar Smolts Through a Hydropower Complex
    Journal of Fish Biology (2014) 85, 1074–1096 doi:10.1111/jfb.12483, available online at wileyonlinelibrary.com Survival of Atlantic salmon Salmo salar smolts through a hydropower complex D. S. Stich*†,M.M.Bailey‡ and J. D. Zydlewski*§ *Department of Wildlife Ecology, 5755 Nutting Hall, University of Maine, Orono, ME 04469, U.S.A., ‡U.S. Fish and Wildlife Service, Central New England Fishery Resource Office, Nashua, NH 03063, U.S.A. and §U.S. Geological Survey, Maine Cooperative Fish and Wildlife Research Unit, 5755 Nutting Hall, University of Maine, Orono, ME 04469, U.S.A. This study evaluated Atlantic salmon Salmo salar smolt survival through the lower Penobscot River, Maine, U.S.A., and characterized relative differences in proportional use and survival through the main-stem of the river and an alternative migration route, the Stillwater Branch. The work was con- ducted prior to removal of two main-stem dams and operational changes in hydropower facilities in the Stillwater Branch. Survival and proportional use of migration routes in the lower Penobscot were estimated from multistate (MS) models based on 6 years of acoustic telemetry data from 1669 smolts and 2 years of radio-telemetry data from 190 fish. A small proportion (0⋅12, 95% c.i. = 0⋅06–0⋅25) of smolts used the Stillwater Branch, and mean survival through the two operational dams in this part of the river was relatively high (1⋅00 and 0⋅97). Survival at Milford Dam, the dam that will remain in the main-stem of the Penobscot River, was relatively low (0⋅91), whereas survival through two dams that were removed was relatively high (0⋅99 and 0⋅98).
    [Show full text]
  • Restoration Monitoring Plan for Noaa Trust Resources
    CONCEPTUAL MONITORING FRAMEWORK FOR THE PENOBSCOT RIVER RESTORATION PROJECT Prepared by the Penobscot River Science Steering Committee Edited by J. Royte, C. Schmitt, and K. Wilson 2008 1 The Penobscot River Science Steering Committee was formed in 2005 to help organize and coordinate scientific research and monitoring related to the Penobscot River Restoration Project (as recommended by the 2004 Penobscot River Science Forum). Today, the committee's mission is to guide and facilitate ecosystem monitoring and research opportunities related to barrier removal in the Penobscot River watershed, estuary, and bay by (1) providing guidance on priority scientific issues for the Penobscot River Restoration Trust, state and federal agencies, and other organizations; (2) exchanging information and sharing data from Penobscot River research and monitoring, and (3) identifying opportunities for collaborative research and education related to ecological restoration. The committee is coordinated by the Senator George J. Mitchell Center for Environmental and Watershed Research at the University of Maine. Members of this ad hoc advisory committee, who volunteer their expertise, represent the following organizations and interests: American Rivers ME Department of Marine Resources Bates College Maine Sea Grant Bigelow Laboratory for Ocean Sciences Penobscot Indian Nation Boston College Penobscot River Restoration Trust Boreal Songbird Initiative Senator George J. Mitchell Center BSA Environmental Consulting The Nature Conservancy, Maine Chapter Eastern Brook Trout Joint Venture The Nature Conservancy, Eastern Region Lower Penobscot River Watershed Coalition Freshwater Program Maine Atlantic Salmon Commission Trout Unlimited ME Coop. Fish and Wildlife Research Unit University of Maine ME Dept. of Environmental Protection University of Southern Maine ME Dept.
    [Show full text]
  • Strategic Plan for the Restoration of Diadromous Fishes to the Penobscot River
    Strategic Plan for the Restoration of Diadromous Fishes to the Penobscot River Prepared By: Department of Marine Resources Department of Inland Fisheries and Wildlife For Presentation to the Atlantic Salmon Commission: Dick Ruhlin, Chair, Member-at-large George Lapointe, Commissioner of the Department of Marine Resources R. Dan Martin, Commissioner of the Department of Inland Fisheries and Wildlife March 2008 2 Table of Contents List of Acronyms ............................................................................................................................. 4 Executive Summary......................................................................................................................... 5 Introduction..................................................................................................................................... 6 Vision .............................................................................................................................................. 9 Description of the Basin.................................................................................................................. 9 Sub-Watersheds ........................................................................................................................... 9 River hydrology ......................................................................................................................... 10 Barriers ....................................................................................................................................
    [Show full text]
  • Movement and Survival of Atlantic Salmon Smolts in the Penobscot River, Maine
    The University of Maine DigitalCommons@UMaine Electronic Theses and Dissertations Fogler Library Summer 8-5-2020 Movement and Survival of Atlantic Salmon Smolts in the Penobscot River, Maine Alejandro Molina Moctezuma University of Maine, [email protected] Follow this and additional works at: https://digitalcommons.library.umaine.edu/etd Part of the Aquaculture and Fisheries Commons, and the Population Biology Commons Recommended Citation Molina Moctezuma, Alejandro, "Movement and Survival of Atlantic Salmon Smolts in the Penobscot River, Maine" (2020). Electronic Theses and Dissertations. 3223. https://digitalcommons.library.umaine.edu/etd/3223 This Open-Access Thesis is brought to you for free and open access by DigitalCommons@UMaine. It has been accepted for inclusion in Electronic Theses and Dissertations by an authorized administrator of DigitalCommons@UMaine. For more information, please contact [email protected]. MOVEMENT AND SURVIVAL OF ATLANTIC SALMON SMOLTS IN THE PENOBSCOT RIVER, MAINE By Alejandro Molina Moctezuma B.S. Universidad Nacional Autónoma de México, 2011 M.S. Universidad Nacional Autónoma de México, 2015 A DISSERTATION Submitted in Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy (in Wildlife Ecology) The Graduate School The University of Maine August 2020 Advisory Committee: Joseph Zydlewski, Professor of Wildlife, Fisheries, and Conservation Biology, Advisor John Kocik, Chief Atlantic Salmon Ecosystems Research Team, NOAA Michael Kinnison, Associate Professor of School of Biology and Ecology Erik Blomberg, Associate Professor of Wildlife, Fisheries, and Conservation Biology Nishad Jayasundara, Assistant Professor of School of Marine Sciences MOVEMENT AND SURVIVAL OF ATLANTIC SALMON SMOLTS IN THE PENOBSCOT RIVER, MAINE By Alejandro Molina Moctezuma Dissertation Advisor: Dr.
    [Show full text]
  • 2008 Archive of Governor Baldacciâ•Žs Press Releases
    Maine State Library Digital Maine Governor's Documents Governor 2008 2008 Archive of Governor Baldacci’s Press Releases Office of veGo rnor John E. Baldacci Follow this and additional works at: https://digitalmaine.com/ogvn_docs Recommended Citation Office of Governor John E. Baldacci, "2008 Archive of Governor Baldacci’s Press Releases" (2008). Governor's Documents. 13. https://digitalmaine.com/ogvn_docs/13 This Text is brought to you for free and open access by the Governor at Digital Maine. It has been accepted for inclusion in Governor's Documents by an authorized administrator of Digital Maine. For more information, please contact [email protected]. 2008 Archive of Governor Baldacci’s Press Releases Compiled by the Maine State Library for the StateDocs Digital Archive with the goal of preserving public access and ensuring transparency in government. 2008 Archive of Governor Baldacci’s Press Releases Table of Contents Governor Baldacci Supports Girl Scout Cookie Sale ................................................................................... 13 Governor Congratulates New England Telehealth Consortium on Health Care Grant .............................. 14 Governor Baldacci Names Judicial Nominees ............................................................................................. 15 Governor's State of the State Address ........................................................................................................ 16 Supplemental Budget Unveiled .................................................................................................................
    [Show full text]
  • TOPOZONE Map Information Dams in Maine by County
    TOPOZONE Map information Dams in Maine by County Browse by County - Cumberland, Feature Type - Dam Feature Type County USGS Topo Map Elevation Lat Long Adams Pond Dam Dam Cumberland North Sebago 623 feet 43.993ºN 70.710ºW Bog Dam Dam Cumberland Bridgton 436 feet 44.018ºN 70.710ºW Bridge Street Dam Dam Cumberland Yarmouth 23 feet 43.802ºN 70.183ºW Clark Pond Dam Dam Cumberland Portland West 39 feet 43.633ºN 70.314ºW Crystal Lake Dam Dam Cumberland Bridgton 308 feet 44.112ºN 70.678ºW Cumberland Dam Dam Cumberland Portland West 43 feet 43.683ºN 70.351ºW Dam Number One Dam Cumberland Steep Falls 279 feet 43.857ºN 70.640ºW Dundee Pond Dam Dam Cumberland North Windham 187 feet 43.779ºN 70.455ºW East Elm Street Dam Dam Cumberland Yarmouth 79 feet 43.808ºN 70.189ºW Eel Weir Dam Dam Cumberland North Windham 223 feet 43.818ºN 70.449ºW Foxwells Bridge Brook Dam Dam Cumberland Old Orchard Beach 20 feet 43.557ºN 70.381ºW Gambo Falls Dam Dam Cumberland Gorham 161 feet 43.748ºN 70.438ºW Highland Lake Dam Dam Cumberland Bridgton 423 feet 44.057ºN 70.713ºW Highland Lake Dam Dam Cumberland Portland West 190 feet 43.745ºN 70.351ºW Jordan Mill Dam Dam Cumberland Gray 256 feet 43.993ºN 70.299ºW Knights Pond Dam Dam Cumberland Cumberland Center 285 feet 43.820ºN 70.266ºW Little Falls Dam Dam Cumberland Gorham 108 feet 43.733ºN 70.423ºW Little Sebago Lake Dam Dam Cumberland North Windham 285 feet 43.842ºN 70.424ºW Mallison Falls Dam Dam Cumberland Gorham 128 feet 43.728ºN 70.419ºW Mill Brook Dam Dam Cumberland Prouts Neck 13 feet 43.575ºN 70.348ºW Mill Pond
    [Show full text]
  • TOWN of ORONO COMPREHENSIVE PLAN 2014 UPDATE Volume 1 Inventory & Analysis
    TOWN OF ORONO COMPREHENSIVE PLAN 2014 UPDATE Volume 1 Inventory & Analysis TOWN OF ORONO COMPREHENSIVE PLAN 2014 Update Recommended to Town Council By Comprehensive Plan Committee June 5, 2014 Philip Ruck, Chair Vinal Applebee, Vice Chair Dennis Cross Farahad Dastoor Sharon Quinn Fitzgerald Abe Furth John Jemison Mark Kittridge Dan McConville Judson McIntosh Christa Schwintzer David Thompson Ryan Tipping-Spitz Johanna Anderson (resigned 5/16/14) Kenny Ferguson (resigned 10/18/13) Staff: Evan Richert, AICP, Town Planner Ruth Vaughan, Administrative Assistant Introduction and Acknowledgements The Comprehensive Plan Committee was appointed by the Town Council in early 2012 to update the Comprehensive Plan. A part of the plan was updated in 2009, when a similar committee undertook a full review of the rural area of Town – the area then zoned as Forestry & Agriculture – and recommended wide-ranging changes. The Town Council adopted these revisions in March 2009, most of which have since been implemented. The charge to the Comprehensive Plan Committee was to leave these changes in place but to update the Comprehensive Plan in all other respects. The Committee’s first meeting was in May 2012, and it met monthly for more than two years, completing its work in June 2014. All meetings were open to the public. Along the way, the Committee conducted five, well attended and facilitated Public Forums: two devoted to spotting issues and opportunities (Nov. 7, 2012 and Apr. 24, 2013); two to developing policies and actions (June 6, 2013 and Nov. 12, 2013); and one to reviewing and revising the policies and actions (Mar.
    [Show full text]
  • Town of Orono Comprehensive Plan 2014 Update Orono (Me.)
    The University of Maine DigitalCommons@UMaine Maine Town Documents Maine Government Documents 2014 Town of Orono Comprehensive Plan 2014 Update Orono (Me.). Comprehensive Plan Committee Follow this and additional works at: https://digitalcommons.library.umaine.edu/towndocs Repository Citation Orono (Me.). Comprehensive Plan Committee, "Town of Orono Comprehensive Plan 2014 Update" (2014). Maine Town Documents. 1452. https://digitalcommons.library.umaine.edu/towndocs/1452 This Plan is brought to you for free and open access by DigitalCommons@UMaine. It has been accepted for inclusion in Maine Town Documents by an authorized administrator of DigitalCommons@UMaine. For more information, please contact [email protected]. TOWN OF ORONO COMPREHENSIVE PLAN 2014 UPDATE Volume 1 Inventory & Analysis TOWN OF ORONO COMPREHENSIVE PLAN 2014 Update Recommended to Town Council By Comprehensive Plan Committee June 5, 2014 Philip Ruck, Chair Vinal Applebee, Vice Chair Dennis Cross Farahad Dastoor Sharon Quinn Fitzgerald Abe Furth John Jemison Mark Kittridge Dan McConville Judson McIntosh Christa Schwintzer David Thompson Ryan Tipping-Spitz Johanna Anderson (resigned 5/16/14) Kenny Ferguson (resigned 10/18/13) Staff: Evan Richert, AICP, Town Planner Ruth Vaughan, Administrative Assistant Introduction and Acknowledgements The Comprehensive Plan Committee was appointed by the Town Council in early 2012 to update the Comprehensive Plan. A part of the plan was updated in 2009, when a similar committee undertook a full review of the rural area of Town – the area then zoned as Forestry & Agriculture – and recommended wide-ranging changes. The Town Council adopted these revisions in March 2009, most of which have since been implemented. The charge to the Comprehensive Plan Committee was to leave these changes in place but to update the Comprehensive Plan in all other respects.
    [Show full text]