Disclosure Log

The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information (“the Code") by this department. The disclosure log will be updated on a quarterly basis.

If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.

January to March 2019 Reference number Information requested and released ASD13/6-5/(357/2018) The structural of alterations and additions works, floor plans, sections, elevations and the overall site plans of Cattle Depot Artist Village (before revitalisation)

ASD13/6-5/(365/2018) Architectural and Structural drawings of Education Bureau Kowloon Tong Education Services Centre

ASD13/6-5/(366/2018) Architectural (including floor plans, facade, side elevations and sections) and structural drawings of Cattle Depot Artist Village (before revitalisation)

ASD13/6-5/(1/2019) Structural plans and reinforced concrete details of Radio Television Education Television Centre

ASD13/6-5/(3/2019) Information related to playgrounds: (a) How the Architectural Services Department (ArchSD) works with the Leisure and Cultural Services Department (LCSD) and other stakeholders (if any) on the design of parks and playgrounds, the parties involved, the procedures, major considerations; cases where consultants (private architectural firms) are involved, and their roles. (b) Planning or safety guidelines for playground design. (c) Precedent cases where the government collaborated with non-architects or outside organisations on playground designs; any mechanism or flexibility in the standard project operation procedure that allows cross-disciplinary or cross-sector collaboration.

ASD13/6-5/(4/2019) General building plans and framing plans of Hong Kong Institute of Vocational Education (Kwai Chung)

ASD13/6-5/(6/2019) Elevations, sections and floor plans of the Star Ferry Car Park

ASD13/6-5/(8/2019) Architectural and structural drawings of Pei Ho Street Municipal Services Building

ASD13/6-5/(12/2019) Structural drawings of Hydro Building at Stonecutters Island

ASD13/6-5/(13/2019) Elevations of the Town Hall

ASD13/6-5/(14/2019) Architectural drawings of Old District Office North

ASD13/6-5/(15/2019) Architectural and structural drawings of Health Education Exhibition and Resource Centre

ASD13/6-5/(16/2019) Floor plans, elevations and sections of Ma On Shan Public Library

ASD13/6-5/(17/2019) Floor plans, elevations and sections of Western Wholesale Food Market

ASD13/6-5/(20/2019) Structural record plan for the superstructure of The Prince Philip Dental Hospital

ASD13/6-5/(22/2019) (a) Floor plans and sections of following buildings: (i) Yan Oi Market; (ii) Tuen Mun Eye Centre; (iii) Tuen Mun Woman Health Centre; and (iv) Yan Oi Polyclinic (b) Floor plans of Fu Hong Society Yau Chong Home

ASD13/6-5/(24/2019) Architectural drawings of the Kwun Tong Ferry Pier

ASD13/6-5/(25/2019) Architectural and structural drawings of Tseng Choi Street Government Services Complex

ASD13/6-5/(26/2019) Floor plans and sections of 2/F of Kai Tak Cruise Terminal Federal Cruise Banquet Center and folio grassland

ASD13/6-5/(29/2019) Architectural and structural drawings of the PMQ

ASD13/6-5/(31/2019) Floor plans and elevations of PMQ

ASD13/6-5/(32/2019) Floor plans, elevations and sections of the Western Market

ASD13/6-5/(34/2019) Architectural drawings of PMQ

ASD13/6-5/(35/2019) Architectural drawings of Castle Peak Pottery Kiln (Dragon Kiln)

ASD13/6-5/(36/2019) Floor plans of the Hong Kong Cultural Centre

ASD13/6-5/(37/2019) Floor plans of Sheung Li Uk Garden, Tai Po Road Rest Garden and Tai Po Road/Pak Tin Street Playground

ASD13/6-5/(39/2019) External elevation of Symphony by Jade and Maxim’s Restaurant located at Hong Kong Cultural Centre

ASD13/6-5/(41/2019) Architectural and structural drawings of the Hong Kong Heritage Discovery Centre

ASD13/6-5/(42/2019) Floor plan for ground floor of the Henry G. Leong Yau Ma Tei Community Centre

ASD13/6-5/(43/2019) Floor plans, sections and elevations of 1/F, Youth Square - Y Platform

ASD13/6-5/(44/2019) Floor plans, elevations and sections of former Fanling Magistracy (before revitalization)

ASD13/6-5/(45/2019) Floor plans and elevations of PMQ

ASD13/6-5/(47/2019) Drawings of the Princess Margret Hospital: (a) structural calculations of Blocks H and S; and (b) structural records drawings of Block S

ASD13/6-5/(48/2019) Floor plans of the Health Education Exhibition and Resource Centre

ASD13/6-5/(50/2019) Architectural and structural drawings of Star Ferry Carpark

ASD13/6-5/(52/2019) Floor plans and elevations of North Point Ferry Pier and North Point (East) Ferry Pier

ASD13/6-5/(53/2019) Floor plans of Po On Road Market Cooked Food Centre

ASD13/6-5/(54/2019) Architectural and structural drawings of the Oi!

ASD13/6-5/(55/2019) Architectural drawings of Energizing Kowloon East Office

ASD13/6-5/(56/2019) Structural drawings of Hong Kong Observatory Headquarters

ASD13/6-5/(57/2019) Floor plans, elevations and structural drawings of the Yee Kuk Street Refuse Collection Point

ASD13/6-5/(60/2019) Floor plans, elevations and sections of Stanley Municipal Services Building

ASD13/6-5/(61/2019) The gross floor area and architectural drawings of the Tin Fai Road Sports Centre

ASD13/6-5/(62/2019) Floor plans, sections and elevations of Kwun Chung Municipal Services Building

ASD13/6-5/(63/2019) Elevations, sections and floor plans of Sheung Wan Municipal Services Building

ASD13/6-5/(64/2019) Floor plans, side elevations and sections of the Hong Kong Central Library

ASD13/6-5/(65/2019) The information on the level and height of Block K of Queen Mary Hospital

ASD13/6-5/(66/2019) Structural drawings of a college

ASD13/6-5/(68/2019) Floor plans, sections and elevations of the Central Pier No. 5

ASD13/6-5/(70/2019) (a) The information of Slope Features Nos. 11NE-A/C130; and 11NE-A/R17; (b) Architectural drawings of Kwun Tong Road Children’s Playground; (c) Architectural drawings of Academy of Visual Arts, Hong Kong Baptist University; and (d) Structural drawings of CID Training School Substation located at Academy of Visual Arts, Hong Kong Baptist University

ASD13/6-5/(72/2019) Structural drawings of Queensway Government Offices

ASD13/6-5/(73/2019) Building and structural drawings of Tsing Yi Municipal Services Building

ASD13/6-5/(74/2019) Floor plan (2/F), elevations and sections of Hung Hom Municipal Services Building

ASD13/6-5/(75/2019) Floor plans, sections, elevations and facade of Tai Nan Street Refuse Collection Point and Tai Nan Street Public Toilet

ASD13/6-5/(76/2019) Information related to Tin Fai Road Sports Centre: (a) sustainable materials used; and (b) design or equipment used in (i) water conservation; (ii) energy efficiency and conservation; and (iii) waste and pollution reduction

ASD13/6-5/(77/2019) Elevations and sections of Hong Kong Velodrome Park

ASD13/6-5/(79/2019) Drainage System of the Egg Market of the Western Wholesale Food Market

ASD13/6-5/(80/2019) Architectural drawings of property located at 7 Cox' Road

ASD13/6-5/(81/2019) Floor plans, elevations and sections of Tung Chau Street Temporary Market

ASD13/6-5/(82/2019) Standard template of Quantity Survey Services Consultancy Agreement of Architectural Services Department

ASD13/6-5/(83/2019) Architectural and structural drawings of New Horizons Building

ASD13/6-5/(86/2019) Drawings of original of New Horizons Building

ASD13/6-5/(87/2019) Floor plans, sections and details of glass panels of Rumsey Street Multi-storey Car Park and Harbour Building

ASD13/6-5/(88/2019) Floor plans of Central Market (Previous Name)

ASD13/6-5/(89/2019) Floor plans, sections and elevations of Hong Kong Central Library

ASD13/6-5/(91/2019) Floor plans, sections and framing plans a secondary school (including from 5/F to 7/F)

ASD13/6-5/(92/2019) Floor plans and structural drawings of a primary school

ASD13/6-5/(94/2019) Structural Drawings of WSD Kowloon East Regional Building

ASD13/6-5/(95/2019) Floor plans of the Grand Peace Funeral Parlour

ASD13/6-5/(96/2019) Records drawings of Rumsey Street Multi-Storey Car Park (a) architectural drawings (including floor plans and sections); (b) structural and foundation drawings; and (c) drainage and electricity system records

ASD13/6-5/(97/2019) Layout plans, structural plans and structural calculations of Jockey Club Centre for Positive Ageing (former A Kung Kok Government Quarters)

ASD13/6-5/(99/2019) Structural drawings of Tuen Mun Hospital

ASD13/6-5/(101/2019) Architectural drawings (including floor plans) of Hung Hom (South) Ferry Pier and Central Pier No.8

ASD13/6-5/(102/2019) Floor Plans, Elevations, Sections and Structural Drawings of Water Supplies Department - Mong Kok Office

ASD13/6-5/(103/2019) Princess Margaret Hospital (a) BEAM plus assessment record of block H; and (b) site formation record and site plan for boundaries of the blocks

ASD13/6-5/(104/2019) Architectural drawings of several rest gardens, sitting-out areas, Kwun Tong Waterfront Promenade and Hong Kong Park

ASD13/6-5/(105/2019) Structural drawings of ground floor of 100 and 102 Man Nin Street ASD13/6-5/(106/2019) Floor plan and elevations of the Pei Ho Street Municipal Services Building

ASD13/6-5/(107/2019) Floor plans, sections and elevations of the Tsuen King Circuit Market

ASD13/6-5/(108/2019) Architectural and structural drawings of: (a) Central Market; (b) Western Market; (c) Aberdeen Market; (d) Yaumati Market; (e) Apleichau Market; (f) Shau Kei Wan Market; (g) Kwun Tong Market; and (h) To Kwa Wan Market

ASD13/6-5/(110/2019) Architectural drawings (including floor plans for the years 1957 to 1968) and structural drawings of school improvement programme of a secondary school

ASD13/6-5/(111/2019) Structural Plans and Structural Calculations of a school

ASD13/6-5/(112/2019) Floor plans, sections and elevations of Hong Kong Central Library

ASD13/6-5/(115/2019) Architectural and structural drawings of school improvement programme of a primary school

ASD13/6-5/(116/2019) Architectural and structural drawings of school improvement programme of a secondary school

ASD13/6-5/(117/2019) Architectural and structural drawings of school improvement programme of a school

ASD13/6-5/(120/2019) Elevations of Tai Chik Sha Fire Station

ASD13/6-5/(121/2019) Framing diagram, slab details and beam details of a school

ASD13/6-5/(122/2019) General building plans, structural plans (for alterations and additions works) and building services drawings (for plumbing and drainage works) of the Main Block of Tseung Kwan O Hospital

ASD13/6-5/(123/2019) Architectural and structural drawings of a primary school

ASD13/6-5/(124/2019) Floor plans and elevations of the Hong Kong Central Library

ASD13/6-5/(126/2019) Floor plans of Central Ferry Pier Link Building

ASD13/6-5/(127/2019) As-built drawings for underground building services works for a college

ASD13/6-5/(128/2019) Architectural Drawings of a primary school

April to June 2019 Reference number Information requested and released ASD13/6-5/(100/2019) Architectural drawings of the site at 135 Tai Hang Road (IL 9076)

ASD13/6-5/(125/2019) Architectural and structural drawings of nine schools

ASD13/6-5/(129/2019) Drainage record drawings of two college

ASD13/6-5/(130/2019) Records of accident and maintenance for the Slope Feature Nos. 11SW-A/C290, 11SW-A/C430 and 11SW-A/C431

ASD13/6-5/(131/2019) Architectural drawings, structural drawings and schematic electrical wiring diagrams of a secondary school

ASD13/6-5/(132/2019) Architectural drawings of Tsuen Wan Magistracy Building and Princess Alexandra Community Centre

ASD13/6-5/(133/2019) Floor plans, elevations and sections of Hong Kong Central Library

ASD13/6-5/(134/2019) Structural drawings of Lai King Building of Princess Margaret Hospital

ASD13/6-5/(135/2019) Building plans, drainage and structural drawings for school improvement programme of a primary school

ASD13/6-5/(137/2019) Plans and sections of the following buildings: (a) Tai Wo Hau Sports Centre (b) Tsuen King Circuit Sports Centre; (c) Tsuen Wan Government Offices and Tsuen Wan Public Library; (d) Tsuen Wan Multi-storey Carpark Building; and (e) Tsuen Wan Municipal Services Building

ASD13/6-5/(141/2019) Structural drawings of Castle Peak Bay Immigration Centre

ASD13/6-5/(143/2019) Structural drawings of staircases nos. 1 and 3 of the Providence Garden for Rehab

ASD13/6-5/(145/2019) Documents submitted to use for the former French Mission Building as the office of the Court of Final Appeal

ASD13/6-5/(147/2019) Building plans of The Helena May

ASD13/6-5/(150/2019) Building plans and structural plans of Shek Kip Mei Park Sports Centre

ASD13/6-5/(151/2019) Architectural drawings, structural drawings and drawings of plumbing and drainage from ground floor to roof top of a primary school

ASD13/6-5/(154/2019) The expenditure regarding Quality Powered Mechanical Equipment for the years from 2015 to 2017

ASD13/6-5/(156/2019) General building plans, structure framing plans and drainage plans (ground floor) of a school

ASD13/6-5/(158/2019) Record drawings of facilities for tourists in Shek O Road and Southern District Beaches: (a) Shek O Beach (S0034278); (b) parking and lookout facilities for parking and lookout facilities for tourists, Shek O Road / Layout plans / Miscellaneous details (S0018256); (00055887-A/78970A); (00055883-A/62830A); (00055885-A/67854); (00055886-A76873C); (c) lifeguard lookout tower southern district beaches at Shek O, Chung Hom Kok and Turtle Cout (S052620); (d) reprovision of typhoon damaged lookout tower at Shek O Beach, reinforcement concrete details of lifeguard lookout (S125603); and (e) the drawing of the bridge located in between Shek O and Tai Tau Chau;

ASD13/6-5/(160/2019) Floor plan of 3/F, Block C, 213 Sha Tsui Road, Tsuen Wan,

ASD13/6-5/(163/2019) Elevations, sections and floor plans of Stanley Municipal Services Building

ASD13/6-5/(164/2019) Architectural drawings of the Eastern Community Green Station

ASD13/6-5/(165/2019) Structural drawings and as-built drawings of Pai Lau near Yau Yue Wan Village

ASD13/6-5/(166/2019) Structural details of toe wall of Elgin Street Children's Playground

ASD13/6-5/(167/2019) As-built record drawings, slope maintenance manual, engineer inspection report and other related information of five slope features Nos. 7SW-C/C870, 7SW-C/R16, 7SW-C/C275, 7SW-C/R17 and 7SW-C/CR276 at Kwan Mun Hau Tsuen, Tsuen Wan

ASD13/6-5/(168/2019) Building plans, structural plans and structural calculations of a school

ASD13/6-5/(169/2019) Floor plans of Yen Chow Street Hawker Bazaar

ASD13/6-5/(173/2019) Elevations and sections of Tin Shui Wai Sports Centre (located at Tin Pak Road)

ASD13/6-5/(175/2019) General layout plans, structural plans and structural calculations of the school sports deck of primary school

ASD13/6-5/(176/2019) Maintenance records, addition and alteration records, renovation records, floor plans, sections and structural drawings of the Public Bathhouse at Second Street, Sai Ying Pun

ASD13/6-5/(177/2019) Structural plans of Tsuen Wan Multi-storey Carpark Building

ASD13/6-5/(179/2019) Structural drawings of HAECO Maintenance Building at former Kai Tak Airport

ASD13/6-5/(180/2019) Layout plans, building plans, elevations and sections of old block and the caretaker's residence of the a secondary school

ASD13/6-5/(181/2019) Structural information on the part of the reinforcement concrete retaining wall located at the backlane / pedestrian walkway surrounding the western and southern sides of the Kowloon Park Drive Playground

ASD13/6-5/(182/2019) General building plans of the government property located at 135 Tai Hang Road

ASD13/6-5/(183/2019) Structural drawings and floor plans (including G/F, Block A, Shek Pik Resettlement) of Shop No. A2(82), Nos. 70-84, Ho Pui Street, Tsuen Wan

ASD13/6-5/(187/2019) Architectural drawings of the Tsuen Wan Multi-storey Capark Building

July to September 2019 Reference number Information requested and released ASD13/6-5/7 (184/2019) Elevations and sections of the government property located at 123 Gloucester Road

ASD13/6-5/7 (185/2019) Information of lift installation at Tai Wo Hau Estate Community Centre

ASD13/6-5/7 (186/2019) Framing plans and general building plans of G/F, B1/F and B2/F of Trade and Industry Tower

ASD13/6-5/7 (189/2019) Architectural and structural drawings of the following: (a) Aberdeen Municipal Services Building; (b) Sheung Wan Municipal Services Building; (c) Lockhart Road Municipal Services Building; (d) Shek Tong Tsui Municipal Services Building; and

architectural drawings: (e) Tai Kok Tsui Municipal Services Building

ASD13/6-5/7 (191/2019) Structural drawings/framing plans (school improvement programme/alternation and addition works) and electrical plans of 53 schools/ non-government organizations

ASD13/6-5/7 (192/2019) Structural record plans and design calculation for the superstructure of Phase 1a, Hong Kong Science Park

ASD13/6-5/7 (193/2019) Architectural drawings of Flagstaff House Museum of Tea Ware

ASD13/6-5/7 (194/2019) Structural plans, foundation plans and structural calculation report of Air Mail Centre located at Chek Lap Kok

ASD13/6-5/7 (196/2019) Architectural drawings, general building plans and structural drawings (including superstructure and foundation) together with relevant calculations of 1/F and 4/F to 7/F, Ping Shan Tin Shui Wai Leisure and Cultural Building

ASD13/6-5/7 (197/2019) Architectural drawings of several botanical gardens and colonial statues

ASD13/6-5/7 (199/2019) Floor plans, elevations and sections of Eastern Community Green Station and Sha Tin Community Green Station

ASD13/6-5/7 (200/2019) Site plans, floors plans, sections and elevations of 1/F and 4/F to 7/F of Ping Shan Tin Shui Wai Leisure and Cultural Building

ASD13/6-5/7 (201/2019) Information of tender contract of cleaning service for APB Centre for the years of 2012, 2014 and 2016 : (a) no. of collection of tender; and (b) marking criteria for related tender

ASD13/6-5/7 (204/2019) Structural drawings and as-built drawings of Kwun Tong Magistrates' Courts

ASD13/6-5/7 (205/2019) Information of government vehicles of Architectural Services Department

ASD13/6-5/7 (208/2019) (a) Architectural as-built drawings of Cheung Sha Wan Sports Centre; and (b) floor plans, elevations and structural as-built drawings of Cheung Sha Wan Indoor Game Hall Substation

ASD13/6-5/7 (209/2019) Architectural drawings, structural drawings, drainage system drawings (including storm water drainage and foul drainage) of a secondary school

ASD13/6-5/7 (210/2019) Renovation work information of public bathhouse at Second Street, Sai Ying Pun: (a) date of upgrading the bathing water heating system from "former fuel oil boiler" to "towngas boilers"; (b) date of window upgrading from "wooden windows" to "aluminum windows" at external façade; and (c) record photos showing the former building's conditions

ASD13/6-5/7 (211/2019) Structural drawings of school improvement programme of a college

ASD13/6-5/7 (212/2019) Structural drawings for alternation and addition works of a primary school

ASD13/6-5/7 (213/2019) Structural drawings of wall at G/F, 100 and 102 Man Nin Street, Sai Kung

ASD13/6-5/7 (215/2019) Underground drainage plans of Lei Muk Shue Fire Station and Lei Muk Shue Ambulance Depot

ASD13/6-5/7 (216/2019) Structural drawings, calculations and general building plans of a primary school

ASD13/6-5/7 (217/2019) (a) Elevations and floor plans (from G/F to 2/F) of Tsuen Wan Town Hall; (b) floor plans of public areas of Tsuen Wan Public Library; (c) floor plans and plan ratios Luen Yan Street Cooked Food Hawker Bazaar and Chai Wan Kok Cooked Food Market; and (d) floor plans, elevations and sections of Princess Alexandra Community Centre

ASD13/6-5/7 (218/2019) Tender document of Minor Works Term Consultancy (2018 - 2021) (Consultancy Agreement No.: 9AF131)

ASD13/6-5/7 (220/2019) Architectural drawings including plans, sections, elevations and calculation of gross floor area of Tai Po Complex

ASD13/6-5/7 (221/2019) Plans, sections and elevations of Lockhart Road Municipal Services Building

ASD13/6-5/7 (222/2019) General building plans, drainage plans and structural plans, schematic diagram and layout for plumbing of a school

ASD13/6-5/7 (224/2019) Underground drainage drawings (including manhole) of Kwai Fong Community Centre and Lai King Terrace

ASD13/6-5/7 (225/2019) Structural framing plans and structural design calculation for roof and 1/F of Yuen Long Government Offices

ASD13/6-5/7 (226/2019) Structural framing plans and structural design calculation for roof of Yuen Long District Office

ASD13/6-5/7 (227/2019) Record drawings of Former Asiatic Police Quarters: (a) site and drainage plans (Year: 1950); (b) section X-X Block A and section Y-Y Block B (microfilm no. 36810 / drawing no. A36/9, 1950); and (c) layout of foundations to Blocks A and B

ASD13/6-5/7 (228/2019) Architectural drawings (including floor plans, elevations and sections) and structural information of alteration and addition works of Cattle Depot Artist Village before revitalization

ASD13/6-5/7 (229/2019) Architectural drawings and old aged plumbing and drainage drawings of property located at M/F, No. 71 Man Nin Street, Sai Kung

ASD13/6-5/7 (230/2019) Architectural drawings including the gloss floor area, site coverage and green area of a primary school

ASD13/6-5/7 (231/2019) Floor plans of G/F, Wanchai Tower

ASD13/6-5/7 (233/2019) Architectural drawings, including plans, sections, elevations and calculations of Sai Kung Tseung Kwan O Government Complex

ASD13/6-5/7 (234/2019) Architectural and structural drawings of Blocks H and K of Princess Margaret Hospital

ASD13/6-5/7 (235/2019) Structural drawings of A/C plant room roof at Tai Po Government Offices

ASD13/6-5/7 (236/2019) Information of solar panels installation on the roof top of EMSD Headquarters

ASD13/6-5/7 (237/2019) Information relating to the Unit G14 of G/F Richland Gardens (Commercial & Garage Block)

ASD13/6-5/7 (239/2019) Architectural drawings, side elevations and structural details of Yau Ma Tei Carpark Building

ASD13/6-5/7 (242/2019) (a) floor plans and sections of Health Education Exhibition and Resource Centre; (b) floor plans, sections and side elevations of Hong Kong Heritage Discovery Centre; and (c) master layout plans and site plans of Kowloon Park

ASD13/6-5/7 (243/2019) Floor plans, sections, elevations and facade of Government Supplies Department Building (demolished in 2012)

ASD13/6-5/7 (244/2019) Floor plans, structural drawings, plumbing and drainage drawings and addition and alternation works drawings of a secondary school

ASD13/6-5/7 (247/2019) Structural information of the roof of Tai Hing Government Offices

ASD13/6-5/7 (255/2019) Floor plans, structural drawings, elevations, plumbing and drainage drawings and addition and alternation works drawings of before revitalisation of Central Police Station (Tai Kwun)

October to December 2019 Reference number Information requested and released ASD13/6-5/7 (248/2019) Record drawings of the following venues: (a) floor plans and structural drawings of Central Market before revitalization; (b) architectural drawings of Central Pier No. 5; (c) architectural drawings of Central Pier No. 7; and (d) floor plans of Grand Peace Funeral Parlour (Previous Name)

ASD13/6-5/7 (256/2019) Floor plans of Kwun Tong Jockey Club Health Centre

ASD13/6-5/7 (257/2019) Floor plans of Fa Yuen Street Municipal Services Building

ASD13/6-5/7 (258/2019) Architectural drawings of Energizing Kowloon East Office

ASD13/6-5/7 (259/2019) Building plans, structural drawings and structural calculations of basement and ground level of Pathology Block and Main Block of Tuen Mun Hospital

ASD13/6-5/7 (260/2019) Architectural drawings of the government property located at 135 Tai Hang Road

ASD13/6-5/7 (261/2019) Architectural drawings of North Point (East) Ferry Pier

ASD13/6-5/7 (262/2019) Structural drawings of the following venues: (a) two artificial fountains of Gloucester Road Garden; (b) St. Stephen's Beach Water Sports Centre; (c) Kwong Fuk Football Ground; and (d) Boundary Street Sports Centre No. 2

ASD13/6-5/7 (264/2019) Architectural and structural drawings of the green hill of Hong Kong Wetland Park Phase II

ASD13/6-5/7 (265/2019) Structural information of three slaughterhouses in Hong Kong: (a) piling schedule and typical manhole details of Sheung Shui slaughterhouse (Original Reference Numbers: S172018 and S171993); (b) structural records of slaughterhouse block of Kennedy Town Abattoirs (Original Reference Number: S0021201); and (c) structural records of slaughterhouse block of Cheung Sha Wan Abattoir (Original Reference Number: S054208)

ASD13/6-5/7 (266/2019) Records drawings of the following venues: (a) architectural and structural drawings of General Post Office from 1911 to 1967; and (b) architectural drawings of Star Ferry Car Park

ASD13/6-5/7 (267/2019) Material information submitted by contractor of Tin Shui Wai Hospital (contract no. SS A502)

ASD13/6-5/7 (269/2019) Record drawings of the following venues: (a) structural and architectural drawings of a former secondary school; and (b) structural drawings and plans of a former school currently occupied by Occupational Safety & Health Council OSH Academy

ASD13/6-5/7 (270/2019) Floor plans of Hong Kong Wetland Park including visitor centre

ASD13/6-5/7 (271/2019) Architectural and structural drawings of Kwun Chung Market

ASD13/6-5/7 (272/2019) Architectural and structural drawings of alterations and additions works of the Cattle Depot Artist Village before revitalization

ASD13/6-5/7 (273/2019) Architectural drawings and structural information of alteration and addition works of the former Central Market

ASD13/6-5/7 (274/2019) Architectural drawings of the former Central Market

ASD13/6-5/7 (278/2019) Architectural drawings of G/F and 1/F of the Starbucks at Avenue of Stars

ASD13/6-5/7 (279/2019) Structural information of the G/F of Plant Room

ASD13/6-5/7 (280/2019) General building plans including alterations and additions works, structural framing plans and foundation plans of government property located at 135 Tai Hang Road

ASD13/6-5/7 (282/2019) Structural information of R/F of Leisure and Cultural Services Department Headquarters

ASD13/6-5/7 (283/2019) Architectural drawings of the Cattle Depot Artist Village before revitalization

ASD13/6-5/7 (285/2019) Architectural drawings of the following hospitals: (a) Wai Oi Block and Wai Shun Block of Caritas Medical Centre; (b) Main Block of Kowloon Hospital; (c) Ward Blocks E, G and H of Queen Elizabeth Hospital; (d) Blocks G, H, P and K of Princess Margaret Hospital; (e) Main Block of Kwong Wah Hospital; (f) Level 1 and Level 2 of Day Rehabilitation Centre of North District Hospital; (g) Block A of Hong Kong Buddhist Hospital; (h) Tsan Yuk Hospital; and (i) Block K/Ward Black of Queen Mary Hospital

ASD13/6-5/7 (287/2019) Building plans, structural framing plans and structural design calculations of roof and upper roof of Tsuen Wan Government Offices

ASD13/6-5/7 (289/2019) Structural information of roof floor of Hong Kong Film Archive

ASD13/6-5/7 (290/2019) Approved floor plans, structural drawings and calculation related to restoration of internal staircase of G/F and M/F, 19 Po Yick Street, Tai Po, New Territories

ASD13/6-5/7 (291/2019) Architectural drawings of the City Hall Low Block and Memorial Garden

ASD13/6-5/7 (292/2019) Floor plans of a former school

ASD13/6-5/7 (293/2019) As-built record drawings, slope maintenance manual, engineer inspection report and other related information of two slope features Nos. 7SW-C/C277 and 7SW-CR1376 at Kwan Mun Hau Tsuen, Tsuen Wan

ASD13/6-5/7 (294/2019) Roof building plans and structural framing plans of Sai Kung Government Offices

ASD13/6-5/7 (295/2019) Plans (greening area/lawn) and mechanical drawings of Tiu Keng Leng Sport Centre and Tiu Keng Leng Public Library

ASD13/6-5/7 (296/2019) Architectural drawings of the following government properties: (a) Aurizon located at 62 Moorsom Road, Hong Kong; (b) Aurora located at 61 Moorsom Road, Hong Kong; and (c) 111 Mount Butler Road, Hong Kong

ASD13/6-5/7 (298/2019) Structural information of the basement and ground floor of Hong Kong Cultural Centre

ASD13/6-5/7 (299/2019) Structural information of the roof of the Border District Police Headquarters

ASD13/6-5/7 (301/2019) Building plans and structural drawings/ structural drawings of school improvement programme of two schools

ASD13/6-5/7 (302/2019) Architectural and structural drawings of Kwun Tong Jockey Club Health Centre

ASD13/6-5/7 (303/2019) Structural drawings of a secondary school

ASD13/6-5/7 (304/2019) Building plans of Tai Wan Shan Swimming Pool and Tsim Sha Tsui Star Ferry

ASD13/6-5/7 (306/2019) Architectural drawings of the Western Market before revitalization

ASD13/6-5/7 (307/2019) Operation and maintenance (O&M) manual of drainage/plumbing system and O&M manual of building integrated photovoltaic system (BIPV)/Solar Panel of Tiu Keng Leng Sport Centre and Tiu Keng Leng Public Library

ASD13/6-5/7 (308/2019) Architectural and structural drawings of the Blake Pier at Stanley

ASD13/6-5/7 (309/2019) Structural information of R/F of Yung Fung Shee Memorial Centre

ASD13/6-5/7 (310/2019) Architectural drawings of Yau Ma Tei Wholesale Fruit Market

Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.