Tender: N.I.T. No. 02 /BSD of 2019-20 by A.E./BSD 1. General Information
Type NIT Category Works Mode Method
District BANKURA Inviting Authority Assistant Engineer, Bankura Sadar Sub- Division
543 /BSD dated Tender Id N.I.T. No. 02 /BSD of 2019-20 by A.E./BSD Memo No Memo Date 12-06-2019 12/06/2019
Description N.I.T. No. 02 /BSD of 2019-20 by A.E./BSD
Estimated Work Value -
2. EMD (Earnest Money Deposit) Details
Exempted? Yes Fee Type Demand Draft Payable To Payable At
3. Critical Dates
Tender Publish Date 26-06-2019 03:05 PM Sale/Submission Start Date
Download Start Date Sale/Download End Date 10-07-2019 04:30 PM
Last Date of Application 05-07-2019 05:00 PM Last Date of Permission 08-07-2019 03:00 PM
Last Date of Submission 10-07-2019 04:30 PM Tech Bid Opening Date 10-07-2019 05:00 PM
Tech Bid Uploading Date Fin Bid Opening Date Time
Uploading Bid Date Time
4. Pre-bid Meeting Details
Date Venue Address
5. Work Details
Sl No Description Estimated Cost (Rs.) Completion Time EMD (Rs.)
Sinking of 1 no. 200 mm dia. X 3.5 Mtr. depth Horizontal River Bed Tube Well & restoration & renovation of connecting line carring structure 1 including all related works under Bhara Water Supply Scheme under 435877.00 30 Day's 8800.00 Bankura Sadar Sub- Division, of Bankura Division, PHE Dte. (Flood damage fund / Emergency Fund )
Restoration of UPVC pipe line of kusthal Mejia Road damage due to contruction of PMGSY road of Saltora Block under Saltora & Chhatna W/S 2 435862.00 90 Day's 8800.00 Scheme (Zone- Monipur) in Bankura Sadar Sub-Division under Bankura Division P.H.E. Dte.
Extention of Pipe line Gokulnagar Kali Mandir to Gokulnagar Village Under 3 Indpur ( Zone - III) W/S Scheme Bankura Sadar Sub-Division of Bankura 499598.00 90 Day's 10000.00 Division P.H.E. Dte. (Flood like situation Bankura- 2018)
Extention of Pipe line Indpur Goenka H.S. more to Gokulnagar Kali Mandir 4 Under Indpur ( Zone - III) W/S Scheme Bankura Sadar Sub-Division of 496137.00 90 Day's 10000.00 Bankura Division P.H.E. Dte. (Flood like situation Bankura- 2018)
Land devoloping and dressing of CWR & Pump house Premises under improvement of Bankura Sammilani Medical College & Hospital Water 5 498360.00 30 Day's 10000.00 Supply Scheme under Bankura Sadar Sub- division of Bankura Division, PHE Dte.
Laying distribution system of pipe line from Bikna main road (Vagirath Ashram)via Malla para to Mal para (H/O- Dilip Mal) Under Bikna W/S 6 499139.00 90 Day's 10000.00 Scheme under Bankura Sadar Sub-Division of Bankura Division, PHE Dte. (Draught like situation /Emergency Fund)
Cleaning compound & stacking for different dia. (D.I / C.I / CIDF / G.I. / AC) pipe specials & scrap materials in BSMC & H Godown No- I, II & III including 7 electrification, store verification & construction of bypass MS gate of jail 452549.00 60 Day's 9100.00 type of BSMC & H Water Supply Scheme under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte.
Laying distribution system of pipe line for Barjora to Durgapur Main road near SBI Bank to Anukul Thakur Ashram Under BARJORA (LEFT OUT MOUZAS 8 OF BARJORA BLOCK UNDER BRGF PHASE-I)& its adjoining mouzas W/S 477262.00 90 Day's 9600.00 Scheme within Barjora Block under Bankura Sadar Sub-Division of Bankura Division , PHE Dte.
Interconnection And Special laying Of UPVC line at Seulibona gram of 9 Chhatna Block under Saltora & Chhatna W/S Scheme under Bankura Sadar 246876.00 90 Day's 5000.00 Sub- Division of Bankura Divison P.H.E. Dte.
Dismantaling of concrete & recontruction of conc at main road of Mejia & 10 other allied work of Mejia (PH-II) Water Supply Scheme under Bankura 495135.00 60 Day's 10000.00 Sadar Sub-Division, of Bankura Division, P.H.E. Dte.
Interconnection with Rising main by 150 mm dia MS pipe & Rising main with ditribution for Commitioning of Manna gram, Dangmegia &Tewari Danga 11 373670.00 90 Day's 7500.00 Mejia (PH-II) Water Supply Scheme under Bankura Sadar Sub-Division, of Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well no. 1 to Pump house including supply and erecting of guard pilling etc. including 12 cost of clamps, bracket, 'U' bolt etc. all complete for Karakdanga Water 206485.00 30 Day's 4200.00 Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well no. 2 to Pump house including supply and erecting of guard pilling etc. including 13 cost of clamps, bracket, 'U' bolt etc. all complete for Karakdanga Water 206485.00 30 Day's 4200.00 Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 14 219869.00 30 Day's 4400.00 clamps, bracket, 'U' bolt etc. all complete for Kenjakura Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 15 clamps, bracket, 'U' bolt etc. all complete for EKTESWAR ( Zone - I ) Water 298697.00 30 Day's 6000.00 Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 16 228475.00 30 Day's 4600.00 clamps, bracket, 'U' bolt etc. all complete for SARBERIA Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 17 145812.00 30 Day's 3000.00 clamps, bracket, 'U' bolt etc. all complete for JHANTIPAHARI Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 18 366076.00 30 Day's 7400.00 clamps, bracket, 'U' bolt etc. all complete for INDPUR Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 19 465689.00 30 Day's 9400.00 clamps, bracket, 'U' bolt etc. all complete for ASHNA Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Supplying laying of G.I. delivery main connecting river bed Tube Well to CWR including supply and erecting of guard pilling etc. including cost of 20 185795.00 30 Day's 3800.00 clamps, bracket, 'U' bolt etc. all complete for SANABANDH Water Supply Scheme of Bankura Sadar Sub Division under Bankura Division, P.H.E. Dte.
Laying UPVC pipe line for installation of stand post including const. of platform and drain With all allied works for different habitation of 21 499192.00 90 Day's 10000.00 Bankura - I Block under Bankura I, II & Barjora W/S Scheme (BRGF Ph -I Project) under Bankura Sadar Sub-Division of Bankura Division, P.H.E.Dte.
Installation of stand post including const. of platform and drain With all allied works for different habitation of Bankura - I Block under Bankura I, II 22 499303.00 90 Day's 10000.00 & Barjora W/S Scheme (BRGF Ph -I Project) under Bankura Sadar Sub- Division of Bankura Division, P.H.E.Dte. Laying new UPVC pipe line from Murakhata to Chandar (Murakhata Birpara, Chandar to Panchal Cordline &Mukherjee para ) under Beliatore 23 and its Adjoining Mouzas W/S Scheme of Bankura Sadar Sub-Division 493679.00 90 Day's 10000.00 under Bankura Division PHE Dte. (Temporary water supply fund /Draught like situation fund )
Sinking of 200 mm dia. Vertical River Bed Tube Well 2nos & Laying connecting line carring structure including all related works under Bhara 24 337293.00 60 Day's 6800.00 Water Supply Scheme under Bankura Sadar Sub-Division, of Bankura Division, P.H.E. Dte. (Flood Damage works / emergency works)
Sinking of 1 no. 200 mm dia. Horizontal River Bed Tube Well with fitting of 200 mm dia. strainer with Collecting Line (150 mm dia) in river Darakesawr 25 485298.00 30 Day's 9800.00 under JHANTIPAHARI water supply scheme under Bankura Sadar Sub - Division within Bankura Division, PHE Dte.
Sinking of 1 no. 200 mm dia. Horizontal River Bed Tube Well with fitting of 200 mm dia. strainer with collecting line (150 mm dia.) in river Darakesawr 26 485298.00 30 Day's 9800.00 under SARBERIA water supply scheme under Bankura Sadar Sub - Division within Bankura Division, PHE Dte.
6. Attachments
Sl No File Name
1 Sl- 09.pdf
2 Sl- 26.pdf
3 Sl- 19.pdf
4 Annexure- I.pdf
5 Sl- 11.pdf
6 Sl- 10.pdf
7 Sl- 12.pdf
8 Sl- 20.pdf
9 Notice.pdf
10 Sl- 25.pdf
11 Sl- 04.pdf
12 Sl- 18.pdf
13 Sl- 05.pdf
14 Sl- 24.pdf
15 sl- 08.pdf
16 Sl- 16.pdf 17 Sl- 02.pdf
18 Sl- 21.pdf
19 Sl- 01.pdf
20 Sl- 06.pdf
21 WBF_2911 (i) (ii) (26 Pages).pdf
22 Sl- 03.pdf
23 Sl- 15.pdf
24 Sl- 22.pdf
25 Sl- 07.pdf
26 Sl- 23.pdf
27 Sl- 13.pdf
28 Sl- 17.pdf
29 Sl- 14.pdf