City Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Form - 1 Appendix- I (See Paragraph-6) (I) Basic Information S. No. Item Details 1 Name of the Project/s Hyderabad City Police Commissionerate Headquarters and Integrated Command and Control Centre. By Commissioner of Police, Government of 2 S.No. in the Schedule 8(A) Building and Construction Project Category B: mtrs. built up area ≥ 20,000 sq.mtrs and < 1, 50,000 sq. 3 Proposed capacity / area / length / Total Plot Area : Acres (28328 m2) tonnage to be handled /command Built up area of Building – m2 7.0 area / lease area / number of wells Total Parking Area – m2 34,166 to be drilled Total Built up area- m2 13038 4 New / Expansion / Modernization New 47204 Existing Capacity / Area etc. Not Applicable Category of Project i.e. ‘A’ or ‘B’ B2 5 7 Does it attract the general Not Applicable 6

8 Does it attract the Specific Not Applicable conditions? If yes, please specify . 9 Location • Latitude 17 24 2.84” N conditions? If yes, please specify • Longitude 780 39. ” E Plot / Survey / Khasra No 0 ’ 5 Village Shaikpet 25’ 06 Plot No. 53 and 54 in Sy. No. 403 Mandal Banjara Hills Road No. 12 District Telangana Nearest railway station / airport Lakdikapul Railway Station – 3.8 km along with distance in km 10 Rajiv Gandhi International Airport Shamshabad – km , 11 ct Banjara Hills 19.5 headquarters along with distance in Nearest town, city, distri

1

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. No. Item Details km 12 Shaikpet Village Banjara Hills Road No. 12 (completeVillage Panchayats, postal addresses Zilla Parishad, with Hyderabad District, telephoneMunicipal nos. Corporation, to be given) Local body Telangana , 13 Name of the applicant , Hyderabad City Commissioner of Police, 14 Registered Address

Commissioner of Police, Hyderabad City, Address for Correspondence Basheerbagh, Hyderabad. 500029. 15 BasheerbaCommissioner of Police, Hyderabad City, Name Commissionergh, of Police Hyderabad. 500029. Designation (Owner/Partner/CEO) - Address

Commissioner of Police, Hyderabad.Hyderabad City, Pincode Basheerbagh, E-mail [email protected] 500029 Telephone no. - Fax no. - 040 27852432, 9490616376 Not Applicable any. Location of these sites should be 16 Details of Alternate Sites examined, if shown on a toposheet. 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked project has been submitted. 19 Not Applicable Not Applicable If yes, date of submission 21 Whether the proposal involves Not Applicable 20 If no, reason

details of the same and their status approval / clearance under: if yes, to be given (a)

The Forest (Conservation) Act, 1980? 2

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. No. Item Details (b) The W 1972? ildlife (Protection) Act, (c) 22 Whether there is any Government The C.R.Z. Notification, 1991? Order / Policy relevant / relating to relating to the site are applicable. No, Government Order / Policy relevant / the site 23 Forest Land involved (hectares) No Forest land is involved in the project 24 Whether there is any litigation No litigations pending against the project. pending against the project and / or land in which the project is proposed to set up? (a) Name of the Court (b) Case No. (c) Orders / directions of the its relevance with the proposed project. court, if any and

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data 1.1 Permanent or temporary change in Yes Permanent change in land use will occur raphy due to Construction of Residential including increase in intensity of land Apartments. Project site is almost plain land use, land cover or topog use (with respect to local land use land with thorny bushes and grass. plan). 1.2 Cleara Yes Project site consists of grass thorny and buildings? bushes shrubs and some tress. One nce of existing land, vegetation , Traffic Police Station building and 3 , sheds are existing in the site. one old structure is also located in the site. Few boulders will be disposed through contractor. are available in the site, which

3

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data 1.3 Creation of new land uses? Yes The proposed site will be used for construction of Police Commissionerate Headquarters and Integrated Command Control Centre. 1.4 Pre-construction investigations e.g. Yes Soil testing was done.

Construction works? Yes Proposing to construct a modern ICONIC bore holes, soil testing? 1.5 of the Hyderabad City Police structure, for housing the head quarter Commissionerate along with a world -of-art COMMAND CONTROL CENTER. class, state Demolition works? Yes Demolition of old and existing structures will take place during construction in the 1.6 proposed site. 1.7 Temporary sites used for No Most of the workers will be hired from construction works or housing of the nearby areas. Temporary sheds will construction works? be provided for security persons and outside laborers. 1.8 No The proposed construction involves or earthworks including linear development of Residential Apartments Above ground buildings, structures which requires adequate engineered earthworks. structures, cut and fill or excavations

Excavation will be done for construction of footing & foundations.

The excavated soil of about 4 cum would be used within the site. 2,5 ,952 1.9 Underground works including No Not Applicable mining or funneling? Reclamation Works? No Not Applicable 1.11 Dredging? No Not Applicable 1.10 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes Temporary site office/Room/Shed at

4

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data materials? site. Facilities for treatment or disposal of Yes • Treated in Sewage treatment plant. solid waste or liquid effluents? • Salt glazed vitrified pipes or HDPE 1.15 pipes for sewage collection. • It will be seen that there is no leakage or mixing of sewage with drinking or ground water sources. • Excess Treated effluents will be disposed in nearby sewage lines. Facilities for long term housing of No Labour will be hired from surrounding operational workers? areas. Temporary site office/Room/Shed 1.16 at site. 1.17 No Not Applicable construction or operation? New road, rail or sea traffic during 1.18 No None other transport infrastructure New road, rail, air waterborne or including new or altered routes and

1.19 Closure or diversion of existing No Not Applicable stations, ports, airports etc? transport routes or infrastructure leading to changes in traffic movements? New or diverted transmission lines No None envisaged or pipelines? 1.20 1.21 No None envisaged realignment or other changes to the Impoundment, damming, culverting, hydrology of watercourses or aquifers? 1.22 Stream crossings? No None envisaged. There is no stream crossing in the proposed site. 1.23 Abstraction or transfers of water Yes Ground water will be used during from ground or surface waters? construction and operation phases. 1.24 Changes in water bodies or the land No Due to proposed project there will not surface affecting drainage or run-off? pattern etc. Runoff will be managed by be any changes in water bodies, drainage adequate storm water drain systems

5

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data Transport of personnel or materials Yes Transfer of material will be done by vehicles to the construction site. 1.25 decommissioning? for construction, operation or Long-term dismantling or No None envisaged decommissioning which could have 1.26 an impact on the environment? 1.27 Ongoing activity during No None envisaged decommissioning which could have an impact on the environment ? 1.28 Influx of people to an area in either Yes During operation temporarily or permanently? be occupying the proposed headquarters about 3000 people will of Police Commissionerate Building. 1.29 Introduction of alien species? No None envisaged Loss of native species or genetic No None envisaged diversity? 1.30 1.31 Any other actions? No None envisaged

2. Use of Natural resources for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

S. Information /Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data 2.1 Land especially undeveloped or Yes Undeveloped land – Acres/28328 m2. It agricultural land (ha) is a Govt. Land and is in the control of 7.0 Hyderabad Traffic Police Department. 2.2 Water (expected source & Yes Total water requirement for the project is competing users) Unit : KLD KLD. Source of the water is Municipal supply by HMWSSB. Water 301.52 requirement details are enclosed as Annexure-2. 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Yes Kota sto stone, Coarse & Fine Aggregate, Granite, source- MT) From local traders or nearby sites. aggregates, and / soil (expected ne, marble bricks, sand, cement, steel.

6

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Forests and timber (source-MT) Yes Timber for Doors & windows Energy including electricity Yes About 2 power will be required for 2.5 the Project and it will be sourced from 2.6 962 KW users) Unit : fuel (MT TSSPDCL. and fuels (source, competing (MW) ), energy Govt. of Telangana is proposing to install Building-integrated photovoltaics (BIPV)

replace conventional building materials in (i.e., photovoltaic materials that are used to parts of the b uilding envelope such as the

Solar Power. roof, skylights, or facades) to generate

be generated. Hence power requirement From this about 1030 KW solar power will from TSSPDCL 1932 KW only.

Two DG sets of 12 KVA will be provided as a backup power source. Fuel 50 requirement for DG set will be LPH of HSD. 150 2.7 Any other natural resources No Not Applicable (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information /Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with sources of information data 3.1 No No hazardous substances (as per MSIHC are hazardous (as per MSIHC rules) to rules) are used in the proposed Use of substance or materials, which human health or the environment residential project. Therefore no ( ). hazardous waste is generated. 3.2 Changes in occurrence of disease or No None envisaged flora, fauna and water supplies affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare or people e.g. by No Not applicable

7

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

changing living conditions? 3.4 Vulnerable groups of people who No Not Applicable could be affected by the project e.g.

hospital patient’s, children, the elderly Any other causes No None envisaged etc.,

3.5

4. Production of solid wastes during construction or operation or decommissioning (MT/ month) S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible ) with sources of information data 4.1 Yes Excavated soil is used within the project site only for leveling. Spoil, overburden or mine wastes 4.2 Municipal waste (domestic and or Yes The total municipal waste generated commercial wastes) from the proposed residential project is kg/day. Details enclosed as Annexure - 3. 962 4.3 Hazardous wastes (as per No Not Applicable Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable Surplus product No Not Applicable Sewage sludge or other sludge from Yes The sludge from anaerobic sludge 4.5 effluent treatment digester is sent to fi 4.6 sludge from here sent to greenbelt. lter press, and the 4.7 Construction or demolition wastes Yes • Bio-degradable/Non bio-degradable waste will be sent to municipal solid waste management facility. • Recyclable waste is sold to local vendors. 4.8 Redundant machinery or No Most of the equipment used for the equipment construction will be hired and any surplus equipment and material that is found will be sold off to the appropriate agencies. 4.9 Contaminated soils or other No No soil Contamination is anticipated as materials the proposed project being a

8

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. Information / Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible ) with sources of information data construction project all the waste generated will be recyclable in nature (Domestic in nature). Agricultural wastes No Not Applicable 4.11 Other solid wastes Yes d up 4.10 Solid Waste like rubbles, use used for filling up of low lying areas cement, broken bricks etc which shall be during development stage.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with sources of information data Emissions from combustion Yes Emissions will be mainly from vehicles of fossil fuels from running at the project site during 5.1 stationary or mobile construction and operation period and sources secondly from the DG set used for backup power source (during power failures only for a short duration). High Speed Diesel (HSD) will be used for the DG sets. The main

emissions will be SO2 and NOx The D.G Set will be acoustically enclosed so as to meet the norms laid down by CPCB. Moreover proper stack height will also be provided as per CPCB Norms to ensure proper dispersion of these pollutants. Details enclosed as Annexure – 4. Emissions from production Yes Not Applicable as this is a construction processes project 5.2 Emissions from handling Yes The main emissions during the construction including storage and will be PM (Particulate Matter) from loading 5.3 transport and unloading of material on the site. SO2

and NOx from the combustion of fossil fuels and from the vehicles. The particulate matter

9

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with sources of information data will be controlled by sprinkling water at

regular intervals on paved roads. The SO2

and NOx will be controlled by proper maintenance of the vehicles. Emissions from Yes Fugitive emissions are likely during the construction activities construction activities due to use of 5.4 including plant and construction equipment. These are equipment temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the

site. SO2 and NOx from the combustion of fuels in construction equipment used which would be controlled. Dust or odors from handling Yes Fugitive emissions are likely during the of materials including construction activities due to use of 5.5 construction equipment. These are sewage and waste. temporary in nature. The main emissions construction materials, during the construction will be PM from the loading and unloading of materials on the

site. SO2 and NOx from the combustion of fuels in construction equipment used which would be controlled. Emissions from incineration No Not Applicable of waste 5.6 Emissions from burning of No Not Applicable waste in open air (e.g. slash 5.7 debris) materials, construction Emissions from any other No Not Applicable sources 5.8

10

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data From operation of equipment e.g. Yes during activities such as exccavation 6.1 Noise level of 75 dB (A) is anticipated crushers concrete mixing and crushing etc. These are engines, ventilation plant, , temporary in nature and will be minimized by adopting proper maintenance such as greasing oiling and insulations (enclosures) for noise abatement. From industrials or similar No Not Applicable as this is a construction processes project. 6.2 From construction or demolition Yes Construction activities such as Site preparation 6.3 Crushing , Laying of roads, Drilling, From blasting or piling Yes Not Applicable as no blasting involved From construction or operational Yes Vehicles or Trucks shifting the load from 6.4 traffic one place to another 6.5 From lighting or cooling systems Yes HVAC of 1118 TR is proposed for the project. 6.6 From any other sources Yes From DG set noise is anticipated but this will be for a very short period of time 6.7 during power failures.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea :

S. Information /Checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible ) with sources of information data 7.1 No No hazardous substances are used in the spillage of hazardous materials proposed project as this is a From handling, storage, use or construction project 7.2 From discharge of sewage or other No The domestic wastewater will be passed effluents to water or the land through the closed conduits/ drains/

11

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

(expected mode and place of discharge ) part of the treated water is reused for sewer lines to the STP for the treatment, flushing and green belt 7.3 By deposition of pollutants emitted No In Building and construction project the to air into the land or into water air pollutants are minimal; to minimize the same greenbelt will be developed along the boundary and roads. 7.4 From any other sources No None envisaged Is there a risk of long term build up No Proper Environmental Management Plan of pollutants in the environment 7.5 from these sources? pollution and solid waste management. will be followed for air, water, noise Hence no long term impacts are envisaged and this being a construction project the impact felt on the area will be temporary in nature as most of the impacts are all construction impacts.

8. Risk of accidents during construction or operation of the Project, which could affect human or the environment S.No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 8.1 No This being construction project no etc From explosions, spillages, fires production of hazardous from storage, handling, use or explosion, spillage, fire etc from storage, substances substances will be take place. Fire handling, use or production of hazardous Fighting systems will be installed and safety precautions will be followed as per .

NBC, 2005 rules Basement shall be designed with due considerations for Structural and fire safety. 8.2 From any other causes No Not Applicable 8.3 Could the project be affected by No None envisaged. natural disasters causing environmental damage (e.g. The project site falls in the seismic zone- I which is seismically least active zone.

floods, earthquakes, landslides, , 12

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activates in the locality.

S.No. Information /Checklist Yes Details thereof (with approximate confirmation /No quantities /rates, wherever possible ) with sources of information data 9.1 Lead to development of Yes Yes both construction and operation

development or development supporting. facilities, ancillary phase will enhance the supporting, stimulated by the project which around. utilities, ancillary development in the area could have impact on the environment e.g.: Improved aesthetic look by avenue • Supporting infrastructure plantation and landscape development.

waste-water treatment etc.) (roads, power supply, waste or • Housing development

• Extractive industries

• Supply industries

• Other 9.2 Yes A positive impact on the environment in which could have an impact on the area is anticipated due to the Lead to after use of the site, the environment development of green belt. 9.3 Set a precedent for later Yes The proposed development will facilitate developments sustainable development. 9.4 Have cumulative effects due to No None envisaged as the proposed proximity to other existing or development is a construction project planned projects with similar effects)

13

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

(III) Environment Sensitivity

S. Areas Yes Aerial distances (within 15 km.) No. /No Proposed project location boundary. 1. Areas protected under international No -

legislation for conventions, national or local their ecological, values. landscape, cultural or other related 2. Areas which are important or Yes • Kasu Brahmananda Reddy National sensitive for ecological reasons- park – • Lotus Pond – km(WSW) 0.2 km (W) • Durgam Cheruvu – 3.8 km (W) Wetlands, water courses or other 0.6 • Hussain Sagar – 3.8 km (NE) water bodies, coastal zone, • Musi River – 4.3km (S) biospheres. Mountains, forests • Mir Alam Tank – • – 6.9 km (SSE) • Bahadurpura R.F. – 7.2 km(SSE) Nehru Zoo Park 6.9 km (SE) 3. tant Yes • – or sensitive species of flora or fauna • Kasu Brahmananda Reddy National Areas used by protected, impor Nehru Zoo Park 6.9 km (SE) park –

for breeding, nesting, foraging, 0.2 km (W) 4. No Not Applicable resting, over wintering, migration. underground waters Inland, coastal, marine or No Routes or facilities used by the Yes NH – 5. State, National boundaries No State Boundary within 15km, public for access to recreation or 6. 9 : 3.0 km (E)

7. Defense installations No Not Applicable other tourist, pilgrim areas 8. Densely populated or built-up area Yes Hyderabad 9. Areas occupied by sensitive man- Yes and Community Facilities are present Hospitals, Schools, Places of worship near the site. made land uses (hospitals, schools, facilities ) places of worship, community No Not Applicable quality or scarce resources 10. Areas containing important, high

(ground water resources, surface

resources, forestry, agriculture, fisheries, tourism, minerals) 14

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

S. Areas Yes Aerial distances (within 15 km.) No. /No Proposed project location boundary. 11. Areas susceptible to natural hazard No Not Applicable which could cause the project to present environmental problems

(Earthquakes, subsidence, extreme or adverse climatic landslides, erosion, flooding or conditions)

IV: Proposed Terms of Reference for EIA Studies: Not Applicable

As the Project is falling under Project Activity 8a-Category–B2–Building & Construction Projects.

15

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Annexure - 1

Detailed Land Break-up Details Area Acres Ha Sq. m. % Residential Road area 12.8 1.61 0.652 6520 23.0 Green belt 0.89 0.362 36208413 29.7 Open Area 2.082.42 0.8413 Total 7.0 0.443 28327.6 100 0.97746 9774.6 34.5

16

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Annexure - 2

Water Requirement No. of Per Capita Water Water Persons Consumption Requirement Requirement Category (LPD) (LPD) (KLD) Fixed Population (Office) Floating Population 3000 135.00 (Office) 45 135000 Guest Houses 30014 4.50 Staff 15 4500 Kitchen 180 2520 2.52 HVAC make up 100 45 4500 4.50 Irrigation & Water 30000 30000 30.00 Bodies 1,00,000 100000 100.00 TOTAL 301520 301.5225.00 25,000 25000

17

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Annexure - 3

Solid Waste Generation details

S. Total Solid No. Description Occupancy Kg/capita/day Waste (Kg/day) 1 Office Population 2 Guest population 3 Guest houses 300014 0.25 7507 4 Staff 300 0.15 45 Auditorium 0.5 Total 100 0.25 96225 5 900 0.15 135

18

Hyderabad City Police Commissionerate Headquarters And Integrated Command and Control Centre FORM - 1

Annexure - 4

Stack and Emissions Details

DG Set Capacity 12 KVA

No of DG sets 2 50 Stack Height formula (Ht of

Height of the stack Building + 0.2√KVA) m Fuel (Diesel) 10 m. LPH/per above the DG building set Sulpur content 300 NOx 0.05% max Density 0.03825 g/s Stack Height as per 0.86The stack height should be 1m above the nearest building CPCB/MOEF.

Source Height Dia. Temp. Gas Vel. SO2 NOx (m) (m) In OC (m/sec) gm/sec gm/sec 1 KVA 2 1

250 10 0.5 50 6 0.075 0.03825

19