East Village’s history started before Construction of 48 new homes for BRINGING the 2012 Games as part of social rent on plot N05 will start in the 2005 Stratford City Masterplan. summer 2021, with completion This masterplan identified what is expected in late 2022. MORE HOMES now E20 as an area of great regeneration opportunity. We are committed to working closely with our construction partners to TO EAST VILLAGE In addition to the 3,000 homes built mitigate the impact on East Village for the London 2012 Athletes’ Village, residents as far as possible. We will this masterplan outlined around 2,000 continue to keep East Village residents further homes across East Village within updated as construction activity five development areas. These homes progresses – primarily through our SPRING 2021 will bring more residents, additional retail development update emails. If you and commercial amenities and a greater haven’t already, please subscribe at buzz to our growing neighbourhood. getliving.com/developmentupdates These plots are shown on the map overleaf. If you have any questions about our new developments please contact us Construction on the first of these at [email protected] or pop new developments, plot N08, started into the Get Living Welcome Office at in 2016 and Victory Plaza’s 482 homes 1 East Park Walk, East Village, E20 1JH. for rent and ground floor retail and leisure space opened in Summer 2019.

More than 524 homes are currently Jackie Robinson being constructed on plot N06, within Director of East Village two towers connected by a striking sky Get Living bridge and two ten-storey pavilions. Construction of these new homes and ground floor retail space is due to complete in late 2021, ahead of opening in early 2022.

Get in touch Get Living contacts:

If you have any questions, Relationship Management Team [email protected] please do contact us.

Development updates mailing list facebook.com/GetLiving Sign up at: @getliving getliving.com/developmentupdates EAST VILLAGE www.getliving.com

East Village is a growing neighbourhood and a key part of the regeneration that is taking place in this part of East London. The first residents moved into East Village towards the end of 2013 and more than 6,000 people now call the former London 2012 Athletes’ Village home. Over the coming years East Village is set to grow further. Following on from the construction extensive experience of working in of Victory Plaza (on plot N08) existing neighbourhoods. Mace were appointed as our N06 construction partner. HG Construction Both contractors have security staff has been appointed as our N05 on site 24/7, working closely with Team construction partner and both Mace East Village to keep the site secure. and HG Construction will continue Both will provide regular updates to work closely with Get Living to directly to residents, primarily through minimise disruption to residents. a printed newsletter to all homes, with Both are involved in the Considerate additional updates provided by Get Constructors Scheme and have Living’s development update emails.

N06 permitted hours for N05 permitted hours for construction activity are; construction activity will be;

Mondays to Saturdays 7am – 9pm Mondays to Fridays 8am – 6pm Residents will be kept informed through the Get Living development Saturdays 8am – 1pm update emails if any work is Victory Plaza brought 482 new homes to East Village in summer 2019 absolutely necessary outside of these hours.

Get in touch

For N05 site enquiries: For N06 site enquiries:

Please contact HG Construction at Please call Mace on 0845 602 5761 [email protected] quoting project code 35441 or 07547 408099 quoting project East Village N05

East Village with the new 2,000 homes in place, viewed from the North Credit: Lifschutz Davidson Sandilands architects – Computer generated image East Village future developments

N06

Around 500 homes for Key market rent by Get Living Future construction sites are being built within two Retail Space towers (26 and 31 storeys) connected by a sky bridge Bus Stop B B B ACADEMY and two ten-storey pavilions. AND COMMUNITY Parking P The ground floor will LEE VALLEY VELOPARK PLAYING FIELDS Roads (vehicles) contain further retail AND LEE VALLEY HOCKEY The new buildings at N06 – as viewed and commercial space. AND TENNIS CENTRE from Olympic Park Avenue bridge (indicative only). Credit: Hawkins\Brown LANE architects – computer generated image

N05 CELEBRATION AVENUE N05 48 new homes for social CHOBHAM rent will be built within a ACADEMY SIR LUDWIG GUTTMANN SUNRISE CLOSE striking seven storey building. Verna HEALTH AND House P LEYTON The ground floor will WELLBEING CENTRE CHOBHAM MANOR B include space for retail and Aurelia ULYSSES PLACE community use, opening up Rye House onto new publicly accessible Mansions CHEERING LANE realm including play space. P Swallowtail Tucana House Heights NAPA CLOSETitan Tazetta Ursa Samphire P House House Mansions B Heights Carina Festive Manuka House P LIBERTY BRIDGE ROAD STRATFORD Lucia Mansions Heights Burgundy HONOUR LEA AVENUE Heights House Vega BELVEDERE House P Mimosa Emperor ELIS WAYEarly Rivers House Istra House Mira House LOGAN CLOSE PRIZE WALK House House B CHAMPIONS WALK Meander Limari VICTORY PARADE P Lunaria House P Mansions FORTUNES WALK Pippin Egremont House B Mansions House Applegate Asterid Karner House EAST PARK VICTORYWALK Heights MEDALS WAY PLAZA LIBERTY BRIDGE ROAD Zeller House 1-7 Medals LEE VALLEY VELOPARK House Way AND LEE VALLEY HOCKEY Samaras Festuca Kaleidoscope P Maya AND TENNIS CENTRE SCARLET CLOSE VICTORY PARK Mansions House House Apartments 8-15 Sable P Fortuna Champions TIMBER LODGE House House Coville Walk

AND UNITY CAFÉ MIRABELLE GARDENS Mansions RIBBONS WALK Patina Titian WEST PARK WALK Mansions DE COUBERTIN STREET COUBERTIN DE Mara CELEBRATION AVENUE Saddlers Cavesson 1-19 Torero Heights House House House Oriens Mews Mansions P OLYMPIC PARK AVENUE P Manna P P P ORIENS MEWS House Zinnia P 2-16 WALKCHAMPIONS SANTANDER Sedona Mansions N16 Oriens Mews CYCLES House GLADE WALK Raywood Hopground Galena Merle Seasons VICTORY PARADE Mansions House Heights Mansions House HERE EAST Amelia Sienna 2-7 Nero Mansions House FUTURE Champions House Tayberry HOME OF Walk Venetian THE PENNY House Taffeta Frye Calico House RAVENS WALK Chroma Meller BROOK AND House Calla House House Mansions House House ADAGIO PORTLANDS SANTANDER HOTELS CYCLES N18/19 WATER GLADES PENNY BROOKES STREET Kotata P ANTHEMS WAY House N06 MONTFICHET ROAD FUTURE HOME OF INTERNATIONAL STRATFORD QUARTER NORTH INTERNATIONAL DLR B INTERNATIONAL WAY B

MANHATTAN LOFT GARDENS STRATFORD INTERNATIONAL STATION AND STRATFORD TOWN CENTRE AND COPPER BOX STRATFORD AND BOW ARENA AND HACKNEY WICK AND AND AQUATICS CENTRE QUEEN ELIZABETH OLYMPIC PARK

WESTFIELD STRATFORD CITY AND STRATFORD TOWN CENTRE

East Village 2002 2003 2005 2007 A neighbourhood Stratford City Masterplan Public consultation Stratford City Masterplan The Olympic Delivery in the making planning first submitted permission granted Authority, in partnership with London wins the bid to host the the Architecture Foundation, 2012 Olympic and Paralympic issues an international call for Games, supported by plans architects. 16 world-renowned already in place for residential architects chosen development around Stratford City

2016 2014 2013 2013 2012 2008

Construction work starts at The first of East Village’s opens, Following the post-Games More than 17,000 athletes Construction starts on the N08 (now Victory Plaza) to 31 shops, restaurants and providing 1,800 school places retrofit, East Village welcomes stay during the Games London 2012 Athletes’ Village build 482 homes cafés opens for local children aged 3 to 18 its first residents East Village’s first 3,000 homes reach full occupancy

2018 2019 2021 2021 2022

Winter Summer Summer Winter Winter Future Construction starts at N06 on Get Living launches 482 new Construction starts at N05 on Expected completion of Expected completion of A further 1,000 homes to be a further 500 new homes homes to rent at Victory Plaza 48 new social rent homes new homes at N06 new homes at N05 delivered, building schedule to be confirmed