Total Area: 6.51 Ha
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. Item Details No. 1. Name of the Project M/s. Clariant India Ltd., (Formerly known as M/s. Vivimed Labs Limited, Unit II) Synthetic Organic Chemicals, Cosmetics Manufacturing, repacking Unit and R&D facility 2. S.No. in the Schedule 5 (f) Organic Chemicals & Intermediates 3. Proposed capacity / area / length / Existing unit tonnage to be handled / command area / Application for amendment of Environmental lease area / number of wells to be drilled Clearance (EC) for Change of Name. 4. New/ Expansion / Modernization Existing unit Application amendment of Environmental Clearance (EC) for Change of Name. 5. Existing Capacity / Area etc. Existing Capacity: 8617.8 TPA Total 22 products out of 50 products in 3 groups will be manufactured at any point of time, R&D activity along with 33 repacking products. Total Area: 6.51 Ha 6. Category of Project i.e., ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general Condition? If NO Yes, Please specify 8. Does it attract the specific condition? If NO Yes, Please specify 9. Location Plot/Survey/Khasra No. Sy. No. 202, 207A, 207AA, 207E, 208A, 208AA, 208E, 208EE, 209 & 217 Village Bonthapally-502313 Tehsil Gummadidala (Formerly Jinnaram) District Sangareddy (Formerly Medak) State Telangana 10. Nearest railway station / Nearest Railway Station Dubilpur at 10.2 km airport along with distance in km. Nearest Major Railway station Secunderabad 29 km (aerial distance) Rajiv Gandhi International Airport Shamshabad 47 km (aerial distance) 11. Nearest Town, City, Jinnaram : 5.6 km (SSW) District Headquarters along with distance Hyderabad ORR: 9 km ( SSW) in km. Sangareddy: 30 km (SW) Medak: 42 km (NNW ) 1 12. Village Panchayats, Zilla Parishad, Village Panchayat address (local body): Municipal Corporation, Local body Gram Panchayat Office, (complete postal addresses with telephone Bonthapally-502313 nos. to be given) Gummadidala (M) (Formerly Jinnaram) Sangareddy District (Formerly Medak) Telangana State 13. Name of the applicant Mr. Jim Easow, Director. Authorized signatory Mr. P. Surender Kumar, Head of Operations. 14. Registered Address M/s. Clariant India Limited., Reliable Tech Park, Gut No. 31, Village Elthan, Airoli, Off Thane-Belapur Road, Navi Mumbai – 400708, Maharashtra, India. 15. Address for correspondence: M/s. Clariant India Ltd., Name Mr. P. Surender Kumar Designation(Owner/Partner/ CEO) Head of Operations (Authorized Signatory) Address Bonthapally Village Gummadidala (M) (Formerly Jinnaram) Sangareddy District (Formerly Medak) Telangana State Pin Code 502313 E-mail [email protected] Telephone No. Mob: 9642700245 Fax No. 16. Details of Alternative Sites examined, if Not Applicable as this application for any, Location of these sites should be amendment of Environmental Clearance shown on a top sheet. (EC) for Change of Name. 17. Interlinked projects Nil 18. Whether separate application of interlined Not Applicable project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable as this application for amendment of Environmental Clearance (EC) for Change of Name. 21. Whether the proposal involves Nil approval/clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation)Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z Notification, Act, 1991 22. Whether there is any Government NO Order/Policy relevant/relating to the site 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending NO against the project and / or land in which the project is propose to be set up (a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if any and its relevance with the proposed project. *Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) 2 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Existing Industry and applying for land use, land cover or topography amendment of Environmental Clearance including increase in intensity of (EC) for Change of Name. land use (with respect to local land use plan) 1.2 Clearance of existing land, No Existing Industry and having EC, CFE & vegetation and buildings? latest CFO. Applying for amendment of Environmental Clearance (EC) for Change of Name. 1.3 Creation of new land uses? No Nil 1.4 Pre-construction investigations e.g. No Not envisaged. bore houses, soil testing? 1.5 Construction works? No Nil 1.6 Demolition works? No Not envisaged. 1.7 Temporary sites used for No Nil construction works or housing of construction workers? 1.8 Above ground buildings, structures No Nil or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No No Under Ground Works. mining or tunneling? 1.10 Reclamation works? No Not envisaged. 1.11 Dredging? No Not envisaged. 1.12 Offshore structures? No Not envisaged. 1.13 Production and manufacturing No This application is for amendment of processes? Environmental Clearance (EC) for Change of Name. 1.14 Facilities for storage of goods or Yes This application is for amendment of materials? Environmental Clearance (EC) for Change of Name. 1.15 Facilities for treatment or disposal Yes Existing facilities available as per CFO. of solid waste or liquid effluents? 1.16 Facilities for long term housing of No Most of the workers are locals and nearby operational workers? villages. 1.17 New road, rail or sea traffic during No Not envisaged. construction or operation? 1.18 New road, rail, air waterborne or No Not envisaged. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged. transport routes or infrastructure leading to changes in traffic movements? 3 1.20 New or diverted transmission lines No Not envisaged or pipelines? 1.21 Impoundment, damming, No Not envisaged culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water Yes Water requirement for the industry will be from ground or surface waters? met from the ground water supply through private tankers. 1.24 Changes in water bodies or the No Not envisaged. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Unit in Operation and submitting for for construction, operation or amendment of Environmental decommissioning? Clearance (EC) for Change of Name. 1.26 Long-term dismantling or No Not envisaged. decommissioning or restoration works? 1.27 Ongoing activity during No Not envisaged. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No Unit in Operation and submitting for temporarily or permanently? amendment of Environmental Clearance (EC) for Change of Name. 1.29 Introduction of alien species? No Nil. 1.30 Loss of native species or genetic No Nil. diversity? 1.31 Any other actions? No Nil. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No This is application is for amendment of agricultural land (ha) Environmental Clearance (EC) for Change of Name. 2.2 Water (expected source & Yes Water will be used from Bore Well supply competing users) unit: KLD through tankers. Total water requirement is 736 KLD (Fresh water 395 KLD & recycled water 341 KLD). 2.3 Minerals (MT) No Not applicable. 2.4 Construction material – stone, No This is application is for amendment of aggregates, sand / soil (expected Environmental Clearance (EC) for source – MT) Change of Name. 2.5 Forests and timber (source – MT) No Not applicable. 2.6 Energy including electricity and Yes 4000 KVA power (electricity). fuels (source, competing users) About 85 TPD of coal and 480 lit/hr of Unit: fuel (MT), energy (MW) Diesel. 2.7 Any other natural resources (use No -- appropriate standard units) 4 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information / Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes Complying with EC and SPCB Consent which are hazardous (as per for Operation. MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not envisaged. or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Unit in Operation and submitting for changing living conditions? amendment of Environmental Clearance (EC) for Change of Name. 3.4 Vulnerable groups of people who No Not envisaged. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No -- 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with Approximate confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable. 4.2 Municipal waste (domestic and or Yes The commercial waste from the commercial wastes) administration building is generated and it sold to scrap vendors.