Townland Consultants EXAMPLES OF PROJECTS IN HONG KONG Project TCL REF Project Description Client Lead Duration Completed Consultant of (year) Project (months) Hung Hom Bay Preparation of Planning Briefs for private The Great HOK 3 1987 Comprehensive sector commercial and residential Eagle International Development Area, Hong development on 39.5 ha. of reclaimed land Company Asia Pacific Kong taking account of the Kowloon-Canton Railway Limited Corporation terminal expansion on approx. 26 ha. of the reclaimed area. Specification of development parameters for all sites and a recommended development phasing plan. Proposed Underground Planning inputs to a Feasibility Study for Poly Mark Kenward 3 1989 Commercial proposed commercial development under an Development Consultancy Development Tai Pei area of Public Open Space. Advice on Limited Limited Square, Tsuen Wan, Hong planning aspects and development mix as Kong part of a Core Team of Architects, Engineers, Building Surveyors and Lawyers. Aerial Rapid Transit Planning advice to a private sector consortium Private Sector Acer 2 1989 System Feasibility Study, proposing an elevated railway system linking Consortium Consultants Kowloon South, Hong Tsim Sha Tsui and Hung Hom Bay. Advice on (Far East) Kong statutory planning aspects and the urban Limited design implications and planning constraints and opportunities pertaining to the alignment options, stations and terminus. Development Feasibility Feasibility and Market Study entailing an The Bank of TOWNLAND 3 1990 Study of a Site at assessment of the development context; East Asia Belcher’s Street and review of the property market in respect of Limited Kennedy Town Praya, office, residential and retail uses; generation Hong Kong of development options; and financial analysis in association with Chartered Surveyors. Tai Kok Tsui Urban Comprehensive Planning Study; TOWNLAND Planning TOWNLAND 7 1990 Renewal Study, Kowloon, led a multi-disciplinary team to study indepth Department, Hong Kong urban renewal problems and implementation Hong Kong prospects in the Tai Kok Tsui area. Urban Government renewal action plans were also prepared and Land comprising conceptual land use - transport Development options & implementation proposals. The Corporation Study includes an assessment of development/ redevelopment opportunities provided by the West Kowloon Expressway and the connecting east-west elevated road links. Site Investigation and TOWNLAND was responsible for the Territory Maunsell – 9 1990 Engineering Study for assessment of the land use context, especially Development Scott Wilson Development of potential development opportunities, physical Department, Kirkpatrick Container Terminal No.8, constraints and local concerns, in respect of Hong Kong Hong Kong some 440 hectares of land within which major Government infrastructure provision was required. TOWNLAND also undertook a comprehensive evaluation of alternative sites for the Container Terminal and prepared a Conceptual Land Use Plan illustrating the pattern of land use and the relationship of the port facilities with their surroundings. In addition, TOWNLAND facilitated gazettal procedures and advised on public objections. Page 1 of 65 EXAMPLES OF PROJECTS IN HONG KONG Project TCL REF Project Description Client Lead Duration Completed Consultant of (year) Project (months) Trans Peak Railway TOWNLAND was responsible for land use The Hongkong Maunsell 20 1990 Feasibility Study, Hong assessment; socio-economic assessment; and Shanghai Kong development and re-development potential Hotels Limited appraisal; site identification, preparation of planning briefs and site concept plans and advising on planning and design guidelines for the terminal station and depot sites; and the planning report preparation and production in respect of an 11 km public Light Transit System from downtown Central District to centres on the south side of Hong Kong Island. The scheme included 3 potential terminal station sites, 9 intermediate station sites, one 4.5 ha. depot site and an assessment of development potential along the route. Redevelopment of the Planning and development advice to The Hongkong Client 5 1990 Sites adjoining the Upper prospective tenderer for a prime and Shanghai Peak Tram Station, Hong commercial/tourism re-development site at Hotels Limited Kong the Peak. Assessment of alternative development options and mixes as inputs to viability and feasibility assessments by Client. Upper Peak Tram Station, Master Plan for commercial redevelopment Peak Client 2 1990 Hong Kong on land adjoining the Tram Station, to include Tramways support facilities for the Peak Tram terminus. Company TOWNLAND provided planning and urban Limited design input for a scheme including tram/bus interchange facilities, car parking, commercial/tourist facilities and public park. South East Tsing Yi Port Identification of development constraints and Territory Maunsell- 9 1991 Development Planning opportunities and preparation of land use - Development Scott Wilson and Engineering Study, transport conceptual option plans with a view Department, (Hong Kong) Hong Kong to recommending a Preferred Development Hong Kong Limited Plan for Container Terminal No.9 and land Government uses along the South East Coast of Tsing Yi. Salisbury Garden and Feasibility studies, Rezoning of a public open New World TOWNLAND 35 1991 Salisbury Road, Tsim Sha space and detailed proposals to enable Development Tsui, Kowloon, Hong Kong private sector investment schemes to develop Company Hong Kong’s largest integrated underground Limited & The retail / carpark complex with comprehensive Hongkong and underground pedestrian network, seafront Shanghai promenade and 1 ha. of public garden on the Hotels Limited waterfront as public planning gain. Tai Po Kau Recreation TOWNLAND were successful in securing a Private Sector TOWNLAND 12 1991 Priority Area, Hong Kong composite private residential and public recreational (with boating centre and club house) development on 17 ha. of land in Hong Kong’s first statutory Recreation Priority Area. TOWNLAND coordinated the inputs of the multi-disciplinary team, compiled the technical reports and presented the proposals to the Town Planning Board. Page 2 of 65 EXAMPLES OF PROJECTS IN HONG KONG Project TCL REF Project Description Client Lead Duration Completed Consultant of (year) Project (months) Territorial Land Drainage Preparation of a detailed land use planning Drainage Binnie/ 7 1992 and Flood Control database to cover the principal river basins in Services Maunsell Strategy Study (Phase II), the New Territories of Hong Kong. The Department, Consultants Hong Kong database forms a layer within a GIS system Hong Kong J.V. forming part of a series of River Basin Government Management Plans. The planning database categorises land within the river basins according to run-off characteristics (eg. arable land, hill-slope, residential area) and builds a number of planning scenarios for testing during the course of the Study against land drainage and flood control objectives. The Base Growth scenario (ie. existing and committed development) will form a permanent layer in the Basin Management Plan database. An extensive Growth Scenario was also postulated. MTR Tai Kok Tsui Station The purpose of this Study was to provide a Mass Transit Colliers Jardine 3 1992 Development Planning background planning context for the Railway Assessment, Kowloon, proposed Comprehensive Development Area Corporation Hong Kong (CDA) associated with the MTR Tai Kok Tsui Station Site. The objective was to allow MTRC to reconsider the proposed develoment mix based on the acceptability of changes in relation to planning intentions and statutory planning provisions, as well as financial viability. The Study recommended alternative development mixes which would likely be more acceptable from a land use planning point of view. Initial Feasibility Study for TOWNLAND was the Study Coordinator in this Sino Land TOWNLAND 12 1992 Potential Pedestrian Feasibility Study for possible underground Company Links, Underground development at Tsim Sha Tsui. The Study Limited Carparking and Team included planners, engineers, traffic Commercial consultants, architects, landscapers, Developments beneath economists, lawyers, environmental Public Streets and Open consultants and building surveyors. The Space, Tsim Sha Tsui, Study reviewed the strategic and district / local Kowloon, Hong Kong planning context for the Study Area; established a broad land use / engineering / traffic database to facilitate a preliminary development appraisal with a view to identifying possible underground development; identified the planning / engineering / traffic opportunities and constraints for possible underground development; formulated conceptual development schemes; and highlighted the key development and implementation issues for further investigation. Page 3 of 65 EXAMPLES OF PROJECTS IN HONG KONG Project TCL REF Project Description Client Lead Duration Completed Consultant of (year) Project (months) Mount Butler Quarry TOWNLAND was responsible for all land use Civil P&T Wallace 8 1992 Rehabilitation Study, planning aspects and the co-ordination of the Engineering Evans Limited Hong Kong planning/lands team for inputs to the Department, formulation and evaluation of the land use Hong Kong options, the detailing (Master Plan) of the Government preferred option and the implementation programme for the rehabilitation of a Government quarry within a designated urban fringe park. Kowloon Point
Recommended publications
  • Hong Kong, 1941-1945
    Hong Kong University Press 14/F Hing Wai Centre 7 Tin Wan Praya Road Aberdeen Hong Kong © Ray Barman 2009 ISBN 978-962-209-976-0 All rights reserved. No portion of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage or retrieval system, without prior permission in writing from the publisher. All photos, illustrations, and newspaper cuttings in this book are from the collection of the Barman family. Every effort has been made to track ownership and formal permission from the copyright holders. If there are any inadvertent omissions we apologize to those concerned, and ask that they contact us so that we can correct any oversight as soon as possible. British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. Secure On-line Ordering http://www.hkupress.org Printed and bound by Condor Production Ltd., Hong Kong, China. Contents Foreword for the Series ix About This Book xi Abbreviations xiii About the Author xvii Introduction 1 The Battle 5 Internment 93 Postscript 265 Appendices 269 Notes 293 Index 299 About the Author Charles Edward Barman was born at Canterbury, Kent in England on 14 May 1901, the eldest of four children. He was the son of a gardener, Richard Thomas, and Emily Barman from Tenterden, an area of Kent where many people of the Barman name still live. Charles had two brothers, Richard and George, and a younger sister, Elsie. As a boy, he attended the local primary school at Canterbury and attended services at the Cathedral.
    [Show full text]
  • The Struggle for Sustainable Waste Management In
    The struggle for sustainable waste management in Hong Kong: 1950s– 2010s LSE Research Online URL for this paper: http://eprints.lse.ac.uk/103562/ Version: Published Version Article: Lou, Loretta Ieng Tak and Fabian, Nele (2019) The struggle for sustainable waste management in Hong Kong: 1950s–2010s. Worldwide Waste: Journal of Interdisciplinary Studies, 2 (1). https://doi.org/10.5334/wwwj.40 Reuse This article is distributed under the terms of the Creative Commons Attribution (CC BY) licence. This licence allows you to distribute, remix, tweak, and build upon the work, even commercially, as long as you credit the authors for the original work. More information and the full terms of the licence here: https://creativecommons.org/licenses/ [email protected] https://eprints.lse.ac.uk/ Fabian, N and Lou, LIT. 2019. The Struggle for Sustainable Waste Management :25/':,'(:$67( in Hong Kong: 1950s–2010s. Worldwide Waste: Journal of Interdisciplinary -2851$/2),17(5',6&,3/,1$5<678',(6 Studies, 2(1): 10, 1–12. DOI: https://doi.org/10.5334/wwwj.40 RESEARCH The Struggle for Sustainable Waste Management in Hong Kong: 1950s–2010s Nele Fabian* and Loretta Ieng Tak Lou† As Hong Kong’s landfills are expected to reach saturated conditions by 2020, the city can no longer rely on landfilling alone as the sole solution for waste treatment in the long term. Drawing on five months of archival research at the University of Hong Kong and the Hong Kong Public Records Office (PRO) in 2016 as well as 17 months of fieldwork conducted between 2012, 2013 and 2016, this article provides a much- needed overview of why sustainable waste management has always been such a challenge for Hong Kong.
    [Show full text]
  • Annex List of Development Bureau's Initiatives in the Policy Agenda a List
    Annex List of Development Bureau’s Initiatives in the Policy Agenda A list of Development Bureau’s initiatives in the Policy Agenda is appended below. We have 32 new initiatives and 82 on-going initiatives mainly under the Chapters of “Reinforcing Our Strengths, Enhancing Governance”, “Diversified Economy, Better Jobs”, “Professional-led Quality Education”, “Home Ownership, Liveable City” and “Building a Caring, Inclusive Society, Improving People’s Livelihood”. Reinforcing Our Strengths, Enhancing Governance On-going Initiative y Fully support and accommodate the resource requirements of the Judiciary. The Government continues to work with the Judiciary on the planned construction of a new High Court at the new Central harbourfront, as well as a new District Court at Caroline Hill Road to house the District Court, the Family Court and the Lands Tribunal. This aims to address the long-term accommodation needs in respect of courts and offices at the High Court and District Court levels. Diversified Economy, Better Jobs New Initiatives y Enhance the project governance capability and implement strategic policy initiatives through expanding the establishment and functions of the Project Cost Management Office. y Establish the Centre of Excellence for Major Project Leaders to equip major project leaders with strategic and innovative minds and world-class leadership skills in the delivery of public works projects. y Collaborate with international organisations through exchanging expertise and experience and making reference to practices suitable for application in Hong Kong to enhance project governance. y Promote and lead the adoption of “Hong Kong Construction 2.0” advocating “innovation”, “professionalisation” and “revitalisation” in the construction industry to uplift the capacity and sustainability of the industry, thereby improving productivity, quality, safety and environmental performance.
    [Show full text]
  • 13 and Stage 2 Community Engagement (CE2) Between May and July 2014
    CB(1)452/15-16(06) For discussion on 26 January 2016 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT Planning and Engineering Study for Housing Sites in Yuen Long South – Investigation Draft Recommended Outline Development Plan and Stage 3 Community Engagement INTRODUCTION This paper seeks Members’ views on the draft Recommended Outline Development Plan (RODP) formulated for the Yuen Long South (YLS) development, as part of Stage 3 Community Engagement (CE3) under the “Planning and Engineering Study for Housing Sites in Yuen Long South – Investigation” (the Study). BACKGROUND 2. The Planning Department (PlanD) and the Civil Engineering and Development Department (CEDD) jointly commissioned the Study to examine and optimise the development potential of the degraded brownfield land in YLS for housing and other uses with supporting infrastructure and community facilities, as well as to improve the existing environment. 3. The Study comprises a three-stage community engagement programme. We conducted Stage 1 Community Engagement (CE1) in April to June 2013 and Stage 2 Community Engagement (CE2) between May and July 2014. During CE2, with focus on the Preliminary Outline Development Plan (PODP), a series of community engagement activities including a community forum, briefing sessions, focus group meetings and roving exhibitions were conducted. Various statutory and advisory bodies were consulted. Relevant stakeholder groups including local residents, local open-storage/rural industrial operators, local farmers, professional institutes and green groups/concern - 2 - groups were also consulted. About 1,300 written submissions were received. 4. We briefed the Legislative Council Panel on Development on 7 July 2014 (Paper No. CB(1)1456/13-14(08)) for Members’ views on the PODP.
    [Show full text]
  • Note for Public Works Subcommittee of Finance Committee
    For information PWSCI(2011-12)8 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Forecast of submissions for the 2011-12 Legislative Council session This note gives an overview of the potential capital works items to be submitted to the Public Works Subcommittee in the 2011-12 Legislative Council session. 2. The pool of items that may be ready for submission to the Public Works Subcommittee before the 2012 summer recess totals 65 as listed in ——— Enclosure 1. To enable Members to have a better understanding of the items, we ——— have provided supplementary information on each item at Enclosure 2 following the same order presented in Enclosure 1. 3. The Administration will try to adhere to the targets as much as possible. However, programme changes arising during the design, statutory gazettal and objections, and consultation stages, etc. are expected. We will account for deviations from the current forecast in a year-end report for Members’ reference. 4. Members are also invited to note that funding under 161DR “Restoration of Shuen Wan Landfill―post-completion environmental monitoring work” for the environmental monitoring work at the Shuen Wan Landfill, which is currently funded under the Capital Works Reserve Fund (CWRF), will lapse in December 2011. With more operational experience gained in landfill management, it has become clearer to the Administration that the post-completion environmental monitoring work involves mainly on-going monitoring of landfill gas and leachate pollution of closed landfills through existing landfill gas and leachate management systems. We therefore consider that the expenditure of the monitoring work is more akin to a recurrent commitment rather than a works project in nature.
    [Show full text]
  • GEO REPORT No. 282
    EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang This report was originally produced in June 2009 as GEO Geological Report No. GR 2/2009 2 © The Government of the Hong Kong Special Administrative Region First published, July 2013 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication in print. These include guidance documents and results of comprehensive reviews. They can also be downloaded from the above website. The publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the second last page of this report.
    [Show full text]
  • Living on the Edge Hong Kong Ecological Footprint Shows No Sign of Slowing and Across the Planet, Human Pressure Is Causing Degradation of Natural Systems
    冬 WINTER / 2016 Living On the Edge Hong Kong Ecological Footprint shows no sign of slowing and across the planet, human pressure is causing degradation of natural systems. CHIEF EXECUTIVE OFFICER'S MESSAGE The About Life team discusses with Peter Cornthwaite, CEO WWF-Hong Kong the outcome of 2 GLOBAL CONSERVATION NEWS the Living Planet Report 2016 and Hong Kong’s ecological footprint. COVER STORY “The results are in and the situation is not encouraging. As I feared there has been a further 4 Borrowing From Our Future deterioration in Hong Kong’s ecological footprint, that highlights our city’s overconsumption of natural resources and if everyone consumed at the rate of Hong Kong, we would need 3.9 WWF PEOPLE planets to support our lifestyle. When will this trend be reversed? We now need a clear action 10 In The Field With Africa's plan to reduce our city’s dependence on fossil fuels, wastefulness and start to embrace low Wildlife carbon living. © WWF-Hong Kong FEATURE 12 Woodn’t It Be Nice? 14 Turning The Tide Against Marine Litter 15 The “Reel" Situation 16 Discovering Mai Po Together 18 Turning Our Hotspots Into Hopespots 20 Urban Green Vancouver WATER & WETLANDS OCEANS CLIMATE & ENERGY WWF-Hong Kong proposes that the city steps up its efforts and looks at the various policies WILDLIFE and measures necessary, as outlined in the booklet Transform Hong Kong into Asia's BIODIVERSITY & SUSTAINABILITY OF HONG KONG Most Sustainable City available on our website at https://goo.gl/7tuIQs . In the next Chief Executive’s term our community needs to come together to support investment in more COMMUNITY ENGAGEMENT & EDUCATION technologies that can provide energy efficiency, deal with waste and harness renewable energy, incentivize deployment of PV solar, support zero carbon buildings, with more electric vehicles and charging stations.
    [Show full text]
  • District Profiles 地區概覽
    Table 1: Selected Characteristics of District Council Districts, 2016 Highest Second Highest Third Highest Lowest 1. Population Sha Tin District Kwun Tong District Yuen Long District Islands District 659 794 648 541 614 178 156 801 2. Proportion of population of Chinese ethnicity (%) Wong Tai Sin District North District Kwun Tong District Wan Chai District 96.6 96.2 96.1 77.9 3. Proportion of never married population aged 15 and over (%) Central and Western Wan Chai District Wong Tai Sin District North District District 33.7 32.4 32.2 28.1 4. Median age Wan Chai District Wong Tai Sin District Sha Tin District Yuen Long District 44.9 44.6 44.2 42.1 5. Proportion of population aged 15 and over having attained post-secondary Central and Western Wan Chai District Eastern District Kwai Tsing District education (%) District 49.5 49.4 38.4 25.3 6. Proportion of persons attending full-time courses in educational Tuen Mun District Sham Shui Po District Tai Po District Yuen Long District institutions in Hong Kong with place of study in same district of residence 74.5 59.2 58.0 45.3 (1) (%) 7. Labour force participation rate (%) Wan Chai District Central and Western Sai Kung District North District District 67.4 65.5 62.8 58.1 8. Median monthly income from main employment of working population Central and Western Wan Chai District Sai Kung District Kwai Tsing District excluding unpaid family workers and foreign domestic helpers (HK$) District 20,800 20,000 18,000 14,000 9.
    [Show full text]
  • Development of a Bathing Beach at Lung Mei, Tai Po”
    40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香港灣仔告士打道 5 號稅務大樓 40 樓 ACE Paper 27/2008 For advice Environmental Impact Assessment Report on “Development of a Bathing Beach at Lung Mei, Tai Po” Additional Information on Ecological Surveys PURPOSE On 14 January 2008, the Advisory Council on the Environment (ACE) endorsed with conditions the Environmental Impact Assessment (EIA) report on “Development of a Bathing Beach at Lung Mei, Tai Po”. This paper provides additional information to confirm the ecological status of the habitat of Lung Mei Beach as concluded in the EIA report, addresses the conditions in the endorsement and other concerns of the ACE. ADVICE SOUGHT 2. Members are invited to note and comment on the information provided in this paper. BACKGROUND 3. The views and recommendations of the ACE on the EIA report discussed at the meeting on 14 January 2008 were set out at Annex A. METHODOLOGY OF ECOLOGICAL SURVEYS AND IMPACT ASSESSMENT UNDER THE EIA REPORT ENDORSED BY ACE WITH CONDITIONS ON 14 JANUARY 2008 4. The purpose of the ecological survey focused on collecting representative ecological data to fill information gaps concerning the following: (i) to identify the dominant and typical flora and fauna species present in the Study Area (included 500 m from the Project Site Boundary); (ii) to establish the general ecological profile, physical and ecological characteristics of the site; and (iii) to determine the presence of key factors described in Notes 1 to 3 attached to Appendix A of Annex 16 of Technical Memorandum on Environmental Impact Assessment Process (TM), including recognized sites of conservation importance, important habitats where an ecological assessment will be necessary and species of conservation importance.
    [Show full text]
  • Legislative Council Brief -- Unusual Ground Settlement in Tseung Kwan O
    Ref. L/M(3) in WB(CR) 38/01/15(00) LEGISLATIVE COUNCIL BRIEF UNUSUAL GROUND SETTLEMENT IN TSEUNG KWAN O INTRODUCTION At the meeting of the Executive Council on 21 November 2000, the Council noted the investigation findings on the unusual ground settlement in Tseung Kwan O (TKO). BACKGROUND 2. Unusual ground settlement in the TKO reclamation was first reported in early 1999. A detailed investigation of the causes of the unusual settlement and its effect on existing buildings and other facilities has now been completed. 3. The extent of area affected by the unusual settlement, comprising mainly Tiu Keng Leng, TKO town centre, TKO Area 86 and the TKO Industrial Estate (TKOIE), is shown in Figure 1 at Annex A. The locations of existing residential buildings (in three zones) at the affected town centre are shown in Figure 2 at Annex B. MAGNITUDE OF SETTLEMENT AND LATEST STATUS 4. The magnitude of settlement varies in different areas. At Tiu Keng Leng and the part of town centre to the north of Tong Ming Street, the settlement was very small being in the range of only 70 to 80 mm measured since early 1999. Further south of the town centre between Tong Ming Street and Tong Tak Street, this settlement measured since early 1999 ranged from 150 to 270 mm. In other areas of TKO reclamation, including Area 86 and TKOIE, the settlement ranged from 50 to about 800 mm. 1 5. In almost all the areas, the highest rate of settlement (approximately 40 mm per month at the town centre and up to 160 mm per month for part of other areas) was recorded in the first six to nine months of 1999.
    [Show full text]
  • Project Profile for Yuen Long South Effluent Polishing Plant
    THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION DRAINAGE SERVICES DEPARTMENT Project Profile for Yuen Long South Effluent Polishing Plant January 2019 Yuen Long South Effluent Polishing Plant Project Profile CONTENTS 1. BASIC INFORMATION .............................................................................................................. 2 1.1 Project Title ...................................................................................................................................... 2 1.2 Purpose and Nature of the Project .................................................................................................... 2 1.3 History of Site .................................................................................................................................. 2 1.4 Name of the Project Proponent ........................................................................................................ 2 1.5 Location and Scale of the Project ..................................................................................................... 3 1.6 Type of Designated Project covered by the Project Profile ............................................................. 3 1.7 Name and Telephone Number of Contact Persons .......................................................................... 4 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME ............................ 5 2.1 Project Planning and Implementation .............................................................................................
    [Show full text]
  • Waste Disposal Plan for Hong Kong Executive Summary
    WASTE DISPOSAL PLAN FOR HONG KONG EXECUTIVE SUMMARY Waste Arisings Hong Kong's waste arisings currently amount to nearly 22,500 tonnes per day (t.p.d.) not including the 49,000 rrr of excavated and dredged materials which are dumped at sea. The main components of these arisings are household waste (approximately 4600 t.p.d.), industrial and commercial wastes (approximately l800 t.p.d.), construction waste (approximately 6500 t.p.d.), livestock waste (approximately 2000 t.p.d.), water works sludges (approximately 4000 t.p.d.) and pulverised fuel ash (approximately 2600 t.p.d.). Waste Collection Wastes are collected and delivered to disposal sites "by the statutory collection authorities (the Urban Council, the Regional Council and the Director of Environmental Protection), by numerous private waste collection contractors and, in the case of some industrial waste, by "in house" labour. The collection authorities collect and deliver for disposal most household, some commercial and most street wastes, some clinical waste and most excremental waste. The remainder is handled by the private sector. Environmental problems, which are generated by both the public and private sector waste collection systems, include odour, leachate spillage, dust, noise and littering. Existing controls over the operations of private sector waste collectors and transporters are fragmented and ineffective. Waste Disposal Most wastes are currently either incinerated at one of three government-operated incineration plants or disposed of at one of five government-operated landfills. The old composting plant at Chai Wan now functions as a temporary bulk transfer facility for the transport of publicly-collected waste to landfill.
    [Show full text]