DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

DRAFT ------Pathway Connection Priorities------DRAFT V.11 - 06/22/2012

Priority Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Notes Task Force Comments Level Operator

Segments extend within SHA right-of-way, Along existing Route 29 Sewer Alignment from Lake Open Space, Howard Research & Development Property, and Major Pathway Connection 1 70 Kittamaqundi to existing Patuxent Branch Trail and minor 10 foot wide pathway Primary 3 2.73 CA County right-of-way. Crossings of streams and minor tributaries, connections and Little at existing Patuxent Branch Trail (south of Allview Drive).

Connection from Stevens Forest Road to existing pathway at Pathway Connection 2 75 10 foot wide pathway Primary 22 0.06 CA Stevens Forest Elementary School

Alt (85) - Widen existing sidealk along Little Patuxent Parkway Pathway Connection 3 84/85 From Harpers Farm Road to 10 foot wide pathway Secondary 21 0.38 HS and 10-ft wide pathway from LPP to Wilde Lake High School (0.14 mi)

Connection between townhomes from Faulkner Ridge Circle Pathway Connection 4 86 10 foot wide pathway Primary 14 0.17 CA (west) to Faulkner Ridge Circle (east)

10 foot wide pathway between existing Pathway Connection 5 88 Adjacent to Harper's Choice Middle school Secondary 14 0.05 HS pathways

Connection from Rivendell Lane to Harper's Choice Village Pathway Connection 6 89 10 foot wide pathway Secondary 14 0.19 CA Existing dirt path/desire line Center

Pathway Connection/ Improved pathway between Park and Kilimanjaro 7 20 10 foot wide pathway Primary 13 0.10 HS Improvement Road along east side of Oakland Mills High School

Pathway Connection 8 24 Along utility easement - from Dobbin Road to Stonecutter Road 10 foot wide pathway Secondary 13 0.98 CA

Parallel to Guilford Road, between Hammond HS and Kings Pathway Connection 9 50 10 foot wide pathway Primary 13 0.31 CA Possible educational pathway in stream valley Contrivance Village Center

Connection behind Columbia Palace - from existing pathway at Pathway Connection/ Sidepath 10 13 Red Branch Road to the intersection of Centre Park Drive and 10 foot wide pathway Primary 12 0.23 CA Connection Old Annapolis Road

Connection from Daylong Lane to existing pathway east of Wild 10 foot wide pathway along south side Pathway Connection 11 103 Primary 12 0.11 CA Connection to River Hill Village Center Orange Gate of stormwater pond

Improved existing pathway west of Long Reach Village Center Pathway Connection 12 22 10 foot wide pathway Secondary 11 0.10 CA to Lambskin Lane

From existing pathway off Second Time Lane to Sweet Hours Pathway Connection 13 55 10 foot wide pathway Secondary 11 0.08 CA Way

Connection from existing pathway at the south end of Pathway Connection 14 97 10 foot wide pathway Secondary 11 0.15 CA Connection to school Quarterstaff Road to

Connection from existing pathways south of Sandchain Road to Pathway Connection 15 72 10 foot wide pathway Primary 10 0.05 CA Overheart Lane

Along utility easement - north of Wilde lake and east of West Pathway Connection 16 142 10 foot wide pathway Primary 10 0.33 CA Connection along existing BG&E right-of-way Running Brook Road

Connection between single family homes along Iron Pen Place Pathway Connection 17 87 10 foot wide pathway/sidepath Secondary 9 0.33 CA from Elliots Oak Road to Hesperus Drive

From the intersection of Basket Ring Road and Stevens Forest Pathway Connection 18 18 10 foot wide pathway Secondary 8 0.27 CA Road, north to existing pathways

DRAFT - NOT FOR PUBLIC DISTRIBUTION 1 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

Priority Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Notes Task Force Comments Level Operator

Stream valley path - from Applied Physics Laboratory at Includes crossings of Old Columbia Road, and under Rt 29 within Pathway Connection 19 59 10 foot wide pathway Primary 8 0.83 HC Montpelier Road to existing pathways off of First League stream valley

Connection along stream valley - between Summer Hollow Pathway Connection 20 16 10 foot wide pathway Primary 7 0.22 HC Connection along stream valley Lane and Phelps Luck Road

10 foot wide pathway across Utility Line Crossing - East end of Tamar Drive to Dobbin Center Pathway Connection 21 36 floodplain/wetland to Tamar Dr Primary 7 0.17 CA Recommendation in 2006 County Pedestrian Plan #136 Way (bridge/boardwalk)

Connection behind townhomes on Setting Sun Way to single Pathway Connection 22 56 10 foot wide pathway Secondary 6 0.08 CA family homes along Kindler Road

10 foot wide pathway extending Crossing over/under Route 29 with midblock crossing of Pathway Connection 23 9 From Columbia Road to Meadowbrook Athletic Complex trails Primary 5 0.36 CA over/under Route 29 Meadowbrook Ln.

10 foot wide pathway from existing McGaw Road - From existing county pathway behind Dobbin pathway to along east side of McGaw Pathway connection behind Dobbin Center to commercial area Pathway Connection 24 37 Primary / Secondary 5 0.50 HC Center to Snowden River Parkway Road. Includes possible (inc. future Wegmans) bridge/boardwalk

Pathway Connection/ Sidepath Waterloo Road - Columbia Gateway Drive to Old Montgomery 10 foot wide sidepath on east side of Recommendation in 2006 County Pedestrian Plan #130 25 41 Primary 5 1.11 HC Connection Road Waterloo Road (sidewalk improvements to Columbia Gateway)

From west of Robert Fulton Drive to existing rail corridor to 10 foot wide pathway, Rail to Trail/ Rail Pathway Connection 26 45 Primary 5 1.49 HC Berger Drive with Trail

Widen existing pathway - from northeast of to Pathway Improvement 27 74 10 foot wide pathway Primary 5 0.40 CA Oakland Mills Road

Pathway connection from Columbia Road to Existing pathway Connection would need to cross under/over Route 29 within Pathway Connection 28 76 10 foot wide pathway Primary 5 0.89 CA at Lightning View Road. stream valley

Pathway Connection 29 125 Pedestrian Bridge connection across 10 foot wide pathway/bridge Primary 5 0.17 CA On-going Feasibility Study

Pathway Connection 30 51 Utility Easement - from Skyrock Court to Rain Flower Way 10 foot wide pathway Secondary 4 0.09 CA

Pathway Connection 31 115 From Orchard Green to Old Annapolis Road 10 foot wide pathway Secondary 4 0.06 CA

From the Meadowbrook Athletic Complex trails to the Oakland Connections to pass through Dower Drive and Wethered Drive Pathway Connection 32 10 Business Center at Mellenbrook Rd, and existing pathways 10 foot wide pathway Secondary 3 1.24 CA and connect to existing paths and sidewalk connections. adjacent to the Slave Quarters. Includes intersection improvements at Dower Drive.

From Huntington Pool to existing pathways at Kings 10 foot wide pathway through Kings Pathway Connection 33 52 Primary 3 0.15 HC Contrivance Park Contrivance Park

Existing pathway located east of Oakland Mills Road to 10 foot wide pathway with possible Pathway Connection 34 38 Secondary 2 0.12 CA Community Gardens bridge/boardwalk to cross stream

From existing Kings Contrivance Park trail, south to Pathway Connection 35 53 10 foot wide pathway Secondary 2 0.09 HC Vollmerhausen Road and Early Spring Way

From end of Moonride Lane off of Sweet Grass Ridge to Pathway Connection 36 54 10 foot wide pathway Secondary 2 0.05 CA existing pathway

DRAFT - NOT FOR PUBLIC DISTRIBUTION 2 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

Priority Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Notes Task Force Comments Level Operator

Improve existing single track dirt path - from existing pathway Pathway Connection 37 62 at the end of Sandalfoot Way to existing pathway at the end of 10 foot wide pathway Secondary 2 0.36 CA Yellow Bonnet Place

Pathway Connection 38 92 From Bright Passage to Clary's Forest Pool 10 foot wide pathway Secondary 2 0.12 CA

Connection from existing pathway west of Little Patuxent Pathway Connection 39 120 10 foot wide pathway Secondary 2 0.08 CA Parkway to the south end of Green Meadow Drive

Primary Operator Legend Improvement Prioritization Criteria CA: Columbia Association 1. Pathway Hierarchy HC: Howard County - Primary (3) HS: Howard County Public Schools - Secondary (2) OT: Other/Private Land Owners - Tertiary/ Sidewalk (1) 2. Pathway Connection Proximity to Commercial Centers - Within 1/4 Mile (3) - Within 1/2 Mile (2) 3. Pathway Connection Proximity to Schools - Within 1/4 Mile (3) - Within 1/2 Mile (2)

DRAFT - NOT FOR PUBLIC DISTRIBUTION 3 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

DRAFT ------Sidewalk/ Sidepath Priorities------DRAFT V.11 - 06/22/2012

Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Comments Task Force Comments Operator

10 foot wide sidepath on the south side of Little Requirement of Downtown Columbia Plan. (Hospital to Blandair Park Major Sidepath Connection/ Little Patuxent Parkway - from Cedar Lane to South Entrance 1 82 Patuxent Parkway and the east side of South Primary 25 1.84 OT Trail) by Howard Hughes Corporation; widened existing sidewalk Sidewalk Widening Road Entrance Road adjacent to Merriweather Post Pavilion.

Current County capital improvement project to widen SRP. Recommendations in 2006 County Pedestrian Plan #132, #133 Snowden River Parkway - Broken Land Parkway to Waterloo 10 foot wide sidepath on north side of Snowden (sidewalk improvements on south side of Snowden River Parkway), Major Sidepath Connection 2 40 Primary 19 3.94 HC Road River Parkway #130 (sidewalk improvements on Columbia Gateway). Ramp crossings/bridge accommodations required at Robert Fulton, as well as slope considerations within alignment.

Recommended in 2006 County Pedestrian Plan; identified as a County Major Sidepath Connection 3 134 Cedar Lane - from Little Patuxent Parkway to Guildford Road 10 foot wide sidepath on west side of Cedar Lane Primary 15 2.61 HC Capital project for Feasibility Study; some segments may be feasible for sidewalk and pathway widening

Broken Land Parkway - from Cradlerock Way to Hickory Ridge 10 foot wide sidepath in center median of Broken Major Sidepath Connection 4 122 Road in median, and from Hickory Ridge Road to Little Primary 9 1.76 HC Land Parkway Patuxent Parkway on eastside

10 foot wide sidepath on west side of Freetown Sidewalk Widening 5 136 Freetown Road - from Cedar Lane to Harriet Tubman Lane Secondary 19 0.99 HC Road

Waterloo Road -- From Brothers Partnership Court to Old 10 foot wide sidepath on east side of Waterloo Sidepath Connection 6 25 Secondary 17 0.47 HC Montgomery Rd Road

Twin Rivers Road - from Governor Warfield Parkway to Green 10 foot wide sidepath on east side of Twin Rivers Sidepath Connection 7 124 Primary 17 0.11 HC Mountain Circle (south) Road

10 foot wide sidepath on east side of Harpers Farm Sidepath Connection 8 138 Harpers Farm Road - from Clarksville Pike to Calico Court Primary 17 1.07 HC Road

Adjacent to tennis courts and north of Wilde Lake Middle Sidewalk Widening 9 143 10 foot wide pathway Secondary 16 0.06 CA School

Phelps Luck Road - Old Annapolis Road to Graywing Court on 10 foot wide sidepath on west side of Phelps Luck Sidewalk Widening 10 14 westside, and from Graywing Ct. to existing pathway (midway Primary 15 0.20 HC Road between Enberend Terrace and Halflight Garth) on eastside.

Along Vollmerhausen Road widen existing sidewalks between 10 foot wide sidepath on south side of Sidewalk Widening 11 111 existing trail head parking south of Spring Water Path to Primary 15 0.32 HC Provide wayfinding; widen existing sidewalk Vollmerhausen Road pathway entrance at Patuxent Valley Middle School

Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening 12 140 Harpers Farm Road - at Beaverkill Road Primary 15 0.04 HC south side of Harpers Farm Road

Old Montgomery Road - existing pathway at Waterloo 10 foot wide sidepath on north side of Old Sidepath Connection 13 27 Secondary 14 0.56 HC Elementary to Brightfield Road Montgomery Road

Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening 14 28 Old Dobbin Road - from Dobbin Road to Tamar Drive Secondary 14 0.58 HC Recommendation in 2006 County Pedestrian Plan #146 east side of Old Dobbin Road

Sidewalk Widening/ Sidepath Seneca Drive - from Martin Road to Atholton Elementary 10 foot wide sidepath/ sidewalk widening on south 15 96 Secondary 14 0.71 HC Extends over Rt 29 Connection School side of Seneca Drive

Snowden River Parkway - from Waterloo Road south along Recommended in 2006 County Pedestrian Plan #132 (sidewalk Sidepath Connection 16 107 10 foot wide pathway Secondary 14 0.06 HC Snowden River Parkway to existing County sidepath improvements on south side of Snowden River Parkway)

DRAFT NOT FOR PUBLIC DISTRIBUTION 4 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Comments Task Force Comments Operator

Old Annapolis Road - from Mellenbrook Road to Phelps Luck 10 foot wide sidepath on south side of Old Sidepath Connection 17 121 Secondary 14 1.05 HC Existing Utility Easement Drive Annapolis Road

Kilimanjaro Road - from high school entrance driveway to Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening 18 19 Primary 13 0.03 HC existing pathway north side of Kilimanjaro Road

Widen existing sidewalk along Guilford road to 10 Sidepath Connection/ Pathway Guilford Road/Gerwig Lane/Open Space Area - Hammond Hill 19 49 foot sidepath on south side and Gerwig Road/ 10 Primary 13 1.89 HC Connection/ Sidewalk Widening HS to rail line foot wide pathway in open space area

Cradlerock Way -- existing pathway entrance east of Frietchie Sidepath Connection 20 73 10 foot sidepath on north side of Cradlerock Way Primary 13 0.03 HC Row to Young Heart Lane

10 foot wide sidepath on west side of Columbia Sidepath Connection 21 77 Columbia Road - Little Patuxent Parkway to Clarksville Pike Primary 13 1.34 HC Road

Sweet Hours Way - existing pathway across from Weather 10 foot wide sidepath on south side of Sweet Hours Sidewalk Widening 22 135 Primary 13 0.06 HC Worn Way to pathway entrance east of Weather Worn Way Way

Harpers Farm Road - between pathway connection north of Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening 23 139 Primary 13 0.05 HC Twin River Road east side of Harpers Farm Road

Sidewalk Widening 24 23 Tamar Drive - Cloudleap Court to Old Dobbin Road 10 foot wide sidepath on south side of Tamar Drive Secondary 12 0.18 HC Widen existing sidewalk

Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening/ Pathway Eden Brook Drive/Shaker Drive - From Kindler Drive to South west side of Eden Brook Drive/Shaker Drive, and Shaker Bridge sidewalks to be widened; Recommended in 2006 County 25 57 Primary 12 1.64 HC Connection Carolina Ave crossing of Middle Patuxent River along former Pedestrian Plan roadway alignment to Kindler Road

Owen Brown Village Center - connect existing north and south Pedestrian connections through Owen Brown Sidepath Connection 26 69 Primary 12 0.07 CA pathways Village Center to existing pathways

Little Patuxent Parkway/ Governor Warfield Parkway - from 10 foot wide sidepath on west side of Little Identified within Downtown Columbia Plan; widen existing sidewalk Sidepath Connection 27 79 Secondary 12 1.17 HC Columbia Road to Little Patuxent Parkway Patuxent Parkway/Governor Warfield Parkway south of Vantage Point Road intersection

Cedar Lane - from Little Patuxent Parkway to existing pathway Recommended in 2006 County Pedestrian Plan #233 (proposed Sidewalk Widening 28 90 10 foot wide sidepath on east side of Cedar Lane Primary 12 0.13 HC entrance south of Swansfield Pool sidewalk connections); widen existing sidewalk in sections

10 foot wide sidepath on Columbia Mall Loop Recommended connection within proposed street network as part of Sidepath Connection 29 80 Sidepaths within Downtown Columbia Plan Area Primary 11 0.78 OT Driveway the Downtown Columbia Plan Redevelopment Area

Little Patuxent Parkway - from South Entrance Road to 10 foot wide sidepath on east side of Little Patuxent Recommendation identified in Downtown Columbia Plan, and County Sidepath Connection 30 109 Primary 10 0.95 CA Columbia Road Parkway capital improvement project # 236

Columbia Road - Sidepath from Clarksville Pike to pathway Sidepath Connection/ Sidewalk entrance of Swim Club (westside), and widen 10 foot wide sidepath on west and eastside of 31 3 Primary 8 1.32 HC Widening existing sidewalk from Community Center Pool Drive to Columbia Road pathway connection East of Kingscup Rd (eastside)

Old Montgomery Road - from existing pathway at Jeffers Pool 10 foot wide sidepath on north side of Old Sidepath Connection 32 21 Primary 8 0.04 CA to Tamar Drive Montgomery Road

DRAFT NOT FOR PUBLIC DISTRIBUTION 5 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Comments Task Force Comments Operator

10 foot wide sidepath on north side of Dobbin Road Dobbin Road - from Oakland Mills Road to Snowden River Sidepath Connection 33 29 from Oakland Mills Road to Rt. 175, and on both Primary / Secondary 8 1.77 HC Recommendation in 2006 County Pedestrian Plan #146 Parkway sides east of Rt. 175

County capital improvement project, recommendation in 2006 County Robert Fulton Drive - from Columbia Gateway Drive to Solar 10 foot wide sidepath on south side of Robert Sidewalk Widening 34 44 Primary 8 0.70 HC Pedestrian Plan #139 (entire length of Robert Fulton Drive with Walk Fulton Drive sidewalk improvements)

Stanford Blvd - Dobbin Road to existing pathway on the 10 foot wide sidepath on south and west sides of Sidepath Connection 35 34 Secondary 7 0.22 HC south/west side of Stanford Blvd Stanford Blvd

Alexander Bell Drive - From Columbia Gateway Drive to west 10 foot wide sidepath on south side of Alexander Sidepath Connection 36 43 Secondary 7 0.53 HC end of Alexander Bell Drive Bell Drive

10 foot wide sidepath on south side of Kindler Road Sidewalk Widening 37 58 Kindler Road - from west end of First League to Little Bird Path Primary 7 0.20 HC Widen existing sidewalk and First League

Cradlerock Way - from Broken Land Parkway to pathway 10 foot wide sidepath on north side of Cradlerock Sidepath Connection 38 71 Primary 7 0.12 HC entrance west of Overheart Lane Way

Great Star Drive - Summer Sunrise Drive to existing pathway at 10 foot sidepath on east side of Great Star Drive and Sidepath Connection 39 99 Primary 7 0.08 CA Connection to River Hill Pool the west end of Gentle Light Lane north side of WB 32 Great Star Dr Ramp

Donleigh Drive - from existing pathway entrance west of 10 foot wide sidepath on south side of Donleigh Sidepath Connection 40 112 Primary 7 0.05 CA Intersection improvements needed at Shaker Drive and Donleigh Dr Wesleigh Drive to Shaker Drive Drive

Old Annapolis Road - from southern path entrance east of 10 foot sidepath on south side of Old Annapolis Sidepath Connection 41 118 Secondary 7 0.05 HC Woodland Road to Columbia Road Road

Great Star Drive - widen existing sidewalks along bridge over 10 foot wide sidepath on east and westside of Sidewalk Widening 42 131 Primary 7 0.29 HC Route 32 Route 29 bridge

Red Branch Road - from Old Annapolis Road to existing 10 foot wide sidepath on the south side of Red Sidepath Connection 43 144 Secondary 7 0.27 HC pathway Branch Road

Shaker Drive - from Cape Ann Drive to existing path entrance Modify existing terminus of Columbia Association pathway to extend to Sidepath Connection 44 65 10 foot wide sidepath on south side of Shaker Drive Secondary 6 0.07 HC west of Goodin Circle intersection

Sidepath Connection/ Sidewalk Broken Land Parkway - from Snowden River Parkway to 10 foot wide sidepath on east and west sides of Connection to park and rides. Recommendation in 2006 County 45 66 Primary 5 0.79 HC Widening Guilford Road Broken Land Parkway Pedestrian Plan # 142; widen existing sidewalk in segments

Broken Land Parkway - from existing pathway south of Lake 10 foot wide sidepath on east side of Broken Land Sidepath Connection 46 67 Primary 5 0.47 HC Existing County capital improvement project Elkhorn to Snowden River Parkway on both sides of roadway Parkway

Little Patuxent Parkway - from Hickory Ridge Road to Peartree 10 foot wide sidepath on south side of Little Sidewalk Widening 47 91 Primary 5 0.23 HC Widen existing sidewalk/ pathway Way Patuxent Parkway

Columbia Road - Widen existing sidewalk from Rams Horn Row Sidewalk Widening 48 108 10 foot sidepath on south side of Columbia Road Primary 5 0.04 HC to pathway south of intersection

Clarksville Pike - from path entrance east of Wood Road to 10 foot wide sidepath on north side of Clarksville Sidepath Connection 49 5 Secondary 4 0.13 HC Columbia Road Pike

10 foot wide sidepath on south side of Clarksville Sidepath Connection 50 6 Clarksville Pike - between Davidge Drive and Columbia Road Secondary 4 0.39 HC Pike

Sidepath Connection 51 11 Rumsey Road - existing pathway to Red Branch Road 10 foot wide sidepath on west side of Rumsey Road Secondary 4 0.25 HC

Dried Earth Blvd/April Brook Circle - From Snowden River 10 foot wide sidepath on north side of Dried Earth Sidewalk Widening 52 110 Parkway to west side pathway entrance south of Three Apple Secondary 4 0.32 HC Blvd to south side of April Brook Circle Downs

DRAFT NOT FOR PUBLIC DISTRIBUTION 6 of 7 DRAFT NOT FOR PUBLIC DISTRIBUTION Columbia Active Transportation Action Agenda DRAFT NOT FOR PUBLIC DISTRIBUTION

Primary Recommendation Type Priority Location # Location Description Route Classification Total Score Length (miles) Comments Task Force Comments Operator

Widen existing sidewalk to 10 foot sidepath on east Mellenbrook Road/Creekbed Court - From existing pathway on Sidewalk Widening 53 133 side of Creekbed Court and south side of Secondary 4 0.22 HC Creekbed Court to Edgar Road Mellenbrook Road

10 foot wide sidepath on west side of Oakland Mills Sidewalk Widening 54 39 Oakland Mills Road - Pathway tunnel to Dasher Court Primary 3 0.08 HC Widen existing sidewalk with existing minibus right-of-way Road

Watch Chain Way - from existing west side pathway entrance 10 foot wide sidepath on east side of Watch Chain Sidewalk Widening 55 126 north of Middlewater Court to existing east side pathway Primary 3 0.07 HC Way entrance

Murray Hill Road - from Vollmerhausen Road to Huntington Widen existing sidewalk to 10 foot wide sidepath on Sidewalk Widening 56 141 Primary 3 0.05 HC Pool east side of Murray Hill Road

Sidepath Connection 57 145 Grace Drive - from Quiet Night Ride to Cedar Lane 10 foot wide sidepath on north side of Grace Drive Primary 3 0.85 HC

Sidewalk Widening 58 146 Oakland Mills Road - from existing pathway to Dobbin Road 10 foot widening of sidewalk Primary 3 0.03 HC

Sidewalk Widening/ Sidepath Sanner Road - from Applied Physics Laboratory entrance to 59 147 10 foot widening of sidewalk Primary 3 0.54 HC Connection Cedar Lane

Sidepath Connection/ Sidewalk Widen existing sidewalk to 10 foot wide sidepath on 60 7 Clarksville Pike - between Ten Mills Road and existing pathway Secondary 2 0.09 CA Widening south side of Columbia Road

Martin Road - sidepath connection from existing pathway to Sidepath Connection/ Realigned 10 foot wide sidepath on east side of Martin Road/ 61 81 Hickory Ridge Road/ realign pathway to connect to the Secondary 2 0.05 CA Path Connection 10 foot wide realigned pathway intersection of Hickory Ridge Road and Broken Land Parkway

Realignment of existing pathway east of Velvet Path to crossing Sidewalk Widening 62 98 10 foot wide pathway Secondary 2 0.07 HC Alternative realignment of path to line up at Summer Sunrise crossing of Summer Sunrise Drive

Oakland Mills Road - from Gracious End Court to Snowden 10 foot wide sidepath on east side of Oakland Mills Sidepath Connection 63 130 Secondary 2 0.07 HC River Parkway Road

Oak Hall Lane - from Oakland Mills Road to end of Oak Hall 10 foot wide sidepath on south side of Oak Hall Sidepath Connection 64 148 Secondary 2 0.22 HC Lane Lane

Primary Operator Legend Improvement Prioritization Criteria CA: Columbia Association 1. Pathway Hierarchy HC: Howard County - Primary (3) HS: Howard County Public Schools - Secondary (2) OT: Other/Private Land Owners - Tertiary/ Sidewalk (1) 2. Pathway Connection Proximity to Commercial Centers - Within 1/4 Mile (3) - Within 1/2 Mile (2) 3. Pathway Connection Proximity to Schools - Within 1/4 Mile (3) - Within 1/2 Mile (2)

DRAFT NOT FOR PUBLIC DISTRIBUTION 7 of 7