Queen Elizabeth Olympic Park Walking Tour Behind The
Total Page:16
File Type:pdf, Size:1020Kb
500,000 BEHIND THE QUEEN people a day used the SCENES AT ELIZABETH park during the games THE PARK OLYMPIC PARK WALKING TOUR Before Before LEYTON HACKNEY MARSH Guttmann Square LEE VALLEY HOCKEY 17 AND TENNIS CENTRE LEYTON (10 minutes) Mountain bike BMX trails track LEE VALLEY 16 VELOPARK Millrace Meadow Velo Place 15 Chobham Manor Olympic Open 2015 Knight’s Rings Hopkins’ Field Bridge Alfred’s 18 Meadow Tumbling Bay 14 Playground 13 Here East Victory Park Open 2016 Timber Lodge Café East Village 12 Eastcross Wetlands Walk Bridge East Wick 11 Agitos Open 2017 The Escarpment HACKNEY START WICK STRATFORD 10 INTERNATIONAL Wallis STRATFORD Bridge COPPER BOX ARENA CITY Westfield John Lewis HACKNEY The International WICK Quarter The Slipway Open 2017 M&S 9 Stratford Sweetwater Waterfront The Open 2018 Mandeville International Place Playground Quarter Theatre Tallow Open 2017 Monier Room Bridge Bridge 8 STRATFORD Great British 6 LONDON Sweetwater Garden AQUATICS Open 2018 7 CENTRE Fountains Since 9/11 BROMLEY- BY-BOW The Lawn 5 FINISH STRATFORD 2 N 1 THE STADIUM ARCELORMITTAL 4 ORBIT After After South Lawn The London Marathon Charitable Trust community 3 W E track (open 2017) S View Tube PUDDING MILL LANE QUEEN ELIZABETH OLYMPIC PARK 1 The Stadium 7 Fountains 13 Timber Lodge Café 2 Archelormittal Orbit 8 Theatre Room 14 Tumbling Bay Playground 3 South Lawn 9 Mandeville Place 15 Olympic Rings 4 Podium 10 Copper Box Arena 16 Lee Valley Velopark 5 The Lawn 11 Agitos 17 Lee Valley Hockey & Tennis Centre 6 London Aquatics Centre 12 Wetlands Park 18 Here East (Open 2016) Walking Tour Temporary steps were built to allow visitors to move freely in the park and doubled as seating. Contaminated land remediated and transformed into The Stadium site for safe public use. www.atkinsglobal.com FROM THE GAMES NEW TREE TO THE LEGACY 0% FAILURE SAVES £1 million 3 m nths IN SOUTH PARK PROMENADE time savings (TYPICAL NEW TREE FAILURE RATE IS 20-30%) ON DELIVERY BECAUSE OF FASTER APPROVALS ASSOCIATED WITH PUBLIC REALM PARAMETER PLANS £20 public walkways million DESIGNED USING innovative SAVED BY USING NEW SUSTAINABLE URBAN DRAINAGE ON SITE PLANTING TRIALS REMOVED THE SOIL WASHING TECHNIQUE • Recycled Water used for irrigation RISK OF WETLANDS PLANTING FAILURES IN SOIL HOSPITAL • 184 tonnes of waste plastics used for ground filter drains ARCELORMITTAL ORBIT GREENWAY SUPER SEWER RECLAIMED MATERIAL LONDON AQUATIC CENTRE NEW MIXED USE WESTFIELD STADIUM PLATFORM DEVELOPMENT RENEWABLE UTILITIES UTILITIES POWER mega UTILITIES power PLUG Tunnels ENOUGH TO BOIL 130 million 60,000 KETTLES AT THE SAME TIME DEEP TAX SAVINGS FROM RE-USING WATER SEWER MATERIALS ON STADIUM SITE DLR AND MAINLINE TRAINS 1.4 million OF EARTH TREATED cubic metres IN SOIL HOSPITAL.