REPUBLIC OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE REGIONAL DIRECTOR ISLAND REGION (NIR) CANGMATING, SIBULAN, (INTERIM OFFICE)

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - OF PERMANENT BRIDGES TO MORE THAN 2 LANES-SECONDARY LOGOY BR. (B00489NR) ALONG AIRPORT ACCESS RD K0008+526.000 T0 K0008+595.000 L = 69.000m

SHEET CONTENT SUBMITTED RECOMMENDING APPROVAL APPROVED SHEET No.

1 TITLE PAGE MA. LUCILA C. PINERO ERIC A. AYAPANA LEAH N. DELFINADO, CESO IV 28 OIC-CHIEF, MAINTENANCE DIVISION OIC-ASSISTANT REGIONAL DIRECTOR OIC-REGIONAL DIRECTOR BEG. OF BRIDGE END OF BRIDGE BACK OF BACKWALL BACK OF BACKWALL K0008+526.00 K0008+595.00 ELEV. = 23.443m. ELEV. = 22.756m.

BH-1 BH-3 BH-2 BH-4 K0008+ 523.95 K0008+567.51 K0008+596.16 ELEV. 23.58 K0008+540.88 ELEV. 13.39 ELEV. 14.53 ELEV. 18.53

K E Y M A P

Cadiz City City Sagay City THE SITE Silay City Escalante City

Toboso Talisay City

Bacolod City Murcia Calatrava Bago City Valliadolid San Carlos La Carlota City San Enrique Mountain

Vallehermoso

Point Evedra

Isabela

Guihulngan City City La Libertad Jimalalud Cauayan Ilog City L A Y - O U T P L A N Bindoy(Payabon) DRAWN NTS Manjuyod

Bais City Hinoba-an(ASIA) City PROJECT LENGTH DATA Amlan(Ayuquitan) San Jose Basay City(Tulong) SECTION LIMITS LENGTH ( m) Sibulan Santa Catalina City Valencia(Luzurriaga) Bacong

BRIDGE PROPER Dauin ( BACK OF BACKWALL ) K0008+526 TO K0008+595.00 69.000

Siaton Samboanguita RIVER BANK PROTECTION STA. -0+95 TO -0+015 ( DOWNSTREAM ) 145.00 RIVER BANK PROTECTION STA. 0+015 TO 0+100 ( UPSTREAM ) N E G R O S I S L A N D R E G I O N M A P

SHEET NO. SHEET CONTENTS SHEET NO. SHEET CONTENTS SHEET NO. SHEET CONTENTS

1 / 28 COVER SHEET 11 / 28 AASHTO TYPE IV PSC GIRDER REINFORCEMENT SCHEDULE 21 / 28 GENERAL NOTES (RIVER BANK PROTECTION WORKS) 2 /28 LAY-0UT PLAN, GENERAL NOTES, PROJECT LENGTH DATA,SHEET CONTENTS 12 / 28 ABUTMENT DETAILS 22 / 28 SLOPE RIVER BANK PROTECTION ( PLAN AND PROFILE) THE SITE 3 / 28 GENERAL NOTES FOR STRUCTURES 13 / 28 SCHEDULE OF REINF. (ABUTMENT) ABUTMENT SECTIONS 23 / 28 SLOPE RIVER BANK PROTECTION ( CROSS SECTION) D:\JEBOY 15\AS-STAKED 3RD SUBMITTAL\AS-STAKED BRIDGES\1 LOGOY BRIDGE\VICINITY MAP CLEAR .jpg

4 / 28 SUMMARY OF ESTIMATES OF QUANTITIES 14 / 28 TYPICAL BORED PILE DETAILS FOR ABUTMENT A & B 24 / 28 SLOPE RIVER BANK PROTECTION ( CROSS SECTION)

5 / 28 TOPOGRAPHIC PLAN 15 / 28 DETAILS OF PIER 25 / 28 SLOPE RIVER BANK PROTECTION ( CROSS SECTION)

6 / 28 BORING LOG 16 / 28 DETAILS OF PILE CAP 26 / 28 SLOPE RIVER BANK PROTECTION ( CROSS SECTION)

7 / 28 GEN. PLAN, GEN. ELEV., TYPICAL SECTION, HYDRAULIC DESIGN DATA 17 / 28 TYPICAL BORED PILE DETAILS FOR PIER 1 & 2 27 / 28 SLOPE RIVER BANK PROTECTION ( CROSS SECTION) FRAMING PLAN, CROSS SECTION, TRANSVERSE SECTION, SECTION AT DIAPHRAGM, 8 / 28 18 / 28 APPROACH SLAB DETAILS &REINF. SCHEDULE, SIDEWALK & RAILINGS DETAILS SLOPE RIVER BANK PROTECTION ( CROSS SECTION) POURING SEQUENCE 9 / 28 DETAILS OF AASHTO TYPE IV PSC GIRDER (L=22m) 19 / 28 SLOPE PROTECTION DETAILS, GABIONS & MATRESS DETAILS

10 / 28 DETAILS OF AASHTO TYPE IV PSC GIRDER (L=25m) 20 / 28 DETAILS OF GUARDRAILS V I C I N I T Y M A P

PROJECT TITLE: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.: V. C. MORACA CONSTRUCTION AND MAINTENANCE OF BRIDGES ENGINEER II ALONG NATIONAL ROADS - OF PERMANENT BRIDGES TO DRAWN: MORE THAN 2 LANES-SECONDARY LAY-OUT PLAN OFFICE OF THE REGIONAL DIRECTOR LOGOY BR. (B00489NR) ALONG BACOLOD SILAY AIRPORT R. B. SEROJANO 2 REGION ( NIR ) ACCESS RD GENERAL NOTES ENGINEER I K0008+526.000 T0 K0008+595.000 L = 69.000m AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV ( INTERIM - OFFICE ) PROJECT LENGTH DATA 28 CANGMATING, SIBULAN, NEGROS ORIENTAL SHEET CONTENTS CHECKED: DIVISION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC-REGIONAL DIRECTOR LOCATION: E. G. GAHUM ENGINEER III DATE: DATE: DATE: GENERAL NOTES FOR STRUCTURE

PROJECT TITLE: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.: V. C. MORACA CONSTRUCTION AND MAINTENANCE OF BRIDGES ENGINEER II ALONG NATIONAL ROADS - OF PERMANENT BRIDGES TO MORE THAN 2 LANES-SECONDARY DRAWN: OFFICE OF THE REGIONAL DIRECTOR LOGOY BR. (B00489NR) ALONG BACOLOD SILAY AIRPORT GENERAL NOTES R. B. SEROJANO 3 ( NIR ) ACCESS RD ENGINEER I K0008+526.000 T0 K0008+595.000 FOR STRUCTURES ( INTERIM - OFFICE ) L = 69.000m AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV CHECKED: 28 CANGMATING, SIBULAN, NEGROS ORIENTAL DIVISION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC-REGIONAL DIRECTOR LOCATION: E. G. GAHUM ENGINEER III DATE: DATE: DATE: PROJECT TITLE: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHEET NO.: V. C. MORACA CONSTRUCTION AND MAINTENANCE OF BRIDGES ENGINEER II ALONG NATIONAL ROADS - OF PERMANENT BRIDGES TO MORE THAN 2 LANES-SECONDARY DRAWN: OFFICE OF THE REGIONAL DIRECTOR LOGOY BR. (B00489NR) ALONG BACOLOD SILAY AIRPORT R. B. SEROJANO 4 NEGROS ISLAND REGION ( NIR ) ACCESS RD SUMMARY OF QUANTITIES K0008+526.000 T0 K0008+595.000 ENGINEER I ( INTERIM - OFFICE ) L = 69.000m AILEN S. JULIT ERIC A. AYAPANA LEA N. DELFINADO, CESO IV CHECKED: 28 CANGMATING, SIBULAN, NEGROS ORIENTAL DIVISION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OIC-REGIONAL DIRECTOR LOCATION: E. G. GAHUM ENGINEER III DATE: DATE: DATE: