ENVIRONMENTAL ASSESSMENT 8-1 ALKANE RESOURCES LTD Section 8: References Tomingley Gold Project Report No. 616/05

8Section 8

References

ANZECC/ARMCANZ (2000). Australian and New Zealand Guidelines for Marine and Fresh Water Quality. Appleton, J (2003). The archaeological investigation of the proposed route for the realignment of the Newell Hwy, Goobang Project, Parkes, Central West. Prepared for GHD on behalf of the RTA. Australia and New Zealand Environment and Conservation Council (ANZECC) (2000). ANZECC Fresh and Marine Water Quality Guidelines. Austroads (2005). Part 5: Intersections at Grade. Austroads Guide to Traffic Engineering Practice series. Benson, J.S., Allen, C.B., Togher, C.& Lemmon, J. (2006). Vegetation Classification and Assessment: Part 1 Plant Communities of the NSW Western Plains. Cunninghamia 9(3): 383-450. Brayshaw, H. (1993). Water Supply Pipeline to proposed North Parkes Mine, NSW. Archaeological survey for Aboriginal Sites. Report to DPWS. Coffey Geotechnics Pty Ltd (Coffey) (2007). Draft Preliminary Groundwater Investigation, Alkane Exploration Ltd, Tomingley, NSW, August 2007. Coffey Geotechnics Pty Ltd (Coffey) (2008). Groundwater Monitoring Results, Facsimile correspondence between Andrew Fulton (Coffey) and Mike Sutherland (Alkane), Coffey Reference – GEOTLCOV22468AB, 8 April 2008. D.E. Cooper and Associates Pty Ltd (2009). Tomingley Gold Project Residue Management Report. Department of Climate Change (DCC) (2008a). Carbon Pollution Reduction Scheme. “Green Paper”, July 2008. Published by the Department of Climate Change. Department of Climate Change (DCC) (2008b). Carbon Pollution Reduction Scheme. Australia’s Low Pollution Future. “White Paper”, December 2008. Published by the Department of Climate Change. Department of Climate Change (DCC) (2009a). National Greenhouse Account (NGA) Factors, June 2009. Published by the Department of Climate Change. Department of Environment and Conservation (DEC) (2005a). Interim Community Consultation Requirements for Applicants. Department of Environment and Conservation (DEC) (2005b). Approved Methods for the Modelling and Assessment of Air Pollutants in NSW.

R. W. CORKERY & CO. PTY. LIMITED

ALKANE RESOURCES LTD 8-2 ENVIRONMENTAL ASSESSMENT Tomingley Gold Project Section 8: References Report No. 616/05 Department of Environment and Conservation (DEC) (2007). Approved Methods for the Sampling and Analysis of Air Pollutants in NSW (as revised and published in NSW Government Gazette 5 January 2007). Department of Environment and Conservation and Department of Primary Industries (2005). Draft Guidelines for Threatened Species Assessment. Department of Environment and Climate Change (DECC) (2007). Guidelines for Biodiversity Certification of Environmental Planning Instruments – Working Draft. April 2007. Department of Environment and Climate Change (DECC) (2008a). Managing Urban Stormwater: Soils and Construction, Vol. 2C, DECC, NSW, . Department of Environment and Climate Change (DECC) (2008b). Managing Urban Stormwater: Soils and Construction, Vol. 2E, DECC, NSW, Sydney. Department of Environment and Climate Change (DECC) (2008c). Principles for the use of Biodiversity Offsets in NSW. Department of Environment, Climate Change and Water (DECCW) (2008d). BioBanking Assessment Methodology and Credit Calculator Operational Manual. Department of Environment, Climate Change and Water (DECCW) (2009a). Conserving Nature Website of DECCW. http://www.environment.nsw.gov.au/bioregions/ SouthWesternSlopes-Biodiversity.htm. Department of Environment, Climate Change and Water (DECCW) (2009) Atlas of NSW Wildlife http://wildlifeatlas.nationalparks.nsw.gov.au/wildlifeatlas/watlas.jsp last accessed 2009. Department of Environment, Climate Change and Water (DECCW) (2010). DECCW Interim Policy on Assessing and Offsetting Biodiversity Impacts of Part 3A Developments. Approved by Director General 30 November 2010. Department of the Environment and Heritage (DEH) (2009) EPBC Act Protected Matters Search Tool http://www.deh.gov.au/erin/ert/epbc/index.html Department of Infrastructure, Transport, Regional Development and Local Government (DITRDLG) (2009). Australian Code for the Transportation of Dangerous Goods by Road and Rail (Dangerous Goods Code). Department of Health. (2001). Septic Tank and Collection Well Accreditation Guideline. NSW Government. Department of Local Government (DLG) (1998). Environment and Health Protection Guidelines: On-Site Sewage Management for Single Households. Department of Planning (2008). Applying SEPP 33 (Consultation Draft) July 2008. State of New South Wales. Department of Urban Affairs and Planning (DUAP) (1992a). Guidelines for Hazard Analysis: Hazardous Industry Planning Advisory Paper No. 4. Department of Urban Affairs and Planning (DUAP) (1992b). Risk Criteria for Land Use Planning: Hazardous Industry Planning Advisory Paper No. 4. Department of Urban Affairs and Planning (DUAP) (1999). Multi-Level Risk Assessment Guidelines. Revised Edition.

R. W. CORKERY & CO. PTY. LIMITED

ENVIRONMENTAL ASSESSMENT 8-3 ALKANE RESOURCES LTD Section 8: References Tomingley Gold Project Report No. 616/05

Environment Australia (1998). Best Practice Environmental Management in Mining: Dust Control. Environment Australia, Department of the Environment, 1998. FJF Group (2011). Traffic Impact Assessment for the Tomingley Gold Project. Volume 2, Part 7 of the Specialist Consultant Studies Compendium. Fairfull and Witheridge (2003). Why do Fish Need to Cross the Road? Fish Passage requirements for Waterway Crossings. Gibbons, P. and Lindenmayer, D. (2002). Tree hollows and wildlife conservation in Australia. CSIRO Publishing, Australia. Graeme Campbell & Associates Pty Ltd (GCA) (2011). Tomingley Gold Project: Kinetic- Testing of Tailings-Solids Samples. Report to Alkane Resources Ltd, 4th April 2011. Hunt, Evan R. (1999). Extension of Exeter Quarry- Livestock Issues, Prepared on behalf of Concrite Quarries Pty Limited. Institute of Engineers Australia (IEA) (2002). Australian Rainfall And Runoff – A Guide to Flood Estimation (4th Edition). Volume 1. Koettig, M. (1985). Assessment of Aboriginal Sites in the City Area. Report to Dubbo City Council. Landcom (2004). Managing Urban Stormwater: Soils and Construction, Vol. 1 2nd eds, Landcom, NSW, Sydney. Landcom (2004). Managing Urban Stormwater: Soils and Construction. 4th Edition. Landcom, Sydney. Landscape Strategies Australia (LSA) (2009). Report on Proposed Revegetation of Tomingley Gold Mine for Alkane Resources Ltd., August 2009. Mackie Environmental Research, 2003. Hunter Valley Operations – West Pit Extension and Minor Modifications: Surface and Groundwater Management Studies. Report prepared on behalf of Coal & Allied, September 2003 for West Pit EIS. Marinelli F and Niccoli W.L., (2000). Simple Analytical Equations for Estimating Groundwater Inflow to a Mine Pit, Groundwater Vol. 38 No. 2, pp311-314. Metcalfe, L., Sivertsen, D.P., Tindall, D. & Ryan, K.M. (2003). Natural vegetation of the NSW wheat-belt (Cobar –Nyngan –Gilgandra –Nymagee – –Dubbo) 1:250,000 vegetation sheets. Cunninghamia 8(2): 253–284. Mining One (2009). Tomingley Gold Project Feasibility Study Factual Geotechnical Report For Residue Storage Facility. Mintrex (2009). Tomingley Gold Project Drainage Management Plan (rev 3 - 28 December 2009). Moore, P. C. (NPWS) (1977). Parkes to Peak Hill 66kV Transmission line. Survey of proposed line for Aboriginal relics. NSW Department of Health. (2001). Septic Tank and Collection Well Accreditation Guideline. NSW Government. Nicholson, A. (1990). Archaeological survey of additional area to be included in the Northparkes Project, located near Parkes, NSW. Report to National Systems Research P/L.

R. W. CORKERY & CO. PTY. LIMITED

ALKANE RESOURCES LTD 8-4 ENVIRONMENTAL ASSESSMENT Tomingley Gold Project Section 8: References Report No. 616/05 NSW Government (2009). BioNet website. http://www.bionet.nsw.gov.au OzArk Environmental and Heritage Management Pty Limited (OzArk) (2011a). Ecology Assessment for the Tomingley Gold Project. Volume 1, Part 4 of the Specialist Consultant Studies Compendium. OzArk Environmental and Heritage Management Pty Limited (OzArk) (2011b). Cultural Heritage Assessment for the Tomingley Gold Project. Volume 2, Part 5 of the Specialist Consultant Studies Compendium. PAEHolmes (2011). Air Quality Assessment for the Tomingley Gold Project. Volume 2, Part 6 of the Specialist Consultant Studies Compendium. Paton, R. (2006). Aboriginal Heritage Assessment of the Northparkes Mine E48 Project. Report to RW Corkery on behalf of Northparkes Mines. Rural Fire Service (NSW) (RFS) (2006). Planning for Bush Fire Protection. Strategic Environmental and Engineering Consultants (SEEC) (2011). Surface Water Assessment for the Tomingley Gold Project. Volume 1, Part 2 of the Specialist Consultant Studies Compendium. SLR Consulting (2011). – Noise and Blasting Assessment for the Tomingley Gold Project. Volume 1, Part 1 of the Specialist Consultant Studies Compendium. Sustainable Soils Management (SSM) (2009). Soils Assessment of the Tomingley Gold Project, prepared on behalf of Alkane Resources Limited. Sustainable Soils Management (SSM) (2011). Soils and Land Capability Assessment for the Tomingley Gold Project. Volume 2, Part 8 of the Specialist Consultant Studies Compendium. Stone, T. (1986). An archaeological survey of the Goonumbla mining lease. Report to Peko- Wallsend. The Impax Group (2011). Groundwater Assessment for the Tomingley Gold Project. Volume 1, Part 3 of the Specialist Consultant Studies Compendium.

R. W. CORKERY & CO. PTY. LIMITED