Details required for submitting Fresh TOR Application

Basic Profile 1. Name of the proponent (auto fill) : ITBP/ CPWD 2. Name of applicant (auto fill) : Bhumika Mishra 3. Contact person (auto fill) : Bhumika Mishra 4. Designation (auto fill) : Executive Engineer 5. Telephone No. (auto fill) : 011 – 23863054 6. Mobile No. (auto fill) : +91 – 8003295260 7. Fax No. (auto fill) : 8. Email Address (auto fill) : [email protected] 9. Website (if any) (auto fill) : 10. Pin code (auto fill) : 110011 11. State (auto fill) : Delhi 12. District (auto fill) : New Delhi 13. Town/ Village (auto fill) : Project Profile 1. Name of the Project : Chumar Road 2. Project Sector (Coal mining, Industrial projects, : Infrastructure and Miscellaneous Projects+CRZ; Industrial projects – 2, Infrastructure and Highways Miscellaneous Projects + CRZ, New Construction Projects and Industrial Estates, Non – Coal Mining, Nuclear Projects, River Valley and Hydroelectric Projects, Thermal Projects); 3. Project Cost (In Crore); : INR 1815.74 4. Location of the Project; : District: , State: Jammu and Kashmir 5. Shape of the Project Land (Block (polygon), : Block (polygon) and Strip; Point, Strip). When an option is selected; 5.1 Upload GPS file (KML, KMZ only); : KML Or KMZ file Uploaded;

5.2 Upload copy of Survey of Topo – sheet : (pdf only – As Annexure Survey of India Topo – sheet) (Scale 1: 50,000); 6. Site alternative under consideration (If any) : Alignment has been fixed considering the requirement (Upload site alternatives). of ITBP and hence no alternate is available. 7. Brief summary of project (Upload at least one : Brief summary of project page document, Upload pdf only and attach it as Annexed Annexure – Brief summary of project). 8. Does your project location falls under out of : None of above Areas: Leh (J&K). any following areas (Ghaziabad (UP), Indore (M.P), Jharsuguda (Orissa), Ludhiana (Punjab), Panipat (Haryna) ,Patancheru – ollaram (A.P.), Singraulli (UP and MP), Vapi (Gujarat), None of above Areas). 9. Number of states in which project will be : Jammu and Kashmir; executed (e.g., 1, 2, 3, 4, 5, 6) If 1 is selected;

Page 1 of 15

9.1 Main State of the project; : Jammu and Kashmir; If other than 1 is selected; 9.2 Other State (Multiple Entries allowed) (If the : Other State; project to be executed, does not belong to any state, then state category could be selected as 'Other'); 9.3 State; : Jammu and Kashmir; 9.4 District; : Leh; 9.5 Tehsil; : 10. Town/ Village (Name of more than one town may : Hanle be entered by separating with ','); 11. Plot/ Survey/ Khasra No. (Name of more than : one Plot/ Survey/ Khasra may be entered by separating with ','); 12. Project/ activity in the schedule (changes with : Not Applicable; Project Sector) If Project Sector is Coal mining; 12.1 Sub Activity has following options (Open Cast : Not Applicable; Mining, Underground Mining, Open Cast Cum Underground Mining); If Project Sector is Industrial Projects – 2; 12.2 Sub Activity has following options (Offshore : Not Applicable; oil & Gas Exploration, Onshore oil Gas Exploration); 12.3 If Project Sector is River Valley or : Not Applicable; Hydroelectric Projects; 12.4 Sub Activity has following options (River, : Not Applicable; Hydro); 13. Project Type (New, Expansion under para 7 (ii), : New, Expansion under para 7 (ii); Modernization under para 7 (ii), Change of product mix under para 7 (ii)); If Expansion or Modernization is selected; 13.1 MoEF & CC file number (Previous EC); : Not Applicable; 13.2 Existing capacity/ area etc. : 172.872 Hectare; 13.3 Date of Previous EC; : Not Applicable; 13.4 Upload Previous EC letter (only pdf, As : Not Applicable; Annexure – Previous EC letter); If Project Sector is Coal mining or Non – Coal Non – Coal Mining; Mining; 13.5 Upload approval of mining plan; : Not Applicable; 14. Category of project i.e., 'A' or 'B'; : A 15. Does it attract the general condition? : Yes; (Yes/No) If “Yes” is selected, upto four options can be selected; 15.1 Protected areas notified under the wildlife : Yes; The area lies in Changthang Cold Desert Wildlife (Protection) Act, 1972; Sanctuary. 15.2 Critically polluted areas as notified by the : No; Central Pollution Control Board (CPCB) from time to time; 15.3 Notified Eco – sensitive areas; : No;

Page 2 of 15

15.4 Inter - State boundaries and international : International Boundaries boundaries; 16. Does it attract the specific condition? : No; (Yes/No) If “Yes” is selected, following option can be selected; 16.1 If any Industrial Estate/ Complex/ Export : processing Zones/ Special Economic Zones/ Biotech Parks/ Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre – defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates/ complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/ complex are complied with (Such estates/ complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/ estate; If the above option is selected; 16.2 Status of the Environmental Clearance to the : EC application yet to be submitted Project (EC Obtained, EC under process, EC application yet to be submitted); If EC Obtained is selected; 16.2.1 MoEF & CC File No.; : 16.2.2 Upload a copy of Environmental Clearance : to the Project (upload pdf only as Annexure – EC Letter); 16.2.3 Date of grant of Environmental Clearance : to the Project; 17. Is there any litigation pending against the : No; project? (Yes/No); If “Yes” is selected; 17.1 Attach court order (s) given in this regard (pdf : only as Annexure – litigation); Undertaking 1. Name; : Mrs. Bhumika Mishra; 2. Designation; : Executive Engineer ; 3. Company; : CPWD, Nirman Bhawan, New Delhi; 4. Address : Office of Executive Engineer – V, Indo China Boarder Road Division – V, E – Wing, Nirman Bhawan, New Delhi – 11. Project Profile 1. Nearest Railway Station; : Katra (J&K) is the nearest railway station. 2. Distance from the project site (in Km) : Katra is the nearest railway station, at a distance of 928 (Nearest Railway Station); Km from Chumar and 922 Km from Hanle 3. Nearest Airport : Kushok Bakula Rimpochee Airport in Leh. 4. Distance from the project site (in Km) : Leh Kushok Bakula Rimpochee Airport is 263 Km Page 3 of 15

(Nearest Airport); from project site Chumur and 257 Km from Hanle. 5. Nearest Town/ City/ District; : Leh 6. Distance from the project site (in Km) : District Leh is located at a distance of about 255 (Nearest Town/ City/ District); Kilometers from Hanle. 7. Details of alternative sites examined? : No (Yes/No); If “Yes” is selected; 7.1 Upload details (Upload pdf only and attach it : NA as Annexure – alternative sites examined); Whether part of interlinked projects? No; (Yes/No); If “Yes” is selected; 8. 8.1 Whether separate application of interlinked : No project has been submitted? (Yes/No); If “Yes” is selected, 8.1.1 MoEF file number : 8.1.2 Date of submission : If “No” is selected, 8.1.3 Reason : 9. Whether the proposal involves approval/ : Yes, The Forest Clearance has been obtained as per J&K clearance under the Forest (Conservation) Forest Act, 1987. Act, 1980? (Yes/ No); If “Yes” is selected; 9.1 Status (In – Principle (Stage – I) Approval : Final approval obtained Obtained, Final (Stage – II) Approval Obtained, Forest Clearance Under Process, Application for Forest Clearance yet to be submitted); 10. Whether the proposal involves approval/ Yes; clearance under the wildlife (Protection) Act, 1972? (Yes/No); If “Yes” is selected; 10.1 Status (Wildlife clearance obtained, Wildlife : Wildlife clearance under process clearance under process, Application for Wildlife clearance yet to be submitted); 11. Whether the proposal involves approval/ : No; clearance under the C.R.Z notification, 2011? (Yes/No); 12. Whether there is any Government Order/ : Yes, MoEF OM dated 06.08.2019; Policy relevant/ relating to the site? (Yes/No); If “Yes”; 12.1 Upload Order/ Policy (only pdf, Attach as : Annexure – order/ policy); 13. Whether there is any litigation pending : No; against the project and/ or land in which the project is proposed to be set up? (Yes/No) If “Yes”; 13.1 Name of the court; : 13.2 Sub court; :

Page 4 of 15

13.3 Case no.; : 13.4 Orders/ Directions of the court, if any and its : relevance with the proposed project; Activity (II) 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.). 1.1 Permanent or temporary change in land : Yes, The existing path of proposed alignment is a foot use, land cover or topography including track, so road construction will make a permanent increase in intensity of land use (with change in the topography of the area. Temporary land respect to local land use plan) (Yes/No) (if Yes, use change is anticipated by establishment of the Details thereof (with approximate quantities/ construction camps which can be reversed by rates, wherever possible) with source of restoration works after completion. Total length of the information data); project in 96.57 Km with 3.75 m carriageway and shoulders 1.25 m each and ROW of 18 m. 1.2 Clearance of existing land, vegetation : Yes, Construction of Road will be done systematically, and buildings? (Yes/No) (if Yes, Details thereof with economy of materials and sustainability conditions (with approximate quantities/ rates, wherever kept in mind. There is no vegetation in this area which possible) with source of information data); will be cleared. This is as per NOC given by DFO, leh (copy attached). No existing buildings in this area. 1.3 Creation of new land uses? (Yes/No) (if : Yes, new land use will consist a single lane paved road Yes, Details there of (with approximate quantities/ with granular/ earthen side shoulders along with avenue rates, wherever possible) with source of plantation. information data); 1.4 Pre-construction investigations e.g., bore : Yes, Proposed Alignment is road assessed is 23.80% houses, soil testing? (Yes/No) (if Yes, Details Hard Rock and 76.20% all kind of soil (include Ordinary thereof (with approximate quantities/ rates, rock). Sub Soil investigations will be done as per IRC wherever possible) with source of information guidelines. data); 1.5 Construction works? (Yes/No) (if Yes, : Yes, Construction of a 96.56 km road from Hanle to Details thereof (with approximate quantities/ Chumar along the attached approved alignment; in rates, wherever possible) with source of additional to that protection works such as breast walls, information data); retaining walls, will be constructed. 1.6 Demolition works? (Yes/No) (if Yes, Details : No; thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.7 Temporary sites used for construction : Yes, For establishment of the construction camps and works or housing of construction workers? Labour camps 2 hectare (approx.) of unused land site (Yes/No) (if Yes, Details thereof (with approximate will be selected away from settlements; temporary quantities/ rates, wherever possible) with source of changes to the land can be reversed by restoration information data); works after completion. 1.8 Above ground buildings, structures or : Yes, Earthwork involving upto 40 lac cum of soil and earthworks including linear structures, cut rock balancing the quantity of cut and fills such that and fill or excavations (Yes/No) (if Yes, Details minimum debris is produced. Protection structures such thereof (with approximate quantities/ rates, as 33 km breast wall, 24 kms of retaining wall, culverts wherever possible) with source of information and 4 bridges with span of 40m approx are to be data); constructed. 1.9 Underground works including mining or : No; tunneling? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.10 Reclamation works? (Yes/No) (if Yes, : No; Details thereof (with approximate quantities/ rates, wherever possible) with source of information data);

Page 5 of 15

1.11 Dredging? (Yes/No) (if Yes, Details thereof : No; (with approximate quantities/ rates, wherever possible) with source of information data); 1.12 Offshore structures? (Yes/No) (if Yes, : No; Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.13 Production and manufacturing : Yes, aggregate production by crusher, concrete mix by processes? (Yes/No) (if Yes, Details thereof (with batching plant and bituminous surfacing course approximate quantities/ rates, wherever possible) material production from hot mix plant will be done. with source of information data); 1.14 Facilities for storage of goods or : Yes; Temporary camps (construction/labour) will be materials? (Yes/No) (if Yes, Details thereof (with constructed, accommodation sheds and open yards will approximate quantities/ rates, wherever possible) be made for the storage of construction material during with source of information data); project implementation. The site will be restored after work completion. 1.15 Facilities for treatment or disposal of : Yes; Solid waste will be generated, it will be segregated solid waste or liquid effluents? (Yes/No) (if and disposed, plastic waste can be recycled whereas Yes, Details thereof (with approximate quantities/ liquid sewerage waste will be disposed in septic tanks. rates, wherever possible) with source of information data); 1.16 Facilities for long term housing of : Yes; Camp or facility till maintenance period of the road operational workers? (Yes/No) (if Yes, Details will be established and Safety along the road stretch will thereof (with approximate quantities/ rates, be monitored. wherever possible) with source of information data); 1.17 New road, rail or sea traffic during : Yes; during construction temporary approach roads will construction or operation? (Yes/No) (if Yes, be developed for movement of construction machinery Details thereof (with approximate quantities/ such as rollers, pavers, excavators, tippers and loaders. rates, wherever possible) with source of These approach roads will be restored after completion information data); of construction and new road constructed will be used at operation and maintenance stage. 1.18 New road, rail, air waterborne or : No; other transport infrastructure including new or altered routes and stations, ports, airports etc.? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.19 Closure or diversion of existing : Yes, Proposed road is a new alignment, existing road is transport routes or infrastructure leading to a foot track for connectivity. Temporary diversions will changes in traffic movements? (Yes/No) (if be developed to execute the construction work. Safety at Yes, Details thereof (with approximate quantities/ the work site will be maintained by barricading, warning rates, wherever possible) with source of signages and informatory boards. information data); 1.20 New or diverted transmission lines or : No; pipelines? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.21 Impoundment, damming, culverting, : Yes, Culverts are provided for natural crossing of water realignment or other changes to the streams across the carriageway. Almost 380 culverts are hydrology of watercourses or aquifers? proposed for crossing of water streams. (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.22 Stream crossings? (Yes/No) (if Yes, Details : Yes, Almost 380 culverts are proposed for crossing of thereof (with approximate quantities/ rates, water streams and 4 bridges of 40 m span across major wherever possible) with source of information streams are proposed. data);

Page 6 of 15

1.23 Abstraction or transfers of water form : Yes; through borewells for day to day use for labour and ground or surface waters? (Yes/No) (if Yes, construction. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.24 Changes in water bodies or : No; the land surface affecting drainage or run - off? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.25 Transport of personnel or : Yes; Transport will be provided for transit of workers; materials for construction, operation materials will be transported with precautions to avoid or decommissioning? (Yes/No) (if Yes, Details environmental impacts. thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.26 Long – term dismantling or : No; decommissioning or restoration works? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.27 Ongoing activity during : No; decommissioning which could have an impact on the environment? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.28 Influx of people to an area in either : Yes, during construction temporary influx of workers temporarily or permanently? (Yes/No) (if Yes, and contractor’s employees will be in place, however, Details thereof (with approximate quantities/ local workers will be engaged from surrounding rates, wherever possible) with source of localities. information data); 1.29 Introduction of alien species? (Yes/No) : No; (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.30 Loss of native species or genetic : No; diversity? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 1.31 Any other actions? (Yes/No) (if Yes, Details : No; thereof (with approximate quantities/ rates, wherever possible) with source of information data); 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non – renewable or in short supply). 2.1 Land especially undeveloped or : Yes, 178.24 hectare of undeveloped forest land will be agricultural land (ha) (Yes/No) (if Yes, Details diverted for the construction of this road. thereof (with approximate quantities/ rates, wherever possible) with source of information data); 2.2 Water (expected source & competing : Yes, water will be used for curing activities of structures users) unit: KLD (Yes/No) (if Yes, Details thereof and others from various sources. (with approximate quantities/ rates, wherever possible) with source of information data); 2.3 Minerals (MT) (Yes/No) (if Yes, Details : No; thereof (with approximate quantities/ rates, Page 7 of 15

wherever possible) with source of information data); 2.4 Construction material stone, aggregates, : Yes, The retrieved material obtained during excavation sand / soil (expected source – MT) (Yes/No) will be crushed for production of aggregates. (if Yes, Details thereof (with approximate Aggregate required =274138 M3 quantities/ rates, wherever possible) with source of

information data); 2.5 Forests and timber (source – MT) : No (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 2.6 Energy including electricity and fuels : Yes, DG generator for running machinery and Camp (source, competing users) Unit: Fuel (MT), facility will be used. The same can be replaced by Energy (MW) (Yes/No) (if Yes, Details thereof electricity if available. (with approximate quantities/ rates, wherever possible) with source of information data); 2.7 Any other natural resources (use : Not envisaged appropriate standard units) (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. 3.1 Use of substances or materials, which are : Yes, Bituminous traces shall be left during construction hazardous (as per MSIHC rules) to human can be hazardous; measures for cleaning and disposing health or the environment (flora, fauna, and will be adopted. No other hazardous substances are water supplies) (Yes/No) (if Yes, Details thereof used in construction of the road. (with approximate quantities/ rates, wherever possible) with source of information data); 3.2 Changes in occurrence of disease or : No, Health precaution will be taken during construction affect disease vectors (e.g., insect or water period by providing clean drinking water for workers; borne diseases) (Yes/No) (if Yes, Details avoiding water stagnation by levelling of depressions; thereof (with approximate quantities/ rates, disposal of waste to septic pits/tanks, health checks and wherever possible) with source of information using precautions. data); 3.3 Affect the welfare of people e.g., by : Yes, Road construction will certainly improve the changing living conditions? (Yes/No) (if Yes, connectivity and improve transportation which will Details thereof (with approximate quantities/ enhance employment opportunity, education options, rates, wherever possible) with source of economics of local commuters, movement of army information data); artillery and vehicles in the region and other related activities. 3.4 Vulnerable groups of people who could : No; be affected by the project e.g., hospital patients, children, the elderly etc. (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 3.5 Any other causes (Yes/No) (if Yes, Details : No; thereof (with approximate quantities/ rates, wherever possible) with source of information

data);

4. Production of solid wastes during construction or operation or decommissioning (MT/ Month).

Page 8 of 15

4.1 Spoil, overburden or mine wastes : Yes, the excavated earth will be used in the filling of (Yes/No) (if Yes, Details thereof (with approximate various structures like retaining walls, breast walls, quantities/ rates, wherever possible) with source of culverts etc. The remaining excess quantity will be information data); disposed in the muck disposal sites along the road. 4.2 Municipal waste (domestic and or : Yes, In Labour camps Solid waste (including food commercial wastes) (Yes/No) (if Yes, Details waste) will be generated and can be disposed thereof (with approximate quantities/ rates, adequately. Sewerage waste generated will be disposed wherever possible) with source of information in septic tanks. data); 4.3 Hazardous wastes (as per Hazardous : No; Waste Management Rules) (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.4 Other industrial process wastes (Yes/No) : No; (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.5 Surplus product (Yes/No) (if Yes, Details : Yes, The excess quantity of earthwork which could not thereof (with approximate quantities/ rates, be used in filling will be disposed in the muck disposal wherever possible) with source of information sites along the road. data) 4.6 Sewage sludge or other sludge from : No; effluent treatment (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.7 Construction or demolition wastes : No; (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.8 Redundant machinery or equipment : Yes; Redundant machinery or machinery will be (Yes/No) (if Yes, Details thereof (with approximate demobilized if found. quantities/ rates, wherever possible) with source of information data); 4.9 Contaminated soils or other materials : No; (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.10 Agricultural wastes (Yes/No) (if Yes, : No; Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 4.11 Other solid wastes (Yes/No) (if Yes, Details : No; thereof (with approximate quantities/ rates, wherever possible) with source of information data); 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/ Hr). 5.1 Emissions from combustion of fossil : Yes, regular monitoring will be done to check and fuels from stationary or mobile sources prevent emissions from vehicles or machinery. (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 5.2 Emissions from production processes : Yes, Emissions and Particulate matters will be likely to (Yes/No) (if Yes, Details thereof (with approximate be generated in construction camps from Crusher/ quantities/ rates, wherever possible) with source of aggregate production, from use of machineries and

Page 9 of 15

information data); during earthwork. These will be monitored during construction and mitigation measures will be adopted to prevent the same. 5.3 Emissions from materials handling : Yes, transportation of material including soil, sand and including storage or transport (Yes/No) (if cement will add to particulate matters. Measures to Yes, Details thereof (with approximate cover the transported vehicles will be practiced. All quantities/ rates, wherever possible) tippers can have tail boards to prevent emissions. with source of information data); 5.4 Emissions from construction activities : Yes, emissions and Particulate matters will be likely to including plant and equipment (Yes/No) (if be generated in construction camps from Hot mix Yes, Details thereof (with approximate quantities/ plants, WMM and batching/RMC plants. These can be rates, wherever possible with source of monitored during construction and mitigation measures information data); will be adopted. Hot-mix plant can be fitted with dust extraction unit and others can be installed with dust suppression units to prevent air pollution. 5.5 Dust or odours from handling of : No; materials including construction materials, sewage and waste (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 5.6 Emissions from incineration of waste : No; (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data) 5.7 Emissions from burning of waste in open : No; air (e.g., slash materials, construction debris) (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data) 5.8 Emissions from any other sources : Yes, dust emissions due to movement of machinery at (Yes/No) (if Yes, Details thereof (with approximate the diversions, along the construction area and due to quantities/ rates, wherever possible) with source of Earthwork activity is expected which can be information data); checked/controlled by water sprinkling and water spraying. 6. Generation of Noise and Vibration, and Emissions of Light and Heat. 6.1 From operation of equipment e.g., : Yes, Noise will be generated from vehicle engines, engines, ventilation plant, crushers (Yes/No) vibratory rollers, HMP and Crusher plants but it will be (if Yes, Details thereof (with approximate bearable (with 70-75 dB frequency) in outer quantities/ rates, wherever possible) with source of environment. Operators will be provided by ear muffs, information data); machinery such as Crusher and HMP will be provided by noise muzzles. Acoustic DG sets will be used in camps. 6.2 From industrial or similar processes : No (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 6.3 From construction or demolition : Yes, generated noise will be of bearable frequency, (Yes/No) (if Yes, Details thereof (with approximate construction work is recommended in day time. quantities/ rates, wherever possible) with source of information data); 6.4 From blasting or piling (Yes/No) (if Yes, : Yes, Controlled blasting will be recommended. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 6.5 From construction or operational traffic : Yes, noise will be generated due to movement of (Yes/No) (if Yes, Details thereof (with approximate vehicles and operation of machineries etc. Construction quantities/ rates, wherever possible) with source of camps will be established at appropriate distance from

Page 10 of 15

information data); human habitat to minimize the noise. 6.7 From any other sources (Yes/No) (if Yes, : No; Details thereof (with approximate quantities/rates, wherever possible) with source of information

data);

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea. 7.1 From handling, storage, use or spillage of : No, hazardous materials (Yes/No) (if Yes, Details Diesel and fuel storages; Precaution shall be taken for thereof (with approximate quantities/rates, handling whereas; soil test will be conducted quarterly wherever possible) with source of information to monitor the effects. data); 7.2 From discharge of sewage or other : No, effluents to water or the land (expected Sewerage from the Labour camps will be generated and mode and place of discharge) (Yes/No) (if Yes, disposed using septic tanks hence preventing any Details thereof (with approximate quantities/ contamination of land and water; Camps will be located rates, wherever possible) with source of away from the habitations and water bodies. information data); 7.3 By deposition of pollutants emitted to air : No; into the land or into water (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 7.4 From any other sources (Yes/No) (if Yes, : Yes, land contamination is anticipated due to Details thereof (with approximate quantities/ bituminous work during road construction. Precautions rates, wherever possible) with source of will be taken to avoid the spillage of bitumen on land. information data); 7.5 Is there a risk of long term build – up of : No; pollutants in the environment from these sources? (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment. 8.1 From explosions, spillages, fires etc. : No from storage, handling, use or production of hazardous substances (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 8.2 From any other causes (Yes/No) (if Yes, : No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 8.3 Could the project be affected by natural : Yes, disasters causing environmental damage Landslides could be possible on proposed road (e.g., floods, earthquakes, landslides, construction because it is located on hilly terrain. Slope cloudburst etc.)? (Yes/No) (if Yes, Details stability measures will be taken during construction thereof (with approximate quantities/ rates, activity. wherever possible) with source of information data); 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. 9.1 Lead to development of supporting. : Yes, after the construction of road and increased utilities, ancillary development or connectivity a fillip to overall development in the region Page 11 of 15

development stimulated by the project is expected. It will trigger other supporting /ancillary which could have impact on the activities especially along the settlements enroute may environment e.g., have temporary environmental impacts, which could be  Supporting infrastructure (roads, power reversible if monitored. supply, waste or waste water treatment, etc.)  housing development  extractive industries  supply industries  Other Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 9.2 Lead to after – use of the site, which : No; could have an impact on the environment (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); 9.3 Set a precedent for later development : The past experience of improvement of road project (Yes/No) (if Yes, Details thereof (with approximate shows that easy accessibility to transport have positive quantities/rates, wherever possible) with source of impacts on Socio-Economic, Environmental and quality information data); of life. Indicators analyzed at various road projects have proved enhanced Education, Employment, Economic growth, reduction in emissions from vehicles, safety while driving, and access to social service, health centers after construction of road projects. Plantation at road side will increase aesthetics. Restoration and rehabilitation will reverse the potential temporary environmental impacts. 9.4 Have cumulative effects due to proximity : to other existing or planned projects with similar effects (Yes/No) (if Yes, Details thereof (with approximate quantities/ rates, wherever possible) with source of information data); Environmental Sensitivity 1. Areas protected under international : No; conventions, national or local legislation for their ecological, landscape, cultural or other related value (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 2. Areas which are important or sensitive for : Yes; Ryul Lake is located within a distance of 1.5 Km ecological reasons – Wetlands, from proposed road alignment. watercourses or other water bodies, coastal zone, biospheres, mountains, forests (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 3. Areas used by protected, important or : Yes; Changthang cold desert wild life sanctuary is sensitive species of flora or fauna for located in the buffer zone. breeding, nesting, foraging, resting, over wintering, migration (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 4. Inland, coastal, marine or underground : NA; waters (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary) 5 State, National boundaries (Yes/No) (if Yes, Yes, (Indo-China border) within Aerial distance (within 15 Km.) Proposed project 10 km of proposed alignment. location boundary); Page 12 of 15

6 Routes or facilities used by the public for : No; access to recreation or other tourist, pilgrim areas (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 7 Defence installations (Yes/No) (if Yes, Aerial : Yes, ITBP and Army have their Border Outposts in distance (within 15 Km.) Proposed project location Hanle and Chumar. boundary) 8. Densely populated or built – up area (Yes/No) : No, Hanle is a village settlement located near by the (if Yes, Aerial distance (within 15 Km.) Proposed proposed road which is sparsely populated. project location boundary); 9. Areas occupied by sensitive man – made : Yes; Schools and places of worship are there in the land uses (hospitals, schools, places of vicinity. worship, community facilities) (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 10. Areas containing important, high quality or No; scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 11. Areas already subjected to pollution or : No; environmental damage. (those where existing legal environmental standards are exceeded) (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); 12. Areas susceptible to natural hazard which : Yes, could cause the project to present Landslides could be possible on proposed road environmental problems (earthquakes, construction because it is located on hilly terrain. Slope subsidence, landslides, erosion, flooding or stability measures will be taken during construction extreme or adverse climatic conditions) activity. (Yes/No) (if Yes, Aerial distance (within 15 Km.) Proposed project location boundary); PROPOSED TERMS OF REFERENCE FOR EIA STUDIES 1. Upload Proposed TOR File (Upload pdf only : Annexure – Proposed TOR File; and attach it as Annexure – Proposed TOR File); 2. Upload scanned copy of covering letter : Scanned copy of covering letter; (Upload pdf only); 3. Upload Pre – feasibility Report (PFR) : Annexure – Pre – feasibility Report (PFR) File; (Upload pdf only and attach it as Annexure – Pre – feasibility Report (PFR) File); 4. Upload Additional Attachments if any (Only : Annexure – Additional Attachments File; single pdf file) (Upload pdf only and attach it as Annexure – Additional Attachments File);

Details required for TOR (Extension, Amendment and Corrigendum) Application (Category – A) Basic Profile 1. Name of the proponent (auto fill) :

Page 13 of 15

2. Name of the implementing agency (auto fill) : 3. Contact person (auto fill) : 4. Designation (auto fill) : 5. Telephone No. (auto fill) : 6. Mobile No. (auto fill) : 7. Fax No. (auto fill) : 8. Email Address (auto fill) : 9. Website (if any) (auto fill) : 10. Pin code (auto fill) : 11. State (auto fill) : 12. District (auto fill) : 13. Town/ Village (auto fill) :

1. Modification Category (Extension of Validity, : Amendment, Corrigendum) 2. Project Sector (Coal mining, Industrial projects, : Industrial projects – 2, Infrastructure and Miscellaneous Projects + CRZ, New Construction Projects and Industrial Estates, Non – Coal Mining, Nuclears Projects, River Valley and Hydroelectric Projects, Thermal Projects) 3. State : 4. MoEF & CC file number (Previous TOR) : 5. Proposal number : 6. Date of Previous TOR : 7. Previous TOR letter (Upload pdf only and : attach it as Annexure – Previous TOR letter)

1. Previous TOR valid upto : 2. For how many years Extension is required : 3. Reason for applying for Extension of validity : 4. Attach document (if any) (upload pdf only and : attach it as Annexure – if any) 5. Upload Covering Letter (upload pdf only and : attach it as Annexure – Covering letter)

1. Reason for applying for Amendment : 2. What Amendment is required : 3. Attach document (if any) (upload pdf only and : attach it as Annexure – if any) 4. Upload Covering Letter (upload pdf only and : attach it as Annexure – Covering letter) Modification Category: Corrigendum 1. Reason for applying for Corrigendum : 2. Attach document (if any) (upload pdf only and :

Page 14 of 15

attach it as Annexure – if any) 3. Upload Covering Letter (upload pdf only and : attach it as Annexure – Covering letter) 4. What changes are required : Undertaking 1. Name (auto fill) : 2. Designation (auto fill) : 3. Company (auto fill) : 4. Address (auto fill) :

Page 15 of 15