Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), , U.P.

APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information

Serial Item Details Number 1. Name of the project/s Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P. 2. S. No. in the schedule Schedule 8 (b) 3. Proposed capacity/ area/length/ Total Plot Area : 3,91,641.99m2 tonnage to be handled/ command Built Up Area:8444.9.88m2 area/ lease area/ number of wells to be drilled 4. New/ Expansion/ Modernization New 5. Existing Capacity/ Area etc. Not Applicable 6. Category of Project i.e. ‘A’ or ‘B’ Category B1 7. Does it attract the general condition? Not Applicable If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Mahavir Nagar (Extension), District Kanpur, District Kanpur State Uttar Pradesh 10. Nearest railway station/ airport The nearest Railway Station is along with distance in kms.  Panki Railway station – 1.86 Km, E  Kalyanpur Railway Station- 5.56 Km, NE 11. Nearest Town, city, District  Bhautikhera- 1.65 Km, SW Headquarters along with distance in  Panki- 2.99 Km, NE kms.  Bahera- 1.46 Km, NW  Surar- 2.52 Km, W  Dabauli- 5.9 Km, SE  Bhauti Pratap pur- 2.30 Km, SW 12. Village Panchayats, Zilla Parishad, Kanpur Development Authority Municipal Corporation, Local body Phone no – 0512 255 6292 (complete postal addresses with Email- [email protected] telephone nos. to be given) Website- www.kdaindia.co.in 13. Name of the applicant Executive Engineer Kanpur Development Authority Zone-2

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 1 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

14. Registered Address Zone 2, Motijheel KDA Office, Kanpur Pin code- 208002 15. Address for correspondence: Zone 2, Motijheel KDA Office, Kanpur Pin code- 208002 Name Executive Engineer

Designation (Owner/Partner/ CEO) Executive Engineer

Address Zone 2, Motijheel KDA Office, Kanpur Pin code- 208002 Pin Code 208002 E-mail [email protected] Telephone No. - Fax No. - 16. Details of Alternative Sites Not Applicable examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects None 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not Applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Not Applicable Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) No.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 2 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

24. Whether there is any litigation No. pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation, or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data 1.1 Permanent or temporary change in No The total plot area 391641.99 m2 has been land use, land cover or topography proposed for Mahavir Nagar Yojna, Phase- including increase in intensity of II under Prime Minister Awasiya Yojna, at land use (with respect to local Mahavir Nagar (Extension) District- land use plan) Kanpur, Uttar Pradesh 1.2 Clearance of existing land, No The proposed project is on fully vegetation, and buildings? vacantland at Mahavir Nagar (Extension) District- Kanpur, Uttar Pradesh 1.3 Creation of new land uses? yes The total plot area 391641.99 m2 has been proposed for Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna, at Mahavir Nagar (Extension) District- Kanpur, Uttar Pradesh. This development is abetter land use for the development of urban areas and creation of an enabling environment to provide comfortable housing to the Economically Weaker Section of the society at a reasonably affordable price. 1.4 Pre-construction investigations Yes Pre- Construction Investigation regarding e.g. bore houses, soil testing? sub soil exploration and testing has been carried out at the proposed project site to study the pertinent physical and mechanical properties of soil for structural stability.The Kanpur Nagar District is part

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 3 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data of Indo Genetic Plain. The silt, gravel, and sands of different grades are main water bearing formations. The ground water occurs 8 under unconfined condition in phreatic zones and under confined condition in deeper zones. The sediment logical constitution of the subsurface granular zones shows remarkable variation in the depth and the nature of occurrence in north and southern part of the district. In southern part specially along Yamuna river, feldspar-quartz, Jaspar sands and gravel (Mourum) are the main constituents of the granular zones that occurs comparatively at shallow levels i.e. 24 to 57 mbgl whereas in the northern parts along the Ganga river, these reworked sedimentary formations are existing at deeper levels i.e. 265 to 310 mbgl. The provenance of these sedimentary formations is mainly Bundelkhand Granite Complex of Archean age and Vindhyan Sandstone of Puranas. In the northern part the silt and clay sediments forming thin lensoid beds are frequently occurring in depth. 1.5 Construction works? Yes As per Building Plan. 1.6 Demolition works? No The project site is a vacantland; hence no demolition work will be done. 1.7 Temporary sites used for No 300 nos. Labours from different areas construction works or housing of will be engaged. During construction construction workers? period Labours will be allowed for staying in encampment. 1.8 Above ground buildings, Yes As per building plan. structures orearthworks including (During the project construction phase, linear structures, cut and fill or excavation will be required only during excavations construction of foundations. However, the soil excavated will be reused for backfilling, landscaping and the fertile top soil will be reused for horticulture purpose) 1.9 Underground works including No Not applicable

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 4 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data mining or tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Off shore structures? No Not applicable 1.13 Production and manufacturing No It is a construction project under Prime processes? Minister Awasiya Yojnahence no production and manufacturing processes shall be carried out. 1.14 Facilities for storage of goods or Yes Separate raw material yard will be made. materials? Cement will be separately stored under cover in bales. Sand will be stacked nearby under tarpaulin cover. Bricks and steel will be laid in open. The raw material yard will be located within the project site. 1.15 Facilities for treatment or disposal Yes A 12.5 MLD STP has been proposed by of solid waste or liquid effluents? the proponent for the treatment of waste water generated from the domestic requirement within the proposed project. About 489.95 KLD waste water shall be reused for gardening and flushing purpose within the project site. Solid Waste Management Plan is enclosed in Conceptual Plan. 1.16 Facilities for long term housing of No Labours from different areas will be operational workers? hired. During construction period Labours will be allowed for staying in encampment. Proper Sanitary Facilities like Temporary Toilets etc. will be provided & treatment will be done using septic/soak pits. 1.17 New road, rail, or sea traffic No No, New roads, rail or sea traffic will be during construction or operation? hired. 1.18 New road, rail, air waterborne or No No alteration in existing transport other transport infrastructure infrastructure is anticipated. including new or altered routes and stations, ports, airports etc?

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 5 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data 1.19 Closure or diversion of existing No The project site has good road connectivity transport routes or infrastructure  NH-2, Kanpur Jhansi Highway- 0.2 Km, leading to changes in traffic SE movements?  NH-25 – 0.60 Km, SE  Aligarh Kanpur Road – 8.68 Km, E  Bithur road – 6.36 Km, NE  Barra Road- 9.26 Km, SE  Panki road- 3 Km, E Forming nexus around the site. No such closure or diversion of existing transport will be done. 1.20 New or diverted transmission No No new or diverted transmission lines or lines or pipelines? pipelines will be done. 1.21 Impoundment, damming, No No impoundment, damming, culverting, culverting, realignment or other realignment, or other changes to the changes to the hydrology of hydrology of surface water courses or watercourses or aquifers? aquifers is proposed. 1.22 Stream crossings? No No Stream is crossing at project site 1.23 Abstraction or transfers of water Yes Ground Water: It is estimated that from ground or surface waters? approx. 1,495.11KLD of water will be required in proposed project. Water requirement shall be met through 5no. of tube well with submersible pump. 1.24 Changes in water bodies or the No Surface drainage will not be affected land surface affecting drainage or with the proposed project. run-off? 1.25 Transport of personnel or Yes Transport of personnel or materials for materials for construction, construction, operation or operation, or decommissioning? decommissioning shall be done by road transport. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No 300 nos. Labours from different areas either temporarily or will be engaged. During construction permanently? period Labours will be allowed for staying in encampment

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 6 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data 1.29 Introduction of alien species? No As on date, there is no history of alien species at the proposed site. 1.30 Loss of native species or genetic No There will be no loss of native species or diversity? genetic diversity. 1.31 Any other actions? No None

2.Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities S. Information/checklist Yes /rates, wherever possible) with source of No. confirmation /No information data. 2.1 Land especially undeveloped or Yes The total plot area of 39,1641.99 m2 has been agricultural land (ha) proposed, under Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension),District- Kanpur, Uttar Pradesh, Water (expected source & Yes Source: 05 no. Tube Well with Submersible 2.2 competing users) unit: KLD pump

Total Domestic Water Requirement 1435.94KLD Total requirement for Gardening 59.17 KLD Flushing 430.782KLD

Total water requirement 1495.17KLD

2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Material from excavation at the project site aggregates, sand / soil (expected will be used for construction purposes. source – MT) Additional construction material like bricks, stones, aggregates, sand will be procured from nearby area. 2.5 Forests and timber (source – No Not Applicable MT) 2.6 Energy including electricity and Yes The expected power demand for the proposed fuels (source, competing users) project will be supplied through Uttar Unit: fuel (MT), energy (MW) PradeshPower Corporation Ltd. 2.7 Any other natural resources (use No None appropriate standard units)

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 7 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes This is a development of Mahavir Nagar which are hazardous (as per Yojna, Phase- II under Prime Minister MSIHC rules) to human health Awasiya Yojna at Mahavir Nagar or the environment (flora, fauna, (Extension), District-Kanpur,which falls and water supplies) under residential& Commercial projects and no storage of hazardous chemicals (as per MSIHC rules) will be done. No D.G. Sets are provisioned in the project site. 3.2 Changes in occurrence of disease No Suitable drainage and waste management or affect disease vectors (e.g. measures will be adopted in both the insect or water borne diseases) construction and operational phase which will restrict stagnation or accumulation of water. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people e.g. Yes This is a development of Mahavir Nagar by changing living conditions? Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), District-Kanpur, This development will cross-subsidize EWS by providing LIG,MIG-1, MIG-2, Mixuse & Commercial plots. It will provide a sense of togetherness to the EWS. This township will help in holistic development of the area. No major adverse impacts on the human health / environments are envisaged. Moreover this project will provide employment to about300 labors from different areas during the construction phase and nearly 18,515personnel’s shall be benefitted from the project during operation phase. Thus the proposed project is supposed to have major beneficial impacts. 3.4 Vulnerable groups of people No No, vulnerable group of people will be who could be affected by the affected by the project.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 8 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 4.1 Spoil, overburden or mine No Not applicable 4.2 Municipalwastes waste (domestic and Yes 10,894.75 Kg/Daymunicipal solid waste or commercial wastes) during operation including floating population shall be generated.Detail of Solid Waste Management is given in Conceptual Plan. 4.3 Hazardous wastes (as per No This is a development of Mahavir Nagar Hazardous Waste Yojna, Phase- II under Prime Minister Management Rules) Awasiya Yojna at Mahavir Nagar (Extension), District-Kanpur, which falls under residential & Commercial projects hence no storage of hazardous chemicals (as per MSIHC rules) will be done. No D.G. Sets are provisioned in the project site. 4.4 Other industrial process wastes No This is a construction project; hence there will be no other industrial process waste. 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes Sludge will be generated from12.5MLD from effluent treatment STPbased on FAB technology has been proposed within theMahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna, which will be passed through filter press where it will be dried and form a cake and then used as manure in green area of the project. 4.7 Construction or demolition Yes Construction waste will be generated wastes which shall be used for flooring & Back filling in roads etc. 4.8 Redundant machinery or No Not applicable equipment

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 9 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No N.A.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 5.1 Emissions from combustion of Yes HC - 1.3 g/KW -hr fossil fuels from stationary or PM - 0.30 g/KW-hr mobile sources NOx – 9.2 g/KW-hr CO - 3.5 g/KW-hr 5.2 Emissions from production No Not applicable processes 5.3 Emissions from materials Yes This will be restricted to the construction handling including storage or phase and to the construction site only; transport 5.4 Emissions from construction Yes This will be restricted to the construction activities including plant and phase and to the construction site only. equipment 5.5 Dust or odours from handling Yes Dust is likely to be generated during of materials including construction. Water will be sprinkled and construction materials, sewage tarpaulin cover will be provided over and waste stored raw material to reduce dust emission. Sewage waste will be treated through 12.5MLD sewage treatment plant based on FAB technology has been proposed by the proponent. 5.6 Emissions from incineration of No Not Applicable waste 5.7 Emissions from burning of No Open burning of biomass/ other material waste in open air (e.g. slash will be prohibited. materials, construction debris) 5.8 Emissions from any other No Not applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data with

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 10 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

source of information data 6.1 From operation of equipment No During construction the machinery used e.g. engines, ventilation plant, for construction will be of highest crushers standard of reputed make and will adhere to international standards. These standards itself take care of noise pollution control / vibration control and air emission control. Hence insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities will be restricted to day time only. 6.2 From industrial or similar No Not applicable processes 6.3 From construction or Yes Due to the various construction activities demolition there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:  Concreting and mixing  Excavation etc. 6.4 From blasting or piling No No blasting or piling will be done. 6.5 From construction or Yes Some amount of noise (60-68 db (A) will operational traffic be generated from vehicular movement in the construction and operational phase within the project site. Plantation shall be done at the periphery and along road side area to ensure noise attenuation. 6.6 From lighting or cooling No None 6.7 systemsFrom any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 7.1 From handling, storage, use or No The proposed project falls under residential spillage of hazardous materials & Commercial projects hence no storage of hazardous chemicals (as per MSIHC rules) will be done. No D.G. Sets are provisioned in the project site. Hence no risk of contamination is envisaged.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 11 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 7.2 From discharge of sewage or No A 12.5MLD STP based on FAB technology other effluents to water or the has been proposed to treat 100% waste water land (expected mode and place within theMahavir Nagar Yojna, Site- II, the of discharge) STP treated water will be totally reused for Flushing and Gardening purposes. Details of 12.5MLD STP is given in Conceptual Plan. 7.3 By deposition of pollutants No The proposed residential and commercial emitted to air into the land or building shall treat the total grey and black into water water within its own premises by setting up 12.5 MLD sewage treatment plant and treated water from STP shall be totally utilized for flushing, & Gardening with Zero Discharge. Treated Water from STP – 12.5 MLD Total Reused Water Breakup- 1. Flushing –430.782KLD 2. Gardening – 59.17KLD 3. Balance – 621.47 KLD will be given toEcological pond. Zero discharge of treated water achieved. Hence, no any pollutant gets into the water or air. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term No Not applicable buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 8.1 From explosions, spillages, fires No This is basically a development of Mahavir etc from storage, handling, use Nagar Yojna, Phase- II under Prime or production of hazardous Minister Awasiya Yojna, and it does not substances involve major hazardous construction activity. Hence chances of explosions, spillages, fires are minimal.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 12 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data During Construction 300 nos. labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will be provided to all supervisors and labours involved in construction activity.

An agreement will be signed with the contractor, which will clearly deal with the safety aspects during construction.

No major hazardous waste is being stored within the project site. No Industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures will be provided 8.2 From any other causes No None 8.3 Could the project be affected by No The area under study falls in Zone-III, natural disasters causing according to the Indian Standard Seismic environmental damage (e.g. Zoning Map. Suitable seismic floods, earthquakes, landslides, coefficients in horizontal and vertical cloudburst etc)? directions respectively, will be adopted while designing the structure. There are no chances of flood and landslide in the plain area of Kanpur city.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S. No. Information/Checklist Yes/ quantities/rates, wherever possible) confirmation No with source of information data

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 13 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

9.1 Lead to development of It is development of Mahavir Nagar supporting. Yojna, Phase- II under Prime Minister Utilities, ancillary development Awasiya Yojna at Mahavir Nagar or developmentstimulated by Extension, Kanpur with adequate Overall the project which could have development facilities. impact on the environment e.g.: Power Demand: UPPCL • Supporting infrastructure Yes Development of 12.5 MLD STP fortotal (roads, power supply, waste or grey and black water treatment. waste water treatment, etc.)

• Housing development Yes It is a housing development of Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar Extension, Kanpur • Extractive industries No Not Applicable

• Supply industries No

• Other No 9.2 Lead to after-use of the site, No Proper care shall be taken to avoid any which could have an impact on impact on the environment. the environment 9.3 Set a precedent for later Yes Infrastructure Development and developments improvement in living standard of the area. Socio Economic conditions will improve.

9.4 Have cumulative effects due to No No impact

proximity to other existing or

planned projects with similar effects

III Environmental Sensitivity S. Areas Name/ Aerial distance (within 15 km.) No. Identity Proposed project location boundary 1 Areas protected under international No No such area is involved. conventions, national or local legislation for their ecological, landscape, cultural or other related value.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 14 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

S. Areas Name/ Aerial distance (within 15 km.) No. Identity Proposed project location boundary 2 Areas which are important or Gomti Watercourses- sensitive for ecological reasons - river Pandu River- 0.2 Km, SW Wetlands, watercourses or other River Ganges- 10.78 Km, NE water bodies, coastal zone, Lower Ganga canal- 2.96 Km, NE biospheres, mountains, forests 3 Areas used by protected, important No No protected or sensitive area is or sensitive species of flora or fauna located within 15 km radius of the for breeding, nesting, foraging, proposed project. resting, over wintering, migration.

4 Inland, coastal, marine or No None underground waters 5 State, National boundaries No  None

6 Routes or facilities used by the  NH-2, Kanpur Jhansi Highway- 0.2 public for accessto recreation or Km, SE other tourist, pilgrim areas.  NH-25 – 0.60 Km, SE  Aligarh Kanpur Road – 8.68 Km, E Yes  Bithur road – 6.36 Km, NE  Barra Road- 9.26 Km, SE  Panki road- 3 Km, E 7 Defense installations No None 8 Densely populated or built-up area The The project site is located at project Mahavir Nagar (Extension), Kanpur, site is Uttar Pradesh proposed near moderatel y build up area like, Para Village

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 15 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

S. Areas Name/ Aerial distance (within 15 km.) No. Identity Proposed project location boundary 9 Areas occupied by sensitive man- Many hospitals, schools, place of made land uses (hospitals, schools, worships & community facilities are places of worship, community available facilities) Hospitals :  DS Memorial hospital and research centre- 0.68 Km, SE  Brij medical centre pvt ltd.- 2.63 Km, NE Yes  Mahavir Hospital and Trauma centre- 2.8 Km, NE Schools:  Naraina Vidyapeeth Engg. & Mgmt. Institute- 0.20 Km, SE  SSD Education Centre- 1.02 Km, N  MBM Girls Degree College- 5.9 Km, NE  Chandrawati Inter College- 4.30 Km, NE  PSIT- 3.13 Km, SW Places of Worship  Hanuman Temple- 2.2 Km, SE  Masjid- 0.69 Km, E  Maa Kali Mandir- 0.9 Km, NE  Shri Mahakaleshwar Mandir- 0.96 Km, NE  Shankar Mandir- 0.23 Km, SE  Van Devi Mandir - 1.58 Km, SE Nearby Areas:  Bhautikhera- 1.65 Km, SW  Panki- 2.99 Km, NE  Bahera- 1.46 Km, NW  Surar- 2.52 Km, W  Dabauli- 5.9 Km, SE  Bhauti Pratap pur- 2.30 Km, SW

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 16 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

S. Areas Name/ Aerial distance (within 15 km.) No. Identity Proposed project location boundary Roads:  NH-2, Kanpur Jhansi Highway- 0.2 Km, SE  NH-25 – 0.60 Km, SE  Aligarh Kanpur Road – 8.68 Km, E  Bithur road – 6.36 Km, NE  Barra Road- 9.26 Km, SE  Panki road- 3 Km, E  Panki Railway station – 1.86 Km, E Railway Station:  Kalyanpur Railway Station- 5.56 Km, NE  Panki Railway station- 1.86 Km, E  Bhaupur Railway Station- 9.41 Km, SW  Govindpur Railway station- 9.34 Km, E  Railway station- 8.23 Km, NE Parks/Stadium  Ramprakash park- 2.35 Km, E  Jhandewala Park- 3.36 Km, NE  Shubhash Park- 3.56 Km, NE  Kanpur prani udyan- 8.42 Km, NE 10 Areas containing important, high Watercourses- quality or scarce resources  Pandu River- 0.2 Km, SW (Ground water resources, surface Yes  River Ganges- 10.78 Km, NE resources, forestry, agriculture,  Lower Ganga canal- 2.96 Km, NE fisheries, tourism, minerals) 11 Areas already subjected to pollution No There will be no adverse impact or environmental damage. (Those from proposed project. where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No The Study area falls under Zone-III, which could cause the project to accordingly to the Indian Standards present environmental problems Seismic Zone Map. Suitable seismic (Earthquakes, subsidence, coefficients in horizontal and landslides, erosion, flooding or vertical directions respectively will

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 17 Form 1-Mahavir Nagar Yojna, Phase- II under Prime Minister Awasiya Yojna at Mahavir Nagar (Extension), Kanpur, U.P.

S. Areas Name/ Aerial distance (within 15 km.) No. Identity Proposed project location boundary extreme or adverse climatic be adopted while designing the conditions) structures. There are no possibilities of the proposed project site getting flooded as per records available.

(IV) Proposed Terms of Reference for EIA Studies “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 28.07.2018 Place: Lucknow

(Authorized Signatory)

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 18