SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated February 7, 2014 JUNIATA COUNTY – SR 3023(A02) #88588 PROPOSAL:$15.00 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project is as follows: This work is the furnishing and placement of an 16'-0" x 8'-0" precast reinforced concrete box culvert and inlet and outlet sections over Lick Run at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the binder and wearing courses and furnishing and placement of guide rail, all within a length of 200 linear feet (0.038 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3023 SECTION A02, in JUNIATA COUNTY, LACK TOWNSHIP. On STATE ROUTE 3023, from Segment 0060 Offset 0131 to Segment 0050 Offset 2391 which is located approximately 1.6 miles east of the intersection with S.R. 3025 and approximately 1.8 miles west of S.R. 3020. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-26-14. ______ELK COUNTY – SR 4003(A03) #85161 PROPOSAL:$15.00 PLANS:$3.52 12X18:$4.32 24X36:$85.80 The description and location of the project is as follows: This work is the furnishing and placement of a 21'-0" x 18'-0" precast reinforced concrete box culvert and inlet and outlet sections over Silver Creek at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the binder and wearing courses and furnishing and placement of guide rail, all within a length of 303 linear feet (0.057 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 4003 SECTION A03, in ELK COUNTY, RIDGWAY TOWNSHIP. On STATE ROUTE 4003, from Segment 0040 Offset 1686 to Segment 0050 Offset 0188 which is located approximately 1.9 miles east of the intersection with S.R. 0948 and approximately 2.5 miles west of S.R. 0219. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-5-14. ______MCKEAN COUNTY – SR 3002(A01) #85271 PROPOSAL:$14.76 PLANS:$4.84 12X18:$5.94 24X36:$85.80 The description and location of the project is as follows: This work is the furnishing and placement of an 18'-0" x 8'-6" precast reinforced concrete box culvert and inlet and outlet sections over Two Mile Run at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the binder and wearing courses and furnishing and placement of guide rail, all within a length of 369 linear feet (0.070 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3002 SECTION A01, in MCKEAN COUNTY, HAMILTON TOWNSHIP. On STATE ROUTE 3002, from Segment 0070 Offset 1126 to Segment 0070 Offset 0699 which is located approximately 120 feet south of the intersection with S.R. 0006 near the village of Wetmore. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-19-14. ______MIFFLIN COUNTY – SR 2004(A02) #93300 PROPOSAL:$14.04 PLANS:$3.30 12X18:$4.05 24X36:$85.50 The description and location of the project is as follows: This work is the furnishing and placement of an 8-0" x 4'-6" precast reinforced concrete box culvert and inlet and outlet sections over Jacks Creek at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the binder and wearing courses and furnishing and placement of guide rail, all within a length of 335 linear feet (0.063 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 2004 SECTION A02, in MIFFLIN COUNTY, DECATUR TOWNSHIP. On STATE ROUTE 2004, from Segment 0220 Offset 2119 to Segment 0230 Offset 0192 which is located approximately 9.5 miles east of the intersection with S.R. 0322 and approximately 1.8 miles west of S.R. 0522. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-12-14. ______

1 CLEARFIELD COUNTY – SR 729(A06) #85104 PROPOSAL:$13.44 PLANS:$5.28 12X18:$6.48 24X36:$93.60 X-SEC:$1.98 12X18:$2.43 24X36:$35.10 The description and location of the project is as follows: This work is the furnishing and placement of an 8'-0" x 7'- 0" precast reinforced concrete box culvert and inlet and outlet sections over Comfort Run at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the binder and wearing courses and furnishing and placement of guide rail, all within a length of 200 linear feet (0.038 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0729 SECTION A06, in CLEARFIELD COUNTY, JORDAN TOWNSHIP. On STATE ROUTE 0729, from Segment 0200 Offset 1793 to Segment 0210 Offset 0359 which is located approximately 0.7 miles north of the intersection with S.R. 3021 and approximately 0.7 miles south of the intersection with T-419. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 6-17-14. ______

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated February 4, 2014 LUZERNE COUNTY – SR 7208(BRG) #8912 PROPOSAL:$44.04 PLANS:$29.26 12X18:$35.91 24X36:$518.70 X-SEC:$1.98 12X18:$2.43 24X36:$35.10 For the rehabilitation and improvement of a certain section of Two COUNTY ROADS & BRIDGES in LUZERNE COUNTY, DORRANCE TOWNSHP, Commonwealth of , County Road 30 & 29, Macadam Rd & St. John’s Road, SR 7208, SECTION BRG. From a point approximately 2.5 miles West on Creek Road (T-397)/ St. Johns Rd. from the intersection with SR 0307 at Station 4+85.30 to a point approximately 0.2 miles South (on Macadam Road) from the intersection with Creek Road at Station 0+50.00, along County Road 30, Macadam Road. From a point approximately .2 miles West on Creek Road (T-397)/ St. Johns Rd. from the intersection with SR 0307 at Station 18+20.00 to a point approximately 0.2 miles Southwest (on St. Johns Road) from the intersection with Creek Road at Station 13+85.00, along County Road 29, St. Johns Road. The project includes the removal and replacement of two existing County Bridges along two rural local, County Roads 30 & 29 with two Single Span P/S Spread Box Beam bridges over and Wapwallopen Creek. Other work includes excavation, drainage, bituminous paving, full depth pavement bridge approach work, guiderail, Temporary Traffic Control, Bridge removal, Temporary Excavation & Support, E & S Control measures, Seeding and other miscellaneous construction all contained within an overall project length 670.30 linear feet (0.127 mile) as indicated on the approved drawings included in the bid package. DBE 4%, Anticipated Notice to Proceed 5-28- 14, Required Completion 7-24-15. ______DAUPHIN COUNTY – SR 283(012) #91011 PROPOSAL:$20.16 PLANS:$7.70 12X18:$9.45 24X36:$136.50 This project consists of milling and resurfacing I-283 and the ramps of various interchanges associated with I-283. Work consists of milling and placing Superpave WMA wearing and binder courses, concrete pavement patching, guide rail, pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for the following: STATE ROUTE 0283, SECTION 012, and other various state routes in DAUPHIN COUNTY, SWATARA & LOWER SWATARA TOWNSHIPS, from the PA Turnpike (HBG East) Interchange north to the Eisenhower Interchange, for an overall project length of 29,237.00 linear feet (5.53 miles). DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 5-15-15. ______

2

PHILADELPHIA COUNTY – SR 0000 #96249 PROPOSAL:$24.60 PLANS:$2.86 12X18:$3.51 24X36:$50.70 The description and location of the project is as follows: this project includes the installation of traffic signals at the following three (3) intersection locations within the City of Philadelphia; North 16th Street and West Champlost Avenue, Old York Road and West Champlost Avenue, and Nedro Avenue and Old York Road and the upgrade of traffic controllers at the following three (3) intersetions locations within the City of Philadelphia; Limekiln Pike and West Champlost Avenue, Champlost Avenue and North Broad Street, and North Broad street and Nedro Avenue. DBE 6%, Anticipated Notice to Proceed 4-14-14, Required Completion 7-11-14. ______

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 30, 2014 ALLEGHENY COUNTY – SR 0000 #50936 PROPOSAL:$19.32 12X18:$13.86 24X36:$17.01 24X36:$245.70 The description and location of the project is as follows: For the installation of various safety improvements including guide rail, signing, signal upgrades, pavements markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for SAFETY LCSIP 2014, ALLEGHENY, BEAVER, and LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. This project being situated as follows: At various high crash locations in Allegheny, Beaver, and Lawrence Counties. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 1-15-15. ______CAMBRIA COUNTY – SR 56(025) #22657 PROPOSAL:$21.48 PLANS:$14.30 12X18:$17.55 24X36:$253.50 X-SEC:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: This project is for the reconstruction and milling and resurfacing of Strayer Street and milling and resurfacing Fairfield Avenue and Broad Street in the City of Johnstown. Other work involved in this project will be drainage upgrades, signal upgrades, ADA Curb Ramps, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0056, SECTION 025, in CAMBRIA COUNTY, CITY OF JOHNSTOWN at the following locations: SR 0056, Section 025 Station 94+04.00 to Station 119+03.00 Segment 0060, Offset 2389 to Segment 0050, Offset 2962 SR 0056, Section MC2 Segment 0060, Offset 2289 to Segment 0100, Offset 2350 (EB) Segment 0060, Offset 2289 to Segment 0100, Offset 2300 (WB) SR 0403, Section MC2 Segment 0180, Offset 0000 to Segment 0180, Offset 1750. DBE 7%, Anticipated Notice to Proceed 4-28-14, Required Completion 11-26-14. ______

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

3

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 28, 2014 MCKEAN COUNTY – SR 770(A01) #4337 PROPOSAL:$34.44 PLANS:$36.52 12X18:$44.82 24X36:$647.40 X-SEC:$7.26 12X18:$8.91 24X36:$128.70 The description and location of the project is as follows: For the replacement of a structures in MCKEAN COUNTY, BRADFORD TOWNSHIP, Commonwealth of Pennsylvania, SR 0770, SECTIONS A01 and A04. This project being situated as follows: On SR 0770 from Segment 0190/Offset 2033 to Segment 0200/Offset 0728 (A01 portion) and from Segment 0200/Offset 2633 to Segment 0210/Offset 0396 (A04 portion) for a total construction length of approximately 1650 feet ( 0.31 miles). For the replacement of the existing two- span bridge with a single-span comp. P/S concrete PA Bulb-Tee Beam Bridge (A01) (approximate length of 76 feet) and replacement of the existing single-span bridge with a single-span comp. P/S concrete PA Bulb-Tee Beam Bridge (A04) (approximate length of 63 feet) and adjacent approach work. Construction includes Superpave Asphalt Mixture Design for the base, binder, and wearing courses, piping, pavement base drains, guide rail, pavement markings, and miscellaneous construction as indicated on the approved drawings included in the bid package. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 7-8-15. ______

CAMBRIA COUNTY – SR 219(28M) #72241 PROPOSAL: $17.88 PLANS:$10.12 12X18:$12.42 24X36:$179.40 X-SEC:$1.32 12X18:$1.62 24X36:$23.40 The description and location of the project is as follows: This project will consist of pavement preservation and other miscellaneous construction on SR 0219 & SR 0022 in Cambria & Indiana Counties. For SR 0219, Section 28M, the scope of work will consist of milling and overlay, pavement patching, minor drainage upgrades, updating ADA curb ramps and traffic signal upgrades at three locations. For SR 0219, Section 42M, the scope of work will consist of diamond grinding and pavement patching including the Ramps at the Carrolltown Interchange. For SR 0022, Section 23M & 24M, the scope of work will consist of diamond grinding and longitudinal grooving. All work is to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 0219, SECTION 28M in CAMBRIA COUNTY, EAST CARROLL, JACKSON & EAST WHEATFIELD TOWNSHIPS, NORTHERN CAMBRIA BOROUGH. DBE 6%, Anticipated Notice to Proceed 4-14-14, Required Completion 10-10-14. ______

WESTMORELAND COUNTY – SR 217(A20) #76110 PROPOSAL:28.20 PLANS:$18.92 12X18:$23.22 24X36:$335.40 X-SEC:$0.88 12X18:$1.08 24X36:$15.60 EXSTRUCT:$2.20 12X18:$2.70 24X36:$39.00 The scope of work for the SR 0217 Section A20 project will consist of replacing the existing P/S Concrete Adjacent Box Beam superstructure with a P/S Concrete Spread Box Beam superstructure, substructure repairs, bridge approach slabs, minimal approach roadway work and updating the guide rail, pavement marking and signing. The specific components of the existing traffic signal will be upgraded. The specific components will include signal heads, controller, advanced signing, pedestrian push buttons, pavement marking and loop sensors, as indicated on the approved drawings included in the bid package for STATE ROUTE 0217, SECTION A20, in WESTMORELAND COUNTY, DERRY & UNITY TOWNSHIP. The project begins at the SR 30 eastbound/SR 217 intersection (segment 0010/0000) and ends at the SR 30 westbound/SR 217 intersection (segment 0010/0275). The length of the project is 292 feet (0.055 miles). A detour will be utilized during construction. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 11- 21-14. ______

4

LYCOMING COUNTY – SR 2001(009) #6056 PROPOSAL:$48.36 PLANS:$22.44 12X18:$27.54 24X36:$397.80 X-SEC:$6.82 12X18:$8.37 24X36:$120.90 The description and location of the project are as follows: SR 2001 Section 009 is for the removal of the existing bridge, construction of a precast reinforced concrete box culvert or an approved equal over a to Creek, selected borrow excavation rock, subbase, superpave base, binder, and wearing courses, guide rail, pavement markings, and other related work; SR 2004 Section 004 is for the removal of the existing bridge, construction of a precast reinforced concrete box culvert or an approved equal over an unnamed tributary to Spring Creek, selected borrow excavation rock, subbase, superpave base and wearing courses, guide rail, and other related work; SR 2001 Section 002 is for the removal of the existing bridge, construction of a single span composite pre-stressed PA bulb-tee beam bridge or an approved equal over a tributary to Spring Creek, selected borrow excavation rock, subbase, superpave base, binder, and wearing courses, guide rail, pavement markings, and other related work within an combined overall length of 2015.00 linear feet (0.382 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 2001, SECTION 009 from approximately 2.55 miles northeast of the intersection with State Route 2004 at Segment 0090 Offset 2373 to approximately 2.24 miles southwest of the intersection with State Route 15 at Segment 0100 Offset 0806 in BRADY TOWNSHIP; SR 2004 Section 004 from approximately 0.10 miles southeast of the intersection with State Route 2001 at Segment 0042 Offset 0000 to approximately 0.40 miles west of the intersection with T-413 (Ridge Road) at Segment 0042 Offset 0019 in WASHINGTON TOWNSHIP; and SR 2001 Section 002 from approximately 0.51 miles northeast of the intersection with State Route 2004 at Segment 0040 Offset 1693 to approximately 4.73 miles southwest of the intersection with State Route 15 at Segment 0050 Offset 0135 in WASHINGTON TOWNSHIP, all in LYCOMING COUNTY. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-1-15. ______

LEHIGH COUNTY – SR 329(POC) #96083 PROPOSAL:$16.68 PLANS:$1.44 The description and location of the project is as follows: This project involves milling, scratch course, wearing course, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTES 329 and 4003, SECTION POC, in Lehigh COUNTY, North Whitehall, Weisenberg, and Lowhill TOWNSHIPS. For SR 329, from approximately SR 873 at segment 10 offset 0000 to approximately segment 40 offset 1730 and for SR 4003, from approximately SR 3014 at segment 70 offset 0000 to approximately SR 100 at segment 130 offset 0000. DBE 0%, Anticipated Notice to Proceed 4-1-14, Required Completion 5-21-14. ______

ERIE COUNTY – SR 98(B02) #649 PROPOSAL:$23.52 PLANS:$31.24 12X18:$38.34 24X36:$553.80 X-SEC:$6.16 12X18:$7.56 24X36:$109.20 EXSTRUCT:$1.98 12X18:$2.43 24X36:$35.10 For the construction of a certain section of STATE HIGHWAY in ERIE COUNTY, Fairview Township, Commonwealth of Pennsylvania, STATE ROUTE 0098 SECTION B02. This project is situated as follows: From approximately 0.6 miles north of the intersection with SR 0832 (PA 832) at Station 594+50.00 to approximately 1.9 miles south of the intersection with SR 0020 (US 20) at Station 610+00.00. For construction of a 2 span composite prestressed concrete bulb-tee beam bridge with a total span length of 192’, warm mix asphalt approach pavements, drainage improvements, guide rail improvements, highway lighting, signing improvements, pavement markings, and delineation all within a project length of 1350.00 feet (0.256 mile) as indicated on the approved drawings. DBE 8%, Anticipated Notice to Proceed 4-14-14, Required Completion 6-10-16. ______

5

BUTLER COUNTY – SR 19(295) #88991 PROPOSAL:$28.44 PLANS:$23.10 12X18:$28.35 24X36:$409.50 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows: Intersection improvements including adding turning lanes, drainage improvements, signal retiming and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 19, SECTION 295, in Butler COUNTY Cranberry TOWNSHIP from approximately 1479 feet west of the SR 19/SR 3020/SR 228 intersection at segment 0060 offset 0800 to approximately the SR 19/SRF 228/SR 3020 intersection at (SR 3020) segment 0070 offset 0865, SR 228 segments 0010/001 offset 0000/0000 to approximately 874 feet east of the SR 19/SR 3020/SR 228 intersection at segment s0010/0011 offsets 0874/0874. DBE 7%, Anticipated Notice to Proceed 4-14-14, Required Completion 11-18-14. ______

ARMSTRONG COUNTY – SR 68(158) #24009 PROPOSAL:$124.08 PLANS:$62.70 12X18:$76.95 24X36:$1,111.50 X-SEC:$9.24 12X18:$11.34 24X36:$163.80 The description and location of the project is as follows: For the replacement of five structures carrying SR 68 over Hart Run (#2), Sugar Creek (#3, #4, and #5) and Whiskey Run (#6) with minimal approach roadway work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 68, SECTIONS 154, 155, 156, 157, and 158, in Armstrong COUNTY Bradys Bend TOWNSHIP from approximately (#2) 150 feet west of the SR 68/SR 4009 intersection at segment 0070 offset 1162 to approximately 625 feet east of the SR 68/SR 4009 intersection at segment 0070 offset 1937, (#3) 515 feet east of the SR 68/SR 4009 intersection at segment 0070 offset 1812 to approximately 1240 feet east of the SR 68/SR 4009 intersection at segment 0080 offset 0406, (#4) from approximately 2545 feet northeast of the SR 68/SR 4009 intersection at segment 0080 offset 1710 to approximately 3170 feet northeast of the SR 68/SR 4009 intersection at segment 0090 offset 0325, (#5) from approximately 380 feet northeast of the SR 68/T880 Furnace Road intersection at segment 0090 offset 2254 to approximately 1030 feet northeast of the SR 68/T880 Iron Furnace Road intersection at segment 0100 offset 0372, (#6) from approximately 270 feet west of the SR 68/SR 4002 intersection at segment 0100 offset 0346 to approximately 930 feet east of the SR 68/Sr 4002 intersection at segment 0100 offset 1546. DBE 6%, Anticipated Notice to Proceed 4-14-14, Required Completion 10-6-15. ______

ARMSTRONG COUNTY – SR 2011(150) #74200 PROPOSAL:$23.88 PLANS:$15.84 12X18:$19.44 24X36:$280.80 X-SEC:$4.62 12X18:$5.67 24X36:$81.90 The description and location of the project is as follows: For the replacement of the existing structure carrying SR 2011 over Garretts Run with a 1-sp composite steel multi-girder bridge and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2011, SECTION 150, in Armstrong County, Marion TOWNSHIP from approximately 250' north of the Manorville Borough line at Segment 0040 Offset 2736 to approximately .9 miles south of the SR 2011(Hill Street)/SR 0066 (South Water Street) intersection at Segment 0050 Offset 1009. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 11-14-14. ______

6

LACKAWANNA COUNTY – SR 6(0) #91209 PROPOSAL:$23.88 PLANS:$7.20 This project is for the resurfacing of approximately 6.66 miles of existing bituminous roadway on the following STATE ROUTES: (S.R. 0307 Segment 247 Offset to Segment 250 Offset 1400, S.R. 3011 Segment 0170 Offset 0800 to Segment 0170 Offset 1835, S.R. 3013 Segment 0060 Offset 2103 to Segment 0140 Offset 2225, S.R. 4026 Segment 0170 Offset 0800 to Segment 0170 Offset 1835, S.R 6307 Segment 0230 Offset 0000 to Segment 0241 Offset 1584S.R. Segment 0010 Offset 0000 to Segment 0030 Offset 2252 in LACKAWANNA COUNTY in VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix design Asphalt Wearing and Scratch Courses, Milling, Base Repair, ADA (Design-Build) Rehabilitation, Line Painting and Pavement Markings. DBE 0%, Anticipated Notice to Proceed 4- 14-14, Required Completion 10-2-15. ______

LUZERNE COUNTY – SR 11(0) #91213 PROPOSAL:$26.04 PLANS:$7.56 This project is for the resurfacing of approximately 22.7 miles of existing bituminous roadway on the following STATE ROUTES: (S.R. 0011 Segment 0731 Offset 0000 to Segment 0730 Offset 0267, S.R. 0029 Segment 0320 Offset 0000 to Segment 0450 Offset 3223, S.R. 0940 Segment 0270 Offset 0987 to Segment 0310 Offset 0679, S.R. 2001 Segment 0010 Offset 0000 to Segment 0040 Offset 2253, S.R. 2002 Segment 0010 Offset 0000 to Segment 0020 Offset 3807,S.R. 2004 Segment 0010 Offset 0000 to Segment 0020 Offset 2086, S.R. 2006 Segment 0010 Offset 0000 to Segment 0060 Offset 3120, S.R. 3001 Segment 0010 Offset 0000 to Segment 0130 Offset 2250 S.R. 3034 Segment 0010 Offset 0000 to Segment 0020 Offset 1712. in LUZERNE COUNTY in VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix design Asphalt Wearing and Scratch Courses, Milling, Base Repair, ADA (Design-Build) Rehabilitation, Line Painting and Pavement Markings. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 10-3-14. ______

SOMERSET COUNTY – SR 7421(842) #88097 PROPOSAL:$22.56 PLANS:$7.48 12X18:$9.18 24X36:$132.60 X-SEC:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project is as follows: This project is for the replacement of three existing 10'-8" (span) x 6'-11 (rise) corrugated metal pipes carrying Witt Hill Road over the North Branch of Jennings Run. These pipes will be replaced with a 24'-0" x 9'-6" Precast Concrete Box Culvert and includes minor roadway approach work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 7421, SECTION 842, in SOMERSET COUNTY, WELLERSBURG BOROUGH located approximately 0.5 miles south of Wellersburg. DBE 9%, Anticipated Notice to Proceed 5-27-14, Required Completion 9-18-14. ______

7

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 24, 2014 SNYDER COUNTY – SR 2006(012) #88012 PROPOSAL:$11.16 PLANS:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows: furnish and install a 8'-0" X 5'-6" precast reinforced concrete box culvert over unnamed tributary to , inlet and outlet sections, and other miscellaneous construction at a Department-prepared site, as indicated on the approved drawings included in the bid package for STATE ROUTE 2006, SECTION 012, in SNYDER COUNTY, PERRY TOWNSHIP from approximately 0.2 miles east of the intersection with SR 104 at segment 0010 offset 1158 to approximately 2.0 miles west of the intersection with SR 2003 at segment 0010 offset 1815. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 7-18-14. ______

MERCER COUNTY – SR 2002(B02) #1821 PROPOSAL:$23.52 PLANS:$13.20 12X18:$16.20 24X36:$234.00 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 For the construction of a certain sections of STATE HIGHWAYS in MERCER COUNTY, SPRINGFIELD TOWNSHIP; Commonwealth of Pennsylvania; STATE ROUTE 2002, SECTION B02 AND STATE ROUTE 2004, SECTION B01 . This project situated as follows: SR. 2002-B02 - From approximately 0.13 mile south of the intersection with SR. 208 at Segment 0090 Offset 1775 (Station 275+00.00) then south to approximately 0.39 mile north of the intersection with SR. 0019 at Segment 0090 Offset 2375 (Station 281+00.00). SR. 2004-B01 - From approximately 0.81 feet west of the intersection with SR. 0019 at Segment 0020 Offset 1009 (Station 42+75.00) then east to approximately 2.4 miles west of the intersection with SR. 0258 at Segment 0020 Offset 1409 (Station 46+75.00). For the construction of a One Span Prestressed Concrete Spread Box Beam Bridge over Hunter Run having an overall span length of 80.0' and structure rehabilitation of a Single Span Adjacent Box Beam Bridge over Mill Run having an overall span length of 47-0'; Also for construction of new roadway approaches using Superpave Asphalt Warm Mixture Designs, concrete bridge approach slabs, bituminous and concrete milling, drainage, guiderail, signs, and pavement markings all within a project length of 600.00 feet (0.113 mile) as indicated on the approved drawings. DBE 8%, Anticipated Notice to Proceed 4-14-14, Required Completion 7-17- 14. ______

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 21, 2014 WASHINGTON COUNTY – SR 22(05M) #96122 PROPOSAL:$32.64 PLANS:$9.02 12x18:$11.07 24x36:$159.90 EXSTRUCT:$1.54 12X18:$1.89 24X36:$27.30 The description and location of the project is as follows: Installing a new concrete invert, cleaning, and painting, in 8 large diameter metal culverts and other miscellaneous construction, as indicated on the approved drawings included in the bid package for 8 STRUCTURES ON STATE ROUTE 22, SECTION 05M and VARIOUS OTHER ROUTES, in WASHINGTON COUNTY. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 10-31-14. ______

8

GREENE COUNTY – SR 88(08R) #82512 PROPOSAL:$15.00 PLANS:$11.44 12X18:$14.04 24X36:$202.80 The description and location of the project is as follows: base repair, milling, resurfacing, guide rail, minor drainage improvements, delineation, signing a 2 lane roadway and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0088,SECTION 08R in GREENE COUNTY DUNKARD and MONONGAHELA TOWNSHIPS from the Point Marion bridge at segment 0008 offset 0704, to approximately 900’ north of the intersection of S.R. 0088 & Rosedale St. (TWP Rd 402) at segment 0080 offset 1452. DBE 7%, Anticipated Notice to Proceed 4-14-14, Required Completion 8-22-14. ______

SUPPLEMENTAL ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 17, 2014 TIOGA COUNTY – SR 6(M27) #82984 PROPOSAL:$25.44 PLANS:$2.86 12X18:$3.51 24X36:$50.70 The description and location of the project are as follows: This work is the resurfacing including Superpave Asphalt Mixture (HMA)/Warm Mix Asphalt (WMA) scratch and wearing courses, milling, base repairs, ADA curb ramps, pavement markings, and other miscellaneous construction all within a length of 5,049.00 linear feet (0.96 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 6, SECTION M27 in WELLSBORO BOROUGH, TIOGA COUNTY from approximately 0.12 miles southwest of the intersection with State Route 4002 at Segment 0490 Offset 0643 to approximately 0.56 miles west of the intersection with State Route 3011 at Segment 0540 Offset 1062. DBE 1%, Anticipated Notice to Proceed 4-14-14, Required Completion 9-19-14. ______

LANCASTER COUNTY – SR 1051(003) #87710 PROPOSAL:$26.88 PLANS:$4.84 12X18:$5.94 24X36:$85.80 EXSTRUCT:$1.98 12X18:$2.43 24X36:$35.10 This is a Design Build Project which includes the rehabilitation of two structures, SR 1018 Rothsville Road Bridge over in Warwick and Ephrata Townships and SR 1051 Main Street Bridge over Little Cocalico Creek in Denver Borough. This project involves Design & Construction of Final Roadway Plans, Structure Plans, Maintenance & Protection of Traffic Plans, Temporary Signal Plans, Utility Relocation Plans & Utility Coordination, obtaining Department of Environmental Protection waterway & environmental permits, and development of Right of Way Plans & acquisition of necessary Right of Way. Conceptual drawings are included in the Bid Package for STATE ROUTE 1051, SECTION 003 in LANCASTER COUNTY, DENVER BOROUGH and EAST COCALICO TOWNSHIP, from Segment 0150 Offset 0127 to Segment 0150 Offset 0622, a length of 395.00 linear feet (0.075 mile), and for STATE ROUTE 1018, SECTION 005, in LANCASTER COUNTY, WARWICK & EPHRATA TOWNSHIPS, from Segment 0020 Offset 2180 to Segment 0030 Offset 0512, a length of 655.00 linear feet (0.124 mile). Overall project length is 1,050.00 linear feet (0.199 mile). DBE 7%, Anticipated Notice to Proceed 4-14-14, Required Completion 10-22-15. ______

9

ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 14, 2014 MONTOUR COUNTY – SR 1011(014) #6396 PROPOSAL:$12.72 PLANS:$4.18 12X18:$5.13 24X36:$74.10 The description and location of the project is as follows: Furnish and install a 24'-0" X 8'-0" precast reinforced concrete box culvert over West Branch of Chillisquaque Creek, inlet and outlet sections, and other miscellaneous construction at a Department-prepared site, as indicated on the approved drawings included in the bid package for STATE ROUTE 1011, SECTION 014, in MONTOUR COUNTY, ANTHONY TOWNSHIP from approximately 2.2 miles north of the intersection with SR 44 at segment 0040 offset 3667 to approximately 1.0 mile south of the Montour-Lycoming County line at segment 0050 offset 0274. DBE 0%, Anticipated Notice to Proceed 4-28-14, Required Completion 7-18-14. ______

ECMS ADVANCED INFORMATION – FEBRUARY 27, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Updated January 13, 2014 BRADFORD COUNTY – SR 409(002) #5248 PROPOSAL:$15.60 PLANS:$8.36 12X18:$10.26 24X36:$148.20 The description and location of the project is as follows: Furnish and install a 19'-0" X 5'-6" precast reinforced concrete box culvert over Billings Creek, inlet and outlet sections, and other miscellaneous construction at a Department-prepared site, as indicated on the approved drawings included in the bid package for STATE ROUTE 409, SECTION 002, in BRADFORD COUNTY, WYALUSING TOWNSHIP from approximately 3.8 miles east of the intersection with SR 6 at segment 0080 offset 0384 to approximately 0.1 miles west of the intersection with SR 706 at segment 0080 offset 0814. Also, furnish and install a 24'-0" X 8'-6" precast reinforced concrete box culvert over Parks Creek, inlet and outlet sections, and other miscellaneous construction at a Department-prepared site, as indicated on the approved drawings included in the bid package for STATE ROUTE 1055, SECTION 006, in BRADFORD COUNTY, ROME TOWNSHIP from approximately 3.1 miles north of the intersection with SR 187 at segment 0070 offset 0669 to approximately 4.1 miles south of the intersection with SR 1056 at segment 0070 offset 1172. DBE 0%, Anticipated Notice to Proceed 4-14-14, Required Completion 9-19-14. ______

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

10