Planning Report

Total Page:16

File Type:pdf, Size:1020Kb

Planning Report PLANNING REPORT Development Application for Material Change of Use – Jazz Music School SEPTEMBER 2018 162 ABBOTSFORD RD, BOWEN HILLS T 07 3857 3511 E [email protected] A 42 Bridge Rd, Albion QLD 4010 W www.developthis.com.au 162 Abbotsford Road, Bowen Hills Contents Introduction ........................................................................................................................ 2 Subject Property Details ..................................................................................................... 4 Application Details .............................................................................................................. 4 Site Characteristics .............................................................................................................. 5 Elements of the Application ................................................................................................ 5 SARA Mapping Triggers ....................................................................................................... 9 Supporting Documentation ........................................................................................... 11 Proposal ............................................................................................................................ 12 Proposed Use Definition ................................................................................................ 13 Key issues .......................................................................................................................... 13 Existing Lawful Use ........................................................................................................ 18 Type of Application ........................................................................................................ 21 Bowen Hills Urban Development Area Development Scheme ..................................... 21 Conclusion ......................................................................................................................... 28 Attachment A .................................................................................................................... 29 Photography .................................................................................................................. 29 Attachment B .................................................................................................................... 33 Additional Info and General Searches ........................................................................... 33 1 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Introduction This Town Planning Report is an application for a Material Change of Use - Educational Establishment (Jazz School) at 162 Abbotsford Rd, Bowen Hills (Lot 62 on RP9371). The proposal relates to Jazz In Time Pty Ltd trading as Jazz Music Institute (JMI) using the premises as an Educational Establishment as per the attached proposal plan by Ian J Moore, Architect. It is understood that the previous use on the site related to light industry; delivery depot, showroom, warehousing and product distribution. Prima Connection conducted a showroom at the site and marketed corporate promotion products. Figure 1 - Site Photo (Location in yellow box) 2 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Figure 2 - Site map The proposal is considered generally in accordance with the Bowen Hills Development Area Development Scheme (see extract below) and it is therefore requested that the proposal be approved in accordance with the proposal plans. 3 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Subject Property Details Address Area 162 Abbotsford Rd, Bowen Hills, Qld 4006 428m2 Real Property Description Area Classification Lot 62 on RP9371 Bowen Hills Urban Development Area (UDA), now Priority Development Area (PDA). Precinct Precinct 9 – Breakfast Creek Precinct Zone Medium impact employment zone Owners’ Names Ward Jazz in Time Pty Ltd Central Application Details Aspects of Development Material Change of Use – Development Permit Applicant Jazz in Time Pty Ltd c/o Matt Doolan Town Planner Contact Person Matt Doolan, Town Planner. Background/History Subject site Prima Connection conducted a delivery depot and showroom at the site and marketed corporate promotion products. A Council Certificate of Classification, attached, dated 22.4.83 indicates that the use was certified as Class VII (Delivery Depot). Under the City Plan 2014, the site was located in the Industry Investigation Zone. Jazz Music Institute (JMI) JMI has operated from its current site at 47 Brookes Street, Bowen Hills for many years. In September 2014 EDQ issued a Development Approval DEV2009/016. This permitted the 4 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills expansion of the existing operation. This existing site is now subject to redevelopment which has prompted the need for the relocation to the subject site. Site Characteristics Location The site is located within the Bowen Hills Urban Development Area (UDA), now designated a Priority Development Area (PDA), administered by Economic Development Queensland (EDQ). The site is located in a predominantly light industrial area. Road frontages The site has a frontage to Abbotsford Road. Current use of site The site is under contract and it is understood that Prima Connection have ceased operations. Existing vegetation No vegetation is to be removed as part of this proposal. Surrounding land Uses The site is adjoined by industrial buildings on both sides. The site backs on to the railway line. Elements of the Application Level of Assessment UDA (PDA) Assessable – Permissible Development Public Notification Given the small scale of the proposal it is expected that no public notification will apply to this application. 5 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Figure 3 – Extract from Land Use Plan Local Plan Area – City Plan The site is included in the Bowen Hills Neighbourhood Plan. The local plan requirements are supplanted by UDA requirements as described in the following extracts: Figure 4 - EDQ Extract showing relationship to other planning schemes Neighbourhood Plan Code • Bowen Hills Neighbourhood Plan Code, but not applicable (as above). Overlay Codes - City Plan • Streetscape Hierarchy • Critical Infrastructure and Movement Network • Airport Environs 6 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills • Bicycle Network • Coastal Hazard • Community Purposes • Flood • Industry Amenity • Potential and Actual Acid Sulfate Soils • Transport Noise Corridor • Transport Air Quality • Road Hierarchy • Community Purposes Network • Priority Infrastructure Area (City Plan 2014) The proposal is generally compliant with these Codes. However, they are not applicable as mentioned above. Flood issues are addressed below in this report. SARA mapping • The following SARA mapping triggers fall within the SEQ Regional Plan: 7 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills 8 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Figure 5 - State Assessment and Referral Agency (SARA) Mapping SARA Mapping Triggers Urban Footprint The South East Regional Plan 2017 (ShapingSEQ) defines a strategic approach to planning and development. Under the Plan the Urban Footprint identifies land suited to urban development. 9 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills The plan lists principles considered in defining the urban footprint. However, the proposal relating to an existing site development within the Urban Footprint is not inconsistent with principles of the Urban Footprint. Coastal Protection The Strategic outcome of the Coastal Environment Planning Policy (April 2016) is to facilitate the protection of coastal processes and coastal resources. The proposal to utilize an existing building in an established development area will not adversely impact on this outcome. Water Resources The property falls within the Water Resource Planning Area. No significant additional impacts are likely in this regard. Biodiversity The State Planning Policy, Biodiversity (April 2016) has been reviewed and the proposal will not have any significant detrimental effect on plant communities. Vegetation will not be affected by the proposal. 10 Matt Doolan Town Planner – Old Albion Fire Station, 42 Bridge Street, Albion 4010 Phone 38573511 162 Abbotsford Road, Bowen Hills Transport Infrastructure The State Transport Infrastructure Policy (April 2016) encourages land use patterns that support sustainable transport. SARA mapping indicates that the subject property is in a future railway corridor. In particular Policy 4 is noted; Policy 4 Protecting state transport infrastructure and existing and future state transport corridors and networks from development that may adversely affect the safety and efficiency of the infrastructure, corridors and networks
Recommended publications
  • Brisbane Native Plants by Suburb
    INDEX - BRISBANE SUBURBS SPECIES LIST Acacia Ridge. ...........15 Chelmer ...................14 Hamilton. .................10 Mayne. .................25 Pullenvale............... 22 Toowong ....................46 Albion .......................25 Chermside West .11 Hawthorne................. 7 McDowall. ..............6 Torwood .....................47 Alderley ....................45 Clayfield ..................14 Heathwood.... 34. Meeandah.............. 2 Queensport ............32 Trinder Park ...............32 Algester.................... 15 Coopers Plains........32 Hemmant. .................32 Merthyr .................7 Annerley ...................32 Coorparoo ................3 Hendra. .................10 Middle Park .........19 Rainworth. ..............47 Underwood. ................41 Anstead ....................17 Corinda. ..................14 Herston ....................5 Milton ...................46 Ransome. ................32 Upper Brookfield .......23 Archerfield ...............32 Highgate Hill. ........43 Mitchelton ...........45 Red Hill.................... 43 Upper Mt gravatt. .......15 Ascot. .......................36 Darra .......................33 Hill End ..................45 Moggill. .................20 Richlands ................34 Ashgrove. ................26 Deagon ....................2 Holland Park........... 3 Moorooka. ............32 River Hills................ 19 Virginia ........................31 Aspley ......................31 Doboy ......................2 Morningside. .........3 Robertson ................42 Auchenflower
    [Show full text]
  • Cultural Heritage
    Airport Link Phase 2 – Detailed Feasibility Study CHAPTER 13 CULTURAL HERITAGE October 2006 Contents 13. Cultural Heritage 13-1 13.1 Approach 13-1 13.2 Description of Existing Environment − Non-Indigenous Cultural Heritage 13-1 13.2.1 Historical context. 13-1 13.2.2 Archaeological context. 13-3 13.2.3 Current Heritage Listings 13-4 13.2.4 Sites and Places recognised as Local Heritage 13-6 13.2.5 Unregistered Sites and Places 13-10 13.2.6 Heritage Precincts 13-10 13.3 Potential Impacts and Mitigation Measures for Non-Indigenous Heritage 13-10 13.3.1 Nature of Impact 13-10 13.3.2 Sites Directly Impacted by the Proposal 13-11 13.3.3 Areas of Potential Impact 13-12 13.3.4 Opportunities 13-14 13.3.5 Mitigation and Monitoring Studies 13-15 13.4 Indigenous Heritage Assessment 13-17 13.4.1 Description of Existing Heritage Environment 13-17 13.4.2 Turrbal Philosophy and Approach 13-18 13.4.3 Jagera Philosophy and Approach 13-18 13.4.4 Risks and Mitigation Measures 13-18 13.5 Conclusions 13-20 PAGE i 13. Cultural Heritage This chapter addresses Section 5.9 or the Terms of Reference. It describes the existing values for Aboriginal and non-indigenous cultural heritage areas and objects that may be affected by the Project activities. A Cultural Heritage Report was undertaken by ARCHAEO Cultural Heritage Services, and the report is provided in full as Technical Paper No. 10a – Cultural Heritage in Volume 3 of the EIS.
    [Show full text]
  • Data, Rating Curve and Historical Flood
    Brisbane River Catchment Flood Study – 15 May 2015 Comprehensive Hydrologic Assessment Revision: 2 Data, Rating Curve and Historical Flood Reference: 238021 Review Report Prepared for the State of Queensland (acting through): Department of State Development, Infrastructure and Planning/Department of Natural Resources and Mines Document control record Document prepared by: Aurecon Australasia Pty Ltd ABN 54 005 139 873 Level 14, 32 Turbot Street Brisbane QLD 4000 Locked Bag 331 Brisbane QLD 4001 Australia T +61 7 3173 8000 F +61 7 3173 8001 E [email protected] W aurecongroup.com A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon. Document control Report title Data, Rating Curve and Historical Flood Review Report Document ID 238021-0000-REP-WW-0001 Project number 238021 File path 238021-0000-REP-WW-0001_Data Rating Curve and Historical Flood Review.docx Client Prepared for the State of Queensland (acting through): Client Pushpa Department of State Development, Infrastructure and contact Onta Planning/Department of Natural Resources and Mines (DNRM) Rev Date Revision details/status Prepared Author Verifier Approver by A 7 November 2013 Draft for Review C Smyth L Toombes R Ayre B 23 December 2013 Revised Draft for Review C Smyth L Toombes T Campbell R Ayre 0 14 March 2014 Revised Draft for Review C Smyth
    [Show full text]
  • Gold Creek Dam and Its Unusual Waste Waterway (1890-1997) : Design, Operation, Maintenance." Can
    CHANSON, H., and WHITMORE, R.L. (1998). "Gold Creek Dam and its Unusual Waste Waterway (1890-1997) : Design, Operation, Maintenance." Can. Jl of Civil Eng., Vol. 25, No. 4, Aug., pp. 755-768 & Front Cover (ISSN 0315- 1468). Gold Creek Dam and its Unusual Waste Waterway (1890-1997) : Design, Operation, Maintenance Hubert Chanson Senior Lecturer, Department of Civil Engineering, and R.L. Whitmore Emeritus Professor, The University of Queensland, Brisbane QLD 4072, Australia. Fax : (61 7) 33 65 45 99 Email : [email protected] Abstract : Completed in 1885, the Gold Creek dam is an earthen dam located on the outskirts of Brisbane, Australia. The spillway system was refurbished three times, each time to increase the maximum overflow capacity. In 1890, a concrete stepped waterway was built to replace the damaged unlined-rock channel. This staircase chute is an unique structure : it is the first large man-made waste waterway built in Queensland, it is the only stepped weir built in Queensland before 1900, and it is, so far as the writers are aware, the first concrete-stepped spillway built for a large dam. The characteristics of the dam and its unusual stepped spillway are reviewed in a historical context. The design is compared with contemporary structures and present knowledge in stepped spillway design. The authors believe that the Queensland engineers gained expertise from overseas and within Australia for the stepped spillway design. However the selection of concrete for the step construction was made by the local engineers and the reasons behind the decision are not yet understood.
    [Show full text]
  • Surface Water Quality
    Airport Link Phase 2 – Detailed Feasibility Study CHAPTER 8 SURFACE WATER QUALITY October 2006 Contents 8. Surface Water Quality 8-1 8.1 Description of Existing Environment 8-1 8.1.1 Description of Waterways 8-1 8.1.2 Environmental Values and Water Quality Objectives 8-3 8.1.3 Water Quality Monitoring Programs 8-6 8.1.4 Water Quality Assessment 8-7 8.2 Potential Impacts and Mitigation Measures 8-11 8.2.1 Potential Impacts 8-11 8.2.2 Mitigation Measures 8-13 8.3 Conclusions 8-15 PAGE i 8. Surface Water Quality This Chapter addresses surface water aspects of Section 5.3 of the Terms of Reference; groundwater management were addressed separately in Chapter 6. A detailed technical paper on surface water quality is provided as Technical Paper No 4 – Surface Water Quality in Volume 3 of the EIS. Watercourses in and adjacent to the study corridor are described in the context of their catchment areas. The quality of water in these waterways is assessed from past or existing monitoring programs. Potential impacts on the Environmental Values of the waterways are assessed and Water Quality Objectives are defined in line with existing local, state and national guidelines. Mitigation measures and/or management strategies are defined for identified potential negative impacts. 8.1 Description of Existing Environment 8.1.1 Description of Waterways The waterways intersecting the study corridor that could be affected by the construction and/or operation of the project and their catchments are shown in Figure 8-1. These are: Enoggera Creek; and Kedron Brook.
    [Show full text]
  • Surface Water Quality
    Airport Link SURFACE WATER TECHNICAL REPORT NO 4 October 2006 Contents 1. Executive Summary 1-1 2. Existing Environment 2-2 2.1 Waterway Descriptions 2-3 2.1.1 Enoggera Creek/Breakfast Creek 2-3 2.1.2 Kedron Brook 2-3 2.2 Regulatory Framework 2-4 2.2.1 Environmental Protection (Water) Policy 1997 2-4 2.2.2 Water Act 2000 2-4 2.3 Water Quality Guidelines 2-5 2.3.1 ANZECC 2000 2-5 2.3.2 EPP(Water) 2006 2-5 2.3.3 BCC WQO 2000 2-6 2.4 Environmental Values and Water Quality Objectives 2-6 2.5 Water Quality Assessment 2-9 2.5.1 Enoggera Creek 2-11 2.5.2 Kedron Brook 2-12 2.6 Document Review 2-14 2.6.1 Healthy Waterways Partnership EHMP 2-14 2.6.2 City Wide Assessment of Water Quality in Brisbane’s Creeks 2-15 2.6.3 Breakfast/Enoggera Creek Waterway Management Plan 2-15 2.6.4 SEQ Regional Water Quality Management Strategy (Moreton Bay Waterways and Catchments Partnership, 2001) 2-15 2.6.5 Brisbane River Water Resource Plan 2-16 2.6.6 Kedron Brook Waterway Health Assessment 2-16 2.7 Existing Environment Summary 2-17 3. Impacts and Mitigation 3-18 3.1 Enoggera Creek Potential Impacts 3-18 3.1.1 Potential Construction Impacts 3-18 3.1.2 Potential Operational Impacts 3-19 3.2 Kedron Brook Potential Impacts 3-20 3.2.1 Potential Construction Related Impacts 3-20 3.2.2 Potential Operation Related Impacts 3-21 3.3 Summary of Potential Impacts 3-21 3.4 Mitigation Measures 3-22 3.4.1 Design 3-22 3.4.2 Construction 3-23 3.4.3 Construction Water Quality Monitoring Program 3-23 3.4.4 Operation 3-24 4.
    [Show full text]
  • Airport Link
    Airport Link FAUNA AND FLORA TECHNICAL PAPER NO. 7 October 2006 Contents 1. Introduction 1-2 2. Legislative Context 2-3 2.1 Commonwealth Legislation 2-3 2.2 Queensland Legislation 2-3 2.3 Brisbane City Council Local Laws 2-4 3. Methodology 2-4 3.1 Background Data Collection and Review 3-5 3.2 Field Surveys 3-6 3.2.1 Terrestrial Flora and Fauna 3-6 3.2.2 Aquatic Flora and Fauna 3-7 3.2.3 Instream Habitat 3-10 3.2.4 Riparian Vegetation 3-10 3.2.5 Aquatic Fauna 3-10 4. Description of the Existing Environment 4-11 4.1 Study Area 4-11 4.2 Terrestrial Flora 4-12 4.2.1 EPBC Records 4-12 4.2.2 Regional Ecosystems 4-12 4.2.3 Queensland Herbarium Records 4-13 4.2.4 Field Observations 4-13 4.2.5 Significant Trees 4-15 4.3 Terrestrial Fauna 4-15 4.3.1 Birds 4-15 4.3.2 Mammals 4-16 4.3.3 Amphibians 4-16 4.3.4 Reptiles 4-17 4.3.5 Fauna of Conservation Significance 4-17 4.3.6 Regional Connections 4-19 4.3.7 Tree Hollows 4-19 4.3.8 Habitat Values 4-20 4.4 Aquatic Flora 4-21 4.4.1 In-stream Habitat 4-21 4.4.2 Riparian vegetation 4-22 4.5 Aquatic Fauna 4-24 4.5.1 Fish 4-24 4.5.2 Aquatic Invertebrates 4-25 4.5.3 Water Dependent Mammals 4-26 4.5.4 Water Dependent Reptiles 4-26 4.6 Spoil Placement Areas 4-27 4.6.1 Port of Brisbane sites 4-27 4.6.2 Brisbane Airport sites 4-27 PAGE i 4.6.3 Threatened Species 4-27 4.6.4 Listed Migratory Species 4-30 4.6.5 Fire Ants 4-30 5.
    [Show full text]
  • Enoggera Dam Information Sheet for Residents Downstream December 2017
    Enoggera Dam Information sheet for residents downstream December 2017 Introduction that would have occurred had the dam not been built, because some water is held in the dam while it is spilling. This means that water flow This information sheet is for residents living downstream of Enoggera slows down as floods pass through the dam. Dam. It outlines how the dam has been designed and constructed, what Seqwater does to manage the dam, and how the dam performed during the As an un-gated dam, Seqwater has no control over water spilling from heavy rainfall associated with ex-Tropical Cyclone Debbie in March 2017. Enoggera once the dams full supply level is reached. It is not possible to influence the outflow from the dam during a flood event. About Enoggera Dam Seqwater’s primary responsibilities during flood events are to Enoggera Dam is about 10 kilometres west of Brisbane’s CBD, located on monitor the safety of the dam and provide dam outflow information Enoggera Creek. The catchment of Enoggera Creek extends west from the to the relevant emergency agencies as required. Such agencies will valleys in the D’Aguilar Mountains. generally be the Bureau of Meteorology and the local council responsible for the area impacted by the dam outflow. For Enoggera Dam, this is Built in 1866, Enoggera is the oldest dam in Brisbane. It was the third Brisbane City Council. largest dam built in Australia in the 1800s and was one of the three dams constructed to store water for Brisbane’s growing population from 1864 to Dam safety 1916.
    [Show full text]
  • Changes in the Freshwater Environments of the Australian Lungfish, Neoceratodus Forsteri, in South-East Queensland, and Implications for the Survival of the Species
    CHANGES IN THE FRESHWATER ENVIRONMENTS OF THE AUSTRALIAN LUNGFISH, NEOCERATODUS FORSTERI, IN SOUTH-EAST QUEENSLAND, AND IMPLICATIONS FOR THE SURVIVAL OF THE SPECIES K E M P, A. 1 This paper assembles evidence collected over several decades to conclude that populations of the Australian lungfish in south-east Queensland are not reproducing sufficiently to guarantee survival of the species in the region. The environment of the Australian lungfish Neoceratodus( forsteri) has been altered over the past 50 years. Biodiversity of plants and animals has been lost. Water impoundments without effective fish transfer devices have been built over rivers. Submerged aquatic plants used by lungfish as spawning sites and refuges for the young have been significantly reduced in numbers, and food animals are absent or much less common. Lungfish used to spawn in a number of habitats in rivers and lakes in natural and translocated environments in south-east Queensland, in response to increasing photoperiod in spring. Oviposition events were cyclical, rising from low levels to a peak in successive years and then falling again. High levels of recruitment have, in the past, followed high levels of spawning activity, but recruitment depends on other factors as well. It should be noted that, while the sole trigger for spawning is photoperiod, many factors influence recruitment, such as food availability, refuges for young fish and the effects of predation, as well as the amount and type of food gathered by adult lungfish prior to the spawning season, and whether adults have been able to supply the eggs with appropriate nutrients. Spawning, and the survival of young, are now affected by environmental degradation, with extensive loss of biodiversity in freshwater environments where lungfish live.
    [Show full text]
  • Cultural Heritage Report
    CULTURAL HERITAGE REPORT for the proposed Airport Link Study Area Southeast Queensland for Report commissioned by SKM/ CONNELL WAGNER Joint Venture Partners For Brisbane City Council MAY 2006 This assessment was undertaken by ARCHAEO Cultural Heritage Services Pty. Ltd., the Centre for Applied History and Heritage Studies, University of Queensland, and John Hoysted (heritage architect), ERM Australia. Contact details are: ARCHAEO Cultural Heritage Services 369 Waterworks Road, Ashgrove, Brisbane PO Box 333, The Gap, Brisbane, 4061 Tel: 3366 8488 Fax: 3366 0255 CONTENTS Executive Summary 1 Introduction 1 1.1 Scope of Study 2 2 Approach to Study 4 2.1 Determining Cultural Heritage Significance 5 2.1.1 Historical Heritage Significance 5 2.1.2 Significant Aboriginal Cultural Heritage 7 2.2 Legislation Applicable to Cultural Heritage 8 2.2.1 National Legislation 8 2.2.2 State Legislation 9 2.3 Nature of Cultural Heritage 9 2.3.1 Historical Heritage Sites and Places 10 2.3.2 Known Aboriginal Areas 11 2.3.3 Archaeological Sites 11 3 The Physical and Cultural Landscape 12 4 Aboriginal Cultural Heritage 15 4.1 The Archaeological Record 15 4.2 Historical Accounts of Aboriginal Life 17 4.3 History of Contact Between Indigenous and Non-Indigenous Cultures 24 4.4 Conclusions 26 5 Historical Heritage 27 5.1 Suburb Histories 27 5.1.1 Windsor 27 5.1.2 Lutwyche 38 5.1.3 Wooloowin and Kalinga 43 5.2 Previous Consultancy Reports 47 5.2.1 Study Area Corridor 47 5.2.2 Study area 2 – Possible Spoil Placement Sites 49 5.3 Conclusions 51 6 Results of Heritage Research 53 6.1 Historical Heritage Sites and Places of Known Significance 53 6.1.1 Former Windsor Shire Council Chambers 56 6.1.2 Windsor State School Campus 56 6.1.3 Windsor War Memorial Park 57 6.1.4 Kirkston 57 6.1.5 Oakwal 58 6.1.6 Boothville or Monte Video 58 6.1.7 Craigellachie 59 6.1.8 BCC Tramways Substation No.
    [Show full text]
  • August 2019.Indd
    Wilston House story p 18 JOURNAL Windsor & Districts’ Historical Society Inc. servicing the old Windsor Town Council areas of Albion, Alderley, Bowen Bridge, Eagle Junction*, Eildon, Grange, Kalinga, Kedron*, Lutwyche, Maida Hill, Newmarket*, Wilston, Wooloowin and now extended to cover Gordon Park and Herston. *part of this suburb. VOLUME 31 No. 3 - AUGUST 2019 AUGUST - 3 No. 31 VOLUME Photo by David Teague Wilston House Newspaper clippings from 1928. Tommy Tristram, Ginger Beer Brewer, Hope Street, South Brisbane, may almost be considered an Australian, as he landed with his parents when very young in Mel- Ceramic bourne. After travelling through the ginger beer different colonies he settled in Bris- bottle bearing bane in 1861, and in 1864 entered Tommy the employ of Messrs. Gardner and Tristram’s Keid, with whom he remained ten imprint. years. Other He then started business Tristram’s on his own account, and conducted bottles are it for two years, when being offered in our a substantial share of the profits, he collection opened a branch for Mr Gardner in Hope Street, into which he merged at the his own business. After managing Chambers. this concern for nearly nine years, he again started business on his own account and has succeeded in working up a large connection. All drinks manufactured in this estab- lishment are first class. His mission revival style factory at West End was opened in 1928. It is now called The Markets. PAGE TWO - Windsor & Districts Historical Society Inc. JOURNAL - AUGUST 2019 NEXT MEETING 4 p.m. Sun. 18 August The guest speaker for the WDHS general meeting on Sun- day 18 August next will be: MATTHEW WENGERT.
    [Show full text]
  • Brisbane River Estuary Environmental Values and Water Quality Objectives Basin No
    Environmental Protection (Water) Policy 2009 Brisbane River Estuary environmental values and water quality objectives Basin No. 143 (part), including all creeks of the Brisbane River estuary, other than Oxley Creek July 2010 Prepared by: Water Quality & Ecosystem Health Policy Unit Department of Environment and Resource Management © State of Queensland (Department of Environment and Resource Management) 2010 The Department of Environment and Resource Management authorises the reproduction of textual material, whole or part, in any form, provided appropriate acknowledgement is given. This publication is available in alternative formats (including large print and audiotape) on request. Contact (07) 322 48412 or email <[email protected]> July 2010 Document Ref Number Main parts of this document and what they contain • Scope of waters covered Introduction • Key terms / how to use document (section 1) • Links to WQ plan (map) • Mapping / water type information • Further contact details • Amendment provisions • Source of EVs for this document Environmental Values • Table of EVs by waterway (EVs - section 2) - aquatic ecosystem - human use • Any applicable management goals to support EVs • How to establish WQOs to protect Water Quality Objectives all selected EVs (WQOs - section 3) • WQOs in this document, for - aquatic ecosystem EV - human use EVs • List of plans, reports etc containing Ways to improve management actions relevant to the water quality waterways in this area (section 4) • Definitions of key terms including an Dictionary explanation table of all (section 5) environmental values • An accompanying map that shows Accompanying WQ Plan water types, levels of protection and (map) other information contained in this document iii CONTENTS 1 INTRODUCTION ............................................................................................................................
    [Show full text]