AQUIND Limited AQUIND INTERCONNECTOR Environmental Statement – Volume 3 – Appendix 29.2 Collated Onshore Long and Short List of Developments

The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 – Regulation 5(2)(a)

The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

Document Ref: 6.3.29.2 PINS Ref.: EN020022

AQUIND Limited

AQUIND Limited AQUIND INTERCONNECTOR Environmental Statement – Volume 3 – Appendix 29.2 Collated Onshore Long and Short List of Developments

PINS REF.: EN020022 DOCUMENT: 6.3.29.2

DATE: 14 NOVEMBER 2019

WSP WSP House 70 Chancery Lane London WC2A 1AF +44 20 7314 5000 www.wsp.com

AQUIND Limited

DOCUMENT

Document 6.3.29.2 Environmental Statement – Volume 3 – Appendix 29.2 Collated Onshore Long and Short List of Developments

Revision 001

Document Owner WSP UK Limited

Prepared By S. Rice

Date 11 November 2019

Approved By U. Stevenson

Date 11 November 2019

AQUIND INTERCONNECTOR PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Onshore Long and Short List if Developments November 2019 AQUIND Limited

CONTENTS

APPENDIX 29.2 COLLATED ONSHORE LONG AND SHORT LIST OF DEVELOPMENTS 1

TABLES

Table 1 - Onshore Long List of Developments 1

AQUIND INTERCONNECTOR PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Onshore Long and Short List if Developments November 2019 AQUIND Limited

APPENDIX 29.2 COLLATED ONSHORE LONG

AND SHORT LIST OF DEVELOPMENTS

Table 1 below outlines the Onshore Long List of Developments considered in the cumulative effects assessment. Table 1 – Onshore Long List of Developments

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

1 Land rear of 185-189A Outline application with some matters 0.69 km to east of Granted Outline Tier Lovedean Lane, reserved for 40 residential dwellings (mix of the Order Limits 1 (15/09/2014) , Waterlooville 1, 2, 3, and 4 bed) with associated amenity space and road network with access from (54596/001) Lovedean Lane via existing access

2 Land rear of, 179-189A Reserved matters application pursuant to 0.69 km to east of Granted Reserved Tier Lovedean Lane, 54596/001 for dwellings and discharge of the Order Limits Matters 1 Horndean, Waterlooville condition 7 of 54596/001 as revised by plans and details received on 3 March 16 (29/04/2018) (54596/002) 3 Development land east Outline planning application with all matters 2.52 km east of Granted Outline Tier of Horndean, Rowlands reserved (except for access to the highway the Order Limits (05/02/2016) 1 network and associated off-site highway

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 1 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Castle Road, Horndean, improvements) for the demolition of existing Site bought by Bloor Waterlooville buildings and the development of a maximum of 700 dwellings, approximately Homes who (55562/01) 1.7 Ha of employment land, a Local Centre submitted request (including local retail, a primary school and for a new Scoping community facilities), a Care Village, playing Opinion in August pitches, a cricket pavilion (including 2018 (55562/004) associated access and parking), allotments (including associated building and car parking), acoustic bunds and ecological buffers together with internal access network (including footpaths and cycleways), drainage works, associated landscaping and open space (including play areas). Under the current programme, it is expected that construction will take place between 2016 and 2020.

4 Former Purbrook Park Construction of 76 No. dwellings consisting 0.96 km East of Granted Full n/a Playing Fields, Stakes of 3 No. 2 bed, 38 No. 3 bed, 23 No. 4 bed the Order Limits (03/08/2012) Road, Waterlooville houses and 12 No. 2 bed flats with

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 2 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(APP/12/00205) associated parking, landscaping including Construction open space and play area, and pumping complete station. New vehicular access to Stakes Road and new pedestrian access to Stakes Hill Road. 5 Purbrook School Erection of 26 residential units with 0.96 km East of Granted Full Former Playing Fields, associated works, access parking and the Order Limit (13/01/2017) Stakes Road, landscaping. Waterlooville Construction complete (APP/16/00347)

6 Purbrook Park School, Construction of new two storey school 0.42km to the east Granted Full n/a Park Avenue, building (Block A), two storey school of the Order Limits (16/04/2014) Waterlooville, PO7 5DS building to courtyard (Block B), Construction (APP/14/00687) refurbishment to Block D, raised covered complete walkways, new pedestrian access to main entrance and new Block A, altered and additional car parking, landscaping and other works. Demolition of two storey Caretakers house

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 3 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Works now completed. 7 108 London Road, Subdivision of plot to provide a further 2 Western boundary Granted Full Tier Widley, Waterlooville, bedroom dwelling with access from London adjacent (0.18km) 1 (08/01/2018) PO7 5AA Road. to the Order Limits (APP/17/01009) Construction not yet

started. 8 Land at 38-44 London Construction of 43 retirement apartments for Western boundary Granted Full Tier Road, Purbrook older persons including communal facilities, adjacent (0.40km) (21/12/2017) 1 parking, associated landscaping with access to the Order (APP/17/01141) from Stakes Road and 2 commercial / Limits. Construction not yet residential units fronting London Road. started

9 Woodcroft Farm Development of 288 residential units, 0.79 km to south- Granted Full Tier Development Site, retention of existing farmhouse, new access east of Order (05/05/2015) 1 Woodcroft Lane, road from Eagle Avenue Limits Waterlooville Under construction

(APP/13/00804) Phase 1 infrastructure works consisting of

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 4 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

bridleway improvements were completed in 2017. 10 Waterlooville Swimming Hybrid Application: Full planning permission Northern Granted Full/Outline Tier Pool, Waterberry Drive, for reconfiguration of existing car park and boundary (01/07/2017) 1 Waterlooville, PO7 7UW development of single storey deck car adjacent(0.40km) Construction not parking. Outline planning permission for to the Order Limits (APP/17/00295) started. future extension on current footprint of overflow carpark at Waterlooville Leisure Centre for access and layout with all other matters reserved. 11 Former BAE Systems, Outline planning application with all matters, Eastern boundary Registered and Tier Waterloo Park, Elettra apart from access, reserved for adjacent to the awaiting decision 1 Avenue, Waterlooville development of office, storage, industrial, Order Limits hotel, leisure and restaurant uses. (APP/18/01072)

12 Coastline between Construction of new coastal defences Boundary Granted Full Tier Ports Creek Railway consisting of raised earth embankments adjacent to the (13/02/2015) 1 Bridge and Kendall’s with rock armour on the seaward side, Order Limits together with wave walls to abut the A2030 Under construction

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 5 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Wharf, , Eastern Road bridge to tie into the new PO3 5LY embankments (along the alignment of the existing coastal defences), and associated (14/01387/FUL) landscaped works including a shared footpath constructed along the full length of the new embankment.

13 Coastal Defences Fort Replacement of existing coastal sea 0.47 km to east of Granted Full Tier Cumberland, Fort defences with rock revetment. the Order Limits (22/06/2016) 1 Cumberland Road, Construction , PO4 9LJ complete (16/00255/FUL) 14 West Wing St. Marys Construction of 2 and 3 storey buildings 0.57 km to west of Granted Outline Tier Hospital Milton Road comprising 191 dwellings and a 2 storey 60 the Order Limits (29/03/2012) 1 Portsmouth PO3 6AD bed care home with associated estate roads/parking areas/open space and Granted Conditional 11/00250/OUT landscaping after demolition of existing Outline (29/03/2012) buildings. Outline with all matters reserved. 13/01120/REM for 191 dwellings and care home

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 6 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

approved (15/02/2014). Complete 14/01121/REM for care home approved (19/11/2014). Complete 15 Tesco Fratton Way, Construction of a Retail Store (Use Class 0.70 km to west of Granted Full n/a Southsea, PO4 8FA A1) of up to 10,475sqm GEA, Petrol Filling the Order Limits (19/02/2014) Station (Sui Generis) with an associated (14/00128/FUL) kiosk up to 86sqm GEA, canopy and jet Construction wash, new access/egress arrangements, complete car parking including replacement Stadium car parking, service yard, highway and footpath works, landscaping, and other associated works (after demolition of existing structures).

16 Former Kingston Prison, Redevelopment of former prison comprising: 0.69 km to west of Granted Full Tier Milton Road, part demolition and conversion of listed the Order Limits (02/02/2017) 1

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 7 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Portsmouth, PO3 6AS buildings to provide 73 dwellings and Construction not yet 16/00085/FUL commercial unit (within Class A1 or Class started. A3); demolition of non-listed structures; construction of five blocks of between three and seven stories to provide 157 dwellings; part demolition of listed prison wall and formation of new vehicular accesses to Milton Road and St Marys Road; and provision of car parking and associated landscaping and other works. Construction not yet started. 17 Voyager Park, Portfield Development of site for 1.07 km to west of Granted Outline Tier Road, Portsmouth, PO3 offices/industry/warehousing/distribution the Order Limits (04/04/2012) 1 5FJ (Classes B1/B2 and B8) (Outline) with variation to condition 17 of planning Numerous (11/00822/VOC as permission 11/00822/VOC to allow the Reserved Matters varied by construction of up to 40,000sqm gross 12/00159/VOC) applications floorspace. submitted for individual units. Largely constructed.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 8 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

18 Milton Common, Construction of new coastal defences Adjacent to Order Granted Full n/a Eastern Road, consisting of a rock revetment along the Limits (04/02/2016) Portsmouth seaward side of Milton Common and three earth bunds on Milton Common together Construction (15/01769/FUL) with the demolition of Great Salterns Quay complete and associated landscaping works.

19 Land adjacent to 291 Construction of three-storey building to form Within Order Granted Full Tier Locksway Road, three flats with associated parking, cycle Limits (23/10/2015) 1 Southsea and refuse storage Under construction (15/01330/FUL)

20 Land adj 1A Evelegh Construction of new two storey dwelling Western boundary Granted Full Tier Road, Portsmouth, P06 of site directly (24/11/2016) 1 1DH adjacent the Order Limits Construction not yet 16/01588/FUL started 21 Portsmouth Park Hotel, Construction of 2 single storey buildings to Within the Order Granted Full Tier Eastern Road, form restaurant / takeaway with drive-thru Limits. (31/08/2016) 1 Portsmouth, PO6 1UN (Use Class A3/A5) and coffee shop / café (Use Class A1/A3) with drive-thru with

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 9 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(16/00522/FUL) associated car parking and landscaping and Construction not yet alterations to existing hotel car park and circulation and realignment of existing started access roads

22 Little Brandon, Construction of five-bedroom dwelling Southern Granted Full Tier Road, house Boundary of site 1 Portsmouth, PO6 1BE directly adjacent (21/03/2018) (0.04 km) to Order (18/00053/FUL) Construction not yet Limits started. 23 Former Dairy Site, Outline application for the construction of up 0.2 km to north- Granted Full Tier Station Road, to 108 dwellings (principle of access only to west of the Order (22/03/2018) 1 Portsmouth, PO6 1PL be considered). Limits (17/00224/OUT)

24 Kendalls Wharf, Eastern Construction of 50m quay wall as a 0.04 km east of Awaiting decision Tier Road, Portsmouth, PO3 continuation of the existing quay wall and the Order Limits 1 5LY provision of rock armouring at northern end (Determination to form a revetment; and construction of a period expired 17/01676/FUL 4m by 4m dolphin structure with linking 27/11/2017) walkway 25m south of existing quay.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 10 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Works are expected to take 3 to 4 months to complete. Works would aim to commence on 1 April Dredging works are proposed to be undertaken during late May or early June.

25 Construction of club house (on land Within the Order Granted Full Tier Sports Ground, Eastern adjacent to football pitch) Limits (03/07/2017) 1 Road, Portsmouth

(17/00182/FUL) Under construction. Anticipated to be near completion. 26 170 Milton Road, Construction of 3-storey building to form 9 0.7 km south-west Granted Full Tier Portsmouth, PO4 8PN flats with associated parking, refuse/cycle of Order Limits (25/06/2018) 1 stores and landscaping, following demolition (17/01097/FUL) of existing building Construction not yet started 27 Land to north of Change of use of enclosed area of unused Eastern boundary Awaiting decision Tier Harbourside Holiday land to form an extension to the existing directly adjacent (Determination 1 and Lodge Park, to the Order Limits

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 11 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Eastern Road, Harbourside Holiday Park adjoining to the period expired Portsmouth, PO3 6QB south 24/09/2018 (18/01182/FUL)

28 St James Hospital, Outline application for the construction of Adjacent (0.02 Awaiting decision Tier Locksway Road, 107 dwellings including provision of km) to north-west 1 Southsea, PO4 8HW vehicular and pedestrian access, public boundary of the (Determination open space and hard and soft landscaping Order Limits period (18/00288/OUT) expiresd31/12/2018) Construction of 4 years anticipated, commencing in 2018 and completing in 2021.

29 Admiral Lord Nelson Construction of single storey front extension 0.34 km west of Granted Full Tier School, Dundas Lane, to include 10 additional classrooms and new the Order Limits 1 Portsmouth, PO3 5XT sports pitches (07/06/2019) (18/01891/FUL)

30 Unit 5, Interchange Construction of building of 3004 sqm (GEA) 0.17 km to west of Granted Full Tier Park, Robinson Way, for use within light or general industrial the Order Limits 1 Portsmouth, PO3 5QD purposes (B1 or B2) or storage and (01/04/2019) distribution (B8) (18/01027/FUL) Construction not yet started

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 12 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

31 Self-Drive Depot, Construction of After Sales Centre (B2) 0.19 km to west of Granted Full Tier Airport Service Road, comprising 18-bay workshop/MOT centre, the Order Limits 1 Portsmouth, PO3 5PW reception area, service drive-in and (22/11/2018) associated development (18/01050/FUL) Construction not yet started 32 Southsea Leisure Park, Retrospective application for the Partially within the Granted Full n/a Melville Road, construction of a wall and widening of an Order Limits (08/09/2017) Southsea, PO4 9TB existing pathway. Construction (17/00710/PLAREG) complete

33 Cliff House, Dayton Construction of two-storey, three-bedroom 0.03 km south of Granted Full Tier Lane, Portsmouth, PO6 detached chalet bungalow. Construction of the Order Limits 1 1BS carport and extensions to Cliff House. (20/12/2018) (18/01620/FUL) Construction not yet started

34 81 Solent Road, Construction of two dwelling houses 0.01 km west of Granted Full Tier Portsmouth, PO6 1HJ following demolition of existing. the Order Limits 1 (21/12/2018)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 13 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(18/01618/FUL) Construction not yet started

35 142 Milton Road, Construction of 4 storey residential block to 0.62 km south- Awaiting decision Tier Portsmouth, PO4 8PN form 12 flats. west of Order (determination 1 Limits (18/02089/FUL) period expired 08/02/2019) 36 Land Bounded by Erection of 91 residential units, associated 0.41 km to west of Granted Full Tier Tanners Lane, Kidmore public open space, residents car park, the Order Limits 1 Lane and Anmore landscaping, access, car parking, partial (03/07/2018) Road, Denmead realignment of road junction and associated Construction not yet works (resubmission). (17/00335/FUL) started 2-year construction programme anticipated.

37 Land to rear of 32-36 3 new dwellings 0.03 km to west of Granted Full Tier Mill Road, Denmead, the Order Limits 1 PO7 6PA (10/11/2016) (16/01861/FUL) Construction not yet started

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 14 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

38 Denmead Baptist Construction of 10 dwellings together with 0.27 km to west of Granted Full n/a Church, 51 Anmore associated access, car parking, refuse and the Order Limits Road, Denmead, PO7 cycle storage following demolition of (08/06/2016) 6NW Denmead Baptist Church Construction (15/02566/FUL) complete

39 Land to the North of Construction of stables and menage. 0.03 km south- Granted Full n/a The Gables and West of west of Order

Closewood Road, Limits (10/02/2016) Closewood Road, Construction Denmead complete (15/02448/FUL)

40 121 Anmore Road, Redevelopment comprising change of use Within the Order Granted Full n/a Denmead, from farmstead (C3/sui-generis) to childrens Limits. Waterlooville, PO7 6NX care home (C2) incorporating replacement, (21/05/2015) renovations and erection of replacement (14/00890/FUL) Construction farmhouse and barn, retention of paddocks, complete improvement to vehicular access, car parking, landscaping and associated works

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 15 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

41 Taylor Wimpey Site – Outline application for development of land Directly adjacent Granted Full Tier Land at Old Park Farm, for residential (450 units), live / work (24 to Order Limits 1 South of Hambledon units), employment (7.1 ha including B1, B2, (04/01/2008) Road, Waterlooville B8 and a Household Waste Recycling Development largely Centre), mixed use including retail, food & (05/40000 and complete, expected drink, financial/professional & health, open 05/00500/OUT) to be finished space / recreation purposes and the construction of two accesses. 2018/2019

42 Land at Old Park Farm, First Phase of Residential Development – Directly adjacent Granted Reserved n/a Hambledon Road, 110 dwellings to Order Limits Matters Waterlooville (08/04/2009) (08/40000/003 and 08/00350/REM) Construction complete 43 Grainger Development Outline application for the development of Directly adjacent Granted part Online, Tier Site Land West of approx 2,550 no. dwellings including the to Order Limits part Full 1 London Road, construction of a new access from Waterlooville / Ladybridge Roundabout, Milk Lane and (18/04/2012) Newlands Phase 1 completion of Maurepas Way access, a Three phases local centre (comprising retail, community complete, one still building, land for health care, land for elderly

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 16 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Hambledon Road, care) public house, land for 2 primary under construction Denmead, schools, land for a nursery, land for with others not yet employment uses, associated amenity (APP/10/00828 and under construction space along with substantial green 10/02862/OUT) infrastructure, SuDS, land for allotments, main pumping station, land for cemetery, restoration of River Wallington, together with landscape structure planting (Matters for Approval Access only). Full planning application for the development of Phase 1 comprising 194 no. dwellings, internal roads, garages, driveways, pathways, boundary treatment, substation, pedestrian/cycle ways, including to Maurepas Way, associated parking spaces, flood attenuation ponds, temporary play provision, associated amenity space and hard and soft landscape works. Full planning for engineering operations associated with infrastructure requirements and service provision for the detailed Phase 1 application, the temporary closure of Footpath No 11 and Southwick and

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 17 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Widley Footpath No 30, with suitable alternative route provided (approved 18/04/2012).

44 Phase 2, Dukes Second Phase of Residential Development North-eastern Granted Full n/a Meadow, Hambledon (121 Dwellings) along with 7 live/work units boundary directly Road, Waterlooville and 326 square metres of A1/A2/A3 adjacent to the (24/12/2010) floorspace, mixed use including retail, food Order Limits (APP/10/00610 and Construction and drink, financial / professional and 10/02353/REM) complete health, open space / recreation purposes and the construction of two accesses from Hambledon Road

45 Phase 3 and 4, Land at Third and Fourth phase of residential Adjacent to Order Granted Reserved n/a Old Park Farm, development – 219 units, 17 live work units, Limits Matters Hambledon Road, employment, mixed use including retail, food and drink, financial / professional and (09/07/2013) Waterlooville / Dukes health, open space / recreational purpose Construction Meadow, Hambledon and the construction of two accesses from complete Road, Denmead, Hambledon Road. Hampshire

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 18 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(APP/12/00008 and 11/03014/REM) (amended by APP/12/01243 & 12/02502/FUL) 46 Berewood Phase 1, 104 units of private rented accommodation 0.13 km to west of Granted Reserve Tier Hambledon Road, the Order Limits Matters 1 Denmead (24/03/2015) (14/02872/REM) Under construction 47 Land at Old Park Farm, 103 dwellings and associated infrastructure 0.36 km to south Granted Full Tier Wimpey Site, west of the Order 1 Hambledon Road, Limits (31/07/2015) Denmead Under construction (13/02843/FUL)

48 Berewood Phase 2 Reserved matters application for 246 Eastern edge of Granted Reserved Tier Development Site, residential dwellings site adjacent to Matters 1 London Road, Purbrook Order Limits (24/06/2014)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 19 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(APP/14/00032) The phasing timetable is subject to the Under construction market sales rate, but is anticipated to be between three and four years to complete the development.

49 Land at junction of Main Erection of extra care accommodation with Northern Granted Full n/a Avenue and Hambledon 48 units and associated communal facilities, boundary of site Road, Dukes Meadow access, car parking and landscaping. directly adjacent (19/01/2015) Development Site, to the Order Limits Construction Waterlooville complete (APP/14/00854)

50 Berewood Phase 2 Reserved Matters application for Phase of Southern part of Granted Reserved Tier Development Site, the Town Park site adjacent (0.07 Matters 1 km) to Order London Road, Purbrook Limits (22/07/2014) (APP/16/01211 and Construction not yet 16/03168/REM) started 51 Berewood Phase 3A, Reserved Matters application for 296 0.36 km west of Granted Reserved Tier East of Newlands dwellings the Order Limits Matters 1 Avenue, Waterlooville (10/01/2017)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 20 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

(16/02621/REM) Under construction

52 Berewood Phase 13A, Reserved Matters application for 73 0.26 km to west of Granted Reserved Tier Development Land to dwellings the Order Limits Matters 1 the West of Newlands (28/02/2018)

Avenue, Waterlooville, Under construction Hampshire (17/01772/REM)

53 Berewood Phase 9b, Reserved Matters application for 75 0.03 km west of Granted Reserved Tier West of Marrelsmoor dwellings the Order Limits Matters 1 Avenue, Waterlooville, (28/02/2018) Hampshire

(17/02957/REM) Under construction

54 Berewood Phase 10a, Reserved Matters application for 43 0.03 km west of Granted Reserved Tier South of Marrelsmoor dwellings the Order Limits Matters 1 Avenue, Waterlooville, (20/12/2018) Hampshire (17/02956/REM)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 21 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Construction not yet started

55 Berewood Phase 9a, Reserved Matters application for 104 0.78 km west of Awaiting Decision Tier West of Marrelsmoor dwellings the Order Limits (determination 1 Avenue, Waterlooville, expired 13/09/2018) Hampshire 18/01351/REM

56 Berewood E2, Plot 1, Reserved Matters application for 10,177 0.35 km south- Granted Reserved Tier Houghton Avenue, sqm of B1/B2/B8 floorspace west of the Order Matters 1 Waterlooville, Limits (11/12/2018) Hampshire (18/01581/REM)

57 Locks Farm, Botley Development of a gas powered standby 11.8 km to north Application refused Tier Road, Bishops generation facility and associated west of Order 1 Waltham, Hampshire infrastructure (for a period of 25 years from Limits date of commissioning) (18/01337/FUL)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 22 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

58 Portsmouth City Centre Modification of existing road network around 2.10 km north- Awaiting Decision Tier Highway Network the A3 southwards from the junction with west of the Order (determination 1 incorporating parts of Princess Royal Way to the junction with Limits (at closest period expired Mile End Road, Church Unicorn Road, including construction of a point) (07/03/2018) Street, Commercial new link road between Flathouse Road and Road Marketway, the A3 south of Herbert Street; associated Charlotte Street, site clearance, junction works, bus and Cascades Approach, cycle routes and necessary highway Hope Street, Flathouse alterations, with landscaping, street Road furniture, road signage, markings and lighting. Demolition of Pickfords Vanguard (17/02066/CS3) Ltd, Flathouse Road, PO1 4QJ. Partial demolition and reconfiguration of the western edge of Morrisons Supermarket, Victory Retail Park, Flathouse Road, PO1 4QP. Repositioning of Clarence Street service yard access gate to Sainsbury's Supermarket, 315 Commercial Road, PO1 4BS.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 23 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

59 Welborne Land North of New Community of Up To 6000 Dwellings 8.33 km west of Granted- Outline Tier , Fareham and various other uses the Order Limits 1 (at closest point) (P/17/0266/OA)

60 Site of Fawley Power Mixed use redevelopment of redundant 18.15 km west of EIA Scoping Tier Station (Fawley power station. the Order Limits submitted and 1 Waterside) (at closest point) opinion received from NFDC, NFNPA (17/11559) and MMO. Public consultation x2 – most recent July 2018 Outline application planned for submission in Autumn 2018. Outline application submitted May 2019.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 24 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

61 Number not used

62 North Portsea Island Phase 4 of the North Portsea Island Coastal Southern Emerging - contract Tier Coastal Flood Defence Flood Defence Scheme is a combination of boundary of site out for tender. 1 Scheme, Eastern Road two distinct sections: Kendall’s Wharf and adjacent to Order Documentation for and Kendall’s Wharf Eastern Road. The full length of the Limits bidders was due for frontage is 2,4 km (300 m for Kendall’s (19/00706/FUL) Wharf and 2,1 km for Eastern Road). The submission by sea defences are being raised to +4,8 m 29/06/18 AOD along the frontage to accommodate a Kendalls Wharf - 1 in 500 Standard of Protection (SOP). The Target road raising and steel sheet piles of Kendall’s Wharf works will be raised to a commencement lower level as set back from the coast. 09/2019. Target completion 04/2020. The Kendall’s Wharf defences tie in with Anchorage park embankment defences Eastern Road (constructed in 2016) in the North and are seawall – Target set landward of Kendall’s Wharf aggregates, commencement who are responsible for their own flood 04/2020. Target protection. The first c. 150 m of sea defence will be a raised earth embankment with a 3 completion 10/2022. m crest and continuation of the 2 m wide

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 25 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

coastal path. This will tie into an area of Phase 4 /2022 Pre- road raising landward of Kendall’s Wharf. South of the road will be a 150 m steel application sheet pile wall which will tie into the coastal consultation defences at Eastern Road. undertaken in The scope of the works for Eastern Road, at November 2018 summary level, comprises of the construction of a reinforced seawall, including sheet pile and bearing pile installation with local realignment. Part of this will be an encasement and part new sea wall with a stepped revetment. The construction of replacement slipways and access steps will also be required. Other aspects of phase 4 that will /could be involved and should be considered by the contractor: — some minor elements of contractor led design, — additional ground /site investigation,

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 26 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

— services searches and trial pitting to locate services, — installation of flood boards /gates, — responding to any emergency failures to other parts of PCC’s coastal defence related assets for which PCC may call on the contractor’s services, — site clearance, — demolition and removal of 150 m of existing seawall in the southern section of the site and creation of a high roost site /bird island, — reconstruction of the coastal path, — landscape works.

63 to London Replacement of 90 km aviation fuel pipeline 13.45 km to north- Application Tier Pipeline project that runs from Fawley Refinery to West west of the Order submitted to PINS in 1 London Terminal Storage facility at Limits at closest May 2019, DCO Hounslow point application accepted

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 27 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

Works to install and commission the pipeline for examination in programmed to be completed early 2023 or June 2019. earlier if possible.

64 A27 Arundel Bypass A new dual carriageway bypass linking 28.21 km east of Preferred route Tier together the 2 existing sections of the road the Order Limits at announced May 3 DCO to replace the existing single carriageway closest point 2018 (Option 5a). road. New evidence on scheme has emerged (inc updated traffic modelling) on Options 1 and 3 since. Further non- statutory public consultation on Options 1, 3 and 5a planned for Spring 2019. Scheme likely to be submitted in Q4 of 2019.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 28 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

65 Norths Hill, Portsmouth, Construction of 20MW embedded Short 2.7 km to west of Granted Full Tier PO6 3RU Term Operating (STOR) generating plant the Order Limits (14/12/2018). 1 building; auxillary equipment; DNO (18/01646/FUL) substation associated works; and a new Construction not wooden maintenance shed. started.

66 Fraser Range Part demolition and redevelopment of the Adjacent to Awaiting decision Tier site. Including the conversion of three Eastern boundary (19/00420/FUL) (determination 1 existing structures and construction of new of Order Limits expired 31/07/2019) buildings (108 apartments and 26 houses), associated access, parking and landscaping works and construction of new seawall flood defences.

67 Land South of Installation of two energy storage systems Within the Order Permission granted Tier Lovedean Electricity and associated infrastructure with a total Limits on 17/04//2018, 1 Substation, Broadway capacity of 49.95MW Lane, Lovedean, Planning Permission Waterlooville quashed at judicial 57524/001 review on 07/09/2018.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 29 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

New Scoping Opinion requested by applicant on 01/11/2018. EHDC deemed no EIA required. SoS stated that EIA is not required in July 2019. 68 Land to the south of Old Pivot Power considering site for battery Within the Order Application n/a Mill Lane and storage plant project Limits withdrawn * east/south-east of The Haven, Denmead 19/01071/FUL 69 36 Mill Road Denmead Proposed land to rear of 32-36 MILL ROAD 0.03 km to west of Application PO7 6PA FOR 3 Houses of 1 No. 3 Bed House and 2 the Order Limits permitted (16/01861/FUL) No. 2 Bed Houses

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 30 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

70 Lovedean Electricity Installation of 30m high Telecommunication Within the Order Granted Station, Broadway Mast 0.6 m dish and 0.6 m antenna for Limits Lane, Lovedean, network connections between electricity Waterlooville, PO8 0SJ substations. (32642/003) 71 Land South of, Chalton 207 dwellings and provision of open space, 3.65 km to north- Permitted 2015 Lane, Clanfield, sports pitches, bowling green, pavilion and east of the Order Waterlooville allotments, with associated access, parking, Limits access roads, footpaths/cycle paths, (28463/002) landscaping and works, with demolition of existing buildings and structures (as amended by plans received 30 September 2014 72 Yew Tree Cottage, Change of use of agricultural fields to 0.43 km to East of Granted Eastland Gate, private equestrian paddocks, creation of the Order Limits Lovedean, associated manege and horse walker Waterlooville, PO8 0SR (26982/003)

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 31 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

73 England Coast Path – Natural England’s Within the Order 19th July 2017, Tier Portsmouth to South Limits Natural England 3 proposals to the Secretary of State under Hayling submitted a report section 51 of the National Parks and Access to the Secretary of to State for the the Countryside Act 1949 for improved Environment, Food access along the coast of Hampshire and Rural Affairs between setting out the Portsmouth and South Hayling proposals for improved access to the coast between Portsmouth and South Hayling Island. Once the Secretary of State has approved the report, works will start with HCC and PCC,

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 32 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

including all necessary applications 74 Southsea Seafront from Flood and coastal erosion management Within the Order Awaiting decision Tier Long Curtain Moat in scheme comprising a combination of vertical Limits 1 (Application the West to Eastney sea wall, raising and realignment of the submitted Marine Barracks in the promenade, construction of stepped 16/07/2019, East (19/01097/FUL) revetment, rock armour revetments and determination period groynes, secondary defence walls and expires 06/11/2019) bunds, beach widening and management, and all associated works, highway alterations, removal of trees and landscaping. Scheme includes the removal and repositioning of 34 Grade II Listed lamp columns, 3 Grade II Listed shelters and 6. Grade II Listed monuments, works affecting the Grade II Listed South Parade Pier, regrading and works to the Grade II Listed Southsea Common and works to the Grade

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 33 of 34

ID Application Name and Applicant for ‘other development’ and Distance from Status Tier Reference brief description project

I Listed Naval Memorial. The proposal constitutes EIA development.

*The application for development number 68 (Land to the south of Old Mill Lane and east/south-east of The Haven, Denmead 19/01071/F3UL) was withdrawn on the 2/07/2019. As the application could be re-submitted in the future, for the purpose of the cumulative effects assessment, it has been assessed.

AQUIND INTERCONNECTOR WSP PINS Ref.: EN020022 Document Ref.: Environmental Statement Appendix 29.2 Collated Onshore Long and Short List of Developments November 2019 AQUIND Limited Page 34 of 34

AQUIND INTERCONNECTOR