NORTH CENTRAL RAILWAY

HATHRAS PARLIAMENTARY CONSTITUENCY , the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager important role in development of the state and provides North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between and . It has now been extended upto Jhansi with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad.

In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the HATHRAS constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency.

It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN HATHRAS PARLIAMENTARY CONSTITUENCY

HATHRAS PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS: , , Hathras, Sadabad, Chharra

B. WORKS COMPLETED IN LAST FOUR YEARS: 1. INFRASTRUCTURAL DEVELOPMENT GPora: Extension of Clear standing room of UP loop line by 37m to increase Clear standing room from 678m to 715m. Constructed at a cost of Rs.0.64 Cr. GFoot Over Bridges constructed at and Pora stations at a cost of Rs. 2.90 Cr.

Road Over Bridge (ROB) in lieu of: GLevel Crossing No-90 Km 1288/1-3 at a cost of Rs. 21.41 Cr. GLevel Crossing No-85 Km 1276/23-25 at a cost of Rs. 20.48 Cr. GLevel Crossing No-94C Km-1294/29-31 at a cost of Rs. 18.06 Cr. GLevel Crossing No-96 Km 1299/9-11 at a cost of Rs.12.51 Cr. GRoad Over Bridge / Under Bridge in lieu of LC No. 280 & 287 on Sikandrarao - Rati Ka Nagla Section at a cost of Rs. 4.53 Cr.

2. IMPROVEMENTS IN PASSENGER AMENITIES:

GP.P. shelter at Sikandra Rao station at a cost of Rs. 24.01 lakh. GToilets at Sikandra Rao station at a cost of Rs. 18.3 lakh. GTrain Display Boards at Hathras City at a cost of Rs. 14.22 lakh. GPassenger Operated Enquiry Terminals (POET) at Hathras City station. G100% LED lights have been provided at platform, station building & circulating area.

C OTHERS DEVELOPMENTS: New Trains introduced with stoppage over Hathras Constituency. GTrain No 19715/19716 Jaipur - Lucknow Express -Tri- Weekly - from Jaipur to Lucknow via Hathras City- New Service. GTrain No 13167/13168 Kolkata - Agra Cantt Express -Weekly - from Kolkata to Agra Cantt via Hathras City, New Service. GTrain No 22443/22444 Weekly Express from Kanpur Central to Bandra T. - via Hathras City New Service. GTrain No 12875/12876 Neelanchal Express - from Puri to New Delhi - New Stoppage at Hathras. GTrain No 15055/15056 Ramnagar - Agra Cantt. Weekly Express. GTrain No 19401/19402 Ahmedabad - Lucknow Weekly Express. GTrain No 22443/22444 Kanpur Central - Bandra (T) Weekly Express.

D. ON-GOING WORKS

GConstruction of Limited Height Subway at 03 level crossing 4HK, 5HK & 3HK at a cost of Rs. 12.53 Cr. GImplementation of roof top solar project at Hathras. GMendu-Hathras city- Road over bridge in lieu of level crossing No.309 at a cost of Rs. 35.01 Cr. GKiccha, Patiali, Roshanpur, Rudain, Hathras City & Kashipur - Minimum essential amenities deficiency removal by raising of platform from rail level to medium level at a cost of Rs. 384.19 lakh. GFoot Over Bridge at Hathras City at a cost of Rs. 102.74 lakh. GExtension of high level platforms for longest train (12 stations) at a cost of Rs. 1280.4 lakh GFacilities for differently abled persons at Hathras station. Automatic Ticket Vending Hathras Railway Station Machine at City

Passenger Shed at Pora. New Foot Over Bridge at Chamraulla.

Flagging off of -Ramnagar Express