Reserve Land , West

Design & Access Statement Outline Planning Application

November 2017 Landscape Architects David Jarvis Associates Limited 1 Tennyson Street Swindon Wiltshire SN1 5DT Client / Applicant Crest Strategic Projects tel: 01793 612173 Crest House Pyrcroft Road www.davidjarvis.biz Chertsey Surrey KT16 9GN tel: 01932 580423 www.crestnicholson.com

RPS Planning & Development 140 Wall London, EC2Y 5DN

tel: 020 7280 3300

www.rpsgroup.com Architects OSP Architecture Broadmede House Farnham Business Park Weydon Lane Farnham Surrey GU9 8QT Consulting Engineers Campbell Reith tel: 01252 267878 Friars Bridge Court www.osparchitecture.com 41-45 Blackfriars Road London SE1 8NZ

tel: 020 7340 1700

www.campbellreith.com

Planning Consultants Savills Planning and Regeneration Savills 2 Charlotte Place Ecology Southampton Derek Finnie Associates Ltd SO14 0TB tel: 023 8071 3900 [email protected] www.savills.co.uk www.derekfinnie.com

OS Licence no. 100007327 Contents

1.0 Background 6.0 Access & Movement

1.1 Planning Application...... 6 6.1 Vehicular Access and Movement...... 48 1.2 Location...... 6 6.2 Pedestrian/Cyclist Access...... 50 1.3 Vision...... 6 6.3 Public Transport...... 52 6.4 Parking Strategy...... 52 2.0 Existing Site & Context 6.5 Waste & Recycling Strategy...... 54 6.6 Flooding and Drainage...... 54 2.1 The Existing Site...... 10 6.7 Site Waste Management Strategy...... 56 2.2 Trees...... 10 2.3 Levels & Topography...... 10 7.0 Sustainability 2.4 Site Boundaries...... 10 2.5 Ecology...... 10 7.1 Sustainability Principles...... 58 2.6 Site Context...... 10 7.2 Crime Prevention and Community Safety ...... 60 3.0 Design Framework 7.3 Inclusiveness - Access for All...... 61 3.1 Design Policy & Guidance...... 14 3.2 Urban Design Compendium ...... 16 8.0 Development Parameters

3.3 Approved Parameter Plans...... 18 8.1 Land Use Parameter Plan...... 64 3.4 Site Constraints...... 20 8.2 Density Parameter Plan...... 65 3.5 Site Opportunities...... 22 8.3 Building Heights Parameter Plan ...... 66 8.4 Vehicular, Pedestrian and 4.0 Design Process Cycle Movement Parameter Plan...... 67 8.5 Landscape and Open Space 4.1 Objectives...... 26 4.2 Initial Development Concept...... 26 Parameter Plan...... 68 4.3 Public Exhibitions...... 29 4.4 First Pre-application Meeting...... 29 9.0 Conclusions 4.5 Second Pre-application Meeting...... 29 9.1 Conclusions...... 70

5.0 Proposals 10.0 Appendices 5.1 Design...... 32 10.1 Appendix 1...... 74 5.2 Use and Amount...... 33 10.2 Appendix 2...... 76 5.3 Residential Mix...... 33 10.3 Appendix 3...... 77 5.4 Layout...... 34 5.5 Scale...... 36 5.6 Landscaping and Ecology...... 38 5.7 Appearance...... 42 5.8 Character Areas...... 44

Reserve Land, Kilnwood Vale - Design & Access Statement

Background 1.0

1.1 Planning Application 1.2 Location 1.3 Vision

Reserve Land, Kilnwood Vale - Design & Access Statement 5 1.0 Background

1.1 Planning Application 1.2 Location This document has been prepared for Crest Nicholson The Reserve Land site is located at the western end of Operations Ltd (hereafter referred to as ‘Crest’) to the Kilnwood Vale development site. It lies to the west of accompany an outline planning application for the the main entrance in to the development from the A264 ‘Reserve Land’ at the Kilnwood Vale development on and to Phase 1 which is now complete. land to the west of . The Reserve Land lies to the west of Phase 1 of the Kilnwood Vale development (as shown in the location 1.3 Vision plan on the opposite page). It forms part of the strategic allocation for ‘Land West of ’ (now known The proposed scheme for the Reserve Land embraces as Kilnwood Vale) in the adopted District the overall vision for the new neighbourhood at Kilnwood Planning Framework. The Reserve Land is also within Vale as set out in both the Design and Access Statement the consented boundary (red line) for the Kilnwood Vale that accompanied the Outline Planning Application Scheme. and in the Joint Area Action Plan (2009). The vision incorporates: Outline permission for the Kilnwood Vale Scheme site was approved in October 2011 (ref: DC/10/1612). A series of reserved matters planning applications • Sustainably built and located development have subsequently been submitted for a number of based on the neighbourhood principle the housing parcels in Phases 2 and 3. The approved masterplan for Phases 2 and 3 as subsequently • Access to a wide range of local services amended in April 2016 (ref: DC/15/2813). • Excellent public transport opportunities The ‘Reserve Land’ was safeguarded as part of the outline planning consent to provide the opportunity to • High quality open spaces and informal leisure accommodate a Western Relief Road (WRR), should it facilities have been determined that the route was necessary to secure future development west of Crawley. The time • Development of the highest design quality. for confirming the requirement for the WRR has now expired. It is acknowledged through planning guidance and the existing planning permission that this site could be developed for housing if not required for the WRR. This Design and Access Statement has been prepared in accordance with the requirements of the Town and Country Planning (General Development Procedure) (Amendment) () Order 2010 (SI 2010/567). In particular, the content and format of the statement closely follows the advice set out in Section 6 of the Communities and Local Government (CLG) Guidance on information requirements and validation which accompanies the Development Management Policy Annex: Information requirements and validation for planning applications. The purpose of this Design and Access Statement is to demonstrate the evolution of the design process and background material that has influenced the proposed application. The application is for a residential development comprising approximately 227 new homes on the 9.3 hectare site.

6 Background

Kilnwood Vale

Reserve Land

Location Plan (NTS)

Reserve Land, Kilnwood Vale - Design & Access Statement 7

Existing Site & Context 2.0

2.1 The Existing Site 2.2 Trees 2.3 Levels & Topography 2.4 Site Boundaries 2.5 Ecology 2.6 Site Context

Reserve Land, Kilnwood Vale - Design & Access Statement 9 2.0 Existing Site & Context

2.1 The Existing Site 2.4 Site Boundaries

The site currently comprises a grass pasture. Phase The proposed site is located to the west of Phase 1. The 1 and the primary access road and new roundabout eastern boundary will be formed by the western edge at the junction with the A264 are now complete. There of Hoppers Brook. The scheme will avoid encroaching is a general fall across the site from south to north into the root protection zone of the trees along the Brook and land falls away from the bend in the access road and will provide an 8 metre wide buffer zone between into the eastern edge of the site at its southern end. the top of the bank to the Brook and the eastern edge of Hoppers Brook runs along the eastern edge of the site, development. and a farm track runs along its western edge. A surface water drainage basin as part of the suds network for The northern boundary will be formed by the top of the the Kilnwood Vale site has been constructed within slope to the southern edge of the attenuation basin at the northern part of the site, contained on all sides by the northern end of the site. existing trees and hedges. The western boundary will be formed by the field 2.2 Trees boundary hedge along the western edge of the field. A 10 metre wide landscape buffer zone will be There are a number of existing trees along the eastern retained between the hedge and the western edge of boundary with Hoppers Brook. These will be retained for development. the most part with a limited amount of removal to enable access. There are a number of smaller field boundary The southern boundary will be formed by the boundary trees around the other site boundaries. with the highway land along the northern edge of the A264. A 10 metre wide landscape buffer zone will be retained between the site boundary and the southern 2.3 Levels & Topography edge of the development. There is a general fall across the site from south to north which will be subject to re-profiling. The site level currently falls away from the western edge of the access 2.5 Ecology road into Kilnwood Vale. A number of ecological surveys have been undertaken across the Kilnwood Vale Reserve Land, including an Extended Phase 1 Habitat survey, a badger survey, a series of bat surveys and a reptile survey. For further details, refer to Derek Finnie Associates’ Kilnwood Vale - Reserve Land Ecological Assessment October 2017 (Report Ref: DFA17073V2).

Other than three bat species at relatively low numbers, no other species of note were encountered within the Reserve Land site.

Overall, it has been assessed there would be a negligible ecological impact as a result of the proposal.

10 Existing Site & Context

2.6 Site Context The immediate context for the site comprises arable fields to the west which form part of the strategic gap. To the north of the site is an area of woodland known as Pondtail Shaw. To the east of the site is Phase 1 of the Kilnwood Vale development. Immediately to the south of the site is the A264.

Adjacent built development

Reserve Land, Kilnwood Vale - Design & Access Statement 11

ExistingDesign Framework Site & Context 3.0

3.1 Design Policy & Guidance 3.2 Urban Design Compendium 3.3 Approved Parameter Plans 3.4 Site Constraints 3.5 Site Opportunities

Reserve Land, Kilnwood Vale - Design & Access Statement 13 3.0 ExistingDesign Framework Site & Context

3.1 Design Policy & Guidance

Introduction Local Planning Policy

The development plan for the site consists of the The key policies from the Planning Horsham District Planning Framework 2015 and the Framework 2015 which relate to design are: West of Bewbush Joint Area Action Plan (2009). Further considerations include the relevant policies of the • Policy 1 - Sustainable Development; National Planning Policy Framework (NPPF), Planning Practice Guidance, and Supplementary Planning • Policy 2 - Strategic Development; Guidance. • Policy 16 - Meeting Local Housing Needs; • Policy 24 - Environmental Protection; National Planning Policy Framework • Policy 25 - The Natural Environment and The NPPF was published in 2012, and sets out national Landscape Character; guidance relating to design. Paragraph 56 states that • Policy 31 - Green Infrastructure and the Government attaches great importance to the design Biodiversity; of the built environment, and that good design is a key aspect of sustainable development. Paragraph 58 • Policy 32 - The Quality of New Development; explains that planning decisions should aim to ensure that developments: function well and add to the overall • Policy 33 - Development Principles; quality of the area throughout their lifetime; establish • Policy 35 - Climate Change; a strong sense of place; optimise the potential of the Site to accommodate development; respond to local • Policy 37 - Sustainable Construction; character and history and reflect the identity of local • Policy 38 - Flooding; surroundings and materials; create safe and accessible environments; and are visually attractive as a result of • Policy 39 - Infrastructure Provision; good architecture and appropriate landscaping. • Policy 40 - Sustainable Transport; and Further detailed guidance on design issues is provided by the Government’s Planning Practice Guidance, as • Policy 41 - Parking. updated on 6 March 2014. The Guidance explains that planning should promote:

• Local character (including landscape setting); • Safe, connected and efficient streets; The sign of a good • A network of green spaces (including parks) place to live and public places; • Appropriate security measures and address crime prevention; • Access and inclusion; 12 • Efficient use of natural resources; and • Cohesive and vibrant neighbourhoods.

14 ExistingDesign Framework Site & Context

The Kilnwood Vale development site is part of the Other Design Guidance West of Bewbush Joint Area Action Plan conceptual masterplan. The West of Bewbush Joint Area Action In addition to national and local policy, the development Plan was prepared to provide a more detailed planning proposals have been designed with reference to a framework for the development of land west of Bewbush, number of design guidance documents as follows: now known as Kilnwood Vale. It sets out key design principles and objectives, including: • Manual for Streets (2007) (MfS 2, September 2010) • A neighbourhood centre to act as the focus for services, facilities, community activity and • By Design: Urban Design in the Planning integration; System – Towards Better Practice (May 2000); • A concentrated number of formal and informal • Better Places to Live: By Design (CABE, open spaces; September 2001); • A legible layout that facilitates access by all • Planning and Access for Disabled People: A modes of transport to the Neighbourhood Good Practice Guide (March 2003); Centre and open spaces; • Building for Life (Building for Life Partnership, • Clear pedestrian and cycle linkages throughout 2012) the neighbourhood for permeability and • Safer Places – The Planning System and surveillance; Crime Prevention (Office of the Deputy Prime • Practical and convenient sustainable transport Minister and the Home Office, 2004); linkages to and from the Town Centre, • Secured by Design; primary employment locations and adjacent neighbourhoods; • Urban Design Compendium (English Partnerships, 2000); and • Clearly defined edges and character for the area making it distinguishable from the • Laying the Foundations: A Housing Strategy for adjacent neighbourhoods; England. • The provision of green corridors throughout the neighbourhood and into adjacent neighbourhoods; • Distinctiveness achieved through contextual and unique architecture, urban and landscape design.

The principle of residential development on the application site has been accepted through the approval of the outline application (ref: DC/10/1612). The

...... additional opportunity presented by the Reserve land ...... Safer...... Places

T has always been identified as an extension to the outline he Planning System and Crime Prevention application site including on the consented parameter This good practice guide sets out how the planning system is able to deliver well-designed and safe places. It challenges URBAN DESIGN all those involved in the design and layout of new development to think about the most appropriate crime reduction measures ...... without compromising the quality of the local ...... plans. environment. In doing so, it emphasises the ...... The Planning System and Crime Prevention ...... importance of designing to suit the local ...... context. This guide builds on and complements . Safer Places Government urban design and crime reduction objectives and guidance, including

Secured By Design COMPENDIUM

Llewelyn-Davies

Customer Services Department The Thomas Telford Limited Unit I/K Paddock Wood Distribution Centre Paddock Wood Tonbridge TN12 6UU

Tel: 020 7665 2464 Fax: 020 7665 2245

Reserve Land, Kilnwood Vale - Design & Access Statement 15 3.0 ExistingDesign Framework Site & Context

3.2 Urban Design Compendium (English Partnership / Housing Corporation)

The Urban Design Compendium sets out the process by which developers and other practitioners achieve good design through the establishment of good practice and creative thinking. The document considers a number of key principles for urban design and how they can be achieved. These are set out below:

• Places for people - To be well used and loved. Places must be safe, comfortable, varied and attractive. They need to be distinctive and offer a variety of choice. • Enrich the existing - New development should enrich and complement existing urban places at both region, city and neighbourhood scale. • Make Connections - Places need to be accessible particularly for pedestrians and cyclists and integrated physically and visually with their surroundings; • Work with landscape - Maximise each site’s intrinsic resources – climate, landform, landscape and ecology to maximise energy conservation and amenity; • Mix uses and forms - Stimulating, enjoyable and convenient places should meet demands from a wide range of users and utilise various built forms, uses, tenures and densities; • Manage the investment - For projects to be developable and well cared for they must be economically viable, well managed and maintained; and • Design for change - New development should be flexible enough to respond to future changes in use, lifestyles and demography.

16 ExistingDesign Framework Site & Context

Site plan showing immediate context

Reserve Land, Kilnwood Vale - Design & Access Statement 17 3.0 ExistingDesign Framework Site & Context

3.3 Approved Parameter Plans The approved outline planning application (ref: DC/15/2813) included six parameter plans. These were as follows:

• Land Use Plan. • Density Plan. • Building Heights Plan. • Pedestrian & Cycle Movement Plan. • Vehicular Movement Plan. • Landscape & Open Space Plan.

18 ExistingDesign Framework Site & Context

Vehicular movement Building heights

Land use distribution Landscape and open space

Approved Parameter Plans Pedestrian and cyclist movement

Reserve Land, Kilnwood Vale - Design & Access Statement 19 3.0 ExistingDesign Framework Site & Context

3.4 Site Constraints The constraints plan illustrates the physical issues which have informed the development of the proposals for the application site. These are set out below:

• Development site boundaries. • The built form and massing and architectural character of the Phase 1 scheme. • Requirement for 8 metre buffer clear of development along western edge of Hoppers Brook. • Root protection zones to retained trees along Hoppers Brook. • The alignment of existing access road from A264 into Kilnwood Vale and required roundabout at access to the Reserve Land site. • Earthworks re-profiling around western edge of access road to grade down into site. • The extent of the surface water attenuation basin at the northern end of the site. • Provision for primary recreational route around the edges of the attenuation basin. • Provision of 10 metre wide landscaped buffer zone along southern boundary with A264. • Provision of 10 metre wide landscaped buffer zone along western boundary. • Requirement for temporary reptile reception area at northern end of site. • Necessary pedestrian and cycle linkages to the surrounding masterplan and wider area. • Topography. • Orientation.

• Pumping station.

20 ExistingDesign Framework Site & Context

Site Constraints Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 21 3.0 ExistingDesign Framework Site & Context

3.5 Site Opportunities The project team have carefully considered all of the identified constraints and used these to set out guiding design principles and a framework for the evolution of proposals for the Reserve Land site as follows:

• Vehicular access point from existing site entrance road. • Retention of landscape buffer zone around edges of the site. • Play provision within green buffer on western boundary. • Provision of community greens within northern and southern parts of development. • Integration of primary recreational route within landscape and movement network around attenuation basin. • Integration of landscape proposals. • Density distribution grading away from site entrance, similar to Phase 1. • Building heights distribution in accordance with Phase 1. Higher buildings are strategically located along the southern boundary adjacent to the A264, along the access and centrally to limit impacts. • Setting development away from boundaries to limit impact. • Provision of diverse mix of dwelling types and sizes to meet housing need. • Provision of affordable homes to meet local need.

22 ExistingDesign Framework Site & Context

Site Opportunities Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 23

Proposals 4.0

4.1 Objectives 4.2 Initial Development Concept 4.3 Public Exhibition (23 and 28 September 2017) 4.4 First Pre- Application Meeting 4.5 Second Pre- Application Meeting

Phase 2C, Kilnwood Vale - Design & Access Statement 25 4.0 Design Process

4.1 Objectives 4.2 Initial Development Concept Following the appraisal of the physical issues and An initial development concept plan was produced which opportunities presented by the site and the local set out the framework for the evolution of the illustrative character and design guidance and vision associated layout. This indicates higher density development with the wider development of Kilnwood Vale, a number along the southern edge of development as well as the of sketch layouts have been prepared as part of the entrance gateway, with a gradation of lower density design evolution. towards the open space edges.

A number of key objectives for development of the site have been identified and include the following:

• Achieve a high quality development; • Make efficient use of land; • Comply with national and local government guidelines; • Respond positively to existing adjacent properties and the surrounding landscape; • The proposed development should blend into the landscape setting and features of landscape value should be retained and enhanced where possible; • Create a high quality entrance into the Kilnwood Vale; • Be design led, ie not of standard design, but respecting the character of the area and the neighbouring development; • Create a development with a clear sense of place and local identity where people aspire to live; • Create a safe and secure environment achieved by the design and layout of the scheme; • Provide opportunities for sustainable access to services and facilities within the wider development to the east; • Provide a diverse range of new homes to respond to local need; • Create good pedestrian and cyclist links between the site and the surrounding area; • Minimise the impact of accommodating parking; • Enable sustainable living; and • Provide spaces for formal and informal recreation and social interaction.

26 Design Process

Concept Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 27 4.0 Design Process

Design Principles Diagram

28 Design Process

4.3 Public Exhibitions 4.4 First Pre-Application (23 and 28 September 2017) Meeting Public exhibitions were held at the Faygate Village Hall A meeting was held with Jason Hawkes and from 10:00am - 4:30pm on Saturday 23 September and representatives from Horsham District Council on 30 4:00 - 7:30pm on Thursday 28 September. May 2017 to discuss initial proposals for the site.

The exhibitions were well attended. The Pre-application document presented, set out the following: Copies of the exhibition boards are included in the Appendix to this document. These included: • Principle of development; • Development context; • Welcome board; • Constraints and opportunities; • Background and development context; • Concept; • Development constraints and opportunities; • Design principles; • Development concept and design principles; • Illustrative masterplan; • Proposed illustrative masterplan; • Dwelling size distribution; • Design principles associated with the proposed development; • Building heights diagram; and • Character areas; • Affordable distribution. • Public realm and landscaping proposals; In principle no policy objection to residential use, quantum or layout of the draft proposals was stated by • Transport and parking; and Horsham District Council. • Feedback and next steps. 4.5 Second Pre-Application Meeting For more detail on the public consultation events, refer to the Statement of Community Involvement. A second pre-application meeting was held with Horsham District Council planning department on 19 October 2017.

A second Pre-Application document was presented and the changes were explained. Savills explained that it was now proposed to submit an application for approximately 227 dwellings.

Information was requested on the areas of the various categories of open space in relation to Horsham Standards. Additional tree planting is to be shown in the parking court.

Reserve Land, Kilnwood Vale - Design & Access Statement 29 5.0 Proposals

30

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Proposals 5.0

5.1 Design 5.2 Use and Amount 5.3 Residential Mix 5.4 Layout 5.5 Scale 5.6 Landscaping and Ecology 5.7 Appearance 5.8 Character Areas

Reserve Land, Kilnwood Vale - Design & Access Statement 31

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 5.0 Proposals

5.1 Design Crest has been undertaking regular meetings with Horsham District Council to discuss the evolving masterplan proposals for Kilnwood Vale. Following the analysis of the existing site and its context, and the guidance and parameters within the approved outline application, the proposals have been developed for the Reserve Land with the following objectives in mind: • To achieve a high quality environment with good public realm and amenity space. • To be an efficient use of land. • To comply with the approved Parameter Plans and national and local government guidelines. • To be design led, ie. not of standard design, but respecting the character of the development site. • To create a good mix of accommodation in accordance with the requirements of the Outline Planning Approval. • To provide a range of affordable housing in compliance with the mix set out in the Section 106 • To create a place with clear local identity where people want to live. • To provide a safe and secure environment achieved by the layout and design of the scheme. • To incorporate landscaped buffers around the edges of the site. • To enable sustainable living. • To ensure a high degree of permeability enabling ease of movement, with good links to the surrounding area and to the facilities provided within the new neighbourhood. • To minimise the impact of car parking on the quality of the public realm. • To ensure an appropriate relationship between the proposed dwellings and completed homes in Phase 1. • To create appropriate and varied spaces between buildings • To achieve high quality design of the built environment. • To provide play facilities. Extract from Illustrative Masterplan

32

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Proposals

5.2 Use & Amount 5.3 Residential Mix Outline planning permission is sought for approximately The Reserve Land is an extension of the wider Kilnwood 227 dwellings with detailed permission sought for access Vale community and will deliver 40% of the total number only. of dwellings as affordable homes. This is consistent with the signed Section 106 Agreement (S106) for the wider A summary of the mix of accommodation included within Kilnwood Vale development, providing a tenure split of the illustrative layout is set out below: 70% shared ownership and 30% rent. The schedule below sets out the agreed S106 affordable housing split:

Schedule of Private Housing Schedule of Affordable Housing (40%)

Percentage Percentage Unit Type Unit Type (%) (%)

1 Bedroom apartment 7.4 1 Bedroom apartment 25 2 Bedroom apartment 14.0 2 Bedroom apartment 25 2 Bedroom house 30.2 2 Bedroom house 25

Private 3 Bedroom house 33.8 3 Bedroom house 15 Affordable 4 Bedroom house 14.7 4 Bedroom house 10 Total 100 Total 100

Note: Schedules of Accommodation are provided for indicative purposes only

Reserve Land, Kilnwood Vale - Design & Access Statement 33 5.0 Proposals

5.4 Layout The illustrative masterplan shown opposite provides Apartments and short terraces of houses define the an indicative layout for information purposes only. The edges of the primary street from the access into the site. illustrative layout has been designed to ensure that it This leads to a secondary loop road in the northern part would have a complimentary character to Phase 1. of the development off which a number of streets radiate out to the green edges. The illustrative layout for the site indicates how the following could be provided: A green square in the northern part of the layout forms a focal space for this part of the development. Terraced • Approximately 227 new homes. houses around this space give an enhanced sense of • A high quality environment with a range enclosure. A similar but less formal space provides a of homes including 1, 2, 3 and 4 bedroom focus to the southern part of the development with lanes dwellings. again radiating from it to the development edges. • 40% of new homes to be affordable. Larger detached houses form a frontage to the green space which contains the attenuation basin at the • Buildings oriented to limit potential overlooking. northern edge of the development. This forms a • A safe and secure environment for the new continuation of the character and treatment on the community. northern edge of Phase 1. The shared surface lane along this edge provides the opportunity to complete the • An informal, organic edge around the western primary recreational route indicated on the consented and northern boundaries. parameter plans. The houses are arranged on a sinuous building line which gives this edge an informal, semi- • A landscaped buffer zone along the eastern rural character. edge adjacent to Hoppers Brook. In the northeast corner a shared surface lane connects • A landscaped buffer along the southern edge with the lane within the western edge of Phase 1. This adjacent to A264. provides the opportunity for a bollarded emergency • A positive frontage at the development access, and pedestrian / cyclist connectivity. interface with open space areas to ensure Along the eastern edge of the development the layout good natural surveillance. reflects that on the western edge of Phase 1. The • Good demarcation of the public and private houses complete a large perimeter block with Hoppers realm. Brook running north-south through it. The scheme layout will be designed to ensure opportunities are included • Higher density development along the southern for higher density dwellings along the southern edge. edge of development as well as the entrance Terraces of houses front onto the secondary street gateway, with a gradation of lower density with mews courts behind with short terraces of houses towards the open space edges. and Flats over Garages (FOGs) providing surveillance • Apartment buildings up to 3 storeys high, and to the landscaped buffer strip along the western edge houses up to 2½ storeys in height. of Hoppers Brook. Buildings are oriented to limit overlooking onto adjacent development. The scheme • Parking provision in accordance with West layout has been designed to ensure that private external Sussex County Council standards. amenity spaces are protected from the traffic noise on the A264 on the building form. The Environmental • Public open space for informal recreation and Noise Survey and Assessment prepared for this site the provision of formal play space. recommends acoustic barriers, such as a close boarded timber fence, earth bund, or combination to mitigate against traffic noise on the A264. The apartment buildings located along the entrance road frontage and around the proposed new roundabout will Glazing and ventilation provision within the dwellings provide a strong sense of arrival to the new community along the southern boundary of the site will be designed of Kilnwood Vale. The building forms have also been to ensure that they meet required sound reduction designed to provide a gateway into the proposed site. standards and residential amenity levels within the The building scale is reduced along the northern edge dwellings. to ensure that the form and massing is complimentary Additional details of the design approach to the layout to the Phase 1 dwellings on the eastern side of Hoppers are included within section 5.8 – Appearance. Brook.

34 Proposals

Illustrative Masterplan

Reserve Land, Kilnwood Vale - Design & Access Statement 35 Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 5.0 Proposals

5.5 Scale The illustrative design proposals for the Reserve Land have been designed to be complimentary to the buildings which have been constructed within Phase 1. The lower scale along the eastern boundary respects the adjacent properties to the east. Building heights comprise a mix of 2 and 2.5 storey houses and 2.5 and 3 storey apartments and 2 storey flats above garages. The diagram illustrates the potential distribution of building heights within the layout.

36 Proposals

Illustrative Building Heights Diagram

Reserve Land, Kilnwood Vale - Design & Access Statement 37 5.0 Proposals

5.6 Landscaping and Ecology Landscaping will be integrated into the development. This will comprise the following: • Street, courtyard and garden tree planting. • Shrub and hedgerow planting on street frontages. • Hardscape and street furniture proposals . • Play areas comprising a Local Equipped Area of Play (LEAP) and Local Areas of Play (LAP’s). • Landscaping within buffer zones. The proposed illustrative layout has been prepared to respond to the landscape sensitivity of the site in relation to the western edge of Hoppers Brook and the development in Phase 1, and the wider countryside edges. • Landscape buffer zones have been provided around all of the outer edges of the development. • Trees along Hoppers Brook will be retained and integrated as part of the development. • Small parks have been incorporated as a central focus to the northern and southern parts of the development. • Formal tree planting will be incorporated in the Primary Street and along the access road frontage. • Informal tree planting will be incorporated into the community lanes and along the open space edges around the perimeter of the development. • Landscaped frontages would be provided to new homes along lanes and private drives with hedge and shrub plantinghedge and shrub planting. The hardscape materials would be designed to maintain the high quality which has been achieved for the public realm within the Phase 1 development. This will include the following: • Macadam carriageway on primary and secondary streets. • Block paved community lanes and private drives.

Examples of hard and soft landscaping treatments

38 Proposals

CONNECTION TO BROADER KILNWOOD VALE AMENITY ROUTES AND OPEN SPACES

PONDTAIL SHAW - Woodland amenity route

PRIMARY RECREATIONAL ROUTE

POND S2 - Enhanced amenity landscape - New wetland scrapes at west end - Occasional trees - Enhanced marginal planting. SPECIES RICH HAY MEADOW

POND S2 FRONTAGE - To match Phase 1 COMMUNITY ORCHARD - Hibernacula (existing) to remain - Information boards - Mown amenity grass paths - Species rich hay meadow

POCKET PARK - Grassed open space - Informal parkand trees Green threads link the perimeter - LAP landscape and the pocket parks

HOPPERS BROOK GREENWAY - Woodland understorey planting - Occasional open views to Brook - Introduce erosion control / stream enhancements - Mown grass and bulb frontage - Species rich hay meadow mix to outer edge

WESTERN BOUNDARY AMENITY ROUTE - Informal amenity route - Existing hedgerow retained - Woodland / buffer planting - Scattered native tree planting - Mown grass and bulb frontage - Species rich hay meadow mix to outer edge.

EQUIPPED PLAY AREA VILLAGE GREEN LEAP- 'Wildlife theme' - Existing informal public amenity space - 400m2 - Jungle mulch and play bark surface

Green threads link the perimeter landscape and the pocket parks POCKET PARK - Informal grassed open space - Birch trees to provide height / open feel - LAP

AMENITY ROUTE WET WOODLAND - Existing willow / alder rich woodland

0 20 40 60 80 100

Illustrative landscape strategy for the Reserve Land

Reserve Land, Kilnwood Vale - Design & Access Statement 39 0 20m 40m 60m 80m 100m

Drawing Revision Client Drawing Title Status Rev. Date Description Drawn Checked ILLUSTRATIVE LANDSCAPE STRATEGY P4 02.11.2017 UPDATED TO SUIT CLIENT COMMENT RECEIVED 01.11.2017 05:47hrs. AC AC CREST NICHOLSON ISSUED FOR INFORMATION P3 29.10.2017 OSP BASE UPDATED TO REV 29A AND STRATEGY REVISED TO SUIT. AC AC P2 19.09.2017 AREA BY '5' REVISED TO SUIT CLIENT COMMENT. GR AC P1 18.09.2017 REVISED TO SUIT NEW LAYOUT GR AC DRAFT AB AC Project Scale Sheet Size Date BASED ON OSP Coloured Site Layout 1:1000 A1 MAY 2017 DAVID JARVIS ASSOCIATES Reserve Land, Kilnwood Vale KILNWOOD VALE - RESERVE LAND Client Ref. Drawing Ref. Drawing No. Status DAVID JARVIS ASSOCIATES LIMITED 1 Tennyson Street Swindon Wiltshire SN1 5DT 16375 / SK29A 227 units - t: 01793 612173 Scale 1:1000 @ A1 May 2017 2587-5-1-2-DRS 001 P4 e: [email protected] w: www.davidjarvis.biz ©David Jarvis Associates 2016 5.0 Proposals

B

C A

View A: Looking towards Western Green

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327

View B: Looking towards Northern Open Space

View C: Looking towards Hoppers Brook Boundary

40 Proposals

B

A C

Key Plan (not to scale)

Reserve Land, Kilnwood Vale - Design & Access Statement 41 5.0 Proposals

5.7 Appearance The development of scheme proposals at the reserved matters stage would need to ensure that the reserve land is complimentary to Phase 1, is appropriate to its context and local building traditions within , and has subtle variations in materials and building details to reinforce the legibility of the respective street types, while ensuring that it is a coherent part of the overall masterplan. The images of the Phase 1 site below indicate the variety of building form and architectural expression which could be applied on the Reserve Land site. The palette of proposed materials and details would be complimentary to those used within Phase 1.

42 Proposals

Primary Street Frontage examples Open Space Frontage examples

Entrance Green Frontage examples Village Green examples

Reserve Land, Kilnwood Vale - Design & Access Statement 43 5.0 Proposals

5.8 Character Areas The illustrative layout for the site will have the potential to be sub-divided into a number of areas with different characteristics. These have been indicated on the diagram below.

Entrance green frontage Hoppers Brook edge

Primary street frontage Southern Green

Northern Green and radiating streets Southern edge Character Areas Diagram Open space frontage Reserve Land, Kilnwood Vale

Entrance green frontage Hoppers Brook edge 16375 / SK27A Scale 1:1000 @ A1 August 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com Primary street frontage consents. All dimensions to be checkedSouthern by user and any discrepancies, Green errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327

Northern Green and radiating streets Southern edge Character Areas Diagram Open space frontage Reserve Land, Kilnwood Vale 16375 / SK27A Scale 1:1000 @ A1 August 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327

Illustrative Character Areas Diagram

Entrance green frontage Hoppers Brook edge 44 Primary street frontage Southern Green

Northern Green and radiating streets Southern edge Character Areas Diagram Open space frontage Reserve Land, Kilnwood Vale 16375 / SK27A Scale 1:1000 @ A1 August 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Proposals

Character Areas

The images below are generally of the completed Phase 1 development and have been used to illustrate how the development could be designed to respond to the different parts of the site.

Entrance Green Frontage examples Primary Street Frontage examples

Northern Green and Radiating Streets examples Open Space Frontage examples

Hoppers Brook Edge examples Southern Green examples

Southern Edge examples Character areas diagram and images to show potential housing typologies within respective areas

Reserve Land, Kilnwood Vale - Design & Access Statement 45 6.0 Access & Movement

46

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Access & Movement

6.06.1 Vehicular Access and Movement 6.2 Pedestrian / Cyclist Access and Movement 6.3 Public Transport 6.4 Parking Strategy 6.5 Waste & Recycling Strategy 6.6 Flooding & Drainage 6.7 Site Waste Management Strategy

Reserve Land, Kilnwood Vale - Design & Access Statement 47

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 6.0 Access & Movement

6.1 Vehicular Access and Movement Network Outline planning permission is sought for approximately Access to the Reserve Land site will be via the proposed 227 dwellings with detailed consent for access only. An new roundabout located on the existing access road access and movement parameter plan has also been into the Kilnwood Vale development from the A264. submitted as part of the outline application for the site. The roundabout has been designed in consultation with WSCC. A new footpath will be provided around the western side of the access road which will also provide links to the bus stops and Phase 1. The proposed layout has been designed to create a legible and permeable movement network.

NOTES 1. This drawing has been prepared in accordance with the scope of RPS’s N appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. DO NOT SCALE.

2m Footway/ Hardsurfaced area

2m Verge/ Landscaped area

FFL 79.50

E Footway & Verge Added to Northern edge 031117 MRA KK

D Hatch areas amended. 031117 MRA KK

C Hatch areas amended 021117 MRA KK

B Hatch amended Nov 17 MRA MRA Existing Bus Lane A Adjustments Made to Kerb line Oct 17 BD MRA Rev Description Date Initial Checked

1.2m wide island

140 London Wall London, EC2Y 5DN NOTES T: +44(0)20 7280 3300 E: [email protected] N 1. This drawing has been prepared in accordance with the scope of RPS’s appointment with its client and is subject to the terms and conditions of Client Crest Strategic Projects that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared

and provided. Project Kilnwood Vale, Reserve Land 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. DO NOT SCALE. Title Proposed Site Access Junction

2m Footway/ Hardsurfaced area Status Drawn By Checked By Information BD MRA Project Number Scale @ A3 Date Created JNY9408 25.10.2017

Drawing Number Rev 2m Verge/ Landscaped area JNY9408-01 E

c 2016 RPS Group rpsgroup.com Drawing Ref: P:\JNY9408 - KILNWOOD VALE, RESERVE LAND\HIGHWAYS\DRAWINGS\JNY9408-01E-PROPOSED LAYOUT.DWG Plotted Date: 11/3/2017 10:01 AM Crown Copyright, All rights reserved. RPS Group license number 0100039993

FFL 79.50 Proposed Access Roundabout Location Plan Proposed Access Roundabout (Source: RPS Group)

Features of the vehicular movement network include the following:

• Hierarchy of street types and spaces which E• FootwayGreen & Verge Added spaces to Northern edge form031117 focus MRA KK in each area with punctuate the layout D Hatchcommunity areas amended. lanes031117 leading MRA KK from them C Hatch areas amended 021117 MRA KK • New roundabout proposed on existing access B Hatch amended Nov 17 MRA MRA Existing Bus Lane A• AdjustmentsGreen Made to lanesKerb line and Octprivate 17 BD MRAdrives around open road to Kilnwood Vale Rev Descriptionspace edges Date Initial Checked • Primary street leads from new roundabout into • A design speed of 20mph achieved through development1.2m wide island sympathetic design of streets 20mph in line • Secondary streets serve the northern and with Manual for Streets (MfS) southern areas of layout

140 London Wall London, EC2Y 5DN T: +44(0)20 7280 3300 E: [email protected]

Client Crest Strategic Projects

Project Kilnwood Vale, Reserve Land

48 Title Proposed Site Access Junction

Status Drawn By Checked By Information BD MRA Project Number Scale @ A3 Date Created JNY9408 25.10.2017

Drawing Number Rev JNY9408-01 E

c 2016 RPS Group rpsgroup.com Drawing Ref: P:\JNY9408 - KILNWOOD VALE, RESERVE LAND\HIGHWAYS\DRAWINGS\JNY9408-01E-PROPOSED LAYOUT.DWG Plotted Date: 11/3/2017 10:01 AM Crown Copyright, All rights reserved. RPS Group license number 0100039993 Access & Movement

Illustrative Access and Movement Diagram

Reserve Land, Kilnwood Vale - Design & Access Statement 49 6.0 Access & Movement

6.2 Pedestrian / Cyclist Access and Movement Network The illustrative layout incorporates a network of routes for pedestrians and cyclists which emphasises the high degree of permeability and connectivity with the wider masterplan. The pedestrian and cyclist routes include segregated footways and cycle routes on carriageway on the primary and secondary streets and shared surface community streets and green lanes. The footpath / cycleway network connects with the street network in Phase 1 and shows segregated footways within the open space around the edges of the site which connects to the primary recreational routes incorporated into the wider masterplan at the northern end of the site.

50 Access & Movement

Pedestrian and Cyclist Movement

Pedestrian and Cyclist Movement Diagram Reserve Land, Kilnwood Vale 16375 / SK30A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327

Illustrative Pedestrian / Cyclist Access and Movement Network Diagram

Pedestrian and Cyclist Movement

Reserve Land, Kilnwood Vale - Design & Access Statement 51 Pedestrian and Cyclist Movement Diagram Reserve Land, Kilnwood Vale 16375 / SK30A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 6.0 Access & Movement

6.3 Public Transport 6.4 Parking Strategy A number of bus routes are proposed to be diverted Parking will be provided on site in accordance with West through the site including routes 200, 300, 23 / 24 and Sussex County Council guidance, which is estimated Fastway route 10. The services provide access to a to be required by applying the West Sussex County range of destinations including Horsham, Crawley and Council parking demand calculator. . Provision would generally be as follows: • One and two bedroom apartments 1 - 2 spaces • Two bedroom houses 1.5 - 2 spaces • Three bedroom houses 1.5 – 3 spaces • Four bedroom houses 2 – 3 spaces One visitor space will also be provided for every five dwellings. Parking will be designed into the scheme to ensure that it does not dominate the public realm but that there is sufficient provided and it is conveniently located to ensure that parking issues do not arise. Parking provision will be in a number of forms, including: • Parallel parking on street • Perpendicular parking either on street or on plot • Rear parking courts • On-plot in garages and drive spaces Images showing each of the above are included on the opposite page. Cycle parking is provided in accordance with West Sussex County Council’s guidance. The standard applied is set out below: • One and two bedroom apartments – 0.5 spaces per unit in communal storage rooms • Two bedroom houses – 1 space per house • Three and four bedroom houses – 2 spaces per house

52 Access & Movement

Perpendicular parking on-plot Parallel mews parking

On-plot parking On-street parallel parking

Parking in rear courts Parking in frontage courts

Reserve Land, Kilnwood Vale - Design & Access Statement 53 6.0 Access & Movement

6.5 Waste and Recycling Strategy 6.6 Flooding and Drainage ‘Manual for Streets’ outlines that “the design of local The surface and foul water drainage strategy for the roads should accommodate service vehicles without Reserve Land is included in the FRA which accompanies allowing their requirement to dominate the layout. On this application. streets with low traffic flows and speeds, it may be assumed that they will be able to use the full width of the Flood Risk carriageway to manoeuvre.” Internal roads within the development have been designed to be wide enough to The site is located within Flood Zone 1, meaning the site accommodate the swept path requirements of service is at low risk of flooding from fluvial sources. According and refuse vehicles while not being overly obtrusive. to the National Planning Policy framework (NPPF) the proposed development (residential dwellings) The design of the proposed layout and the various street is classified as ‘More Vulnerable’ and it is therefore types incorporates the provision of hardstand space to considered appropriate in this location. accommodate bins on collection day so that they may be collected by the Council. The layout will be designed Foul Water Drainage in accordance with Horsham District Council’s current standards. The foul water drainage strategy will be designed to adoptable standards, with flows discharging to an adoptable pumping station located at the north eastern corner of the site. Flows from the site pumping station will discharge to the gravity sewers with Phase 1 of Kilnwood Vale. Surface Water Drainage

Surface water from the development will be conveyed by gravity pipe sewers that will be offered for adoption. The surface water from the development will be discharged to the attenuation pond north of the site. Permeable paving will be utilised in large car parks to provide source control of surface water and improve the surface water quality discharged from the car parking areas. Surface water will be discharged from the attenuation pond at greenfield run off rates. Due to poor soil infiltration rates, soakways were considered inappropriate for the site. The attenuation pond in addition to limiting flows off the site will provide amenity value and enhance biodiversity on the site.

54 Access & Movement

EXISTING POND S2

OUTFALL TO POND S2

IL = 74.725 78.00

OUTFALL TO POND S2

IL = 74.725 78.00

NOTES

1 DO NOT SCALE THIS DRAWING ON PRINT OR ELECTRONICALLY. WORK FROM FIGURED DIMENSIONS ONLY. 2 No deviation from the details shown on this drawing is allowed without CampbellReith's prior permission in writing. 3 Read this drawing with all Architects, Service Engineers and CampbellReith's relevant details and drawings. NB. Setting-out dimensions as per the Architect's drawings take precedence. 4 All work is to be in accordance with the relevant specifications issued by

CampbellReith, British Standard Codes of Practice, Statutory requirements and the Contract Documents. 79.00 5 DRAWING STATUS P : PRELIMINARY - Evolving drawings for approvals,Tenders, Billings, etc. C : CONSTRUCTION - Fully developed drawings issued under instruction for

construction. 79.00 ONLY STATUS C DRAWINGS TO BE USED FOR CONSTRUCTION.

6 SUITABILITY CODE 80.00 81.00 WORK IN PROGRESS: S0 - Work in progress SHARED (NON-CONTRACTUAL): S1 - For coordination, S2 - For information, S3 - For internal review and comment, S4 - For construction approval. DOCUMENTATION (FOR CONTRACTOR PURPOSES): D1 - For costing, D2 - For Tender, D3 - For contractor design, D4 - For manufacture / procurement. 81.00 80.00 CONSTRUCTION: A - For construction, B - For construction but with comments (i.e. areas in abeyance) C - Comprehensive revisions required.

7 x Denotes Section Number. x Denotes Drawing Number

81.00

8. Bulk earthworks levels are assumed to be 500mm below finished 80.00 ground levels. 80.00 81.00

80.00

LEGEND

81.00 79.00 PROPOSED BULK EARTHWORKS 80.00 CONTOUR (MAJOR)

PROPOSED BULK EARTHWORKS CONTOUR (MINOR)

PROPOSED SURFACE WATER DRAINAGE

PERMEABLE PAVING 81.00 81.00

81.00

80.00 79.00 Status/Rev Client Job Title BRISTOL SURREY LONDON 8. Bulk earthworks levels are assumed to be 500mm below finished ground levels. Drg No. drawn CREST NICHOLSON KILNWOOD VALE, CRAWLEY 1 DO NOT SCALE THIS DRAWING ON PRINT OR ELECTRONICALLY. NOTES D1 DOCUMENTATION (FOR CONTRACTOR PURPOSES): D4 7 Denotes Section Number. C S4 CONSTRUCTION: 5 DRAWING STATUS 3 Read this drawing with all Architects, Service Engineers and CampbellReith's S1 S0 6 SUITABILITY CODE P1 4 All work is to be in accordance with the relevant specifications issued by P2 2 No deviation from the details shown on this drawing is allowed without WORK IN PROGRESS: Denotes Drawing Number A - For construction, and the Contract Documents. CampbellReith, British Standard Codes of Practice, Statutory requirements drawings take precedence. relevant details and drawings. CampbellReith's prior permission in writing. WORK FROM FIGURED DIMENSIONS ONLY. SHARED (NON-CONTRACTUAL): - Comprehensive revisions required. C P ONLY STATUS C DRAWINGS TO BE USED FOR CONSTRUCTION. - For construction approval. - For coordination, - Work in progress - For costing, - For manufacture / procurement. E 31.71:500 03.10.17 NEJ : : Reserve Land SurfaceLEGEND Water Drainage Strategy PRELIMINARY CONSTRUCTION 79.00 80.00 11950-RL-CD100 0117 916 1066 01737 784 500 020 7340 1700 DRAINAGE STRATEGY D2 date ISSUED FOR INFORMATION - For Tender, - Evolving drawings for approvals,Tenders, Billings, etc. - SURFACE WATER B - For construction but with comments (i.e. areas in abeyance) S2 PROPOSED SURFACE WATER DRAINAGE PERMEABLE PAVING PROPOSED BULK EARTHWORKS CONTOUR (MINOR) PROPOSED BULK EARTHWORKS CONTOUR (MAJOR) construction. - Fully developed drawings issued under instruction for RESERVE LAND - For information, TANK REMOVED www.campbellreith.com Description x x NB. D3 scale @ A0 Setting-out dimensions as per the Architect's - For contractor design, S3 DUBAI BIRMINGHAM MANCHESTER Reserve Land, Kilnwood Vale - Design & Access Statement - For internal review and comment, 55 C1 checked BSF Suitability S2 00 971 4345 7088 C Campbell Reith Hill LLP 2015 01675 467 484 0161 819 3060 61.7NEJ 06.10.17 51.7NEJ 25.10.17 Date Status/Revision CR Project No. 11950 P2 By 81.00 MANHOLE TO LIMIT DISCHARGE TO 13.4L/S FLOW CONTROL OUTFALL TO POND S2 IL = 74.725

78.00 80.00 81.00 OF SURFACE

3 80.00 ACCOMMODATE 177M WATER AS LONG TERM STORAGE TOP OF TANK = 79.500 TANK SIZE = 16 x 29 1m DEEP EXISTING POND S2 CELLULAR STORAGE TANK TO PROPOSED CL = 80.000 BOTTOM OF TANK = 78.500

OUTFALL TO POND S2 IL = 74.725 79.00

78.00

P1 ISSUED FOR INFORMATION 06.10.17 NEJ

Status/Rev Description Date By

LONDON 020 7340 1700 MANCHESTER 0161 819 3060 SURREY 01737 784 500 BIRMINGHAM 01675 467 484 BRISTOL 0117 916 1066 DUBAI 00 971 4345 7088 www.campbellreith.com

Job Title KILNWOOD VALE, CRAWLEY Client CREST NICHOLSON

RESERVE LAND SURFACE WATER DRAINAGE STRATEGY

drawn date scale @ A0 C1 checked CR Project No.

NEJ 03.10.17 1:500 BSF 11950

Drg No. Suitability Status/Revision 11950-RL-CD100 S2 P1

C Campbell Reith Hill LLP 2015 6.0 Access & Movement

6.7 Site Waste Management Strategy Provision will be made within dwellings for the storage of recyclable waste to assist in encouraging recycling within the household. This space will generally be provided either in kitchens or utility rooms. Storage and collection of refuse and recyclable waste has been considered as an integral part of the design process. Storage provision will be made on the basis of the following: Houses • 1 no. 140 litre residual waste bin • 1 no. 240 litre recyclable waste bin • 1 no. 240 litre garden waste bin

External residual and recyclable waste storage will generally be within rear gardens for terraced and semi detached houses without garages, and as part of the garage provision for semi-detached and detached properties with on plot parking. Terraces will be a maximum of five houses in length with a passageway giving rear access to gardens for bins, cycles and general rear garden access.

Apartments Storage of residual and recyclable waste for apartments has been based on the provision of an 1100 litre bin for each per six flats. Residual waste is collected weekly and recyclable waste and garden waste is collected alternate fortnightly on a different day to residual waste. A worst case provision has been allowed in the design of the hardstand spaces incorporated in the street for 1 no. 240 litre bin per household. The hardstand space allows the bins to be stored adjacent to the adoptable highway.

56 Sustainability

7.07.1 Sustainability Principles 7.2 Crime Prevention and Community Safety 7.3 Inclusiveness - Access for All

Reserve Land, Kilnwood Vale - Design & Access Statement 57 7.0 Sustainability

7.1 Sustainability Principles Community The following principles will be considered to enable the This development forms part of a new sustainable development to be sustainable. neighbourhood which incorporates a number of key functions all with easy access of the Reserve Flooding Lane. Kilnwood Vale masterplan incorporates a new neighbourhood centre which includes provision for the To reduce the surface water runoff from the developed following: site thereby minimising the risk of flooding downstream of the site, the following drainage features could be • New primary school incorporated into the proposed development: • Medical centre • The amount of hard landscaping will be • Community hub / Library minimised, whilst the use of porous and permeable surfaces will be maximised. • Extra care housing • All surface water will be disposed of through • Commercial uses including Pub / restaurant the use of SuDS strategy. and retail The site is located within Flood Zone 1 and there is no • Employment uses history of flooding of the site. This will serve not only the new community within the Water Efficiency new neighbourhood but the surrounding area as well. A Home Owners’ Pack will be provided with the Rainwater harvesting in the form of rainwater butts will dwellings which will contain at least the following be used for landscape maintenance. information: Energy • Local transport services.

The new houses will provide the following in their • Utility suppliers. specification: • Energy efficiency. • Fabric first approach. • Local amenities. • All windows will be double-glazed. • Refuse collection. • A Home Owners’ Pack will be provided. • Recycling facilities. • Local organisations and community groups. • Environmental technologies installed in the home.

58 Sustainability

Open Space Public Transport

The provision of good quality recreational and amenity A number of bus routes are proposed to be diverted space is an important part of sustainable residential through the site including routes 200, 300, 23 / 24 and development. The proposed scheme is integrated within Fastway route 10. The services provide access to a the wider landscape framework for Kilnwood Vale with range of destinations including Horsham, Crawley and easy access via the pedestrian and cyclist movement Gatwick Airport. Bus stops currently located on the network to the Greenways, other open space areas and access road into Kilnwood Vale from the A264 will be to the central sporting space. retained. Provision on the reserve land site includes landscaped This will enable almost all of the new homes within the buffer zones around the site perimeter with an integrated reserve land to be within a 5 minute walk of the bus wildlife amenity route. It also includes the provision of a stops. Local Equipped Area for play with a wildlife theme and enhanced amenity landscape around the surface water Cycling drainage basin. In order to encourage cycling as an alternative mode of Adaptability transport to journeys by car, these proposals are well integrated with the pedestrian and cycle movement The new homes will be designed to provide the network within the masterplan, which will provide opportunity for residents to work at home, having safe and convenient access by cycle to the local sufficient space and facilities and being equipped with neighbourhood facilities and the surrounding area. suitable outlets that will enable the occupants to have data access and necessary power supplies. Ecology Crime The provision of landscaped open space within the development will enhance the opportunities for The design of the scheme has addressed the principles ecological biodiversity on the site. set out within Secured by Design. This will ensure a residential environment that puts occupants safety at the forefront and which in turn will create a high quality environment for the long term.

Reserve Land, Kilnwood Vale - Design & Access Statement 59 7.0 Sustainability

Materials 7.2 Crime Prevention and Consideration will be given to the use of local Community Safety materials and suppliers where viable to reduce the transport distances and to support the local economy. The layout has been designed to prevent crime and Consideration will be given to the following measures: the fear of crime in accordance with government guidance set out in “Safer places – the Planning System • Use of ‘A’ rated materials as assessed using and Crime Prevention” (Office of the Deputy Prime the BRE Green Guide to Specification for Minister, April 2004). In particular, the development will Buildings wherever possible. incorporate the following features: • Use of timber, the source of which is certified • Traditional streets that are overlooked by the by FSC / PEFC or an equivalent approved surrounding houses so that they feel safe, both certification body where practical. in the daytime and at night. • Use of insulation materials with zero ozone • Exposed back gardens will be avoided (to depletion potential. both the proposed houses and neighbouring dwellings) to minimise the risk of unauthorised entry to properties from the rear. • The proposed development is limited to the primary route and a private courtyard, restricting access through the site to residents and their visitors. • Secured by Design principles to be adopted across the site.

60 Sustainability

Lighting 7.3 Inclusiveness - Access for All The choice of street lighting will be in accordance with In accordance with the guidance and requirements for the requirements of West Sussex County Council. The access, highlighted in Section 3.0 of this document, the height and design of the columns and lanterns will be in dwellings have been designed to comply with Approved keeping with those already approved and implemented Document Part M of the Building Regulations (2004) and on Phase 1 of the development. the requirements of the Equality Act (2010): The lighting strategy will also meet landscaping and • The proposed development will place an ecological requirements. Street lighting will be designed emphasis on pedestrian, mobility impaired and to minimise light pollution and will be energy efficient. cycle use over car travel. The locations of street light columns and street trees will be coordinated to ensure that illumination levels are • The development has been designed to allow not compromised by tree canopies. Lighting column movement choice. Means of travel other than locations will be carefully considered as part of the street the car will be encouraged. layout to ensure that visual clutter is minimised. • Parking will not dominate the development. • The internal layout of the dwellings will allow for wheelchair or mobility impaired access in accordance with Approved Document Part M of the Building Regulations (2004).

Reserve Land, Kilnwood Vale - Design & Access Statement 61 8.0 Development Parameters

62 Development Parameters

8.08.1 Land Use Parameter Plan 8.2 Density Parameter Plan 8.3 Building Heights Parameter Plan 8.4 Pedestrian and Cycle Movement Parameter Plan 8.5 Vehicular Movement Parameter Plan 8.6 Landscape and Open Space Parameter Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 63 8.0 Development Parameters

8.1 Land Use Parameter Plan The Reserve Land which is the subject of this outline application is within the approved site area for the wider Kilnwood Vale development which has extant public consent. It has the capacity to deliver additional new homes which are complimentary to the wider consented masterplan, and specifically to the adjacent Phase 1 which is now complete.

Consented Land Use Distribution Parameter Plan

Land Use Distribution Parameter Plan

64 Development Parameters

8.2 Density Parameter Plan The Density Parameter Plan which has been submitted with this application is generally consistent with and complimentary to the Density Parameter Plan approved under the extant outline consent for the wider Kilnwood Vale development and particularly, to the adjacent Phase 1 area.

Consented Density Parameter Plan

Character / Density Parameter Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 65 8.0 Development Parameters

8.3 Building Heights Parameter Plan The Building Heights Parameter Plan approved under the extant outline consent (ref DC/15/2813) shows the southern part of the Kilnwood Vale development having storey heights from 2 – 3 storeys. The building heights within the scheme proposals for the Reserve Land include houses of 2 and 2.5 storeys in height and apartment buildings of 2, 2.5 and 3 storeys in height which are therefore consistent with and complimentary to the adjacent Phase 1 land. The Building Parameters set out on page 100 of the OPA DAS also set out the maximum and minimum overall plan dimensions individual, terraced and corner buildings. The residential building parameters are summarised below: • Standard residential building– Length min 4m, max 45m / Width min 7m, max 11m • Corner residential building – Length min 4m, max 45m / Width min 7m, max 45m Consented Building Heights Parameter Plan Buildings within the reserve land would be generally compliant with these parameters.

Building Heights Parameter Plan

66 Development Parameters

8.4 Vehicular, Pedestrian and Cycle Movement Parameter Plan The proposed Access and Movement Parameter Plan incorporates the proposed vehicular and pedestrian movement framework. The movement network includes a new roundabout on the primary street access road from the A264 and a number of pedestrian access points into the site via the eastern boundary. The pedestrian movement network integrates the primary recreational route identified on the consented Pedestrian and Cycle Movement Parameter Plan around the perimeter of the surface water drainage basin.

Consented Pedestrian and Cycle Movement Parameter Plan

Consented Vehicular Movement Parameter Plan

Access and Movement Parameter Plan

Reserve Land, Kilnwood Vale - Design & Access Statement 67 8.0 Development Parameters

8.5 Landscape and Open Space Parameter Plan The scheme proposals submitted with this outline planning application will enable the layout for the reserve land to be integrated with an be complimentary to the landscape framework for the overall development of Kilnwood Vale. The proposed parameter plan incorporates the surface water drainage basin already constructed at the northern end of the site. It also incorporates: • Temporary reptile receptor area in the north west corner of the site • Landscape buffer zones around the site perimeter • A Local Equipped Area of Play (LEAP) • Local Areas of Play (LAP’s) • Proposed footpaths and amenity routes

• Pocket parks Consented Landscape and Open Space Parameter Plan • Green lanes

Landscape and Open Space Parameter Plan

68 Conclusions 9.0 9.1 Conclusions

Reserve Land, Kilnwood Vale - Design & Access Statement 69

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 9.0 Conclusions

9.1 Conclusions This outline application will enable the development of a subsequent more detailed layout for the site. It will deliver the following:

• Creation of development gateway into the new community of Kilnwood Vale; • Provision of approximately 227 additional new homes to meet demand; • Provision of 40% affordable homes to meet local need; • Provision of one and two bedroom apartments; • Provision of two, three and four bedroom houses; • Delivery of surface water attenuation storage; • Provision of landscape buffers around the site edges; • Provision for informal and formal recreation including play facilities and pocket parks; • Provision of parking to meet West Sussex County Council standards; • Dedicated access point; • Links with wider development with sustained access to services and facilities.

70

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Conclusions

Reserve Land, Kilnwood Vale - Design & Access Statement 71

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 10.0 Appendices

72

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 Appendices 10.0 10.1 Public Exhibition Boards 10.2 Requirements of CLG Guidance on information requirements and validation 10.3 Response to CLG Guidance on information requirements and validation

Reserve Land, Kilnwood Vale - Design & Access Statement 73

Revised Coloured Site Layout Reserve Land, Kilnwood Vale 16375 / SK29A Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 10.0 Appendices

10.1 Public Exhibition Boards

Kilnwood Vale Kilnwood Vale Reserve Land Reserve Land

1. Welcome 2. Background & Development Context Welcome1. Welcome to this public exhibition of our proposals for the Reserved Land The1. Kilnwood Welcome Vale site was allocated in the West of Bewbush Joint It is acknowledged through planning guidance and the existing Area Action Plan (JAAP) for a new residential neighbourhood and planning permission that this site could be developed for housing at Kilnwood Vale. associated uses. The JAAP required the Reserve Land to be set aside should it not be required for the WRR. Through pre-application to meet the requirement to safeguard land for a Western Relief Road discussions with Horsham District Council is was agreed that the TheThe purpose purpose of ofthis this exhibition exhibition is to is set to outprovide Crest Nicholson’sThe amendments (Crest) that we areLocation proposing plan are environment. (WRR)The purpose should it of have this been exhibition determined is to provide that the routeThe amendments was necessary that wesafeguarding are proposing period are forenvironment. the WRR had expired and that a planning proposalsyou with for an Land update known on progress as the ‘Reserved on the Land’related at Kilnwood to the layout of the scheme only. We Further details of the limited amendments toyou serve with further an update development on progress West ofon Crawley. the related to the layout of theapplication scheme only. could We come Further forward details for residential of the limited development amendments on the that we propose to make to the masterplan Reserve Land. that we propose to make to the masterplan ValeKilnwood. The ‘Reserve Vale Scheme. Land’ is located west of the mainare site not opposite proposing to increase the amount TheKilnwood JAAP safeguarded Vale Scheme. the Reserve Land for part areof the not WRR proposing for to increase the amount layout are set out on the following pages, layout are set out on the following pages, PhaseIn order 1. to improve the scheme and deliver of development or change the uses already In order to improve the scheme and deliver of development or change the uses already along with details of what has happened so the period of five years from May 2009, or up to the date of the along with details of what has happened so key facilities earlier in the development, in approved. The proposed amendments will key facilities earlier in the development, in approved. The proposed amendments will This is because the West of Bewbush Joint Area Action Plan (JAAP) far and the next stages of development. adoption of the last of the two Core Strategy Reviews (referring to far and the next stages of development. discussion with Horsham District Council, we deliver key community facilities such as discussion with Horsham District Council, we deliver key community facilities such as required the land to be ‘reserved’ for a certain period to meet the Thank you for your interest and if you have both Horsham District Council’s and Crawley Borough Council’s Thank you for your interest and if you have are proposing some limited amendments the school and leisure uses earlier in the are proposing some limited amendments the school and leisure uses earlier in the requirement to safeguard land for a Western Relief Road (WRR) any comments or queries, please contact local plan reviews). Both plans are now adopted and therefore the any comments or queries, please contact to the layout of the next phases of development programme. Furthermore, we to the layout of the next phases of development programme.Land Furthermore, use distribution we should it have been determined that the route was necessary to us by using the details provided in the Next safeguarding period has expired. us by using the details provided in the Next development. believe that the amendments we propose development. believe that the amendments we propose serve further development West of Crawley. Theto safeguarding the scheme layout will result in a better Steps page. to the scheme layout will result in a better Steps page. period has now expired. It is acknowledged through planning guidance and the existing planning permission for Kilnwood Vale that this site could be Adjacent built development developed for housing, should it not be required for the WRR. Crest are in the process of delivering Phases 2 and 3 on land to the east of Phase 1, which will include key facilities and infrastructure, including the neighbourhood centre. Development of the Reserve Land will be carefully integrated with the emerging neighbourhoods

atPhase Kilnwood 1 Gateway Vale. Village Green Phase 1 North Square Phase 1 Entrance Green Phase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green The following boards explain the background to the proposals and the key issues that have been considered. Representatives from CrestBackground along with their consultant team are present today to answer Background Phase 1 Masterplan Phase 1 Masterplan yourFollowing queries. extensive consultation, outline planning Following extensive consultation, outline planning permission was granted in 2011 for up to 2,500 new homes permission was granted in 2011 for up to 2,500 new homes Weon thewelcome Kilnwood your Vale site feedback along with in a developingnew neighbourhood the proposals further in on the Kilnwood Vale site along with a new neighbourhood advancecentre, school, of submitting open spaces andan outlinea new rail applicationstation. to Horsham District centre, school, open spaces and a new rail station. CouncilSince planning later thispermission year. was granted, good progress Since planning permission was granted, good progress has been made with the delivery of 291 new homes in has been made with the delivery of 291 new homes in Phase 1, with a number now occupied. It is anticipated Phase 1, with a number now occupied. It is anticipated Vehicular movement Building heights that Phase 1 will be completed in Spring 2016. that Phase 1 will be completed in Spring 2016. Kilnwood Vale The road construction and infrastructure stage of Phase The road construction and infrastructure stage of Phase 1 is now well advanced, which includes the completion 1 is now well advanced, which includes the completion of the roundabout; primary and secondary junctions of the roundabout; primary and secondary junctions from the A264; and completion of key areas of open from the A264; and completion of key areas of open and public spaces. Further works have been completed and public spaces. Further works have been completed with regard to the noise attenuation landform, as with regard to the noise attenuation landform, as well as associated landscaping, pedestrian and cycle well as associated landscaping, pedestrian and cycle way provision. Key public transport services in the way provision. Key public transport services in the form of the Metrobus Service Gatwick Direct 200 have form of the Metrobus Service Gatwick Direct 200 have been delivered in advance of Crest’s obligations. been delivered in advance of Crest’s obligations. The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to residents in March 2015 ahead of an official opening residents in March 2015 ahead of an official opening ceremony in April 2015. The neighbourhood park ceremony in April 2015. The neighbourhood park Pedestrian and cyclist movement Landscape and open space incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead of Crest’s obligation to provide this open space. Both the of Crest’s obligation to provide this open space. Both the early delivery of the public transport provision and the early delivery of the public transport provision and the neighbourhood park demonstrate Crest’s commitment to neighbourhood park demonstrate Crest’s commitment to providing a high quality living environment for residents. providing a high quality living environment for residents.

Gateway Village Green Opening Gateway Village Green Opening

Kilnwood Vale Kilnwood Vale Reserve Land Reserve Land

3. Development Constraints & Opportunities 4. Development Concept & Design Principles The1. physical Welcome issues which have informed the development of Development of the site will potentially offer opportunities and A1. number Welcome of key objectives for development of the site have been identified and include the following: these proposals are set out on the Site constraints diagram. These benefits to the existing community at Kilnwood Vale as well as the include the following: residents of the reserve land site. Some of these are set out below: • Achieve a high quality development • Create a high quality, gateway entrance to the community of Kilnwood Vale Alignment of existing access road into Kilnwood Vale and levels to Opportunity to secure seamless delivery of Kilnwood Vale • Respond positively to existing neighbourhoods to the east (Phase 1) • • environment. environment. Thelimit purpose traffic ofpassing this exhibition through Phase is to 1 provide The amendments that we are proposing are The purpose of this exhibition is to provide The amendments that we• are Create proposing a development are with a clear sense of place and local identity Opportunity to provide new housing in the district Comply with national and local government guidelines you with an update on progress on the related to the layout of the• scheme only. We Further details of the limited amendments • you with an update on progress on the related to the layout of the schemewhere people only. aspireWe Furtherto live details of the limited amendments Existing general fall of land across site • Kilnwood Vale Scheme. are not proposing to increase• New the homes amount will supportthat we businesses propose towithin make the to Neighbourhoodthe masterplan • KilnwoodRespond to Vale the Scheme.visual and landscape context of theare site not proposing to increase the amount that we propose to make to the masterplan layout are set out on the following pages, • Create a safe and securelayout environment are set out achieved on the followingby the design pages, and InAccess order arrangementsto improve the to scheme serve the and proposed deliver developmentof development or change theCentre uses already In order to improve the scheme and deliver of development or change the uses already • along with details of what has happened so • Create a distinct and legible access into the Reserve Land layout of the schemealong with details of what has happened so key facilities earlier in the development, in approved. The proposed amendments will key facilities earlier in the development, in approved. The proposed amendments will • Existing trees and associated root protection zones along Hoppers • Opportunity to providefar and affordable the next stageshomes ofto development.meet local need far and the next stages of development. discussion with Horsham District Council, we deliver key community facilities such as • discussionThe proposed with development Horsham District should Council, blend into we the deliver landscape key setting community facilities• Provide such a diverseas range of new homes to respond to local need Brook Thank you for your interest and if you have Thank you for your interest and if you have are proposing some limited amendments the school and leisure uses• earlierOpportunity in the to provide an extended network of pedestrian areand proposing features of some landscape limited value amendments on the site should the be retainedschool and and leisure uses earlier in the any comments or queries, please contact • Create good pedestrianany and comments cycle links or between queries, the please site andcontact the • toRequired the layout 8 metre of the wide next bufferphases ofalong western sidedevelopment of Hoppers programme. Furthermore,and cyclist movement we and enhanced connectivity to the wider toenhanced the layout where of the possible next phases of development programme. Furthermore, we believe that the amendments we propose us by using the details provided in the Next believe that the amendmentssurrounding we propose area us by using the details provided in the Next development.Brook countryside • development.Be design led, respecting the character of the area and the to the scheme layout will result in a better Steps page. to the scheme layout will •result Facilitate in a better integration Stepsof the page.proposed public transport network and Existing hedgerow and 10 metre wide landscape buffer zone Opportunity to provide enhanced recreational amenity and play neighbouring development • • footpath/cycleways along western edge of site space for the existing community • Minimise the impact of accommodating parking • Provision of 10 metre wide buffer zone along southern edge • Earlier phasing of development brought about by the location of the development and the delivery of a means of access that is not Requirement for acoustic mitigation from A264 • dependent on 3rd parties Development concept diagram Design principles diagram • Provision of temporary reptile reception area • Buffer to drainage basin in the north of the site • Provision of potential emergency access in northeast corner of Phasesite via1 Gateway Phase Village 1 Green Phase 1 North Square Phase 1 Entrance Green Phase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green

Constraints plan Opportunities plan 16. Transport & Parking Background Background Phase 1 Masterplan Phase 1 Masterplan Following extensive consultation, outline planning Following extensive consultation, outline planning permission was granted in 2011 for up to 2,500 new homes permission was granted in 2011 for up to 2,500 new homes on the Kilnwood Vale site along with a new neighbourhood on the Kilnwood Vale site along with a new neighbourhood centre, school, open spaces and a new rail station. centre, school, open spaces and a new rail station. * Since planning permission was granted, good progress Since planning permission was granted, good progress has been made with the delivery of 291 new homes in has been made with the delivery of 291 new homes in Phase 1, with a number now occupied. It is anticipated Phase 1, with a number now occupied. It is anticipated that Phase 1 will be completed in Spring 2016. that Phase 1 will be completed in Spring 2016. The road construction and infrastructure stage of Phase The road construction and infrastructure stage of Phase * 1 is now well advanced, which includes the completion 1 is now well advanced, which includes the completion * * of the roundabout; primary and secondary junctions of the roundabout; primary and secondary junctions from the A264; and completion of key areas of open from the A264; and completion of key areas of open * and public spaces. Further works have been completed and public spaces. Further works have been completed with regard to the noise attenuation landform, as with regard to the noise attenuation landform, as * well as associated landscaping, pedestrian and cycle well as associated landscaping, pedestrian and cycle way provision. Key public transport services in the way provision. Key public transport services in the form of the Metrobus Service Gatwick Direct 200 have form of the Metrobus Service Gatwick Direct 200 have * been delivered in advance of Crest’s obligations. been delivered in advance of Crest’s obligations. The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to * residents in March 2015 ahead of an official opening residents in March 2015 ahead of an official opening * ceremony in April 2015. The neighbourhood park ceremony in April 2015. The neighbourhood park incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead of Crest’s obligation to provide this open space. Both the of Crest’s obligation to provide this open space. Both the early delivery of the public transport provision and the early delivery of the public transport provision and the neighbourhood park demonstrate Crest’s commitment to neighbourhood park demonstrate Crest’s commitment to Site Boundary Root Protection Open Space Nodes / Hoppers Brook Attenuation basin Site Boundary Key vistas providing a high quality living environment for residents. providing a high quality living Areaenvironment for residents. Pocket Parks

Overall Site Boundary Protected Ecology Connecting footpaths Secondary Vistas Play area Blocks Primary Frontage vvvvvvvvvvvvvv Area through open space Gateway Village Green Opening Gateway Village Green Opening Primary Building Frontage Development blocks, High Value Frontage to Hard Standing Secondary Accent buildings Frontage indicative buildings Secondary Street attenuation basin Gardens More broken Site Boundary 10m wide landscaped buffer along western 10m buffer along southern edge Potential Emergency Access Potential pocket parks Parking Courts Landscaped buffers, open Gateway buildings Adjacent Development frontage on semi- boundary within Street space and SuDS Basin * Blocks Boundary of overall site Existing fall of land across site Potential LEAP Highest density as entrance gateway to Shared Surface Lanes rural edges 8m wide buffer along western edge of Hoppers development / Kilnwood Vale Public Open Space Primary Access Landmark New roundabout Vehicular Access from proposed roundabout Brook Temporary reptile reception area Potential secondary street network Play area Road Private Drive buildings access (Construction access for Phase 2) Graduation of density towards green Garage / Parking Courts Green Space incorporating LEAP on western edges Proposed Bulk Earthworks Potential vehicular access to Reserve Tree Canopy Adoptable Turning Emergency Access (Main residents access edge Land parcel Connecting footpaths Heads Tree Canopy for Phase 1) Tree Protection Barrier Emergency / Phase 1 * through open space Infrastructure and associated landscaping / Potential residential development zones Vehicular Access Existing hedgerow earthworks main entrance from A264 Root Protection Zone Landscape buffer zones, open space Requirement for acoustic mitigation from A264 Canopies of existing trees and SuDS

74 Appendices

Kilnwood Vale Kilnwood Vale Kilnwood Vale Reserve Land Reserve Land Reserve Land

5. Proposal 6. Design Principles Associated with the 7. Character Areas The1. proposed Welcome layout has been prepared to illustrate one way in which the development could be planned. This will not form part of the 1. Welcome The1. illustrative Welcome layout for the site will have the potential to be sub-divided into a number of areas with different characteristics. These Outline Planning consent but would be used to inform more detailed proposals in the future. The proposed Outline Planning Application Proposed Development have been indicated on the diagram below. will comprise: The images on this board are generally of the completed Phase 1 Character areas diagram Up to 250 dwellings Illustrative layout development and have been used to illustrate how the development • The purpose of this exhibition is to provide The amendments that we are proposing are environment. TheThe illustrative purpose of masterplan this exhibition would is create to provide a series The of amendmentscharacter areas that resulting we are proposing from the built are form,environment. street hierarchy and character, The purpose of this exhibition is to provide The amendments that we are proposing are environment. could be designed to respond to the different parts of the site . youNew with homes an update will comprise on progress a mix of on one the and related to the layout of the scheme only. We Further details of the limited amendments landscaping,you with an and update housing on progress typology. on the related to the layout of the scheme only. We Further details of the limited amendments you with an update on progress on the related to the layout of the scheme only. We Further details of the limited amendments • Character areas diagram and images to show potential housing Kilnwoodtwo bedroom Vale apartmentsScheme. and two, three are not proposing to increase the amount that we propose to make to the masterplan ItKilnwood is proposed Vale that Scheme. the new homes would be designedare not to proposing to increaseA general the amount gradation ofthat density we propose is proposed to make with to the the higher masterplan densities Kilnwood Vale Scheme. are not proposing to increase the amount that we propose to make to the masterplan layout are set out on the following pages, layout are set out on the following pages, typologies within respective areas layout are set out on the following pages, Inand order four to bedroom improve thehouses scheme and deliver of development or change the uses already complementIn order to improve those already the scheme being andconstructed deliver as ofpart development of the or changebeing the uses around already the access to the site reducing to lower densities In order to improve the scheme and deliver of development or change the uses already along with details of what has happened so along with details of what has happened so along with details of what has happened so key facilities earlier in the development, in approved. The proposed amendments will Kilnwoodkey facilities Vale earlier development in the development, using materials in and approved.architectural The proposed amendmentsaround the development will edges. key facilities earlier in the development, in approved. The proposed amendments will • 35-40% Affordable housing (On-going far and the next stages of development. far and the next stages of development. far and the next stages of development. discussion with Horsham District Council, we deliver key community facilities such as detailingdiscussion which with responds Horsham to District the local Council, building we traditionsdeliver key within community this facilities such as discussion with Horsham District Council, we deliver key community facilities such as discussion with Horsham Council) Thank you for your interest and if you have Thank you for your interest and if you have Thank you for your interest and if you have are proposing some limited amendments the school and leisure uses earlier in the partare ofproposing West Sussex. some limited amendments the school and leisure uses earlier in the are proposing some limited amendments the school and leisure uses earlier in the any comments or queries, please contact any comments or queries, please contact any comments or queries, please contact • toBuildings the layout comprise of the next 2 and phases 2.5 storey of houses development programme. Furthermore, we to the layout of the next phases of development programme. Furthermore, we to the layout of the next phases of development programme. Furthermore, we us by using the details provided in the Next us by using the details provided in the Next us by using the details provided in the Next development.and 2.5 and 3 storey apartments believe that the amendments we propose development. believe that the amendments we propose development. believe that the amendments we propose to the scheme layout will result in a better Steps page. to the scheme layout will result in a better Steps page. to the scheme layout will result in a better Steps page. • Traditional approach to site layout with a series of development blocks and sequence Building heights diagram Density distribution diagram of streets, lanes and squares

• New roundabout off the existing Kilnwood Entrance Green Frontage examples Vale primary access road from A264 • Proposed buildings provide frontage to access road from A264 • Buildings provide positive frontage and natural surveillance to landscape buffer Phase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green Phase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green Phase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green zones around boundaries • Gateway apartment buildings at site access Background Background Background • Network of streets and lanes creates Phase 1 Masterplan Phase 1 Masterplan Phase 1 Masterplan Followingpermeable extensive and consultation, well-connected outline planning layout Following extensive consultation, outline planning PrimaryFollowing Street extensive Frontage consultation, examples outline planning permission was granted in 2011 for up to 2,500 new homes permission was granted in 2011 for up to 2,500 new homes permission was granted in 2011 for up to 2,500 new homes Entrance Green Frontage • onLayout the Kilnwood incorporates Vale site along access with afor new management neighbourhood on the Kilnwood Vale site along with a new neighbourhood on the Kilnwood Vale site along with a new neighbourhood centre,of Hoppers school, open Brook spaces and and associated a new rail station. landscape centre, school, open spaces and a new rail station. centre, school, open spaces and a new rail station. Primary Street Frontage Northern Green and Radiating Streets • SinceGreen planning lanes permission and private was granted, drives good around progress Since planning permission was granted, good progress Since planning permission was granted, good progress has been made with the delivery of 291 new homes in has been made with the delivery of 291 new homes in has been made with the delivery of 291 new homes in Open Space Frontage edges creates informal, semi-rural quality Phase 1, with a number now occupied. It is anticipated Phase 1, with a number now occupied. It is anticipated Phase 1, with a number now occupied. It is anticipated Hoppers BrookEdge thatat Phaseinterface 1 will bewith completed wider incountryside Spring 2016. and that Phase 1 will be completed in Spring 2016. that Phase 1 will be completed in Spring 2016. Southern Green Thedrainage road construction basin and infrastructure stage of Phase The road construction and infrastructure stage of Phase The road construction and infrastructure stage of Phase Southern Edge 1 Playis now area well advanced,with landscaped which includes buffer the completion on western 1 is now well advanced, which includes the completion 1 is now well advanced, which includes the completion • of the roundabout; primary and secondary junctions of the roundabout; primary and secondary junctions of the roundabout; primary and secondary junctions fromedge the A264; and completion of key areas of open from the A264; and completion of key areas of open from the A264; and completion of key areas of open Northern Green and Radiating Streets examples andConnection public spaces. to Further approved works have drainage been completed basin to and public spaces. Further works have been completed and public spaces. Further works have been completed • with regard to the noise attenuation landform, as with regard to the noise attenuation landform, as with regard to the noise attenuation landform, as wellthe as north associated to ensurelandscaping, that pedestrian surface and water cycle run- well as associated landscaping, pedestrian and cycle well as associated landscaping, pedestrian and cycle wayoff provision. and flood Key public risk istransport not increased, services in thein line way provision. Key public transport services in the way provision. Key public transport services in the formwith of the Metrobus wider drainage Service Gatwick strategy Direct 200 have form of the Metrobus Service Gatwick Direct 200 have form of the Metrobus Service Gatwick Direct 200 have been delivered in advance of Crest’s obligations. been delivered in advance of Crest’s obligations. been delivered in advance of Crest’s obligations. Entrance green frontage Hoppers Brook edge The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to Primary street frontage Southern Green residents in March 2015 ahead of an official opening residents in March 2015 ahead of an official opening residents in March 2015 ahead of an official opening Northern Green and radiating streets Southern edge ceremony in April 2015. The neighbourhood park ceremony in April 2015. The neighbourhood park ceremony in April 2015. The neighbourhood park Character Areas Diagram Open space frontage incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as Reserve Land, Kilnwood Vale a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead 16375 / SK27 Scale 1:1000 @ A1 August 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com of Crest’s obligation to provide this open space. Both the of Crest’s obligation to provide this open space. Both the of Crest’s obligation to provide this open space. Both the consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 early delivery of the public transport provision and the early delivery of the public transport provision and the Openearly Spacedelivery Frontage of the public examples transport provision and the Southern Edge examples neighbourhood park demonstrate Crest’s commitment to neighbourhood park demonstrate Crest’s commitment to neighbourhood park demonstrate Crest’s commitment to providing a high quality living environment for residents. providing a high quality living environment for residents. providing a high quality living environment for residents.

Gateway Village Green Opening Gateway Village Green Opening Gateway Village Green Opening

2 Storeys Lowest Density

2.5 Storeys Medium Density

3 Storeys Highest Density

2 Storeys Lowest Density

2.5 Storeys Medium Density Hoppers Br ook Edge examples Southern Green examples 3 Storeys Highest Density Revised Building Heights Diagram Density Distribution Diagram Reserve Land, Kilnwood Vale Reserve Land, Kilnwood Vale 16375 / SK23 16375 / SK26 Revised Coloured Site Layout - 244 Units Scale 1:1000 @ A1 August 2017 Scale 1:1000 @ A1 August 2017 © Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 © Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com Reserve Land, Kilnwood Vale consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 16375 / SK29 Scale 1:1000 @ A1 September 2017

© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327

Kilnwood Vale Kilnwood Vale Kilnwood Vale Reserve Land Reserve Land Reserve Land

8. Public Realm & Landscape Proposals 9. Transport & Parking 10. Feedback & Next Steps The1. proposed Welcome illustrative layout has been prepared to respond to The hardscape materials would be designed to maintain the high The1. only detailWelcome which will be approved as part of the Outline Pedestrian & cycle movement 1. Welcome the landscape sensitivity of the site in relation to the western edge quality which has been achieved for the public realm within the Planning Application will be the access arrangement. A new Thank you for your time. Following receipt of your comments at todays The illustrative layout Pedestrian & cyclist movement plan of Hoppers Brook and the development in Phase 1, and the wider Phase 1 development. This will include the following: roundabout is proposed to give access to the site from the existing incorporates a network of routes exhibition we will review the information and incorporate responses countryside edges. access road into Kilnwood Vale from the A264. The plan below Macadam carriageway on primary and secondary streets for pedestrians and cyclists • environment. illustrates the potential arrangement of the proposed roundabout. environment. environment. TheLandscape purpose buffer of this zones exhibition have beenis to provideprovided aroundThe amendments all of the that we are proposing are The purpose of this exhibition is to provide The amendments that wewhich are proposing emphasises are the high whereverThe purpose of this possible exhibition is toin provide advance The amendments of submitting that we are proposing the are Outline Planning • Block paved communityFurther lanes details and of private the limited drives amendments Further details of the limited amendments Further details of the limited amendments yououter with edges an update of the development on progress on the related to the layout of the• scheme only. We you with an update on progress on the related to the layout of thedegree scheme of only.permeability We and you with an update on progress on the related to the layout of the scheme only. We Kilnwood Vale Scheme. are not proposing to increase the amount that we propose to make to the masterplan Kilnwood Vale Scheme. are not proposing to increaseconnectivity the amountDO NOT SCALE with the thatwider we propose to make to the masterplan ApplicationKilnwood Vale Scheme. in late October/earlyare not proposing November. to increase the amount that we propose to make to the masterplan

FFL Trees along Hoppers Brook will be retained and integrated as part layout are set out on the following pages, 80.00 layout are set out on the following pages, layout are set out on the following pages, • In order to improve the scheme and deliver of development or change the uses already In order to improve the scheme and deliver of development or changemasterplan. the uses already The pedestrian and In order to improve the scheme and deliver of development or change the uses already of the development along with details of what has happened so along with details of what has happened so along with details of what has happened so key facilities earlier in the development, in approved. The proposed amendments will key facilities earlier in the development, in approved. The proposed amendmentscyclist routes includewill segregated key facilities earlier in the development, in approved. The proposed amendments will far and the next stages of development. far and the next stages of development. far and the next stages of development. discussionSmall parks with have Horsham been incorporated District Council, as a wecentral deliver focus key to the community facilities such as discussion with Horsham District Council, we deliver key community facilitiesfootways such and as cycle routes on discussion with Horsham District Council, we deliver key community facilities such as • Open space edge treatmentThank you for yourPlay interestarea example and if you have Thank you for your interest and if you have Further information Thank you for your interest and if you have the school and leisure uses earlier in the the school and leisure uses earlierFFL in the the school and leisure uses earlier in the arenorthern proposing and some southern limited parts amendments of the development are proposing some limited amendments carriageway79.50 on the primary and are proposing some limited amendments development programme. Furthermore, we any comments or queries, please contact development programme. Furthermore, we any comments or queries, please contact development programme. Furthermore, we any comments or queries, please contact to the layout of the next phases of to the layout of the next phases of secondary streets•••• and•••• shared Ifto you the layout have of theany next questions phases of relating to these outline proposals, please contact Sarah Beuden at • Formal tree planting will be incorporated in the Primary Street us by using the details provided in the Next DRAWING STATUS: us by using the details provided in the Next us by using the details provided in the Next development. believe that the amendments we propose development. believe that the amendmentssurface we communityproposeS0 - WORK IN PROGRESS streets and development. believe that the amendments we propose and along the access road frontage Steps page. Steps page. Steps page. to the scheme layout will result in a better to the scheme layout will greenresult inlanes. a better Savills Planning. Her contact detailsto the schemeare set layout out will below: result in a better

Mountbatten House, Basing View, Basingstoke, RG21 4HJ, UK T+ 44 (0) 1256 318 800, F+ 44 (0) 1256 318 700 • Informal tree planting will be incorporated into the community wsp.com The footpathCLIENT: / cycleway network CREST NICHOLSON lanes and along the open space edges around the perimeter of ARCHITECT: Email: [email protected] connects with the street the development PROJECT: network inKILNWOOD Phase VALE 1 and shows

TITLE: • Landscaped frontages would be provided to new homes along segregatedPROPOSED ROUNDABOUT footways LAYOUT within the Tel: 023 8071 3961

SCALE @ A3: CHECKED: APPROVED: lanes and private drives with hedge and shrub planting 1:500 CH KK openPROJECT space No: DESIGNED: aroundDRAWN: DATE: the edges AS AS June 17

DRAWING No: REV: of the site SK001which connectsA to c WSP UK Ltd 07 August 2017 16:36:50, by Andrew Lanfear by 07 August 2017 16:36:50, Examples of hard and soft landscaping treatments Illustrative landscape strategy for the Reserve Land P:\16375 RESERVE LAND, KILNWOOD VALE\EXTERNAL\WSP\2017_06_27\170613_KILNWOOD VALE_PROPOSED ROUNDABOUT LAYOUT\170613_PROPOSED LAYOUT.DWG, printed on File name Address: Savills Planning, Proposed access roundabout plans the primary recreational routes incorporated into the wider 2 Charlotte Place PONDTAIL SHAW masterplan at the northern end Phase 1 Gateway Village Green Phase 1 North Square - Woodland amenity route Phase 1 Entrance Green ParkingPhase 1 Gateway Village Green Phase 1 North Square Phase 1 Entrance Green Phase 1 Gateway Village Southampton Green Phase 1 North Square Phase 1 Entrance Green of the site. 4. Parking will be provided on site to exceed the amount which is PRIMARY AMENITY ROUTE Pedestrian and Cylcist Movement SO14 0TB estimated to be required by applying the West Sussex County 3. Background CouncilBackground parking demand calculator. Provision would generally be as Vehicular movement Background Pedestrian and Cyclist Movement Phase 1 Masterplan POND S2 Phase 1 Masterplan Phase 1 Masterplan - Enhanced amenity landscape follows: Access and movement plan Following extensive consultation, outline planning Following extensive consultation, outline planning The proposed layout has been Following extensive consultation, outline planning Pedestrian and Cyclist Movement Diagram permission was granted in 2011 for up to 2,500 new homes 5. permissionOne and was two granted bedroom in 2011 apartmentsfor up to 2,500 new1 - 2 homes spaces designed to create a legible and Reserve Land, Kilnwood Vale permission was granted in 2011 for up to 2,500 new homes • 16375 / SK30 Scale 1:1000 @ A1 September 2017 on the Kilnwood Vale site along with a new neighbourhood on the Kilnwood Vale site along with a new neighbourhood permeable movement network.© Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com on the Kilnwood Vale site along with a new neighbourhood consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 centre, school, open spaces and a new rail station. 2. • centre,Two school,bedroom open housesspaces and 1.5 a new - 2 railspaces station. Features of the vehicular centre, school, open spaces and a new rail station. WILDLIFE AREA - Reptiles Since planning permission was granted, good progress - Hibernacula (existing) Since planning permission was granted, good progress movement network include the Since planning permission was granted, good progress - Information boards • Three bedroom houses 1.5 – 3 spaces Kilnwood Vale has been made with the delivery of 291 new homes in - Mown grass paths has been made with the delivery of 291 new homes in has been made with the delivery of 291 new homes in - Flower rich grassland following: Phase 1, with a number now occupied. It is anticipated • PhaseFour 1, bedroom with a number houses now occupied. 2 – 3 spaces It is anticipated Phase 1, with a number now occupied. It is anticipated that Phase 1 will be completed in Spring 2016. that Phase 1 will be completed in Spring 2016. that Phase 1 will be completed in Spring 2016. 1. • Hierarchy of street types and POCKET PARK - Grassed open space The road construction and infrastructure stage of Phase - Informal parkand trees The road construction and infrastructure stage of Phase spaces which punctuate the The road construction and infrastructure stage of Phase Green threads link the perimeter 6. 1 is now well advanced, which includes the completion landscape and the pocket parks 1 is now well advanced, which includes the completion layout 1 is now well advanced, which includes the completion of the roundabout; primary and secondary junctions HOPPERS BROOK GREENWAY of the roundabout; primary and secondary junctions of the roundabout; primary and secondary junctions - Open views to Brook from the A264; and completion of key areas of open - Introduce erosion control / stream enhancements from the A264; and completion of key areas of open • New roundabout proposed from the A264; and completion of key areas of open and public spaces. Further works have been completed and public spaces. Further works have been completed and public spaces. Further works have been completed GREEN LINK on existing access road to with regard to the noise attenuation landform, as - Informal amenity with regard to the noise attenuation landform, as with regard to the noise attenuation landform, as - Existing hedgerow retained Kilnwood Vale - Woodland / buffer planting well as associated landscaping, pedestrian and cycle - Scattered native tree planting well as associated landscaping, pedestrian and cycle well as associated landscaping, pedestrian and cycle way provision. Key public transport services in the - Meandering walk way provision. Key public transport services in the way provision. Key public transport services in the - Mown grass and bulbs • Primary street leads from - Flower rich longer grass Frontage parking Mews parking form of the Metrobus Service Gatwick Direct 200 have form of the Metrobus Service Gatwick Direct 200 have new roundabout into form of the Metrobus Service Gatwick Direct 200 have been delivered in advance of Crest’s obligations. 7. been delivered in advance of Crest’s obligations. been delivered in advance of Crest’s obligations. development The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to The Gateway Village Green was informally opened to

residents in March 2015 ahead of an official opening LEAP- 'Wildlife theme' residents in March 2015 ahead of an official opening residents in March 2015 ahead of an official opening 1. VILLAGE GREEN • Secondary streets serve the - 400m2 - Existing informal public amenity space ceremony in April 2015. The neighbourhood park - Jungle mulch and play bark surface ceremony in April 2015. The neighbourhood park northern and southern areas ceremony in April 2015. The neighbourhood park incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as incorporates informal and formal play facilities, as well as 7. of layout a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead a formal recreational green and has been delivered ahead Green threads link the perimeter of Crest’s obligation to provide this open space. Both the landscape and the pocket parks of Crest’s obligation to provide this open space. Both the of Crest’s obligation to provide this open space. Both the POCKET PARK • Green spaces form focus in early delivery of the public transport provision and the - Informal grassed open space early delivery of the public transport provision and the early delivery of the public transport provision and the - Birch trees to provide height / open feel each area with community neighbourhood park demonstrate Crest’s commitment to neighbourhoodOn-plot parking park demonstrate Crest’s commitmentOn-street to parking neighbourhood park demonstrate Crest’s commitment to 3k FITNESS / WILDLIFE AMENITY ROUTE lanes leading from them providing a high quality living environment for residents. - Distance markers providing a high quality living environment for residents. providing a high quality living environment for residents. - Information points 1. - Habitats; WET WOODLAND 1. Hedgerows - Existing willow / alder rich woodland • Green lanes and private drives 2. Species rich grassland Gateway Village Green Opening 3. Woodland edge 8. Gateway Village Green Opening Gateway Village Green Opening 4. Wetland around open space edges 5. Species rich grassland Access road to Kilnwood Vale from A264 6. Stream Proposed bus stop (Bus Route) 7. Semi ornamental Primary access streetAccess road to Kilnwood Vale from A264 (Bus Route) 8. Woodland understorey A design speed of • Secondary streets and spatial nodes Revised Access and Movement Diagram Community Lanes (SharedExisting Surface) bus stop Reserve Land, Kilnwood Vale 20mph achieved through Green Lanes and privatre drives (shared Surface) Primary access street 16375 / SK22 Scale 1:1000 @ A1 August 2017 © Copyright exists on the designs and information shown on this drawing. This drawing may be scaled to the scale bar for planning application purposes only. Do not scale for any other purpose, use figured dimensions only. Subject to site survey and all necessary OSP Architecture, Broadmede House, Farnham Business Park, Weydon Lane, Farnham, Surrey, GU9 8QT, Tel: 01252 267878, www.osparchitecture.com consents. All dimensions to be checked by user and any discrepancies, errors or omissions to be reported to the Architect before work commences. This drawing is to be read in conjunction with all other relevant materials. OS Licence no. 100007327 sympathetic design of streets Secondary streets and spatial nodes 20mph in line with Manual for Community Lanes (Shared Surface) Parking in courts Parking in courts Streets (MfS) Green Lanes and privatre drives (shared Surface)

0 20m 40m 60m 80m 100m

Drawing Revision Client Drawing Title Status Rev. Date Description Drawn Checked CREST NICHOLSON ILLUSTRATIVE LANDSCAPE STRATEGY P2 19.09.2017 AREA BY '5' REVISED TO SUIT CLIENT COMMENT. GR AC DRAFT P1 18.09.2017 REVISED TO SUIT NEW LAYOUT GR AC DRAFT AB AC

Project Scale Sheet Size Date BASED ON OSP Coloured Site Layout 1:1000 A1 MAY 2017 DAVID JARVIS ASSOCIATES Reserve Land, Kilnwood Vale KILNWOOD VALE - RESERVE LAND Client Ref. Drawing Ref. Drawing No. Status DAVID JARVIS ASSOCIATES LIMITED 1 Tennyson Street Swindon Wiltshire SN1 5DT 16375 / SK21 - t: 01793 612173 Scale 1:1000 @ A1 May 2017 2587- 0001 P2 e: [email protected] w: www.davidjarvis.biz ©David Jarvis Associates 2016

Reserve Land, Kilnwood Vale - Design & Access Statement 75 10.0 Appendices

10.2 Requirements of CLG Guidance on information requirements and validation Design Component Appearance

The design and access statement should cover both the Appearance is the aspect of a place or building that design principles and concepts that have been applied determines the visual impression it makes, including the to the proposed development and how issues relating external built form of the development, its architecture, to access to the development have been dealt with. materials, decoration, lighting, colour and texture. Statements should evolve throughout the design and development process. Appraising the Context

A design and access statement for a planning Development proposals that are not based on a good application should explain the design principles and understanding of the local physical, economic and social concepts that have been applied to particular aspects context are often unsympathetic and poorly designed, of the proposal – these are the amount, layout, scale, and can lead to the exclusion of particular communities. landscaping and appearance of the development. An important part of a design and access statement is the explanation of how local context has influenced the Amount design. The amount of development is how much development Use is proposed. For residential development, this means the number of proposed units for residential use and for all A design and access statement should explain how other development, this means the proposed floor space this understanding of the context has been considered for each proposed use. in relation to its proposed use. The use is the use or mix of uses proposed for land and buildings. Design Layout and access statements should explain the proposed use or uses, their distribution across the site, the The layout is the way in which buildings, routes and appropriateness of the accessibility to and between open spaces (both private and public) are provided, them, and their relationship to uses surrounding the site. placed and orientated in relation to each other and buildings and spaces surrounding the development. Access Component

Scale Statements should explain how access arrangements will ensure that all users will have equal and convenient Scale is the height, width and length of a building or access to buildings and spaces and the public transport buildings in relation to its surroundings. network. The statement should address the need for flexibility of the development and how it may adapt to Landscaping changing needs. Landscaping is the treatment of private and public spaces to enhance or protect the amenities of the site and the area in which it is situated through hard and soft landscaping measures. Statements should also explain the function of the landscaping, for instance for sustainable drainage purposes, providing shading or other climate change adaptation purposes, and explain how it will be maintained.

76 Appendices

10.3 Response to CLG Guidance on information requirements and validation Design Component Schedule of Accommodation

This Design and Access Statement covers the following The schedule of accommodation is detailed on page 37. design principles and concepts: Parking Schedule Amount The parking strategy is detailed on page 54. The amount of development is detailed on pages 33. Layout

The layout of the development is described on pages 34-35. Scale

The scale of the development is described on page 36. Landscaping

The landscape strategy is described on pages 38-41. Appearance

The appearance of the development is described on page 42-43. Appraising the Context

The analysis of the existing surrounding context is described on page 10. Use

The use of the development has been described on page 33. Access Component

The access to and within the proposed development site has been described on pages 48-51.

Reserve Land, Kilnwood Vale - Design & Access Statement 77 Crest Nicholson South Crest House Pyrcroft Road Chertsey Surrey KT16 9GN