1. GENERAL a) Name of Applicant: Smt. Madhuri Shukla W/o Shri Gyanprakash Shukla 'D' Block 54,Vijya Nagar , Malviya Nagar , Jaipur, Mobile No. – 08740000000 b) Status of Applicant: Private Individual Photocopy of Photo ID is enclosed as an Annexure No I c) Mineral/s which are occurring in the area and which the applicant intends to mine: The Granite is occurring in the area and the applicant intends to mine Granite. d) Period for which the mining lease is granted/renewed/proposed to be applied The applicant has applied M.L. for period of fifty years from date of Registration for fresh grant. e) Name of Qualified Person who preparing the Mining Plan: Rakesh Purohit B.E. Mining Address - 17E/777, Chopasani Housing Board, Jodhpur. Phone (0291)2706098 (Tele Fax), M-9829021098. Photocopy of Experience Certificate is enclosed as Annexure - II. f) Name of prospecting agency: There are few operating mines nearby and on the basis of geological survey, the availability of granite was checked and verified by state mining department and subsequently consent for grant of mining lease was issued.

1 g) Reference No. and date of Letter of intent from the state Government: This mining plan with progressive mine closure plan is prepared with reference to Under Rule 29(1) & 29 (13) of RAJASTHAN MINOR MINERAL CONCESSION RULES, 2017 The applicant has applied for mining lease in 3.2622 hectares area at village Dari, Tehsil & District Pali and Superintendent Mining Engineer vide letter no. SME/JODH/CC/SOJAT/MINOR/REF No- 201810000427, dated 5/10/2018 has given consent to grant mining lease. The photocopy of letter of intent (LOI) is enclosed as Annexure – III. The applied lease map for applied area is enclosed as Plate no.1 Photocopy of the Description Report is enclosed as an Annexure. IV

2. LOCATION AND ACCESSIBILITY a) Details of area (with Location Map): Enclosed as plate no. 2A. District & State: Pali, Rajasthan. Tehsil: Pali Village Khasara No. /Plot No. / Block Range/felling Series etc.: Village Dari, Khasra no. 582/120 (Private Agriculture land) Photocopy of the Khasra map along with Jamabandi is enclosed as an Annexure V. Applied area (Hectares): 3.2622 Hects. Whether the area is recorded to be in forest (please specify, whether protected, reserved etc.)- No, the area does not fall in forestland. Ownership Occupancy- Private Agriculture land – 3.2622 Hects. Existence of public road/railway, if any nearby and approximate distance: The applied area is approached from village Dari, which is about (5km) from the applied area in North West direction. The applied area is situated near village Dari. The applied area is approached from District- Headquarter Pali which is about 35Kms away from the applied area. The Nearest Railway Station is Pali, which is about 35kms from the area. Medical Facility, School & other facilities are available at Dari village. Land use pattern (Forest, agricultural, Grazing, Barren etc.)- The entire 3.2622 hects land is private agricultural land. Attach a general location and vicinity map showing area boundaries and existing and proposed access routes. It is referred that the area be marked on a Survey of topographical map or a cadastral map or forest map as the case may be. However if none of these are available, the area should be shown on an accurate sketch. The area applied for mining lease falls in Survey of India Topo Sheet No.45G/2. Key Plan is enclosed as Plate No. 2 PILLAR LATITUDE LONGITUDE X 2533‟59.38‟‟ 732‟48.03‟‟ A 2534‟2.78‟‟ 7302‟47.05‟‟ B 2534‟5.31‟‟ 7302‟54.64‟‟ C 2534‟8.79‟‟ 7302‟49.60‟‟ D 2534‟8.12‟‟ 7302‟45.89‟‟ E 2534‟2.17‟‟ 7302‟45.27‟‟

PART -A 3.0 GEOLOGY AND EXPLORATION A. PHYSIOGRPAHY:- The applied area under Mining lease is flat. The highest contour general RL in the area is 198.0mRL & Lowest Contour RL is 197mRL . There is no nalla flowing in the area. The Sukri River is passing outside the applied area at a distance of about 17.0 mts from boundary line „B‟ as shown in Environment plan plate no. 6. The rainwater follows the natural slope and flows out of the applied area. There is no public road passing through the area. All the surface features are marked on the surface plan & Geological plan plate No. 3 & 4 respectively. The land status is private agriculture land. 3.1 Regional Geology: - The geological set up of in very complex and interesting. It comprises heterogeneous assemblages of Igneous, Sedimentary and Metamorphic rocks. These are classified into Delhi super group, Marwar super group and Post Delhi Igneous rocks. The main rock type found are phylite, schist, basic volcanics, quartzite, calc schist, calc gneiss and dolomite. The rocks are about 740 to 2000million years old. The geological Sequence Worked out by G.S.I. memoir 123 is given as under: Supergroup/Age Group Lithology Quarternary Alluvium & wind blown sand Nagaur Group Sandstone, gypsum & siltstone Marwar Supergroup Bilara Group Limestone, chert & dolomite Jodhpur Group Sandstone, shale, boulders, chert. Middle to U. Proterozoic Malani Igneous Suite Granite (Jolor type) Rhyolite & pyroclastics with dykes of granophyre Erinpura Granite Granite and gneiss

Punagarh Group Basic volcanic with pillow lava, meta tuff, quartzite, shale, slate phyllite, bedded chert

Delhi Supergroup Sirohi Group Phyllite, mica schist, biotite Lower to MiddleProterozoic schist, dolomitic marble, migmatite & gneisses epidiorite, Hornablende Sendra-Ambaji Granite Granite and gneiss Phulad Ophiolite Suite Hornblends schist, amphibolite, pyroxene granulite, gabbro & ultramafics. Kumbhalgarh Group Calc schist, marble, granite schist/amphibolite, biotite

schist, quartzite, mica schist and migmatite

The oldest & prominent rock exposed along district belongs to Delhi supergroup comprising southern, eastern and north eastern margine of the metamorphosed ferruginous and massive clastics.Thearea around lease area is occupied by the extrusive and intrusive phases of Malani igneous suit.In fact granite is found as boulders and sheets and also as small hillocks.This granite is part of Jalore granite group which is essentially quartz-felspar- hornblende granite.

3.2 LOCAL GEOLOGY:-

(i) The stratigraphic succession of the Post Delhi intrusive belong to local geology. Post Delhi intrusive/extrusives boulder granite and rhyolite of Malani suit.It is to clarify that only intrusive granite is exposed near Dary. This granite is intrusive into Delhi rocks but such exposres are obscured by soil cover. Now this granite is medium to coarse grained,cream to pinkish coloured, and shows equigranular texture. Granite is traversed by 2-3 sets of joints, trend if 1st joint is N30E, 2nd is N60E, 3rd is N50W, this divides rock into small blocky masses facilitates block mining. There are few old leases in this area which give information about granite thickness.

The detailed study of the area was done to assess the presence of granite in the applied area. These studies included Geological Mapping, Topographical survey and Geological Traversing. Detailed geological mapping of the applied area of 3.2622Hectares was carried out on a scale of 1:1000. Topographical survey of the ML area was simultaneously done. Different litho units along with their dimensions were marked on map. Mineralized bodies i.e. granite rock is precisely marked. The Geological Plan is enclosed as plate No. 4 along with this report. The country rock of the area comprises of plutonic ROCKS OF Jalore granite Suite. Pinkish & light red coloured granite outcrops in the area. The granite is medium grained. The granite comprises quartz, feldspar biotite hornblende etc as mineral component. It comprises two to three sets of joints and weathered at surface. Medium to small size blocks of granite can be extracted. Description of litho units: - Given below are the generalized litho-units:  Soil – 1.0m to 3.0m  Weathered Granite - 2.0mts.  Granite – 35.0mts. (Proved= 20mts) (Probable= 10mts) & (Possible= 5mts)

3.3 (A) GENERAL GEOLOGY OF THE AREA/PHYSICAL CHARACTERS OF GRANITE. The country rock exposed in the applied area is Granite which belongs to Jalore granite of post Delhi age. Area is completely occupied by the granite and the area falls on ground surface and partly part of small hillock. Granite is defined as plutonic light colored and acidic igneous rock Composition: - The most common mineralogical constituents of the granite are quartz and feldspars. The first is always easily recognized by its physical properties. Feldspar, which makes up the greater part of granite, are of two types the Potash Feldspar and Soda Feldspar. Among other minerals the most important are Micas, Amphiboles, commonly Hornblende, and rarely pyroxenes like Augite and Hypersthene.

Similarly Accessory minerals like oxide of iron, aPAtite, garnet and tormoulene appearances are also seen. Texture: - Granite is medium to coarse grained. There are two different sets of joints running perpendicular to each other dividing the massive rock mass into blocky formation. Occurance: - The granite occurs chiefly as deep seated intrusion like Sills, Bosses, Stocks and Batholiths. Origin: - The origin of the granite is magmatic source. Colour: - Granite is defined as plutonic light colored. Nature: - Non toxic in nature B) EXPLORATION WORK DONE TO DATE:- No exploration work is done till date. Few operative mining lease are located near this applied area and also on the basis of geological survey the availability of granite was checked and verified by state mining department. C) EXPLORATION PROPOSED TO BE CARRIED OUT IN THE FIRST FIVE YEARS: Proposed exploration program in the first five years is given below: - For confirmation of granite continuity in the applied area as applied area is soil covered, area unexplored shall be explored by digging two scout bore hole (SB.H-1 to SB.H.-2) in first year of mining upto a depth of 20mts. The location of the proposed bore hole is shown in Surface Geological Plan & Section, Plate No. 4.

D) RESERVES: The reserve estimation is done, taking the operating mines near by applied area into consideration. The reserves are divided in three categories i.e. Proved, Probable and Possible.

RESERVES ESTIMATION A. PROVED RESERVES (refer Plate no. 4) Section is drawn to show the thickness of the granite rock. The entire area has been multiplied by the average thickness of 20.0m to get the volume of the proved reserves. The average thickness 20m of granite has been taken based on nearby operating mines.

B. PROBABLE RESERVES As discussed above, the average depth for proved reserves has been taken 20mts from the exposed surface. Section is drawn to show the thickness of the granite rock. The thickness of the probable reserves as taken as the 10.0m further down to depth of proved reserves. The area has been multiplied by the thickness of 10.0m to get the volume of the probable reserves. The average thickness 10.0m of granite has been taken based on nearby operating mines. C. POSSIBLE RESERVES The thickness of the possible reserves are taken as 5.0m further down to probable reserves depth. The entire area has been multiplied by the thickness of 5.0m to get the volume of the possible reserves. The detailed calculations are given below:

RESERVE CALCULATION OF GRANITE (REFER PLATE NO. 4) Category Area Average Thickness Volume Tonnage Sqm. (m) Cum. Proved 32622 20 652440 1826832 Probable 32622 10 326220 913416 Possible 32622 5 163110 456708 TOTAL 2611770 3196956 Bulk density is taken 2.8 tonnes/cum

ESTIMATION OF MINEABLE RESERVES FOR GRANITE Proved Reserves 1. (i) Area covered by 7.5m of boundary barrier in the proved category of reserve has been calculated as 2547 sqmt. Thus the mineral blocked in barrier is 2547 x 20 x 2.8 = 142632MT

(ii) Area covered by working benches in the proved category reserves 2093sqm. Mineral blocked in benches is (2093 x 20 x 2.8) = 117208MT

Total Mineral blocked under proved category due to boundary barrier and making of benches = 259840MT (“211”)

Mineable reserves (proved) – blocked reserve (Barrier+ Benches) 1826832 – 259840 = 1566992MT. under “111” Probable Reserves (i) Area covered by 7.5m of boundary barrier in the probable category of reserve has been calculated as 2547sqmt. Thus the mineral blocked in barrier is 2547 x 10 x 2.8 = 71316 MT

(ii) Area covered by working benches in the probable category reserves 4103sqm. Mineral blocked in benches is 4103 x 10 x 2.8 = 114884 MT Total Mineral blocked under probable category due to boundary barrier and making of benches = 186200MT under “221”) Mineable reserves (probable) – blocked reserve (Barrier+ Benches) 913416 – 186200 = 727216MT. under “121” Total Mineable Reserves = 1566992MT + 727216 MT = 2294208MT UNFC code for reserve transcription

Classification Code Quantity in M.T. Total Mineral resources (A+B) 3196956 A.Mineral Reserve: - 1.Proved Mineral Reserves 111 1566992 2.Probable Mineral Reserves 121&122 727216 B.Remaining Resources: - 1.Feasibility Mineral Resources 211 259840 2.Prefeasibility Mineral Resources 221 186200 3.Measured Mineral Resources 331 - 4.Indicated Mineral Resources 332 - 5. Inferred Mineral Resources 333 456708 6.Reconnaissance Mineral 334 Resources

4.0 MINING A) Proposed Mining Method:- Since the deposit is at shallow depth the proposed method of mining will be Semi Mechanized open cast. For the systematic working of open cast mines, benching will be done. The granite is overlain by soil and weathered granite. So to extract granite it is necessary to remove the soil and weathered granite. The mining will be done with making systematic benches. The mining will be done with help of conventional tools such as Jackhammers, hand shovels, picks, half sets etc. Drilling and blasting shall be carried out in rare cases if required. The drilling will be done with the compressor and Jack Hammer, drilling holes of 32-34mm dia. and depth from 0.8m to 3.3m in a single hole depending upon the size of block/ slab. The drilling in granite rock shall be for the purpose to run wire of wire saw for cutting of granite in blocks/ slabs. The main development work will be the systematic benching. This benching will also give the desired production of the granite. In the first five years of mining plan, each year about 100917 MT (Average) of rock will be excavated this will give marketable granite of around 80734MT (Average) per year considering 80% recovery. B) Composite Plan and Year Wise Section: Proposed working Plan and Sections for first five years are attached as Plate No. 5. (B) (i) Plan Showing pit layouts, Dumps, Sub grade Mineral stack etc. – The waste will be dumped inside the applied area as shown in the Proposed working plan plate no. 5 C) Proposed Rate of ROM Production and Expected Life of Mine: The proposed rate of ROM production for the first five years is 1,00,917MT Total mineable mineral includes (Proved + Probable) category is 2294208MT Expected Life of Mine from the present targeted rate of production: 2294208/100917MT = 23.0 years Actual life of mine will depend upon colour variation and quantity observed/found below surface as fractured Granite.

D) Conceptual Plan of the Mine for Lease Period: (Refer plate no.7) At the end of mine of life 2294208MT of mineable reserves will be excavated from the lease area as shown in plate no.7 conceptual plan. At end of the life of mine out of a total of about 2.74 hectares excavated area, in which about 1.53 hectare area will be backfilled from O.B excavated & topsoil spread over it. The land may be used for agriculture purpose and some trees will also be planted over it to preserve the aesthetic look of the area. An area of about 1.21 hectare will be left as for accumulation of rainwater, which will charge the water table of the area and water collected in this reservoir, which will be utilized for the agriculture purpose.

E) Opencast Mines:- i) Salient Features of Mode of working :- The mining will be done through semi mechanized method and the drilling of the holes will be done through compressed air operated Jack Hammers. The working will be done by forming bench of 6.0m (Average) height in granite. In first year onwards, soil will be removed, 2.0m weathered granite and 6mts granite will be excavated. The granite is a building material. The cost of the granite is directly dependent on the size of the block mined. Therefore, it is desired to get the maximum size of the boulders from the rocks. For this special techniques in drilling, i.e. by locating the direction and spacing of the joints, is done and the suitable free face is created by wiresaw machines to extract blocks. Describe briefly layout of mine workings, the layout of faces and sites of disposal of waste- (refer plate no. 5) In the first five years of mining plan, each year about ROM 100917 MT(Average) of rock will be excavated this will give marketable granite of around 80734MT(Average) per year. The bench wise calculations are given in table below Bulk density of granite is taken as 2.8MT/cum.

Production & waste generated in first five years mining R.L. Area Avg. Volume Granite Reject O.B Soil

Thick Cum. Marketable (20%) Cum Cum.

ness (80%) MT

MT

Year Bench From To I i 197 196 4540 1 4540 - - - 4540 ii 196 194 4540 2 9080 - - 9080 - iii 194 188 3094 6.0 18564 41583.36 10395.84 - - iv 188 182 2028 6.0 12168 27256.32 6814.08 - Total 68839.68 17209.92 9080 4540 i 197 196 2867 1 2867 - - - 2867 II ii 196 194 2867 2 5734 - - 5734 - iii 194 188 3059 6.0 18354 41112.96 10278.24 - - iv 188 182 2948 6.0 17688 39621.12 9905.28 - - Total 80734.08 20183.52 5734 2867 III i 197 196 2867 1 2867 - - - 2867 ii 196 194 2867 2 5734 5734 - iii 194 188 3059 6.0 18354 41112.96 10278.24 - - iv 188 182 2948 6.0 17688 39621.12 9905.28 - - Total 80734.08 20183.52 5734 2867 IV i 197 196 2867 1 2867 - 2867 ii 196 194 2867 2 5734 5734 - iii 194 188 3059 6 18354 41112.96 10278.24 - - iv 188 182 2948 6 17688 39621.12 9905.28 - - Total 80734.08 20183.52 5734 2867 i 197 196 2867 2 5734 - - 5734 ii 196 194 2867 2 5734 - - 5734 V iii 194 188 3059 6 18354 41112.96 10278.24 - - iv 188 182 2948 6.0 17688 39621.12 9905.28 - -

Total 80734.08 20183.52 5734 5734 Grand Total 391776 97944 32016 18875

Total Marketable granite produced in first five year will be = 391776MT Total O.B Waste generated in first five year will be = 32016MT Total Soil generated in first five year will be = 18875Cum Total Reject generated in first five year will be = 97944cum

(G) Underground Mining: - Not applicable.

(H) Extent of Mechanization: - *Machinery will be taken on hire basis as per required in mining. Type Nos. Dia. Of Size/Capacity Make Motive Hole Power J/Hammer 1 32 – 34 6-7 kgf/cm2 Atlas Copco Compresse mm d Air Compressor 1 - 6-7 kgf/cm2 Local Diesel Wire Saw 1 - 60HP Local DG Set Generator - - - - - Excavator 1 - 1.9cum BEML Diesel Chain pulley 1 - 20 Tonne Local Diesel block Tractor with 2 - 10 Tonne Mahindra Diesel Trolley

(I) Haulage and Transport Equipment:- (a) Haulage within mining leasehold: - Haulage of the large granite blocks with in the mining area will be done by the mechanical loader. (b) Transport from Mine head to destination:-Transport from Mine head to destination will be done by the trucks on hire basis.

5. BLASTING Granite blocks in required size will be cut from insitu deposit by wiresaw cutters. Blasting may be required very occasionally for removal of waste. This will be done complying with the provisions of MMR, 1961 and Explosives Act. Blasting shall be done by certified blaster only. TYPE OF EXPLOSIVE TO BE USED 1. High explosive to use as booster like slurry explosive. 2. Slurry/Ammonium Nitrate with Fuel Oil (ANFO) 3. No. 6 or No. 8 Ordinary Detonators with Safety Fuse. STORAGE OF EXPLOSIVE Since blasting will be very occasional, no storage is planned for the mine. Explosive will be procured from authorized dealer who will supply explosive in licenced explosive van as and when required for charging and blasting. Left out explosive will be taken back by the supplier. Since lessee‟s family have number of mines in the area, they may go for a common magazine for storage, if required in future. PRECAUTIONS:- All the adequate precautions as per provisions MMR1961 will be taken. Authorized person will do blasting.

6. MINE DRAINAGE The applied area under Mining lease is flat. There is no nalla flowing through the area. In the rainy season the rainwater from the natural slopes flows down to the nearby private land hence water will not be accumulated in the pit. Pump shall be available at the site for dewatering the water from working pit if water gets accumulated in rainy season. Post monsoon ground water table is 25-30m and pre monsoon is 30 to 35m deep from the lowest surface level.

7.0 STACKING OF MINERAL REJECTS AND DISPOSAL OF WASTE 7.1 Nature of waste: - The waste rock obtained will be the granite rock pieces and weathered granite, which does not have any market. These are obtained while sizing of the rock, and also at the time of blasting. The year wise generation of waste/rejects, overburden during first five years of mining is given as under: - Year Overburden Reject (MT) Soil (Cum) (cum.) I. 9080 17209.92 4540 II. 5734 20183.52 2867 III. 5734 20183.52 2867 IV. 5734 20183.52 2867 V. 5734 20183.52 5734 Total 32016 97944 18875

7.2 Selection of dumping site for Soil: - The Soil generated in the first five years will be stacked near the boundary pillar „C‟ of the applied area as shown in the proposed five year working plan. Plate No.5 7.3 Selection of dumping site: - The waste (Reject & O.B) generated in the first five years will be stacked near the boundary line “CB” over an area of 5974 sqm with the height of 12.30mts. The tentative position is shown in the proposed five year working plan. Plate No.5

7.4 Maximum height and spread of dumps: - The 80% of the total mined out rock is marketable. The remaining rock is stacked as waste near the boundary line “CB” over an area of 5974 sqm with the height of 12.30mts The waste will be dumped inside the area. The waste generated in the first five years will be stacked near the boundary line AB. 7.5 Stacking of Sub grade Mineral: - No sub grade mineral will be generated during the course of mining. 7.6 Selection of site and spread for stacking of sub grade mineral: No site is required for the sub grade mineral.

8. USE OF MINERAL Granite finds extensive use in architectural works. These have been used extensively in monuments and memorials, as columns and steps in building and also as concrete aggregate after crushing.

9. SITE SERVICES

(A) Site Services: - 1. Office and Store: - Mine office will be proposed inside the area in first five year. 2. Water supply: - The water is required for drinking purpose & for spraying on roads to reduce dust pollution due to mining. Water is also required for plantation purpose. Water is available from nearby area and transported by water tankers. 3. Power supply: - Power is now available in the area and will be used for some of the mining equipments like wire saw cutting machines, crane, pump etc. 4. Workshop:- Since lessee‟s family have number of mines in the area, a common workshop facility will serve all the mines. 5. First –aid facility: - A common first aid station with all first aid facilities and qualified first aiders for group of mines owned by lessee and his family will be maintained in the area. Minimum first aid equipments as per law will be maintained at this mine also. B) EMPLOYMENT POTENTIAL Management and Supervisory Staff Technical and other persons will be employed as follows: S.No. Designation Qualification Requirement 1. Mining Engineer II-class manager 1 2. Mine Foreman Foreman Certificate 1 3. Geologist Post Graduate in 1 Geology 4. Time Keeper/Chowkidar Matriculate 1 For Granite: - Targeted Marketable production = 100917 MT per year Working days in a year = 300 days No of shift in a day = One Per day output required in mineral = 336MT Labor required per day in mineral will be 20Nos. Skilled – 5 Unskilled – 15

10. MINERAL BENEFICIATION No mineral beneficiation is proposed. The granite rock will be sold as blocks for slabs or for tiles. These will be sized at the site as per the market requirement. The granite blocks (Khandas) are sized 12‟‟ x 24‟‟ x 28‟‟ for tiling plants. The Granite blocks for slabs are sized ranging from 1mx 1m x 3m/4m/5m as market demand.

11. ENVIRONMENT MANAGEMENT PLAN 11.1 NOTE ON THE STATUS OF BASELINE INFORMATION: (i) Existing Land use pattern:- Indicate land req. Forest Crop Grazing Waste Others Total Outside Land Land Land Land applied area (In hectares) a) Pits & ------Quarries b) Dumps of ore ------Waste & O.B. c) Mineral Stack ------d) Soil Stack ------e) Infrastructure including of ------office, Workshop & plants Roads f) Township ------g) Others Barren land - - - - - Crop land - 3.2622 - - - 3.2622 - Total occupied - 3.2622 - - - 3.2622 - Area h) Area backfilled by mine owner -nil (i) Area afforested by mine owner - nil

(ii) Water regime:- There is no nalla flowing with in the area. The Sukri River is passing outside the applied area at a distance of about 17.0 mts from boundary line „B‟ as shown in Environment plan plate no. 6. The post monsoon water table is 25 to 30m and pre-monsoon 30 to 35m below the general ground level of the area. (iii) Flora and fauna: - There are some plants with in the applied area i.e. local plants Vilayati Babool, Khejri, ker & shrubs with thorny bushes are the major assets found in and around the applied area. The density of such trees is counted to be less than 1 tree per hect. No carnivore‟s animals are seen around 5 kms. radius because there is no wild life. Pet animals like cow, goat, sheep, etc. are kept by the villagers. (iv) Quality of air, ambient noise level and water:- There is no major industry in the area and therefore, the air in general is of good quality. Few mines are being operated where diesel equipments are being used but their capacity and working hours are so less that they hardly affect the quality of atmospheric air. Few diesel operated machines like Poclain/JCB, dumpers will be used in this mine but they will be maintained in good condition so that gases emitted by them are within prescribed limits. The trucks, Jeeps or local public conveyance passing nearby the area generates noise, which is of very intermittent and low level. The ambient noise level is also within the specified limits, as no permanent sources of noise generation are present within the applied area. The canal flowing near the lease area will not be affected by mining operation of this mine. Ground water will get intersected by excavation in the mine. (v) Climatic Conditions:- The temperature in summer touches upto 47°C, while in winter it comes as low as to 4°C. The average annual rainfall in the area is about 400mm. (vi)Human settlement:- There is no human settlement in the area.

(vii) Public Building, Places and Monuments: There are no public buildings like temples, public wells, and public road passing through the applied area. (viii) Whether area falls under notified area under water (Prevention & Control of Pollution) Act, 1974: -

The area is notified under Water Act, 1974.

11.2 ENVIRONMENTAL IMPACT ASSESSMENT Land Scape:- Land use after fifth year Indicate land req. Forest Crop Grazing Waste Other Total Outside Land Land Land Land applied area (In hectares) a) Pits & Quarries - 1.6922 - - - 1.6922 - b) Dumps of ore Waste & Reject. - 0.5974 - - - 0.5974 - c) Mineral Stack 0.0833 0.0833 d) Soil Stack 0.06 0.06 e) Infrastructure including of - 0.005 - - - 0.005 - office, Workshop & plants Roads f) Township ------g) Others - - - Barren land - - - - - 0.8243 0.8243 Crop land - - - - Total occupied Area - 3.2622 - - - 3.2622 - h) Area backfilled by mine owner-nil i) Area afforested by mine owner 0.5Hect About 0.5hect area will be covered under plantation inside the lease area on boundary barrier during next five years & about 0.57hect area will be planted above the backfilled area & boundary barrier during life of mine. Hence total 1.07 ha area will be covered under plantation during the life of mine. ii) Aesthetic environment: The aesthetic environment of the area will not have any adverse effect. At the place of proposed mining, no vegetation is present. Hence there will be no impact on the aesthetic environment of the area.

iii) Soil and Land use pattern: During the first five years the soil present in the lease will be removed and after that it will be used for plantation purposes subsequently whenever backfilling of mined out waste is undertaken the soil will be spread over the backfilled area and leveled. iv) Agriculture:-The mining working will be concentrated in the area where no agricultural activities are going on. There will be no impact on the agriculture of the area. v) Forest: - The area does not falls in forest land, so there will be no harm. vi) Vegetation:-There is no vegetation in this area. Some thorny bushes of local species are present in and around the area in the soil. These bushes will not be cut down in the area where mining is proposed; hence there will be no effect on vegetation will be there. vii) Public Building, Places and Monuments:- There is no public building; Places or monuments inside or around the applied area and so there will be no anticipated impact. (b) Water Environment:- i) Surface Water There is no nalla passing through the area, therefore there will be no effect on the surface water. ii) Ground Water The water table is 25-30m post monsoon and 30-35m pre monsoon below the lowest level in the area. The mining activity will intersect the ground water table. A sump is proposed for accumulation of ground water to keep the pit bottom working dry. The water from this sump will be pumped by a 5 HP pump to fillup tankers to use this water for wet drilling as well as for spraying to suppress the dust generated by mining operations. iii) Quality of water: Since mineral is non-toxic and no material having toxicity is proposed to be used in mining operations, quality of ground water is not likely to get effected.

(c) Air Environment i) Noise:- Though, mining is semi mechanized, machines like wiresaw, crane, pump etc. being electric operated, will not produce much sound. The noise producing poclain/JCB for loading of excavate material into trucks will also not have much noise pollution as their use will be very limited. Persons in the vicinity of high noise equipments like drilling machines, will be provided with ear muffs/plugs. ii) Air:- Drilling will generate the dust. This may affect the air environment. It is proposed to use wet drilling only. In case of any difficulty in wet drilling, dry dust extractors will be used to prevent the dust to become air born. Other than this, only plying of trucks may generate some dust, which will be negligible. Water spraying on roads will reduce the dust pollution from plying of trucks. Dust survey at prescribed interval is also proposed to check on the dust pollution in the mine. iii) Climatic Conditions There will be no impact on climatic conditions of the area by mining operations. (d) Socio-economic Environment i) Social and Demographic profile The villagers of the nearby villages will have better employment opportunities. ii) Occupational health and safety There will be no impact on health and safety of the villagers. iii) Human Settlement There is no human settlement with in the applied area. Therefore there will be no impact on the human settlement. iv) Recreational facility Presently, no recreational facilities are proposed or present in the area. Therefore there will be no impact on these.

11.3 ENVIRONMENT MANAGEMENT PLAN (i) Temporary storage and utilization of topsoil:- There is no fertile topsoil present in the area but soil is present in the applied area. The soil generated in the first five years will be stacked near the boundary pillar „C‟ of the applied area as shown in the proposed five year working plan, Plate No.5. During the first five years the soil present in the lease will be removed and after that it will be used for plantation purposes subsequently whenever backfilling of mined out waste is undertaken the soil will be spread over the backfilled area and leveled. (ii) Proposal for reclamation of land affected by mining activities during and at the end of mining lease period:- (a) In the first five years, there is no proposal for reclamation of the land affected by mining because the bottom of the granite will not be reached in the first five years. (b) At end of the life of mine out of a total of about 2.74 hectares excavated area, in which about 1.53 hectare area will be backfilled from O.B excavated & topsoil spread over it. The land may be used for agriculture purpose and some trees will also be planted over it to preserve the aesthetic look of the area. An area of about 1.21 hectare will be left as for accumulation of rainwater, which will charge the water table of the area and water collected in this reservoir, which will be utilized for the agriculture purpose. (iii) Programme of afforestation:- Soil is present in the area, which will be used for plantation purpose. To improve the environment of the area proposal for plantation of babool & neem trees has been made. It is proposed to plant 100 tree/ year inside the applied area along boundary line C-B. So during the proposed five-year period about 500 trees of babool, Neem will be planted in an area of 0.5 hect. The site of plantation has been marked in year wise development plan, plate no. 5.Proper after care by manuring, watering and pesticides etc. will be taken by proper staff.

(ii) Stabilization and vegetation of dumps:- There will not be any waste generation except the weathered rock extraction which is planned to be dumped in identified place. For stabilization of this dump, it will be kept at its angle of repose and the height will be not more than 12.30m. Retaining wall shall be made at the bottom of the dump to prevent any inadvertent entry to the bottom of dump. (v) Treatment and disposal of mine water: - The mine water will be used for spraying on roads for dust suppression. It will also be used for plantation purpose. It will not be discharged outside as far as possible. Even if, need comes like in rainy season, it will be discharged only after desilting. (vi) Measures for minimizing adverse effect on water regime: - There is no nalla passing through the area, therefore there will be no effect on the surface water. Since mining activity will intersect the water table, there will be make of water in the mine. To deal with this, a sump is proposed for accumulation of ground water to keep the pit bottom working dry. The water from this sump will be pumped by a 5 HP pump to fillup tankers to use this water for wet drilling as well as for spraying to suppress the dust generated by mining operations. Since mineral is non-toxic and no material having toxicity is proposed to be used in mining operations, quality of ground water is not likely to get effected. (vii) Socio-Economic benefits arising out of mining: Mining in remote and rural areas brings in some changes in the traditional life style of the local people. Presently the nearby villagers have mainly occupation of agricultural for their livelihood. After grant of mining lease they will have better employment opportunities, which will improve their living standards. Due to this mine general condition of people in the area will improve.

(viii) Measures for dust control: - The dust generated during drilling will be taken proper care by using wet drilling. Water spraying will be done on roads. Drillers will be provided with dust mask. Periodic dust sampling as prescribed by law will be done to check on the dust pollution.

12.0 ANY OTHER RELEVANT INFORMATION NIL

Signature of Technical Person

Rakesh Purohit B.E Mining

PROGRESSIVE MINE CLOSURE PLAN

1.0 INTRODUCTION (a) Name of applicant & complete address Smt. Madhuri Shukla W/o Shri Gyanprakash shukla D block 54,Vijya nagar , Malviya Nagar , Jaipur ,Rajasthan Mobile No. – 08740000000 (b) Applied area: - 3.2622 Hectares. (c) Type of area: - Non forest land. (d) Present land status: - Agricultural land = 3.2622 hectares. (1). Area already excavated = Nil (2). Storage for Topsoil = Nil (3). O.B./Dump = Nil (4). Mineral storage = Nil (5). Infrastructure (Workshop/Adm. Building, cart track) = Nil (6). Roads = Nil (7). Railways = Nil (8). Green belt = Nil (9). Tailing pond = Nil (10). Effluent treatment plant = Nil (11). Mineral separation plant = Nil (12). Township area = Nil (13). Others (To specify) = Nil (f) Method of mining: - Open cast semi mechanized mining by forming benches of 2.0mts maximum height in overburden & 6.0mts in mineral. (g). Mineral-processing operations: - No mineral beneficiation is proposed, at the site. 1.1 Reasons for closure: - The mine closes either due to depletion of Mineable reserve or due to uneconomic mining or due to search of more economic substitute for mining product. The aforesaid reasons for closure are not applicable at this stage.

Statutory obligations:- Lessee has to follow Mines safety rules and regulation for day to day working in the interest of labor. 1.2 Name & address who is preparing the progressive closure plan: - RAKESH PUROHIT Address- 17E-777, Chopasani Housing Board, Jodhpur – 342008 Phone No. (0291)- 2706098 (TeleFax), 9829021098 (M) E-mail: – [email protected]

Executing Agency: -

Smt. Madhuri Shukla W/O Shri Gyanprakash shukla D block 54,Vijya nagar , Malviya Nagar , Jaipur ,Rajasthan Mobile No. – 08740000000

2.0 MINE DESCRIPTION (A) Physiography & Drainage: - The applied area under Mining lease is flat. The highest contour general RL in the area is 198.0mRL & Lowest Contour RL is 197mRL . There is no nalla flowing in the area. The Sukri River is passing outside the applied area at a distance of about 17.0 mts from boundary line „B‟ as shown in Environment plan plate no. 6. The rainwater follows the natural slope and flows out of the applied area. There is no public road passing through the area. All the surface features are marked on the surface plan & Geological plan plate No. 3 & 4 respectively. The land status is private agriculture land.

2.1 Regional Geology: - The geological set up of Pali District in very complex and interesting. It comprises heterogeneous assemblages of Igneous, Sedimentary and Metamorphic rocks. These are classified into Delhi super group, Marwar super group and Post Delhi Igneous rocks. The main rock type found are phylite, schist, basic volcanics, quartzite, calc schist, calc gneiss and dolomite. The rocks are about 740 to 2000million years old. The geological Sequence Worked out by G.S.I. memoir 123 is given as under: Supergroup/Age Group Lithology Quarternary Alluvium & wind blown sand Nagaur Group Sandstone, gypsum & siltstone Marwar Supergroup Bilara Group Limestone, chert & dolomite Jodhpur Group Sandstone, shale, boulders, chert. Middle to U. Proterozoic Malani Igneous Suite Granite (Jolor type) Rhyolite & pyroclastics with dykes of granophyre Erinpura Granite Granite and gneiss

Punagarh Group Basic volcanic with pillow lava, meta tuff, quartzite, shale, slate phyllite, bedded chert Delhi Supergroup Sirohi Group Phyllite, mica schist, biotite Lower to MiddleProterozoic schist, dolomitic marble,

migmatite & gneisses epidiorite, Hornablende Sendra-Ambaji Granite Granite and gneiss Phulad Ophiolite Suite Hornblends schist, amphibolite, pyroxene granulite, gabbro & ultramafics. Kumbhalgarh Group Calc schist, marble, granite schist/amphibolite, biotite

schist, quartzite, mica schist and migmatite

The oldest & prominent rock exposed along district belongs to Delhi supergroup comprising southern, eastern and north eastern margine of the metamorphosed ferruginous and massive clastics.Thearea around lease area is occupied by the extrusive and intrusive phases of Malani igneous suit.In fact granite is found as boulders and sheets and also as small hillocks.This granite is part of Jalore granite group which is essentially quartz-felspar- hornblende granite.

2.2 LOCAL GEOLOGY:- A. The stratigraphic succession of the Post Delhi intrusive belong to local geology. Post Delhi intrusive/extrusives boulder granite and rhyolite of Malani suit.It is to clarify that only intrusive granite is exposed near Dary. This granite is intrusive into Delhi rocks but such exposres are obscured by soil cover. Now this granite is medium to coarse grained,cream to pinkish coloured, and shows equigranular texture.Granite is traversed by 2-3 sets of joints, trend if 1st joint is N30E, 2nd is N60E, 3rd is N50W,this divides rock into small blocky masses facilitates block mining. There are few old leases in this area which give information about granite thickness.

The detailed study of the area was done to assess the presence of granite in the applied area. These studies included Geological Mapping, Topographical survey and Geological Traversing. Detailed geological mapping of the applied area of 3.2622Hectares was carried out on a scale of 1:1000. Topographical survey of the ML area was simultaneously done. Different litho units along with their dimensions were marked on map. Mineralized bodies i.e. granite rock is precisely marked. The Geological Plan is enclosed as plate No. 4 along with this report. The country rock of the area comprises of plutonic ROCKS OF Jalore granite Suite. Pinkish & light red coloured granite outcrops in the area. The granite is medium grained. The granite comprises quartz, feldspar biotite hornblende etc as mineral component. It comprises two to three sets of joints and weathered at surface. Medium to small size blocks of granite can be extracted. Description of litho units: - Given below are the generalized litho-units:  Soil – 1.0m to 3.0m  Weathered Granite - 2.0mts.  Granite – 35.0mts. (Proved= 20mts) (Probable= 10mts) & (Possible= 5mts)

3.3 (A) GENERAL GEOLOGY OF THE AREA/PHYSICAL CHARACTERS OF GRANITE. The country rock exposed in the applied area is Granite which belongs to Jalore granite of post Delhi age. Area is completely occupied by the granite and the area falls on ground surface and partly part of small hillock. Granite is defined as plutonic light colored and acidic igneous rock Composition: - The most common mineralogical constituents of the granite are quartz and feldspars. The first is always easily recognized by its physical properties. Feldspar, which makes up the greater part of granite, are of two types the Potash Feldspar and Soda Feldspar. Among other minerals the most important are Micas, Amphiboles, commonly Hornblende, and rarely pyroxenes like Augite and Hypersthene.

Similarly Accessory minerals like oxide of iron, aPAtite, garnet and tormoulene appearances are also seen. Texture: - Granite is medium to coarse grained. There are two different sets of joints running perpendicular to each other dividing the massive rock mass into blocky formation. Occurance: - The granite occurs chiefly as deep seated intrusion like Sills, Bosses, Stocks and Batholiths. Origin: - The origin of the granite is magmatic source. Colour: - Granite is defined as plutonic light colored. Nature: - Non toxic in nature

D) RESERVES: The reserve estimation is done, taking the operating mines near by applied area into consideration. The reserves are divided in three categories i.e. Proved, Probable and Possible. RESERVES ESTIMATION A. PROVED RESERVES (refer Plate no. 4) Section is drawn to show the thickness of the granite rock. The entire area has been multiplied by the average thickness of 20.0m to get the volume of the proved reserves. The average thickness 20m of granite has been taken based on nearby operating mines. B. PROBABLE RESERVES As discussed above, the average depth for proved reserves has been taken 20mts from the exposed surface. Section is drawn to show the thickness of the granite rock. The thickness of the probable reserves as taken as the 10.0m further down to depth of proved reserves. The area has been multiplied by the thickness of 10.0m to get the volume of the probable reserves. The average thickness 10.0m of granite has been taken based on nearby operating mines. C. POSSIBLE RESERVES The thickness of the possible reserves are taken as 5.0m further down to probable reserves depth. The entire area has been multiplied by the thickness of 5.0m to get the volume of the possible reserves. The detailed calculations are given below:

RESERVE CALCULATION OF GRANITE (REFER PLATE NO. 4) Category Area Average Thickness Volume Tonnage Sqm. (m) Cum. Proved 32622 20 652440 1826832 Probable 32622 10 326220 913416 Possible 32622 5 163110 456708 TOTAL 2611770 3196956 Bulk density is taken 2.8 tonnes/cum

ESTIMATION OF MINEABLE RESERVES FOR GRANITE Proved Reserves 1. (i) Area covered by 7.5m of boundary barrier in the proved category of reserve has been calculated as 2547 sqmt. Thus the mineral blocked in barrier is 2547 x 20 x 2.8 = 142632MT

(ii) Area covered by working benches in the proved category reserves 2093sqm. Mineral blocked in benches is (2093 x 20 x 2.8) = 117208MT Total Mineral blocked under proved category due to boundary barrier and making of benches = 259840MT (“211”)

Mineable reserves (proved) – blocked reserve (Barrier+ Benches) 1826832 – 259840 = 1566992MT. under “111”

Probable Reserves (i) Area covered by 7.5m of boundary barrier in the probable category of reserve has been calculated as 2547sqmt. Thus the mineral blocked in barrier is 2547 x 10 x 2.8 = 71316 MT

(ii) Area covered by working benches in the probable category reserves 4103sqm. Mineral blocked in benches is 4103 x 10 x 2.8 = 114884 MT Total Mineral blocked under probable category due to boundary barrier and making of benches = 186200MT under “221”) Mineable reserves (probable) – blocked reserve (Barrier+ Benches) 913416 – 186200 = 727216MT. under “121” Total Mineable Reserves = 1566992MT + 727216 MT = 2294208MT

UNFC code for reserve transcription

Classification Code Quantity in M.T. Total Mineral resources (A+B) 3196956 A.Mineral Reserve: - 1.Proved Mineral Reserves 111 1566992 2.Probable Mineral Reserves 121&122 727216 B.Remaining Resources: - 1.Feasibility Mineral Resources 211 259840 2.Prefeasibility Mineral Resources 221 186200 3.Measured Mineral Resources 331 - 4.Indicated Mineral Resources 332 - 5. Inferred Mineral Resources 333 456708 6.Reconnaissance Mineral 334 Resources

2.5 Mining Method: - Since the deposit is at shallow depth the proposed method of mining will be Semi Mechanized open cast. For the systematic working of open cast mines, benching will be done. The granite is overlain by soil and weathered granite. So to extract granite it is necessary to remove the soil and weathered granite. The mining will be done with making systematic benches. Road and ramps at prescribed gradient will be made during the mining granite. The height of the benches will be kept, 1m in soil, 4m in Weathered Granite & 6m in granite in third bench. Weathered Granite will be removed by drilling & blasting . Granite is form of blocks will be extracted by wiresaw cutters. Loading of blocks will be by crane into dumpers. Drilling and blasting will support these. The main development work will be the systematic benching. This benching will also give the desired production of the granite. In the first five years of mining plan, each year about 100917 MT (Average) of rock will be excavated this will give marketable granite of around 80734MT (Average) per year considering 80% recovery.

3.0 REVIEW OF IMPLEMENTATION OF MINING PLAN/ SCHEME OF MINING INCLUDING FIVE YEARS PROGRESSIVE CLOSURE PLAN UPTO THE FINAL CLOSURE OF MINE It is a fresh applied area and this progressive mine closure plan is first plan for this area, hence this chapter is not applicable at present.

4.0 CLOSURE PLAN 4.1 Mine-out land: - (i) Existing Land use pattern: Indicate land req. Forest Crop Grazing Waste Others Total Outside Land Land Land Land applied area (In hectares) a) Pits & - - - - - Quarries b) Dumps of ore - - - - - Waste & O.B. c) Mineral Stack ------d)Soil Stack e) Infrastructure including of - - - - - office, Workshop & plants Roads f) Township - - - - - g) Others (i)Barren land - - - - - (ii)Crop land - 3.2622 - - - 3.2622 - Total occupied - 3.2622 - - - 3.2622 - Area h) Area backfilled by mine owner -nil (i) Area afforested by mine owner – nil

(ii)Land use pattern after Fifth Year Indicate land Forest Crop Grazing Waste req. Other Total Land Land Land Land Outside applied area (In hectares) a) Pits & Quarries - 1.6922 - - - 1.6922 - b) Dumps of ore - 0.5974 - - - 0.5974 - Waste & Reject. c) Mineral Stack 0.0833 0.0833 d) Soil Stack 0.06 0.06 e) Infrastructure including of office, - 0.005 - - - 0.005 - Workshop & plants Roads f) Township ------g) Others - - - Barren land - - - - - 0.8243 0.8243 Crop land - - - - Total occupied Area - 3.2622 - - - 3.2622 - h) Area backfilled by mine owner-nil i) Area afforested by mine owner 0.5Hect

4.2 Water Quality Management: - i) Surface Water :- There is no nalla passing through the area, therefore there will be no effect on the surface water. ii) Ground Water The water table is 25-30m post monsoon and 30-35m pre monsoon below the lowest level in the area. The mining activity will intersect the ground water table. A sump is proposed for accumulation of ground water to keep the pit bottom working dry. The water from this sump will be pumped by a 5 HP pump to fillup tankers to use this water for wet drilling as well as for spraying to suppress the dust generated by mining operations.

iii) Quality of water: Since mineral is non-toxic and no material having toxicity is proposed to be used in mining operations, quality of ground water is not likely to get effected. 4.3 Air Quality Management: - i) Noise:- Though, mining is semi mechanized, machines like wiresaw, crane, pump etc. being electric operated, will not produce much sound. The noise producing poclain/JCB for loading of excavate material into trucks will also not have much noise pollution as their use will be very limited. Persons in the vicinity of high noise equipments like drilling machines, will be provided with ear muffs/plugs. ii) Air:- Drilling will generate the dust. This may affect the air environment. It is proposed to use wet drilling only. In case of any difficulty in wet drilling, dry dust extractors will be used to prevent the dust to become air born. Other than this, only plying of trucks may generate some dust, which will be negligible. Water spraying on roads will reduce the dust pollution from plying of trucks. Dust survey at prescribed interval is also proposed to check on the dust pollution in the mine. iii) Climatic Conditions There will be no impact on climatic conditions of the area by mining operations. (ii) Ambient Noise & Vibration levels: - There will be occasional sound of the compressors and Jack hammers when drilling of holes will be made. There will be sound due to machinery. To avoid this proper maintenance of the m/c will be done and the earplugs shall be provided to the drillers/ operators.

4.4 Waste Management: - The waste rock obtained will be the granite rock pieces and weathered granite, which does not have any market. These are obtained while sizing of the rock, and also at the time of blasting. The year wise generation of waste/rejects, overburden during first five years of mining is given as under: - Year Overburden Reject (MT) Soil (Cum) (cum.) I. 9080 17209.92 4540 II. 5734 20183.52 2867 III. 5734 20183.52 2867 IV. 5734 20183.52 2867 V. 5734 20183.52 5734 Total 32016 97944 18875

7.2 Selection of dumping site for Soil: - The Soil generated in the first five years will be stacked near the boundary pillar „C‟ of the applied area as shown in the proposed five year working plan. Plate No.5 7.3 Selection of dumping site: - The waste (Reject & O.B) generated in the first five years will be stacked near the boundary line “CB” over an area of 5974 sqm with the height of 12.30mts. The tentative position is shown in the proposed five year working plan. Plate No.5 7.4 Maximum height and spread of dumps: - The 80% of the total mined out rock is marketable. The remaining rock is stacked as waste near the boundary line “CB” over an area of 5974 sqm with the height of 12.30mts The waste will be dumped inside the area. The waste generated in the first five years will be stacked near the boundary line AB.

4.5 Topsoil Management: - There is no fertile topsoil present in the area. In the first five years this soil presented in the lease will be removed and stack separately for plantation purpose.

4.6 Tailing Dam Management: - There will not be processing activity hence no toxic material will be used. Thus, there is no necessity of tailing pond for disposal of tailing of toxic mineral substance. Hence no management is required. 4.7 Infrastructure: - As such does not require large infrastructure. However a small office building with a small storeroom is available at the mine site, which will be abandoned with the closure of the mine. The water is required for drinking purpose only. Drinking water is available by the wells from nearby the area. As per mines rules & regulation for labour Rest shelter cum First aid Station along with toilet facilities would be available at mine site. 4.8 Disposal of Mining Machinery: - No machinery is proposed to disposed off during the period of this progressive mine closure plan. 4.9 Safety & Security: - All mining operation will be done, as per statutory provisions as mentioned in metal mines regulations. Proper benches will be maintained in overburden and height of benches will not exceed 6mts and width will not be less than height. Helmet & Shoes etc will be provided to the employees working in the applied area. The excavated area will be kept properly cordoned off by masonry wall or secured barbed wire fencing. During nighttime and off duty hours guards will be posted to prevent unauthorized and inadvertent entry of person and cattle. The safe workings are proposed in the supervision of technical and qualified supervisory staff. Safety measures will be provided as per Mines Act.

4.10 Disaster Management and Risk Assessment: - The proposed working will be semi-mechanized mining method. Underground mining is not proposed. No tailing dam is proposed. Thus high-risk accidents like land slide, subsidence, flood, inundation, fire, seismic activities etc. not come across.

In case of accident a well-equipped first aid station will be provided at mine site for giving first aid to injured persons. The area is near the state highway and vehicles on this highway are available with good frequency. The lessee vehicle also remains at site most of the time during working. The applicant is capable to meet any type of risk.

4.11 Care and maintenance during temporary discontinuance: - In case of temporary discontinuance of mining operations, the mine workings will be in the watch of a watchman. Before re-open of the mine the maintenance will be provided to all the machineries deployed at mine. Before entering the laborers into mine workings are proposed to inspect by manager for safety purpose as per Mines Act. The following precautions are to be taken: - 1. Total excavated area will be properly cordoned off by barbed wire fencing or permanent masonry bound any wall to prevent inadequate entry of human or cattle. Round the clock guarding by watch and ward personnel will be done. 2. The excavated area will be properly lighted during nighttime. 3. A stand by diesel pump shall be kept ready to dewater the pit during monsoon months so that mining operation can be resumed with much loss of time. 4. Before resuming mining operation the area will thoroughly inspected by manager and other officers and necessary steps will be taken ensure safe working condition.

5.0 ECONOMIC REPERCUSSIONS OF CLOSURE OF MINE AND MANPOWER RETRENCHMENTS 5.1 Number of local residents employed: - All the laborers will be employed from nearby villages. Except these laborers few persons of nearby area will also get employment as staff and supervisory staff etc. Some persons will get indirect job from the mining activities.

5.2 Compensation: - The compensation to the employees with sustenance of himself and their family members will be provided as per Labour law and Mines Act.

5.3 Satellite occupations connected with mining activity: - Employment is also provided to the local villagers by other allied activities.

5.4 Continued engagement of employment in the rehabilitated, status of mining lease area and any other remnant activities: - Not applicable in this progressive mine closure plan

5.5 Envisaged repercussions on the expectation of the society around due to closure of mine: - This paragraph belongs to final closure of the mine and not related with progressive mine closure plan.

6.0 TIME SCHEDULING FOR ABANDONMENT This is a progressive closure plan for the first five years only for Granite mine near village Dari, and no abandonment or temporary discontinuance is being proposed during this progressive mine closure period. There is some soil is present in the area. Then To improve the environment of the area proposal for plantation of babool & neem trees has been made. It is proposed to plant 100 tree/ year inside the applied area along boundary line. So during the proposed five-year period about 500 trees of babool , Neem will be planted in an area of 0.5 hect. The site of plantation has been marked in year wise development plan, plate no. 5 .Proper after care by manuring, watering and pesticides etc. will be taken by proper staff.

Year No. Replacements Year wise Type of species Location (20%) Area (in Hect) I 100 20 0.1 Neem, Babool As shown in etc working plan, II 100 20 0.1 “ plate no. 5 III 100 20 0.1 “ IV 100 20 0.1 “ V 100 20 0.1 “ About 0.5hect area will be covered under plantation inside the lease area on boundary barrier during next five years & about 0.57hect area will be planted above the backfilled area & boundary barrier during life of mine. Hence total 1.07 ha area will be covered under plantation during the life of mine.

7.0 ABANDONMENT COST

No temporary discontinuance and abandonment is anticipated during the progressive mine closure plan period. But during this period of PMCP tentative expenditure will be done for protection of environment that is fencing, plantation and other environment aspects including backfilling & waste management as follows: - Table as per CCOM Circular No. 3/2009 First to Fifth Year Items Details Proposed Remark Area in Quantity Expenditure in Hect Rs. 1 2 3 4 5 6 (A) RECLAMATION i) Backfilling - - - - & REHABILITATION ii) Afforestation on the - - - - OF MINED OUT back filled area LAND / AREA iii) Others - - - - (Please specify eg. Afforestation on exhausted benches) iv) Pisciculture - - - - V) Converting into water - - - - reservoir vi) Picnic spot - - - - (B) STABILISATION & I) Terracing - - - - REHABILITATION OF ii) Pitching - - - - DUMPS (WITHIN iii) Construction of - - - - LEASE) parapet walls / Retaining wall at toe of dumps iv) Construction of check - - - - dams along slope of vallies v) Construction of Settling - - - - ponds ( Garland drains etc) vi) Desiliting of settling - - - - ponds, channels vii) Afforestation on - - - - dumps viii) Others ( Please specify) ( C) REHABILIATION i) Afforestation 0.5 500 Nos. 15000 30/ OF BARREN AREA (Green belt building) sapling WITHIN LEASE ii) Others ( Care & Maint) - - 15,000 - iii) Wire fence - - 15,000 - (D) ENVIRONMENTAL i) Ambient Air Quality - - 15,000 - MONITORING ii) Water Quality - - 15,000 - ( Core & Buffer zone iii) Noise Level Survey - - 15,000 - separately) iv) Ground Vibration - - - - v) Others ( please specify) ------Total 90000

8.0 FINANCIAL ASSURANCE Details of the end the period of the Progressive mine closure plan are given as below: Head Area put on Additional Total Area Net area use at start requireme considered considered of plan nt during (In hect) at fully for

(In hect) plan reclaimed & calculation period (In rehabilitated (In hect)

S.No hect) (In hect) 1 Area under Nil 1.6922 1.6922 Nil 1.6922 mining 2 Storage for top Nil 0.06 0.06 Nil 0.06 soil 3 Overburden/ Nil 0.5974 0.5974 Nil 0.5974 Dump & Rejects 4 Mineral stores Nil 0.0833 0.0833 Nil 0.0833 5 Infrastructure Nil 0.005 0.005 Nil 0.005 (Workshop, administrative building etc.) 6 Roads Nil Nil Nil Nil Nil 7 Railways Nil Nil Nil Nil Nil 8 Tailing pond Nil Nil Nil Nil Nil 9 Effluent Nil Nil Nil Nil Nil treatment plant 10 Mineral Nil Nil Nil Nil Nil separation plant 11 Township area Nil Nil Nil Nil Nil 12 Others to specify Nil Nil Nil Nil Nil Total Nil 2.4379 2.4379 Nil 2.4379

As per Rule 29 (14) of RMMCR, 2017 every lessee/ quarry licensee is has to be submitted financial assurance at the rate of Rs. 15,000/- per hectare or part there of the area of mining. Therefore being the lease area 3.2622hectare, the lessee will be submitted the financial assurance of Rs. 50000/- (minimum) in terms of FDR as asked by authorized Officer DMG.

9.0 CERTIFICATE Certificate is enclosed with report.

10. PLAN & SECTIONS Plan & sections area prepared & enclosed with this plan.

Place: Jodhpur (Raj.)

Signature of Technical Person

Date:

RAKESH PUROHIT B.E. MINING

CERTIFICATES

(1) This is to certify that the provision of Granite under Rule 29 (1) & 29 13 (i) RAJASTHAN MINOR MINERAL CONCESSION RULES, 2017. have been observed in the preparation of Mining Plan with Progressive Mine Closure Plan of Granite Area (RFENo-201810000427) for an area of 3.2622 hects near village – Dari, Tehsil– Pali, District– Pali (Rajasthan) by Smt. Madhuri Shukla wherever specific permission are required, the lessee will approach the concerned authorities of State Government Authorities for granting the permission.

(2) Certified that the provisions of Mines Act, Rules and Regulations made there under have been observed in preparing this Mining Plan with Progressive Mine Closure Plan and wherever specific permission is required, the lessee will approach the D.G.M.S.

(3) It is also certified that the information furnished in the above Mining Plan with Progressive Mine Closure Plan are true and correct to the best of my knowledge.

Place: Jodhpur (Raj.)

Signature of Technical Person

Date:

RAKESH PUROHIT B.E. MINING

INDEX

S.NO. DESCRIPTION PAGE NO 1. GENERAL 1 2. LOCATION & ACCESSIBILITY 3 3. GEOLOGY & EXPLORATION 4 4. MINING 10 5. BLASTING 14 6. MINE DRAINAGE 15 7. STACKING OF MINERAL REJECTS AND DISPOSAL 15 OF WASTE 8. USE OF MINERAL 16 9. SITE SERVICE 17 10. MINERAL BENEFICIATION 18 11. ENVIRONMENT MANAGEMENT PLAN 18 12. ANY OTHER INFORMATION 25 13. PROGRESSIVE MINE CLOSURE PLAN 26-44

LIST OF ANNEXURES S.NO. PARTICULARS ANNEXURE NO.

1. PHOTOCOPY OF PHOTO ID I

2. PHOTOCOPY OF EXPERINECE CERTIFICATE II

3. PH0TOCOPY OF CONSENT LETTER III

4. PHOTOCOPY OF DESCRIPTION REPORT IV

5. PHOTOCOPY OF KHARSRA MAP & JAMABANDI V

LIST OF PLATES S.NO. PARTICULARS PLATE SCALE NO. 1. APPLIED AREA MAP 1 1:4000 2. KEY PLAN 2 1:50000 3. LOCATION PLAN 2A 1:10KM 4. SURFACE PLAN 3 1:1000 5. SURFACE GEOLOGICAL PLAN AND 4 1:1000 SECTIONS 6. YEARWISE WORKING PLAN 5 1:1000 AND SECTIONS 7. ENVIRONMENT PLAN 6 1:5000 8. CONCEPTUAL PLAN 7 1:1000 9. PROGRESSIVE MINE CLOSURE 8 1:1000