Grouse In Situ Oil Sands Project Summary Table Proponent Name: Canadian Natural Date: May 18, 2011 Resources Limited Project Name: Grouse Project Company Contact Marc Scrimshaw Name and Regulatory Coordinator Information: Email: [email protected] Phone: (403) 386-5740 Name of Company Canadian Natural Company Website: www.cnrl.com that will hold Resources Ltd. Approval: Type of Project (e.g., In Situ New Project, New Project in-situ, mine, quarry, Expansion, upgrader, etc.): Additional Phase or Modification Projected September 2014 Projected Operation October 2017 Construction Start Start (Month/Year): (Month/Year): Life of Project (# 2017-2037 (20 Yr.) Project Location Primarily in Townships 74 and years, YYYY - (Legal Land 75, Range 12, and a portion of YYYY): Description) and Townships 74 and 75, Range Municipality: 11, West of the 4th Meridian - Lac La Biche County Total Project Area 18,900 ha* Private or Public Public (ha): Land: Nearest Residence Conklin (47 km) Nearest First Nation IR 167 Heart Lake (42 km) (km): Reserve(s) (name IR 194B Winefred Lake (78 km) and km): IR 194 Janvier (80 km) IR 131 Beaver Lake Cree (84 km) Types of Activity SAGD, Central Process Power Source (If on Third party utility company (major project Facility, tankage, water site power generation processes): source wells, disposal describe quantity wells, product line, (MW) and facilities): power line Project Products: Diluted bitumen Average Production 18,250,000 barrels (50,000 Capacity per Year bpcd); 2,901,531 m3 (7,949 (specify units): m3/cd) Method of Product Pipeline Location of End Currently USA but this may Transport (e.g., Market: evolve as develops pipeline, rail, truck): upgrading capacity. Infrastructure Central Processing Project By-Products: Sulfur cake to go to a third Requirements (roads, Facility, roads, party landfill for future project pipelines, water wellpads, pipelines phases if the ERCB sulphur intake, storage, (steam and emulsion, recovery threshold is reached tankage): fuel gas, diluent, (i.e., 1 tonne per day). diluted bitumen sales, saline water source, non-saline water source, disposal, salt cavern), electrical power lines, water wells, camps

Expected Types of Air SO2, NOx, CO2 Expected Types of Potentially treated domestic Emissions (e.g., SO2, Effluent Releases waste water effluent – released NOX, CO2): (note the water overland bodies the effluent will be released to):

Types of Wastes Brine from the Waste Management Deep Disposal Wells, Salt Generated: evaporative water Facilities (i.e., Cavern and Third Party purification, drilling, Disposal Well, Salt domestic Caverns, Landfill, or Third-Party):

Nearest Unnamed Lake - Watercourse Class C (RAP April 16 to July Waterway/Waterbody measured from edge of Crossings (type of 15) (name and km): proposed CPF location crossing, any Class A ~ 400 m to C waterbodies):

EPEA Approval Yes Regulatory Board(s) ERCB Required (ERCB/NRCB/AUC) (Y/N/Unknown): : Water Act Licence Yes – non-saline water Water Act Approval Yes Required required for utility Required (Y/N/Unknown. If purposes and for make- (Y/N/Unknown. If yes: purpose, source up water for steam yes, purpose): and estimated generation. Sources volumes): and estimated volumes have not been determined, however, CNRL will maximize saline water use for steam generation. Fisheries Act No Navigable Waters Unknown Authorization Protection Act Required Authorization (Y/N/Unknown): Required (Y/N/Unknown): Waterbodies Required No Nearest Water Well Nearest Domestic Well < 2 km (Y/N/Unknown/NA. (km) (Domestic and If yes, # and ha): Commercial): Nearest Commercial Well < 10 km Nearest Provincial Highway 881 - 33 km Access Access improvement Highway (# and straight distance (~50 Improvements to requirements will be distance): km by existing road); Provincial Highway: determined upon completion of Highway 63 - 31 km a traffic impact assessment. straight distance (~ 80 km by existing road)

Traffic Impact Yes Total Area to be 470 ha* Assessment Required Disturbed (ha): (Yes/No/Unknown): Existing Land Use(s): Forest Post-reclamation Forest Land Use(s):

Reclamation Start and Estimate 2025-2045 Unique Caribou Zone, Trappers and End (YYYY - Environmental or First Nation Traditional Land YYYY): Social Use Considerations (Describe or None): Historic Resources Yes Estimated 1,683 Impact Assessment Construction Person- Required Years of (Y/N/Unknown): Employment

Estimated Operation 540 Construction or On-site construction and Persons-Years of Operation Camp operation camps will be Employment: Required required. (Y/N/Unknown. If yes, on-site or off- site): Method of Transport Workers will likely Date Stakeholder Q2 2011 of Employees to Site commute from nearby Engagement Started (Construction and communities such as (Public/Aboriginal): Operation): Fort McMurray and Lac La Biche. When off shift, workers will likely commute to their home destinations Aboriginal Groups Heart Lake First Involved in Nation, Chipewyan Stakeholder Prairie Dene First Engagement: Nation, , Conklin Métis Local #193, Chard Métis Local #214, Whitefish (Goodfish) Lake First Nation #128, Fort McMurray #468 First Nation, Willow Lake Métis Local #780, , Buffalo Lake Métis Settlement, Kikino Métis Settlement * These are preliminary estimates and are subject to change upon filing of the joint application/EIA

350000 400000 450000 500000 550000 1 9

. p w T 0 0 0 9

0 . 0 p 0 63 w 3 UV T 6 9 8

. p w

Fort McMurray T 8 8

CLEARWATER INDIAN RESERVE #175 . p

69 w UV T 7 8

. p w T

Gordon Lake 6 8

Gregoire Lake Provincial Park . p

GREGOIRE LAKE GREGOIRE LAKE w INDIAN RESERVE #176A INDIAN )"RESERVE #176B T

0 Anzac Gipsy Lake 0 0 GREGOIRE LAKE 5 8 0

. 5 INDIAN RESERVE #176 p 2 w 6 T 4

Garson Lake 8

. p w REGIONAL MUNICIPALITY OF WOOD BUFFALO UV956 T 3 8

HOUSE RIVER INDIAN CEMETERY INDIAN RESERVE #178 . p w WABASCA INDIAN RESERVE #166C T Patterson R 2 ichardso 8 n Lake .

R

p i w

v

Forrest T e MUNICIPAL DISTRICT OF OPPORTUNITY NO. 17 r Lake 1 8

WABASCA INDIAN RESERVE #166B . p w WABASCA INDIAN RESERVE #166A T 0

754 0 0

UV 8

0 .

0 Janvier p

WABASC0 A INDIAN RESERVE #166D JANVIER INDIAN RESERVE #194 w 2 T 6 )" er WABASCA INDIAN RESERVE #166 iv R COWPER LAKE INDIAN RESERVE #194A me Deschar 9 7

. p w T Crow Lake Provincial Park 8 7

. p w T 7 7

. p w

S Conklin T

A

)" 6

S 7

.

A WINEFRED LAKE INDIAN RESERVE #194B p w

K T

L

A

B 5

T 0 7

. 0 E p 0

C 0 w T 5

Winefred Lake R 1 6 UV813 H T

881 4 7 UV E

A . p w

W T

A 3 7

.

N p w T

JEAN BAPTISTE GAMBLER INDIAN RESERVE #183 2 7

. p w T Calling Lake Provincial Park LAC LA BICHE COUNTY 1 7

. p w T 0 7

. 0

r p 0 ve i w 0

R T 0 2 he HEART LAKE INDIAN RESERVE #167 Cold Lake Air Weapons Range 0 UV ic 1 B 6 La

HEART LAKE INDIAN RESERVE #167A 9 6

North . Wabasca p w Lake UV858 T 8 6

Lac la Biche . p w Plamondon T Buffalo 663 River )" UV Dene COUNTY OF ATHABASCA NO. 12 7 Sir Winston Churchill Provincial Park 6 Nation

.

Wabasca p w IR166D Lac La Biche T )" Lakeland Provincial Park 6 6

55 UV COLD LAKE INDIAN RESERVE #149C . p

855 w

Dillon T UV Lake Cross Lake Provincial Park BEAVER LAKE INDIAN RESERVE #131 5 6

Cold Lake Provincial Park . p 0 812 Marie Lake w T 0 UV 663 0 UV Goose Lake 0 663 5 UV UV55 0 827 "

6 ) UV 897 4

Cold Lake 6 UV . p w T BUFFALO LAKE METIS SETTLEMENT UV892COLD LAKE INDIAN RESERVE #149B 3 6

.

COLD LAKE INDIAN RESERVE #149A p w Long Lake Provincial Park KIKINO METIS SETTLEMENT T Watapi CITY OF COLD LAKE Lake

831 2

UV 6

.

MUNICIPAL DISTRICT OF BONNYVILLE NO. 87 p w UV661 Calling 55 T Lake UV897 UV WHITEFISH LAKE INDIAN RES8E6R6VE #128 41 UV UV 1

C 6 al COLD LAKE INDIAN RESERVE #149

l . ing Riv p er 36 r w UV e T Moose Lake Provincial Park v i 659 B R r d UV COUNTY OF THORHILD NO. 7 d e x t n t

m 867 a C 0 . 882 S A UV r 6 P

UV e . t

e A

h p

k

M a w b _ T 0 a Garner Lake Provincial Park

N 18 0 UV Lawrence s 0 c O

I a 0 T 0 Lake R ELIZABETH METIS SETTLEMENT 9 A 0 i

v 5 6

C

e . r 36 p O UV w L 857 Primrose T _ UV KEHEWIN INDIAN RESERVE #162537 T Lake a UV Kes tase C 881 w R UV iv E e

J r 8 5

O 827

UV COUNTY OF ST. PAUL NO. 19 . R p P w _ T

E 651

S UV 859 r e U UV 829 652 FISHING LAKE MvETIS SETTLEMENT i 7 O UV LAMONT COUNTY UV R PUSKIAKIWENIN INDIAN RESERVE #122u 5 STURGEON COUNTY R 29 ea .

n p G UV Mart i - e w

1 k 803 28 38 s g R eT r

- 881 v UV UV UV SADDLE LAKE INDIAN RESERVE #125 UV Wolf u i M E North Buck

R Lake Lake Cold Lake U Rg. 26 Rg. 25 Rg. 24 Rg. 23 Rg. 22 Rg. 21 Rg. 20 Rg. 19 Rg. 18 Flat Rg. 17 Rg. 16 Rg. 15 Rg. 14 Rg. 13BeaverR Lga. k1e2 Rg. 11 PinRehg.u 1rs0t Rg. 9 Rg. 8 Rg. 7 Rg. 6 Rg. 5 Rg. 4ProvincRiagl. 3 Rg. 2 Rg. 1 Rg. 27 G

I MUarNieIPOUHEOS INDIAN RESERVE #121

F Lake Lake Park sk River IR131 ALEXANDER INDIAN RE_ SERVE #134 Ami Lake 0 0

0 k \ GROUSE PROJECT AREA e e

A r I GROUSE IN SITU C E \ COMMUNITY e S 1:1,000,000 in OIL SANDS PROJECT E 10 0 10 P R

U MUNICIPAL BOUNDARY

G Kilometres I Peace River ! F \ PROVINCIAL PARK ! Fort McMurray

S NAD 1983 UTM Zone 12N P

A INDIAN RESERVE Project Code: Technical: Date: M

\ ^_

4 7192-514 BE 11/05/03

1 AIR WEAPONS RANGE 5 Senior: Date: Drawn by: Date: _ ! 2

9 WATER BODY BE 11/05/03 TT 11/05/03 1 7

\ Reference: GROUSE PROJECT l

a 1:50,000 Base Features obtained from GeoBase used under license r WATERCOURSE u

t

a LOCATION MAP ! N RAILWAY n

a Disclaimer: i d HIGHWAY Prepared solely for the use of CNRL as specified in the a

n accompanying report. No representation of any kind is made to other a

C parties with which CNRL has not entered into contract. \

: Project Location I ^_ FIGFUIGRUER 8E. 1-A