<<

Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S South 1 Bharuch Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 132 KV -- 7 Bharuch Netrang 66KV Mauza (Chasvad) Valia 30-40 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Umargam 66KV Chimipatal (Satvan) 12 Narmada Dediapada 66KV Bal (Mozda) 13 Bharuch Ankleshwar 132/66KV Ankleshwar 50-70 14 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 50-70 15 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 132 KV 16 Bharuch Ankleshwar 66KV Ankleshwar (Urban) Ankleshwar -- 17 Bharuch Hansot 66KV Hansot 50-70 18 Bharuch Ankleshwar 66KV Panoli GIDC 19 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 20 Surat 132/66KV 50-70 21 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 132 KV 22 Surat Choryasi 66KV Bhagwati Bhestan -- 23 Surat Choryasi 66KV Bhestan-B 30-40 24 Surat Choryasi 66KV Bhestan() 25 Valsad Atul 220/132/66KV Atul 50-70 26 Valsad Dharampur 66KV Dharampur 27 Valsad Dharampur 66KV Nani Vahiyal 28 Valsad Valsad 66KV Atak Pardi (Valsad) 29 Valsad Dharampur 66KV Piprol 30-40 30 Valsad Valsad 66KV Valandi (Navera) 220 KV Atul -- 31 Valsad Valsad 66KV Magod (Meh) 32 Valsad Valsad 66KV Gundalav GIDC 33 Valsad Pardi 66KV Khadki Dungri 30-40 34 Valsad Pardi 66KV Kolak 35 Valsad Valsad 66KV Valsad City 30-40 36 Valsad Umargam 220/66KV Bhilad 50-70 37 Valsad Umargam 66KV Umargam 38 Valsad Umargam 66KV Sarigam GIDC 220 KV 39 Valsad Umargam 66KV Sanjan 30-40 -- Bhilad 40 Valsad Umargam 66KV Vangam(Umargam-II) 41 Valsad Umargam 66KV Palgam 42 Valsad Umargam 66KV Bhilad 30-40

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 1/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S South Gujarat 43 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 44 Dang Vaghai 66KV Waghai 45 Dang Ahwa 66KV Ahwa 46 Dang Ahwa 66KV Saputara 47 Navsari Chikhli 66KV Tankal 48 Navsari Chikhli 66KV Butlav 30-40 49 Navsari Chikhli 66KV Limzar 50 Navsari Vansda 66KV Vansda 51 Navsari Vansda 66KV Ankalachh 52 Navsari Tapi 66KV Chunavadi 53 Navsari Vansda 66 KV Mahuwas (Kevadi) 220 KV 54 Navsari Chikhli 66KV Chikhli -- Chikhli 55 Navsari Khergam 66KV Khergam 56 Navsari Chikhli 66KV Fadvel (Matwad) 57 Navsari Chikhli 66KV Rankuwa (Manekpor) 58 Navsari Chikhli 66KV Rumla (Amadhra) 30-40 59 Navsari Chikhli 66KV Godthal 60 Navsari Chikhli 66KV Anaval 61 Surat Mahuva 66KV Vaheval 62 Navsari Vansda 66KV Bhinar 63 Valsad Valsad 66KV Dungri (Valsad) 64 Valsad Valsad 66KV Untadi(Malvan Bigri) 30-40 65 Navsari Chikhli 66KV Balwada (Wagaldhara) 66 Surat Choryasi 220/66KV Ichhapore 50-70 67 Surat 66KV 68 Surat Olpad 66KV Olpad 69 Surat Olpad 66KV Saroli 50-60 70 Surat Olpad 66KV Karamla (Varod) 71 Surat Choryasi 66KV Pala 72 Surat Surat City 66KV Adajan 73 Surat Choryasi 66KV SVNIT 220 KV 30-40 -- 74 Surat Choryasi 66KV Gujarat Hira Bourse Icchapore 75 Surat Choryasi 66KV Pal 76 Surat Choryasi 66KV ( Pal-2) 30-40 77 Surat Choryasi 66KV 78 Surat Choryasi 66KV (Amroli) 79 Surat Olpad 66KV Gothan 30-40 80 Surat Choryasi 66KV Mora 81 Surat Choryasi 66KV Ichhapore 30-40 82 Surat Mandvi 220/66KV Kim 50-70 83 Surat 66KV Kamrej 30-40 84 Surat Kamrej 66KV Velanja 85 Surat Kamrej 66KV Karjan 50-70 220 KV Kim -- 86 Surat Mangrol 66KV Pipodara 40-50 87 Surat Mangrol 66KV Pipodara-II 40-50 88 Surat Mandvi 66KV Karanj 30-40 89 Surat Mandvi 66KV Areth (Nogama)

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 2/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S South Gujarat 90 Surat Mandvi 66KV Umarkhadi (Maldha) 15-20 91 Surat Mangrol 66KV Vankal 92 Surat Mangrol 66KV 93 Surat Mangrol 66KV Mosali (Mangrol) 94 Surat Mangrol 66KV Palod (Kim) 30-40 220 KV Kim -- 95 Surat Olpad 66KV Vadoli 96 Surat Olpad 66KV Mindhi 97 Surat Mangrol 66KV Fair deal Text Park 30-40 98 Surat Mangrol 66KV Palod-2 30-40 99 Surat 220/66KV Mota (Bardoli) 50-70 100 Surat Bardoli 66KV Bardoli 101 Surat Bardoli 66KV (Bardoli) 102 Surat Bardoli 66KV Afva(Dungar) 103 Surat Mahuva 66KV Bamaniya 30-40 104 Surat Mahuva 66KV Singod 105 Surat Mahuva 66KV Gopla (Kharvan) 106 Surat Mahuva 66KV Mahuva 107 Surat Bardoli 66KV 108 Surat Bardoli 66KV Madhi 30-40 109 Surat Mandvi 66KV Mandvi 110 Surat Bardoli 66KV Mota 30-40 111 Surat Kamrej 66KV Sampura 30-40 112 Surat Mandvi 66KV Kasal 220 KV 113 Surat Kamrej 66KV Parab (Mankna) 50-70 Mota -- 114 Tapi Vyara 66KV Vyara (Bardoli) 115 Tapi Vyara 66KV Borakhadi 116 Tapi Vyara 66KV Rupwada 30-40 117 Tapi Vyara 66KV Chikhalvav 118 Tapi Vyara 66KV Magarkui 119 Tapi Vyara 66KV Vyara-2 120 Tapi Valod 66KV Bhimpor (Kanjod) 121 Surat Bardoli 66KV Manekpore 122 Tapi Valod 66KV Valod 123 Tapi Valod 66KV Virpor (Pathakwadi) 30-40 124 Tapi Valod 66KV Karanjkhed 125 Tapi Vyara 66KV Dolvan 126 Tapi Vyara 66KV Mangaliya (Chimer) 127 Tapi Vyara 66KV Kalakva 128 Navsari Navsari 220/66KV Navsari 50-70 129 Navsari Gandevi 66KV Billimora 130 Navsari Gandevi 66KV Gandevi 131 Navsari Gandevi 66KV Amalsad 30-40 132 Navsari Jalalpore 66KV Sultanpur(Dandi) 220 KV 133 Navsari Gandevi 66 KV Chhapar (Kotha) -- Navsari 134 Navsari Jalalpore 66KV Eroo 135 Navsari Navsari 66KV Chhapra (Navsari -B) 30-40 136 Navsari Navsari 66KV Navsari city 137 Navsari Jalalpore 66KV Maroli 30-40 138 Navsari Navsari 66KV Vesma 30-40

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 3/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S South Gujarat 139 Surat Choryasi 220/66KV Popada 50-70 220 KV 140 Surat Choryasi 66KV SUSM-1 -- 30-40 Popda 141 Surat Choryasi 66KV Bhatia 220/66KV Sachin 142 Surat Choryasi 50-70 (Talangpore) 143 Surat Choryasi 66KV Sachin -B 144 Surat Choryasi 66KV Vanz (Susml) 145 Surat Palsana 66KV Erthan (Lingad) 30-40 146 Surat Choryasi 66KV Kharvasa 147 Surat Palsana 66KV GETP 148 Navsari Jalalpore 66KV Mangrol 30-40 220 KV 149 Surat Choryasi 66KV Khajod (Magadalla) Sachin 150 Surat Choryasi 66KV Jiyav (Bamroli) 30-40 -- (Talangpore 151 Surat Choryasi 66KV Vadod ) 152 Surat Choryasi 66KV Vesu 153 Surat Choryasi 66KV Vesu-2 (Magdalla) 40-50 154 Surat Choryasi 66KV Dumas 155 Surat Choryasi 66KV Pandesara 30-40 156 Surat Choryasi 66KV Jiav (Pandesara-II) 157 Surat Choryasi 66KV Sachin -A 158 Surat Choryasi 66KV Sachin-D 30-40 159 Surat Choryasi 66KV Sachin ‘C 160 Bharuch Wagra 220/66KV Rahiyad 50-70 220 KV 161 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70 Suva -- 162 Bharuch Wagra 66KV Galenda 50-70 (Rahiyad) 163 Bharuch Wagra 66KV Suva 30-40 164 Bharuch Wagra 220/66KV Dahej 50-70 165 Bharuch Wagra 66KV Dahej 166 Bharuch Wagra 66KV Luna 220 KV -- 167 Bharuch Wagra 66KV Vadadala (Dahej) 30-40 Dahej 168 Bharuch Wagra 66KV Jolva 169 Bharuch Wagra 66KV Bhesali 170 Valsad Vapi 220/66KV Vapi 50-70 171 Valsad Dharampur 66KV Motaponda (Kakadkopar) 172 Valsad Pardi 66KV Paria 173 Valsad Pardi 66KV Chival (Dhagadmal) 174 Valsad Pardi 66KV Nimkhal 175 Valsad Pardi 66KV Kherlav 30-40 176 Valsad Vapi 66KV Kocharava(Rata Koparali) 220 KV 177 Valsad Kaparada 66KV Kaparada -- Vapi 178 Valsad Kaparada 66KV Astol 179 Valsad Kaparada 66KV Sutharpada 180 Valsad Kaparada 66KV Shahuda 181 Valsad Umargam 66KV Damanganga GIDC 182 Valsad Umargam 66KV Karembele (Nahuli) 40-50 183 Valsad Vapi 66KV Chandor 184 Valsad Vapi 66KV GIDC -Vapi 30-40

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 4/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S South Gujarat 185 Valsad Vapi 66KV GIDC Vapi -III rd. Ph. 186 Valsad Vapi 66KV Dungra 30-40 187 Valsad Vapi 66KV GIDC Vapi - IV th Ph. 220 KV -- 188 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40 Vapi 189 Valsad Vapi 66KV Morai 30-40 190 Valsad Vapi 66KV Morai-2 191 Surat Kamrej 220/66KV Vav 50-70 192 Surat Kamrej 66KV Kosmada 40-50 193 Surat Choryasi 66KV 194 Surat Palsana 66KV 195 Surat Palsana 66KV Palsana 196 Surat Palsana 66KV Tatithaiya 30-40 197 Surat Palsana 66KV Jolva 198 Surat Choryasi 66KV Punakumbharia 220 KV Vav -- 199 Surat Kamrej 66KV Laskan 30-40 200 Surat Kamrej 66KV Laskana -2 201 Surat Kamrej 66KV Vav 30-40 202 Surat Olpad 66KV Sivan (Sayan west) 30-40 203 Surat Olpad 66KV Delad 204 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 205 Surat Choryasi 66KV Deladva 206 Surat Choryasi 66KV Sarthana 30-40 207 Bharuch Wagra 220/66KV Wagra 50-70 208 Bharuch Wagra 66KV Vilayat 220 KV 30-40 -- 209 Bharuch Bharuch 66KV Kukarwada Wagra 210 Bharuch Bharuch 66KV Sayakha 30-40 211 Surat Mangrol 400/220/66KV 50-70 212 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70 400 KV -- 213 Surat Mangrol 66KV Kosamba Kosamba 30-40 214 Surat Mangrol 66KV Kharach (Tarsali) 215 Tapi Songadh 66KV Borda 216 Tapi Songadh 66KV Bhogvad 30-40 217 Tapi Songadh 66KV Sagbara 218 Tapi Nizar 66KV Nizar 219 Tapi Nizar 66KV Kelani (Kukarmunda) 220 Tapi Nizar 66KV Balda/Nimbhora 30-40 221 Tapi Uchchhal 66KV Rumkitalav 222 Tapi Uchchhal 66KV Uchchhal 223 Tapi Uchchhal 66KV Vadpada(Naranpur) 224 TapiSongadh 66KV Chikhali Bheshrot (Khodtalav) 220 KV -- 225 Tapi Songadh 66KV Vadi Bhesrot 30-40 Ukai Hydro 226 Tapi Songadh 66KV Sisor (Panchpipla) 227 Tapi Songadh 66KV Ukai 228 Tapi Songadh 66KV Songadh 229 Tapi Songadh 66KV Kavla 230 Tapi Songadh 66KV Kumkuva 30-40 231 Tapi Songadh 66KV Jamkhadi (Hindala) 232 Tapi Songadh 66KV Vadpada (Tokarva) 233 Dang Ahwa 66KV Malangdev 234 Dang Subir 66KV Subir

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 5/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 1 Chhota Udaipur Chhotaudepur 132/66KV Chhota Udepur (Vasedi) 50-70 2 Chhota Udaipur Chhotaudepur 132/66 KV Zoz 40-50 3 Chhota Udaipur Chhotaudepur 66KV Vanar 30-40 4 Chhota Udaipur Bodeli 66KV Bodeli 5 Chhota Udaipur Bodeli 66KV Patiya (Ranbhun) 132 KV 6 Chhota Udaipur Bodeli 66KV Uchapan Chhota -- 7 Chhota Udaipur Bodeli 66KV Kharedivav 30-40 Udepur 8 Chhota Udaipur Pavi-Jetpur 66KV Vadoth (Vasedi) 9 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur 10 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi) 11 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli) 30-40 12 Chhota Udaipur Chhotaudepur 66KV Judavant 13 Chhota Udaipur Kawant 220/66KV Kawant 50-70 14 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka) 15 Chhota Udaipur Naswadi 66KV Sengpur (Khanda) 30-40 220 KV 16 Chhota Udaipur Naswadi 66KV Ratanpur -- Kawant 17 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad) 18 Chhota Udaipur Kawant 66KV Panvad 30-40 19 Chhota Udaipur Kawant 66KV Rendi (Manka) 20 Dahod Dahod 132/66KV Dahod 50-70 21 Dahod Dahod 66KV Kharedi (Chhapri) 22 Dahod Dahod 66KV Kharod (Chhapari) 30-40 23 Dahod Dahod 66KV Kathala 24 Dahod Dahod 66KV Navagam 132 KV -- 25 Dahod Zalod 66KV Karath (Limdi) Dahod 26 Dahod Zalod 66KV Zalod 30-40 27 Dahod Zalod 66KV Gultora 28 Dahod 66KV Garbada (Nalvai) 30-40 29 Dahod Garbada 66KV Vajelav (Jesavada) 30 Dahod Limkheda 132/66KV Limkheda 40-50 31 Dahod Devgadh Bariya 66KV Devgadh-Baria 66KV Mota Ambaliyara 32 Dahod Limkheda (Randhikpur) 30-40 132 KV -- 33 Dahod Devgadh Bariya 66KV Piplod Limkheda 34 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya) 35 Dahod Dhanpur 66KV Singavali (Pipero) 30-40 36 Dahod Limkheda 66KV Limkheda 30-40 37 Vadodara 220/132/66KV Gotri 50-70 38 Vadodara Padra 66KV Samiyala (Tandalja) 39 Vadodara Padra 66KV Padra 50-70 40 Vadodara Padra 66KV Mahuvad 41 Vadodara Vadodara 66KV Bhayli 50-70 42 Vadodara Vadodara 66KV Koyali 50-70 132 KV 43 Vadodara Vadodara 66KV Sherkhi -- Gotri 44 Vadodara Vadodara 66KV Vasana 50-70 45 Vadodara Vadodara City 66KV Vidhyutnagar 46 Vadodara Vadodara City 66KV Atladra 50-70 47 Vadodara Vadodara 66KV Gotri-B 48 Vadodara Vadodara City 66KV Subhanpura 30-40 49 Vadodara Vadodara City 66KV Gorwa

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 6/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 50 Kheda Mehemdabad 132/66KV Mahemdabad 50-70 51 Kheda Kheda 66KV Kheda 52 Kheda Kheda 66KV Matar 53 Kheda Kheda 66KV Samadra 30-40 54 Kheda Matar 66KV Limbasi 55 Kheda Vaso 66KV Vaso 132 KV 56 Kheda Mehemdabad 66 KV Wathwadi Mahemdab -- 30-40 57 Kheda 66KV Jinjar ad 58 Kheda Mehmedabad 66KV Haldarwas 59 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali) 60 Kheda Mahutha 66KV Shehri (Alina) 30-40 61 Kheda Mahutha 66KV Ruppura 62 Kheda Mahutha 66KV Mahudha 63 Vadodara Savli 132/66KV Manjusar 50-70 64 Vadodara Desar 66KV Desar 132 KV 65 Vadodara Savli 66KV Savli -- 30-40 Manjusar 66 Vadodara Savli 66KV Tundav 67 Vadodara Savli 66KV Alindra(Manjusar) 68 Kheda Nadiad 132/66KV Nadiad 50-70 69 Anand Anand 66KV Samarkha 70 Kheda Galteshwar 66KV Vadad 71 Kheda Nadiad 66KV Chaklasi 30-40 132 KV 72 Kheda Nadiad 66KV Malarpura (Chaklasi Party) -- Nadiad 73 Kheda Nadiad 66KV Palaiya 74 Kheda Nadiad 66KV Kamla (Nadiad City) 30-40 75 Kheda Nadiad 66KV Dabhan 76 Kheda Mehemdabad 66KV Sandhana 30-40 77 Vadodara Vadodara 132/66KV Nandesari 50-70 78 Vadodara Savli 66KV Rania (Moxi) GIDC 79 Vadodara Vadodara 66KV Nandesari-I 30-40 132 KV -- 80 Vadodara Savli 66KV Poicha Nandesari 81 Vadodara Vadodara 66KV Nandesari-III 50-60 82 Vadodara Vadodara 66KV Ranoli GIDC 30-40 83 Anand Anand 132/66KV Ode 50-70 84 Anand Anand 66KV Vasad 30-40 85 Anand Anand 66KV Sarsa 86 Anand Umreth 66KV Sureli 30-40 132 KV 87 Kheda 66KV Nesh -- Ode 88 Kheda Thasara 66KV Thasra 89 Anand Anand 66KV Bhalej 30-40 90 Anand Umreth 66KV Umreth 91 Kheda Thasara 66KV Rakhiyal 92 Dascroi 132/66KV Narol 50-70 93 Ahmedabad Dascroi 66KV Jetalpur 30-40 132 KV 94 Ahmedabad Dascroi 66 KV Navagam -- Narol 95 Ahmedabad Dascroi 66KV Lambha (Kamod) 15-20 96 Kheda Kheda 66KV Bidaj (Vanch) 30-40

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 7/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 97 Ahmedabad Dascroi 66KV Barejadi 98 Ahmedabad Dascroi 66KV Vinjol (Gatrad) 99 Ahmedabad Dascroi 66KV Bhuvaldi 100 Ahmedabad Dascroi 66KV Bilasiya 132 KV 101 Ahmedabad Dascroi 66KV Vehlal 30-40 -- Narol 102 Ahmedabad Dascroi 66KV Kanbha 103 Ahmedabad Dascroi 66KV Hirapur 104 Ahmedabad Dascroi 66KV Dhamatwan 105 Ahmedabad Dascroi 66 KV Nenpur 106 Mehsana Kadi 400/220/66KV Vadavi 50-70 107 Ahmedabad Ahmedabad 66KV Sarkhej (Shela) 400 KV 108 Ahmedabad Dascroi 66KV Bopal 40-50 Vadavi 109 Ahmedabad Dascroi 66KV Science City 110 Ahmedabad Dascroi 66KV Bhadaj 111 Ahmedabad Ahmedabad 132/66KV Sabarmati 50-70 -- 112 Gandhinagar 66KV Adalaj 30-40 113 Gandhinagar Gandhinagar 66KV Sargasan 132 KV 114 Ahmedabad Ahmedabad City 66KV Traghad Sabarmati 115 Ahmedabad Dascroi 66KV Khoraj (shaligram) 30-40 116 Ahmedabad Dascroi 66 KV Goderej City 117 Narmada Tilakwada 132/66KV Tilakwada 50-70 118 Chhota Udaipur Bodeli 66KV Chalamali (Vanadha) 119 Chhota Udaipur Bodeli 66KV Koshindra 30-40 120 Chhota Udaipur Naswadi 66KV Naswadi 121 Narmada Nandod 66KV Navagam 122 Narmada Nandod 66KV Amadla (Nandod) 50-70 132 KV -- 123 Narmada Nandod 66KV Garudeshwar (Devaliya) Tilakwada 124 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40 125 Narmada Tilakwada 66KV Soikuva 40-50 126 Vadodara Dabhoi 66KV Chandod 127 Vadodara Dabhoi 66KV Pisai (Sathod) 30-40 128 Vadodara Sinor 66KV Simli (Segwa) 129 Bharuch Zagadiya 220/132/66KV Achhalia 50-70 130 Bharuch Zagadiya 66KV Rajpardi 131 Bharuch Zagadiya 66KV Zagadia 30-40 132 Bharuch Zagadiya 66KV Bhalod (Govali) 133 Bharuch Zagadiya 66KV Panetha 30-40 220 KV 134 Narmada Nandod 66KV Rajpipla -- 135 Narmada Nandod 66 KV Anijara (Lachhras) Achhalia 136 Narmada Nandod 66KV Bhacharwada 25-30 137 Narmada Nandod 66 KV Amletha 138 Narmada Nandod 66KV Pratapnagar (Umalla) 139 Narmada Nandod 66 KV Rajuwadiya 50-70 140 Narmada Nandod 66KV Ori 141 Ahmedabad Sanand 220/66 KV Bhat 50-70 142 Ahmedabad Sanand 400/220/66 KV Chharodi 50-70 220 KV 143 Ahmedabad Sanand 66KV Vinchhiya (Mankol) 40-50 -- Bhat 144 Ahmedabad Dascroi 66KV Bhat (Bavla) 30-40 145 Ahmedabad Sanand 66KV Changodar

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 8/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 146 Ahmedabad Sanand 66KV Sanathal 147 Ahmedabad Dascroi 66KV Visalpur 148 Ahmedabad Sanand 66KV Chharodi 149 Ahmedabad Viramgam 66KV Thuleta 220 KV 30-40 -- 150 Ahmedabad Sanand 66KV Madhavnagar Bhat 151 Ahmedabad Sanand 66 KV Shella 152 Ahmedabad Sanand 66 KV Ambali 153 Ahmedabad Sanand 66KV Sanand GIDC 154 Panchmahal Halol 220/66KV Chandrapura 50-70 155 Panchmahal Ghoghamba 66KV Ghoghamba 156 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani) 157 Panchmahal Halol 66KV Shivrajpur 158 Panchmahal Ghoghamba 66KV Ranjitnagar 30-40 159 Panchmahal Ghoghamba 66KV Kantu (Bor) 220 KV 160 Panchmahal Halol 66KV GIDC Halol B Chandrapur -- 161 Panchmahal Halol 66KV Tarkhanda (Panchdevla) a 162 Panchmahal Halol 66KV GIDC - Halol 30-40 163 Panchmahal Kalol 66KV Madhwas 30-40 164 Vadodara Savli 66KV Ankaliya (Nharpura) 165 Panchmahal Halol 66KV Baska 30-40 166 Panchmahal Halol 66KV KhaKharia 167 Panchmahal Godhra 220/132/66KV Godhra 50-70 168 Panchmahal Kalol 66KV Vejalpur 169 Panchmahal Kalol 66KV Kalol 30-40 170 Panchmahal Kalol 66KV Bhukhi (Gangadiya) 171 Panchmahal Kalol 66 KV Bhadroli Khurd 172 Panchmahal Godhra 66KV Lilesara 30-40 173 Panchmahal Godhra 66KV Santroad 174 Panchmahal Morvahadaf 66KV Rajayata 175 Panchmahal Morvahadaf 66KV Chandpur 30-40 220 KV -- 176 Panchmahal Morvahadaf 66KV Mota Amalia Godhra 177 Panchmahal Godhra 66KV Jafrabad (Govindi) 178 Panchmahal Godhra 66KV Timba 179 Panchmahal Godhra 66KV Tuva(kankanapur) 30-40 180 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina) 181 Panchmahal 66KV Shehera 182 Panchmahal Shehra 66KV Nandarva 30-40 183 Panchmahal Shehra 66KV Panam Dam 184 Panchmahal Shehra 66KV Padardi 185 Vadodara Vadodara 220/132/66KV Jambuva 50-70 186 Vadodara Dabhoi 66KV Dabhoi 187 Chhota Udaipur Sankheda 66KV Sankheda 30-40 188 Chhota Udaipur Sankheda 66KV Bhatpur 189 Vadodara Vadodara 66KV Indrapuri 50-70 220 KV 190 Vadodara Vadodara City 66KV Waghodia Road -- Jambuva 191 Vadodara Vadodara 66KV Gajrawadi 30-40 192 Vadodara Vadodara City 66KV Motibaug 193 Vadodara Vadodara City 66KV Tarsali 194 Vadodara Vadodara City 66KV Makarpura-GIDC-B 50-70 195 Vadodara Vadodara City 66KV Makarpura GIDC-A

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 9/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 196 Vadodara Padra 220/66KV Gavasad 50-70 197 Bharuch Jambusar 66KV Sarod (Hamodpore-Kanthariya) 40-50 220 KV 198 Vadodara Padra 66KV Karkhadi -- Gavasad 199 Vadodara Padra 66KV Gavasad 50-70 200 Vadodara Padra 66KV Mobha 201 Bharuch Zagadiya 220/66KV Jhagadia 50-70 220 KV 202 Bharuch Zagadiya 66KV Randedi 50-70 -- Jhagadia 203 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40 132 KV 204 Bharuch Bharuch 132/66KV Bharuch 50-70 -- Bharuch 205 Bharuch Bharuch 220/132/66KV Haldarwa 50-70 206 Bharuch Amod 66KV Samni (Kurchan) 207 Bharuch Bharuch 66KV Palej 208 Bharuch Bharuch 66KV Zanor (Nabipur) 209 Bharuch Wagra 66KV Muller 15-20 210 Bharuch Bharuch 66KV Bharuch -B 220 KV 211 Bharuch Bharuch 66KV Bori (Hingala) -- Haldarwa 212 Bharuch Wagra 66KV Wagra 213 Bharuch Bharuch 66KV Panchbatti 214 Bharuch Bharuch 66KV Kadod 30-40 215 Bharuch Bharuch 66KV Haldarva 30-40 216 Vadodara Karjan 66KV Rarod (Nareshwar) 30-40 217 Vadodara Karjan 66KV Saring 218 Kheda Kapadvanj 220/66KV Kapadwanj 50-70 219 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40 220 Kheda Kapadvanj 66KV Nirmali 221 Kheda Kapadvanj 66KV Attarsumba 30-40 222 Kheda Kapadvanj 66KV Hamirpura (Bhailakui) 223 Kheda Kapadvanj 66KV Torna 224 Kheda Kathalal 66KV Aral 30-40 225 Kheda Kathlal 66KV Chhipadi (Khalal) 226 Kheda Kathlal 66KV Kathlal 220 KV 227 Kheda Mahmedabad 66KV Aklacha -- 30-40 Kapadwanj 228 Kheda Kapadvanj 66KV Vyas Vasna 229 Kheda Kathlal 66KV Apruji 230 Kheda Kathlal 66KV Anara 30-40 231 Kheda Thasra 66KV Chetarsumba 30-40 232 Mahisagar Balasinor 66KV Jorapura 233 Mahisagar Balasinor 66KV Relia 234 Kheda Galteshwar 66KV Sevalia 30-40 235 Kheda Balasinor 66KV Rozva 236 Mahisagar Balasinor 66KV Balasinor 237 Ahmedabad Dascroi 220/66KV Khanpur 50-70 220 KV 238 Ahmedabad Dascroi 66KV Kuha -- 30-40 Khanpur 239 Ahmedabad Dascroi 66 KV Bahiyal 220 KV 240 Anand Anand 220/66KV Mogar 50-70 -- Mogar 241 Bharuch Amod 220/66KV Amod 50-70 242 Bharuch Amod 66KV Sarbhan 220 KV -- 243 Bharuch Amod 66KV Ochhan (Telod -Ikhar) 30 Amod 244 Vadodara Karjan 66KV Handod

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 10/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 245 Vadodara Karjan 220/66KV Karjan 50-70 246 Vadodara Dabhoi 66KV Karvan (Kayavarohan) 247 Vadodara Karjan 66KV Simali 30-40 220 KV 248 Vadodara Sinor 66KV Sadhali -- Karjan 249 Vadodara Sinor 66KV Sinor 250 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40 251 Vadodara Karjan 66KV Lakodara 30-40 252 Anand Anand 220/66KV Karamsad 50-70 253 Anand Anand 66KV Anand 254 Anand Anand 66KV Gopalpura 30-40 255 Anand Anand 66KV Anand Agri. University 256 Anand Anand 66KV Boriavi (Jol) 257 Anand Anand 66KV V.V. Nagar 30-40 258 Anand Anand 66KV Vithal Udyognagar 259 Anand Petlad 66KV Mahelav 260 Anand Petlad 66KV Changa 30-40 261 Kheda Nadiad 66KV Uttarsanda 262 Kheda Nadiad 66KV Akhdol 220 KV 263 Anand Anand 66KV Karamsad 30-40 Karamsad / 264 Anand Anklav 66KV Anklav -- 220 KV 265 Anand Anklav 66KV Bhetasi Mogar 266 Anand Anklav 66KV Navakhal (Khedasa) 267 Anand Borsad 66KV Borsad 30-40 268 Anand Borsad 66KV Shinglav 269 Anand Anand 66KV Navli 270 Anand Anklav 66KV Khadol (Haldari) 271 Anand Borsad 66KV Ras 30-40 272 Anand Petlad 66KV Virsad 273 Anand Petlad 66KV Nar 274 Anand Cambay 66KV Timba 30-40 275 Anand Petlad 66KV Petlad 276 Anand Sojitra 66KV Kasor 30-40 277 Ahmedabad Ahmedabad 220/132/66KV Ranasan 50-70 278 Ahmedabad Ahmedabad 66KV Naroda 279 Ahmedabad Ahmedabad 66KV Odhav 30-40 220 KV 280 Ahmedabad Ahmedabad 66KV Kathvada -- Ranasan 281 Gandhinagar Gandhinagar 66KV Muthia 30-40 282 Ahmedabad Dascroi 66KV Chandkheda 30-40 283 Ahmedabad Dascroi 66 KV Bhat 284 Vadodara Waghodiya 400/220/66KV Asoj 50-70 285 Vadodara Vadodara 132/66KV Fertilizarnagar 50-70 286 Vadodara Savli 66KV Khakhariya 30-40 287 Vadodara Savli 66KV Pratapnagar (Godampura) 288 Vadodara Waghodiya 66KV Asoj (Paldi) 400 KV 289 Vadodara Waghodiya 66KV Vyankatpura -- Asoj 290 Vadodara Waghodiya 66KV Jarod 30-40 291 Vadodara Vadodara 66KV Amaliyara 292 Vadodara Vadodara City 66KV Chhani-A 293 Vadodara Vadodara City 66KV Chhani -B 294 Vadodara Vadodara City 66KV Sama

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 11/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Central Gujarat 295 Mahisagar Lunawada 220/66KV Savdasna Muvada 50-70 296 Mahisagar Lunawada 66KV Lunawada 297 Mahisagar Santrampur 66KV Movasa 298 Mahisagar Lunawada 66KV Kothamba 299 Mahisagar Lunawada 66KV Ved(vardhadari) 30-40 300 Mahisagar Santrampur 66KV Santrampur 301 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda 302 Dahod 66KV Lakhanpur 303 Dahod Fatepura 66KV Sarasva 304 Mahisagar Kadana 66KV Ditvas 220 KV 305 Mahisagar Khanpur 66KV Bakor (Lavana) 30-40 Savdasna -- 306 Mahisagar Khanpur 66KV Motakhanpur Mauda 307 Mahisagar Virpur 66KV Virpur 308 Mahisagar Balasinor 66KV Pandava (Parbia) 309 Mahisagar Lunawada 66KV Limbadiya 30-50 310 Mahisagar Virpur 66KV Salaiya 311 Mahisagar Virpur 66KV Debhari 312 Mahisagar Lunawada 66KV Budhajina Tekra 30-40 313 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan) 314 Mahisagar Santrampur 66KV Mora 30-40 315 Mahisagar Santrampur 66KV Malvan 316 Ahmedabad Bavla 220/66KV Salejada 50-70 317 Ahmedabad Bavla 66KV Juval rupavati 318 Ahmedabad Bavla 66KV Kerala 30-40 319 Ahmedabad Sanand 66KV Zamp 320 Ahmedabad Sanand 66KV Daduka (Rethal) 321 Ahmedabad Bavla 66KV Bavla 322 Ahmedabad Sanand 66KV Nani Devti Maximum 50-70 220 KV 323 Ahmedabad Sanand 66KV Rajoda MW RE injection Salejada 324 Ahmedabad Sanand 66KV Moraiya feasible 325 Ahmedabad Sanand 66KV Vendor Park 30-40 326 Ahmedabad Sanand 66KV Bol-2(GIDC) 327 Ahmedabad Sanand 66KV Sanand-2 328 Ahmedabad Bavla 66KV Bol-1(GIDC) 329 Ahmedabad Bavla 66KV Kesardi 330 Ahmedabad Bavla 66KV Kalyangadh 331 Ahmedabad Dholka 66KV Dholka City 30-40 332 Ahmedabad Dholka 66KV Koth 333 Ahmedabad Dholka 66KV Raipur 334 Ahmedabad Dholka 66KV Simej 30-40 Maximum 50-70 220 KV 335 Ahmedabad Dholka 66KV Walthera MW RE injection Salejada 336 Ahmedabad Dholka 66KV Ingoli road feasible 337 Ahmedabad Dholka 66KV Dholka GIDC 338 Ahmedabad Dholka 66KV Pisawada 30-40 339 Ahmedabad Dholka 66 KV Shetra 340 Vadodara Waghodiya 220/66KV Vyankatpura 40-50 341 Panchmahal Halol 66KV Madar (Koprej) 30-40 220 KV 342 Vadodara Waghodiya 66KV Rustampura 30-40 Vyankatpur -- 343 Chhota Udaipur Bodeli 66KV Surya a 344 Vadodara Vadodara 66KV Khatamba 40-50 345 Vadodara Vadodara City 66KV Harni

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 12/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 1 Kheda Nadiad 66KV Navagam (Nyka) 30-40 2 Ahmedabad Viramgam 220/66KV Viramgam 40-50 220 KV -- 3 Ahmedabad Detroj 66KV Kanz 30-40 Viramgam 4 Ahmedabad Viramgam 66KV Jakhawada 30-40 5 Gandhinagar Gandhinagar 132/66KV Chiloda 50-70 6 Gandhinagar Gandhinagar 66KV Unava 7 Gandhinagar Dehgam 66KV Sadra 8 Gandhinagar Mansa 66KV Pethapur 30-40 132 KV -- 9 Sabarkantha Prantij 66KV Kamalpur Chiloda 10 Gandhinagar Mansa 66KV Manekpur (Grambharti) 11 Gandhinagar Gandhinagar 66KV Shahpur 10-15 12 Gandhinagar Gandhinagar 66KV Dabhoda 30-40 13 Banaskantha Deesa 132/66KV Deesa 50-70 14 Banaskantha Deesa 66KV Bhildi 15 Banaskantha Deesa 66KV Lorwada 30-40 16 Banaskantha Deesa 66KV Balodhar 132 KV -- 17 Banaskantha 66KV Manekpura Deesa Deesa 30-40 18 Banaskantha 66KV Juna Deesa 19 Banaskantha 66KV Ranpur Deesa 30-40 20 Banaskantha 66KV Kant 400 KV 21 Patan Radhanpur 400/220/66KV Charanka 50-70 -- Charanka 22 Patan Patan 132/66KV Patan 40-50 23 Patan Harij 66KV Dunawada 24 Patan Patan 66KV Dudharampura (Varetha) 15-20 132 KV 25 Patan Patan 66KV Anawada -- Patan 26 Patan Patan 66KV Kamliwada 30-40 27 Patan Saraswati 66KV Kansa 15-20 28 Patan Shihori 66KV Anganwada 29 Patan Sidhpur 132/66KV Siddhpur 50-70 30 Banaskantha Vadgam 66KV Basu 30-40 31 Banaskantha Vadgam 66KV Kakoshi 32 Banaskantha Vadgam 66KV Chhapi 30-40 132 KV 33 Mehsana Unjha 66KV Kahoda 30-40 -- Siddhpur 34 Patan Sidhpur 6KV Khali 30-40 35 Patan Unjha / Mehsana 66KV Tundav 36 Patan Sidhpur 66KV Mudana 30-40 37 Patan Sidhpur 66KV Sujanpur 38 Sabarkantha 132/66KV Talod 50-70 39 Sabarkantha 66KV Prantij 40 SabarkanthaPrantij 66KV Talod GIDC 132 KV 30-40 -- 41 Sabarkantha 66KV D'Muvadi Talod 42 Sabarkantha 66KV Tajpur 43 Sabarkantha Talod 66KV Harsol 30-40 44 Banaskantha Lakhani 220/66KV Agathala 50-70 45 Banaskantha 66KV Rantila 46 BanaskanthaLakhni, Deodar 66KV Lakhani 30-40 220 KV -- 47 Banaskantha 66KV Agathala Agathala 48 Banaskantha 66KV Soni Deodar, Lakhani 30-40 49 Banaskantha 66KV Shergadh

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 13/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 50 Banaskantha 66KV Kotda (D) Lakhani 30-40 51 Banaskantha 66KV Chekara 52 Banaskantha Lakhani 66KV Motakapra 220 KV 30-40 -- 53 Banaskantha Deesa 66KV Nesda Agathala 54 Banaskantha Deodar 66KV Jalota 30-40 55 Banaskantha Tharad 66KV Taruva 30-40 56 Sabarkantha Himmatnagar 220/66KV Agiyol 50-70 57 Sabarkantha Himmatnagar 66KV Dedhrota 58 Sabarkantha Himmatnagar 66KV Munpur 30-40 59 Sabarkantha Himmatnagar 66KV Hansalpur 60 Sabarkantha Himmatnagar 66KV Kali Dungar 61 Sabarkantha Himmatnagar 66KV Chandrani 30-40 62 Sabarkantha Himmatnagar 66KV Moti Demai 63 Sabarkantha Himmatnagar 66KV Kaniyol 64 Sabarkantha Prantij 66KV Amodara 30-40 65 Sabarkantha Himmatnagar 66KV Sonasan 220 KV -- 66 Sabarkantha Himmatnagar 66KV Hajipur Agiyol 30-40 67 Sabarkantha Himmatnagar 66KV Dalpur 68 Sabarkantha Himmatnagar 66KV Himmatnagar-1 69 Sabarkantha Himmatnagar 66KV Parabda 30-40 70 Sabarkantha Himmatnagar 66KV Gadhoda 71 Sabarkantha Himmatnagar 66KV Nikoda 30-40 72 Sabarkantha Himmatnagar 66KV Gadhi 73 Sabarkantha Himmatnagar 66KV Gambhoi 74 Sabarkantha Himmatnagar 66KV Rupal 30-40 75 Sabarkantha Himmatnagar 66KV Himmatnagar-2 76 Patan Bechraji / Mehsana 220/66KV Bechraji 50-70 220 KV 77 Patan Chanasma 66KV Maniyari -- 15-20 Becharaji 78 Patan Bechraji / Mehsana 66KV Modhera 79 Gandhinagar Kalol 220/66KV Chhatral 50-70 80 Gandhinagar Kalol 66KV Pansar 30-40 81 Gandhinagar Kalol 66KV Chhatral GIDC 82 Gandhinagar Kalol 66KV Borisana 30-40 83 Gandhinagar Kalol 66KV Vadsar 84 Gandhinagar Kalol 66KV Kalol 30-40 220 KV 85 Gandhinagar Kalol 66KV Dhanot -- 30-40 Chhatral 86 Mehsana Kalol 66KV Karannagar 87 Mehsana Kadi 66KV Khavad 88 Mehsana Kadi 66KV Sadra 30-40 89 Mehsana Kadi 66KV Rangpurda (Nanikadi) 90 Mehsana Kadi 66KV Nandasan 30-40 91 Mehsana Kadi 66KV Rajpur 92 Aravali Bhiloda 220/66KV Bhutiya 50-70 93 Aravali Bhiloda, Vijaynagar 66KV Bhiloda 94 Aravali Bhiloda, Vijaynagar 66KV Ubsal 95 Aravali Bhiloda, Vijaynagar 66KV Torada 220 KV -- 96 Aravali Bhiloda, Vijaynagar 66KV Bhiloda 30-40 Bhutiya 97 Aravali Bhiloda, Vijaynagar 66KV Vijaynagar 98 Aravali Bhiloda, Vijaynagar 66KV Pal 99 Aravali Bhiloda, Vijaynagar 66KV Dantod

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 14/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 100 Aravali Bhiloda 66KV (Palla) 101 Aravali Bhiloda 66KV Bhetali (Mehru) 30-40 102 Aravali Bhiloda 66KV Kheradi 103 Sabarkantha 66KV Poshina 104 Sabarkantha 66KV Golwada Poshina, Danta, 105 Sabarkantha 66 KV Makadchampa 15-25 Khedbrahma 106 Sabarkantha 66KV Hingatiya 107 Sabarkantha 66KV Khedbrahma 108 Sabarkantha Khedbrahma 66KV Tandaliya 30-40 220 KV 109 Sabarkantha Idar 66KV Panol -- Bhutiya 110 Sabarkantha Vadali 66KV Vadali 30-40 111 Sabarkantha Vadali 66KV Babsar 112 Sabarkantha 66KV Kundala Vijaynagar, Vadali 30-40 113 Sabarkantha 66KV Choriwad 114 Sabarkantha 66KV Chitroda Idar 30-40 115 Sabarkantha 66KV Badoli 116 Sabarkantha Idar 132/66KV Idar 50-70 117 Sabarkantha 66KV Sudarpur Idar 30-40 118 Sabarkantha 66KV Lai Ranasan 119 Gandhinagar Gandhinagar 220/66KV Jamla 50-70 120 Gandhinagar Gandhinagar 66KV Randheja 30-40 121 Gandhinagar Gandhinagar 66KV Moti Adrej 122 Gandhinagar Kalol 66KV Soja - II 123 Gandhinagar Kalol 66KV Nardipur 30-40 124 Mehsana Kadi 66KV Karjisan 220 KV 125 Gandhinagar Kalol 66KV Veda -- Jamla 126 Gandhinagar Kalol 66KV Itla 30-40 127 Mehsana 66KV Gozaria 128 Mehsana 66KV Gozariya-2 129 MehsanaGozariya 66KV Boru 30-40 130 Mehsana 66KV Charada 131 Mehsana 66KV Kharna 132 Aravali Bayad, Dhansura 220/66 KV Dhansura 50-70 133 Aravali Bayad, Dhansura 66KV Ambaliyara 30-40 134 Aravali Bayad, Dhansura 66KV Akrund() 135 Aravali Bayad 66KV Demai 30-40 136 Aravali Bayad 66KV Sangal (Vasnirel) 220 KV 137 Aravali Malpur, Dhansura 66KV Aniyor -- 30-40 Dhansura 138 Aravali Malpur, Dhansura 66KV Khadol (Simali) 139 Aravali Bayad 66KV Untarada 30-40 140 Aravali Talod 66KV Rozad 141 Sabarkantha 66KV Punsari Talod 20 142 Sabarkantha 66KV Bayal 143 Aravali Modasa 220/66KV Faredi 50-70 144 Aravali Modasa 66KV Modasa 145 Aravali Dhansura 66KV Rahiyol 220 KV -- 146 Aravali Modasa 66KV Tiintoi 30-40 Faredi 147 Aravali Modasa 66KV Medhasan 148 Aravali Modasa 66KV Nani Isrol

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 15/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 149 Aravali Malpur, Meghraj 66KV Malpur 150 Aravali Malpur, Meghraj 66KV Limbodara 30-40 151 Aravali Malpur, Meghraj 66 KV Ramgadhi 152 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad) 153 Aravali Meghraj 66KV Meghraj 220 KV 154 Aravali Meghraj 66KV Relawada -- Faredi 155 Aravali Meghraj 66KV Kasana 156 Aravali Meghraj 66KV Waghpur 30-40 157 Aravali Meghraj 66KV Rajpur (Ramghadi) 158 Aravali Meghraj 66KV Navagam (isari) Kantalu 159 Aravali Meghraj 66KV Lakshmanpura (Lusadiya) 160 Banaskantha Deesa 220/66KV Jangral 50-70 161 Banaskantha 66KV Sadarpur 162 BanaskanthaDeesa 66KV Samau 30-40 163 Banaskantha 66KV Bhatsan 164 Banaskantha 66KV Rasana Deesa, Palanpur 30-40 165 Banaskantha 66KV Aseda 220 KV 166 Banaskantha 66KV Samdhi -- Jangral 167 Banaskantha 66KV Sampra 168 Banaskantha Sihori66KV Umbari 30-40 169 Banaskantha 66KV Kamboi 170 Banaskantha Palanpur 66KV Gadh 30-40 171 Patan Sarasvati 66KV Mesar 30-40 172 Patan Sarasvati 66KV Dharusana 30-40 173 Patan Saraswati 66KV Jangral 30-40 220 KV 174 Patan Saraswati 66KV Kimbuva 30-40 -- Jangral 175 Patan Sidhpur 66KV Kalyana 30-40 176 Gandhinagar Dehgam 66KV Rakhiyal 30-40 177 Gandhinagar Dehgam 66KV Halisa 178 Gandhinagar Dehgam 66KV Khanpur (Lihoda) 30-40 179 Gandhinagar Gandhinagar 66KV Chhala 180 Gandhinagar Dehgam 66KV Dehgam 220 KV 30-40 -- 181 Gandhinagar Dehgam 66KV Kadadar(Zak) Khanpur 182 Gandhinagar Dehgam 66KV Chiskari 30-40 183 Gandhinagar Gandhinagar 66KV Kadjodra 30-40 184 Gandhinagar Gandhinagar 66KV Bahial 30-40 185 Gandhinagar Gandhinagar 66KV Kudasana(Koba) 186 Mehsana Kheralu 220/66KV Kheralu 50-70 187 Mehsana Kheralu 66KV Sakari 188 Banaskantha Vadgam 66KV Panchada 30-40 189 Banaskantha Vadgam 66KV Kodram 190 Banaskantha Danta 66KV 191 Banaskantha Danta 66KV Gorad 192 Banaskantha Danta 66KV Kuvarsi 30-40 220 KV 193 Banaskantha Danta 66KV Solsanda -- Kheralu 194 Mehsana Satlasana 66KV Dharoi 195 Banaskantha Danta 66KV Satalsana 196 Mehsana 66KV Kheralu 30-40 Kheralu 197 Mehsana 66KV Varetha 198 Mehsana 66KV Sudasana (Umari) 30-40 199 Palanpur Satlasana 66KV Motasada 200 Mehsana 66KV Otalpur

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 16/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 201 Mehsana Kheralu 66KV Mandali 30-40 202 Mehsana Unjha 66KV Dasaj 203 Mehsana Unjha 66KV Unjha 204 Mehsana Unjha 66KV Karali 30-40 205 Mehsana Visnagar 66KV Umta 206 Mehsana Visnagar 66 KV Thalota 220 KV 207 Mehsana 66KV Vadnagar -- Vadnagar Kheralu 208 Mehsana 66KV Undhai (Pipaldhar) 209 Mehsana 66KV Jantral 30-40 210 MehsanaVijapur 66KV Sundarpur 211 Mehsana 66KV Ladol 212 Mehsana Vadnagar 66KV Khanpur 30-40 213 Mehsana Vijapur 66KV Techava 214 Mehsana Mehsana 220/132/66KV Mehsana 50-70 215 Patan Chanasma 66 KV Dhinoj 30-40 216 Mehsana Becharji 66KV Motap 217 Mehsana Mehsana 66KV Palavasna 30-40 218 Mehsana Mehsana 66KV Nagalpur (Mehsana-II) 220 KV 219 Mehsana Visnagar 66KV Basna -- Mehsana 220 Mehsana Visnagar 66KV Udalpur 30-40 221 Mehsana Visnagar 66KV Kamana 222 Mehsana Visnagar 66 KV Kherva 223 Mehsana Visnagar 66KV Bhandu 30-40 224 Mehsana Visnagar 66KV Valam 225 Mehsana Jotana 220/66 KV Mitha 50-70 226 Mehsana Mehsana 66KV Asjol 30-40 227 Mehsana Mehsana 66KV Balol 30-40 228 Mehsana Jotana 66KV Mitha 30-40 229 Mehsana 66KV Suraj 230 MehsanaJotana 66KV Kasalpur (Jotana) 220 KV 30-40 -- 231 Mehsana 66KV Mudarda Mitha 232 Mehsana Detroi / Ahmedabad 66KV Katosan 233 Mehsana Mehsana 66KV Langhnaj 234 Mehsana Mehsana 66KV Linch 30-40 235 Mehsana Mehsana 66KV Mandali 236 Mehsana Mehsana 66KV Akhaj 237 Banaskantha Palanpur 220/66KV Palanpur 50-70 238 Banaskantha Amirgadh 66KV Amirgadh 239 Banaskantha Amirgadh 66KV Iqbagadh 30-40 240 Banaskantha Amirgadh 66KV Juni Sarotri (Balundra) 241 Banaskantha Amirgadh 66KV Hebatpur 242 Banaskantha Amirgadh 66KV Bhayala 243 Banaskantha Amirgadh 66KV Virampur 220 KV -- 244 Banaskantha Amirgadh 66KV Malan 30-40 Palanpur 245 Banaskantha Amirgadh 66KV Vasan 246 Banaskantha Amirgadh 66KV Palanpur-2 247 Banaskantha Vadgam, Danta 66KV Moriya 248 Banaskantha Vadgam, Danta 66KV Jalotra 30-40 249 Banaskantha Vadgam, Danta 66KV Danta 250 Banaskantha Vadgam, Danta 66KV Gangva

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 17/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 251 Banaskantha Vadgam, Danta 66KV Gidasan 252 Banaskantha Vadgam, Danta 66KV Vadgam 30-40 253 Banaskantha Vadgam, Danta 66KV Pilucha 254 Banaskantha Vadgam, Palanpur 66KV Kanodar 255 Banaskantha Vadgam, Palanpur 66KV Lalwada 30-40 220 KV 256 Banaskantha Vadgam, Palanpur 66KV Gadalwada -- 257 Banaskantha Dantiwada, Palanpur 66KV Bhakar Palanpur 30-40 258 Banaskantha Dantiwada, Palanpur 66KV Chandisar 259 Banaskantha Dantiwada, Palanpur 66KV Dantiwada 260 Banaskantha Palanpur 66KV Rajpur (Pakhanva) 30-40 261 Banaskantha Dantiwada, Palanpur 66KV Bhutedi 262 Banaskantha Palanpur 66KV Palanpur-1 30-40 263 Patan Radhanpur 220/66KV Radhanpur 50-70 264 Banaskantha 66KV Khariya Sihori, Kankrej 30-40 265 Banaskantha 66KV Un 266 Patan Sami 66KV Sankheshwar 220 KV 267 Patan Sami 66KV Mujpur -- 10-15 Radhanpur 268 Patan Sami 66KV Nani Chandur 269 Patan Sami 66KV Sami 270 Patan Radhanpur 66KV Bhandhvad (Dev) 30-40 271 Patan Kankrej 66KV Jakhel 272 Patan Sankhari 220/66KV Sankhari 50-70

273 Patan Sankhari 400/220/66KV Veloda (Sankhari) 50-70 274 Patan Chanasma 66KV Chanasma 275 Patan Chanasma 66KV Kamboi 15-20 220 KV 276 Patan Chanasma 66KV Ziliya (Keshani) -- Sankhari 277 Patan Patan 66KV Balisana 278 Patan Patan 66KV Manud 30-40 279 Patan Patan 66KV Norta (Mandotri) 280 Patan Unjha / Mehsana 66KV Unava 281 Banaskantha Tharad 220/66KV Tharad 50-70 282 Banaskantha 66KV Runi 283 Banaskantha 66KV Rampura 284 BanaskanthaBhabar, Vav 66KV Tithgam 30-40 285 Banaskantha 66KV Balodhan 286 Banaskantha 66Kv Bhabar 287 Banaskantha 66KV Kotarwada 288 Banaskantha 66KV Makhanu 289 Banaskantha 66KV Mera Deodar, Tharad 30-40 290 Banaskantha 66KV Chalva 220 KV -- 291 Banaskantha 66KV Jetda Tharad 292 Banaskantha 66KV Del 293 Banaskantha 66KV Miyal 294 Banaskantha 66KV Lavana 295 Banaskantha 66KV Ghodasar 296 Banaskantha 66KV Asodar Lakhani, Tharad 30-40 297 Banaskantha 66KV Keshargam 298 Banaskantha 66KV Rah 299 Banaskantha 66KV Pathamda 300 Banaskantha 66KV Bhoradu

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 18/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 301 Banaskantha Tharad 66KV Tadav 30-40 302 Banaskantha 66KV Piluda 220 KV 303 Banaskantha 66KV Dedarada -- Tharad 30-40 Tharad 304 Banaskantha 66KV Dudhva 305 Banaskantha 66KV Tharad 306 Banaskantha Dhanera 220/66KV Thavar 50-70 307 Banaskantha 66KV Jadiyali Lakhani 30-40 308 Banaskantha 66KV Nandala 309 Banaskantha Dhanera 66KV Dhakha 30-40 310 Banaskantha Tharad 66KV Duva 311 Banaskantha 66KV Jadia 312 Banaskantha 66KV Bhatib 220 KV 30-40 313 Banaskantha 66KV Dharnodhar Thavar -- 314 Banaskantha 66KV Kuvarala (Dhanera) Dhanera 315 Banaskantha 66KV Lavara 30-40 316 Banaskantha 66KV Nanuda 317 Banaskantha 66KV Malotra 318 Banaskantha 66KV Siya 30-40 319 Banaskantha Deesa 66KV Nanameda 320 Banaskantha Dhanera 66KV Vaktapura 321 Gandhinagar Kalol 66KV Moti Bhoyan 30-40 322 Gandhinagar Kalol 66KV Khatraj 30-40 323 Gandhinagar Kalol 66KV Santej 324 Mehsana Kadi 66KV Kadi 30-40 400 KV 325 Mehsana Kadi 66KV Laxmipura -- Vadavi 326 Ahmedabad Detroj 66KV Katosan 30-40 327 Mehsana Kadi 66KV Meda Adraj 328 Mehsana Kadi 66KV Meda 30-50 329 Mehsana Kadi 66KV Thol 330 Banaskantha Mera 66KV Mera 331 Banaskantha Mera 66KV Mitha 30-40 332 Banaskantha Mera 66KV Vadiya 333 Banaskantha Deesa 66KV Ramvas 334 Banaskantha Deodar 66KV Vakha 335 Banaskantha Deodar 66KV Ravel 336 Banaskantha Deodar 66KV Chamanpura 337 Banaskantha Kankrej 66KV Khimana 30-40 338 Banaskantha Deodar 66KV Khoda 339 Banaskantha Deodar 66KV Mithipaldi 220 KV 340 Banaskantha Deodar 66KV Duchakwada Deodar -- 341 Banaskantha Deodar 66KV Vatam (Vakha) 342 Banaskantha Deodar 66KV Kotda (F) 343 Banaskantha Deodar 220/66KV Deodar 50-70 344 Banaskantha Deodar 66KV Deodar 30-40 345 Banaskantha Deodar 66KV Raiya 346 Banaskantha Kankrej 66KV Kuvarva 30-40 347 Banaskantha Kankrej 66KV Arniwada 348 Banaskantha Kankrej 66KV Jakhel 349 Banaskantha Deodar 66KV Jasanvada (Khandosan) 30-40 350 Banaskantha Kankrej 66KV Terwada

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 19/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S North Gujarat 351 Banaskantha Kankrej 66KV Jalmor 352 Banaskantha 66KV Sihori 30-40 220 KV Sihori 353 Banaskantha 66KV Padardi Deodar -- 354 Banaskantha 66KV Dugrasan (Vakha) Sihori 30-40 355 Banaskantha 66KV Thara 356 Gandhinagar 66KV Mansa Mansa 30-40 357 Gandhinagar 66KV Lodra 358 Mehsana Mansa 66 KV Vihar 359 Mehsana Visnagar 66KV Kada 30-40 360 Sabarkantha 66KV Mau Idar 361 Sabarkantha 66KV Vasai 50-70 362 Mehsana Vijapur 220/66KV Vijapur 220 KV 363 Mehsana Vijapur 66KV Pilwai (Veda) 30-40 -- Vijapur 364 Mehsana 66KV Malosan 365 MehsanaVijapur 66KV Tatosan 30-40 366 Mehsana 66KV Vadasan 367 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40 368 Mehsana 66KV Ranasan 369 MehsanaVijapur 66KV Sanghpur 30-40 370 Mehsana 66KV Hirpura 371 Banaskantha Deesa 400/220/66KV Zerda 50-70 372 Banaskantha Dantiwada 66KV Jegol 373 Banaskantha Dantiwada 66KV Ganguvada 30-40 374 Banaskantha Dantiwada 66KV Panthwada 375 Banaskantha Deesa 66KV Vithodar 376 Banaskantha 66KV Devsari 377 BanaskanthaLakhani, Deesa 66KV Pechhdal 30-40 378 Banaskantha 66KV Nagfana 400 KV 379 Banaskantha Deesa 66KV Malgadh 30-40 Kansari -- 380 Banaskantha 66KV Ramun (Zerda) Deesa 30-40 381 Banaskantha 66KV Sherpura 382 Banaskantha 66KV Zerda Deesa 30-40 383 Banaskantha 66KV Khimat 384 Banaskantha 66KV Dama Deesa 30-40 385 Banaskantha 66KV Samsherpura 386 Banaskantha 66KV Gadha Deesa 30-40 387 Banaskantha 66KV Baiwada

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 20/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 1 Jamkandorna 132/66KV Bhayavadar 40-50 2 Rajkot Upleta 66KV Arni 30-40 Maximum 40-50 132 KV 3 Rajkot 66KV Supedi MW RE injection Bhayavadar 4 Rajkot Dhoraji 66KV Moti Vavdi 30-40 feasible 5 Rajkot Jamkandorna 66 KV Khajurada 6 Junagadh Junagadh 132/66KV Junagadh 40-50 7 Junagadh Junagadh 66KV Bilkha Maximum 40-50 132 KV 8 Junagadh Mendarda 66KV Chiroda MW RE injection 30-40 Junagadh 9 Junagadh Junagadh 66KV Bagdu (Prabhatpur) feasible 10 Junagadh Bhesan 66KV Chhodvadi 11 Jamnagar Jamnagar 132/66KV Naghedi 40-50 12 Jamnagar Jamnagar 66KV Shapar (Baid) 30-40 13 Jamnagar Jamnagar 66KV Lakha Baval Maximum 40-50 14 Jamnagar Jamnagar 66KV Lal Bangalow 132 KV MW RE injection 15 Jamnagar Jamnagar 66KV Bedeshwar Naghedi 20-30 feasible 16 Jamnagar Jamnagar 66KV Saatrasta 17 Jamnagar Jamnagar 66KV Hapa GIDC 18 Jamnagar Jamnagar 66KV Jamnagar-C 30-40 19 Devbhumi Jam- 66KV Vadinar 30-40 132 KV Sikka -- 20 Gir Somnath 132/66KV Talaja 40-50 21 Gir Somnath Veraval 66KV Veraval Maximum 40-50 22 Gir Somnath Veraval 66KV Moraj 132 KV MW RE injection 23 Gir Somnath Veraval 66KV Adri 30-40 Talaja feasible 24 Gir Somnath Talala 66KV Jepur 25 Gir Somnath Veraval 66KV Ghusia 26 Rajkot Rajkot 132/66KV Vikram 40-50 27 Rajkot Rajkot 66KV Punitnagar (Rajkot-B) 28 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot) 29 Rajkot Rajkot 66KV Shastri medan 30-40 30 Rajkot Rajkot 66KV Laxminagar 31 Rajkot Rajkot 66KV Mota Mava 32 Rajkot Rajkot 66KV Khokhadad Maximum 40-50 132 KV 33 Rajkot Rajkot 66KV Tramba MW RE injection Vikram 34 Rajkot Rajkot 66KV Kherdi feasible 30-40 35 Rajkot Rajkot 66KV Faldang 36 Rajkot Rajkot 66KV Magharvada 37 Rajkot Rajkot 66KV Raj Samadhiyala 38 Rajkot Rajkot 66KV Punitnagar-II 30-40 39 Rajkot Rajkot 66KV Kotharia 30-40 40 Rajkot Rajkot 66KV Nilkanth 41 Bhavnagar Mahuva 220/66KV Otha (Mahuva) 50-70 42 Bhavnagar Mahuva 66KV Kalsar 43 Bhavnagar Talaja 66KV Datha 30-40 220 KV Maximum 50-70 44 Bhavnagar Talaja 66KV Pithalpur Mahuva MW RE injection 45 Bhavnagar Mahuva 66KV Dudhal-2 (Otha) feasible 46 Bhavnagar Mahuva 66KV Khuntvada 30-40 47 Bhavnagar Mahuva 66KV Bila 48 Gir Somnath Girgadhada 220/66KV 50-70 Maximum 50-70 220 KV 49 Gir Somnath Una 66KV Samter (Una-II) 30-40 MW RE injection Dhokadava 50 Gir Somnath Una 66 KV Dandi 25-30 feasible

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 21/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 51 Gir Somnath Girgadhada 66KV Dhokadva 52 Gir Somnath Girgadhada 66KV 30-40 53 Gir Somnath Girgadhada 66KV Rabarika 54 Gir Somnath Girgadhada 66 KV Navaugla Maximum 50-70 220 KV 55 Gir Somnath Una 66KV Una MW RE injection 30-40 Dhokadava 56 Gir Somnath Una 66KV Tad (Paldi) feasible 57 Gir Somnath Girgadhada 66KV 30-40 58 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz 59 Gir Somnath Una 66KV Vajadi 30-40 60 Jamnagar Jamnagar 220/66KV Jamnagar 50-70 61 Jamnagar Jamnagar 66KV Aliabada 30-40 Maximum 50-70 220 KV 62 Jamnagar Jamnagar 66KV Jamnagar-B MW RE injection Jamnagar 63 Jamnagar Jamnagar 66KV Morkanda 30-40 feasible 64 Jamnagar Lalpur 66KV Rajhans (GIDC Ph-III) 65 Jamnagar Jamjodhpur 220/66KV Moti Gop 50-60 66 Jamnagar Jamjodhpur 66KV Sonvadia Maximum 50-70 220 KV 67 Jamnagar Jamjodhpur 66KV Ghunada MW RE injection 30-40 Moti Gop Devbhumi feasible 68 Bhanwad 66KV Verad Dwarka 69 Rajkot Kotda-sangdi 220/66KV Kangasiyali 50-70 70 Rajkot Kotda-sangdi 66KV Shapar 71 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II) 50-70 220 KV Maximum 50-100 72 Rajkot Kotda-sangdi 66KV Hirni Kangashiya MW RE injection 73 Rajkot Kotda-sangdi 66KV Veraval (Rajkot) li feasible 74 Rajkot Rajkot 66KV Vavdi 30-35 75 Rajkot Rajkot 66KV Kothariya (Solvant) 76 Rajkot Rajkot 66KV Khamba 40-50 77 Junagadh Keshod 220/66KV Keshod 50-70 78 Junagadh Keshod 66KV Keshod 30-35 79 Junagadh Mendarda 66KV Patrama (Khalipipli) 80 Junagadh Keshod 66KV Sondarada 30-40 81 Junagadh Keshod 66KV Ajab 82 Junagadh Keshod 66KV Koylana 30-40 83 Junagadh Maliya Hatina 66KV Amrapar 84 Junagadh Keshod 66 KV Bhat Simroli 85 Junagadh Keshod 66 KV Moti Ghasri 30-40 Maximum 50-70 86 Junagadh Mangrol 66 KV Mangrol 220 KV MW RE injection 87 Junagadh Keshod 66 KV Khirsara Keshod 30-35 feasible 88 Junagadh Keshod 66 KV Ishara 89 Junagadh Maliya Hatina 66KV Malia (Hatina) 90 Junagadh Maliya Hatina 66 KV Kadaya 30-40 91 Junagadh Maliya Hatina 66KV Chuldi 92 Junagadh Maliya Hatina 66KV Mendarda 30-40 93 Junagadh Maliya Hatina 66KV Nani Khodiyar 94 Junagadh Mangrol 66KV Chotli Vidi 95 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 30-35 96 Junagadh Maliya Hatina 66KV Budhecha 97 Surendranagar Limbdi 220/132/66KV Limbdi 40-50 98 Surendranagar Chuda 66KV Chokadi 220 KV -- 99 Surendranagar Wadhwan 66KV Vastadi 15-20 Limbdi 100 Surendranagar Chuda 66KV Chachka

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 22/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 101 Surendranagar Muli 66KV Muli 30-40 102 Surendranagar Sayla 66KV Sayla 220 KV -- 103 Surendranagar Wadhwan 66KV Tuva (Timba) 10-15 Limbdi 104 Surendranagar Wadhwan 66KV Surendranagar 30-40 105 Rajkot Rajkot 220/66KV Nyara 50-70 106 Rajkot Lodhika 66KV Metoda 107 Rajkot Lodhika 66KV Metoda GIDC-II 50-70 108 Rajkot Lodhika 66KV Central Metoda GIDC 109 Rajkot Lodhika 66KV Khirsara 110 Rajkot Paddhari 66KV PadadhriI 111 Rajkot Paddhari 66KV Sarapdad Maximum 50-100 220 KV 112 Rajkot Paddhari 66KV Targhadi 30-40 MW RE injection Nyara 113 Rajkot Paddhari 66KV Mota Khijadia feasible 114 Rajkot Paddhari 66KV Nyara 115 Rajkot Lodhika 66KV Nagar Pipaliya 30-40 116 Jamnagar Kalavad 66KV Nikava 117 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D) 118 Rajkot Rajkot city 66KV University Rd. 50-70 119 Rajkot Rajkot 66KV Raiyadher 120 Junagadh Vanthali 220/132/66KV Shapur 50-70 121 Junagadh Bhesan 66KV Mendpara 122 Junagadh Junagadh City 66KV Junagadh (GIDC) 123 Junagadh Junagadh City 66KV Zanzarda (JU. City) 30-40 124 Junagadh Junagadh 66KV Choki 125 Junagadh Junagadh 66KV Majevadi Maximum 50-70 126 Junagadh Mendarda 66KV Arniyana 220 KV MW RE injection 127 Junagadh Vanthali 66KV Mahobatpur (Navagam) 30-40 Shapur feasible 128 Junagadh Vanthali 66KV Vadala 129 Junagadh Manavadar 66KV Katakpara 30-40 130 Junagadh Vanthali 66KV Shapur 40-50 131 Junagadh Vanthali 66KV Kanza 132 Junagadh Vanthali 66KV Agatrai 30-40 133 Junagadh Vanthali 66KV Bamanasa 134 Gir Somnath Kodinar 220/66KV Timbdi 50-70 135 Gir Somnath Sutrapada 66KV Moradiya 30-40 136 Gir Somnath Kodinar 66KV Sindhaj 30-40 137 Gir Somnath Kodinar 66KV Aranej 138 Gir Somnath Sutrapada 66KV Lodhwa (Singsar) 139 Gir Somnath Sutrapada 66 KV Gorakhmadi 30-40 140 Gir Somnath Sutrapada 66KV Prashnavada 141 Gir Somnath Sutrapada 66KV Kanjotar(Barda) Maximum 50-70 220 KV 142 Gir Somnath Sutrapada 66KV Singasar 30-40 MW RE injection Timbdi 143 Gir Somnath Sutrapada 66KV Sutrapada feasible 144 Gir Somnath Veraval 66KV Veraval (GIDC) 50-70 145 Gir Somnath Veraval 66KV (GIS) 146 Gir Somnath Veraval 66KV 147 Gir Somnath Kodinar 66 KV Devli 148 Gir Somnath Kodinar 66 KV Kodinar 30-50 149 Gir Somnath Kodinar 66 KV Jantrakhadi 150 Gir Somnath Kodinar 66 KV Advi

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 23/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 151 Gir Somnath Veraval 66KV Bhetali 30-40 152 Gir Somnath Talala 66KV Amblash 153 Gir Somnath Talala 66KV Raydi 30-40 Maximum 50-70 154 Gir Somnath Talala 66KV Ankolwadi 220 KV MW RE injection 155 Gir Somnath Talala 66KV Jasadhar 30-40 Timbdi feasible 156 Gir Somnath Sutrapada 66KV Pranchi 157 Gir Somnath Kodinar 66KV Ghantwad 30-40 158 Gir Somnath Kodinar 66KV Alidar 159 Bhavanagar Palitana 220/66KV Sagapara (Palitana) 50-70 160 Bhavanagar Bhavnagar 66KV Tana 161 Bhavanagar Ghogha 66KV Dihor 162 Bhavanagar Bhavnagar 66KV Trapaj 163 Bhavnagar Talaja 66KV Mannar 164 Bhavnagar Ghogha 66KV Navagam (Kukad) 20-30 165 Bhavnagar Talaja 66KV Talaja Maximum 50-70 166 Bhavnagar Talaja 66KV Pasvi 220 KV MW RE injection 167 Bhavnagar Talaja 66KV Devalia Sagapara feasible 168 Bhavanagar Ghogha 66KV Timana 169 Bhavanagar Palitana 66KV Palitana-2 10-15 170 Bhavanagar Palitana 66KV Shetrunjaya Dam 171 Bhavanagar Bhavnagar 66KV Godidhal 30-40 172 Amreli Bhavnagar 66KV Nonganvadar 173 Bhavnagar Palitana 66KV Ankolali 30-40 174 Bhavnagar Gariyadhar 66KV Mandvi 175 Bhavanagar Bhavnagar 220/66KV Vartej 50-70 176 Bhavanagar Bhavnagar 66KV Bandar Road 30-40 177 Bhavanagar Bhavnagar 66Kv Sardarnagar 178 Bhavanagar Bhavnagar 66KV Sidsar 179 Bhavanagar Ghogha 66KV Mamsa-2 180 Bhavanagar Bhavnagar 66KV Bhumbhali 20-30 181 Bhavanagar Bhavnagar 66KV Bhadi 182 Bhavanagar Ghogha 66KV Nathugadh 183 Bhavanagar Bhavnagar 66KV Bhavnagar 184 Bhavanagar Bhavnagar 66KV Valketgate Maximum 50-70 30-40 220 KV 185 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra) MW RE injection Vartej 186 Bhavanagar Bhavnagar 66KV Nari Road feasible 187 Bhavanagar Bhavnagar 66KV Desainagar 30-35 188 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara) 189 Bhavanagar Shihor 66KV Songadh 30-40 190 Bhavanagar Shihor 66KV Sar 191 Bhavanagar Bhavnagar 66KV Navagam (Kardej) 192 Bhavanagar Shihor 66KV Shihor 30-40 193 Bhavanagar Shihor 66KV Sihor-2 194 Bhavanagar Shihor 66KV Nesda 30-40 195 Bhavanagar Shihor 66KV Ghanghali

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 24/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 196 Junagadh Visavadar 220/66KV Visavadar 50-70 197 Amreli Dhari 66KV Bhader 198 Amreli Dhari 66 KV Vekariya 199 Amreli Dhari 66KV Dalkhania 200 Amreli Dhari 66KV Kagdadi (Hamapur) 30-40 201 Amreli Dhari 66KV Kubda 202 Amreli Dhari 66KV Dudhala 203 Amreli Dhari 66KV Dhari 204 Amreli Dhari 66KV Malsika 205 Junagadh Bhesan 66KV Junidhari Gundali (TadkaPipliya) 206 Junagadh Bhesan 66KV Chuda 207 Junagadh Bhesan 66KV Morvada Maximum 50-70 208 Junagadh Bhesan 66KV Chanaka 30-40 220 KV MW RE injection 209 Junagadh Bhesan 66KV Ishwariya Visavadar 210 Junagadh Bhesan 66KV Bhesan feasible 211 Junagadh Visavadar 66KV Mota Kotda 212 Junagadh Visavadar 66KV Dhebar 213 Junagadh Visavadar 66KV Bhalgam 30-40 214 Junagadh Visavadar 66KV Navihaliyad 215 Junagadh Visavadar 66KV Ratang (Magharadi) 30-40 216 Junagadh Visavadar 66KV Baradia 217 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40 218 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40 219 Junagadh Visavadar 66KV Moti Monpari 30-40 220 Junagadh Visavadar 66KV Kankchiyala 30-40 221 Junagadh Visavadar 66KV Bhutdi 222 Amreli Savarkundla 66 KV Badhada 223 Amreli Khambha 66 KV Mota Samadhiyala 224 Amreli Dhari 66 KV Devla 30-40 225 Amreli Khambha 66 KV Khambha 226 Amreli Khambha 66 KV Dedan 227 Amreli Khambha 66 KV Tataniya 228 Amreli Dhari 66KV Chalala 220 KV Maximum 40-50 30-40 229 Amreli Dhari 66KV Hudali Savarkundl MW RE injection 230 Amreli Amreli 66 KV Savarkundla 30-40 a feasible 231 Amreli Amreli 220/66KV Savarkundla 50-70 232 Amreli Liliya 66 KV Liliya 30-35 233 Amreli Liliya 66 KV Gundaran 234 Bhavnagar Gariyadhar 66 KV Gariyadhar 235 Bhavnagar Gariyadhar 66 KV Virdi 10-15 236 Amreli Lathi 66 KV Damnagar 237 Amreli Amreli 400/220/66KV Amreli 50-70

238 Amreli Amreli 66KV Mota Ankadiya (Limbadia) 30-40 239 Amreli Kunka-vav 66KV Kukkavav Maximum 50-70 400 KV 240 Amreli Amreli 66KV Amreli - A MW RE injection Amreli 241 Amreli Amreli 66KV Amreli - B feasible 30-40 242 Amreli Amreli 66KV Jaliya 243 Amreli Amreli 66KV Gavadka 244 Rajkot Jetpur 400/220/66KV Jetpur 50-70 Maximum 50-70 400 KV 245 Rajkot Dhoraji 66KV Jamkandorna MW RE injection 30-40 Jetpur 246 Rajkot Dhoraji 66KV Mevasa feasible

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 25/26 Details of district wise substations for RE integration as on September-2019 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Tentative feasible Name of EHV Name fo District Name of Taluka Name of Substation RE integration (in Remark No. MW) Source S/S Saurashtra 247 Amreli Kunka-vav 66KV Vadiya 248 Amreli Kunka-vav 66KV Amrapar 30-40 249 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya) 250 Amreli Kunka-vav 66KV Tori 251 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 30-40 252 Rajkot Jetpur 66KV Jetpur-A 30-40 Maximum 50-70 253 Rajkot Jetpur 66KV Dhoraji Bypass 400 KV 30-40 MW RE injection 254 Rajkot Jetpur 66KV Mandlikpur Jetpur feasible 255 Rajkot Jetpur 66KV Jetalsar 30-40 256 Rajkot Jetpur 66KV Arab Timbadi 257 Rajkot Jetpur 66KV Devki Galol 30-40 258 Rajkot Jetpur 66KV Jetpur-B 259 Rajkot Jetpur 66KV Jetpur (Dhareshwar) 30-40 260 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 30-40 261 Rajkot Rajkot 400/220/66KV Hadala 50-70 262 Rajkot Rajkot 66KV Gauridad 30-40 263 Rajkot Rajkot 66KV Navagam (Rajkot - F) 264 Rajkot Rajkot 66KV Kuvadava 265 Rajkot Rajkot 66KV Dudhsagar Maximum 50-70 30-50 400 KV 266 Rajkot Rajkot 66KV Surya Rampara MW RE injection Hadala 267 Rajkot Rajkot 66KV Kankot feasible 268 Rajkot Rajkot 66KV Aji-2 269 Rajkot Rajkot 66KV Aji GIDC 270 Rajkot Rajkot 66KV Vijaynagar (Hadala) 30-35 271 Rajkot Rajkot 66KV Aji Dahisarda 30-40 272 Rajkot Rajkot 66KV Popatpara 30-40

D:\E_Drive\RE\Web‐site‐Update\Aug‐19\RE‐Integration‐66KV‐Aug19.xlsx/Final‐List‐07092019 26/26