Technical Report Olympias Mine Greece

Total Page:16

File Type:pdf, Size:1020Kb

Technical Report Olympias Mine Greece Technical Report Olympias Mine Greece Centered on Latitude E 40° 36' and Longitude N 23° 50' approximately Effective Date: December 31, 2019 Prepared by: Eldorado Gold Corporation 1188 Bentall 5 - 550 Burrard Street Vancouver, BC V6C 2B5 Qualified Persons Company Mr. David Sutherland, P.Eng. Eldorado Gold Corporation Mr. Paul Skayman, FAusIMM. Eldorado Gold Corporation Mr. Colm Keogh, P.Eng. Eldorado Gold Corporation Mr. Sean McKinley, P.Geo. Eldorado Gold Corporation Mr. Ertan Uludag, P.Geo. Eldorado Gold Corporation O LYMPIAS M INE, G REECE T ECHNICAL R EPORT Table of Contents SECTION • 1 SUMMARY ................................................................................................................ 1-1 1.1 Property Description and Location ............................................................... 1-1 1.2 Geology ........................................................................................................ 1-2 1.3 Drilling, Sampling and Verification ................................................................ 1-2 1.4 Metallurgical Testwork .................................................................................. 1-3 1.5 Mineral Resources ........................................................................................ 1-4 1.6 Mineral Reserves and Mining ....................................................................... 1-5 1.7 Processing .................................................................................................... 1-8 1.8 Infrastructure ................................................................................................ 1-9 1.9 Market studies and contracts ..................................................................... 1-10 1.10 Environmental ............................................................................................. 1-10 1.11 Capital and Operating costs ....................................................................... 1-11 1.12 Economics .................................................................................................. 1-12 1.13 Conclusions and recommendations ........................................................... 1-14 SECTION • 2 INTRODUCTION ....................................................................................................... 2-1 SECTION • 3 RELIANCE ON OTHER EXPERTS .......................................................................... 3-1 SECTION • 4 PROPERTY DESCRIPTION AND LOCATION ........................................................ 4-1 4.1 Property Location ......................................................................................... 4-1 4.2 Land Tenure ................................................................................................. 4-2 4.3 Permitting ..................................................................................................... 4-2 4.4 Royalties and Taxes ..................................................................................... 4-3 4.5 Environmental Liabilities ............................................................................... 4-3 4.6 Other ............................................................................................................. 4-3 SECTION • 5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ...................................................................................................... 5-1 5.1 Location and Accessibility ............................................................................ 5-1 5.2 Infrastructure and Local Resources ............................................................. 5-2 5.3 Climate and Physiography ........................................................................... 5-3 5.4 Surface Rights .............................................................................................. 5-3 SECTION • 6 HISTORY ................................................................................................................... 6-1 6.1 Introduction ................................................................................................... 6-1 6.2 Ownership and Work Carried Out ................................................................ 6-1 SECTION • 7 GEOLOGICAL SETTING AND MINERALIZATION ................................................. 7-1 2020 Final Report i O LYMPIAS M INE, G REECE T ECHNICAL R EPORT 7.1 Regional Geology ......................................................................................... 7-1 7.2 Local Geology ............................................................................................... 7-3 SECTION • 8 DEPOSIT TYPES ...................................................................................................... 8-1 8.1 Deposit Geology ........................................................................................... 8-1 8.2 Deposit Model ............................................................................................... 8-4 SECTION • 9 EXPLORATION ......................................................................................................... 9-1 SECTION • 10 DRILLING ................................................................................................................ 10-1 10.1 Introduction ................................................................................................. 10-1 10.2 Core Handling and Sampling Procedures .................................................. 10-2 10.3 Surveys ....................................................................................................... 10-2 10.4 Core Recovery ............................................................................................ 10-2 10.5 Bulk Density Determinations ...................................................................... 10-2 SECTION • 11 SAMPLE PREPARATION, ANALYSES AND SECURITY .................................... 11-1 11.1 Introduction ................................................................................................. 11-1 11.2 Sample Preparation and Assaying ............................................................. 11-1 11.3 QA/QC Program ......................................................................................... 11-1 11.4 Concluding Statement .............................................................................. 11-10 SECTION • 12 DATA VERIFICATION ............................................................................................ 12-1 12.1 Introduction ................................................................................................. 12-1 12.2 Database checks ........................................................................................ 12-1 12.3 Model to Mill Reconciliation ........................................................................ 12-1 12.4 Concluding Statement ................................................................................ 12-2 SECTION • 13 MINERAL PROCESSING AND METALLURGICAL TESTING ............................. 13-1 13.1 Historical Metallurgical Testing ................................................................... 13-1 13.2 SGS Metallurgical Test Report No. 14607-001 – Final, 2015 .................... 13-1 13.3 Conclusions and Recommendations ........................................................ 13-22 SECTION • 14 MINERAL RESOURCE ESTIMATES ..................................................................... 14-1 14.1 Introduction ................................................................................................. 14-1 14.2 Mineralized Domains .................................................................................. 14-1 14.3 Data Analysis .............................................................................................. 14-3 14.4 Block Model ................................................................................................ 14-5 14.5 Grade Estimation ........................................................................................ 14-5 14.6 Block Model Validation ............................................................................... 14-8 14.7 Mineral Resource Classification ............................................................... 14-14 14.8 Mineral Resource Estimate ...................................................................... 14-18 SECTION • 15 MINERAL RESERVE ESTIMATES ........................................................................ 15-1 15.1 Cut-Off Grade ............................................................................................. 15-1 2020 Final Report ii O LYMPIAS M INE, G REECE T ECHNICAL R EPORT 15.2 Mining Shapes ............................................................................................ 15-3 15.3 Dilution and Recovery Factors ................................................................... 15-3 15.4 Reserve Resource Reconciliation .............................................................. 15-4 SECTION • 16 MINING METHODS ................................................................................................. 16-1 16.1 Introduction ................................................................................................. 16-1 16.2 Geotechnical Considerations ..................................................................... 16-2 16.3 Mining Methods .......................................................................................... 16-5 16.4 Backfill .......................................................................................................
Recommended publications
  • From Base Metals and Back – Isamills and Their Advantages in African Base Metal Operations
    The Southern African Institute of Mining and Metallurgy Base Metals Conference 2013 H. de Waal, K. Barns, and J. Monama From base metals and back – IsaMills and their advantages in African base metal operations H. de Waal, K. Barns, and J. Monama Xstrata IsaMill™ technology was developed from Netzsch Feinmahltechnik GmbH stirred milling technology in the early 1990s to bring about a step change in grinding efficiency that was required to make Xstrata’s fine-grained lead/zinc orebodies economic to process. From small-scale machines suited to ultrafine grinding, the IsaMill™ has developed into technology that is able to treat much larger tonnages, in coarser applications, while still achieving high energy efficiency, suited for coarser more standard regrind and mainstream grinding applications. The unique design of the IsaMillTM, combining high power intensity and effective internal classification, achieves high energy efficiency and tight product distribution which can be effectively scaled from laboratory scale to full-sized models. The use of fine ceramic media also leads to significant benefits in downstream flotation and leaching operations. These benefits are key drivers for the adoption of the technology into processing a diverse range of minerals worldwide, and offer major opportunities for power reduction and improved metallurgy for the African base metal operations. Keywords: IsaMill, regrind, energy efficiency, inert grinding. Introduction The development of the IsaMillTM, by MIM (now GlencoreXstrata) and Netzsch Feinmahltechnik GmbH, was initiated to enable the development of the fine-grained ore deposits at Mt Isa and McArthur River in Northern Australia. To liberate the valuable minerals and so produce a saleable concentrate this ultrafine-grained ore needed to be ground to a P80 of 7 μm.
    [Show full text]
  • Impurity Control in Copper Metallurgical Plants with Special Focus on Arsenic Oct 2018 17
    Impurity Control in Copper Metallurgical Plants with Special Focus on Arsenic Oct 2018 17, George P. Demopoulos* Department of Mining and Materials Engineering, McGill University *[email protected] https://www.mcgill.ca/materials/people/faculty/george-p- Seminar Impurity JOGMEC demopoulos P1resented at the Int’l Seminar on Impurities in Copper 1 Raw Materials, Tokyo, Japan, October 2018 Towards Sustainable Metallurgical Processes • Impurity control- a must in making the Copper metallurgical industry sustainable! • Development of sustainable processes means Oct Oct 2018 17, innovation • Meet economic and environmental goals simultaneously • Innovation needs research collaborations Seminar Impurity JOGMEC • This series of seminars is an excellent initiative… 2 Sustainability Aspects of Impurity Control Technologies-1 • Consider deportment of impurities throughout the whole process flowsheet for best intervention strategy Oct Oct 2018 17, • Work towards clean impurity-specific separation approaches to minimize valuable metal loss, reagent usage, or intro of new pollutants: SX (residual organics?), IX, Molecular Recognition Technology (MRT), magnetic resins, selective precipitation, Sorption/Adsorption etc. Seminar Impurity JOGMEC • Equally important to get enrichment-concentration to 3 facilitate economic recovery and/or disposal Sustainability Aspects of Impurity Control Technologies-2 • Consider recovery if there is demand of the impurity as by-product; Oct 2018 17, Example: Se, Te, Sb, Bi in Cu industry: Can be sold as feedstock
    [Show full text]
  • Ore Processing in Fluidized Bed Technologies Overview • Fundamentals in Fluidized Bed Technology
    Ore processing in fluidized bed technologies Overview • Fundamentals in fluidized bed technology. • Outotec‘s experience in fluidized bed technologies. • CFB/FB applications for iron containing ores. • CFB aplications for alumina calcination. • Technology and project development. © Outotec – All rights reserved Fluidized bed systems - fundamentals Bubbling Circulating Transport or flash fluidized bed fluidized bed reactor (FR) (FB) (CFB) • In a fluidized bed particles are held suspended by the upward. • Increasing gas velocities will create different flow regimes. • The highest slip velocity is reached in CFB, leading to high mass & heat transfer rates. • Outotec has applied CFB, FB, AFB and FR for treatment of different fine ores. Annular fluidized bed (AFB) © Outotec – All rights reserved Circulating fluidized bed advantages • High mass & heat transfer CFB Uniform temperature, low energy consumption. • Direct processing of fines Fuel NG Minimum fines losses and accretions. • High productivity GasAir Minimum plant downtime & low GasAir specific investment costs. • No heavy rotating equipment Easy and flexible control, low operation & maintenance costs. • Easy and exact control of temperature and retention time. • Direct combustion of natural gas in the CFB furnace. Circulating fluidized bed © Outotec – All rights reserved Outotec‘s experience in fluidized bed technologies CFB applications Rio Tinto Alcan Gove 3 CFB calciners. HBI Circored plant Trinidad. Capacity 0.5 million t/a 6 © Outotec – All rights reserved CFB applications Outotec‘s fluidized bed applications 7 © Outotec – All rights reserved CFB applications – iron ore processing • Outotec has built CFB plants for preheating, roasting and hydrogen based reduction of iron ores. • In the case of iron ore preheating & calcination, the target is to remove LOI and to preheat the ore for down stream processes (e.g.
    [Show full text]
  • Mineralization at Le Pulec, Jersey, Channel Islands; No. 1 Lode
    134 SHORT COMMUNICATIONS REFERENCES McKay, W. J. (1975) Woodlawn copper-lead-zinc orebody. Ibid. 701-10. Davis, L. W. (1975) Captains Flat lead-zinc orebody. In Knight, C. L. (ed.). Economic Geology of Australia and Papua New Guinea I. Metals. Melbourne, Australasian [Revised manuscript received 2 June 1981] Institute of Mining and Metallurgy, 691-700. Malone, E. J., Olgers, F., Cucchi, F. G., Nicholas, T., and t~) Copyright the Mineralogical Society Dept. of Geology, University of Wollonoong, New South Wales, Australia F. IVOR ROBERTS [Present address: School of Applied Geology, University of New South Wales, PO Box 1, Kensinoton , NSW 2033, Australia] MINERALOGICAL MAGAZINE, MARCH 1982, VOL. 46, PP. 134-6 Mineralization at Le Pulec, Jersey, Channel Islands; No. 1 Lode THE No. 1 Lode is the westernmost and most Mineralization within the Brioverian sediments extensive of three lead-zinc veins cutting Brioverian sediments at Le Pulec. It was described by Williams Anatase is common within the sediments as 2-10 (1871) as being between 1.5 and 1.8 m in width and pm anhedral grains associated with silicates or 183 m in length, with a trend of 340 ~ and the as 10 x 2 #m laths, parallel to the basal cleavage galena was reported to have a high silver content. of the altered phyllosilicates, particularly musco- Since the investigation of the No. 3 Lode (Ixer and vite. Anatase is also found with hematite laths Stanley, 1980) it has been possible to examine (20x 2 /~m) included in early pyrite grains. A several specimens, collected from the recently re- coarse-grained (600 x 20 pm) generation of anatase discovered No.
    [Show full text]
  • The Nature of Waste Associated with Closed Mines in England and Wales
    The nature of waste associated with closed mines in England and Wales Minerals & Waste Programme Open Report OR/10/14 BRITISH GEOLOGICAL SURVEY MINERALS & WASTE PROGRAMME OPEN REPORT OR/10/14 The National Grid and other Ordnance Survey data are used with the permission of the The nature of waste associated Controller of Her Majesty’s Stationery Office. OS Topography © Crown with closed mines in England and Copyright. All rights reserved. BGS 100017897/2010 Wales Keywords Abandoned mine waste facilities; Palumbo-Roe, B and Colman, T England and Wales; mineral deposits; environmental impact; Contributor/editor European Mine Waste Directive. Cameron, D G, Linley, K and Gunn, A G Front cover Graiggoch Mine (SN 7040 7410), Ceredigion, Wales. Bibliographical reference Palumbo-Roe, B and Colman, T with contributions from Cameron, D G, Linley, K and Gunn, A G. 2010. The nature of waste associated with closed mines in England and Wales. British Geological Survey Open Report, OR/10/14. 98pp. Copyright in materials derived from the British Geological Survey’s work is owned by the Natural Environment Research Council (NERC) and the Environment Agency that commissioned the work. You may not copy or adapt this publication without first obtaining permission. Contact the BGS Intellectual Property Rights Section, British Geological Survey, Keyworth, e-mail [email protected]. You may quote extracts of a reasonable length without prior permission, provided a full acknowledgement is given of the source of the extract. The views and statements expressed in this report are those of the authors alone and do not necessarily represent the views of the Environment Agency.
    [Show full text]
  • Investor Presentation
    Investor presentation September 2020 Forward looking statements It should be noted that certain statements herein which are not historical facts, including, without limitation, those regarding expectations for general economic development and the market situation, expectations for customer industry profitability and investment willingness, expectations for company growth, development and profitability and the realization of synergy benefits and cost savings, and statements preceded by ”expects”, ”estimates”, ”forecasts” or similar expressions, are forward looking statements. These statements are based on current decisions and plans and currently known factors. They involve risks and uncertainties which may cause the actual results to materially differ from the results currently expected by the company. Such factors include, but are not limited to: 1) general economic conditions, including fluctuations in exchange rates and interest levels which influence the operating environment and profitability of customers and thereby the orders received by the company and their margins 2) the competitive situation, especially significant technological solutions developed by competitors 3) the company’s own operating conditions, such as the success of production, product development and project management and their continuous development and improvement 4) the success of pending and future acquisitions and restructuring. August 5, 2020 2 Metso Outotec in brief Metso Outotec is a frontrunner in sustainable technologies, end-to- end solutions and services for the aggregates, minerals processing, 4.2 50+ metals refining and recycling billion euro countries with industries globally. sales* presence By improving our customers’ energy and water efficiency, increasing their productivity and reducing environmental risks with our process 15,000+ 150 years of and product expertise, we are the employees, 80+ expertise in mining partner for positive change.
    [Show full text]
  • Metso Outotec's Magazine for Mining & Aggregates Customers >> Issue 1, 2021
    resultsMetso Outotec’s magazine for mining & aggregates customers >> Issue 1, 2021 Partner for positive change 1 results - mining + aggregates In this issue Metso Outotec in brief............................................................................................................... 4 Our businesses............................................................................................................................. 5 Our offerings - Aggregates / Mining / Metals refining.............................................. 6 Our strengths................................................................................................................................ 9 Our services................................................................................................................................... 10 Our customers : Our references............................................................................................. 12 Products / solutions.................................................................................................................... 26 Dear Customers, News updates............................................................................................................................... 44 I hope that you and your families are keeping safe and business is also improving. In these uncertain times, we need sharper focus on delivery & service capabilities to ensure business continuity for our customers. Therefore, we have ensured that our operations continue to deliver despite current challenges,
    [Show full text]
  • Architectural, Constructional and Structural Aspects of a Historic School in Greece. the Case of the Elementary School in Arnaia, Chalkidiki
    heritage Article Architectural, Constructional and Structural Aspects of a Historic School in Greece. The Case of the Elementary School in Arnaia, Chalkidiki Vasiliki Pachta 1,*,†, Vasiliki Terzi 2,† and Evangeli Malandri 1 1 Lab. of Building Materials, School of Civil Engineering, Aristotle University of Thessaloniki, 54124 Thessaloniki, Greece 2 Institute of Statics and Dynamics, School of Civil Engineering, Aristotle University of Thessaloniki, 54124 Thessaloniki, Greece; [email protected] (V.T.); [email protected] (E.M.) * Correspondence: [email protected]; Tel.: +30-2310995882 † These authors contributed equally to this work. Abstract: Historic school buildings were built during the end of the 19th century and into the beginning of the 20th century, using the traditional and locally available building materials and techniques, and most of them still function as schools. Because of the requirements arising from their constant use, there is an intense interest in their structural and energy integration, while there is limited research on the tangible and intangible values they encompass. In this study, an effort has been made to assess the historical, architectural, constructional and structural aspects of a historic school building located in the town of Arnaia, in the mountainous part of Chalkidiki peninsula, Northern Greece. The study included on-site inspection, architectural overview, determination and mapping of the constructional materials and techniques applied, as well as investigation of the preservation state of the building. Additionally, a structural analysis of the system was performed through a three-dimensional finite element model. All research data was comparatively evaluated, in order to identify the principles governing its physiognomy and structure.
    [Show full text]
  • Challenges Related to the Processing of Fines in the Recovery of Platinum Group Minerals (Pgms)
    minerals Review Challenges Related to the Processing of Fines in the Recovery of Platinum Group Minerals (PGMs) Kirsten C. Corin 1,* , Belinda J. McFadzean 1, Natalie J. Shackleton 2 and Cyril T. O’Connor 1 1 Centre for Minerals Research, Chemical Engineering Department, University of Cape Town, P Bag X3, Rondebosch, Cape Town 7700, South Africa; [email protected] (B.J.M.); [email protected] (C.T.O.) 2 Minerals Expertise Tech Pty Ltd., Germiston 2007, South Africa; [email protected] * Correspondence: [email protected] Abstract: In order to increase the recovery of PGMs by flotation, it is necessary to optimise the liberation of the key minerals in which the platinum group elements (PGEs) are contained which include sulphides, arsenides, tellurides, and ferroalloys among others, while at the same time ensuring the optimal depression of gangue minerals. In order to achieve this, comminution circuits usually consist of two or three stages of milling, in which the first stage is autogeneous, followed by ball milling. Further liberation is achieved in subsequent stages using ultra-fine grinding. Each comminution stage is followed by flotation in the so-called MF2 or MF3 circuits. While this staged process increases overall recoveries, overgrinding may occur, hence creating problems associated with fine particle flotation. This paper presents an overview of the mineralogy of most of the more significant PGM ores processed in South Africa and the various technologies used in comminution circuits. The paper then summarises the methodology used in flotation circuits to optimise recovery Citation: Corin, K.C.; McFadzean, of fine particles in terms of the collectors, depressants, and frothers used.
    [Show full text]
  • Counterguerrilla Operation
    FM 90-8 counterguerrilla operation/ AUGUST 1986 This publication contains technical or operational information that is for official government use only. Distribution is limited to US Government agencies Requests from outside the US Government for release of this publication under the Freedom of Information Act or the Foreign Military Sales Program must be made to: HO TR ADOC, Fort Monroe, VA 23651 ... HEADQUARTERS, DEPARTMENT OF THE ARMY DISTRIBUTION RESTRICTION- Approved for public release; distribution is unlimited. FM 90-8 CHAPTER 6. COMBAT SUPPORT Section I. General ............................................ 6-1 II. Reconnaissance and Surveillance Units ............. 6-2 Ill. Fire Support Units ................................. 6-7 CHAPTER 7. COMBAT SERVICE SUPPORT Section I. General ............................................ 7-1 II. Bases ............................................. 7-1 Ill. Use of Assets ...................................... 7-3 APPENDIX A. SUBSURFACE OPERATIONS Section I. General ............................................ A-1 II. Tunneling .......................................... A-2 Ill. Destroying Underground Facilities ................. A-12 APPENDIX B. THE URBAN GUERRILLA Section I. General ............................................ B-1 II. Techniques to Counter the Urban Guerrilla .......... B-2 APPENDIX C. AMBUSH PATROLS Section I. General ............................................ C-1 II. Attack Fundamentals .............................. C-2 Ill. Planning ..........................................
    [Show full text]
  • New Mineral Names*,†
    American Mineralogist, Volume 100, pages 1649–1654, 2015 New Mineral Names*,† DMITRIY I. BELAKOVSKIY1 AND OLIVIER C. GAGNE2 1Fersman Mineralogical Museum, Russian Academy of Sciences, Leninskiy Prospekt 18 korp. 2, Moscow 119071, Russia 2Department of Geological Sciences, University of Manitoba, Winnipeg, Manitoba R3T 2N2, Canada IN THIS ISSUE This New Mineral Names has entries for 10 new minerals, including debattistiite, evdokimovite, ferdowsiite, karpovite, kolskyite, markhininite, protochabournéite, raberite, shulamitite, and vendidaite. DEBATTISTIITE* for 795 unique I > 2σ(I) reflections] corner-sharing As(S,Te)3 A. Guastoni, L. Bindi, and F. Nestola (2012) Debattistiite, pyramids form three-membered distorted rings linked by Ag atoms in triangular or distorted tetrahedral coordination. Certain Ag9Hg0.5As6S12Te2, a new Te-bearing sulfosalt from Len- genbach quarry, Binn valley, Switzerland: description and features of that linkage are similar to those in the structures of crystal structure. Mineralogical Magazine, 76(3), 743–750. trechmannite and minerals of pearceite–polybasite group. Of the seven anion positions, one is almost fully occupied by Te (Te0.93S0.07). The Hg atom is in a nearly perfect linear coordination Debattistiite (IMA 2011-098), ideally Ag9Hg0.5As6S12Te2, is a new mineral discovered in the famous for Pb-Cu-Ag-As-Tl with two Te/S atoms. One of five Ag sites and Hg site, which are bearing sulfosalts Lengenbach quarry in the Binn Valley, Valais, very close (separation 1.137 Å), are partially occupied (50%). Switzerland. Debattistiite has been identified in two specimens Thus there is a statistical distribution (50:50) between Hg(Te,S)2 from zone 1 of the quarry in cavities in dolomitic marble with and AgS2(Te,S)2 polyhedra in the structure.
    [Show full text]
  • Evolution of the Isamill™ Into Magnetite Processing
    EVOLUTION OF THE ISAMILL™ INTO MAGNETITE PROCESSING Greg Rasmussen, Xstrata Technology Pty Ltd Tommy Do , Ernest Henry Mining Michael Larson, Xstrata Technology Pty Ltd Katie Barns, Xstrata Technology Pty Ltd Xstrata Technology • Mount Isa Mines (MIM), a large Australian mining company, was acquired by Xstrata in 2003 who then merged with Glencore in 2013 • MIM internal technology group was re-named Xstrata Technology (XT) and became an independent technology developer and supplier to the global minerals industry with 250 staff worldwide • The equipment and processes which are marketed by XT are developed in our own operations • XT offers full-package solutions including: • Equipment and processes • Engineering • Commissioning and Training • Dedicated after-market support IsaMill™ Technology Development ™ • Development of IsaMill driven by inability Broken Hill to efficiently treat fine grained orebodies • Late 1980s, Xstrata required 7µm grind for new Pb/Zn orebodies in Australia • Conventional mining technologies tested (1975-1990), but 0 40 micron − Too high power consumption to achieve target size McArthur River − Ball/tower mills ineffective below 20-30μm − Negative influence of steel grinding on flotation 0 40 micron IsaMill™ Technology Development A technology was found... • Horizontal Bead Mills − Used in industries other than mining (pharmaceuticals, paint, food, etc.) − Small, batch scale − Very expensive and exotic media types • Cross-over into mining required: − Much larger scale − Continuous operation − Ability to use cheap,
    [Show full text]