Social Monitoring Report

Project Number: 49377-001 March 2019 Period: July 2018 – December 2018

IND: District Roads II Sector Project

Submitted by: Madhya Pradesh Road Development Corporation Ltd.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD. (GOVERNMENT OF MADHYA PRADESH)

Loan No. 3437-IND: Madhya Pradesh District Road II Sector Project (MPDRIISP)

Reporting Period: July-2018 to December-2018

Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

ABBREVIATION

ADB - Asian Development Bank

BOQ - Bill of Quantity

CPR - Community Property Resources

CSC - Construction Supervision Consultant

GoI - Government of

GoMP - Government of Madhya Pradesh

GRC - Grievance Redress Committee

IP - Indigenous People

IPDF - Indigenous People Development Frameworks

IR - Involuntary Resettlement

JV - Joint Venture

LAR - Land Acquisition and Resettlement

MDR - Major District Roads

MP - Madhya Pradesh

MPDRIISP - Madhya Pradesh District Road II Sector Project

MPRDC - Madhya Pradesh Road Development Corporation

PIU - Project Implementation Unit

RF - Resettlement Framework

RoW - Right of Way

RP - Resettlement Plan

SDDR - Social Due Diligence Report

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 1 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

TABLE OF CONTENTS

1 INTRODUCTION AND PROJECT BACKGROUND ...... 3 2 BRIEF DESCRIPTION OF SUB-PROJECTS ...... 3 3 PROJECTS CATEGORIZATION ...... 7 4 RESETTLEMENT IMPACTS IN THE SUB-PROJECTS ...... 9 5 SOCIAL SAFEGUARD ACTIVITIES DURING THE REPORTING PERIOD ...... 10 5.1 Implementation of social safeguards: ...... 10 5.2 Verification of Community Structures – Community Property Resources .... 10 6 CONSULTATION WITH THE STAKEHOLDERS ...... 12 7 GRIEVANCE REDRESS ...... 15 8 INSTITUTIONAL ARRANGEMENT ...... 15 9 COMPLIANCE STATUS WITH RESPECT TO LOAN COVENANT ...... 16 10 CONCLUSIONS ...... 17

Annexure 1: Attendance of Participants during Public Consultation and Photographs ...... 18 Annexure-2: Details of State level and Divisional level GRCs Committee ...... 55

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 2 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

SEMI-ANNUAL SOCIAL SAFEGUARD MONITORING REPORT

1 INTRODUCTION AND PROJECT BACKGROUND The Madhya Pradesh state has a road network of about 127,000 km, of which about 4,700 km are national highways, 11,000 km are state highways, and 20,000 km are Major District Road (MDR). Rural roads make up the balance of the road network. The Government of Madhya Pradesh (GoMP) has been using a combination of budgetary, Public-Private Partnership and ADB financing, to improve road network in Madhya Pradesh (MP). The project will complement the past and ongoing efforts under previously ADB funded road sector projects in the State of MP. MDRs form the key linkage between rural, peri-urban and urban areas. MDR), have not been specifically targeted for improvement resulting in overall poor road network connectivity. GoMP has now proposed to improve the MDRs through the Madhya Pradesh District Road II Sector Project (MPDRIISP) financed by ADB. The Project will improve transport connectivity in the state by rehabilitating and upgrading MDRs hereby providing reliable road transport services in the state. The Project constitutes (i) rehabilitating and upgrading about 1468.245 km1 of MDRs; (ii) improving road maintenance and asset management; and (iii) developing an efficient accident response system. MPRDC specifically, targeting MDRs to form key linkage between rural, semi- urban and urban areas and complete state road connectivity. The project has identified, 57 stretches of existing MDRs with total length of about 1468.245 km under 25 packages for widening and reconstruction. 2 BRIEF DESCRIPTION OF SUB-PROJECTS The proposed project for widening and reconstruction of MDRs from single lane/ intermediate lane/ two lane carriageway to intermediate/ two lane carriageway, the Madhya Pradesh Road Development Corporation (MPRDC), GoMP, aimed at improving the MDRs to provide reliable road transport services in the state. MPRDC has selected 57 subproject road stretches under 25 packages (package- 1 {-1} has 5 contracts, package-2 {} has 7 contracts and package- 3 {} has 13 contracts) with total length of 1468.245 km. All the 25 packages are scattered across the state in the districts of the Guna, Shivpuri, Ashok Nagar, Vidisha, , Dewas, , Sagar, Chhattarpur, Seoni, , Chindwara, Rewa, , , , Umaria and . The details of all concerned sub-projects are as under in Table-1.

1 Initially the project envisaged the rehabilitation and construction of approximately 1530km.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 3 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Table-1: Details of Package wise Subprojects and Progress

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M

Signing cement Project Package

Package-1 (Bhopal) Khatakia to Suthaliya via. M/s Bansal Construction NH-3, Kumbraj, Barod, Works Pvt. Ltd. & Pkg-1 Mragwas, Batawda, 70.79 Prakash Asphaltings & 10.05.2017 16.06.2017 65.67% Chanchoda, Binaganj, Toll Highways (India) Ltd Teligaon (MDR-6-10) (JV) Sirsod-Pichhore Road (MDR- 31.24 07-01) M/s KCC Buildcon Pvt. Pkg-2 03.05.2017 24.05.2017 53.96% Narwar-Chitori to Amola Ltd. 26.33 Road (MDR-07-01) Mungawali-Malahargarh 16.72 Road (MDR-08-04) Piprod-Thubon Road (MDR- M/s Gawar 7.74 08-05) Construction Ltd. & Pkg-3 07.04.2018 05.05.2018 17.57% Belai-Kareela Mata Mandir M/s Atcon India Ltd. 17.72 Road (MDR-08-09) (JV) Bhounrasa-Malhargarh Road 20.13 (MDR-27-18) Sanwer-Chandravatiganj- M/s DineshChand R. Pkg-4 Gautampura Road (MDR-27- 33.94 Agrawal Infracon Pvt. 09.08.2018 15.05.2018 30.02% 18) Ltd. Bijawar-Kantaphod-Satwaas- M/s Dinesh Chand R. Pkg-5 Khategaon Road (MDR-10- 55.065 23.02.2017 19.04.2017 83.70% Agrawal 03) Package-2 (Jabalpur) -Gotetoria Road 13.57 (MP-MDR-41-03) Podar-Salichok-Babai- M/s Gannon Pkg-6 Sukhakhairi Road2 23.57 12.05.2017 24.07.2017 42.62% Dunkerley & Co. Ltd. (MP-MDR-41-12) Kareli-Singhpur-Dangidhana 32.86 Road (MP-MDR-41-14) Maharajpur-Sahajpur Road 24.45 (MP-MDR-31-08) Samnapur-Bilehra-Nanhi M/s KCC Buildcon Pvt. Pkg-7 Deori-Narayanpur Road 45.40 16.02.2017 26.04.2017 91.76% Ltd. (MP-MDR-31-29) Kesali-Sahajpur Road 15.06 (MP-MDR-31-30) Garpehera-Dhamoni Road 35.33 (MP-MDR-31-14) Barodiya-Dhamoni Road M/s KCC Buildcon Pvt. Pkg-8 19.81 16.02.2017 26.04.2017 79.55% (MP-MDR-31-15) Ltd. Nauniya-Madanpura Road 1.81 (MP-MDR-31-23)

2 There is difference in nomenclature of name between DDR and Contract. However, its confirmed that it is one and the same road.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 4 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M

Signing cement Project Package Khurai-Rajwas Road 31.82 (MP-MDR-31-10) Bariya Choki-Lugasi-Garhi- Malhara Road 15.54 (MP-MDR-36-06) Bamitha-Dumra Road M/s IL&FS (Rajnagar to Dumra ) 28.07 Transportation (MP-MDR-35-07) Pkg- Networks Ltd. And Rajnagar-Bachhon Road 02.03.2017 26.04.2017 30.09% 10 23.85 IL&FS Engineering & (MP-MDR-35-10) Construction Company Khaparia-Banspahari Road 24.47 JV (MP-MDR-35-13) Chhatarpur-Vikrampur- Rajnagar Road (Vikrampur to 10.24 Rajnagar) (MP-MDR-35-23) -Kanhiwada Road 21.79 M/s IL&FS (MP-MDR-37-07) Transportation Dharna-Asta-Dondiwada- Pkg- Networks Ltd. And Dharmakua Road 26.23 02.03.2017 26.04.2017 25.06% 11 IL&FS Engineering & (MP-MDR-37-11) Construction Company - Road 30.60 JV (MP-MDR-42-06) Rampayali-Garra Chouki 27.56 Road (MP-MDR-42-16) Khairlanji-Agasi Road 28.96 (MP-MDR-42-18) M/s Sorathia Velji Pkg- Laalbarra-Samnapur Road Ratna & Co. M/s Ketan 19.05.2017 16.05.2017 85.82% 12 8.40 (MP-MDR-42-20) Construction Ltd (JV) Sitapathar-Mahkepaar- Goreghat Road 23.04 (MP-MDR-42-24) Chourai-Panjara-Chand Road 17.22 (MP-MDR-40-10) Pkg- Chand-Bichhua-Khamarpani M/s GHV (INDIA) Pvt. 59.30 01.05.2017 28.05.2017 85.70% 14 Road (MP-MDR-40-10) Ltd. Raymond Chowk – Saikheda 11.70 Road Package-3 (Rewa) Subproject Subproject Subproject Teonther – Shankargarh Subproject Not 14.60 Not Not Not (MP-MDR 43-09) Awarded Pkg- Awarded Awarded Awarded 15A Subproject Subproject Subproject Naigarhi – Garh Road (MP- Subproject Not 14.14 Not Not Not MDR 43-17) Awarded Awarded Awarded Awarded Baheradabar – Piparahi – Pkg- M/s Udit Infra world Jadkud Road (MP-MDR 43- 19.70 09.05.2018 03.05.2018 35.70% 15B Pvt. Ltd. Rewa, M.P. 11) Kirhai –Ramgarh – Subproject Subproject Subproject Pkg- Mukundpur Road (MP-MDR 34.35 Subproject Not Awarded Not Not Not 16A 44-16) Awarded Awarded Awarded

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 5 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M

Signing cement Project Package Subproject Subproject Subproject Bhadanpur – Bhatura Road ( 20.05 Subproject Not Awarded Not Not Not MP-MDR 44-23) Awarded Awarded Awarded M/s ABC Associates JV Pkg- Jharkua – Raigon – Kasara 23.95 Bhati Associates Pvt. 11.05.2018 03.05.2018 3.60% 16B (MP-MDR 44-19) Ltd., M.P. Harfari Khaira – Misirgawan 25.99 M/s Prakash Asphalting Pkg- Road (MP-MDR 46-08) & Toll Highways (India) 22.09.2017 15.01.2018 23.20% 17 Chitrangi – Garhwa Road 22.67 Ltd., Indore (MP-MDR 46-02) Persauna-Mada Road (MP- 12.615 M/s Barbrik Project Pkg- MDR 46-03) Limited, Raipur, 07.04.2018 05.05.2018 12.80% 18A Mada-Ramgarh Road (MP- 19.87 Chattisgarh.- MDR 46-04) Pkg- Jhurai - Sarai Road (MP- M/s Shreeji Infraspace 31.44 12.04.2018 03.05.2018 9.70% 18B MDR 46-04) Pvt. Ltd., Ahmedabad. M/s Shreeji Infrastructure India Pvt. Pkg- Sohagpur – Manpur Road 59.40 Ltd. – PRL Projects & 27.02.2017 15.07.2017 65.90% 19 (MP-MRD 46-01) Infrastructure Ltd. (SIIPL-PRL) (JV) Anuppur – Jaitpur Road (MP- 36.66 MDR 49-04) Gohparu – Rasmohni – Pkg- M/s GHV (INDIA) Pvt. Budhar (via Bathiya Road) 39.935 22.02.2017 24.03.2017 64.90% 20 Ltd. (MP-MDR 49-08) Pasgarhi – Deori – Janakpur 23.49 Road (MP-MDR 49-07) Jigna New Ramnagar to 24.20 Gorsarsri Road (MP-MDR) Govindgarh Tikr Subproject Subproject Subproject Pkg- Subproject Not Laxmanapur Road (MP- 17.71 Not Not Not 21 Awarded MDR) Awarded Awarded Awarded Brohari Manpur Road (MP- 16.83 MDR) Deotalab Garh Road (MP- 14.79 Subproject Subproject Subproject Pkg- MDR) Subproject Not Not Not Not 22A Latiyar-Hanumana Road Awarded 26.04 Awarded Awarded Awarded (MP-MDR) Sohagi-Teothar-Panwar- 9.52 Subproject Subproject Subproject Pkg- Daboura Road (MP-MDR) Subproject Not Not Not Not 22B -Sonari Road (MP- Awarded 27.76 Awarded Awarded Awarded MDR) M/s Shreeji Infra space - Pkg- Pvt. Ltd. – M/s Gour Rajendragram Road (MP- 52.21 04.01.2018 06.03.2018 16.20% 23 Road Tar Coat Pvt. Ltd. MDR) (JV)

By the end of this reporting period, MPRDC has awarded 20 contract packages and the civil works have also commenced. The supervision consultancy for Package-1

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 6 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

(Bhopal) is M/s URS Scott Wilson India Private Limited, India in association with M/s Aicons Engineering Pvt. Ltd., India, Package-2 (Jabalpur) is M/s MSV International Inc., USA in joint venture with Highway Engineering Consultants India and Package-3 (Rewa) is M/s Intercontinental Consultants and Technocrats Pvt. Ltd., India in joint venture with Rodic Consultants Pvt. Ltd., India., The package wise details of supervision consultants in Table-2. Table-2: Name of Package Wise Supervision Consultant

Civil Work Package No./Name of Contract Name of Supervision Consultant Contract Contract Signing Package No. M/s URS Scott Wilson India Supervision Consultant Private Limited, India in Package-1 to 01-Mar-2017 for Package-1 (Bhopal) association with M/s Aicons Package-5 Engineering Pvt. Ltd., India M/s MSV International Inc., USA Supervision Consultants Package-6 to in joint venture with Highway 04-Mar-2017 for Package-2 (Jabalpur) Package-14 Engineering Consultants India M/s Intercontinental Consultants Supervision Consultants and Technocrats Pvt. Ltd., India in Package-15 to 27-Jan-2017 for Package-3 (Rewa) joint venture with Rodic Package-23 Consultants Pvt. Ltd., India.

3 PROJECTS CATEGORIZATION The project has been categorised as category ‘B’ for involuntary resettlement (IR) and Category ‘C’ for Indigenous People (IP) as per ADB’s Safeguard Policy Statement (SPS), 2009. The subprojects do not involve any land acquisition or involuntary resettlement impact on titled/ non-titled people except for Package-11. The construction of Package-11 envisages the temporary resettlement (livelihood) impact on nine households and the resettlement plan (RP) has been disclosed on ADB website. While for remaining subprojects, the three social due diligence reports (DDR) confirming no resettlement impacts and availability of required right of way for construction of the subprojects have been prepared and disclosed on ADB website. The subproject wise safeguard categorisation is provided in Table-3 below: Table-3: Details of Subprojects Impacts and Categorization No. of APs Package Actual Name of Road District as per RPs/ Category No. Impact DDRs Khatakia to Suthaliya via. NH-3, Pkg-1 Kumbraj, Barod, Mragwas, Batawda, Guna Nil Nil C Chanchoda, Binaganj, Teligaon Sirsod-Pichhore Road Pkg-2 Shivpuri Nil Nil C Narwar-Chitori to Amola Road

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 7 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

No. of APs Package Actual Name of Road District as per RPs/ Category No. Impact DDRs Mungawali-Malahargarh Road Ashok Piprod-Thubon Road Pkg-3 Nagar, Nil Nil C Belai-Kareela Mata Mandir Road Vidisha Bhounrasa-Malhargarh Road Sanwer-Chandravatiganj- Pkg-4 Indore Nil Nil C Gautampura Road Bijawar-Kantaphod-Satwaas- Pkg-5 Dewas Nil Nil C Khategaon Road Gadarwara-Gotetoria Road Podar-Salichok-Babai-Sukhakhairi Pkg-6 Narsinghpur Nil Nil C Road Kareli-Singhpur-Dangidhana Road Maharajpur-Sahajpur Road Samnapur – Bilehra - Nanhi Deori - Pkg-7 Sagar Nil Nil C Narayanpur Road Kesali-Sahajpur Road Garpehera-Dhamoni Road Barodiya-Dhamoni Road Pkg-8 Sagar Nil Nil C Nauniya-Madanpura Road Khurai-Rajwas Road Bariya Choki – Lugasi – Garhi - Malhara Road Bamitha-Dumra Road (Rajnagar to Dumra) Pkg-10 Chhatarpur Nil Nil C Rajnagar-Bachhon Road Khaparia-Banspahari Road Chhatarpur-Vikrampur-Rajnagar Road (Vikrampur to Rajnagar) Barghat-Kanhiwada Road Dharna-Asta-Dondiwada-Dharmakua Seoni, Pkg-11 9 9 B Road Balaghat Waraseoni-Katangi Road Rampayali-Garra Chouki Road Khairlanji-Agasi Road Pkg-12 Balaghat Nil Nil C Laalbarra-Samnapur Road Sitapathar-Mahkepaar-Goreghat Road Chourai-Panjara-Chand Road Pkg-14 Chand-Bichhua-Khamarpani Road Nil Nil C Raymond Chowk – Saikheda Road Teonther – Shankargarh Road Pkg-15A Rewa Nil Nil C Naigarhi – Garh Road Baheradabar – Piparahi – Jadkud Pkg-15B Rewa Nil Nil C Road

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 8 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

No. of APs Package Actual Name of Road District as per RPs/ Category No. Impact DDRs Kirhai –Ramgarh – Mukundpur Road Pkg-16A Satna Nil Nil C Bhadanpur – Bhatura Road Pkg-16B Jharkua – Raigon – Kasara Road Satna Nil Nil C Harfari Khaira – Misirgawan Road Pkg-17 Singrauli Nil Nil C Chitrangi – Garhwa Road Persauna-Mada Road Pkg-18A Sidhi Nil Nil C Mada-Ramgarh Road Pkg-18B Jhurai - Sarai Road Singrauli Nil Nil C Shahdol, Pkg-19 Sohagpur – Manpur Road Nil Nil C Umaria Anuppur – Jaitpur Road Gohparu – Rasmohni – Budhar (via Pkg-20 Shahdol Nil Nil C Bathiya Road) Pasgarhi – Deori – Janakpur Road Jigna New Ramnagar to Gorsarsri Road Rewa, Pkg-21 Shahdol, Nil Nil C Govindgarh Tikr Laxmanapur Road Umaria Brohari - Manpur Road Deotalab Garh Road Pkg-22A Rewa Nil Nil C Latiyar-Hanumana Road Sohagi-Teothar-Panwar-Daboura Pkg-22B Road Rewa Nil Nil C Chakghat-Sonari Road Pkg-23 Kotma - Jaithari Rajendragram Road Anuppur Nil Nil C

4 RESETTLEMENT IMPACTS IN THE SUB-PROJECTS During the reporting period, the subprojects did not cause any land acquisition and involuntary resettlement (permanent/ temporary) impacts on structures or livelihood. The MPRDC officials along with the consultants has conducted ground verification and site visits to all the subprojects and confirmed that the project does not cause any land acquisition and involuntary resettlement. All subproject roads construction works are being undertaken within the available RoW. The contractors have been instructed to construct the road without affecting any titled, non-titled, built-up, private/public property/ house boundary etc. and the contractors to provide adequate access to avoid any disruption of their livelihoods, if any. During the site visits, It has been verified that 189 hand pumps are likely to get affected and would require shifting. The summary of socio-economic and resettlement impacts is provided in Table-4.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 9 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Table-4: Summary of Resettlement Impacts and Socio-Economic Details Package-1 Package-2 Package-3 Type of Impact Remark (Bhopal) (Jabalpur) (Rewa) 1. Temporary livelihood loss 0 9 0 2. Impact on CPRs Affected CPRs as per BOQ 90 217 211 Affected CPRs as per SDDR 0 0 0 Affected CPRs during 68 78 43 Construction

5 SOCIAL SAFEGUARD ACTIVITIES DURING THE REPORTING PERIOD 5.1 Implementation of social safeguards: In order to identify any resettlement impacts, during the project implementations, EA and the consultants have carried out several site visits and consultations with the people in the subproject areas during the reporting period. The implementation of the concerned subproject does not cause any land acquisition, resettlement of structures and livelihood impact during the reporting period. The public consultation will be continued throughout the project implementation period to ensure that no social/ resettlement issues remain unaddressed. 5.2 Verification of Community Structures – Community Property Resources Impact on community property resources (CPR) is critical from the point of view of community. In terms of CPRs, only hand pumps are likely to be affected and the list provided in the Bill of Quantity (BOQ) has been verified on ground in accordance with the detailed design. As per the verification, 189 hand pumps (Package 1- 68, Package 2- 78, Package 3- 43) are likely to be impacted. The contract package-wise list of affected hand pumps is provided in the Table-5. The provision of shifting of hand pumps have been incorporated in the civil contract and the hand pumps will be relocated in consultation with the community and sarpanch of the concerned village. During this reporting period no hand pumps are shifted/ relocated.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 10 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Table-5: Community Structures as per Contract Agreements/ DDRs and during Implementation Impact on Community Structures - CPRs Package No. of HP as per Actual no. Status of Shifting/ Target for No. Contract of HP to be Relocation Shifting Agreement/ BOQ Shifted

Package-1 (Bhopal)

Shifting not initiated and Target for Pkg-1 21 10 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-2 17 9 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-3 22 22 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-4 8 8 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-5 22 19 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Package-2 (Jabalpur) Pkg-6 18 0 No hand pump impacted - Shifting not initiated and Target for Pkg-7 30 12 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-8 26 8 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-10 50 5 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-11 24 24 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-12 46 24 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-14 23 5 estimates is being obtained Shifting from PHED Deptt. Dec-2018

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 11 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Impact on Community Structures - CPRs Package No. of HP as per Actual no. Status of Shifting/ Target for No. Contract of HP to be Relocation Shifting Agreement/ BOQ Shifted Package-3 (Rewa) Pkg-15B 3 0 No hand pump impacted - Shifting not initiated and Target for Pkg-16B 16 8 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-17 30 6 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Pkg-18A 36 0 No hand pump impacted - Shifting not initiated and Target for Pkg-18B 3 5 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-19 56 5 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-20 45 11 estimates is being obtained Shifting from PHED Deptt. Dec-2018 Shifting not initiated and Target for Pkg-23 22 8 estimates is being obtained Shifting from PHED Deptt. Dec-2018

6 CONSULTATION WITH THE STAKEHOLDERS The public consultation/ meetings were organized with the local communities including construction workers as well as women about the importance of the project for their betterment. In the meetings people were made aware about widening proposal, social issues, redress of grievances, if any, advantages of the project and documented their suggestion regarding project. The package- wise summary of issues discussed during consultations held with local people/communities given in Table-6: Table-6: Summary of Public Consultation Issues Discussed Response/ Outcome Package-1 (Bhopal)  Provide proper and better  The majority of the people have access to roads, markets, appreciated the project road construction hospitals, community work and benefit of the project road. centres and agriculture  People expect that the improved project

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 12 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Issues Discussed Response/ Outcome produce. road will provide better accessibility to roads, markets, hospitals, community  Complains if any arise centres and agriculture operations. during construction.  People were informed about the  Proper road safety Grievance Redress Mechanism for measures should be lodging the complaints, if any. provided during construction near  For road safety measures, there is settlement areas/ market requirement of speed breaker/ rumble areas to avoid the accidents. strips in settlement areas/market areas to avoid the accidents.  Provide proper drainage system along the villages.  Construction of appropriate and effective drainage system in residential  Shifting of hand pump near areas/market areas. the village before construction of the road.  Hand pumps will be shifted after consultation with villagers/community before construction. Package-2 (Jabalpur)  Complains if any arise  People were informed about the during construction. Grievance Redress Mechanism for lodging the complaints, if any and to  Provide proper drainage resolve the problem system along the villages.  Construction of appropriate and effective  Shifting of hand pump near drainage system in residential the village before areas/market areas. construction of the road.  Hand pumps will be shifted before consultation prior to construction. Package-3 (Rewa)  Provide proper and better  The residents of the sub project area have access to markets and appreciated the construction work as it agriculture produce has already provided easy accessibility to material. avail the social and other services including accessibility to markets and  Improve road connectivity agriculture operations; and reduce time to accessibility to health  Reduction in travel time, traffic center, schools and other congestion and vehicle operating cost. social institutions.  Better access to health care, education,  Proper road safety market and other social services induced measures should be positive impact of improved project road provided during in terms of better quality of life and living construction near village/ standards.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 13 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Issues Discussed Response/ Outcome market areas.  Proper road safety measures in  Provide proper drainage settlement areas/market areas to avoid system along the villages. the accidents.   Complains if any arise In case of any conflict, the contractors during construction. have been advised to inform MPRDC and supervision consultant to find out alternate solutions. In case any complaints, an effective and efficient Grievance Redress Mechanism is already in place for timely and sensible hearings to facilitate solutions. Apart from that, effective consultation process with the community in the process will be ensured.

The public consultation were conducted to comprehend expectation from subprojects and also to understand the need and concerns of the local people including vulnerable and elderly population. The list of the consultations held with date, location and number of participants and photographs during consultation are attached as Annexure-1. The details of public consultations are presented in Table-7. Table-7: Details of Public Consultations Sl. Number of Date Package Village No. Participants 1 12/07/2018 Package-2 Pogara 24 2 17/07/2018 Package-2 Sirsod Chauraha 22 3 17/07/2018 Package-2 Sirsod 05 4 17/07/2018 Package-2 Sajor 04 5 17/07/2018 Package-2 Dulai 04 6 30/07/2018 Package-3 Dhachari (Mungroli) 14 7 10/08/2018 Package-3 Bilheru 17 8 22/09/2018 Package-3 Bilheru 26 9 20/10//2018 Package-3 Malhargarh 30 10 14/11/2018 Package-4 Padliya 17 11 25/11/2018 Package-2 Sirsod 17 12 13/09/2018 Package-7 Simariya 12 13 13/09/2018 Package-7 Dobhi 05 14 06/08/2108 Package-12 Chikhalabad 10 15 19/08/2108 Package-12 Tekadighat 07

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 14 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Sl. Number of Date Package Village No. Participants 16 16/08/2018 Package-14 Tinkheda 10 17 16/08/2018 Package-14 Saikheda 07 18 17/08/2018 Package-14 Panjara 08 19 17/08/2018 Package-14 Khapa Bihari 11 20 21/12/2018 Package-19 Bijouri 08 21 30/12/2018 Package-20 Bhatiya 10 22 30/12/2018 Package-20 14 23 30/12/2018 Package-20 Jaitpur 13 24 29/12/2018 Package-20 Budwa 11 25 30/12/2018 Package-23 Chori, Bartola 24

7 GRIEVANCE REDRESS MECHANISM Grievances Redress Mechanism of the subprojects is an integral part of agreed Resettlement Framework (RF). RF requires the constitution of forming of a Grievance Redress Committee (GRC) at the State as well as PIU levels to deal with the disputes, complaints, receiving suggestions and facilitate timely implementation of the sub-project. GRC has been constituted in two levels. The state level GRC at MPRDC, Bhopal and Divisional Level / PIU level GRC has been constituted vide no 21415 dated 31st March 2017. The order copies are attached as Annexure-2. A complaint register has been maintained at each division and also in the contractor’s camp for recording of complaints of local public and other stakeholders. During the reporting period, no any grievances were received from any of the community. During public consultation, most of the people told that they are not having any grievances against the subproject and project did not caused any impact on their private land, properties, structure and livelihood during this reporting period. 8 INSTITUTIONAL ARRANGEMENT The Executing Agency (EA) for the project is GoMP through MPRDC. MPRDC is wholly owned by GoMP. A Chief Engineer at MPRDC headquarter has been designated as person in charge for project implementation. MPRDC has appointed a social safeguard expert (SSE) for implementation and monitoring of social safeguard requirements. The SSE at MPRDC headquarters, reports to the Chief Engineer, is responsible for ensuring compliance with social safeguards of project roads. The SSE is supported by three R&R cum Social Development Specialists from each construction supervision consultants (CSC) on an intermittent basis. MPRDC has twelve divisional offices (Bhopal, Jabalpur, Sagar, Gwalior, Chambal, Ujjain, Indore, Sidhi, Shahdol, Narmadapuram, Seoni and Rewa) acting as Project Implementation Units (PIU) and each is headed by a

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 15 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Divisional Manager (Tech.) who is of the rank of executive engineer and is responsible for overall implementation in the field. At PIUs, one officer of the rank of assistant engineer has been given the additional charge of safeguards. R&R cum Social Development Specialists of CSCs have been mobilized during the reporting period. The details of inputs provided by the experts are given in table below.

S. No. Name of the Expert/ Package Input (Person Days) 1 Arbind Kumar Soni (Package-1) 82 Days 2 Naresh Singh (Package-2) 35 Days 2 T. Veer Raju/ Sukla Sen (Package-3) 47 Days

9 COMPLIANCE STATUS WITH RESPECT TO LOAN COVENANT The compliance status with respect to loan covenant is presented in the Table-8: Table-8: Compliance Status of Loan Covenant S. Status of Loan Covenant Agency No. Compliance 1 GOI and the State will ensure that all land and GoI No land right of way required for Investment Program and acquisition and are made available in timely manner GoMP resettlement issues are involved in this project 2 Adequate compensation are provided prior to GoI No land the signing of relevant civil works contracts, and acquisition and and involuntary resettlement is carried out in GoMP resettlement accordance with the resettlement framework issues are (RF) and resettlement plans (RPs) agreed involved in this upon between the Government and ADB. An project RP will be prepared for each subproject involving land acquisition and resettlement and shall be submitted to ADB for review and approval prior to award of any related civil works contracts, if any. 3 GOI and the State will ensure that subprojects GoI No negative will not negatively impact on vulnerable and Impact on any groups such as indigenous people. In the GoMP groups event of their involvement in any of subprojects, the GOI and the states will ensure that the subprojects are carried out in accordance with the Indigenous People Development frameworks (IPDF) agreed up

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 16 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

S. Status of Loan Covenant Agency No. Compliance on between GOI and the states and the ADB and comply with ADBs policy on Indigenous People (1998). 4 In the event any issues related to indigenous GoI Agreed. No people arises in course of project and issue related to implementation, the borrower and the State GoMP indigenous shall ensure to address those issues in people is accordance with the applicable laws and anticipated. policies of the borrower, ADB’s policy on indigenous peoples (1998) and the Indigenous People Development Framework for the facility as agreed between the borrower, the State and ADB. In the case of any discrepancy between the borrower’s legislation and ADB’s policy shall prevail. 5 GOI and State will ensure that all civil works GoI Complied contractors comply with all applicable labour and laws, including those on occupational health GoMP and safety and do not employ child labour as defined in national legislation for construction and maintenance activities. Priority work will be given to people from the area where the works are implemented and men and women will receive equal pay for work of equal value. 6 Within six months of the Effective Date, the GoMP GRC has been State shall have established a grievance Constituted redressal mechanism

10 CONCLUSIONS MPRDC confirms that the subprojects, during the reporting period did not cause any impacts on land, resettlement (temporary/ permanent, partial/full) impacts on structures and livelihood of titled as well as non-titled households. All road construction works were undertaken within the available RoW. The contractors have been clearly instructed to construct the road without affecting any boundary/ fencing of built up property. In event of any conflict, the contractors were advised to get such incidents to the knowledge of supervision consultant and the local MPRDC office well in advance to find out alternate solutions.

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 17 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Annexure 1: Attendance of Participants during Public Consultation and Photographs

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 18 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 19 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 20 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 21 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 22 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 23 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 24 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 25 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 26 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 27 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 28 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 29 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 30 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 31 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 32 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 33 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 34 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 35 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 36 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 37 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 38 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 39 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 40 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 41 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 42 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 43 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 44 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 45 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 46 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 47 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 48 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Photographs of Public Consultations

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 49 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 50 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 51 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 52 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 53 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND

Social Safeguard Monitoring Report, July 2018 – December 2018 Page - 54 Madhya Pradesh District Road II Sector Project (MPDRIISP), Loan No. 3437-IND