SUPPORT TO INFRASTRUCTURE SUMMARY TYPES OF PROJECTS

TECHNICAL 40 SERVICES TO 12 DOCUMENTATION projects MUNICIPALITIES projects

PLANNING 31 ANTI-EROSION 8 DOCUMENTATION project projects 112 5,480,093 PROTECTION

Euros 19 2 projects invested CONSTRUCTION WORKS projects DEVELOPMENT projects

KEY RESULTS

Main designs created Priority local infrastructure projects Detailed regulation plans and a 40 to positively benefit the improvement of 18 improve the social and economic 5 tourist destination management municipal infrastructure in the fields of infrastructure in municipalities study enable the sustainable development education, culture, social services, tourism of the Golija tourist destination, as well as and waste collecting and disposal Projects introducing the geographic of the five adjacent municipalities 11 information system into LSGs Detailed regulation plans developed facilitate easier development planning Building constructed according to the 31 to positively benefit the improvement of 1 highest European standards to house the municipal infrastructure in the fields of Anti-erosion protection projects Bujanovac department of the Subotica education, culture, social services, tourism 5 contribute to the protection of citizens and offers quality bilingual education and waste collecting and disposal their possessions from the effects of floods in South

OVERVIEW

Through European PROGRES 112 important infrastructure projects were supported with 5,480,093 Euros.

The European Union and the Government of Switzerland have earmarked close to 5.5 million Euros for the implementation of more than 100 projects geared towards the improvement of infrastructure in 34 municipalities of Southeast and Southwest Serbia, partially through direct support to the realisation of priority municipal infrastructure projects and partially through strengthening local capacities for implementing such projects.

The construction of the facilities for the Bujanovac department of the Subotica Faculty of Economics stands as the most striking result of these efforts. The building worth almost one million Euros was constructed in mere nine months in accordance with the highest European standards. The Programme has dedicated 1.8 million Euros for 18 priority municipal infrastructure projects which will improve communal services, enhance energy efficiency in public buildings, construct or renovate institutions of health or social protection and sports facilities, but also create of improve the business environment in municipalities. Over 300 thousand Euros was directed into the development of main designs which will serve as a starting point for building or reconstructing schools and municipal cultural centres, improving the provision of communal services and advance the energy efficiency of public buildings.

Additional half and million Euros invested into conducting technical, biotechnical and biological works on the anti-erosion protection of the water courses of Raška river and Pusta reka will protect the inhabitants of five municipalities from the effects of floods, while the same is expected out of the projects for the protection of Jablanica, and Pčinja river basins, which are currently in preparation. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

1. Technical documentation / Babušnica Development of the Main Design 9,194 The development of the main design for the Main design development for the Reconstruction and reconstruction and adaptation of the marketplace and Renovation of the Market the necessary access roads. The technical Place With Access Roads documentation will create conditions to improve the economic potentials of the local population predominantly engaged in agriculture and dairy farming.

2. Planning documentation / Babušnica Detailed Regulation Plan 12,750 Development of the detailed regulation plan of the Detailed regulation plans business - production complex in Babušnica will create preconditions for the improvement of the business environment in the municipality.

3. Planning documentation / Babušnica Detailed Regulation Plan 2,250 Development of the detailed regulation plan of the Detailed regulation plans Babušnica wastewater treatment plant will create the preconditions for the improvement of the quality of water supplied to the citizens of the municipality.

4. Construction works / Babušnica Enhancing energy 100,000 Replacement of joinery and facade works on the Cultural Local infrastructure efficiency of the Centre will reduce energy consumption and expenses, project Culture Centre improve overall conditions in the Cultural Centre and contribute towards an improved energy management system at municipal level. The building hosts several organisations as well: Public library, Tourism Organization of Babušnica Municipality, Local Community Office and Citizens' Association “Green Earth”.

5. Technical documentation / Bela Development of the Main Design 2,771 The development of the main design for the Main design development Palanka for the Reconstruction of the reconstruction of the Primary School “Ljupče Španac” in Primary School “Ljupče Španac” Bela Palanka will create conditions for improving the in Bela Palanka building's energy efficiency.

6. Technical documentation / Bela Development of the Main Design 13,193 The development of the main design for the expansion Main design development Palanka for the Expansion and Upgrade and upgrade of the rainwater sewage in the settlement of of the Rainwater Sewage in the Bela Palanka which will reduce the damages after heavy Settlement of Bela Palanka rains and floods .

7. Technical documentation / Bela Development of the Main Design 13,318 The development of the main design for the Main design development Palanka for the Reconstruction of Public reconstruction of Public Lighting in the Municipality of Lighting in the Municipality of Bela Palanka to create preconditions for ensuring funding Bela Palanka for the reconstruction of the street utility infrastructure in the municipality.

8. Planning documentation / Bela Detailed Regulation Plan 9,329 Preparation of the detailed regulation plan for the Detailed regulation plans Palanka industrial zone “Murica 2” in Bela Palanka .

9. Services to municipalities / Bela Introduction of the GIS 98,250 The project aims to promote investments into industrial Geographic information Palanka zone locations near Corridor X and the creation of a system (GIS) cadastre of underground lines. The production of a detailed regulation plan for one industrial zone covered by the project is already being funded by European PROGRES. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

10. Construction works / Bela Reconstruction of 62,393 The working conditions in a school with more than 700 Local infrastructure project Palanka the primary school pupils will improve, which should positively impact the “Ljupče Španac” wider municipal strategic approach to increasing energy efficiency of public buildings.

11. Technical documentation / Development of the Main Design 8,771 The development of the main design for extending and Main design development for Extending and Reconstructing reconstructing of the Social Protection Institution facility of the Social Protection institution in in order to improve the living conditions of Facility in Trbunje citizens living in the accommodation centre and working condition of the employees.

12. Planning documentation / Blace Detailed Regulation Plan 2,526 Drafting of the detailed regulation plans for the work zone Detailed regulation plans “Fruto2” will create the preconditions for attracting investments into the municipality.

13. Planning documentation / Blace Detailed Regulation Plan 12,349 Drafting of the detailed regulation plans for the work zone Detailed regulation plans “Gornja Draguša“ will create the preconditions for attracting investments into the municipality.

14. Technical documentation / Bojnik Development of the Main Design of 6,750 The development of the main design for the construction Main design development the Building for Entrepreneurship of the municipal building to house entrepreneurship Development Centre in Bojnik development centre which would have direct impact on the economic development of the municipality.

15. Technical documentation / Bojnik Development of the Main Design 4,594 The development of the main design for the construction Main design development of the Building for Social of a facility to improve living conditions of the most Housing in Bojnik vulnerable of Bojnik municipality population.

16. Planning documentation / Bojnik Detailed Regulation Plan 13,860 Formulation of the detailed regulation plan for the Detailed regulation plans business zone in Kosančić will create the preconditions for attracting investments into the municipality.

17. Construction works / Bojnik Completion of 98,173 Finalising the construction of the water supply pipeline Local infrastructure the water supply network and provision of drinking water to some 1,800 people project should contribute to the reduction in the number of patients suffering from jaundice and prevention of spreading infectious diseases.

18. Technical documentation / Bosilegrad Development of the Main Design 11,117 The development of the main design for the atmospheric Main design development for Atmospheric Sewerage of the sewerage of the central part of Bosilegrad Municipality. In Central Part of Bosilegrad this way, all atmospheric precipitation that now goes Municipality uncontrollably and creates sand, gravel and other materials, would be directed into the natural flows of the Dragovištica River and Dobri Dol stream, which have a regulated riverbed in this area.

19. Construction works / Bosilegrad Development of culture through 49,544 The reconstruction of the ruined, leaking roof and Local infrastructure the improvement of the Cultural procurement of modern equipment will result in full project Centre - Reconstruction of the functionality of the local Cultural Centre, the library and Culture Centre and Procurement the Centre for Social Work, which are sharing the same of Modern Equipment building. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

20. Planning documentation / Brus Detailed Regulation Plan 2,376 Formulation of the detailed regulation plans for the Detailed regulation plans Agribusiness Centre will create preconditions for attracting investments into the municipality.

21. Planning documentation / Brus Detailed Regulation Plan 12,624 Formulation of the detailed regulation plan for the Spa Detailed regulation plans Park will create preconditions for developing tourism in the municipality.

22. Construction works / Brus Building the House for 95,400 By building the House for Children with Disabilities an Local infrastructure Children with Disabilities enormous improvement in the quality of life of 30 children project and up to 200 family members will be made. Not only will the children get access to education and be engaged socially, but their parents will be able to seek at least temporary employment and generate income. The project was developed and will be carried out in partnership between Brus Municipality and local Association for Mental Disabilities.

23. Technical documentation / Bujanovac Development of the Main Design for 1,785 The development of the main design for the construction Main design development the Construction of the Community of the community cultural centre in Muhovac necessary Cultural Centre in Muhovac to house local cultural activities.

24. Technical documentation / Bujanovac Development of the Main Design for 1,785 The development of the main design for the construction Main design development the Construction of the Community of the community cultural centre in Breznica necessary to Cultural Centre in Breznica house local cultural activities.

25. Technical documentation / Bujanovac Development of the Main Design for 1,785 The development of the main design for the construction Main design development the Construction of the Community of the community cultural centre in Končulj necessary to Cultural Centre in Končulj house local cultural activities.

26. Construction works / Bujanovac Construction of the Subotica 767,345 Construction of the new building for the Subotica Faculty Construction of the building Faculty of Economics, Bujanovac of Economics, Bujanovac Department Facilitates high for the Bujanovac Faculty Department Building quality conditions for the education of over 400 currently enrolled students, half of which are Serbian, half Albanian.

27. Planning documentation / Bujanovac Detailed Regulation Plan 8,367 Development of the detailed regulation plan for the Detailed regulation plans commercial-business and manufacturing zone along the roads from Niš and along the road towards Bujanovac Spa will contribute to creating preconditions for improving the business environment and attracting investments into the municipality.

28. Planning documentation / Bujanovac Detailed Regulation Plan 6,633 Formulation of the detailed regulation plans for Detailed regulation plans commercial office buildings and manufacturing complexes along Gnjilanski road “Sector 6” will contribute to creating preconditions for improving the business environment and attracting investments into the municipality . PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

29. Construction works / Crna Improving Energy Efficiency in 100,000 Reconstruction of the building of the Technical School Local infrastructure Trava the Municipality of “Milentije Popović" in Crna Trava will improve energy project efficiency and create better living and working conditions for 185 students and 54 staff members. The project will also help raise public awareness about the importance of using renewable energy sources at the municipal level.

30. Technical documentation / Development of the Main Design 6,350 The development of the main design for the Main design development for the Reconstruction and reconstruction and the reorganisation of the ground floor Upgrading of the Preschool of Doljevac preschool institution “Lane”. One part of the institution “Lane” in Doljevac building will serve as a kindergarten and another as a vocational education department of the “Niš School of Economics”.

31. Technical documentation / Doljevac Development of the Main Design 9,642 The development of the main design for the Construction Main design development for the Construction of Reservoir of Reservoir “Kočane” will create preconditions to “Kočane” in Kočane Settlement in improve the local sources of healthy drinking water and Doljevac Municipality would reduce current deficit in the supply of the potable drinking water

32. Construction works / Doljevac Construction of the 181,400 The project will provide more income generating Local infrastructure Market Centre - First Phase opportunities for vegetable and fruit growers, as well as project for those who are looking to start agriculture-based businesses. This would create more income for local self- government as well, through tax and fee collection.

33. Technical documentation / Gadžin Development of the Main Design for 4,266 The development of the main design for the improvement Main design development Han the Improvement of Energy Efficiency of energy efficiency of the Municipal Administration of the Municipal Administration Building in Gadžin Han will create preconditions for the Building in Gadžin Han necessary construction works.

34. Planning documentation / Gadžin Detailed Regulation Plan 4,950 Creating preconditions for new investments and local Detailed regulation plans Han development in Gadžin Han through the preparation of detail regulation plan for the industrial zone “Zaplanjska ”.

35. Planning documentation / Gadžin Detailed Regulation Plan 7,650 Creating preconditions for new investments and local Detailed regulation plans Han development in Gadžin Han through the preparation of the detailed regulation plan for the industrial zone “South”.

36. Technical documentation / Ivanjica Development of the Main Design 5,667 The development of the main design for the kindergarten Main design development for the Kindergarten in Crnoljevo in Crnoljevo which covers 20% of Ivanjica area and would contribute to providing accommodation to 115 children, which is 80 % of the total number of pre-school children in Ivanjica and should have positive impact on family preservation, upbringing and proper direction of youth at the earliest age.

37. Technical documentation / Ivanjica Development of the Main Design 9,450 The development of the main design for the construction Main design development for Ivanjica Sports Hall of Ivanjica Sports Hall. The sports facility is expected to stimulate youth, as a primary target group, to engage in sport activities. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

38. Planning documentation / Ivanjica Detailed Regulation Plan 6,000 Development of the detailed regulation plan for the Detailed regulation plans tourist-recreational zone “Jakovića Polje” will contribute to creating preconditions for the development of tourism in the municipality.

39. Planning documentation / Ivanjica Detailed Regulation Plan 8,700 Development of the detailed regulation plan for the Detailed regulation plans business-production zone “Senjak” will contribute to creating preconditions for improving the business environment in the municipality.

40. Construction works / Ivanjica Reconstruction of the Branch of 99,998 By replacing asbestos pipes with the new ones the project Local infrastructure the Main Pipeline in the Town shall resolve the greatest water supply problem in project Area Lučka Reka – Javor Ivanjica and thus contribute to creation of conditions for quality life of the local population and for the economic growth and development of domestic and foreign investors.

41. Technical documentation / Knjaževac Development of the Main Design 3,157 The development of the main design for the construction Main design development for the Construction of the of the Commercial Building in Knjaževac Municipality to Commercial Building in Knjaževac house five-eight local craft and small business from Knjaževac with adequate space for doing business. Besides the income generated from the souvenir retail the building will be leased and the rent will contribute to municipal budget.

42. Technical documentation / Knjaževac Development of the Main Design for 5,702 The development of the main design for the construction Main design development the Construction of the Campsite of the campsite “Banjica” aims to increase the local “Banjica” tourism to the level of significant economic activity in the region.

43. Technical documentation / Knjaževac Development of the Main Design for 9,805 The development of the main design for the Construction Main design development the Construction of Sport Hall in of Sport Hall in Knjaževac will allow growth of competitive Knjaževac sports in the Municipality as currently 1,500 members in the 40 registered clubs within the local Sport Association do not have a facility to organise competitive sport events.

44. Planning documentation / Knjaževac Detailed Regulation Plan 12,270 Development of the detailed regulation plan for the Detailed regulation plans archeo-ethno park “Ravna” will contribute to creating preconditions for the further development of tourism in the municipality.

45. Technical documentation / Kuršumlija Development of the Main Design 18,270 The development of the main design for refurbishing the Main design development to Replace the Asbestos, water supply infrastructure in Kuršumlija municipality to Galvanised and Cast Iron Pipes in result in the reduction of losses in the network as well as the Kuršumlija Municipality continuous and stable water distribution to citizens.

46. Services to municipalities / Kuršumlija GIS as a tool of integrated local 84,350 The project predicts surveying and mapping underground Geographic information economic and tourism communal infrastructure and is focused on improving system (GIS) development tourism through the creation of thematic touristic maps and municipal services. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

47. Construction works / Kuršumlija Toward Environmentally 100,000 The reconstruction of the main building of the Primary Local infrastructure Sustainable and Accountable School “Miloje Zakić“ will improve energy efficiency and project Community through Application working conditions for 600 pupils. The project is a part of of Energy Efficiency Concepts - the strategic municipal approach to increase energy Reconstruction of the main efficiency in public facilities, which should create building of the Primary School preconditions for the transformation of Kuršumlija into “Miloje Zakić“ an energy sustainable municipality.

48. Planning documentation / Lebane Detailed Regulation Plan 12,915 Development of the detailed regulation plan of the Detailed regulation plans cultural – historical and touristic complex ”Caričin Grad” will contribute to creating preconditions for the valorisation of cultural and historic potentials of the municipality.

49. Construction works / Lebane Completion of construction of 44,916 The Municipal Haemodialysis facility is vital for 30 Local infrastructure the building for haemodialysis patients from Lebane, Medveđa and Bojnik, who need to project be transported daily back and forth to Leskovac for the treatment. Two phases of the construction were completed and the Ministry of Health invested funds into some equipment.

50. Planning documentation / Leskovac Detailed Regulation Plan 15,000 Improving conditions for infrastructure development by Detailed regulation plans formulating the detailed regulation plan for the area of general regulation plan 16 "green zone" - east/section 4b.

51. Services to municipalities / Leskovac Increasing attractiveness for 91,965 The application aims to valorise the identity of the city Geographic information investments through a functional GIS and its potentials by mapping brownfield locations and system (GIS) rich industrial heritage. This approach is also in line with EU policies and strategies wherein priority is given to projects that support urban development.

52. Construction works / Leskovac Improvement of energy 95,000 Primary School “Trajko Stamenkovic“ in Leskovac will Local infrastructure efficiency in Primary School improve its energy efficiency through energy restoration. project “Trajko Stamenković“ Joinery will be replaced, façade restored and the lights will be converted into a low energy system. Working conditions in the school will improve for 846 pupils and 87 staff members, as well as the health and safety conditions.

53. Anti-erosion protection / Leskovac Preparation of Main Designs for 32,674 The development of technical documentation will enable Main design development Lebane the Anti-Erosion Protection of the tendering for works on anti-erosion protection of river Medveđa Jablanica River Watershed basins for the Jablanica River watershed.

54. Technical documentation / Merošina Development of the Main Design 3,754 The development of the main design for the Main design development for the Reconstruction and reconstruction and the necessary upgrade of the Centre Upgrade of the Centre for Social for Social Welfare in Merošina. Welfare in Merošina

55. Technical documentation / Merošina Development of the Main Design 7,519 The development of the main design for energy efficiency Main design development for Energy Efficiency Measures in measures in the Primary School “Jastrebački partizani” in the Primary School “Jastrebački Oblačina will plan for the heating and electrical Partizani”, Oblačina installations, facade, insulation of floors and walls, reconstruction of the roof and carpentry and will improve the overall studying condition for the students. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

56. Planning documentation / Merošina Detailed Regulation Plan 14,400 Development of the detailed regulation plan for the Detailed regulation plans tourist complex “Oblačinsko lake” will contribute to creating preconditions for the further development of tourism in the municipality.

57. Services to municipalities / Merošina Introduction and development 133,479 The application focusses on creation of property Geographic information of GIS inventory and brownfield and greenfield location system (GIS) mapping. A joint GIS for both municipalities is planned, which represents a good approach in using equipment for data provision in terms of sustainability and sharing resources between partner municipalities.

58. Technical documentation / Novi Development of the Main Design 22,275 The development of the main design for the construction Main design development Pazar for the Construction of of a pumping station and suction – pressure line “Paričko A Pumping Station and Suction – brdo” aimed to disburden the central water supply (by 65 Pressure Line “Paričko Brdo” l/s) and decrease losses, costs of maintenance and improved supply of drinking water to citizens of Novi Pazar.

59. Technical documentation / Novi Development of the Main Design 24,870 The development of the main design for rehabilitation of Main design development Pazar for Sanitation of City Landfill Golo brdo Landfill will enable creation of the landfill “Golo brdo” compliant with the European Union (EU) standards which will in turn contribute to the conservation of natural and agricultural resources and improved quality of life of all citizens in the region.

60. Planning documentation / Novi Detailed Regulation Plan 15,000 Development of the detailed regulation plan for the waste Detailed regulation plans Pazar water treatment plant in Novi Pazar will contribute to creating preconditions for the improvement of the quality of water being supplied to the citizens.

61. Services to municipalities / Novi The establishment of GIS 99,700 The application is twofold: It aims to utilise GIS in cultural Geographic information Pazar heritage valorisation, which will serve tourism system (GIS) development, as well as to employ existing equipment in mapping natural resources for investment attraction.

62. Anti-erosion protection Novi Anti-Erosion Works 26,773 Anti-erosion works on Jusuf potok as part of the anti- Pazar on Jusuf Potok erosion protection of Raška River watercourse.

63. Anti-erosion protection Novi Conducting Forestation Works 89,254 Conducting forestation works around the Raška River, as Pazar Around the Raška River part of the anti-erosion protection of Raška River watercourse.

64. Anti-erosion protection Novi Conducting Anti-Erosion Works 96,429 Conducting anti-erosion works on the protection of the Pazar on the Protection of the Basins basins of Raška river, as part of the anti-erosion of Raška river protection of Raška River watercourse.

65. Technical documentation / Preševo Development of the Main Design for 1,350 The development of the main design will increase the Main design development Improvement of Energy Efficiency in quality of life and work of the students and the school Primary School “Zenel Ajdini” in the employees. Village Raince - Preševo PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

66. Technical documentation / Preševo Development of the Main Design for 1,350 The development of the main design for the improvement Main design development Improvement of Energy Efficiency in of energy efficiency in the primary school “Dituria” in the the Primary School “Dituria” in the village of Crnotince, aimed to increase the quality of life of Village Crnotince - Preševo the students.

67. Services to municipalities / Preševo Digitalisation of the existing 60,690 The project is mainly focussed on the economic Geographic information Geospatial Data and GIS development and presentation of industrial zones which system (GIS) Development with the Purpose owe their high potential to a favourable geo-strategic of Local Economic Development position.

68. Anti-erosion protection / Preševo Preparation of General Designs 118,700 Creating conditions for further development of technical Main design development Vranje for Južna Morava River documentation for the protection of Južna Morava Leskovac Watercourse from Grdelica to watercourse which will contribute to the protection of Vladičin Han Preševo, with Moravica and citizens and their property from the effects of flooding. Bujanovac Binačka Morava Rivers

69. Technical documentation / Priboj Development of the Main Design 7,200 The development of the main design for the reconstruction Main design development Reconstruction of Public Lighting of the entire lighting system in throughout the municipality and improve the overall safety of the citizens. The new, LED based, lighting system will have a low energy consumption and a long lifespan.

70. Technical documentation / Priboj Development of the Main Design for 6,662 The development of the main design serves as a Main design development the Reconstruction of Electro- precondition for preserving the health and safety of people Mechanical Sector of Water and for the overall economic development of the Treatment Plant municipality.

71. Construction works / Priboj Reconstruction of 199,980 Replacement of the roof cladding and external woodwork Local infrastructure project Administrative Building of the Administrative Building will improve the working in Industrial Park conditions in the Free Zone, thus contributing to creation of more favourable business environment for the economic growth, and consequent increase in employment and better living standard of the 27,000 inhabitants of Priboj. These activities complement to significant funding of the in the Industrial Park, which is well equipped with infrastructure and has potential for both brownfield and greenfield investments.

72. Technical documentation / Prijepolje Development of the Main Design for 9,516 The development of the main design will improve the Main design development Improvement of Energy Efficiency in overall quality of provided service at the Centre. Prijepolje Health Centre

73. Planning documentation / Prijepolje Detailed Regulation Plan 13,200 Development of the detailed regulation plan for Sehovića Detailed regulation plans Polje.

74. Construction works / Prijepolje Rehabilitation of the Sports Hall 91,701 After the reconstruction over 1,000 elementary and high Local infrastructure project with the Supporting Equipment school students, more than 60 teachers and approximately 400 kindergarten children will be able to develop their sport affinities and skills in favourable conditions, with improved energy efficiency and with necessary sport equipment. Furthermore, the security of the students will be improved, as they will not walk across the highway, while the other classes won't have to be shortened, due to children travel between facilities for physical education. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

75. Services to municipalities / Introduction of the GIS 79,720 The project primarily focuses on surveying underground Geographic information lines and planning documentation. system (GIS)

76. Anti-erosion protection Prokuplje Works on the Anti-Erosion 167,539 Technical, bio-technical and biological works for the anti- Bojnik Protection of Pusta Reka erosion protection of Pusta Reka watercourse with the Lebane aim of protecting citizens and their property from the effects of flooding.

77. Technical documentation / Raška Development of the Main Design 4,454 The development of the main design for construction of a Main design development for the Construction of the social housing building to permanently accommodate 12 Building for Social Housing socially vulnerable families in line with the previously established set of criteria and the current legislation.

78. Technical documentation / Raška Development of the Main Design 11,967 The development of the main design for the Construction Main design development for the Construction of Bridge of Bridge over the Ibar River envisages the Waste Water Over the Ibar River Treatment Plant in the Rvati settlement, on the right bank of the Ibar River.

79. Construction works / Raška Development of the Main Design 5,481 The development of the main design envisages the Local infrastructure project for Heating System At the Raška instalment of an air conditioning system in the Sports Sports Hall Hall, so that the hall can be used 365 days a year. This would enable the Tourism Sports Organisation of Raška to introduce new and promote existing recreational activities to Raška population.

80. Planning documentation / Raška Detailed Regulation Plan 8,346 Formulation of the detailed regulation plan for the Detailed regulation plans business zone “Baljevac”.

81. Planning documentation / Raška Detailed Regulation Plan 612 Formulation of the detailed regulation plan for the Detailed regulation plans business zone “South 2 Supnje” will contribute to creating preconditions for the improvement of the business environment and attracting investments into the municipality.

82. Planning documentation / Raška Detailed Regulation Plan 5,916 Formulation of the detailed regulation plan for the Detailed regulation plans business zone “North ” will contribute to creating preconditions for the improvement of the business environment and attracting investments into the municipality.

83. Services to municipalities / Raška “Raška ReGIStration” – 99,487 The project is mainly focussed on the promotion of Geographic information Improvement of Urban Planning significant and well known tourism potentials of system (GIS) Procedures and Local Economic National Park. The project will improve visibility Development Through the use of and municipal services that support investments. GIS Technologies

84. Planning documentation / Sjenica Detailed Regulation Plan 6,510 Development of the detailed regulation plan I for the block Detailed regulation plans 1.2 PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

85. Planning documentation / Sjenica Detailed Regulation Plan 8,330 Development of the detailed regulation plan II for blocks Detailed regulation plans 1.5 and 1.6

86. Services to municipalities / Sjenica Establishing Municipal GIS with 99,900 The application envisions mapping weak points in Geographic information the Cadastre of Underground underground lines, but also largely focusses on system (GIS) Lines strengthening the capacities of local municipal services and gathering data using local capacities. This approach empowers local governments to lead and be responsible for project results.

87. Construction works / Sjenica Replacement of the Final Part of 99,974 Reconstructing the final part of the water-supply system Local infrastructure project the Asbestos-Cement Pipeline of Sjenica with new pipes, will complete the donor supported interventions started in 2010, and will create conditions for connection of 620 households, 40 private enterprises and 30 agricultural estates to the new system.

88. Technical documentation / Development of the Main Design 7,600 The development of the main design will create Main design development for the Sewerage Systems in the conditions for the improvement of agriculture and Village Jelašnica in Surdulica diversification of activities in the rural area and will Municipality provide better quality of life for the residents.

89. Technical documentation / Surdulica Development of the Main Design 15,840 The development of the main design and technical Main design development for Sewerage Systems in the Rural control for the construction of the sewerage system will Areas of Surdulica Municipality allow for the improvement of agriculture and diversification of activities in rural areas.

90. Planning documentation / Surdulica Detailed Regulation Plan 12,000 Detailed regulation plan for the wastewater collection, Detailed regulation plans drainage and treatment systems in the area of Vlasina.

91. Planning documentation / Surdulica Detailed Regulation Plan 3,000 Detailed regulation plan “Stari Rid”. Detailed regulation plans

92. Services to municipalities / Surdulica Establishing GIS in the 88,700 The project aims at the economic development through Geographic information Municipality of Surdulica the promotion of a highly recognised tourism potential - system (GIS) Vlasina Lake.

93. Construction works / Surdulica Reconstruction of the School 100,000 This village school in Surdulica, which shares its premises Local infrastructure project in Suvojnica Village with the kindergarten, is essential for encouraging local population to remain and continue living in the village. This emphasises the relevance of the intervention, which is further strengthened with energy efficiency aspects of the project, as well as good governance, as the residents will have the opportunity to participate in managing the facility as well as to use the facility for social activities.

94. Technical documentation / Development of the Main Design 4,918 The development of the main design will allow for the Main design development for Improvement of Energy improvement in the school's energy efficiency. Efficiency of the Primary School “Dobrila Stambolić” in Svrljig PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

95. Planning documentation / Svrljig Detailed Regulation Plan 15,000 Creating a favourable environment for the development of Detailed regulation plans infrastructure through the detailed regulation plan for the manufacturing complex in the urban area “B” in Svrljig.

96. Main design development / Trgovište Preparation of Detailed Designs 24,506 Development of technical documentation that will enable Anti-erosion protection for the Anti-Erosion Protection tendering for works on anti-erosion protection of river of the Pčinja River Watershed basins for Pčinja River watershed with the aim of protecting citizens and their property from the effects of flooding.

97. Technical documentation / Tutin Development of the Main Design 22,722 The development of the main design would contribute to Main design development for the Construction of the the construction of necessary social infrastructure in School in Mala Ravan Tutin - one of the youngest municipalities in Serbia (children aged 6-14 make over 17% of total population) which will, in turn, improve the quality of educational services in the area.

98. Planning documentation / Tutin Detailed Regulation Plan 14,895 Development of the detailed regulation of Pope. Detailed regulation plans

99. Construction works / Tutin Constructing of Primary School 83,173 Construction of a primary school building in Zapadni Local infrastructure project Building in Zapadni Mojstir Mojstir, including the school yard and playground, will create conditions for better performance and the implementation of higher education standards for 48 children from the communities of Zapadni Mojstir, Istočni Mojstir, Batrage and Čulije.

100. Planning documentation / Vlasotince Detailed Regulation Plan 14,850 Detailed regulation plan for the industrial zone Vlasotince. Detailed regulation plans

101. Construction works / Vlasotince Construction of the Dog Shelter 92,000 The Dog Shelter will be a bi-municipal asset (Vlasotince Local infrastructure project and Bojnik), and represents a rare case of inter-municipal cooperation. Animal control in said municipalities is a serious issue, which results in significant costs for both LSGs for paying damages to citizens that got bitten by stray dogs. The project has potential for a serious good governance intervention (managing the facility, ownership aspects, costs and risk division etc. animal rights etc.).

102. Main design development / Vlasotince Preparation of Detailed Designs 36,759 Development of technical documentation that will Anti-erosion protection Babušnica for the Anti-Erosion Protection of enable tendering for works on anti-erosion protection of Crna Trava the Vlasina River Watershed river basins for Vlasina River watershed with the ultimate goal of protecting citizens and their property from the effects of flooding.

103. Technical documentation / Vranje Development of the Main 5,185 The development of the main design for reconstruction of Main design development Design for Reconstruction and the existing, ten classroom, school object in Rataje which Extension of Primary School will improve the quality of educational services in the “Branislav Nušić” in Rataje area. PROJECT LIST

TYPE OF CONTRIBUTION No. LSG PROJECT DESCRIPTION PROJECT PROJECT TITLE (EUR)

104. Technical documentation / Vranje Development of the Main Design for 9,540 The development of the main design for construction of Main design development Construction of New Kindergarten the preschool institution in Vranje “Naše dete” to in Vranje supplement the existing, but scarce, preschool capacities in the City.

105. Planning documentation / Vranje Detailed Regulation Plan 15,000 Development of the detailed regulation plan for the Detailed regulation plans business manufacturing zone Bunuševac 3 in Vranje will contribute to creating preconditions for improving the business environment and attracting investments into the municipality.

106. Services to municipalities / Vranje GIS in the Function of 91,000 The project focusses on the promotion of industrial zones Geographic information Sustainable Development through a holistic approach. The project systematically system (GIS) and effectively connects and merges various activities related to the same topic. Part of the planning documentation for industrial areas was funded by EU PROGRES with one segment being currently funded by European PROGRES.

107. Construction works / Vranje Infrastructure Improvement of 191,392 The Programme in its both iterations supported the Local infrastructure project the Vranje Free Zone Within the development of the Zone by financing important planning Detailed Regulation Plan of the documentation, making this intervention a logical step in Bunuševac 2 Area the same direction as it further develops the Zone's infrastructure assets.

108. Technical documentation / Žitorađa Development of the Main Design for 1,039 The development of the main design is aimed at Main design development the Improvement of Energy Efficiency increasing the quality of life of the students. in Primary School “Toplički Heroji” in the Village

109. Technical documentation / Žitorađa Preparation of main design for the 1,289 The preparation of main design for the improvement of Main design development improvement of energy efficiency energy efficiency in primary school “Toplički Heroji” in in primary school “Toplički Heroji” Žitorađa. in Žitorađa

110. Services to municipalities / All 34 LSGs Provision of FIDIC conditions 309,098 Provision of trainings for use of FIDIC contracts for Works Geographic information of works contracts training to all Programme LSGs and on job trainings for LSGs that system (GIS) will receive CFCU Grants.

111. Golija development Ivanjica Detailed Regulation Plan for 220,000 The project is to be developed in partnership with the Raška Infrastructure Corridors Ministry of Trade, Tourism and Telecommunications and Sjenica LSGs, and implies the development of detailed regulation Novi Pazar plans for infrastructure corridors as well as activities aimed at improving knowledge and raising awareness of destination management.

112. Golija development Ivanjica Feasibility study and planning 60,000 The project is to be developed in partnership with the Raška documentation for Golija Ministry of Trade, Tourism and Telecommunications and Sjenica LSGs, and implies the preparation of the management Novi Pazar model for Golija, as well as the activities aimed at Kraljevo improving knowledge and raising awareness of destination management. NUMBER TOTAL CONTRIBUTION TYPES OF PROJECTS OF PROJECTS (EUR)

TECHNICAL DOCUMENTATION 40 321,123

PLANNING DOCUMENTATION 31 297,608

CONSTRUCTION WORKS 19 2,652,389

SERVICES TO MUNICIPALITIES 12 1,336,339

ANTI-EROSION PROTECTION 8 592,634

GOLIJA DEVELOPMENT 2 208,000

TOTAL 112 5,480,093