Presentation - Olympia Technology Park

By N.SENTHIL KUMAR AGM 1. About Olympia Group Background:

The Olympia Group was born out of the alliance of Two strong business houses – The Khivraj Group & The MK Group.

The -based renowned Khivraj Group, has over 5 decades of successful business history spanning various industries such as Real Estate, Automobile, Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia.

Mr Ajit Kumar Chordia, the Managing Director is also an Founding member of IGBC and actively involved in IGBC.

The MK Group Kolkata have an impressive track record of large-scale property development in several sectors of Real Estate - MSB Residential Apartments, Clubhouses and Shopping Malls among others represented by Mr Chandrakant Kankaria.

Mr. Ajit Kumar Mr. Chandrakant Mr. Bharat Chordia Kankaria Kumar Chordia Projects – A snap shot

OLYMPIA TECH PARK OLYMPIA PLATINA OLYMPIA TEKNOS OLYMPIA NATIONAL OLYMPIA INSPIRE • 100,000 Sq.ft. of completed space • 130,000 Sq.ft. of completed space TOWERS GUINDY • Sprawling 2 million Sq.ft. campus • Adjacent to Olympia Technology • Structure of B+S+10 • Total Area – 72,904 Sq.ft • Total Area – 2,00,000 Sq.ft • LEED Certified Gold Rated Green Park • Typical floor Plate (sft) 13,000 • Building Structure – 2B+Stilt+10 • Building Structure – 2B+Stilt+10 Building by USGBC • Fully Occupied • Fully Occupied • Typical floor Plate 2 – 10 – 7,424 Sq.ft • Awaiting CC • In operation for the past 14 Years • Under Certification of IGBC • Under Certification of IGBC • Fully Occupied • Under Certification of USGBC • IGBC Platinum Certified Building Platinum Rating Gold Rating • Under Certification of IGBC Gold Rating Gold Rating

OLYMPIA OPALINE OLYMPIA OPALINE OLYMPIA SKY VILLAS PARK RESIDENCES • Types of Flats: 4 BHK • Types of Flats: 2, 3 BHK SEQUEL BY OLYMPIA • Apartment Range: 6150 sq.ft – 6300 • Project Status: Completed • Types of Flats: 3 & 4 BHK • Total Area – 1,05,000 Sq.ft sq.ft - No of Flats – 1200 • Apartment Range: 1145 sq.ft – 2343 • Luxury Apartments Sq.ft • No. of Flats: 18 Luxury Duplex • Project Completed and Occupied • No. of Flats: 608 - Project completed & Occupied • Gold Certified under IGBC Green Home - Project completed Rating System. Education Projects – A snap shot

VELAMMAL NEXTGEN SCHOOL KC HIGH SCHOOL

• State of Art school for Velammal group of • School for KC High run by Mrs Valli to have their schools designed by expats working at RSP. The school is relocated and cater for concept of learning street is the major highlight expansion. of the design. • School affiliated to Cambridge International Board. • Total Area of 1.3 lakh Sq.ft on 3.25 Acres of land. • Total Area is 90KSF on 1.35 Acres of land. • Amenities like Basket ball court, Auditorium, Mini Soccer Field, Swimming pool etc. • Project delivered and school is in operations for • Project delivered and school is in operations for last couple of years. last couple of years. 2. OTP Energy Consumption Overview Energy Sources of Olympia Technology Park

TNEB GRID WIND ENERGY

OLYMPIA ENERGY SOURCE

DG – CAPTIVE ROOF TOP SOLAR Energy Consumption Details for 3 Years

Units in KWh Source of Energy Units in KWh 2017-18 2018-19 2019-20 Description 2017-18 2018-19 2019-20 TNEB 11153209 3725848 5612421

Diesel Generators 1453610 1904570 705110 Green Energy 18556442 24222318 23062228

Solar Energy 658436 1582834 1628935 Non-Green Energy 12606819 5630418 6317531 Wind Energy 17898006 22639484 21433293 Total 31163261 29852736 29379759 Total 31163261 29852736 29379759

100% 81% 78% 80% 60% 60% 40%

40% 19% 22% 20%

0% 2017-18 2018-19 2019-20

Green Energy Non-Green Energy Energy Consumption FY 2019-20

TNEB Energy Energy Description of Consumption 19% Energy Source ( in KWh ) Diesel Generators 2% TNEB 5612421

Solar Energy 6% Diesel Generators 705110

Wind Solar Energy 1628935 Energy 73% Wind Energy 21433293

Total 29379759 TNEB Energy Diesel Generators Solar Energy Wind Energy 3. OTP Specific Energy Consumption Specific Energy Consumption – Past 3 years

Parameters Units 2017-18 2018-19 2019 - 20

Total Annual Energy Consumption KWh 31163261 29852736 29379759

Built Up Area Sq. M 181631 181631 181631 Specific Electrical Energy KWh / Sq.M 171.57 164.36 161.76 Consumption

Specific Energy Consumption 174 172 171.57 170 168 166 164 164.36 162 161.76 160 158 156 2017-18 2018-19 2019 - 20 Year on Year Improvement of Specific Energy Consumption

Description 2017-18 2018-19 2019-20

Specific Energy Consumption 171.57 164.36 161.76

Variation - 4.39 1.61

Improvement % - 4.39 % 1.61 %

Reasons for Improvement in SEC :

• Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 lift lobbies with automation control.

• Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby. 4. Information on Competitors, National & Global Benchmark Information on Competitors, National & Global Benchmark SEC Benchmark - Competitor:

Sl.No Competitor Name SEC

1 Tata Consultancy Services, Cochin 81.2

National SEC Bench Mark ( BEE ): EPI Bench Mark for Office Buildings  Office Building EPI depends upon multiple factors like climate zone, operating hours, occupancy trends etc.. Climate Zone Less than More than 50% AC 50% AC  Olympia Tech Park Campus comes under mixed category. Combination of Office, Data labs, Food Warm & Humid 101 182 court & Amenities, Banks, ATM and GYM etc. with 95% Air conditioned space. Composite 85 179  Chennai comes under Warm & Humid Climate Zone and our campus comes under the category of more Hot & Dry 90 173 than 50 % Airconditioned area. Hence EPI Bench Mark as BEE - 182. Moderate 94 179  Our EPI FY 2019-20 - 161.76 Road Map for Further Improvement of SEC

. Optimum utilization of HVAC System.

. Continuous monitoring and audits of energy.

. Maximize utilization of Day Light effectively and reduce the lighting consumption in day time.

. Greater Use of Energy Efficient Equipment's

. Greater Use of energy efficient lights

. Inclusion of digital technologies in operations of building and management of energy. Major Encon Project Planned FY 2020-21

• Installation of Auto Tube Cleaning Technology for 3 Nos of 750 TR Water Cooled Chillers to improve the chiller Efficiency and save the energy.

Project Cost – INR 2.56 Millions.

• Installation of Control Command Centre for enhancement of IBMS System in the view effective monitoring and help us for energy saving in HVAC Systems.

Project Cost – INR 10.2 Millions. 5. Energy Savings Projects Implemented in last 3 Years. Energy Savings Projects Implemented in last 3 Years

Important Projects in 2017- 18, 2018-19 & 2019-20

 Installation of additional one water cooled chiller.

 Conversion of PL light fittings into LED light fitting in various locations of Office Premises.

 Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 lift lobbies with automation control

 Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby.

Investments Savings Payback Year No of Proposals ( in Million INR) ( in Million INR ) ( Months )

2017 -18 7 31.68 17.59 21

2018 -19 4 9.48 3.91 29

2019 -20 2 1.42 0.75 22 Encon Project Implemented in 2019-20 Conversion of DX Units to Chilled Water CSU Unit

Before During CSU Replacement

 Converted the 5.5 TR DXC Unit – 8 Nos into Chilled Water CSU Unit – 6 Nos in Phase -1 & 2 lift lobby area.

 Optimization the energy consumption and reduced the common area energy consumption.

 Energy Saved - 62437 Units / Year

 Cost Saving Achieved – INR 5.62 Lakhs / Year

 Investment Cost – INR 8.02 Lakhs

 Payback Period - 17 Months 6. Innovative Projects Implemented. Innovative Projects Implemented

AFFF ( Aqueous Film Forming Foam ) Fire Fighting System for HSD Yard

Source of Idea Solution Advantage

. Non availability of alternate fire . Worked out the alternate option . Two modes of fire extinguishing fighting arrangements in HSD to implement 200 Ltrs AFF arrangements available for HSD Yard for the existing 50 Ltrs DCP Mechanical Foam Fire Yard. Extinguisher available. Extinguisher system . Implementation Cost – INR 1.18 . Reliability of safety in HSD yard is Lakhs increased. 7. Utilisation of Renewable Energy Sources. Utilisation of Renewable Energy Sources FY 19-20

Installed Capacity Generation % of Overall Type of RE Type of Energy Onsite/Off site (MW) (Million Units) Electrical Energy

Solar PV Electrical Onsite 1.1 1.62 5.54%

Wind Electrical Off site 15.15 21.43 72.95%

Wind – 72.95% (21.42 Million units))

Solar - 5.54% (1.62 Million units) Investment Made & Capacity Addition in last 3 years

Installed Project Name Type Capacity (MW) Year of Installation Investment Cost

Onsite Roof Top Solar Plant 1.1 June -2017 INR – 5.08 Cr Renewable Energy

PROJECT DETAILS Capacity 1.1 MW Type Direct Online Grid Year Energy Generation Make of Solar PV Panel Trina ( in KWh ) Remarks Rating & Qty. of Solar PV 315 Watts, 3510 Nos Panel Make of Inverter Delta Installed in June -2017 and 2017-18 658436 commenced the partial Rating & Qty. of Inverter 50 KW , 19 Nos generation. Energy Generation / Year 1582834 ( in KWh ) 2018-19 1582834 Investment Cost ( in INR ) 5.08 Cr 2019-20 1628935 ROI ( Months ) 46 RPO Obligation

RPO Target fixed in Tamil Nadu RPO Achieved at site

Solar Non – Solar Total Year Solar Non – Solar Total Year

2017-18 5 % 9 % 14 % 2017-18 2.11 % 57.43 % 59.55 %

- - 2018-19 - 2018-19 5.3 % 75.84 % 81.14 %

2019-20 6.75 % 10.25% 17 % 2019-20 5.54 % 72.95 % 78.50 %

Reference Source https://www.iexindia.com/ Group Total Capacity & Unit Capacity ( MW )

WINDMIL DETAILS – OFF SITE

Capacity in S.No WEG HT SC NO MW Location

1 79204721737 0.8 2 59224760079 0.85 3 59224760083 850 4 79204720772 0.75 5 79204720517 0.95 Theni, 6 79204720683 0.75 Tirunelveli, 7 79204720684 0.75 Udumalaipet. 8 79224723414 0.60 9 79224723413 0.60 10 39224340917 1.65 11 79244700344 2.0 12 79244700338 2.0 15 79204720531 0.95 16 79204721545 1.65

Total Capacity ( in MW ) 15.15 8. GHG Inventorisation. GHG Inventorisation

Energy Consumption Details ( in Kwh ) Ton of CO 2 Emission Year TNEB Wind Solar DG Total TNEB DG Total 2017-18 11153209 17898006 658436 1453610 31163261 9145.6 828.6 9974.2 2018-19 3725848 22639484 1582834 1904570 29852736 3055.2 1085.6 4140.8

2019-20 5612421 21433293 1628935 705110 29379759 4602.2 401.9 5004.1

Renewable Energy Usage in KWh Reduction of CO 2 Emission ( in Ton 30000000 14000

12000 25000000 10000 20000000 8000 15000000 6000 10000000 4000

5000000 2000

0 0 2016 -17 2017-18 2018-19 2019-20 2016 -17 2017-18 2018-19 2019-20 Target for CO 2 Emission Reduction

Action Plan : a. Encourage the usage of Public Transportation and shuttle services by Employees. b. Exploring replacement of Existing DG sets into Hybrid DG Sets to reduce the diesel consumption and operate DG Sets by using Biofuel. c. Increase the usage of renewal energy and reduce the energy usage of Utility and DG Sets. 9. Green Supply Chain Management Green Purchase Policy

Green Purchasing is the practice of procuring goods and services that cause less harm to the environment, and the living beings that depend upon it for survival. Olympia Tech Park will strive to purchase materials that are:

. Durable, as opposed to single use or disposable

. Non-toxic or minimally toxic, preferably biodegradable

. Highly energy-efficient

. Recyclable or safely disposable

. Made from raw materials obtained in an environmentally sound, sustainable manner

. The cause of minimal or no environmental damage during normal use or maintenance.

. Shipped with minimal packaging (consistent with care of the product), preferably made of recycled and/or recyclable materials

. Products which have obtained Greenpro or any other Eco labeling

. The Products should have low VOC and lesser health impacts

. The products should be local materials sourced within 400km range Information on other Green Projects implemented

Sl. No Project Status

1 Olympia-Merlin Reflection IGBC Pre- certified Platinum

2 Olympia Platina Under Certification – Attempting for IGBC Platinum Rating

3 Olympia Park Residences Achieved IGBC Gold Rating.

4 Olympia – Teknos Under Certification – Attempting for IGBC Gold Rating

5 Olympia – National Under Certification – Attempting for IGBC Gold Rating Olympia – Goodwood 6 Pre-certified IGBC Platinum Rating Residence Under Certification – Attempting for LEED BD+C 7 Olympia – Inspire Platinum Rating

8 Olympia – Cyberspace Under WELL Certification 10. Team Work, Employee Involvement & Monitoring Daily Monitoring System

. Monitor the Energy, Water Consumption details on daily basis.

. Updation of Daily Energy & Water Consumption data along with cumulative consumption data. Compare the data with previous days.

. Monitoring of HVAC Energy Consumption, Common Area consumption & Occupant Energy usage details on daily basis.

. Monitoring of operation parameter of MEP Equipment on daily basis and take the action if any abnormality.

. Monitoring of raw water procurement and STP treated water usage details on daily basis. Take the necessary action to minimise raw water procurement.

. Monitoring of Employee , Visitor head count on daily basis.

. Monitoring of Two Wheeler, Four Wheeler count on daily basis and take the action to increase the usage of public transport, shuttle services. Monitoring

Use of Advanced Equipments and Tools for Monitoring.

Thermal Image Scanner Power Quality Analyser Anemometer

Integrated Building Management System for Monitoring and Control. Review Meeting Chaired by

 1st level of review meeting is being conducted & chaired by Shift Engineer on weekly basis.

 2nd level of review meeting is being conducted & chaired by Technical Manager level once in two weeks.

 3rd level of review meeting is being conducted & chaired by Property Manager once in a month.

 4th level of review meeting is being conducted & chaired by Top Management once in 3 months.

Discussion Points :

It is a practice to conduct the review meeting with in-house team ( Technical, HK & Security team ) to discuss the below mentioned points. a. Further improvement of building operations. b. Optimisation of Energy & Water Consumption. c. Usage of day light effectively and reduce the usage of lights during day time. d. Awareness training on energy conservation measures. Energy Efficiency/ Awareness Training Program Projects Implemented through Kaizens

Foot Operated Hand Sanitizer Dispenser

Source of Idea Solution Advantages . Arrangement of foot operated . Avoided the expenses on type hand sanitizer dispenser by procurement of automatic hand using PVC pipe and fittings. sanitizer dispenser for common . Take the safety measures for . area. prevention of COVID -19 by using Involving in house team to . in house team. arrange food operated Hand Cost saving of INR – 60,000 / - Sanitizer -15 Nos required for . Usage of in-house team common area. effectively during lockdown . Implementation Cost INR – 7500 / ( Rate / Each – INR 500 ) 11. Implementation of ISO 50001 / Green CO / IGBC Rating IGBC Rating

Olympia Technology Park has obtained Platinum Certification in June -2020 from IGBC for existing building category IGBC Rating

SCORE CARD:

S.No CREDIT NAME POINTS ACHIEVED Total Points Targeted 90

1 Site Facility & Management 14 Points Achieved 88 2 Water Efficiency 26 3 Energy Efficiency 26 Targeted Rating Platinum 4 Health & Comfort 10

5 Innovation Category 12 Achieved Rating Platinum Total Points 88

Certified 50-59 points, Silver 60-69 Points, Gold 70-79 Points, Platinum 80-100 points. Implementation of ISO 50001

Engaged an ISO 50001 Certified Agency & Energy Auditor to implement ENMS at site by co-ordinating with IGBC.

Awaiting for proposal from IGBC to obtain ISO 50001 Certification. 12. Long Term Vision on Energy Efficiency Long Term Vision on Energy Efficiency

LONG TERM TARGET ON ENERGY EFFICIENCY

. Increase the usage of renewable energy from 78 % to 85 %

. Improve the EPI from 161.36 to 150

. Enhancement of onsite solar energy from 1.1 MW to 1.2 MW

. Optimization of Annual Energy in Chiller Consumption of Chiller – 68.27 Lakhs Units to 60 Lakhs units Other Relevant Information

USGBC LEED Excellent Energy Efficient Best HVAC Design Certification for GOLD Unit Award-2019 from CII Award

Olympia Technology Park was awarded “The BRY AIR AWARDS 2008” for the “Best HVAC Design” and this award is in its 3rd year and considered as prestigious for it certifies excellence in Energy conservation & Innovative design in HVAC. Other Relevant Information

Postal Dept. has released the special Best Green Building cover with Olympia Tech Park image on Award 29.12.2006

Girem Award was conferred upon Olympia Technology Park for the best green building in - 2009. E Mail : [email protected]

Phone Number : 98405 52387