Baseball Field Upgrades and Needs

Castle View Baseball

Baseball Field Upgrades and Needs

Upgrades & Projects

1.) Infield dirt upgrade: Tilt and add over 20 MT of new dirt. The original quote for this work was $22,000.00. We were able to get the dirt for free including delivery. Depending on the cost to rent equipment we could save over $20,000.00 in this project. Parents will be ask to help in the project. More to come. Expected completion time before December 15, 2016.

2.) Warning track behind Home plate: Extend warning track from dugout to dugout behind Home plate. Cost not determined since it will depend on equipment rental. Will need a a sod remover and dirt to complete. Expected Completion date December 15 2016

3.) Clay Brick layout (Home plate and pitcher's mound): Laid clay brick foundation on hitter's box, catcher box and pitcher's mound. This is to prevent erosion and holes in overused areas. Cost for a pallet of bricks around $500.00. Expected completion date December 15 2016

4.) Re-Do Pitcher's mound: Need to bring mound to correct dimensions and "slope". Dirt will come from donated dirt that will be use to upgrade infield. Expected Completion date December 15, 2016

5.) Wood floor on Dugouts: Floor installation of treated wood inside home and visitor's dugouts. Floors will help preventing slips, wear and tear on cleats.

6.) Concrete Work: a.) Pour concrete behind bleachers. Will extend about 12 feet creating path from concession's stand and clubhouse. Cost $2,300.00. b.) Expand concrete strip on batting cage in order to have a secure surface for hitting practices. Cost $2,100.00.

7.) Batting Cage: Replace nets with Pro League netting. Make upgrades on net saving backdrops. New home plate mats.

8.) Fix Hitting bubble: Fix netting around hitting bubble. Looking at netting replacement prices

9.) Bleacher's Cover: Exploring possibilities.

10.) Legacy Bricks Project: Booster club has identified a great fundraiser in which Legacy Bricks will be sell to the school and business. The project is lay and create and area in the field where the bricks can be place.

11.) Clubhouse upgrades: Need to replace flooring and add floor covering on back of the office of the clubhouse.

Equipment

1.) Pro Anchored Bases (Set of 3)…...... $180.00

2.) Pro-rated Home plate...... $100.00

3.) Pallet of Clay Bricks...... $500.00

4.) Clay Bags (50LB Bags)

5.) Diamond Pro dry

5.) Cocoa Matt Dragg (6X4)…...... $280.00

6.) 3 Heavy Duty Push Brooms......

7.) On Deck Circle Mats (With CV Logo)

8.) Loop/2 Way Hoe (2)…...... $35.00

9.) Home Plate Matt Clay (3) @…...... $320.00 Each

10.) Stationary Bike (used)

Wish List

1.)Ball Cart...... $219.00

2.) Home Plate Halo (Can have a sponsor logo on sides if donated)

3.) Radar Gun (Pro Graded)

4.) Pitching Machine

5.) Roof Covering on Batting Cages

6.) Sand Pro (Used)…...... $2,000.00

DONE:

1.) Shed: Completed.... Next step paint. Waiting on school for paint. Cost $1,200.00

2.) Visitor's bullpen..... Need to set protecting net. Cost $0.00

3.) New Uniforms (Varsity)…...... Cost $7,100.00

4.) Hats 130 hats...... Cost $2,150.00

Note: Please, please feel free to reach out to us with any ideas, comments and/or suggestions. You never know if it is something we can utilize in the program.