Biogas in Odsherred, Denmark

Biogas in Odsherred, Denmark

Zealand www.balcenergyareas.eu Denmark Odsherred Biogas The planning process for establishment of biogas plant Stakeholder involvement Vig North • Odsherred MuniCipality Tools & Methods Goals: A biogas plant with a Capacity of 160,000 tonnes, based on residues from agriCulture and loCal industry. • Long term plan: StrategiC Energy Plan 2015, adopted by the MuniCipal CounCil. The process: Design of biogas plants. MeeTngs and disCussion of the faci- Four types of involvement: lity with (1) mayor and top offiCials, (2) muniCipal CounCilors, (3) invol- • MuniCipal CounCil and the hinterland of each party in the CounCil vement of direCt stakeholders in the facility (4) publiC meeTngs on plans • DireCt stakeholder involvement (suppliers and buyers) of loCaon, funCTon and size of faciliTes, (5) publiC Consultaon mee- • Involvement of the broad publiC through a series of publiC meeTngs Tngs proposals. • PubliC Consultaon acCording to exisTng rules on approvals, etc. Result: Finished design of the plant. Environment and spaal approvals, Conflicts: (EIA, muniCipality plan addiTonal, loCal plan, environmental permit of • ConfliCt with a loCal group near the loCaon. Strong CriTCism of expeCted load the facility). The plant is now under ConstruCTon (proCurement phase). from odor and traffiC. This ConfliCt was both expressed at several meeTngs and through the loCal newspapers (see below) Expected yearly outcome: 61,800 MWh biogas; redukTon of greenhouse gasses at 36,800 tons; 21 full-year direCt employees; turnover at 4.3 Soluon: mio.€ and loCal eConomiC benefit of 4.2 mio (employment & inCome). • Invitaon to visit Solrød Biogas (newly built) to get a personal impression of loads from odor and traffiC: Detailed review of this new plant and its loads. General planning and stakeholder involvement Co-opera(on links with stakeholders Involved stakeholder: • LoCal AgriCultural AssoCiaon (Odsherred Lanboforening) • PharmaceuTCal Plant (H. LundbeCk A / S) • LoCal mink feed mill (Sjællland Pelsdyrfoder A.m.b.a.) • LoCal energy supply Company (Nykøbing Sj. Forsyning A.) • Odsherred Supply (muniCipal owned plant) • Odsherred MuniCipality Main outcome from the involvement process: • Regional eleCtriCity supplying Company (Seas-NVE A/S) • Connuous involvement: Stakeholder involvement has been formed as a • Roskilde University ConTnuous proCess throughout the proCess and is sTll working. • Broad involvement: The different type of involvement have been very sup- porve. • Conflict: In May 2017, CriTCs of the facility were invited to visit Solrød Biogas This 'hands-on' experienCe has a signifiCant impact on the CriTCism, and may to a Certain extent, be Considered as a soluTon of most of the ConfliCts. Contacts Tyge Kjær Roskilde University Tel. +45 22 84 72 00 E-mail [email protected] www.ruc.dk BEA-APP is co-financed by the European Regional Development Fund through the Interreg Bal?c Sea Region programme .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us