Supporting Electricity Sector Reform in Libya

Supporting Electricity Sector Reform in Libya

FINAL REPORT (ISSUE 07A) Public Disclosure Authorized Supporting electricity sector reform in Libya TASK C: Institutional Development and Performance Improvement of GECOL Public Disclosure Authorized Report 4.2: IMPROVING GECOL TECHNICAL PERFORMANCE Public Disclosure Authorized Public Disclosure Authorized 14/12/2017 TASK C – REPORT 4.2: IMPROVING GECOL TECHNICAL PERFORMANCE Contents 1 Executive Summary ................................................................................................... 5 1.1 Generation .................................................................................................................. 7 1.2 Transmission .............................................................................................................. 12 1.3 Control ....................................................................................................................... 14 1.4 Medium Voltage ........................................................................................................ 16 1.5 Distribution ................................................................................................................ 17 2 Introduction ............................................................................................................ 19 3 Generation .............................................................................................................. 24 3.1 Current status ............................................................................................................ 24 3.1.1 Overview ............................................................................................................ 24 3.1.2 Overdue maintenance ....................................................................................... 33 3.1.3 Fuel supply ......................................................................................................... 39 3.1.4 Third party power stations ................................................................................ 40 3.1.5 Generation expansion ........................................................................................ 41 3.2 Energy balance .......................................................................................................... 47 3.3 Points of concern....................................................................................................... 50 3.3.1 Immediate concerns .......................................................................................... 50 3.3.2 Longer term concerns ........................................................................................ 51 3.4 Generation action plan.............................................................................................. 52 4 Transmission ........................................................................................................... 56 4.1 Current status ............................................................................................................ 56 4.2 Transmission substations .......................................................................................... 57 4.3 Overhead transmission lines ..................................................................................... 63 4.4 Underground transmission cables ............................................................................ 66 4.5 Points of concern....................................................................................................... 67 4.5.1 Immediate concerns .......................................................................................... 67 4.5.2 Longer term concerns ........................................................................................ 67 4.6 Transmission action plan ........................................................................................... 69 5 Control .................................................................................................................... 74 5.1 Current status ............................................................................................................ 74 5.1.1 Overview ............................................................................................................ 74 2 TASK C – REPORT 4.2: IMPROVING GECOL TECHNICAL PERFORMANCE 5.1.2 National Control Center (NCC) ........................................................................... 75 5.1.3 Tripoli Regional Control Center (TRCC) .............................................................. 78 5.1.4 Benghazi Regional Control Center (BRCC) ......................................................... 79 5.1.5 Distribution Control Centers (DCC) .................................................................... 80 5.1.6 Generation Dispatch and Transmission Network Control ................................. 82 5.1.7 Telecommunications .......................................................................................... 89 5.1.8 Demand side management (DSM) ..................................................................... 90 5.2 Points of concerns ..................................................................................................... 93 5.2.1 Immediate concerns .......................................................................................... 93 5.2.2 Longer term concerns ........................................................................................ 94 5.3 Control action plan .................................................................................................... 95 6 Medium Voltage (Subtransmission) ......................................................................... 99 6.1 Medium Voltage cables and overhead lines ............................................................. 99 6.1.1 Investment Strategy ........................................................................................... 99 6.1.2 Description of 66kV & 30kV lines (cables and overhead lines) population ..... 101 6.1.3 Condition of GECOL's MV lines, faults and outages ........................................ 102 6.2 Medium Voltage switchgear ................................................................................... 105 6.2.1 Analysis of MV switchgear failures .................................................................. 106 6.3 Medium Voltage power transformers .................................................................... 107 6.3.1 MV transformers investment strategy ............................................................ 108 6.3.2 Description of MV transformers population ................................................... 109 6.3.3 Condition of GECOL MV power transformers and their defects ..................... 109 6.4 Points of concern..................................................................................................... 115 6.4.1 Immediate concerns ........................................................................................ 115 6.4.2 Longer term concerns ...................................................................................... 115 7 Distribution ........................................................................................................... 117 7.1 Introduction............................................................................................................. 117 7.2 Distribution asset statistics ..................................................................................... 117 7.3 Investment strategy ................................................................................................ 117 7.3.1 Distribution transformers ................................................................................ 118 7.3.2 Distribution cables ........................................................................................... 118 3 TASK C – REPORT 4.2: IMPROVING GECOL TECHNICAL PERFORMANCE 7.3.3 Distribution substations ................................................................................... 119 7.4 Description of assets population ............................................................................. 120 7.4.1 Ground mounted transformers ....................................................................... 120 7.4.2 Distribution substations ................................................................................... 122 7.4.3 Distribution lines .............................................................................................. 123 7.5 Condition of Distribution assets and their defects ................................................. 124 7.5.1 Condition of ground mounted distribution transformers – defects and failures 124 7.5.2 Condition of pole mounted distribution transformers – defects and failures 130 7.5.3 Condition of GECOL distribution substations and their defects ...................... 134 7.5.4 Condition of distribution lines and their defects ............................................. 139 7.6 Points of concern..................................................................................................... 143 7.6.1 Immediate concerns ........................................................................................ 143 7.6.2 Longer term concerns ...................................................................................... 144 8 MV and Distribution action plan ............................................................................ 145 9 Key Performance Indicators ..................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    172 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us