Current Status of Vendor Registration November 2017 No.of presently Communication exchanged Tentative Date of approved vendors between Vendor & RDSO Timeline Firm’s name & Item & SN Application/ Develop Approved (Dates ofletters/emails) Current status (excluding address Specification No. Registration mental Vendor delays on Order firm's end) 1. M/s Drip 25.02.2013 Telecom cable Nil Nil After scrutiny of documents Dir/QA/S&T/Kolkata vide his Elastotek. termination Box QA/S&T/ Kolkata has been advised letter No. JD/Telecom, Kolkata Kolkata. (Non-metallic) for document verification & C-C-C on dated 12.10.2017 sent E- for indoor use assessment on date d 17.12.2014. Mail on dated 13.10.2017 to for specification C-C-C assessment reports submitted this office indicating that Firm no. by QA/S&T/Kolkata on dated shall submit all required RDSO/SPN/TC/ 18.05.2015. After scrutiny of reports documents by 31.10.2017 97/2012, Rev.0 deficiencies letter sent to mentioned by Firm. The Firm Director/QA/S&T/Kolkata on dated have again requested RDSO 30.06.2015 for compliance. Also for submission of all reminder letter of deficiencies sent to documents within 20.11.2017. Director/QA/S&T/Kolkata on dated 09.09.2015, 09.09.2016 & 03.10.2017 and to Firm on dated 03.10.2017 2. M/s Balaji 15.03.2013 Telecom cable Nil Nil Firm vide this office letter 1. A letter have been issued to Enterprises, termination Box No.STT/CT-Box/Balaji/730 dated Signal Dte. On dated New Delhi (Non-metallic) 09.09.2016 advised to ascertain the 24.10.2017 for certain for indoor use availability of Terminal Block to clarification of Terminal for specification Signal Dte. Spec. Block. no. No.RDSO/SPN/189/2004,Version-1 2. Possibility to explore RDSO/SPN/TC/ or latest to be used in CT-Box. Terminal Block from TEC 97/2012, Rev.0 approved sources with TEC Spec.which is under study and presently CT Box used in Rlys is also to be studied to take decision in revising the spec.of CT-Box. 3. M/s A-One 13.03.2013 Telecom cable Nil Nil Firm vide this office letter 1. A letter have been issued to Enterprises, termination Box No.STT/CT-Box/A-One/731 dated Signal Dte. On dated Gurgaon. (Non-metallic) 09.09.2016 advised to ascertain the 24.10.2017 for certain for indoor use availability of Terminal Block to clarification of Terminal for specification Signal Dte. Spec. Block. No.of presently Communication exchanged Tentative Date of approved vendors between Vendor & RDSO Timeline Firm’s name & Item & SN Application/ Develop Approved (Dates ofletters/emails) Current status (excluding address Specification No. Registration mental Vendor delays on Order firm's end) no. No.RDSO/SPN/189/2004,Version-1 2. Possibility to explore RDSO/SPN/TC/ or latest to be used in CT-Box. Terminal Block from TEC 97/2012, Rev.0 approved sources with TEC Spec.which is under study and presently CT Box used in Rlys is also to be studied to take decision in revising the spec.of CT-Box. 4. M/s Singla 27.07.13 Permanently 3 Nil Firm has submitted complete Director/ QA/ S&T/ NDLS has Cables Lubricated document on 23.07.2013. After recommended for closure of Jammu HDPE Duct as scrutiny of documents, QA/ S&T/ the case due to Noncompliance per NDLS has been advised for document of STR on 6.11.2017. RDSO/SPN/TC/ verification and C-C-C assessment on Case is being studied for 45/2013, Rev.- 29.01.2014. deficiencies observed closure. 2.0 during C-C-C by QA/ S&T/ NDLS which is advise to firm vide letter dt. 31.07.2014. Reminder issued by Director/QA/S&T/New Delhi to firm on .09.01.2015. Letter regarding early completion of C-C-C was sent to Director/ QA/ S&T/ NDLS on 29.11.2015. Reminder has again been sent to Director/ QA/ S&T/ NDLS on 16.10.2017. Letter has sent to Director/QA/S&T/NDLS, for deficiencies communicated to the firm. 5. M/s Roxtec 16.07.2015 Joint Enclosure Nil Nil Firm submitted documents on Competent authority has India Pvt. Ltd. for Armoured 19.04.2016. After scrutiny of granted permission for Gurgaon, Optical Fiber documents, Director QA/ S&T/ development of prototype No.of presently Communication exchanged Tentative Date of approved vendors between Vendor & RDSO Timeline Firm’s name & Item & SN Application/ Develop Approved (Dates ofletters/emails) Current status (excluding address Specification No. Registration mental Vendor delays on Order firm's end) Haryana Cable RDSO/ Jaipur. has been advised for sample on 10.10.2017. SPN/ document verification and C-C-C Firm has not yet submitted the TC/68/2014 assessment on 23.06.2016. Complete sample for Type Testing. Rev.1.0 report submitted by Director / QA/ S&T/ Jaipur on 08.02.2017.Sortage of document . Firm has submitted on 25.09.2017.after scrutiny , Competent authority has granted permission for development of prototype sample on 10.10.2017. 6. M/s 11.12.2015 Joint Enclosure Nil Nil Firm submitted documents on In reference to the advice from AmpsonEngg. for Armoured 10.02.17. After scrutiny of Director QA/ S&T/ Mumbai Pvt. Ltd., Optical Fiber documents, Director QA/ S&T/ for issuing Show cause . Firm Thane Cable RDSO/ Mumbai has been advised for is advised to clarify regarding SPN/ document verification and C-C-C Test arrangement of Resistance TC/68/2014 assessment on 30.03.2017. Director/ to Aggressive Media test on Rev.1.0 QA/S&T / Mumbai. Deficiencies 27.10.2017. There is no observed during C C A by QA/ S&T/ approved vendor for this item. Mumbai which is advise to firm vide letter dt. 13.06.2017& 24.07.2017. Director/ QA/S&T / Mumbai. has proposed subject item may be closed due to non- compliance of deficiencies, vide letter dt. 15.09.17.A letter has sent to firm on 27.10. 2017. 7. M/s Kriti 17.05.2016 Permanently 3 Nil Firm submitted complete documents Capacity- Cum- Capability Industries (I) Lubricated on 1.02.2017. After scrutiny of approval has been granted to Ltd Dhar HDPE Duct as documents, Director QA/ S&T/ the firm. Firm has been (MP) per RDSO/SPN/ Mumbai has been advised for advised for submission of test TC/45/2013, document verification and C-C-C sample on 10.11.2017. Rev.-2.0 assessment on 20.01.2017. Director/ Amendment 1.0 QA/S&T / Mumbai .has submitted Capability assessment report on No.of presently Communication exchanged Tentative Date of approved vendors between Vendor & RDSO Timeline Firm’s name & Item & SN Application/ Develop Approved (Dates ofletters/emails) Current status (excluding address Specification No. Registration mental Vendor delays on Order firm's end) 21.08.2017. 8. M/s Sweta 25.02.2017 Permanently 3 Nil Firm has advise to submitted the Deficiencies advised to the Industries Lubricated complete document with legal Firm vide letter dt. 30.06.2017 Bhopal HDPE Duct as documents as per ISO guidelines and Firm’s response is awaited. per deficiencies advise vide this office RDSO/SPN/TC/ letter dt. 30.06.2017. 45/2013, Rev.- 2.0 Amendment 1.0 9. M/s Veer 12.04.2017 Permanently 3 Nil Firm has advise deficiencies vide this Deficiencies in QAP and other Vissions Pvt. Lubricated office letter dt. 30.06.2017. Firm has incomplete documents advised Ltd. HDPE Duct as submitted documents on 03.10.2017. to the firm vide letter dt. Parwanoo per 9.11.2017. (H.P.) RDSO/SPN/TC/ 45/2013, Rev.- 2.0 Amendment 1.0&2 10. M/s 18.05.2017 Permanently 3 Nil Firm has advise to submitted the Deficiencies in QAP and other TijariaPolypip Lubricated complete document with legal In complete documents es Ltd. Jaipur HDPE Duct as documents as per ISO guidelines and advised to the Firm vide letter per deficiencies advise vide this office dt.16.10.2017. RDSO/SPN/TC/ letter dt. 30.06.2017. 45/2013, Rev.- 2.0 Amendment 1.0&2 11. M/s 10.08.2017 Permanently 3 Nil Firm has advise to submitted the Deficiencies advised to the VeekayPlast Lubricated complete document with legal Firm vide letter dt.16.10.2017 Jaipur. HDPE Duct as documents as per ISO guidelines and per deficiencies advise vide this office RDSO/SPN/TC/ letter dt. 16.10.2017. 45/2013, Rev.- 2.0 Amendment 1.0&2 No.of presently Communication exchanged Tentative Date of approved vendors between Vendor & RDSO Timeline Firm’s name & Item & SN Application/ Develop Approved (Dates ofletters/emails) Current status (excluding address Specification No. Registration mental Vendor delays on Order firm's end) 12. M/s Sadhu 26.05.2017 Permanently 3 Nil Firm has advise to submitted the Deficiencies advise to the Autocom Pvt. Lubricated complete document with legal Firm vide letter dt.16.10.20017 Ltd. Dhar. HDPE Duct as documents as per ISO guidelines and per deficiencies advise vide this office RDSO/SPN/TC/ letter dt. 16.10.2017. 45/2013, Rev.- 2.0 Amendment 1.0&2 13. M/s Aaram 25.07.2017 Permanently 3 Nil Firm has advise to submitted the Deficiencies advise to the Plastic Private Lubricated complete document with legal Firm vide letter dt.16.10.2017 Ltd. Jaipur. HDPE Duct as documents as per ISO guidelines and per deficiencies advise vide this office RDSO/SPN/TC/ letter dt.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-