Our Business Kyushu Electric Power’S Mission Midterm Management Policy Financial Highlights Non-fi Nancial Information

Our Business Kyushu Electric Power’S Mission Midterm Management Policy Financial Highlights Non-fi Nancial Information

Section 1 Section 2 Section 3 Section 4 Section 5 Kyushu Electric Power Summary Management Message Special Report Management Base Financial Information Corporate Profi le Our Business Kyushu Electric Power’s Mission Midterm Management Policy Financial Highlights Non-fi nancial Information Our Business The Kyushu Electric Power Group comprises Kyushu Electric Power Co., Ltd., 57 subsidiaries and 29* affi liated companies. The Group’s business activities consist of Electric Power, Energy-related business, IT and Telecommunications, and Other. As the center of the Group, Kyushu Electric Power is engaged in general electric power business activities. *As of March 31, 2014 Main Supply Facilities (As of March 31, 2014) Composition of Generated and ɵ Sasuna 5,100 Tsushima Chugoku Electric Power Co., Inc. Toyotama 42,000 ɵ Shin Kokura Purchased Electric Power (kWh) Ashibe 1,800,000 16,500 Oronoshima 330 ɵ ɵ Izuhara 8,600 ɵ Iki ɵ Shin Iki 24,000 New Energy Nuclear Karita 735,000 Genkai NPS Karatsu Buzen 1,000,000 3% 0% 3,478,000 875,000 Buzen Diesel 3,600 Matsuura 700,000 Geothermal Yanagimata Takigami Ainoura 63,800 2% Total Coal 875,000 27,500 Uku 3,000 ɵ Otake ɺ Tenzan Shin Oita Hydro 34% 600,000 12,500ɺ 2,295,000 91,284 Matsubara 50,600 ɺ Kuchinoshima 150 6% Omuta Hatchoubaru 110,000 ɵ ɵ 3,000 Hatchoubaru binary 2,000 ɵ Nakanoshima 200 Petroleum million kWh Shin Arikawa 60,000 ɵ ɵ Suwanosejima 160 Fukue Daini Tairajima 150 18% ɵ Iwayado 21,000 51,100 LNG Kamishiiba Tsukabaru 63,050 Tokara Islands 93,200 Morotsuka 50,000 Reihoku 1,400,000 37% Introductory notes Ohira 500,000 ɵ Kodakarajima 110 Hydroelectric power station (over 50,000 kW) Omarugawa 1,200,000 Kodakarajima 110 Pumped storage power station Hitotsuse 180,000 ɵ Sendai ɵ Composition of Capacity for All Facilities (kW) 1,000,000 Ogiri 30,000 Takarajima 200 Thermal power station ɺ Oyodogawa Daini 71,300 Koshikijima 250 Oyodogawa Daiichi Tatsugo 60,000 Nuclear power station ɵ Kikaijima Koshikijima Daiichi ɵ 55,500 Naze 21,000 ɵ 14,250 ɵ Shin Kikai Geothermal Sendai NPS ɺ Geothermal power station Amamioshima ɵ 12,600 1,780,000 Kikai 2,100 1% ɵ Internal combusion power station ɵ Koniya 4,750 Nuclear Wind power station Hydro Noma-misaki ɵ Shin Tokunoshima 21,000 Total 23% Photovoltaic power station 3,000 Hetono 2,000 ɵ ɺ Yamagawa 30,000 ɵ Kametsu 7,500 18% Main substation, switchyard Tokunoshima 22.89 Kuroshima 240 500 kV power line ɵ Takeshima 190 ɵ ɵ Okinoerabujima ɵ Tanegashima Daiichi Petroleum 220 kV power line Ioujima 300 Shin China 19,100 ɵ million kW Coal 16,500 Amami Islands Kuchierabujima 300 Tanegashima 21% Facilities of other companies ɵ 18% ɵ Shin Tanegashima Yorontou 24,000 Shin Yoron 5,600 ɵ The numerical values of the plants show Yakushima ɵ Yoron 2,210 LNG outputs of kW 19% Business Development Overseas (Fiscal 2013) China: Business related to energy Inner Mongolia wind power India: Technical support related to savings in the textile project (Output of 50,000 kW) construction of the Barauni manufacturing industry China: Chifeng thermal power plant in the state of Bihar Tuxpan II and V projects India: Renewable Energy (Output of 495,000 kW x 2) Hsin Tao Power Project (Output of around 500,000 kW) Mexico: State of VeracruzIlijan project (Output of 600,000 kW) Taiwan: Hsinchu County Rwanda: Support on drawing up electric power plans promoting the development Taiwan: Consulting for Taiwan of geothermal energy Power’s substation construction IPP business (under way) IPP business (under construction) IPP business (planned) Ilijan project (Output of 1.2 million kW) Consulting and environmental business Philippines: Batangas City (including all carried out by the end of the fiscal year) Utility business (under way) Senoko Power Ltd. Sarulla geothermal power project Phu My III project (Output of 3.3 million kW) (Output of around 320,000 kW) (Output of 744,000 kW) Singapore Indonesia: North Sumatra Vietnam: Ba Ria-Vung Tau Province 2/76 Kyushu Electric Power Company Annual Report 2014.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us